LEED-CI 2.0 Letter Template SS Credit 1: Site Selection, LEED Certified Building I, , declare to USGBC that the commercial interiors project proposed for LEED-CI certification is located in a LEED certified building. (Responsible Party) A copy of the core building LEED certification document. I have provided the following documentation to support the declaration: Up to a total of 3 points may be earned in ½ point increments if the building in which the tenant space is located meets any of the stated requirements in SS Credit 1, Options A – L. Complete those specific templates to declare achievement for Options A – L. - OR - Option B: Stormwater Management, Rate and Quantity Page 3 Option D: Heat Island Effect, Non-Roof Page 7 Option G: Water Efficient Landscaping, Reduced Potable Water Consumption Page 12 Option I: Innovative Wastewater Technologies Page 14 Option E: Heat Island Effect, Roof Page 9 Option C: Stormwater Management, Treatment Page 6 Option A: Brownfield Redevelopment Page 2 Option F: Light Pollution Reduction Page 11 Option K: On-Site Renewable Energy Page 21 Option L: Other Quantifiable Environmental Performance Page 22 Option H: Water Efficient Landscaping, No Potable Use or No Irrigation Page 13 Option J: Water Use Reduction, 20% Reduction Page 17 OPTIONS LIST

Upload: others

Post on 23-Oct-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

  • LEED-CI 2.0 Letter TemplateSS Credit 1: Site Selection, LEED Certified Building

    I, , declare to USGBC that the commercial interiors project proposed for LEED-CI

    certification is located in a LEED certified building.

    (Responsible Party)

    A copy of the core building LEED certification document.

    I have provided the following documentation to support the declaration:

    Up to a total of 3 points may be earned in ½ point increments if the building in which the tenant space is located meetsany of the stated requirements in SS Credit 1, Options A – L. Complete those specific templates to declare achievementfor Options A – L.

    - OR -

    Option B: Stormwater Management, Rate and Quantity Page 3

    Option D: Heat Island Effect, Non-Roof Page 7

    Option G: Water Efficient Landscaping, Reduced Potable Water Consumption Page 12

    Option I: Innovative Wastewater Technologies Page 14

    Option E: Heat Island Effect, Roof Page 9

    Option C: Stormwater Management, Treatment Page 6

    Option A: Brownfield Redevelopment Page 2

    Option F: Light Pollution Reduction Page 11

    Option K: On-Site Renewable Energy Page 21

    Option L: Other Quantifiable Environmental Performance Page 22

    Option H: Water Efficient Landscaping, No Potable Use or No Irrigation Page 13

    Option J: Water Use Reduction, 20% Reduction Page 17

    OPTIONS LIST

  • LEED-CI 2.0 Letter TemplateSS Credit 1: Site Selection, LEED Certified Building

    Option A: Brownfield Redevelopment

    I, , declare to USGBC that this project is developed on a site documented as

    contaminated (by means of an ASTM E1903-97 Phase II Environmental Site Assessment) or on a site classified as a Brownfield by alocal, state, or federal government agency.

    (Responsible Party)

    I have provided one of the following supplementary documentation to support the declaration:

    A copy of pertinent sections of the ASTM E 1903-97 Phase II Environmental Site Assessment documenting the sitecontamination.

    A letter from a local, state or federal regulatory agency confirming that the site is classified as a Brownfield by that agency.

    A narrative and supporting documentation describing real or perceived site contamination that has been remediated priorto development.

    “In addition, I confirm that the following remedial measures have been taken to protect the environment:

    Areas of the Site AffectedList of Damage or Contamination thatExisted Remedial Measures Taken

    Credit: Points Documented:

    Project Name:

  • LEED-CI 2.0 Letter TemplateSS Credit 1: Site Selection, LEED Certified Building

    Option B: Stormwater Management, Rate and Quantity

    Option 1: If existing site imperviousness is less than or equal to 50%

    I, , declare to USGBC that the post-development 1.5 year, 24 hour peak discharge rate

    and quantity does not exceed the pre-development 1.5 year 24 hour peak discharge rate and quantity.

    (Responsible Party)

    I have provided the calculations found in the table below and certify that existing site imperviousness is less than or equal to50%

    I have provided a design narrative for the stormwater management technology/plan implemented and pre/postdevelopment stormwater rate and quantity calculations to support this claim.

    OR

    Option 2: If existing site imperviousness exceeds 50%

    I, , declare to USGBC that implementation of the project stormwater management plan

    results in at least a 25% decrease in the rate and quantity of stormwater runoff.

    (Responsible Party)

    OR

    I have provided a design narrative for the stormwater management technology/plan implemented and pre/postdevelopment stormwater rate and quantity calculations to support this claim.

    I have provided the calculations found in the table below and certify that existing site imperviousness exceeds 50%.

    Coefficient Tables

    Suface Type

    Pavement, Asphalt

    Pavement, Concrete

    Pavement, Brick

    Pavement, Gravel

    Roof, Conventional

    Roof, Garden Roof (< 4 in)

    Roof, Garden Roof (4 - 8 in)

    Roof, Garden Roof (9 - 20 in)

    Roof, Garden Roof (> 20 in)

    Turf, Flat (0 - 1% slope)

    Runoff Coefficient

    0.95

    0.95

    0.85

    0.75

    0.95

    0.50

    0.30

    0.20

    Pavement, Pervious 0.60

    0.10

    0.25

    Suface Type

    Turf, Average (1 - 3% slope)

    Turf, Hilly (3 - 10% slope)

    Turf, Steep (> 10% slope)

    Vegetation, Flat (0 - 1% slope)

    Vegetation, Average (1 - 3% slope)

    Vegetation, Hilly (3 - 10% slope)

    Vegetation, Steep (> 10% slope)

    Runoff Coefficient

    0.35

    0.40

    0.45

    0.10

    0.20

    0.25

    0.30

    User Defined 1

    User Defined 2

    User Defined 2

  • LEED-CI 2.0 Letter TemplateSS Credit 1: Site Selection, LEED Certified Building

    Design Case Table

    Suface Type Runoff Coefficient

    Design Case Table

    Area [SF] Impervious Area

    Total Area

    Total Impervious Area

    Imperviousness [%]

  • LEED-CI 2.0 Letter TemplateSS Credit 1: Site Selection, LEED Certified Building

    Baseline Case Table

    Baseline Case Table

    Suface Type Runoff Coefficient Area [SF] Impervious Area

    Total Area

    Total Impervious Area

    Imperviousness [%]

    Credit: Points Documented:

    Project Name:

  • LEED-CI 2.0 Letter TemplateSS Credit 1: Site Selection, LEED Certified Building

    Option C: Stormwater Management, Treatment

    Option 1: EPA Efficient

    I, , declare to USGBC that the design complies with or exceeds Best Management

    Practices (BMPs) outlined in Chapter 4, Part 2 (Urban Runoff), of the United States Environmental Protection Agency’s (EPA’s)Guidance Specifying Management Measures for Sources of Nonpoint Pollution in Coastal Waters, January 1993 (Document No.EPA-840-B-92-002) for removal of 80% of the average annual post-development total suspended solids (TSS) and 40% of theaverage annual post-development total phosphorous (TP).

    (Responsible Party)

    I further certify that the EPA standard is more stringent than the applicable local standard.

    I have provided a brief narrative of the design including assumptions and any calculations necessary to support TP and TSSremoval efficiencies.

    I further certify that the local standard is more stringent than the EPA standard.

    I have provided a brief narrative of the design including assumptions and any calculations necessary to support TP and TSSremoval efficiencies.

    I, , declare to USGBC that the design will comply with or exceed the local Best

    Management Practices implemented for removal of TSS (total suspended solids) and TP (total phosphorous).

