GENERAL NOTES
GENERAL NOTES:
of 25psf for future wearing surface and all of the following Live Loads:
Design Specifications" (including 2015 thru 2016 interim revisions) with an allowance
Bridge is designed in accordance with the "7th edition of the AASHTO LRFD Bridge
Service and Strength I Limit States:
Strength II Limit State:
ODOT Type STP-5BW Permit truck
ODOT Type STP-4E Permit truck
Longitude 120.8262W:
collect the Seismic Hazard Values for the bridge site with Latitude 45.6678N and
Hazard Maps (Site-Specific Ground Motion Response Analysis) have been used to
modified by the "ODOT Bridge Design & Drafting Manual". The 2014 USGS Seismic
edition of the AASHTO Guide Specifications for LRFD Seismic Bridge Design" as
Seismic design is performed by the multi-mode analysis in accordance with the "2th
Values
Mapped HazardDesign Hazard Values
PGA Ss S1 As SDS SD1Category
Design
Seismic
Class
SiteEarthquakeCriteria
Performance
Seismic
Life SafetyReturn
1000-Year
0.125 0.270 0.098 C 0.159 0.351 0.147 A
Operational
Zone
Subduction
Cascadia
C A
Bar Size #3 #4 #5 #6 #7 #8 #9 #10 #11 #14 & #18
Uncoated 3'-6" 4'-1" 4'-8" 5'-3" 5'-10" 6'-6" Not permitted
Coated (1) 4'-2" 4'-10" 5'-6" 6'-3" 7'-0" 7'-10" Not permitted
Coated (2) 5'-2" 6'-1" 6'-11" 7'-10" 8'-9" 9'-9" Not permitted
Bar Size #3 #4 #5 #6 #7 #8 #9 #10 #11 #14 & #18
Uncoated 1'-7" 3'-2" 3'-8" 4'-2" 4'-9" 5'-11" Not permitted
Coated (1) 1'-11" 3'-2" 3'-9" 4'-5" 5'-0" 6'-5" Not permitted
Coated (2) 2'-5" 3'-2" 4'-9" 5'-6" 6'-3" Not permitted
between bars at least 6*db.
Use Coated (1) for epoxy coated bars with cover at least 3*db and clear spacing
between bars less than 6*db.
Use Coated (2) for epoxy coated bars with cover less than 3*db or clear spacing
be shop or field bent.
field bent. The top bends of stirrups extending from prestressed precast units may
top bends of stirrups extending from beam stems into the top slab may be shop or
Place bars 2" clear of the nearest face of concrete unless shown otherwise. The
Produce welds according to the latest edition of AWS D 1.5.
GENERAL NOTES CONT'D:
Phone Number541-388-6192(Agency Dispatch Center)
Route (RTE)
Highway No. (HWY)
Milepoint (MP)
Bridge No. (BR)
Structure Name
BRIDGE ID MARKER TABLE
US97
22538
See Std. Dwg. BR195 for details.
0.39
Spanish Hollow, Hwy 42
Provide prestressing steel according to detail plans.
at end bents, and all bars extending into the deck.
top and bottom longitudinal bars, top and bottom transverse bars, additional deck steel
Use epoxy coated reinforcing steel in the deck and bridge end panel. This includes
supports at 24" maximum centers.
of the CRSI Manual of Standard Practice (SBU, BBU, or CHCU). Place wire bar
the bottom mat of reinforcing steel with wire bar supports as shown in Chapter 3
at 24" maximum centers each way. Support the top mat of reinforcing steel from
Support the bottom mat reinforcing steel from the forms with precast mortar blocks
that more than 12" of fresh concrete is cast below the bar.
Increase all splice lengths 30% for horizontal or nearly horizontal bars so placed
Provide Class 3300 - 1•", 1" or ƒ" concrete for all other concrete.
determined in the field.
Do not fabricate reinforcing steel for columns until final footing elevations have been
far as possible, unless shown otherwise.
Splice reinforcing steel at alternate bars, staggered at least one splice length or as
EXCAVATION/BACKFILL END BENTS
{ Bent
Wall Backfill
= Limits of Granular
EXCAVATION/BACKFILL WINGWALLS
1'-0"1'-0"
1'-0"1'-0"
Wingwall, thickness varies.
