oracle primavera roadmap & future direction - doag.org · pdf file•oppm 9.x •p6...
TRANSCRIPT
![Page 1: Oracle Primavera Roadmap & Future Direction - doag.org · PDF file•OPPM 9.X •P6 Analytics •AutoVue •Crystal Ball •Risk Analysis •Gateway 1. Deliver customer value With](https://reader033.vdocuments.us/reader033/viewer/2022051721/5a793f837f8b9ac53b8c7e74/html5/thumbnails/1.jpg)
© 2013 Oracle Corporation
Oracle Primavera Roadmap & Future Direction April 2013 Primavera Product Strategy February 2013
![Page 2: Oracle Primavera Roadmap & Future Direction - doag.org · PDF file•OPPM 9.X •P6 Analytics •AutoVue •Crystal Ball •Risk Analysis •Gateway 1. Deliver customer value With](https://reader033.vdocuments.us/reader033/viewer/2022051721/5a793f837f8b9ac53b8c7e74/html5/thumbnails/2.jpg)
© 2013 Oracle Corporation
The following information is intended to outline our general
product direction.
It is intended for information purposes only, and may not be
incorporated into any contract. It is not a commitment to
deliver any material, code, or functionality, and should not be
relied upon in making purchasing decisions.
The development, release, and timing of any features or
functionality described for Oracle’s products remains at the
sole discretion of Oracle.
![Page 3: Oracle Primavera Roadmap & Future Direction - doag.org · PDF file•OPPM 9.X •P6 Analytics •AutoVue •Crystal Ball •Risk Analysis •Gateway 1. Deliver customer value With](https://reader033.vdocuments.us/reader033/viewer/2022051721/5a793f837f8b9ac53b8c7e74/html5/thumbnails/3.jpg)
© 2013 Oracle Corporation
trends
![Page 4: Oracle Primavera Roadmap & Future Direction - doag.org · PDF file•OPPM 9.X •P6 Analytics •AutoVue •Crystal Ball •Risk Analysis •Gateway 1. Deliver customer value With](https://reader033.vdocuments.us/reader033/viewer/2022051721/5a793f837f8b9ac53b8c7e74/html5/thumbnails/4.jpg)
© 2013 Oracle Corporation
PPM IS THE FASTEST GROWING SAAS SEGMENT
*Source: IDC, Gartner
41% ANNUAL GROWTH, PROJECTED TO GROW FROM $241 MILLION IN 2011 TO $952 MILLION IN 2015 PILLAR CAGR
PPM 41%
SCM 13.7%
ERP 10%
CRM 12.9%
![Page 5: Oracle Primavera Roadmap & Future Direction - doag.org · PDF file•OPPM 9.X •P6 Analytics •AutoVue •Crystal Ball •Risk Analysis •Gateway 1. Deliver customer value With](https://reader033.vdocuments.us/reader033/viewer/2022051721/5a793f837f8b9ac53b8c7e74/html5/thumbnails/5.jpg)
© 2013 Oracle Corporation
*Source: Oracle
INTEGRATED INTO THE ENTERPRISE
20 OF THE TOP 20 PRIMAVERA CUSTOMERS INTEGRATE WITH MISSION CRITICAL APPLICATIONS
![Page 6: Oracle Primavera Roadmap & Future Direction - doag.org · PDF file•OPPM 9.X •P6 Analytics •AutoVue •Crystal Ball •Risk Analysis •Gateway 1. Deliver customer value With](https://reader033.vdocuments.us/reader033/viewer/2022051721/5a793f837f8b9ac53b8c7e74/html5/thumbnails/6.jpg)
© 2013 Oracle Corporation
*Source: The Productivity Imperative, McKinsey June 2010
85% OF NEW JOBS CREATED IN THE PAST DECADE REQUIRED COMPLEX KNOWLEDGE SKILLS
INNOVATION WORKER & THE RISE OF SOCIAL TOOLS
![Page 7: Oracle Primavera Roadmap & Future Direction - doag.org · PDF file•OPPM 9.X •P6 Analytics •AutoVue •Crystal Ball •Risk Analysis •Gateway 1. Deliver customer value With](https://reader033.vdocuments.us/reader033/viewer/2022051721/5a793f837f8b9ac53b8c7e74/html5/thumbnails/7.jpg)
© 2013 Oracle Corporation
