Oregon Youth Authority The latest news on Hillcrest and MacLaren facilities Consolidation Update July 2016 1 Consolidaon Project Planning Info Nichole Kisor, Project Manager, 971-283-6665 OYANet site: hp://oyanet.oya.state.or.us/DirectorsOffice/10YearPlan/Pages/default.aspx Public site: www.oregon.gov/oya/pages/10YearPlan.aspx General News The MacLaren Medical Clinic relocated to the high school and is operaonal. Hillcrest and MacLaren team event: Save the date for Aug. 31 for a fun event for staff and their families from both facilies to meet and get to know each other. Do you have ideas for acvies? Contact Nichole Kisor or Recreaon Coordinator Rod Marn. Hot Topics this Month MacLaren groundbreaking Page 1 - Ceremonial celebraon of construcon projects Staffing Page 2 - Date for posng admin structure with names Campus Event Planning Page 3 - New event scheduling process starts in August Tentave Unit Move Dates Pages 4-5 - Updated calendar for unit moves About 40 guests, including legislators, government officials, business leaders, contractors, and other public supporters, joined about 60 staff and youth for a ground- breaking ceremony on June 30 at MacLaren. The event formally acknowledged the construcon of six new living units and the renovaon of Grover Coage. Guests viewed displays and talked to youth involved in MacLaren’s vocaonal programs, saw images and a video of the new units, and took a walk-through of Grover, which currently is under construcon. We plan to host several open houses next spring for all staff to have the chance to view the new housing units. Event photo gallery: hps://flic.kr/s/aHskzcsp6L Video of new living units: www.youtube.com/watch?v= GoZUowNA2IM Design manual for new units: hp://oyanet.oya.state. or.us/DirectorsOffice/10YearPlan/10YearPlan/MacLaren EastCampusDesignManual-11316Webview.pdf Woodburn Independent event coverage: www.oregon. gov/oya/newsroom/OYAInNews/Woodburn%20 Independent%20-%20groundbreaking.pdf Groundbreaking at MacLaren OYA director Fariborz Pakseresht poses with MacLaren youth. Rex Emery, OYA’s physical plant operaons manager, leads a tour of Grover Coage. Photo by youth Adam R.

Upload: doque

Post on 28-Feb-2018

217 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: Oregon Youth Authority Newsletter - July... · Oregon Youth Authority The latest news on Hillcrest and MacLaren facilities Consolidation Update ... OYA director Fariborz Pakseresht

Oregon Youth Authority

The latest news on Hillcrest and MacLaren facilities

Consolidation Update

July 2016

1

Consolidation Project Planning InfoNichole Kisor, Project Manager, 971-283-6665OYANet site: http://oyanet.oya.state.or.us/DirectorsOffice/10YearPlan/Pages/default.aspxPublic site: www.oregon.gov/oya/pages/10YearPlan.aspx

General News• The MacLaren Medical Clinic relocated to the high

school and is operational.• Hillcrest and MacLaren team event: Save the

date for Aug. 31 for a fun event for staff and their families from both facilities to meet and get to know each other. Do you have ideas for activities? Contact Nichole Kisor or Recreation Coordinator Rod Martin.

Hot Topics this MonthMacLaren groundbreaking Page 1- Ceremonial celebration of construction projects

Staffing Page 2- Date for posting admin structure with names

Campus Event Planning Page 3- New event scheduling process starts in August

Tentative Unit Move Dates Pages 4-5- Updated calendar for unit moves

About 40 guests, including legislators, government officials, business leaders, contractors, and other public supporters, joined about 60 staff and youth for a ground-breaking ceremony on June 30 at MacLaren.

The event formally acknowledged the construction of six new living units and the renovation of Grover Cottage. Guests viewed displays and talked to youth involved in MacLaren’s vocational programs, saw images and a video of the new units, and took a walk-through of Grover, which currently is under construction.

We plan to host several open houses next spring for all staff to have the chance to view the new housing units.

Event photo gallery: https://flic.kr/s/aHskzcsp6L Video of new living units: www.youtube.com/watch?v= GoZUowNA2IMDesign manual for new units: http://oyanet.oya.state.or.us/DirectorsOffice/10YearPlan/10YearPlan/MacLaren EastCampusDesignManual-11316Webview.pdfWoodburn Independent event coverage: www.oregon.gov/oya/newsroom/OYAInNews/Woodburn%20 Independent%20-%20groundbreaking.pdf

Groundbreaking at MacLaren

OYA director Fariborz Pakseresht poses with MacLaren youth.

Rex Emery, OYA’s physical plant operations manager, leads a tour of Grover Cottage. Photo by youth Adam R.

