order #xxxxx - eco-2067 sustainable exhibit - 10’x20

7
866.463.2611 • www.ecosystemsdisplays.com Setups Order #XXXXX - ECO-2067 Sustainable Exhibit - 10’x20’ Configuration Plan View 10’ 20’

Upload: others

Post on 14-Jun-2022

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Order #XXXXX - ECO-2067 Sustainable Exhibit - 10’x20

866.463.2611 • www.ecosystemsdisplays.com

Set

ups

Order #XXXXX - ECO-2067 Sustainable Exhibit - 10’x20’ Configuration

Plan View

10’

20’

Page 2: Order #XXXXX - ECO-2067 Sustainable Exhibit - 10’x20

866.463.2611 • www.ecosystemsdisplays.com

Gen

eral

Info

7A

General Setup Instructions •The setup instructions are created specifically for your configuration.

•Setup instructions are laid out sequentially in levels, including exploded

views and a logical series of steps for assembly. We encourage you to study

the instructions before attempting to assemble your exhibit.

Hex Tool for Assembling Exhibit Extrusion Lock Connectors

Numbering Instructions for Setups/Packing Inline Connection between Extrusions Baseplate Connection for Vertical Extrusions

Cleaning and Packing •Use non-abrasive cleaners when cleaning extrusions or ECO Glass inserts.

•Use mild cleaners and soft materials such as cotton to clean all laminates.

•Keep exhibit components away form extreme heat and long exposure to

sun light. This will prevent warping and fading.

•Retain all packing material for ease of re-packing. This protects the exhibit

components and keeps each part organized.

Disassembling •When disassembling exhibit, tighten all setscrews to prevent loss of hardware

in the shipping process.

Page 3: Order #XXXXX - ECO-2067 Sustainable Exhibit - 10’x20

866.463.2611 • www.ecosystemsdisplays.com

Gen

eral

Info

1 2 4 5

SEG Graphic Install1

2

3

4

Graphic is installed corners first. This allows a proportional fit around the

perimeter of the extrusion.

Locate channels along the edge of the extrusions.

Fold over graphic (hiding threads) and tuck silicon edge and fabric

into corners.

After corners are complete, slide in the rest of the graphic into channel.

(From edges to center)

3

5 Graphic is installed. Stand back and be amazed!

Place ECO panel together with a vertical offset, slide down to lock

connector in place.

Panel Corner Connectors are installed just like ECO panels. Remove by

off-setting top lock clips horizontally followed by separating vertically.2

1

ECO Panel Install 1 2

Page 4: Order #XXXXX - ECO-2067 Sustainable Exhibit - 10’x20

866.463.2611 • www.ecosystemsdisplays.com

Ste

p 1

Velc

ro: B

ack

Edg

e

Velc

ro: B

ack

Edg

e

Velc

ro: B

ack

Edg

e

Velc

ro: B

ack

Edg

e

Velc

ro: B

ack

Edg

e

Velc

ro: B

ack

Edg

e

Steps:1) Install Baseplates [1] to bottom of verticals [2,7] using bolts.2) Connect horizontals between verticals, as shown.3) Apply fabric graphics to back of assembly, using Velcro.

Item1234567

9/9A10/10A11/11A12/12A19/19A

Qty.2111111

1/11/11/11/11/1

DescriptionBaseplate85.75”h S44 Vertical Extrusion86”h S44 Vertical Extrusion w/ MOD-300 Aero connector86”h S44 Vertical Extrusion86”h S44 Vertical Extrusion86”h S44 Vertical Extrusion w/ MOD-300 Aero connector85.75”h S44 Vertical Extrusion22”w S44 Horizontal Extrusion22”w S44 Horizontal Extrusion22”w S44 Horizontal Extrusion69.622”w S44 Horizontal Extrusion69.622”w S44 Horizontal Extrusion

1

2 3

199 10 11

12

19A9A 10A 11A

12A

6 754

1

When assembled

Attach graphicsto velcro on back ofassembled frame

Velcro: Back Top Edge

Velcro: Back Bottom Edge

Velcro: Back Bottom Edge

Velcro: BackBottom Edge Velcro: Back

Bottom Edge Velcro: BackBottom Edge

Velcro: Back Top Edge

Velcro: BackTop Edge Velcro: Back

Top EdgeVelcro: Back

Top Edge

Page 5: Order #XXXXX - ECO-2067 Sustainable Exhibit - 10’x20

866.463.2611 • www.ecosystemsdisplays.com

Ste

p 2

Item131415

16/16A17/17A18/18A

Qty.1111

1/11/1

Description24”h S44 Vertical Extrusion w/ Door Stop24”h S44 Vertical Extrusion w/ Door Hinge22”w Z45 Horizontal Extrusion12”w Z45 Horizontal Extrusion12”w Z45 Horizontal Extrusion22”w Z45 Horizontal Extrusion