*Source: IDC Worldwide Mobile Worker Population 2009-2013 Forecast
GLOBAL MOBILE WORKER POPULATION EXPECTED TO SURPASS 1 BILLION IN 2013, WHICH ACCOUNTS FOR 35% OF THE WORKFORCE
MOBILE
![Page 8: Oracle Primavera Roadmap & Future Direction - doag.org · PDF file•OPPM 9.X •P6 Analytics •AutoVue •Crystal Ball •Risk Analysis •Gateway 1. Deliver customer value With](https://reader033.vdocuments.us/reader033/viewer/2022051721/5a793f837f8b9ac53b8c7e74/html5/thumbnails/8.jpg)
© 2013 Oracle Corporation
PROLIFERATION OF PPM IN THE ENTERPRISE
IT 66%
Sales 33%
Product Dev 47%
Operations 59%
Marketing 41%
Finance 41%
*Source: Forrestor
![Page 9: Oracle Primavera Roadmap & Future Direction - doag.org · PDF file•OPPM 9.X •P6 Analytics •AutoVue •Crystal Ball •Risk Analysis •Gateway 1. Deliver customer value With](https://reader033.vdocuments.us/reader033/viewer/2022051721/5a793f837f8b9ac53b8c7e74/html5/thumbnails/9.jpg)
© 2013 Oracle Corporation
![Page 10: Oracle Primavera Roadmap & Future Direction - doag.org · PDF file•OPPM 9.X •P6 Analytics •AutoVue •Crystal Ball •Risk Analysis •Gateway 1. Deliver customer value With](https://reader033.vdocuments.us/reader033/viewer/2022051721/5a793f837f8b9ac53b8c7e74/html5/thumbnails/10.jpg)
© 2013 Oracle Corporation
![Page 11: Oracle Primavera Roadmap & Future Direction - doag.org · PDF file•OPPM 9.X •P6 Analytics •AutoVue •Crystal Ball •Risk Analysis •Gateway 1. Deliver customer value With](https://reader033.vdocuments.us/reader033/viewer/2022051721/5a793f837f8b9ac53b8c7e74/html5/thumbnails/11.jpg)
© 2013 Oracle Corporation
Microsoft Excel
Salesforce
Clarizen
Project.net
ProjectPlace
Evernote
Basecamp
Zoho Projects
Asana
Mavenlink
Powersteering
Sopheon Accolade
Planview
Planisware
GenSight
Daptiv
AtTask
Sciforma
LiquidPlanner
Siemens Teamcenter
CA Clarity
Planview
HP
Compuware
Innotas
Serena
BMC
IBM Rational
Version One
Rally
SAP
Deltek
Artemis
Dekker Tracker
Acumen Fuse
One point
Sciforma PSNext
PDware
Planta
Planisware
SAP
Artemis
IBM Maximo
Prometheus
Click Software
Viziya
ABB Ventyx
Pasta
Logica ARM Suite
Knowledge Relay
Trimble Meridian
CMiC
PMWeb
PowerPlant
eBuilder
Asta
Accruent
Ares Prism
US Cost
IBM Tririga
![Page 12: Oracle Primavera Roadmap & Future Direction - doag.org · PDF file•OPPM 9.X •P6 Analytics •AutoVue •Crystal Ball •Risk Analysis •Gateway 1. Deliver customer value With](https://reader033.vdocuments.us/reader033/viewer/2022051721/5a793f837f8b9ac53b8c7e74/html5/thumbnails/12.jpg)
© 2013 Oracle Corporation
vision
![Page 13: Oracle Primavera Roadmap & Future Direction - doag.org · PDF file•OPPM 9.X •P6 Analytics •AutoVue •Crystal Ball •Risk Analysis •Gateway 1. Deliver customer value With](https://reader033.vdocuments.us/reader033/viewer/2022051721/5a793f837f8b9ac53b8c7e74/html5/thumbnails/13.jpg)
© 2013 Oracle Corporation
IT
NPD
Manufacturing
ETO
Owner
Capital Projects
EPC
Contractor
Routine
Maintenance
Process
Improvement / LSS
Earned Value
Program Management
Shutdown /
Turnaround /
Outage
Installation
Services
#1 MULTI-INITIATIVE PPM SOLUTION
![Page 14: Oracle Primavera Roadmap & Future Direction - doag.org · PDF file•OPPM 9.X •P6 Analytics •AutoVue •Crystal Ball •Risk Analysis •Gateway 1. Deliver customer value With](https://reader033.vdocuments.us/reader033/viewer/2022051721/5a793f837f8b9ac53b8c7e74/html5/thumbnails/14.jpg)
© 2013 Oracle Corporation
how?