42
99804
Structure Excavation (None)
= Limits of
Wall Backfill
= Limits of Granular
Finished Ground
Existing Ground
Finished Ground
Existing Ground
Provide Class 4000 - …" concrete for all drilled shafts.
diameter. bar =b
d
WELDING NOTES:
Bar Size #3 #4 #5 #6 #7 #8 #9 #10 #11 #14 & #18
Uncoated Not permitted
Coated (1) Not permitted
Coated (2) Not permitted
Reinforcing Splice Lengths (Class B) Grade 60 f'c = 3.3 ksi
1'-0"
1'-2"
1'-6" 2'-0" 2'-6" 3'-0" 4'-1" 5'-4" 6'-9" 8'-7" 10'-6"
8'-5"1'-7" 2'-0" 2'-5" 3'-3" 4'-3" 5'-5" 6'-10"
1'-4" 1'-8" 2'-0" 2'-9" 3'-7" 4'-6" 5'-9" 7'-0"
--- 0.051 0.092 0.071
Specifications for Construction 2018.
Provide all materials and perform all work according to the Oregon Standard
design lane load.
HL-93: Design truck (or trucks per LRFD 3.6.1.3) or the design tandems and the
1'-9" 2'-4" 2'-11"
2'-1"
2'-7"
2'-10"
3'-6"
3'-6"
4'-4"
Reinforcing Splice Lengths (Class B) Grade 80 f'c = 3.3 ksi lrc = 0.4
2'-1"
2'-6"
2'-8"
3'-11"
5'-8"
7'-1"
5'-4"
8'-0"
7'-1"
8'-10"
Reinforcing Splice Lengths (Class B) Grade 80 f'c = 4.0 ksi lrc = 0.40
Provide concrete in precast prestressed beams according to detail plans.
Provide Class 4000 - ƒ" concrete in columns.
RENEWAL DATE: JUNE 30, 2018
ENGINEER
REGIS
TERED PROFESSIO
NAL
OREGON
PA
UL JOSEPH STRAUS
ER
MAY 23, 20
13
82398PE
BR_22538_gen_01.dgn :: Default 12/13/2017 7:37:20 AM hwye78x
Provide all reinforcement in columns and drilled shafts according to ASTM Specification A706.
Specification M31 (ASTM A615), AASHTO M225 (ASTM A496), or AASHTO M32 (ASTM A82).
Provide other Grade 80 reinforcing steel according to ASTM Specification A706, AASHTO
Provide Class HPC4000 - 1" concrete with fibers in deck and interior bent caps.
Provide Class HPC4000 - 1" concrete in end panels.
Internally cure deck concrete as specified.
AASHTO M225 (ASTM A496), or AASHTO M32 (ASTM A82).
pad U-bars according to ASTM Specification A706, AASHTO Specification M31 (ASTM A615),
Provide Grade 60 reinforcement for bridge rail, end panel, end panel footing, columns and concrete
MLG12-13-2017 Added "Columns"
1
1
Michael L. Graves SHEET
OF
DRAWING NO.
DATE REVISION BY
CALC. BOOK
STRUCTURE NO.
DRAFTER:
CHECKER:
REVIEWER:
ACCOMPANIED BY DWGS.
DESIGNER: DATEOREGON DEPARTMENT OF TRANSPORTATION
22538
6825
Paul J. Strauser
Zachary T. Beget
(541) 388-6225 Fax: (541) 385-0476
BEND, OR 97703-5765
63055 N Highway 97, Building M
REGION 4 BRIDGE ENGINEERING
US97: SPANISH HOLLOW CREEK & TROUT CREEK BRIDGES PROJECT
18
See Dwg. 99803 for this
structure.
SHERMAN COUNTY
SHERMAN HIGHWAY
SPANISH HOLLOW CR_HWY 42_MP0.39
Mark E. Lusby
AVAILABLE UPON REQUEST
DOCUMENT
FINAL ELECTRONIC
OCT - 2017
Michael L. Graves SHEET
OF
DRAWING NO.