Page 2: Oregon Youth Authority Newsletter - July... · Oregon Youth Authority The latest news on Hillcrest and MacLaren facilities Consolidation Update ... OYA director Fariborz Pakseresht

Oregon Youth Authority

The latest news on Hillcrest and MacLaren facilities

Consolidation Update

2

Consolidation Project Planning InfoNichole Kisor, Project Manager, 971-283-6665OYANet site: http://oyanet.oya.state.or.us/DirectorsOffice/10YearPlan/Pages/default.aspxPublic site: www.oregon.gov/oya/pages/10YearPlan.aspx

Staffing

Key Developments

• The Consolidation Oversight Committee approved in June the staffing plans for the Medical Clinic, Physical Plant Operations, Office Specialist Support/Records, and Office Coordinators. The plans are scheduled for Cabinet review in mid-July. We expect to finalize these areas by the end of the month.

• Additional staffing discussions are still underway. The following areas will be reviewed after we determine what the programs will look like once we are consolidated: QMHPs, YCUCs, SDCs, Work/Vocational positions, and education positions.

• We are continuing to meet with the affected service areas to share more specific info about the schedules and timelines as information becomes available.

Building Naming

• We have revised the timeline to include additional time for seeking out names and reviewing potential options. The group expects to have this work completed by the end of August as opposed to June, as originally planned.

• After the group has selected final names for the buildings, we will work on a plan to honor the history of existing building names.

Staffing Milestones

Finalize staffing for the Medical Clinic, Physical Plant Operations, Office Specialist Support/Records, and Office Coordinators.

Post finalized administrative struc-ture with names on OYA Net.

Continue to seek input from staff and develop a plan for the best way to move from the current to the future state.

Work unit re-bids occur as needed.

Both facilities become one for bidding purposes.

Begin close monitoring of staffing levels.

Begin moving to new structure wherever possible.

Begin one-on-one discussions with Hillcrest staff about moving. Develop contingency plans to backfill staff who indicate they are not making the move.

Mid-July

Aug. 1

Summer 2016

September 2016

Oct. 1, 2016

Fall 2016

Page 3: Oregon Youth Authority Newsletter - July... · Oregon Youth Authority The latest news on Hillcrest and MacLaren facilities Consolidation Update ... OYA director Fariborz Pakseresht

Oregon Youth Authority

The latest news on Hillcrest and MacLaren facilities

Consolidation Update

3

Consolidation Project Planning InfoNichole Kisor, Project Manager, 971-283-6665OYANet site: http://oyanet.oya.state.or.us/DirectorsOffice/10YearPlan/Pages/default.aspxPublic site: www.oregon.gov/oya/pages/10YearPlan.aspx

Last Graduation at HillcrestHillcrest celebrated its final graduation ceremony on June 29 in a combined event with MacLaren.

Nineteen graduates received their high school diplomas, GEDs, and barbering certificates: 13 from Robert S. Farrell High School at Hillcrest, 5 from William P. Lord High School at MacLaren, and 1 from South Jetty High School at North Coast.

The Statesman Journal covered the event: www.oregon.gov/oya/TYP/Statesman%20 Journal%20-%20Hillcrest%20graduation.pdf

Campus Event Planning

This group has met several times and is making great progress toward creating an event planning process that will be easier for all. They are creating:• A process map for event planning on the

consolidated campus, from event initiation to post-event review;

• An event scheduling form;• Event planning protocols, including a timeline and

conflict resolution expectations; and• A central list of storage locations for all event-

related equipment on campus.

Beginning Aug. 1, 2016: If you are planning any type of event on either the Hillcrest or MacLaren campus,

no matter how large or small, you will need to begin using the new scheduling process developed by this group. The process starts with filling out the new Event Scheduling Form, which is being developed and will be available soon on OYANet.

The new event scheduling process will help make things smoother for event planners as well as for the rest of the staff on campus who will support the event. The process will: • Ensure that locations are booked properly for

events and prevent scheduling conflicts.• Ensure that events are better coordinated and

communicated.• Connect event planners with the appropriate

contacts on campus.• Provide an event planning committee that can help

staff plan their events better.• Organize all event equipment on campus so that

planners know what is available.

If you already are planning an August event at Hillcrest or MacLaren, please contact Carolyn Gage, [email protected], and she will connect you with someone on the event planning committee to start the process.

Page 4: Oregon Youth Authority Newsletter - July... · Oregon Youth Authority The latest news on Hillcrest and MacLaren facilities Consolidation Update ... OYA director Fariborz Pakseresht

Oregon Youth Authority

The latest news on Hillcrest and MacLaren facilities

Consolidation Update

4

Consolidation Project Planning InfoNichole Kisor, Project Manager, 971-283-6665OYANet site: http://oyanet.oya.state.or.us/DirectorsOffice/10YearPlan/Pages/default.aspxPublic site: www.oregon.gov/oya/pages/10YearPlan.aspx

Several groups are already meeting:• The Level System group has held one session and

will continue to meet for the next two months to develop a plan. More information will be available after the second session.

• A small group of staff met at the end of June to develop a high-level schedule of campus activities. The group plotted out gym/fitness room times for all units on campus once consolidated, which include one hour of time during the week, and two hours of time on the weekends. The group also looked at other key buildings on campus, such as The Station and Thayer, and plot-ted out activities that would be running there if we moved immediately. At first glance, these spaces will be able to accommodate all of the activities we expect to occur on campus when full. This group also identified point people for each building to work towards having one person responsible for managing changes and activities in each location.