    (Responsible Party)

    Option 2: Local standard is more stringent than EPA standard

    Project Name:

    Credit: Points Documented:

  • LEED-CI 2.0 Letter TemplateSS Credit 1: Site Selection, LEED Certified Building

    Option D: Heat Island Effect, Non-Roof

    Option 1: Reflective Paving, Shading, and/or Open Grid Pavement

    I, , declare to USGBC that the building provides shade (or will have within 5 years of

    construction) and/or uses light-colored/high-albedo materials with a Solar Reflectance Index (SRI) of at least 30, and/or open gridpavement, that individually or in total equals at least 30% of the site's non-roof impervious surfaces, which include parking areas,walkways, plazas, fire lanes, etc.

    (Responsible Party)

    The project site / landscape drawing has been uploaded. The drawing(s) provides information regarding paving materialsand/or landscaping materials, as applicable.

    Total area of all non-roof hardscape surfaces on project site [sf]:

    Total area of all hardscape surfaces with open-grid paving system that are at least 50%pervious [sf]:

    Total area of all hardscape features having an SRI of at least 30 [sf]:

    Total effective shaded area of hardscape features shaded by trees or other landscapefeatures [sf]:

    Percentage of total qualifying area for heat island reduction strategies [%]:

    I have provided the following calculation to support the declaration:

    Manufacturer &Product Name/Product ID Reflectance [%] Emittance [%] SRI Value

    SRI Data for Reflective Paving Calculation in Option 1

  • LEED-CI 2.0 Letter TemplateSS Credit 1: Site Selection, LEED Certified Building

    Option 2: Covered Parking

    (Responsible Party)

    I, , declare to USGBC that the building provides a minimum of 50% of parking spaces

    underground or covered by structured parking.

    Percentage of on-site covered parking spaces [%]:

    Total number of parking spaces that are under cover (underground, under building /shade structure):

    Total number of parking spaces provided for the project:

    I have provided the following calculation to support the declaration:

    The project site drawing has been uploaded. The drawing(s) provides information regarding covered parking.

    Option 3: Open Grid Pavement System Only

    I, , declare to USGBC that the building provides an open-grid pavement system

    (less than 50% impervious) for 50% of the parking lot area.

    (Responsible Party)

    Percentage of total qualifying area for heat island reduction strategies [%]:

    Total area of all hardscape surfaces with open-grid paving system that are at least 50%pervious [sf]:

    Total area of all non-roof hardscape surfaces on project site [sf]:

    I have provided the following calculation to support the declaration:

    The project site / landscape drawing has been uploaded. The drawing(s) provides information regarding the open-gridpaving materials.

    Credit: Points Documented:

    Project Name:

  • LEED-CI 2.0 Letter TemplateSS Credit 1: Site Selection, LEED Certified Building

    Option E: Heat Island Effect, Roof

    Total Project Roof Area [sf]:

    Total Project Roof Area is needed for all credit calculations

    Option 1: Reflective Roofing Materials

    I, , declare to USGBC that the building's roof has a Solar Reflectance Index (SRI) greater

    than or equal to a minimum of 75% of the roof surface.

    (Responsible Party)

    SRI ValueRoofing TypeEmittance [%]Reflectance [%]Manufacturer &Product Name/Product ID

    SRI Data for Reflective Roofing Materials Calculation in Option 1

    Percentage of SRI compliant roof area, based on total roof area [%]:

    Total area of installed steep-sloped roofing materials having a minimum SRI of 29 [sf]:

    Total area of installed low-sloped roofing materials having a minimum SRI of 78 [sf]:

    I have provided the following calculation to support the declaration:

    The project roof plan has been uploaded. The drawing provides information regarding installed roofing materials.

    Option 2: Green Roof

    (Responsible Party)

    I, , declare to USGBC that the building has installed a "green" (vegetated) roof

    for at least 50% of the roof area.

    Total area of installed vegetated roofing system [sf]:

    Percentage of green roof area, based on total roof area [%]:

    I have provided the following calculation to support the declaration:

    The project roof plan has been uploaded. The drawing provides information regarding installed roofing materials andvegetated roofing systems, as applicable.

  • LEED-CI 2.0 Letter TemplateSS Credit 1: Site Selection, LEED Certified Building

    Option 3: Combined Reflective Roof and Green Roof Systems

    I, , declare to USGBC that the building has a combination of high SRI roofs and

    vegetated roofs that satisfy the calculation below.

    (Responsible Party)

    SRI ValueRoofing TypeEmittance [%]Reflectance [%]Manufacturer &Product Name/Product ID

    SRI Data for Reflective Roofing Materials Calculation in Option 3

    Weighted Average Calculation (Combined SRI Compliant and Green Roof) [sf]:(area of SRI roof / 0.75) + (area of Green roof / 0.5) >= total roof area

    Total area of installed vegetated roofing system [sf]:

    Total area of installed steep-sloped roofing materials having a minimum SRI of 29 [sf]:

    Total area of installed low-sloped roofing materials having a minimum SRI of 78 [sf]:

    I have provided the following calculation to support the declaration:

    The project roof plan has been uploaded. The drawing provides information regarding installed roofing materials andvegetated roofing systems, as applicable.

    Credit: Points Documented:

    Project Name:

  • LEED-CI 2.0 Letter TemplateSS Credit 1: Site Selection, LEED Certified Building

    Option F: Light Pollution Reduction

    I, , declare to USGBC that this project's exterior lighting has been designed according

    to the Illuminating Engineering Society of North America (IESNA) Recommended Practice Manual: Lighting for ExteriorEnvironments (RP-33-99) such that:

    (Responsible Party)

    As demonstrated by the photometric site plan provided, the overall site illuminance meets the average illuminance levelsand uniformity ratios recommended by the Illuminating Engineering Society of North America (IESNA) RecommendedPractice Manual: Lighting for Exterior Environments (RP-33).

    Any luminaire within a distance of 2.5 times its mounting height from the property boundary shall have shielding such thatno light from that luminaire crosses the property boundary.

    The maximum candela value of all interior lighting shall fall within the building (not out through windows) and themaximum candela value of all exterior lighting shall fall within the property.

    All exterior luminaires with more than 1000 initial lamp lumens are shielded and all luminaires with more than 3500 initiallamp lumens are Full Cutoff (IESNA Classification).

    I have done all of the below to support the declaration:

    Project Name:

    Credit: Points Documented:

  • LEED-CI 2.0 Letter TemplateSS Credit 1: Site Selection, LEED Certified Building

    Option G: Water Efficient Landscaping, Reduced Potable Water Consumption

    I, , declare to USGBC that potable water consumption for site irrigation

    has been reduced by 50% through:

    (Responsible Party)

    High efficiency irrigation technology.

    - OR -

    No permanent irrigation system.

    - OR -

    Captured rain or recycled site water.

    I have provided the following supplementary documentation to support the declaration:

    Narrative of the equipment used.

    Baseline Case Total Water Applied [gal]

    Percentage Reduction of Potable Water [%]

    Calculations (should be based on July conditions):

    Narrative describing all species of plants to be used and their irrigation needs.

    Narrative describing the captured rain or recycled site water system and system capacity.

    - OR -

    - OR -

    - AND -

    Design Case Total Potable Water Applied (TPWA) [gal]

    Reused Water [gal]

    Design Case Total Water Applied (TWA) [gal]

    Project Name:

    Credit: Points Documented:

  • LEED-CI 2.0 Letter TemplateSS Credit 1: Site Selection, LEED Certified Building

    Option H: Water Efficient Landscaping, No Potable Use or No Irrigation

    I, , declare to USGBC that the project site will not use any potable water for irrigation.