DATE REVISION BY
CALC. BOOK
STRUCTURE NO.
DRAFTER:
CHECKER:
REVIEWER:
ACCOMPANIED BY DWGS.
DESIGNER: DATEOREGON DEPARTMENT OF TRANSPORTATION
22538
6825
Paul J. Strauser
Zachary T. Beget
(541) 388-6225 Fax: (541) 385-0476
BEND, OR 97703-5765
63055 N Highway 97, Building M
REGION 4 BRIDGE ENGINEERING
US97: SPANISH HOLLOW CREEK & TROUT CREEK BRIDGES PROJECT
18
See Dwg. 99803 for this
structure.
SHERMAN COUNTY
SHERMAN HIGHWAY
SPANISH HOLLOW CR_HWY 42_MP0.39
Mark E. Lusby
AVAILABLE UPON REQUEST
DOCUMENT
FINAL ELECTRONIC
OCT - 2017
BR_22538_bt_02.dgn :: Default 12/13/2017 7:39:06 AM hwye78x
{ Girder
{ Girder
{
Bearin
g
2'-
0"
Pad
Concrete
Beam "E"
Pile Cap
13
1'-
0"
1•
"
Deep Shear Key
pile cap
embed 3'-0" min. into
8 ~ #8 x 6'-0" long,
END BENT PARTIAL PLAN
99815
6"
END PANEL EXPANSION JOINT DETAIL
1'-
8"
6"
1'-8"
1'-8"
#4 @ 12"
#4 @ 12"
= Preformed Joint Filler
10"
2'-2"
Const. Jt.Roadway
12"
Bearing Pad (Total Required = 36)
•" x 7" x 1'-10" Elastomeric 2'-5"
PadConcrete
Bent 4
Girder
Bent 1
269.67'
262.21' 262.50'
269.96' 270.22'
262.76' 262.69'
270.16' 270.09'
262.62' 262.57'
270.04'
FEDCBA
TOP OF CONCRETE PAD ELEVATIONS (FT)
BENT 1 DETAILS (BENT 4 SIMILAR)
and end panel ledge.
sheets over entire footing
beneath end panel. Extend
Geomembrane (30 mils)
Two sheets smooth HDPE
NOTE A
(See NOTE A)
CONCRETE PAD DETAIL END BENTS
Not to Scale
(See NOTE A)
CONCRETE PAD DETAIL INTERIOR BENTS
{ Bent
{ Bearing =
Elastomeric Bearing Pad
•" x 7" x 22"
min.
10"
4"
Elastomeric Bearing Flap
‚" thick x 1'-9" cont.
•" Dia. Resin Bonded Anchors
(Typ. Bent 1 and Bent 4)
hot dip galv. plate and all hardware.
for •" dia. bolts. Lap 6" at splices,
with Œ" dia. holes at 3'-0" oc.
‚" x 2" x cont. & (A709 Grade 36)
12"
(Typ)
2" cl.
•"
Grout
(Typ)
1•
" Blockout
(Typ)
•" Preformed Joint Filler (Typ)
#3 U-bar @ 4" each way
NOTE:
Pad Detail End Bents" this sheet.
For information and details, see "Concrete
after placing beam.
Any excess concrete protruding above bottom of bearing pads shall be removed immediately
full width of beam. If uniform bearing is not achieved, lift beam and repeat procedure.
and prestressed beams before •" concrete is fully set to insure uniform bearing across
Place •" grout layer a min. of 3 days after pad is poured. Place elastomeric bearing pads
Concrete Pad 2"
min. (T
yp)
Est. 2" at
{ exterior gir
ders
Est. 2•
" at
{ interior gir
ders
Ahead on stationBack on station
{ Bent
Est. 2" at
{ exterior gir
ders
Est. 2•
" at
{ interior gir
ders
Est. 3•
" at
{ interior gir
ders
Est. 3" at
{ exterior gir
ders6"
6"
1'-
8"
8 ~ #4
(Typ)see Std. Dwg. BR145
Single Strip Seal Exp. Jt.,
fill with traffic loop sealant
1•" deep x •" wide sawcut,
3" cl.