Several groups will begin meeting in July and August, including:• Work and Vocational Planning• Education Planning• Treatment Mall Planning

Youth Services and Programming

Tentative Unit Move Dates

See page 5 of this newsletter for a visual representa-tion of where all of the cottages will move on the MacLaren campus. All of the dates and building names are tentative and subject to change.

McBride (H) moved to Hall (E)

Smith (C) moves to McKay (D)

Dunbar (F) moves to Smith (C)

Kincaid (G) moves to Grover (J)

Gamma moves to Kincaid (G)

Sigma moves to Dunbar (F)

Epsilon moves to new unit (T)

Alpha moves to new unit (N)

Delta moves to new unit (O)

Omega moves to McBride (H)

Zeta moves to new unit (P)

SITP moves to new unit (R)

The U moves to new unit (S)

May 11, 2016

Aug. 3, 2016

October 2016

December 2016

May 2017, Week 4

June 2017, Week 2

June 2017, Week 3

July 2017, Week 2

Page 5: Oregon Youth Authority Newsletter - July... · Oregon Youth Authority The latest news on Hillcrest and MacLaren facilities Consolidation Update ... OYA director Fariborz Pakseresht

Cons

olid

ation

Pro

ject

Pla

nnin

g In

foN

icho

le K

isor,

Proj

ect M

anag

er, 9

71-2

83-6

665

OYA

Net

site

: htt

p://

oyan

et.o

ya.s

tate

.or.u

s/Di

rect

orsO

ffice

/10Y

earP

lan/

Page

s/de

faul

t.asp

xPu

blic

site

: ww

w.o

rego

n.go

v/oy

a/pa

ges/

10Ye

arPl

an.a

spx

5

W

Adm

inA

Scho

ol

Voca

tiona

l Tr

aini

ng

Proj

ect

Pooc

h

Med

Clin

ic

Intake Area

Gre

enho

use

Thay

er

Mac

Lare

n Ca

mpu

s Con

solid

atio

nM

ove

Dat

es &

Loc

atio

ns a

s of J

uly

7, 2

016

– Da

tes

and

Build

ing

Nam

es a

re S

ubje

ct to

Cha

nge

Volleyball Court

Volleyball Court

Socc

er

Fiel

d

Food

Ser

vice

s&

St

aff W

elln

ess

Area

Curre

nt:

Hall

Unit

mov

ing

in:

McB

ride

Date

for

mov

e:M

ay-1

6

Futu

re

Nam

e:E

Complete

CS AreaIU

Holm

es

Curre

nt:

McK

ay

Unit

mov

ing

in:

Smith

Date

for

mov

e:Au

g-16

Futu

re

Nam

e:D

#1

Curre

nt:

Grov

er

Unit

mov

ing

in:

Kinc

aid

Date

for

mov

e:De

c-16

Futu

re

Nam

e:J

#3

Curre

nt:

Kinc

aid

Unit

mov

ing

in:

Gam

ma

Date

for

mov

e:M

ay 2

017

Wk

4Fu

ture

Na

me:

G

#4Cu

rrent

:Du

nbar

Unit

mov

ing

in:

Sigm

a

Date

for

mov

e:M

ay 2

017

Wk

4Fu

ture

Na

me:

F

#5Cu

rrent

:

Unit

mov

ing

in:

Epsi

lon

Date

for

mov

e:Ju

ne 2

017

Wk

2Fu

ture

Na

me:

P

#6

Curre

nt:

Unit

mov

ing

in:

Alph

a

Date

for

mov

e:Ju

ne 2

017

Wk

2Fu

ture

Na

me:

K

#7

Curre

nt:

Unit

mov

ing

in:

Delta

Date

for

mov

e:Ju

ne 2

017

Wk

2Fu

ture

Na

me:

L

#8

Curre

nt:

McB

ride

Unit

mov

ing

in:

Om

ega

Date

for

mov

e:Ju

ne 2

017

Wk

3Fu

ture

Na

me:

H

#9

Curre

nt:

Unit

mov

ing

in:

Zeta

Date

for

mov

e:Ju

ne 2

017

Wk

3Fu

ture

Na

me:

M

#10

Curre

nt:

Unit

mov

ing

in:

SITP

Date

for

mov

e:Ju

ly 2

017

Wk

2Fu

ture

Na

me:

N

#11

Curre

nt:

Unit

mov

ing

in:

U of

L

Date

for

mov

e:Ju

ly 2

017

Wk

2Fu

ture

Na

me:

O

#12

Swea

t Lod

ge A

rea

Com

plet

e20

16 M

ay 2

017

Wee

k 4

June

201

7W

eek

2Ju

ne 2

017

Wee

k 3

July

201

7W

eek

2

Colo

r Key

War

ehou

se

Curre

nt:

Smith

Unit

mov

ing

in:

Dunb

ar

Date

for

mov

e:O

ct-1

6

Futu

re

Nam

e:C

#2