![Page 15: Oracle Primavera Roadmap & Future Direction - doag.org · PDF file•OPPM 9.X •P6 Analytics •AutoVue •Crystal Ball •Risk Analysis •Gateway 1. Deliver customer value With](https://reader033.vdocuments.us/reader033/viewer/2022051721/5a793f837f8b9ac53b8c7e74/html5/thumbnails/15.jpg)
© 2013 Oracle Corporation
skire
![Page 16: Oracle Primavera Roadmap & Future Direction - doag.org · PDF file•OPPM 9.X •P6 Analytics •AutoVue •Crystal Ball •Risk Analysis •Gateway 1. Deliver customer value With](https://reader033.vdocuments.us/reader033/viewer/2022051721/5a793f837f8b9ac53b8c7e74/html5/thumbnails/16.jpg)
© 2013 Oracle Corporation
Oracle Primavera + Skire A complete Construction Lifecycle Management Solution
Capital Planning
Project Funding
Plan and Schedule
Cost Controls
Manage Resource & Risk
Change Mgmt.
Deliver Projects
Manage &
Operate Assets
Initiate Projects
Prioritize Projects
Plan
Build
Operate
=
Visibility
Automation
Integration
• Plan
• Shorten cycle time with collaboration between planning, design and procurement teams
• Complete visibility from project initiation to capital planning
• Build
• Improve project accountability and regulatory compliance with proper audit controls
• Control costs and accurately predict cash flow with integrated and detailed tracking
• Operate
• Improve operation and maintenance with integrated scheduling tools
• Balance assignment of resources based on system-wide demands =
![Page 17: Oracle Primavera Roadmap & Future Direction - doag.org · PDF file•OPPM 9.X •P6 Analytics •AutoVue •Crystal Ball •Risk Analysis •Gateway 1. Deliver customer value With](https://reader033.vdocuments.us/reader033/viewer/2022051721/5a793f837f8b9ac53b8c7e74/html5/thumbnails/17.jpg)
© 2013 Oracle Corporation
The Primavera Unifier Solution
Facilities and Real Estate Management
•Complete visibility to all real estate properties – owned and leased
•Facility management tools that enable enterprises to operate efficiently
•Streamlines the process to shorten operational cycle times
Capital Project and Program Management
• Best-in-class cloud-based and on-premise enterprise solution
• Built for the specialized needs of asset- intensive industries
• Simple to deploy and use, and proven with large-scale global enterprises
Key Benefits
• Rapid project execution helps accelerate the construction and bid process to meet project timelines and budgets
• Increases visibility to all projects to ensure field resources are allocated appropriately
• Standardization of workflows, improve coordination between multiple work sites, reducing cycle time and costs
![Page 18: Oracle Primavera Roadmap & Future Direction - doag.org · PDF file•OPPM 9.X •P6 Analytics •AutoVue •Crystal Ball •Risk Analysis •Gateway 1. Deliver customer value With](https://reader033.vdocuments.us/reader033/viewer/2022051721/5a793f837f8b9ac53b8c7e74/html5/thumbnails/18.jpg)
© 2013 Oracle Corporation
IT
NPD
Manufacturing
ETO
Owner
Capital Projects
EPC
Contractor
Routine
Maintenance
Process
Improvement / LSS
Earned Value
Program Management
Shutdown /
Turnaround /
Outage
Installation
Services
Delivering on Vision of #1 Multi-Initiative Solution
![Page 19: Oracle Primavera Roadmap & Future Direction - doag.org · PDF file•OPPM 9.X •P6 Analytics •AutoVue •Crystal Ball •Risk Analysis •Gateway 1. Deliver customer value With](https://reader033.vdocuments.us/reader033/viewer/2022051721/5a793f837f8b9ac53b8c7e74/html5/thumbnails/19.jpg)
© 2013 Oracle Corporation
instantis
![Page 20: Oracle Primavera Roadmap & Future Direction - doag.org · PDF file•OPPM 9.X •P6 Analytics •AutoVue •Crystal Ball •Risk Analysis •Gateway 1. Deliver customer value With](https://reader033.vdocuments.us/reader033/viewer/2022051721/5a793f837f8b9ac53b8c7e74/html5/thumbnails/20.jpg)
© 2013 Oracle Corporation
Oracle Primavera + Instantis Delivers Industry Leading Solution for IT, NPD & LSS
Purpose Built Top-down, resource driven environments
with light project management needs
Cloud Enabled Instantis is built from the ground up using
cloud native technology
Seamless PPM Instantis offers top-down portfolio
capabilities seamlessly integrated
with just enough project execution
.