    (Responsible Party)

    Narrative describing the captured rain system or recycled site water system and system capacity,

    Narrative describing all species of plants to be used and their irrigation needs, and

    Calculations below demonstrating that irrigation requirements can be met from captured rain or recycled site water.

    Narrative describing how the landscape design does not require a permanent irrigation system.

    Baseline Case Total Water Applied [gal]

    Percentage Reduction of Potable Water [%] (note: needs to be "100" to earn credit)

    Design Case Total Potable Water Applied (TPWA) [gal]

    Reused Water [gal]

    Design Case Total Water Applied (TWA) [gal]

    Calculations (should be based on July conditions):

    Option 1: No Potable Use

    Option 2: No Irrigation

    Project Name:

    Credit: Points Documented:

  • LEED-CI 2.0 Letter TemplateSS Credit 1: Site Selection, LEED Certified Building

    Option I: Innovative Wastewater Technologies

    Option 1:

    I, , declare to USGBC that municipally provided potable water for building sewage

    conveyance will be reduced by at least 50%.

    (Responsible Party)

    I have provided the calculations found in the table below and a narrative demonstrating the measures used to reducewastewater by at least 50% from baseline conditions.

    Option 2:

    I, , declare to USGBC that 100% of wastewater will be treated to

    tertiary standards on site.

    (Responsible Party)

    I have provided a narrative describing the on-site wastewater treatment system.

    Fixture Chart

    0.00

    Fixture Type

    Conventional Water Closet

    Low-Flow Water Closet

    Ultra Low-Flow Water Closet

    Composting Toilet

    Conventional Urinal

    Waterless Urinal

    GPF

    1.60

    1.10

    0.80

    1.00

    0.00

    User Defined 1

    User Defined 2

    User Defined 3

  • LEED-CI 2.0 Letter TemplateSS Credit 1: Site Selection, LEED Certified Building

    Design Case Table

    Fixture Type Daily Uses Flow Rate [GPF] Occupant Users SewageGeneration [gal]

    Male

    Female

    Male

    Female

    Male

    Female

    Male

    Female

    Male

    Female

    Total uses by all occupants

    Total Daily Volume [gal]

    Annual Work Days

    Annual Volume [gal]

    Graywater or Stormwater Reuse Volume [gal]

    Total Annual Volume [gal]

  • LEED-CI 2.0 Letter TemplateSS Credit 1: Site Selection, LEED Certified Building

    Baseline Case Table

    Fixture Type DailyUsesFlow Rate

    [GPF]Occupant

    Users

    SewageGeneration

    [gal]

    Male

    Female

    Male

    Female

    Total uses by all occupants

    Total Daily Volume [gal]

    Annual Work Days

    Total Annual Volume [gal]

    Wastewater Generation Reduction [%]

    Male

    Female

    Male

    Female

    Not Applicable (no value entered for graywater and stormwater reuse)

    For graywater and stormwater reuse, I have provided a narrative and calculations demonstrating the capacity of the systemto provide the stated amount of reused water.

    - OR -

    I have provided the following supplementary documentation to support the graywater and stormwater reuse:

    Project Name:

    Credit: Points Documented:

  • LEED-CI 2.0 Letter TemplateSS Credit 1: Site Selection, LEED Certified Building

    Option J: Water Use Reduction, 20% Reduction

    I, , declare to USGBC that the project uses at least 20% less water, based on tenant

    occupancy requirements, than baseline fixture performance requirements of the Energy Policy Act of 1992.

    (Responsible Party)

    Fixture Charts

    Flush Fixture Chart

    Flush Fixture Type

    Conventional Water Closet

    Low-Flow Water Closet

    Ultra Low-Flow Water Closet

    Composting Toilet

    Conventional Urinal

    Waterless Urinal

    Water Use[GPF]

    1.60

    1.10

    0.80

    0.00

    1.00

    0.00

    Flow Fixture Chart

    Flow Fixture Type

    Conventional Lavatory

    Low-Flow Lavatory

    Kitchen Sink

    Low-Flow Kitchen Sink

    Shower

    Low-Flow Shower

    Water Use[GPF]

    2.50

    1.80

    2.50

    1.80

    2.50

    1.80

    Janitor Sink

    Hand Wash Fountain

    2.50

    0.50

    Duration[sec]

    15

    15

    15

    15

    300

    300

    15

    15

    User Defined 1

    User Defined 2

    User Defined 3User Defined 1

    User Defined 2

    User Defined 3

  • LEED-CI 2.0 Letter TemplateSS Credit 1: Site Selection, LEED Certified Building

    Design Case Table

    Male

    Female

    Male

    Female

    Male

    Female

    Male

    Female

    Male

    Female

    Total uses by all occupants

    Total Daily Volume [gal]

    Annual Work Days

    Annual Volume [gal]

    Graywater or Stormwater Reuse Volume [gal]

    Total Annual Volume [gal]

    Flow Fixture DailyUsesFlow Rate

    [GPM]Duration

    [sec]Occupant

    Users

    SewageGeneration

    [gal]

    Flush Fixture DailyUsesFlow Rate

    [GPF]Duration

    [Flush]Occupant

    Users

    SewageGeneration

    [gal]

  • LEED-CI 2.0 Letter TemplateSS Credit 1: Site Selection, LEED Certified Building

    Baseline Case Table

    Total uses by all occupants

    Total Daily Volume [gal]

    Annual Work Days

    Total Annual Volume [gal]

    Male

    Female

    Male

    Female

    Male

    Female

    Male

    Female

    Male

    Female

    Flow Fixture DailyUsesFlow Rate

    [GPM]Duration

    [sec]Occupant

    Users

    SewageGeneration

    [gal]

    Flush Fixture DailyUsesFlow Rate

    [GPF]Duration

    [Flush]Occupant

    Users

    SewageGeneration

    [gal]

  • LEED-CI 2.0 Letter TemplateSS Credit 1: Site Selection, LEED Certified Building

    Wastewater Generation Reduction [%]

    Not Applicable (no value entered for graywater and stormwater reuse)

    For graywater and stormwater reuse, I have provided a narrative and calculations demonstrating the capacity of the systemto provide the stated amount of reused water.

    - OR -

    I have provided the following supplementary documentation to support the graywater and stormwater reuse:

    Project Name:

    Credit: Points Documented:

  • LEED-CI 2.0 Letter TemplateSS Credit 1: Site Selection, LEED Certified Building

    Option K: On-Site Renewable Energy

    I, , declare to USGBC that at least 5% of the building’s energy is provided

    by on-site renewable energy supply.

    (Responsible Party)

    Regulated Systems Energy Use

    Energy Type Annual Use [103 Btu] Annual Cost [$] Energy Supplied [%]

    Total Non-Renewable

    Renewable Energy

    Energy Type Annual Use [103 Btu] Annual Cost [$] Energy Supplied [%]

    Total Renewable

    Total Energy Use

    I have provided the following supplementary documentation to support the declaration:

    A narrative describing on-site renewable energy systems installed in the building

    SS Cr. 1 - Option K (0.5 point): On-Site Renewable Energy >= 5% Points Documented:

    SS Cr. 1 - Option K (0.5 additional point): On-Site Renewable Energy >= 10%Points Documented:

    Project Name:

    Credit: Points Documented:

  • LEED-CI 2.0 Letter TemplateSS Credit 1: Site Selection, LEED Certified Building

    Option L: Other Quantifiable Environmental Performance

    I, , declare to USGBC compliance with other quantifiable environmental performance,

    for which the requirements may be found in other LEED Rating Systems.

    (Responsible Party)

    I have provided the following supplementary documentation to support the declaration:

    a brief narrative, calculations or other quantifiable environmental performance as described in the documentationrequirement for the following credits.