(Typ)
3" cl.
(Typ)
Footing grades to match roadway cross slope
see Std. Dwg. BR165.
Dwg. 99810. For details,
surface. For dimensions, see
panel without asphalt wearing
Modified 30'-4" bridge end
NOTE:
with Expansion Joint Blockout" for additional reinforcement.
Reinforcement omitted for clarity. See Std. Dwg. BR165 "Detail
Typical blockout for expansion joint assembly (each side of joint).
RENEWAL DATE: JUNE 30, 2018
ENGINEER
REGIS
TERED PROFESSIO
NAL
OREGON
PA
UL JOSEPH STRAUS
ER
MAY 23, 20
13
82398PE
Increase „" 10°F below 47°F
Decrease „" 10°F above 47°F
Joint Setting = 1•"
(epoxy coated)
MLG12-13-2017 Added "(epoxy coated)"1
1
Michael L. Graves SHEET
OF
DRAWING NO.
DATE REVISION BY
CALC. BOOK
STRUCTURE NO.
DRAFTER:
CHECKER:
REVIEWER:
ACCOMPANIED BY DWGS.
DESIGNER: DATEOREGON DEPARTMENT OF TRANSPORTATION
drawing is not to scalemeasure one inch then
If scale bar doesn't
SCALE WARNING
(541) 388-6225 Fax: (541) 385-0476
BEND, OR 97703-5765
63055 N Highway 97, Building M
REGION 4 BRIDGE ENGINEERING
08893
Paul J. Strauser
SHERMAN COUNTY
SHERMAN HIGHWAY
SPANISH HOLLOW CR_HWY 42_MP2.37
Scott Hayes
Zachary T. Beget
US97: SPANISH HOLLOW CREEK & TROUT CREEK BRIDGES PROJECT
AVAILABLE UPON REQUEST
DOCUMENT
FINAL ELECTRONIC
See Dwg. 99821 for this
structure.
OCT - 2017
6959
2
GENERAL NOTES
7
Place bars 2" clear of the nearest face of concrete (unless shown otherwise).
Mapped Hazard Values Design Hazard Values
PGA Ss S1 As SDS SD1 Category
Design
Seismic
Class
SiteEarthquake
Criteria
Performance
Seismic
Life Safety Return1000-Year
0.1244 0.2697 0.0980 C 0.1587 0.3506 0.1470 A
OperationalZone
SubductionCascadia
- C 0.0500 0.0890 0.0695 A
Provide Class 3300 - 1•, 1 or ƒ concrete for all concrete.
- -
GENERAL NOTES:
Construction 2018.
Provide all materials and perform all work according to the Oregon Standard Specifications for
lengths (unless shown otherwise):
Grade 60. Provide Field bent stirrups according to ASTM Specification A706. Use the following splice
Provide all reinforcing steel according to ASTM Specification A706, or AASHTO M31 (ASTM A615)
unless shown otherwise.
Splice reinforcing steel at alternate bars, staggered at least one splice length or as far as possible,
or CHCU). Place wire bar supports at 24" maximum centers.
with wire bar supports as shown in Chapter 3 of the CRSI Manual of Standard Practice (SBU, BBU,
centers each way. Support the top mat of reinforcing steel from the bottom mat of reinforcing steel
Support the bottom mat reinforcing steel from the forms with precast mortar blocks at 24" maximum
the actual geometry, location and limits of all shoring and cut slopes required.
all temporary shoring and excavation as required for construction. The contractor shall determine
Pay limits for temporary shoring, structure excavation and backfill are for information only. Provide
ksi 3.3 = f'c 60 GRADE B) (CLASS LENGTHS SPLICEREINFORCING
SizeBar #3 #4 #5 #6 #7 #8 #9 #10 #11 #18 
Uncoated 1'-0" 1'-4" 1'-8" 2'-0" 2'-9" 3'-7" 4'-6" 5'-9" 7'-0" PermittedNot
bar. the below cast is concrete fresh of12"
than more that placed so bars horizontal nearly or horizontal for 40% lengths splice allIncrease
diameter. bar =b
d
GLOBAL SEISMIC DESIGN STRATEGY:
elastic substructure.