P6 &
Unifier
Strategies
Tasks
Work Orders
Portfolios
Resources
Deliverables
Projects
Instantis
Corporate Capital Projects R & D IT Manufacturing Maintenance
![Page 21: Oracle Primavera Roadmap & Future Direction - doag.org · PDF file•OPPM 9.X •P6 Analytics •AutoVue •Crystal Ball •Risk Analysis •Gateway 1. Deliver customer value With](https://reader033.vdocuments.us/reader033/viewer/2022051721/5a793f837f8b9ac53b8c7e74/html5/thumbnails/21.jpg)
© 2013 Oracle Corporation
IT
NPD
Manufacturing
ETO
Owner
Capital Projects
EPC
Contractor
Routine
Maintenance
Process
Improvement / LSS
Earned Value
Program Management
Shutdown /
Turnaround /
Outage
Installation
Services
Delivering on Vision of #1 Multi-Initiative Solution
![Page 22: Oracle Primavera Roadmap & Future Direction - doag.org · PDF file•OPPM 9.X •P6 Analytics •AutoVue •Crystal Ball •Risk Analysis •Gateway 1. Deliver customer value With](https://reader033.vdocuments.us/reader033/viewer/2022051721/5a793f837f8b9ac53b8c7e74/html5/thumbnails/22.jpg)
© 2012 Oracle Corporation
roadmap
![Page 23: Oracle Primavera Roadmap & Future Direction - doag.org · PDF file•OPPM 9.X •P6 Analytics •AutoVue •Crystal Ball •Risk Analysis •Gateway 1. Deliver customer value With](https://reader033.vdocuments.us/reader033/viewer/2022051721/5a793f837f8b9ac53b8c7e74/html5/thumbnails/23.jpg)
© 2013 Oracle Corporation
OVERARCHING STRATEGY
• P6 EPPM R8.X
• Primavera Unifier 9.X
• Instantis 8.x
• Contract Management
• OPPM 9.X
• P6 Analytics 3.1
• AutoVue
• Crystal Ball
• Risk Analysis
• Gateway
1.
Deliver Customer Value With
Existing Products
![Page 24: Oracle Primavera Roadmap & Future Direction - doag.org · PDF file•OPPM 9.X •P6 Analytics •AutoVue •Crystal Ball •Risk Analysis •Gateway 1. Deliver customer value With](https://reader033.vdocuments.us/reader033/viewer/2022051721/5a793f837f8b9ac53b8c7e74/html5/thumbnails/24.jpg)
© 2013 Oracle Corporation
P6 ANALYTICS 3.1 – Released January 2013
• Shutdown/Outage /Turnaround
• Routine/On-Line Maintenance
• Daily Trending:
• Activity and Assignment History
• Burn Down Charts
• Emergent Work
• INPO AP-928 Support
• Slowly Changing Dimensions
• More UDFs and UDF Types
• Code Hierarchy Support
![Page 25: Oracle Primavera Roadmap & Future Direction - doag.org · PDF file•OPPM 9.X •P6 Analytics •AutoVue •Crystal Ball •Risk Analysis •Gateway 1. Deliver customer value With](https://reader033.vdocuments.us/reader033/viewer/2022051721/5a793f837f8b9ac53b8c7e74/html5/thumbnails/25.jpg)
© 2013 Oracle Corporation
PRIMAVERA GATEWAY – Released March 2013
• Reduced TCO
• Industry specific data flows and maps
• Pre-build Integrations and Flows
• Flexible data exchange
• Error handling
• Scalability and ease-of-use
• Quickly build new integration adaptors
![Page 26: Oracle Primavera Roadmap & Future Direction - doag.org · PDF file•OPPM 9.X •P6 Analytics •AutoVue •Crystal Ball •Risk Analysis •Gateway 1. Deliver customer value With](https://reader033.vdocuments.us/reader033/viewer/2022051721/5a793f837f8b9ac53b8c7e74/html5/thumbnails/26.jpg)
© 2013 Oracle Corporation
PRIMAVERA UNIFIER 9.12 – Released March 2013
• Improved P6 integration
• Content repository support
• CMIS
• UCM
• Red Stack uptake
• Autovue version update
• Security improvements
![Page 27: Oracle Primavera Roadmap & Future Direction - doag.org · PDF file•OPPM 9.X •P6 Analytics •AutoVue •Crystal Ball •Risk Analysis •Gateway 1. Deliver customer value With](https://reader033.vdocuments.us/reader033/viewer/2022051721/5a793f837f8b9ac53b8c7e74/html5/thumbnails/27.jpg)
