DESCRIPTION
ORBITAL WELDING. AN EXPERIENCE AT KKNPP. PLANT CAPACITY – 2 X 1000 MWe. STEAM TURBINE. 1 HPC + 3 LPC. 3 Nos. per unit. CONDENSER. TITANIUM TUBES. Size25 X 0.6mm 15 meters long 90000 Nos. ORBITAL WELDING. - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: ORBITAL WELDING](https://reader037.vdocuments.us/reader037/viewer/2022102417/56813df1550346895da7cb71/html5/thumbnails/1.jpg)
ORBITAL WELDING
AN EXPERIENCE AT KKNPP
AN EXPERIENCE AT KKNPP
![Page 2: ORBITAL WELDING](https://reader037.vdocuments.us/reader037/viewer/2022102417/56813df1550346895da7cb71/html5/thumbnails/2.jpg)
PLANT CAPACITY – 2 X 1000 MWe
STEAM TURBINE 1 HPC + 3 LPC
CONDENSER 3 Nos. per unit
TITANIUM TUBES Size 25 X 0.6mm 15 meters long 90000 Nos.
![Page 3: ORBITAL WELDING](https://reader037.vdocuments.us/reader037/viewer/2022102417/56813df1550346895da7cb71/html5/thumbnails/3.jpg)
ORBITAL WELDINGPurpose – To provide leak proof joint between Tube to tube sheet in
Condenser in addition to Forced expansion
Process – GTAW without filler wire addition
Material-Titanium
Large Qty of welding
Welding in position & at site
Material supply by Russians
SIGNIFICANT ASPECTS
![Page 4: ORBITAL WELDING](https://reader037.vdocuments.us/reader037/viewer/2022102417/56813df1550346895da7cb71/html5/thumbnails/4.jpg)
TITANIUM TUBES
Grade : ASTM B 338 Gr2
Tube Sheet : 35 + 5 mm thick
Material : ASTM A516Gr 70 + ASTM B 265 Gr 1
CLADWhy Titanium is used?
Provides excellent resistance to general and localized attack under most oxidizing, neutral and inhibited reducing conditions in aqueous environments.
![Page 5: ORBITAL WELDING](https://reader037.vdocuments.us/reader037/viewer/2022102417/56813df1550346895da7cb71/html5/thumbnails/5.jpg)
Titanium Cont….
Corrosion Resistance due to stable, protective strongly adherent oxide film which forms instantly when a fresh surface is exposed to air moisture.
This film is transparent and not deducted by visual means.
Titanium resist corrosion by sea water to temperature as high as 260 0 C.
Even exposed to sea water for many years at a depth of over a mile shows no measurable corrosion.
![Page 6: ORBITAL WELDING](https://reader037.vdocuments.us/reader037/viewer/2022102417/56813df1550346895da7cb71/html5/thumbnails/6.jpg)
Titanium Cont….
Provides over 25 years of trouble free sea water service for chemical refinery de-salination and nuclear industries
Has the ability to resist erosion by high velocity sea water
The presence of abrasive particles such as sand has only a small effect on the corrosion resistance of Titanium
![Page 7: ORBITAL WELDING](https://reader037.vdocuments.us/reader037/viewer/2022102417/56813df1550346895da7cb71/html5/thumbnails/7.jpg)
Production began in the late 1950s
Most widely used titanium is commercial pure (99.5 % Ti)
Manufacturing Process
Ingot →slab → Hot strip → cold strip → Slitting → Forming → TIG Welding → Stress relieving → Eddy Current & Ultrasonic testing
![Page 8: ORBITAL WELDING](https://reader037.vdocuments.us/reader037/viewer/2022102417/56813df1550346895da7cb71/html5/thumbnails/8.jpg)
Tensile, flare, flattening & reverse flattening
Visual InspectionCleanliness, ID, OD, Surface condition, end condition and marking.