    I claim credit for the following LEED credits from other applicable LEED standards:

    Regulated Systems Energy Use

    Claimed

    1

    2

    3

    4

    5

    6

    LEED Rating System andVersion

    LEED CreditCategory Credit Number Credit Title

    SS Cr. 1 - Option L (0.5 point): Other Quantifiable Environmental Performance Points Documented:

    SS Cr. 1 - Option L (0.5 additional point): Other Quantifiable Environmental Performance Points Documented:

    SS Cr. 1 - Option L (0.5 additional point): Other Quantifiable Environmental Performance Points Documented:

    SS Cr. 1 - Option L (0.5 additional point): Other Quantifiable Environmental Performance Points Documented:

    SS Cr. 1 - Option L (0.5 additional point): Other Quantifiable Environmental Performance Points Documented:

    SS Cr. 1 - Option L (0.5 additional point): Other Quantifiable Environmental Performance Points Documented:

    Points Documented:Credit:

    Project Name:

  • LEED-CI 2.0 Letter TemplateSS Credit 1: Site Selection, LEED Certified Building

    Option K: On-Site Renewable Energy

    Option B: Stormwater Management, Rate and Quantity

    Option D: Heat Island Effect, Non-Roof

    Option G: Water Efficient Landscaping, Reduced Potable Water Consumption

    Option I: Innovative Wastewater Technologies

    Option E: Heat Island Effect, Roof

    Option C: Stormwater Management, Treatment

    Option A: Brownfield Redevelopment

    Option F: Light Pollution Reduction

    Option L: Other Quantifiable Environmental Performance

    Option H: Water Efficient Landscaping, No Potable Use or No Irrigation

    Option J: Water Use Reduction, 20% Reduction

    Points Review

    Subtotal

    Credit: Points Documented:

    Project Name:

    First Name Last Name

    READY TO SAVE THIS TEMPLATE TO LEED-ONLINE? Please enter your first name, last name and today's date below, followed by yourLEED-Online Username and Password associated with the Project listed above to confirm submission of this template.

    Date Username (Email Address) Password

    Letter Template Version.

    Points Final

    ..\My Documents\My Pictures\Logos\tril-usgbclogo.jpg

    ..\..\leed-ci-20.jpg

    ..\..\poweredbyadobe.jpg

    ..\design.jpg

    LEED-CI 2.0 Letter Template

    SS Credit 1: Site Selection, LEED Certified Building 

    I,                                               , declare to USGBC that the commercial interiors project proposed for LEED-CI 

     

    certification is located in a LEED certified building.

    I have provided the following documentation to support the declaration:

    Up to a total of 3 points may be earned in ½ point increments if the building in which the tenant space is located meets any of the stated requirements in SS Credit 1, Options A – L. Complete those specific templates to declare achievement for Options A – L.

    - OR -

    Option B: Stormwater Management, Rate and Quantity Page 3

    Option D: Heat Island Effect, Non-Roof Page 7

    Option G: Water Efficient Landscaping, Reduced Potable Water Consumption Page 12

    Option I: Innovative Wastewater Technologies Page 14

    Option E: Heat Island Effect, Roof Page 9

    Option C: Stormwater Management, Treatment Page 6

    Option A: Brownfield Redevelopment Page 2

    Option F: Light Pollution Reduction Page 11

    Option K: On-Site Renewable Energy Page 21

    Option L: Other Quantifiable Environmental Performance Page 22

    Option H: Water Efficient Landscaping, No Potable Use or No Irrigation Page 13

    Option J: Water Use Reduction, 20% Reduction Page 17

    OPTIONS LIST

    Option A: Brownfield Redevelopment

    I,                                               , declare to USGBC that this project is developed on a site documented as

     

    contaminated (by means of an ASTM E1903-97 Phase II Environmental Site Assessment) or on a site classified as a Brownfield by a local, state, or federal government agency.

    I have provided one of the following supplementary documentation to support the declaration:

    “In addition, I confirm that the following remedial measures have been taken to protect the environment:

    Areas of the Site Affected

    List of Damage or Contamination that Existed

    Remedial Measures Taken

    Points Documented:

    Option B: Stormwater Management, Rate and Quantity

    Option 1: If existing site imperviousness is less than or equal to 50%

    I,                                               , declare to USGBC that the post-development 1.5 year, 24 hour peak discharge rate 

     

    and quantity does not exceed the pre-development 1.5 year 24 hour peak discharge rate and quantity.

    OR

    Option 2: If existing site imperviousness exceeds 50%

    I,                                               , declare to USGBC that implementation of the project stormwater management plan 

     

    results in at least a 25% decrease in the rate and quantity of stormwater runoff.

    OR

    Coefficient Tables

    Suface Type

    Pavement, Asphalt

    Pavement, Concrete

    Pavement, Brick

    Pavement, Gravel

    Roof, Conventional

    Roof, Garden Roof (< 4 in)

    Roof, Garden Roof (4 - 8 in)

    Roof, Garden Roof (9 - 20 in)

    Roof, Garden Roof (> 20 in)

    Turf, Flat (0 - 1% slope)

    Runoff Coefficient

    0.95

    0.95

    0.85

    0.75

    0.95

    0.50

    0.30

    0.20

    Pavement, Pervious

    0.60

    0.10

    0.25

    Suface Type

    Turf, Average (1 - 3% slope)

    Turf, Hilly (3 - 10% slope)

    Turf, Steep (> 10% slope)

    Vegetation, Flat (0 - 1% slope)

    Vegetation, Average (1 - 3% slope)

    Vegetation, Hilly (3 - 10% slope)

    Vegetation, Steep (> 10% slope)

    Runoff Coefficient

    0.35

    0.40

    0.45

    0.10

    0.20

    0.25

    0.30

    User Defined 1

    User Defined 2

    User Defined 2

    Design Case Table

    Suface Type

    Runoff Coefficient

    Design Case Table

    Area [SF]

    Impervious Area

    Total Area

    Total Impervious Area

    Imperviousness [%]

    Baseline Case Table

    Baseline Case Table

    Suface Type

    Runoff Coefficient

    Area [SF]

    Impervious Area

    Total Area

    Total Impervious Area

    Imperviousness [%]

    Points Documented:

    Option C: Stormwater Management, Treatment

    Option 1: EPA Efficient

    I,                                               , declare to USGBC that the design complies with or exceeds Best Management 

     

    Practices (BMPs) outlined in Chapter 4, Part 2 (Urban Runoff), of the United States Environmental Protection Agency’s (EPA’s)  Guidance Specifying Management Measures for Sources of Nonpoint Pollution in Coastal Waters, January 1993 (Document No. EPA-840-B-92-002) for removal of 80% of the average annual post-development total suspended solids (TSS) and 40% of the average annual post-development total phosphorous (TP).

    I,                                               , declare to USGBC that the design will comply with or exceed the local Best 

     

    Management Practices implemented for removal of TSS (total suspended solids) and TP (total phosphorous).

    Option 2: Local standard is more stringent than EPA standard

    Points Documented:

    Option D: Heat Island Effect, Non-Roof

    Option 1: Reflective Paving, Shading, and/or Open Grid Pavement

    I,                                               , declare to USGBC that the building provides shade (or will have within 5 years of 

     

    construction) and/or uses light-colored/high-albedo materials with a Solar Reflectance Index (SRI) of at least 30, and/or open grid pavement, that individually or in total equals at least 30% of the site's non-roof impervious surfaces, which include parking areas, walkways, plazas, fire lanes, etc.

