organization readiness assessment & ocm platform

24
“ORGANIZATION READINESS ASSESSMENT & OCM PLATFORM” Presented by: Eduardo J. Muñiz

Upload: eduardo-muniz

Post on 12-Jan-2017

272 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ORGANIZATION READINESS ASSESSMENT & OCM PLATFORM

“ORGANIZATION READINESS ASSESSMENT & OCM PLATFORM”

Presented by:

Eduardo J. Muñiz

Page 2: ORGANIZATION READINESS ASSESSMENT & OCM PLATFORM

MURPHY’S LAW

“IF SOMETHING MIGHT GO WRONG, IT WILL”

Page 3: ORGANIZATION READINESS ASSESSMENT & OCM PLATFORM

ORGANIZATION READINESS ASSESSMENT & OCM PLATFORM THE NEED

Business Facts

Companies continuously engage in IT/Business Transformation initiatives to stay competitive.

*Corporations estimate yearly investment of 1 Trillion Dollar implementing:

• Strategic Plan/Organization Restructuring/BOM/HR/OD/Talent Management

• Business Process High Value Improvement (BPI/BPR/BPM/LSS/OE).

• ERP/SCM/CRM/Customer Experience Management (CEM)

However vast majority of HR/IT/Business Transformation Projects are unsuccessfully deployed.

http://www.msnbc.msn.com/id/27190518/ns/business-press_releases/t/ibm-global-study-majority-organizational-

change-projects-fail/

http://www.startribune.com/h-b-fuller-wins-case-against-accenture/347256802/

http://connerpartners.com/how-challenging-is-the-change/the-dirty-little-secret-behind-the-70-failure-rate-of-

change-projects

http://www.zdnet.com/blog/projectfailures/erp-change-management-the-silent-killer/12280

http://www.cbisco.com.au/top-10-reasons-lean-six-sigma-projects-fail/

Based on Juran Institute Research.

- Only 40% of HR/IT/Business Transformation Projects address training needs.

- Only 25% of these Projects give Integrated Technology & HR/Business Goals

Page 4: ORGANIZATION READINESS ASSESSMENT & OCM PLATFORM

ORGANIZATION READINESS ASSESSMENT & OCM PLATFORM THE NEED

WHY ARE Strategic IT/Business Transformation Projects Wrongly Designed &

Deployed?

Lack of Organization Readiness & Lack of Change Governance/Stakeholder

Management & Communications Plan

How to address that?

The Answer: ORGANIZATION READINESS ASSESSMENT & OCM

PLATFORM

Page 5: ORGANIZATION READINESS ASSESSMENT & OCM PLATFORM

STRATEGIC

INPUTS BT STRATEGY DESIGN

BT STRATEGY

IMPLEMENTATION BT STRATEGY DESIGN

IMPLEMENTATION BRIDGES

•Organization Readiness Assessment •Structure •Culture •Business Processes

•Implementation Plan •Engage Stakeholders •Capabilities Development •Organization Alignment •Progress Monitoring •Results Measurements •Readiness Assessment

ORGANIZATION READINESS ASSESSMENT & OCM PLATFORM THE PROCESS

Organization’s

Requirements

Threats

Opportunities

Strengths

Vulnerabilities

•Vision

•Business Priorities/KPIS/SLA

•Parameterization

•Organizational

•Structure

•Processes

•Culture

•Structure Support/Governance

•Stakeholder Management

•Consequence Management

•Communications Strategy

• Optimize, Stabilize

• Benefit Realization

• Evaluation

• Organization/Talent

Readiness

Assessment

• Sustainability

Page 6: ORGANIZATION READINESS ASSESSMENT & OCM PLATFORM

Design/Preparation Implementation Business-as-Usual

BT Institutionalization P

erf

orm

ance

Time

+

-

Valley of Despair

Natural Cycle of Change

You are here Cost of Not

Managing Change

The Major Change is to transform

into integrated-process-focused

organization

Any change that impacts

organization processes is an

organization-wide change

Time

Activitie

s

You are here

1 Year 2 Years

Enable and

Accommodate

Strategic Change

Strengthen

and Align

Organization

Performance

Institutionalize Change

Stabilize Optimize and

Sustain Processes,

Structure, Culture

3 Years

ORGANIZATION READINESS ASSESSMENT & OCM PLATFORM THE PROCESS

Page 7: ORGANIZATION READINESS ASSESSMENT & OCM PLATFORM

Organization/Talent Readiness Assessment System

A High Value Organization/Talent Readiness Assessment Tool aimed

to diagnose Organization/People Preparedness, to identify Capability

Gaps for Organization Alignment and Training and make sure that

Business Solution’s functionality fits Organization Processes, Culture &

Structure.