© 2013 Oracle Corporation
P6 EPPM 8.3 – Released March 2013
• Improved Unifier integration
• Usability and adoption features
• UN/CEFACT XML
• Improved XML import control
• Improvements to Gantt & TSLD
![Page 28: Oracle Primavera Roadmap & Future Direction - doag.org · PDF file•OPPM 9.X •P6 Analytics •AutoVue •Crystal Ball •Risk Analysis •Gateway 1. Deliver customer value With](https://reader033.vdocuments.us/reader033/viewer/2022051721/5a793f837f8b9ac53b8c7e74/html5/thumbnails/28.jpg)
© 2013 Oracle Corporation
P6 EPPM 8.3 – Released March 2013
Rename Columns
Landing page for users
![Page 29: Oracle Primavera Roadmap & Future Direction - doag.org · PDF file•OPPM 9.X •P6 Analytics •AutoVue •Crystal Ball •Risk Analysis •Gateway 1. Deliver customer value With](https://reader033.vdocuments.us/reader033/viewer/2022051721/5a793f837f8b9ac53b8c7e74/html5/thumbnails/29.jpg)
© 2013 Oracle Corporation
P6 EPPM 8.3 – Released March 2013
Select multiple values from pick lists
Advanced print options
![Page 30: Oracle Primavera Roadmap & Future Direction - doag.org · PDF file•OPPM 9.X •P6 Analytics •AutoVue •Crystal Ball •Risk Analysis •Gateway 1. Deliver customer value With](https://reader033.vdocuments.us/reader033/viewer/2022051721/5a793f837f8b9ac53b8c7e74/html5/thumbnails/30.jpg)
© 2013 Oracle Corporation
• New Graphics Engine • Gantt & Time-Scaled Logic
Diagrams
• Share graphics
• Run without full PM installed
• Configurable • Field Stacking
• Text Wrapping
• Variable Timeline
• Connector Blocks
• Batching Reports
P6 EPPM 8.3 Visualizer – Released March 2013
![Page 31: Oracle Primavera Roadmap & Future Direction - doag.org · PDF file•OPPM 9.X •P6 Analytics •AutoVue •Crystal Ball •Risk Analysis •Gateway 1. Deliver customer value With](https://reader033.vdocuments.us/reader033/viewer/2022051721/5a793f837f8b9ac53b8c7e74/html5/thumbnails/31.jpg)
© 2013 Oracle Corporation
Extensive configurability
P6 EPPM 8.3 Visualizer – Released March 2013
![Page 32: Oracle Primavera Roadmap & Future Direction - doag.org · PDF file•OPPM 9.X •P6 Analytics •AutoVue •Crystal Ball •Risk Analysis •Gateway 1. Deliver customer value With](https://reader033.vdocuments.us/reader033/viewer/2022051721/5a793f837f8b9ac53b8c7e74/html5/thumbnails/32.jpg)
© 2013 Oracle Corporation
• Enhanced assignment distribution
• Collaborate via discussion threads
• View Notebooks
• Search & filter tasks
• View documents
• Update codes and UDFs
• iPhone multi-language support
• Email push capability
P6 EPPM 8.3 Team Member – Released March 2013
![Page 33: Oracle Primavera Roadmap & Future Direction - doag.org · PDF file•OPPM 9.X •P6 Analytics •AutoVue •Crystal Ball •Risk Analysis •Gateway 1. Deliver customer value With](https://reader033.vdocuments.us/reader033/viewer/2022051721/5a793f837f8b9ac53b8c7e74/html5/thumbnails/33.jpg)
© 2013 Oracle Corporation
P6 EPPM 8.3 Team Member – Released March 2013
Discussions / collaboration
![Page 34: Oracle Primavera Roadmap & Future Direction - doag.org · PDF file•OPPM 9.X •P6 Analytics •AutoVue •Crystal Ball •Risk Analysis •Gateway 1. Deliver customer value With](https://reader033.vdocuments.us/reader033/viewer/2022051721/5a793f837f8b9ac53b8c7e74/html5/thumbnails/34.jpg)
© 2013 Oracle Corporation
Update Activity Codes & UDFs