The earthquake resisting system (ERS) includes an essentially elastic superstructure and essentially
Capacity Protected Superstructure
Bents 1 and 4
Essentially Elastic Seat Abutments
Bents 2 and 3
Capacity Protected Cap Beam
RENEWAL DATE: JUNE 30, 2018
ENGINEER
REGIS
TERED PROFESSIO
NAL
OREGON
PA
UL JOSEPH STRAUS
ER
MAY 23, 20
13
82398PE
BR_08893_gen_01.dgn :: Default 12/11/2017 1:49:30 PM hwye78x
Hazard Values for the bridge site with Latitude 45.6474N and Longitude 120.8049W:
& Drafting Manual". The 2014 USGS Seismic Hazard Maps have been used to collect the Seismic
Guide Specifications for LRFD Seismic Bridge Design" as modified by the "ODOT Bridge Design
Seismic retrofit design is performed by the multi-mode analysis in accordance with the "AASHTO The ERS includes the following earthquake resisting elements (EREs):
Essentially Elastic Columns (Not Detailed for Ductility)
Capacity Protected Footings
and saturate the surface as specified.
joints according to 00540.43 (a). Remove damaged and unconsolidated concrete and clean, roughen
For concrete placed against the existing structure, treat existing concrete surfaces as construction
Furnish high strength resin from the QPL for bonded anchors.
1'-0" (Typ)
Existing Ground (Varies)
Existing abutment footing (Typ)
Temporary shoring as required (Typ)
= Structure Excavation
= Granular Structure Backfill
Select stone backfill as required
4'-0" min. bench (Typ)
PAY LIMITS FOR STRUCTURE EXCAVATION AND BACKFILL
PAY LIMIT NOTES:
Existing column footing (Typ)
the pay limits for structure evcavation.
All excavation at this site is included in
Superstructure not shown.
99822
a 4" min. thickness
stabilization as shown and specified with
grade slope and construct shotcrete slope
Prior to installation of temporary shoring,
1
1.5 (Typ)
1 12-11-2017 Added Slope Information
1
MLG
Michael L. Graves SHEET
OF
DRAWING NO.
DATE REVISION BY
CALC. BOOK
STRUCTURE NO.
DRAFTER:
CHECKER:
REVIEWER:
ACCOMPANIED BY DWGS.
DESIGNER: DATEOREGON DEPARTMENT OF TRANSPORTATION
drawing is not to scalemeasure one inch then
If scale bar doesn't
SCALE WARNING
(541) 388-6225 Fax: (541) 385-0476
BEND, OR 97703-5765
63055 N Highway 97, Building M
REGION 4 BRIDGE ENGINEERING
08893
Paul J. Strauser
SHERMAN COUNTY
SHERMAN HIGHWAY
SPANISH HOLLOW CR_HWY 42_MP2.37
Scott Hayes
Zachary T. Beget
US97: SPANISH HOLLOW CREEK & TROUT CREEK BRIDGES PROJECT
AVAILABLE UPON REQUEST
DOCUMENT
FINAL ELECTRONIC
See Dwg. 99821 for this
structure.
OCT - 2017
6959
5
PLAN
SECTION C-C
C
{ Structure
C
9'-0"
{ Bent
{
Bent
51°
2" clr.
4'-0"
5'-
1"
ƒ" Chamfer (Typ)
2" clr. (Typ)
#4 Stirrup @ 12"
#4 Stirrup spacing
4 ~ #4 each face
3" cl.
(Typ)
3" cl.
(Typ)
3" cl.
(Typ)
B
4 ~ #4 cont., each face
N
A
SECTION A-A
{ Bent
Existing girder
9'-0"
9'-0" 3
'-6…
"
BENT DETAILS
7
into existing girder
8" min. embedment
NOTE:
1. Bent 3 shown, Bent 2 similar.
3'-8†"
12"
(Typ)
6"
grout from the ODOT QPL.
Fill holes with non-shrink
existing girders as required.