Tube to tube sheet joining
Contact Rolling (0 to 5 % wall thinning for a length of 10 mm)
Orbital Welding – For highly reliable leak tightnessForced Rolling (8 to 10 % wall thinning for a length of 25mm)
Physical Testing
![Page 9: ORBITAL WELDING](https://reader037.vdocuments.us/reader037/viewer/2022102417/56813df1550346895da7cb71/html5/thumbnails/9.jpg)
PROCESS FLOW CHARTFront / Rear end tube sheet cleaning – wire brush mounted in portable drilling machine
followed by acetone
Visual inspection
Titanium tube insertion
Initial cleaning before contact rolling
Initial contact rolling up to 10mm
Sh 1 of 3
![Page 10: ORBITAL WELDING](https://reader037.vdocuments.us/reader037/viewer/2022102417/56813df1550346895da7cb71/html5/thumbnails/10.jpg)
End facing of tube & tube sheet up to 0.05 mm
Welding
Visual inspection
Rectification of repair work
Final expansion 8 to 10 % by lubricating SAE 40 oil
Excess length trimming in the rear side
PROCESS FLOW CHART CONTD…Sh 2 of 3
![Page 11: ORBITAL WELDING](https://reader037.vdocuments.us/reader037/viewer/2022102417/56813df1550346895da7cb71/html5/thumbnails/11.jpg)
Tube tightness test by MAUS Gun G-150
Dye Penetrant testing
Final cleaning by acetone
PROCESS FLOW CHART CONTD… Sh 3 of 3
![Page 12: ORBITAL WELDING](https://reader037.vdocuments.us/reader037/viewer/2022102417/56813df1550346895da7cb71/html5/thumbnails/12.jpg)
RUSSIAN REFERENCE DOCUMENTS
GOST 3242 – 79 Welding joints Quality Control Methods
RD 24.020.00-93 (Guide lines welding joints of mixed steam, gas and Hydraulic Turbines)
PNAEG 7-003-87 Welder qualification
PNAEG 7-010-089 Acceptance standard
![Page 13: ORBITAL WELDING](https://reader037.vdocuments.us/reader037/viewer/2022102417/56813df1550346895da7cb71/html5/thumbnails/13.jpg)
WORK PROCEDURES
Condenser Tubing and expansion(Doc.No: BHEL / KKNPP / WP / 023)
Condenser Tube Welding (Doc.No: BHEL / KKNPP / WP / 024)
Condenser Tube to Tube sheet welding repair procedure (Doc.No: BHEL / KKNPP / WP / 031)
![Page 14: ORBITAL WELDING](https://reader037.vdocuments.us/reader037/viewer/2022102417/56813df1550346895da7cb71/html5/thumbnails/14.jpg)
TUBE SPECIFICATION
![Page 15: ORBITAL WELDING](https://reader037.vdocuments.us/reader037/viewer/2022102417/56813df1550346895da7cb71/html5/thumbnails/15.jpg)
UNIT-2 TUBE INSERTION
![Page 16: ORBITAL WELDING](https://reader037.vdocuments.us/reader037/viewer/2022102417/56813df1550346895da7cb71/html5/thumbnails/16.jpg)
AFTER TUBE INSERTION
![Page 17: ORBITAL WELDING](https://reader037.vdocuments.us/reader037/viewer/2022102417/56813df1550346895da7cb71/html5/thumbnails/17.jpg)
TUBE SHEET PROTECTION
![Page 18: ORBITAL WELDING](https://reader037.vdocuments.us/reader037/viewer/2022102417/56813df1550346895da7cb71/html5/thumbnails/18.jpg)
FRONIUS MODEL - FPA 2000 (AUSTRIAN MAKE)
PROGRAMABLE ORBITAL WELDING MACHINES
![Page 19: ORBITAL WELDING](https://reader037.vdocuments.us/reader037/viewer/2022102417/56813df1550346895da7cb71/html5/thumbnails/19.jpg)
Welding parameters for FRONIUS MODEL - FPA 2000
Process : GTAW (Automatic )
No of weld passes 1Argon Gas flow rate 4 to 6 ltr /min
Pre Gas time T10 30 Sec Post Gas time T11 30 Sec Pre Fusion current I21 90A Pre fusion current time T21 0.1Sec Pulse current I22 90A Time of pulse current T22 100msec
![Page 20: ORBITAL WELDING](https://reader037.vdocuments.us/reader037/viewer/2022102417/56813df1550346895da7cb71/html5/thumbnails/20.jpg)
Welding parameters for FRONIUS MODEL - FPA 2000 (Cont…)
Back ground current I23 40A
Time of back ground current T23 100 m sec Down slope state N20 365D
Down slope time T25 5 Sec