    Percentage of total qualifying area for heat island reduction strategies [%]:

    I have provided the following calculation to support the declaration:

    Manufacturer &

    Product Name/Product ID

    Reflectance [%]

    Emittance [%]

    SRI Value

    SRI Data for Reflective Paving Calculation in Option 1

    Option 2: Covered Parking

    I,                                               , declare to USGBC that the building provides a minimum of 50% of parking spaces

     

    underground or covered by structured parking.

    Percentage of on-site covered parking spaces [%]:

    I have provided the following calculation to support the declaration:

    Option 3: Open Grid Pavement System Only

    I,                                               , declare to USGBC that the building provides an open-grid pavement system 

     

    (less than 50% impervious) for 50% of the parking lot area.

    Percentage of total qualifying area for heat island reduction strategies [%]:

    I have provided the following calculation to support the declaration:

    Points Documented:

    Option E: Heat Island Effect, Roof

    Total Project Roof Area is needed for all credit calculations

    Option 1: Reflective Roofing Materials

    I,                                               , declare to USGBC that the building's roof has a Solar Reflectance Index (SRI) greater 

     

    than or equal to a minimum of 75% of the roof surface.

    SRI Value

    Roofing Type

    Emittance [%]

    Reflectance [%]

    Manufacturer &

    Product Name/Product ID

    SRI Data for Reflective Roofing Materials Calculation in Option 1

    Percentage of SRI compliant roof area, based on total roof area [%]:

    I have provided the following calculation to support the declaration:

    Option 2: Green Roof

    I,                                               , declare to USGBC that the building has installed a "green" (vegetated) roof 

     

    for at least 50% of the roof area.

    Percentage of green roof area, based on total roof area [%]:

    I have provided the following calculation to support the declaration:

    Option 3: Combined Reflective Roof and Green Roof Systems

    I,                                               , declare to USGBC that the building has a combination of high SRI roofs and 

     

    vegetated roofs that satisfy the calculation below.

    SRI Value

    Roofing Type

    Emittance [%]

    Reflectance [%]

    Manufacturer &

    Product Name/Product ID

    SRI Data for Reflective Roofing Materials Calculation in Option 3

    Weighted Average Calculation (Combined SRI Compliant and Green Roof) [sf]:

    (area of SRI roof / 0.75) + (area of Green roof / 0.5) >= total roof area

    I have provided the following calculation to support the declaration:

    Points Documented:

    Option F: Light Pollution Reduction

    I,                                               , declare to USGBC that this project's exterior lighting has been designed according 

     

    to the Illuminating Engineering Society of North America (IESNA) Recommended Practice Manual: Lighting for Exterior Environments (RP-33-99)  such that:

    I have done all of the below to support the declaration:

    Points Documented:

    Option G: Water Efficient Landscaping, Reduced Potable Water Consumption

    I,                                               , declare to USGBC that potable water consumption for site irrigation 

     

    has been reduced by 50% through:

    - OR -

    - OR -

    I have provided the following supplementary documentation to support the declaration:

    Percentage Reduction of Potable Water [%]

    Calculations (should be based on July conditions):

    - OR -

    - OR -

    - AND -

    Design Case Total Potable Water Applied (TPWA) [gal]

    Points Documented:

    Option H: Water Efficient Landscaping, No Potable Use or No Irrigation

    I,                                               , declare to USGBC that the project site will not use any potable water for irrigation.

    Percentage Reduction of Potable Water [%] (note: needs to be "100" to earn credit)

    Design Case Total Potable Water Applied (TPWA) [gal]

    Calculations (should be based on July conditions):

    Option 1: No Potable Use

    Option 2: No Irrigation

    Points Documented:

    Option I: Innovative Wastewater Technologies

    Option 1:

    I,                                               , declare to USGBC that municipally provided potable water for building sewage 

     

    conveyance will be reduced by at least 50%.

    Option 2:

    I,                                               , declare to USGBC that 100% of wastewater will be treated to 

     

    tertiary standards on site.

    Fixture Chart

    0.00

    Fixture Type

    Conventional Water Closet

    Low-Flow Water Closet

    Ultra Low-Flow Water Closet

    Composting Toilet

    Conventional Urinal

    Waterless Urinal

    GPF

    1.60

    1.10

    0.80

    1.00

    0.00

    User Defined 1

    User Defined 2

    User Defined 3

    Design Case Table

    Fixture Type

    Daily Uses

    Flow Rate [GPF]

    Occupant Users

    Sewage

    Generation [gal]

    Male

    Female

    Male

    Female

    Male

    Female

    Male

    Female

    Male

    Female

    Total uses by all occupants

    Total Daily Volume [gal]

    Annual Work Days

    Annual Volume [gal]

    Graywater or Stormwater Reuse Volume [gal]

    Total Annual Volume [gal]

    Baseline Case Table

    Fixture Type

    Daily

    Uses

    Flow Rate

    [GPF]

    Occupant

    Users

    Sewage

    Generation

    [gal]

    Male

    Female

    Male

    Female

    Total uses by all occupants

    Total Daily Volume [gal]

    Annual Work Days

    Total Annual Volume [gal]

    Wastewater Generation Reduction [%]

    Male

    Female

    Male

    Female

    - OR -

    I have provided the following supplementary documentation to support the graywater and stormwater reuse:

    Points Documented:

    Option J: Water Use Reduction, 20% Reduction

    I,                                               , declare to USGBC that the project uses at least 20% less water, based on tenant 

     

    occupancy requirements, than baseline fixture performance requirements of the Energy Policy Act of 1992.

    Fixture Charts

    Flush Fixture Chart

    Flush Fixture Type

    Conventional Water Closet

    Low-Flow Water Closet

    Ultra Low-Flow Water Closet

    Composting Toilet

    Conventional Urinal

    Waterless Urinal

    Water Use

    [GPF]

    1.60

    1.10

    0.80

    0.00

    1.00

    0.00

    Flow Fixture Chart

    Flow Fixture Type

    Conventional Lavatory

    Low-Flow Lavatory

    Kitchen Sink

    Low-Flow Kitchen Sink

    Shower

    Low-Flow Shower

    Water Use

    [GPF]

    2.50

    1.80

    2.50

    1.80

    2.50

    1.80

    Janitor Sink

    Hand Wash Fountain

    2.50

    0.50

    Duration

    [sec]

    15

    15

    15

    15

    300

    300

    15

    15

    User Defined 1

    User Defined 2

    User Defined 3

    User Defined 1

    User Defined 2

    User Defined 3

    Design Case Table

    Male

    Female

    Male

    Female

    Male

    Female

    Male

    Female

    Male

    Female

    Total uses by all occupants

    Total Daily Volume [gal]

    Annual Work Days

    Annual Volume [gal]

    Graywater or Stormwater Reuse Volume [gal]

    Total Annual Volume [gal]

    Flow Fixture

    Daily

    Uses

    Flow Rate

    [GPM]

    Duration

    [sec]

    Occupant

    Users

    Sewage

    Generation

    [gal]

    Flush Fixture

    Daily

    Uses

    Flow Rate

    [GPF]

    Duration

    [Flush]

    Occupant

    Users

    Sewage

    Generation

    [gal]

    Baseline Case Table

    Total uses by all occupants

    Total Daily Volume [gal]

    Annual Work Days

    Total Annual Volume [gal]

    Male

    Female

    Male

    Female

    Male

    Female

    Male

    Female

    Male

    Female

    Flow Fixture

    Daily

    Uses

    Flow Rate

    [GPM]

    Duration

    [sec]

    Occupant

    Users

    Sewage

    Generation

    [gal]

    Flush Fixture

    Daily

    Uses

    Flow Rate

    [GPF]

    Duration

    [Flush]

    Occupant

    Users

    Sewage

    Generation

    [gal]

    Wastewater Generation Reduction [%]

    - OR -

    I have provided the following supplementary documentation to support the graywater and stormwater reuse:

    Points Documented:

    Option K: On-Site Renewable Energy

    I,                                               ,  declare to USGBC that at least 5% of the building’s energy is provided

     

    by on-site renewable energy supply.