P6 EPPM 8.3 Team Member – Released March 2013
![Page 35: Oracle Primavera Roadmap & Future Direction - doag.org · PDF file•OPPM 9.X •P6 Analytics •AutoVue •Crystal Ball •Risk Analysis •Gateway 1. Deliver customer value With](https://reader033.vdocuments.us/reader033/viewer/2022051721/5a793f837f8b9ac53b8c7e74/html5/thumbnails/35.jpg)
© 2013 Oracle Corporation
• Enhanced Facilities & Real Estate mgmt. capabilities
• Recurrence pattern templates
• Improved auto-creation of preventive maintenance work orders
PRIMAVERA UNIFIER 9.13 – Planned CY2013
![Page 36: Oracle Primavera Roadmap & Future Direction - doag.org · PDF file•OPPM 9.X •P6 Analytics •AutoVue •Crystal Ball •Risk Analysis •Gateway 1. Deliver customer value With](https://reader033.vdocuments.us/reader033/viewer/2022051721/5a793f837f8b9ac53b8c7e74/html5/thumbnails/36.jpg)
© 2013 Oracle Corporation
UNIFIER MOBILE – Planned CY2013
• Initial focus on tablets (iPad)
• Native mobile application
• Leverage device hardware
• Multi-language support
![Page 37: Oracle Primavera Roadmap & Future Direction - doag.org · PDF file•OPPM 9.X •P6 Analytics •AutoVue •Crystal Ball •Risk Analysis •Gateway 1. Deliver customer value With](https://reader033.vdocuments.us/reader033/viewer/2022051721/5a793f837f8b9ac53b8c7e74/html5/thumbnails/37.jpg)
© 2013 Oracle Corporation
INSTANTIS 8.5 – Planned CY2013
• Resource calendars
• Project request staffing improvements
• Activity labor cost capitalization
• MS Project 2010 support
• Timesheets enhancements
• Variable resource rates for project labor costing
• UI and Navigation improvements
![Page 38: Oracle Primavera Roadmap & Future Direction - doag.org · PDF file•OPPM 9.X •P6 Analytics •AutoVue •Crystal Ball •Risk Analysis •Gateway 1. Deliver customer value With](https://reader033.vdocuments.us/reader033/viewer/2022051721/5a793f837f8b9ac53b8c7e74/html5/thumbnails/38.jpg)
© 2013 Oracle Corporation
P6 ANALYTICS 3.2 – Planned CY2013
• Additional P6 dimensional data:
• Resource hierarchies
• Role hierarchies
• Project Owner
• Risk exposure start and finish dates
• Enhanced geospatial mapping support
• Catalog improvements
![Page 39: Oracle Primavera Roadmap & Future Direction - doag.org · PDF file•OPPM 9.X •P6 Analytics •AutoVue •Crystal Ball •Risk Analysis •Gateway 1. Deliver customer value With](https://reader033.vdocuments.us/reader033/viewer/2022051721/5a793f837f8b9ac53b8c7e74/html5/thumbnails/39.jpg)
© 2013 Oracle Corporation
OPPM 9.0 SP2 – Planned CY2013
• Update Bridge to support MS Project Server 2010
• Configure # of Workflow approvers
• ALL approvers must approve or ANY approver can approve
• Certification of Oracle database 11.2.0.3
• P1 Defect fixes
![Page 40: Oracle Primavera Roadmap & Future Direction - doag.org · PDF file•OPPM 9.X •P6 Analytics •AutoVue •Crystal Ball •Risk Analysis •Gateway 1. Deliver customer value With](https://reader033.vdocuments.us/reader033/viewer/2022051721/5a793f837f8b9ac53b8c7e74/html5/thumbnails/40.jpg)
© 2013 Oracle Corporation
OPPM 9.1 – Planned CY2014
• Additional types of graphs for dashboards and improved output controls
• Multi-select and purge workflow instances
• Enable workflow task email notifications to include a embedded link
• Ability to move items from one portfolio to another via workflow
• Customer Enhancements