Welding Speed V 32 = 125%
Tungsten electrode:
Grade- WL10
Diameter- 1.6 mm
Inclined Angle – 2 0
Grinding Angle – 15 0
![Page 21: ORBITAL WELDING](https://reader037.vdocuments.us/reader037/viewer/2022102417/56813df1550346895da7cb71/html5/thumbnails/21.jpg)
VJ MARCONS - HYDERABAD (Indian Make)
PROGRAMABLE ORBITAL WELDING MACHINES
![Page 22: ORBITAL WELDING](https://reader037.vdocuments.us/reader037/viewer/2022102417/56813df1550346895da7cb71/html5/thumbnails/22.jpg)
WELDING PARAMETERS FOR VJ MARCONS HYDERABAD
Name of the weld programme :KK1No of weld passes : 1Aux Gas shield required : YesTorch shield gas delay, Sec :10Pre gas time, sec : 3.0Overlap required, mm :8.0Up slope time, sec : 2.0Pre heating time, sec : 1.0Down slope time, sec : 5.0Post weld gas flow time, sec :3.0Aux Gas turn off delay, sec :5.0Pulse welding : YesPeak Current, amps : 90.0
![Page 23: ORBITAL WELDING](https://reader037.vdocuments.us/reader037/viewer/2022102417/56813df1550346895da7cb71/html5/thumbnails/23.jpg)
WELDING PARAMETERS FOR VJ MARCONS HYDERABAD (Cont…)
Base Current, amps : 20.0
Peak time, sec : 0.1
Base time, sec : 0.1
Welding speed, RPM : 2.0
Diameter of the tube, mm : 25
![Page 24: ORBITAL WELDING](https://reader037.vdocuments.us/reader037/viewer/2022102417/56813df1550346895da7cb71/html5/thumbnails/24.jpg)
WPS AND PQR
Welding Process: Automatic TIG Welding with out filler material addition7 Welds Per Machine Per Operator
NDT – Visual (Uniform contour free from spatter, burn-through, cracks, surface pores etc.
WPS: BHEL/KKNPP/WPS/004 & 005PQR: BHEL/KKNPP/PQR/004 & 005
Weld spillage, undercut, weld color, DPT etc.
Destructive Testing
Metallographic Examination – Minimum leak path, Weld width and height.
![Page 25: ORBITAL WELDING](https://reader037.vdocuments.us/reader037/viewer/2022102417/56813df1550346895da7cb71/html5/thumbnails/25.jpg)
METALLOGRAPHIC TESTING• Sample ID: 2• Measurement of individual inclusions and clusters as per Table .19 of
PNAEG-07-010-89 of 11.11 metallographic analysis:• L = 0.622 mm• No. of inclusions present – Nil• • a =0.620 mm• h=1.02 mm• H=1.39 mm• W=3.48 mm
• • Mag: 10x Etchant:5%HF• Calculation of Minimum Leak Path (L) = a + Σdp > 0.7t• dp = d1 + d2 where d = dia of the pore• t = Thickness of the tube = 0.6mm• L = 0.622• a = 0.620
W=3.48 mm
H=1.39 mm
h=1.02 mm
![Page 26: ORBITAL WELDING](https://reader037.vdocuments.us/reader037/viewer/2022102417/56813df1550346895da7cb71/html5/thumbnails/26.jpg)
MACHINE & OPERATOR QUALIFICATIONWELDING MACHINES:
• FRONIUS MODEL - FPA 2000 - 4 Nos• VJ MARCONS - HYDERABAD - 2 Nos
CONTACT & FORCED ROLLING MACHINES
CONTACT ROLLING SUGINO 502 L - 2 NosFORCED ROLLING SUGINO 506 L - 3 Nos
OPERATORS
WELDERS - 15CONTACT ROLLING - 5FORCED ROLLING - 4
![Page 27: ORBITAL WELDING](https://reader037.vdocuments.us/reader037/viewer/2022102417/56813df1550346895da7cb71/html5/thumbnails/27.jpg)
TUBE TO TUBE SHEET WELDING
![Page 28: ORBITAL WELDING](https://reader037.vdocuments.us/reader037/viewer/2022102417/56813df1550346895da7cb71/html5/thumbnails/28.jpg)
WELDING HISTORY
Start of welding in Unit-1 :29-03-06
Completion in Unit-2 : 30.11.07
Average out put
FRONIUS MODEL - FPA 2000 : 250 Joints/Shift/Machine
VJ MARCONS - HYDERABAD :200 Joints/Shift/Machine
![Page 29: ORBITAL WELDING](https://reader037.vdocuments.us/reader037/viewer/2022102417/56813df1550346895da7cb71/html5/thumbnails/29.jpg)
TUBE TIGHTNESS CHECK BY MAUS GUN G-150
Compressed Air System Pressure 3 to 9 Bar
Air flow rate 30 l/min
Test pressure holding time 5 to10 sec