    Regulated Systems Energy Use

    Energy Type

    Annual Use [103 Btu]

    Annual Cost [$]

    Energy Supplied [%]

    Total Non-Renewable

    Renewable Energy

    Energy Type

    Annual Use [103 Btu]

    Annual Cost [$]

    Energy Supplied [%]

    Total Renewable

    Total Energy Use

    I have provided the following supplementary documentation to support the declaration:

    SS Cr. 1 - Option K (0.5 point): On-Site Renewable Energy >= 5%

    Points Documented:

    SS Cr. 1 - Option K (0.5 additional point): On-Site Renewable Energy >= 10%

    Points Documented:

    Points Documented:

    Option L: Other Quantifiable Environmental Performance

    I,                                               ,  declare to USGBC compliance with other quantifiable environmental performance, 

     

    for which the requirements may be found in other LEED Rating Systems.

    I have provided the following supplementary documentation to support the declaration:

    I claim credit for the following LEED credits from other applicable LEED standards:

    Regulated Systems Energy Use

    Claimed

    1

    2

    3

    4

    5

    6

    LEED Rating System and Version

    LEED Credit Category

    Credit Number

    Credit Title

    SS Cr. 1 - Option L (0.5 point): Other Quantifiable Environmental Performance

    Points Documented:

    SS Cr. 1 - Option L (0.5 additional point): Other Quantifiable Environmental Performance

    Points Documented:

    SS Cr. 1 - Option L (0.5 additional point): Other Quantifiable Environmental Performance

    Points Documented:

    SS Cr. 1 - Option L (0.5 additional point): Other Quantifiable Environmental Performance

    Points Documented:

    SS Cr. 1 - Option L (0.5 additional point): Other Quantifiable Environmental Performance

    Points Documented:

    SS Cr. 1 - Option L (0.5 additional point): Other Quantifiable Environmental Performance

    Points Documented:

    Points Documented:

    Points Review

    Points Documented:

    READY TO SAVE THIS TEMPLATE TO LEED-ONLINE? Please enter your first name, last name and today's date below, followed by your LEED-Online Username and Password associated with the Project listed above to confirm submission of this template.

    .