![Page 41: Oracle Primavera Roadmap & Future Direction - doag.org · PDF file•OPPM 9.X •P6 Analytics •AutoVue •Crystal Ball •Risk Analysis •Gateway 1. Deliver customer value With](https://reader033.vdocuments.us/reader033/viewer/2022051721/5a793f837f8b9ac53b8c7e74/html5/thumbnails/41.jpg)
© 2013 Oracle Corporation
CONTRACT MANAGEMENT 14.2 – Planned CY2014
• Enable admins to specify user specific layouts
• Link submittals and drawings
• Specify Sharepoint site per project rather than globally
• Create proxy for action items
• Build out web services
• Customer enhancements
![Page 42: Oracle Primavera Roadmap & Future Direction - doag.org · PDF file•OPPM 9.X •P6 Analytics •AutoVue •Crystal Ball •Risk Analysis •Gateway 1. Deliver customer value With](https://reader033.vdocuments.us/reader033/viewer/2022051721/5a793f837f8b9ac53b8c7e74/html5/thumbnails/42.jpg)
© 2013 Oracle Corporation
OVERARCHING STRATEGY
• P6 EPPM R8.X
• Primavera Unifier 9.X
• Instantis 8.5
• Contract Management
• OPPM 9.X
• P6 Analytics
• AutoVue
• Crystal Ball
• Risk Analysis
• Gateway
1.
Deliver customer value With
existing products
• Common UI & Navigation
• More integration of Schedule, Costs, Contracts, Changes
• Common Reports / BI
• Common Integration layer
• Native P6 workflow
• Risk Management
• I18N & Localizations
2.
Integrate and build out P6,
Unifier and Instantis applications
• Mobile, Mobile, Mobile
• ANSI EVMS
• Portfolio Mgmt.+
• Core PM Professional focus
• Offline Client
• Social / Crowd-sourcing / Gamification
3.
Consolidate and extend the
Primavera platform
![Page 43: Oracle Primavera Roadmap & Future Direction - doag.org · PDF file•OPPM 9.X •P6 Analytics •AutoVue •Crystal Ball •Risk Analysis •Gateway 1. Deliver customer value With](https://reader033.vdocuments.us/reader033/viewer/2022051721/5a793f837f8b9ac53b8c7e74/html5/thumbnails/43.jpg)
© 2013 Oracle Corporation
CLOUD & ON-PREMISE PRIMAVERA GATEWAY
ANALYTICS
WORKFLOW
MODERN UI
ORACLE SOCIAL
STREAMS
CROWD SOURCING
GAMIFICATION
NATIVE MOBILE
MULTI-PLATFORM
ORGANIC DEVELOPMENT
ACQUISITONS
IP CONSOLIDATION
CLOUD INTEGRATION SOCIAL
MOBILE PPM PROLIFERATION
![Page 44: Oracle Primavera Roadmap & Future Direction - doag.org · PDF file•OPPM 9.X •P6 Analytics •AutoVue •Crystal Ball •Risk Analysis •Gateway 1. Deliver customer value With](https://reader033.vdocuments.us/reader033/viewer/2022051721/5a793f837f8b9ac53b8c7e74/html5/thumbnails/44.jpg)
© 2013 Oracle Corporation
The preceding information is intended to outline our general product
direction.
It is intended for information purposes only, and may not be incorporated
into any contract. It is not a commitment to deliver any material, code, or
functionality, and should not be relied upon in making purchasing
decisions.
The development, release, and timing of any features or functionality
described for Oracle’s products remains at the sole discretion of Oracle.
![Page 45: Oracle Primavera Roadmap & Future Direction - doag.org · PDF file•OPPM 9.X •P6 Analytics •AutoVue •Crystal Ball •Risk Analysis •Gateway 1. Deliver customer value With](https://reader033.vdocuments.us/reader033/viewer/2022051721/5a793f837f8b9ac53b8c7e74/html5/thumbnails/45.jpg)
© 2013 Oracle Corporation
![Page 46: Oracle Primavera Roadmap & Future Direction - doag.org · PDF file•OPPM 9.X •P6 Analytics •AutoVue •Crystal Ball •Risk Analysis •Gateway 1. Deliver customer value With](https://reader033.vdocuments.us/reader033/viewer/2022051721/5a793f837f8b9ac53b8c7e74/html5/thumbnails/46.jpg)
© 2013 Oracle Corporation