Accurate

Objective

Customizable

User friendly

Interpretation and diagnosis results

Action Plan (Change Governance/Engage Stakeholders/Sponsors,

Communications Platform)

Page 8: ORGANIZATION READINESS ASSESSMENT & OCM PLATFORM

ORAS

Business Focus

Leadership

Decision Making

Communication

Performance

Appraisal

Involvement

Communication

Rewards

Status Quo

Past Experience

Leadership

Leadership

Teamwork

Diversity of

Perspective

People Involved

Mission/Goals

Planning

Decision Making

Problem Solving

Performance

Management

Communication

Leadership

Management

Practices

Values/Attitudes

ORGANIZATION

PROCESSES CULTURE

CHANGE

RESISTANCE

MANAGEMENT

STRUCTURE SYNERGISM

Organization/Talent Readiness Assessment System

Strategic Areas

Page 9: ORGANIZATION READINESS ASSESSMENT & OCM PLATFORM

ORGANIZATION READINESS ASSESSMENT SYSTEM

THE DATA COLLECTOR.- The instrument is composed of several statements

of Organizational difficulties. Respondents are asked to indicate how frequently

each difficulty occurs on scale from 1 (never) to 9 (all the time).

THE SCALE.- For each of the items, the respondents are asked to choose a

number from 1 to 9 indicating how frequently they perceive the difficulty.

1 2 3 4 5 6 7 8 9

___________________________________________________________

Never Rarely Sometimes Frequently All the time

Page 10: ORGANIZATION READINESS ASSESSMENT & OCM PLATFORM

ORGANIZATION READINESS ASSESSMENT SYSTEM

Interpretation of Results

Low Risk Moderate Risk High Risk

OPPORTUNITY CAUTION DANGER

_________________________________________________________________________

1 2 3 4 5 6 7 8 9

BUSINESS READINESS FACTOR

Category I Low Risk - OPPORTUNITY RANGE (1.0-3.0).- Any area within this range, indicates a

positive prognosis, so a proactive approach is required in order to ensure Implementation

success.

Category II Moderate Risk - CAUTION RANGE (3.01-6.0).- Any area within this range, indicates

a guarded prognosis, so immediate actions are required to achieve successful

implementation.

Category III High Risk - DANGER RANGE (6.01-9.0).- Any area within this range, indicates a

negative prognosis, so, it is mandatory to take corrective actions to Strengthen

Organization Vulnerabilities prior to implementation stage.

Page 11: ORGANIZATION READINESS ASSESSMENT & OCM PLATFORM

ORGANIZATIONAL PROCESSES ASSESSMENT Process Areas

MISSION AND GOALS

PLANNING

DECISION MAKING

PERFORMANCE MANAGEMENT

LEADERSHIP

TEAMWORK

COMMUNICATION

SITUATION APPRAISAL

PROBLEM SOLVING

POTENTIAL PROBLEM ASSESSMENT

MEETINGS

TRAINING

Page 12: ORGANIZATION READINESS ASSESSMENT & OCM PLATFORM

ORGANIZATIONAL PROCESSES ASSESSMENT Sample

In my organization, people assume they know the cause

of a problem - only to find out later they were wrong.

Select an answer ranging from 1 to 9, where 1 is NEVER and 9 is ALWAYS

1 2 3 4 5 6 7 8 9

__________________________________________________________

Never Rarely Sometimes Frequently All the time

Page 13: ORGANIZATION READINESS ASSESSMENT & OCM PLATFORM

ORGANIZATIONAL PROCESSES ASSESSMENT

Sample

Readiness Factor by Process Area

Process Area Readiness Factor

- PLANNING 6.56

- TEAMWORK 6.56

- DECISION MAKING 6.21

- SITUATION APPRAISAL 6.20

- PERFORMANCE MANAGEMENT 6.00

- PROBLEM SOLVING 5.96

- LEADERSHIP 5.83

- POTENTIAL PROBLEMS ASSESSMENT 5.83

- MISSION AND GOALS 5.78

- COMMUNICATION 5.42

- MEETINGS 5.28

- TRAINING 4.14

Page 14: ORGANIZATION READINESS ASSESSMENT & OCM PLATFORM

MANAGEMENT STRUCTURE ASSESSMENT Key Attributes Assessment

Leadership

Directing

Coaching

Supporting

Delegating

Management Practices

Planning

Building Teamwork

Receives Feed-Back

Gives Feed-Back

Decision Making

Promotes Innovation

Attitudes/Values

Self

People

Internal Client

External Client

Results

The Organization

Continuous

Improvement

Page 15: ORGANIZATION READINESS ASSESSMENT & OCM PLATFORM

ORGANIZATIONAL CULTURE ASSESSMENT Assessment Areas

Business Focus

Performance Appraisal

Structure

Leadership

Communication

Teamwork

Decision Making & Problem Solving

Implementation

Consequence Management

Page 16: ORGANIZATION READINESS ASSESSMENT & OCM PLATFORM

CLUSTER FACTOR (SYNERGY) ASSESSMENT Assessment Areas

LEADERSHIP

TEAMWORK

DIVERSITY OF PERSPECTIVE

INTERDEPENDENCE

PEOPLE INVOLVED

Page 17: ORGANIZATION READINESS ASSESSMENT & OCM PLATFORM

CHANGE RESISTANCE ASSESSMENT Assessment Areas

PURPOSE

INVOLVEMENT

COMMUNICATION

REWARD

CONSEQUENCE MANAGEMENT

SUPPORT

JOB CHARACTERISTICS

LEADERSHIP

PERSONAL GOALS

STATUS QUO

PAST PERFORMANCE

Page 18: ORGANIZATION READINESS ASSESSMENT & OCM PLATFORM

O.R.A.S. DESIGNER

Page 19: ORGANIZATION READINESS ASSESSMENT & OCM PLATFORM

Eduardo J. Muñiz

After many years leading the design & deployment of HR/Business Transformation Strategies