1" Dia. hole drilled through
18'-0ƒ"
(Typ)
*
*
of concrete as a seperate packed placement.
Contractor may elect to place the top 6"-12"
RENEWAL DATE: JUNE 30, 2018
ENGINEER
REGIS
TERED PROFESSIO
NAL
OREGON
PA
UL JOSEPH STRAUS
ER
MAY 23, 20
13
82398PE
BR_08893_bt_01.dgn :: Default 12/11/2017 1:50:30 PM hwye78x
5'-0"
5'-0"
43'-0"
Cap Beam Retrofit
2 ~ #11 each face
#4 @ 12" each end
4'-
9"
1'-6" 1'-3"1'-3"
A
B
SECTION B-B
into existing column
8" min. embedment
{ Bent
of deck (Typ)
Existing edge
SECTION D-D
{ Bent
Existing girder
into existing gir
der
8"
min. e
mbed
ment
D
D
(Typ)
See "Section C-C"
into existing column
8" min. embedment
(Typ)
(Typ)
(Typ)
(Typ)
5'-1" on skew
(Typ)
(Typ)
(Typ) (Typ) (Typ)
(Typ)
(Typ)
39 @ about 12"
4'-9"
1'-
8"
#4 Stirrup @ Int. girders {
Var.
4'-
9"
4'-9"
epoxy 8" min. into columns
3 ~ #4 cont., drill and
(Typ)
1'-
8"
#4 Stirrup @ Ext. girder
Var.
Int. column).
3 pairs per
Ext. column,
(1 pair per
@ Column
#4 Stirrup
(2 per bent)
Existing 3' dia. column
(2 pairs per bent)
Existing 3' dia. column
horizontal, 4" min. depth
embed anchors @ 15° from
@ 24" staggered each way,
#4 Resin Bonded Anchors
(30 each bent)
horizontal, 4" min. depth
embed anchors @ 15° from
@ 24" staggered each way,
#4 Resin Bonded Anchors
1'-1" 4"
each end
terminate with a std. 90° hook
2 ~ #11 x 39'-9" each face,
99825
ELEVATION
1 12-11-2017 Modified Reinforcement Locations MLG
1
1
Michael L. Graves SHEET
OF
DRAWING NO.
DATE REVISION BY
CALC. BOOK
STRUCTURE NO.
DRAFTER:
CHECKER:
REVIEWER:
ACCOMPANIED BY DWGS.
DESIGNER: DATEOREGON DEPARTMENT OF TRANSPORTATION
drawing is not to scalemeasure one inch then
If scale bar doesn't
SCALE WARNING
(541) 388-6225 Fax: (541) 385-0476
BEND, OR 97703-5765
63055 N Highway 97, Building M
REGION 4 BRIDGE ENGINEERING
08893
Paul J. Strauser
SHERMAN COUNTY
SHERMAN HIGHWAY
SPANISH HOLLOW CR_HWY 42_MP2.37
Scott Hayes
Zachary T. Beget
US97: SPANISH HOLLOW CREEK & TROUT CREEK BRIDGES PROJECT
AVAILABLE UPON REQUEST
DOCUMENT
FINAL ELECTRONIC
See Dwg. 99821 for this
structure.
OCT - 2017
6959
7
15'-0"
Existing 3'-0" Dia. Column
2'-
0"
7
3" cl.
{ Footing
{
Footing
{ Structure
Note: Elevations shown are based on as-built data and adjusted for a +3.22' difference from NVD1929 and NAVD1988.
Existing Footing
(Typ)
per column)
embedment into column (16 total
drill and resin bond 10" min.
#5 @ 12" top and bottom mat,
#5 @ 12"
FOOTING DETAILS
15'-
0"
50'-0"
#5 @ 12" top and bottom mat
TYPICAL SECTION
PLAN
ELEVATION
Buildup concrete over existing footing as required
RENEWAL DATE: JUNE 30, 2018
ENGINEER
REGIS
TERED PROFESSIO
NAL
OREGON
PA
UL JOSEPH STRAUS
ER
MAY 23, 20
13
82398PE
BR_08893_ftg_02.dgn :: Default 12/11/2017 1:51:36 PM hwye78x
exterior column
(50 per interior column, 36 per
existing footing 10" min. embedment.