![Page 30: ORBITAL WELDING](https://reader037.vdocuments.us/reader037/viewer/2022102417/56813df1550346895da7cb71/html5/thumbnails/30.jpg)
CLEAN ROOM
![Page 31: ORBITAL WELDING](https://reader037.vdocuments.us/reader037/viewer/2022102417/56813df1550346895da7cb71/html5/thumbnails/31.jpg)
WATER BOX
![Page 32: ORBITAL WELDING](https://reader037.vdocuments.us/reader037/viewer/2022102417/56813df1550346895da7cb71/html5/thumbnails/32.jpg)
TYPE OF WELD DEFECTS
Transverse Cracks Color Change
Blow Holes Pores
![Page 33: ORBITAL WELDING](https://reader037.vdocuments.us/reader037/viewer/2022102417/56813df1550346895da7cb71/html5/thumbnails/33.jpg)
Surface pores
TYPE OF WELD DEFECTS
Defective Shape
Burn Through-Major Burn Through-Minor
![Page 34: ORBITAL WELDING](https://reader037.vdocuments.us/reader037/viewer/2022102417/56813df1550346895da7cb71/html5/thumbnails/34.jpg)
WELD DEFECTS RECTIFICATION
Efforts to change the acceptance norm-2 Letters
Repair – by machine or manual
Manual-Filler wire (Russian), ASTM
-Color change (Gas lens), Trailing shield
-Trailing shield (Half circle, Rectangle)
-Qualification requirement
-Creation of defects
-welder availability
![Page 35: ORBITAL WELDING](https://reader037.vdocuments.us/reader037/viewer/2022102417/56813df1550346895da7cb71/html5/thumbnails/35.jpg)
Welding Accessories
![Page 36: ORBITAL WELDING](https://reader037.vdocuments.us/reader037/viewer/2022102417/56813df1550346895da7cb71/html5/thumbnails/36.jpg)
Heat Sink
![Page 37: ORBITAL WELDING](https://reader037.vdocuments.us/reader037/viewer/2022102417/56813df1550346895da7cb71/html5/thumbnails/37.jpg)
Manual Welding
![Page 38: ORBITAL WELDING](https://reader037.vdocuments.us/reader037/viewer/2022102417/56813df1550346895da7cb71/html5/thumbnails/38.jpg)
Trailing Shield
![Page 39: ORBITAL WELDING](https://reader037.vdocuments.us/reader037/viewer/2022102417/56813df1550346895da7cb71/html5/thumbnails/39.jpg)
CRITICAL WELD DEFECTS
RECTIFICATION USING Ti DISC
![Page 40: ORBITAL WELDING](https://reader037.vdocuments.us/reader037/viewer/2022102417/56813df1550346895da7cb71/html5/thumbnails/40.jpg)
MOCK UP BLOCK WITH CRATED CRACKS
![Page 41: ORBITAL WELDING](https://reader037.vdocuments.us/reader037/viewer/2022102417/56813df1550346895da7cb71/html5/thumbnails/41.jpg)
PULSE TIG MACHINE
![Page 42: ORBITAL WELDING](https://reader037.vdocuments.us/reader037/viewer/2022102417/56813df1550346895da7cb71/html5/thumbnails/42.jpg)
Ti DISC WITH HOLDER
![Page 43: ORBITAL WELDING](https://reader037.vdocuments.us/reader037/viewer/2022102417/56813df1550346895da7cb71/html5/thumbnails/43.jpg)
Ti DISC FIXING
![Page 44: ORBITAL WELDING](https://reader037.vdocuments.us/reader037/viewer/2022102417/56813df1550346895da7cb71/html5/thumbnails/44.jpg)
DRILLING
![Page 45: ORBITAL WELDING](https://reader037.vdocuments.us/reader037/viewer/2022102417/56813df1550346895da7cb71/html5/thumbnails/45.jpg)
FINISHED HOLES
![Page 46: ORBITAL WELDING](https://reader037.vdocuments.us/reader037/viewer/2022102417/56813df1550346895da7cb71/html5/thumbnails/46.jpg)
FINISHED HOLES
![Page 47: ORBITAL WELDING](https://reader037.vdocuments.us/reader037/viewer/2022102417/56813df1550346895da7cb71/html5/thumbnails/47.jpg)
ESSENTIALS FOR GOOD WELD JOINT
Joint preparation-Paint removal, cleanliness, end facing
Clean room environment
Process parameters, Welding machine, Operators
Parent material & Cladding Quality
Heat in put & Post expansion control
![Page 48: ORBITAL WELDING](https://reader037.vdocuments.us/reader037/viewer/2022102417/56813df1550346895da7cb71/html5/thumbnails/48.jpg)
Titanium is a Royal material and one does not learn unless burn his finger