directly performing Organization Readiness Assessments for the Manufacturing, Service

and Government industry, he started the idea of developing O.R.A.S.

With more than twenty years of experience in Strategic Planning, Organization Restructuring ,

IT/Business Transformation, Organization Readiness Assessment/Change Management and

Human Capital/Business Process High Value Improvement working with companies within

the USA, Latin America, Asia, ME.

Has performed leadership positions working for leading international Strategic consulting firms

in Asia, USA & LATAM.

His educational background includes BSC Industrial Chemical Engineering and Business

Process Architecture Studies.

Page 20: ORGANIZATION READINESS ASSESSMENT & OCM PLATFORM

ORGANIZATION READINESS ASSESSMENT & OCM PLATFORM

Project Objectives

Organization Readiness Assessment & OCM Platform is designed to objectively,

accurately, and timely diagnose Organization/People Preparedness to identify

Capability Gaps for Organization Alignment and define a sound Change Governance/

Stakeholder Management Structure & Communications Platform to ensure successful

and sustainable Project deployment.

To validate and further develop strategic and operational measurements/KPIS/BSC/

SLA to effectively monitor Project deployment process

To establish a mechanism to identify a High Value Key Capabilities development

requirements to be addressed for successful Project implementation

To provide inputs to establish a sound Consequence Management measures to

consistently implement IT/Business Transformation Strategy

Other pertinent Objectives.

Page 21: ORGANIZATION READINESS ASSESSMENT & OCM PLATFORM

OCM PLATFORM

ADMINISTRATOR

PROJECT MANAGERS

MEASUREMENTS & READINESS

FUNCTIONAL AREAS

TECHNOLOGY INFRASTRUCTURE

LOGISTIC SERVICES

FINANCIAL SUPPORT

OTHER

BUSINESS PROCESSES

CULTURE

STRUCTURE

TECHNOLOGY

ORGANIZATION READINESS ASSESSMENT & OCM PLATFORM Functional Structure

Top Management

OCM CONSULTANTS

ORGANIZATION/TALENT

READINESS

ASSESSMENT CENTER

TALENT DEVELOPMENT

BUSINESS UNITS MANAGERS

Page 22: ORGANIZATION READINESS ASSESSMENT & OCM PLATFORM

ORGANIZATION READINESS ASSESSMENT & OCM PLATFORM

Project Schedule

1 2 3 4 5 6 7 8 9 10 11 12

IT/BT

STRATEGY

DESIGN

PREPARATION &

ANALYSIS

TEST VISION.

ORGANIZATION/TALENT

READINESS

ASSESSMENT

CONFIRM BLUE PRINT

ENGAGENENT

STAKEHOLDER MANAGEMENT

ORGANIZATION

ALIGNMENT PLAN

CAPABILITIES DEVELOPMENT

ORGANIZATION BUSINESS PROCESS DESIGN & ALIGNMENT

PROGRESS MONITORING & CONTROL

ORGANIZATION/PEOPLE READINESS ASSESSMENT

BT INSTITUTIONALIZATION OPTIMIZATION TOTAL COMMITMENT

ORGANIZATION/PEOPLE READINESS ASSESSMENT

Page 23: ORGANIZATION READINESS ASSESSMENT & OCM PLATFORM

SAP ORGANIZATION READINESS ASSESSMENT & OCM PLATFORM Sample

Page 24: ORGANIZATION READINESS ASSESSMENT & OCM PLATFORM

ORGANIZATION READINESS ASSESSMENT & OCM PLATFORM

Results to be expected

A high value top management decision making platform to systematically, accurately

and timely assess organization/people’s preparedness to identify Capability Gaps for

Organization Alignment & Training and make sure that a BT Model’s functionality fits

Organization Culture, Processes & Structure.

Objective Assessment of Organization/People’s Readiness to proactively address any

threats and opportunities that might be encountered during deployment of

IT/Business Transformation Strategy.

A sound mechanism to timely and objectively identify current and future key

capabilities requirements (Processes/Structure/Culture) to be addressed before,

during and after deployment of IT/Business Transformation Projects.

Measuring tool for evaluation of Capabilities Development Strategy.

Objective mechanism to assess progress of IT/Business Transformation Strategy

Implementation

Organization’s profile to be used for benchmarking purposes.