131415

16/16A17/17A18/18A

1111

1/11/1

24”h S44 Vertical Extrusion w/ Door Hinge24”h S44 Vertical Extrusion w/ Door Stop22”w Z45 Horizontal Extrusion12”w Z45 Horizontal Extrusion12”w Z45 Horizontal Extrusion22”w Z45 Horizontal Extrusion

Steps:1) Connect horizontal [15] between backwall verticals [3,4].2) Attach horizontals [16,16A] between vertical [13] & backwall vertical [3], sliding infill between verticals.3) Connect horizontals [17,17A] between vertical [14] & backwall vertical [4], sliding infill between verticals.4) Attach horizontals [18,18A] between verticals [13,14].5) Connect horizontal [15] between backwall verticals [5,6].6) Attach horizontals [16,16A] between vertical [13] & backwall vertical [5], sliding infill between verticals.7) Connect horizontals [17,17A] between vertical [14] & backwall vertical [6], sliding infill between verticals.8) Attach horizontals [18,18A] between verticals [13,14].9) Install Door to verticals [14] & [13]. See Door Attachment detail. 10) Attach Shelf Supports to inside of assemblies, using Velcro; place Internal Shelf in each cabinet.11) Place Counter Tops on top of assemblies.12) Attach A5 Shelf Pins to verticals, place Bridge Shelf.

DoorHinge

Hinge

Slide pin intohinge attachedto vertical. Slide doorhinge over pin.

Door Attachment*

Pin

15

13

14

16A

17A18A

18

16

17

Door

**

infill

infill

15

34

5

6

13

14

16A

17A18A

18

16

17

Door

**

infill

infill

When assembled

Shelf Pin

Slide shelf pininto groove ofextrusion &tighten setscrew tosecure.

setscrew

*

** *

*

Counter Top

ShelfCounter Top

Shelf

BridgeShelf

Page 6: Order #XXXXX - ECO-2067 Sustainable Exhibit - 10’x20

866.463.2611 • www.ecosystemsdisplays.com

Ste

p 3

Connections are made by holding the button down and sliding the red tube into opposingtube until the connection is made. To disassemblepush button and pull or twist extrusions apart.

Push-Button

Push-Button

6 6

66

Numbered Label

Using Your Setup InstructionsThe Aero Overhead Sign Setup Instructions are created specifically for your configuration. They include an exploded view of the frame which is sequentially numbered. We encourage you to study the instructions before attempting to assemble your exhibit.

Connections are kept very simple: no tools. Everything assembles with push-buttonconnectors and pre-connected horizontal sections.

Cleaning and Packing Your Display1) Use care when cleaning aluminum extrusion or acrylic inserts. Use only non-abrasive cleaners.2) Retain all packing material. It will make re-packing much easier and will reduce the likelihood of shipping damage.

A CDB

Steps:1) Assemble Aero frame in alphabetical order as shown.2) Install Canopy Mounts to top of backwall verticals.3) Connect assembled Aero frame to top of Canopy Mounts. See Canopy Installation detail.

CanopyInstallation*

Slide assembledaero canopy supportsover installedmount barrels.

CanopyMount

Aer

o Fr

ame

Sup

port

Arm

When assembled

* *

Page 7: Order #XXXXX - ECO-2067 Sustainable Exhibit - 10’x20

866.463.2611 • www.ecosystemsdisplays.com

Ste

p 4

When assembled

Steps:1) Install Monitor Mount to front of verticals [4,5]. See Monitor Mount Attachment detail.2) Attach Graphic Panels to verticals [2,7] using screw caps. See Graphic Attachment detail.3) Connect Shelves to verticals [2,7]. See Shelf Attachment detail.4) Attach Wings to left & right sides of backwall using A10 clips. See Wing Attachment detail.5) Connect Header Graphic above monitor mount, using H8 clips & Velcro.6) Attach Lights to top horizontal. See Light Attachment detail.

Monitor Mount Attachment

Insert connectorinto groove ofextrusion. Tighten setscrewto secure in place.

Attach wall plate to connectorsusing bolts provided.

Setscrew

Setscrew

*

Graphic

ScrewCap

V20

Graphic Attachment

Slide V20 connector into grooveof extrusion, then secure graphic

to connector using screw cap.

*

Shelf Attachment

Insert lock into groove of verticalextrusion and tighten setscrew.

LockSetscrew

Back of ShelfSetscrew will face outward for ease of assembly

*

2) Tighten set screw to secure A10 to extrusion.

1) Slide A10 connector into groove of extrusion.

Wing Attachment*

Wing

4) Tighten knob to secure wing in place.

3) Insert Infill into Clamp

1

2

3

4

*

Lock Clip into Groove of Horizontal Extrusion,then slide Light onto Clip.

Clip

Light Extrusion

Light Attachment

Clip

Light

*

**

*

**

*

**

**

**

***

**

*

Shelf

MonitorMount

Light

Shelf

Shelf

* *

* **wing

wing

wing

Header Graphic

wing

Graphic

Graphic

Graphic

LightLight

Light

*Shelf

Shelf

Shelf

Graphic

Graphic

Graphic

*

*

*

**

*

*

*H8 Clip

Velc

ro

* * *