#5 @ 12", drill and resin bond into
12"
1'-
9"
3'-6"
4'-6"
2'-
3"
2'-6"
NOTE:
Exterior column footings are 7' square (Typ)
Interior column footings are 8' square (Typ)
around top and bottom mat (Typ)#5 @ 24" J-bars as shown
exterior column
(50 per interior column, 36 per
existing footing 10" min. embedment.
#5 @ 12", drill and resin bond into
5'-
4"
max.
4'-
10"
min.
5'-
4"
max.
4'-
10"
min.
#5 @ 12" top and bottom mat
3'-
1"
#5 J-bar @ 24"
3'-
9"
as shown
#5 @ 24" J-bars (Typ)
NOTE:
Chamfer stream side of footing as shown (Typ)
3
2
99827
4'-
3"
4'-
3"
min.
Level Bent 2 El. 508.00'
Bent 3 El. 508.08'
4'-
3"
min.
4'-
9"
max.
1 12-11-2017 Revised Elevations/Added Dimensions MLG
2 12-11-2017 MLGRevised Text
2
1
1
See sheet 1 for this structure.
SHEET
OF
DRAWING NO.
DATE REVISION BY
CALC. BOOK
STRUCTURE NO.
DRAFTER:
CHECKER:
REVIEWER:
ACCOMPANIED BY DWGS.
DESIGNER: DATEOREGON DEPARTMENT OF TRANSPORTATION
08895
6895
REGION 4 BRIDGE ENGINEERING
(541) 388-6032
BEND, OR 97703
63055 N. Highway 97, Bldg. M
19
Michael L. Jones
Zachary T. Beget
Paul J. Strauser
Robert E. Grubbs
SHERMAN COUNTY
SHERMAN HIGHWAY 042 (M.P. 3.11)
SPANISH HOLLOW CR_HWY 42_MP3.11
US97: SPANISH HOLLOW CREEK & TROUT CREEK BRIDGES PROJECT
AVAILABLE UPON REQUEST
DOCUMENT
FINAL ELECTRONIC
Sept. - 2017
18
2'-6"
8"
equally spaced, each face
3-#5 U-bars,
8"
1'-0"
spaced each face
#5 x cont. equally
5-#5 hoops in shear keys9"
10"
30°
30°
8"
between shear keys
#5 hoop @ 12"
spaced each face
#5 x cont. equally
1'-0"
5 equally spaced in shear key
12" o.c. between shear keys and
#5 resin bonded anchors @
6"
9"
10"
6"
BENT 7 BEAM SEAT AND SHEAR LUG DETAILS - 2
SECTION O-O
SECTION P-P
BR_08895_bt_13.dgn :: Sht18 12/11/2017 3:18:11 PM isd258 Rotation: 0°
ENGINEER
REGIS
TERED PROFESSIO
NAL
OREGON
ZACHARY T. B
EGE
T
RENEWAL DATE:
J
ANUARY 08,
200
9
12-31-2017
74311PE
99852
pad detail (4 total bearing pads).
See dwg. no. 99841 for bearing
place new elastomeric bearing pad.
remove existing bearing pads, and
Cut ƒ" out of existing dowels,
pad detail (4 total bearing pads).
See dwg. no. 99841 for bearing
place new elastomeric bearing pad.
remove existing bearing pads, and
Cut ƒ" out of existing dowels,
3'-
0" 3'-
6"
3'-
2"
2'-
8"
2'-
0" 2'-
6"
2'-
2"
1'-
8"
1
1
1
1 12/11/2017 Updated Dimensions ZTB
1
Michael L. Graves SHEET
OF
DRAWING NO.
DATE REVISION BY
CALC. BOOK
STRUCTURE NO.
DRAFTER:
CHECKER:
REVIEWER:
ACCOMPANIED BY DWGS.
