oracle primavera contract management - ten six … · oracle primavera contract management (pcm) is...

4
http://tensix.com | T: (703) 91092600 | Ten Six Consulting LLC | 576 N. Birdneck Rd, #626 Virginia Beach, VA 23451 Duration: 3-days Prerequisites: No previous experience working with Oracle Primavera Contract Management is necessary. Course Description Oracle Primavera Contract Management (PCM) is a web based, multi-user, multi- project database system for managing all aspects of a project relating to the contractual relationship. This contractual relationship is the "center of the universe" from the perspective of how PCM manages information. A project may have multiple relationships with contractors within a project. Oracle Primavera Contract Management is designed to allow the users and management to be pro-active in understanding the progress of the project relating to money and communication. Know when RFI's need to be answered Know when insurance is about to expire for a contractor Know when there is a potential for cost over-runs long before the end of the project Know when submittals must be approved to not affect schedule Know what changes are affecting the bottom line Being web based allows the user to login to the system from any machine running a browser to review documents, approve changes and analyze overall costs. Highly interactive and hands-on, attendees will be taken through case studies that allow them to experience real world scenarios and how Oracle Primavera Contract Management can support these. Oracle Primavera Contract Management

Upload: dinhthien

Post on 29-Jun-2018

225 views

Category:

Documents


0 download

TRANSCRIPT

!

!http://tensix.com!!|!!T:!(703)!91092600!|!!Ten!Six!Consulting!LLC!!|!!576!N.!Birdneck!Rd,!#626!!Virginia!Beach,!VA!23451!

�������

!

Duration: 3-days !

Prerequisites:!No previous experience working with Oracle Primavera Contract Management is necessary.

Course Description !

Oracle Primavera Contract Management (PCM) is a web based, multi-user, multi-project database system for managing all aspects of a project relating to the contractual relationship. This contractual relationship is the "center of the universe" from the perspective of how PCM manages information. A project may have multiple relationships with contractors within a project. Oracle Primavera Contract Management is designed to allow the users and management to be pro-active in understanding the progress of the project relating to money and communication. • Know when RFI's need to be answered • Know when insurance is about to expire for a contractor • Know when there is a potential for cost over-runs long before the end of the project • Know when submittals must be approved to not affect schedule • Know what changes are affecting the bottom line

Being web based allows the user to login to the system from any machine running a browser to review documents, approve changes and analyze overall costs. Highly interactive and hands-on, attendees will be taken through case studies that allow them to experience real world scenarios and how Oracle Primavera Contract Management can support these.

!

Oracle'Primavera'Contract'Management

!

!http://tensix.com!!|!!T:!(703)!91092600!|!!Ten!Six!Consulting!LLC!!|!!576!N.!Birdneck!Rd,!#626!!Virginia!Beach,!VA!23451!

Course Contents DAY 1

Lesson 1 – Introduction to Contract Management

! What is Oracle Primavera Contract Management

! Login to Contract Management

! Customize the Project View in the Main window

! Customize the Control Center in the Main window

! Navigation in Contract Management

Lesson 2 – Creating a Project

! Create a project using the project wizard

Lesson 3 – Companies and Contacts

! Add a company

! Create Contacts

! Group vs project companies

! Copy Companies / Contacts

! Using distribution lists

! Inactivate companies / contacts

Lesson 4 – Tracking Drawings

! Record and review the drawing log

! Distribution of Drawings

! Using drawing sets

! Use the transmittal queue

Lesson 5 – Communication

! Enter an RFI

! Record an answer to RFI

!

!http://tensix.com!!|!!T:!(703)!91092600!|!!Ten!Six!Consulting!LLC!!|!!576!N.!Birdneck!Rd,!#626!!Virginia!Beach,!VA!23451!

! Document a telephone record

DAY 2

Lesson 6 – Logging and Tracking Submittals

! Understanding submittals and submittal packages

! Identify the submittal workflow

! Using multiple reviewers

! Tracking Submittals

! Use the transmittal queue

Lesson 7 – Project Issues

! Define a new issue

! Link documents and attachments to an issue

! Create issue by searching

Lesson 8 – More Communication

! Create a daily report

! Generate daily Report

! Create meeting minutes

! Generate meeting minutes

Lesson 9 – Managing Project Costs

! Cost code structure

! Cost worksheet

! Understanding the cost worksheet

! Cost code detail

Lesson 10 – Budget, Contracts, Purchase Orders, and Trends

! Adding a budget

! Adding a contract and purchase order

!

!http://tensix.com!!|!!T:!(703)!91092600!|!!Ten!Six!Consulting!LLC!!|!!576!N.!Birdneck!Rd,!#626!!Virginia!Beach,!VA!23451!

! Distribute documents to the cost worksheet

DAY 3

Lesson 11 – Change Management

! Change management workflow

! Initiate change management

! Following the CM process

Lesson 12 – Payment Requisitions

! Determine payment requisition options

! Generate from a contract

! Create a schedule of values

! Retrieve change orders

! Progress and certify requisitions

Case Study !!!!!!!!!! !