DESIGNER: DATEOREGON DEPARTMENT OF TRANSPORTATION
22576
6830
REGION 4 BRIDGE ENGINEERING
(541) 388-6032 Fax: (541) 385-0476
BEND, OR 97703-5765
63055 N Highway 97, Bldg. M
18Mussie I. Petros
Zachary T. Beget
US97: SPANISH HOLLOW CREEK & TROUT CREEK BRIDGES PROJECT
JEFFERSON COUNTY
THE DALLES - CALIFORNIA HIGHWAY (MP 75.04)
TROUT CR_HWY 4
Levi R. Huffman
AVAILABLE UPON REQUEST
DOCUMENT
FINAL ELECTRONIC
SEPT - 2017
See Dwg. 99894 for this
structure.
END PANEL ASPHALTIC PLUG DETAIL
10 ~ #4
1'-
5"
5"
1'-2"
1'-2"
#4 @ 12"
#4 @ 12"
10"
1'-8"
Const. Jt.
Roadway
see Std. Dwg. BR157
Asphaltic Plug Joint Seal,
see Std. Dwg. BR165
End Panel,
BENT DETAILS
14
UTILITY OPENING DETAILPILE CAP SPLICE DETAIL
Bent 1
Bent 2
Girder A1 B1 C1 D1 E1 F1
SPAN 1 - BEAM SEAT ELEVATIONS - TOP OF CONCRETE PAD (FT)
Girder
SPAN 2 - BEAM SEAT ELEVATIONS - TOP OF CONCRETE PAD (FT)
Bent 1
Bent 2
Girder
SPAN 3 - BEAM SEAT ELEVATIONS - TOP OF CONCRETE PAD (FT)
Bent 2
Bent 3
1782.98' 1783.14' 1783.31' 1783.35' 1783.18' 1783.01'
1783.03' 1783.18' 1783.33' 1783.37' 1783.18' 1783.00'
1783.03' 1783.18'
A2 B2 C2 D2 E2 F2
1783.33' 1783.37' 1783.18' 1783.00'
1782.91' 1783.05' 1783.19' 1783.08' 1782.88' 1782.68'
1782.91' 1783.05' 1783.19'
A3 B3 C3 D3 E3 F3
1783.08' 1782.88' 1782.68'
1782.56' 1782.68' 1782.81' 1782.96' 1782.74' 1782.53'
11" dia. Pipe
12" dia. opening
1'-9" Splice min.
ENGINEER
REGIS
TERED PROFESSIO
NAL
OREGON
ZACHARY T. B
EGE
T
RENEWAL DATE:
J
ANUARY 08,
200
9
12-31-2017
74311PE
4'-0"
{ Bent
Bridge Deck
Pile Cap
Bridge Deck
Pile Cap
Const. Jt.
12•"
21"
#4 L-bars
with 1ƒ" threaded end (Typ)
#4 L-bars top and bottom
3 ~ #4 U-bars eq. spaced
12•"10"
10"
3'-8"
1'-2"
#4 U-barswall and deck (Typ)
filler between top of curtain
of preformed expansion joint
Place 2 ~ •" thick layers
Jt. Filler (Typ)
Preformed Exp.
Std. 90° hook (Typ)
End rebar with
CURTAIN WALL DETAIL - INTERIOR BENTS
Asphaltic Concrete9"
5"
Increase „" 20°F below 47°F
Decrease „" 20°F above 47°F
1" Joint Setting
Beams 'D', 'E' and 'F'
place 2" cl. each face
2 ~ #4 x 1'-4" dia. hoops,
Stage IV Stage III
PS/PC BoxPS/PC Box
3" cl.
(Typ) 3" cl.
(Typ)
roadway cross slope.
Footing grades to match
and end panel ledge.
sheets over entire footing
beneath end panel. Extend
Geomembrane (30 mils)
Two sheets smooth HDPE
BR_22576_bt_03.dgn :: Default 12/13/2017 7:40:46 AM hwye78x
99907
(epoxy coated)
MLGAdded "(epoxy coated)"12-13-20171
1
from the QPL as needed
shown or use mechanical splice
Splice all horizontal reinf. as
2 12-13-2017 MLGAdded note and clarified detail
2