    Points Final

    txtResponsibleparty: Christine MagarchkSuppdoc: 1rdoPertinentsections: rdoLetter: rdoNarrative: txtMeasures1: txtLocalcode1: txtRemedial1: txtMeasures2: txtLocalcode2: txtRemedial2: txtMeasures3: txtLocalcode3: txtRemedial3: txtMeasures4: txtLocalcode4: txtRemedial4: txtMeasures5: txtLocalcode5: txtRemedial5: txtMeasures6: txtLocalcode6: txtRemedial6: txtMeasures7: txtLocalcode7: txtRemedial7: txtMeasures8: txtLocalcode8: txtRemedial8: txtMeasures9: txtLocalcode9: txtRemedial9: txtMeasures10: txtLocalcode10: txtRemedial10: txtMeasures11: txtLocalcode11: txtRemedial11: txtMeasures12: txtLocalcode12: txtRemedial12: txtMeasures13: txtLocalcode13: txtRemedial13: txtMeasures14: txtLocalcode14: txtRemedial14: txtClaimofcreditid: 318091txtCreditid: 649txtProjectid: 10240746txtCreditname: SS Credit 1 (3 points possible): Site Selection, LEED Certified BuildingtxtPoints: 3txtProjectname: The Recording AcademytxtResponsibleparty1: rdoLessthan50calc: rdoLessthan50narrative: rdoMorethan50narrative: txtUserdefined1: txtUserdefined2: txtUserdefined3: numUserdefinedvalue1: numUserdefinedvalue2: numUserdefinedvalue3: numRunoffdesign1: 0.00000000numRunoffdesign2: 0.00000000numRunoffdesign3: 0.00000000numRunoffdesign4: 0.00000000numRunoffdesign5: 0.00000000numRunoffdesign6: 0.00000000numRunoffdesign7: numRunoffdesign8: 0.00000000numRunoffdesign9: 0.00000000numRunoffdesign10: 0.00000000numRunoffdesign11: 0.00000000numRunoffdesign12: 0.00000000numRunoffdesign13: 0.00000000numRunoffdesign14: 0.00000000numRunoffdesign15: 0.00000000numRunoffdesign16: 0.00000000numRunoffdesign17: 0.00000000numRunoffdesign18: 0.00000000numAreadesign1: numAreadesign2: numAreadesign3: numAreadesign4: numAreadesign5: numAreadesign6: numAreadesign7: numAreadesign8: numAreadesign9: numAreadesign10: numAreadesign11: numAreadesign12: numAreadesign13: numAreadesign14: numAreadesign15: numAreadesign16: numAreadesign17: numAreadesign18: ddlSurfacetypedesign1: ----ddlSurfacetypedesign2: ----ddlSurfacetypedesign3: ----ddlSurfacetypedesign4: ----ddlSurfacetypedesign5: ----ddlSurfacetypedesign6: ----ddlSurfacetypedesign7: ----ddlSurfacetypedesign8: ----ddlSurfacetypedesign9: ----ddlSurfacetypedesign10: ----ddlSurfacetypedesign11: ----ddlSurfacetypedesign12: ----ddlSurfacetypedesign13: ----ddlSurfacetypedesign14: ----ddlSurfacetypedesign15: ----ddlSurfacetypedesign16: ----ddlSurfacetypedesign17: ----ddlSurfacetypedesign18: ----numImperviousareadesign18: 0.00numImperviousareadesign17: 0.00numImperviousareadesign16: 0.00numImperviousareadesign15: 0.00numImperviousareadesign14: 0.00numImperviousareadesign13: 0.00numImperviousareadesign12: 0.00numImperviousareadesign11: 0.00numImperviousareadesign10: 0.00numImperviousareadesign9: 0.00numImperviousareadesign8: 0.00numImperviousareadesign7: 0.00numImperviousareadesign6: 0.00numImperviousareadesign5: 0.00numImperviousareadesign4: 0.00numImperviousareadesign3: 0.00numImperviousareadesign2: 0.00numImperviousareadesign1: 0.00numTotalAreadesign: numTotalimperviousdesign: 0.00numTotalimperviousnessdesignp: 0.00numRunoffbaseline1: 0.00000000numRunoffbaseline2: 0.00000000numRunoffbaseline3: 0.00000000numRunoffbaseline4: 0.00000000numRunoffbaseline5: 0.00000000numRunoffbaseline6: 0.00000000numRunoffbaseline7: numRunoffbaseline8: 0.00000000numRunoffbaseline9: 0.00000000numRunoffbaseline10: 0.00000000numRunoffbaseline11: 0.00000000numRunoffbaseline12: 0.00000000numRunoffbaseline13: 0.00000000numRunoffbaseline14: 0.00000000numRunoffbaseline15: 0.00000000numRunoffbaseline16: 0.00000000numRunoffbaseline17: 0.00000000numRunoffbaseline18: 0.00000000numAreabaseline1: numAreabaseline2: numAreabaseline3: numAreabaseline4: numAreabaseline5: numAreabaseline6: numAreabaseline7: numAreabaseline8: numAreabaseline9: numAreabaseline10: numAreabaseline11: numAreabaseline12: numAreabaseline13: numAreabaseline14: numAreabaseline15: numAreabaseline16: numAreabaseline17: numAreabaseline18: ddlSurfacetypebaseline1: ----ddlSurfacetypebaseline2: ----ddlSurfacetypebaseline3: ----ddlSurfacetypebaseline4: ----ddlSurfacetypebaseline5: ----ddlSurfacetypebaseline6: ----ddlSurfacetypebaseline7: ----ddlSurfacetypebaseline8: ----ddlSurfacetypebaseline9: ----ddlSurfacetypebaseline10: ----ddlSurfacetypebaseline11: ----ddlSurfacetypebaseline12: ----ddlSurfacetypebaseline13: ----ddlSurfacetypebaseline14: ----ddlSurfacetypebaseline15: ----ddlSurfacetypebaseline16: ----ddlSurfacetypebaseline17: ----ddlSurfacetypebaseline18: ----numImperviousareabaseline18: 0.00numImperviousareabaseline17: 0.00numImperviousareabaseline16: 0.00numImperviousareabaseline15: 0.00numImperviousareabaseline14: 0.00numImperviousareabaseline13: 0.00numImperviousareabaseline12: 0.00numImperviousareabaseline11: 0.00numImperviousareabaseline10: 0.00numImperviousareabaseline9: 0.00numImperviousareabaseline8: 0.00numImperviousareabaseline7: 0.00numImperviousareabaseline6: 0.00numImperviousareabaseline5: 0.00numImperviousareabaseline4: 0.00numImperviousareabaseline3: 0.00numImperviousareabaseline2: 0.00numImperviousareabaseline1: 0.00numTotalAreabaseline: numTotalimperviousbaseline: 0.00numTotalimperviousnessbaselinep: 0.00chkEpastandard: 0chkNarrative1: 0chkLocalstandard: 0chkNarrative2: 0txtResponsibleparty2: chkProjectsite1: 0numNonroofa: numOpengrida: numSria: numShadeda: numPercentagea: 0.00txtManufacturer1: numReflectance1: txtManufacturer2: numReflectance2: txtManufacturer3: numReflectance3: numEmittance1: numEmittance2: numEmittance3: numSrivalue1: numSrivalue2: numSrivalue3: numUndergroundc: numSpacesc: chkProjectsite3: 0numPercentagec: 0.00txtResponsibleparty3: numPercentageb: 0.00numOpengridb: numNonroofb: chkProjectsite2: 0numTotalroofarea: txtRoofingtype3: txtRoofingtype2: txtRoofingtype1: numPercentagesri: 0.00numSteepsloped: numLowsloped: chkRoofingmaterials1: 0numPercentagegreenroof: 0.00numVegetatedroof: chkRoofingmaterials2: 0numPercentagecombined: 0.00numVegetatedroofcombined: numSteepslopedcombined: numLowslopedcombined: chkRoofingmaterials3: 0chkSuppdocsiteplan: 0chkSuppdocboundarylight: 0chkSuppdocinteriorlighting: 0chkSuppdocexteriorluminaires: 0chkHighefficiency: 0chkNopermanentirrigation: 0chkCapturedrain: 0chkBriefequipment: 0numBaseline: numPercentagepotable: 0.00chkBriefspecies: 0chkBriefcaptured: 0numDesign: numReused: numApplied: chkSuppdocrainnarrative: 0chkSuppdocplantnarrative: 0chkSuppdoccalculations: 0chkSuppdocnoirrigationnarrative: 0chkCalculations: 0chkNarrative: 0numDailymaledesign1: numFlowmaledesign1: 0.00000000numOccupantmaledesign1: numSewagemaledesign1: 0.00numDailyfemaledesign1: numFlowfemaledesign1: 0.00000000numOccupantfemaledesign1: numSewagefemaledesign1: 0.00numTotaloccupantsdesign: numTotalvolumedesign: 0.00numAnnualworkdaysdesign: numAnnualvolumedesign: 0.00numGraystormvolumedesign: 0numTotalannualvolumedesign: ddlFixturetypedesign1: ----ddlFixturetypedesign2: ----ddlFixturetypedesign3: ----ddlFixturetypedesign4: ----ddlFixturetypedesign5: ----numDailymaledesign2: numDailyfemaledesign2: numDailymaledesign3: numDailyfemaledesign3: numDailymaledesign4: numDailyfemaledesign4: numDailymaledesign5: numDailyfemaledesign5: numFlowmaledesign2: 0.00000000numOccupantmaledesign2: numSewagemaledesign2: 0.00numFlowfemaledesign2: 0.00000000numOccupantfemaledesign2: numSewagefemaledesign2: 0.00numFlowmaledesign3: 0.00000000numOccupantmaledesign3: numSewagemaledesign3: 0.00numFlowfemaledesign3: 0.00000000numOccupantfemaledesign3: numSewagefemaledesign3: 0.00numFlowmaledesign4: 0.00000000numOccupantmaledesign4: numSewagemaledesign4: 0.00numFlowfemaledesign4: 0.00000000numOccupantfemaledesign4: numSewagefemaledesign4: 0.00numFlowmaledesign5: 0.00000000numOccupantmaledesign5: numSewagemaledesign5: 0.00numFlowfemaledesign5: 0.00000000numOccupantfemaledesign5: numSewagefemaledesign5: 0.00numTotaloccupantsbaseline: numTotalvolumebaseline: 0.00numAnnualworkdaysbaseline: numTotalannualvolumebaseline: ddlFixturetypebaseline1: ----ddlFixturetypebaseline2: ----numDailymalebaseline1: numDailyfemalebaseline1: numDailymalebaseline2: numDailyfemalebaseline2: numFlowmalebaseline1: 0.00000000numOccupantmalebaseline1: numSewagemalebaseline1: 0.00numFlowfemalebaseline1: 0.00000000numOccupantfemalebaseline1: numSewagefemalebaseline1: 0.00numFlowmalebaseline2: 0.00000000numOccupantmalebaseline2: numSewagemalebaseline2: 0.00numFlowfemalebaseline2: 0.00000000numOccupantfemalebaseline2: numSewagefemalebaseline2: 0.00ddlFixturetypebaseline3: ----ddlFixturetypebaseline4: ----numDailymalebaseline3: numDailyfemalebaseline3: numDailymalebaseline4: numDailyfemalebaseline4: numFlowmalebaseline3: 0.00000000numOccupantmalebaseline3: numSewagemalebaseline3: 0.00numFlowfemalebaseline3: 0.00000000numOccupantfemalebaseline3: numSewagefemalebaseline3: 0.00numFlowmalebaseline4: 0.00000000numOccupantmalebaseline4: numSewagemalebaseline4: 0.00numFlowfemalebaseline4: 0.00000000numOccupantfemalebaseline4: numSewagefemalebaseline4: 0.00numWastewaterreduction: 0.00numGraywateryesno: 0.00rdoNotapplicable: txtUserdefinedflush1: txtUserdefinedflush2: txtUserdefinedflush3: numUserdefinedvalueflushgpf1: numUserdefinedvalueflushgpf2: numUserdefinedvalueflushgpf3: txtUserdefinedflow1: txtUserdefinedflow2: txtUserdefinedflow3: numUserdefinedvalueflowgpf1: numUserdefinedvalueflowgpf2: numUserdefinedvalueflowgpf3: numUserdefinedvalueflowsec1: numUserdefinedvalueflowsec2: numUserdefinedvalueflowsec3: numFlowflushmaledesign1: 0.00000000numOccupantflushmaledesign1: numSewageflushmaledesign1: 0.00numFlowflushfemaledesign1: 0.00000000numOccupantflushfemaledesign1: numSewageflushfemaledesign1: 0.00ddlFixtureflushtypedesign1: ----ddlFixtureflushtypedesign2: ----ddlFixtureflushtypedesign3: ----ddlFixtureflushtypedesign4: ----ddlFixtureflushtypedesign5: ----numDailyflushfemaledesign3: numDailyflushmaledesign4: numDailyflushfemaledesign4: numDailyflushmaledesign5: numDailyflushfemaledesign5: numFlowflushmaledesign2: 0.00000000numOccupantflushmaledesign2: numSewageflushmaledesign2: 0.00numFlowflushfemaledesign2: 0.00000000numOccupantflushfemaledesign2: numSewageflushfemaledesign2: 0.00numFlowflushmaledesign3: 0.00000000numOccupantflushmaledesign3: numSewageflushmaledesign3: 0.00numFlowflushfemaledesign3: 0.00000000numOccupantflushfemaledesign3: numSewageflushfemaledesign3: 0.00numFlowflushmaledesign4: 0.00000000numOccupantflushmaledesign4: numSewageflushmaledesign4: 0.00numFlowflushfemaledesign4: 0.00000000numOccupantflushfemaledesign4: numSewageflushfemaledesign4: 0.00numFlowflushmaledesign5: 0.00000000numOccupantflushmaledesign5: numSewageflushmaledesign5: 0.00numFlowflushfemaledesign5: 0.00000000numOccupantflushfemaledesign5: numSewageflushfemaledesign5: 0.00numDailyflushmaledesign3: numDailyflushfemaledesign2: numDailyflushmaledesign2: numDailyflushfemaledesign1: numDailyflushmaledesign1: numDurationflushmaledesign1: 1.00000000numDurationflushfemaledesign1: 1.00000000numDurationflushmaledesign2: 1.00000000numDurationflushfemaledesign2: 1.00000000numDurationflushmaledesign3: 1.00000000numDurationflushfemaledesign3: 1.00000000numDurationflushmaledesign4: 1.00000000numDurationflushfemaledesign4: 1.00000000numDurationflushmaledesign5: 1.00000000numDurationflushfemaledesign5: 1.00000000numFlowflowdesign1: 0.00000000numOccupantflowdesign1: numSewageflowdesign1: 0.00numDailyflowdesign1: numDurationflowdesign1: 0.00000000numFlowflowdesign2: 0.00000000numOccupantflowdesign2: numSewageflowdesign2: 0.00numDailyflowdesign2: numDurationflowdesign2: 0.00000000numFlowflowdesign3: 0.00000000numOccupantflowdesign3: numSewageflowdesign3: 0.00numDailyflowdesign3: numDurationflowdesign3: 0.00000000numFlowflowdesign4: 0.00000000numOccupantflowdesign4: numSewageflowdesign4: 0.00numDailyflowdesign4: numDurationflowdesign4: 0.00000000numFlowflowdesign5: 0.00000000numOccupantflowdesign5: numSewageflowdesign5: 0.00numDailyflowdesign5: numDurationflowdesign5: 0.00000000numFlowflowdesign6: 0.00000000numOccupantflowdesign6: numSewageflowdesign6: 0.00numDailyflowdesign6: numDurationflowdesign6: 0.00000000ddlFixtureflowtypedesign1: ----numFlowflowdesign7: 0.00000000numOccupantflowdesign7: numSewageflowdesign7: 0.00numDailyflowdesign7: numDurationflowdesign7: 0.00000000numFlowflowdesign8: 0.00000000numOccupantflowdesign8: numSewageflowdesign8: 0.00numDailyflowdesign8: numDurationflowdesign8: 0.00000000ddlFixtureflowtypedesign2: ----ddlFixtureflowtypedesign3: ----ddlFixtureflowtypedesign4: ----ddlFixtureflowtypedesign5: ----ddlFixtureflowtypedesign6: ----ddlFixtureflowtypedesign7: ----ddlFixtureflowtypedesign8: ----numOccupantflushmalebaseline1: numOccupantflushfemalebaseline1: ddlFixtureflushtypebaseline1: ----ddlFixtureflushtypebaseline2: ----ddlFixtureflushtypebaseline3: ----ddlFixtureflushtypebaseline4: ----ddlFixtureflushtypebaseline5: ----numDailyflushfemalebaseline3: numDailyflushmalebaseline4: numDailyflushfemalebaseline4: numDailyflushmalebaseline5: numDailyflushfemalebaseline5: numOccupantflushmalebaseline2: numFlowflushfemalebaseline2: 0.00000000numOccupantflushfemalebaseline2: numFlowflushmalebaseline3: 0.00000000numOccupantflushmalebaseline3: numFlowflushfemalebaseline3: 0.00000000numOccupantflushfemalebaseline3: numFlowflushmalebaseline4: 0.00000000numOccupantflushmalebaseline4: numFlowflushfemalebaseline4: 0.00000000numOccupantflushfemalebaseline4: numFlowflushmalebaseline5: 0.00000000numOccupantflushmalebaseline5: numFlowflushfemalebaseline5: 0.00000000numOccupantflushfemalebaseline5: numDailyflushmalebaseline3: numDailyflushfemalebaseline2: numDailyflushmalebaseline2: numDailyflushfemalebaseline1: numDailyflushmalebaseline1: numDurationflushmalebaseline2: 1.00000000numDurationflushfemalebaseline2: 1.00000000numDurationflushmalebaseline3: 1.00000000numDurationflushfemalebaseline3: 1.00000000numDurationflushmalebaseline4: 1.00000000numDurationflushfemalebaseline4: 1.00000000numDurationflushmalebaseline5: 1.00000000numDurationflushfemalebaseline5: 1.00000000numFlowflowbaseline1: 0.00000000numOccupantflowbaseline1: numDailyflowbaseline1: numDurationflowbaseline1: 0.00000000numFlowflowbaseline2: 0.00000000numOccupantflowbaseline2: numDailyflowbaseline2: numDurationflowbaseline2: 0.00000000numFlowflowbaseline3: 0.00000000numOccupantflowbaseline3: numDailyflowbaseline3: numDurationflowbaseline3: 0.00000000numFlowflowbaseline4: 0.00000000numOccupantflowbaseline4: numDailyflowbaseline4: numDurationflowbaseline4: 0.00000000numFlowflowbaseline5: 0.00000000numOccupantflowbaseline5: numDailyflowbaseline5: numDurationflowbaseline5: 0.00000000numFlowflowbaseline6: 0.00000000numOccupantflowbaseline6: numDailyflowbaseline6: numDurationflowbaseline6: 0.00000000ddlFixtureflowtypebaseline1: ----numFlowflowbaseline7: 0.00000000numOccupantflowbaseline7: numDailyflowbaseline7: numDurationflowbaseline7: 0.00000000numFlowflowbaseline8: 0.00000000numOccupantflowbaseline8: numDailyflowbaseline8: numDurationflowbaseline8: 0.00000000ddlFixtureflowtypebaseline2: ----ddlFixtureflowtypebaseline3: ----ddlFixtureflowtypebaseline4: ----ddlFixtureflowtypebaseline5: ----ddlFixtureflowtypebaseline6: ----ddlFixtureflowtypebaseline7: ----ddlFixtureflowtypebaseline8: ----numFlowflushmalebaseline2: 0.00000000numFlowflushfemalebaseline1: 0.00000000numDurationflushfemalebaseline1: 1.00000000numDurationflushmalebaseline1: 1.00000000numFlowflushmalebaseline1: 0.00000000numSewageflushmalebaseline1: 0.00numSewageflushfemalebaseline1: 0.00numSewageflushmalebaseline2: 0.00numSewageflushfemalebaseline2: 0.00numSewageflushmalebaseline3: 0.00numSewageflushfemalebaseline3: 0.00numSewageflushmalebaseline4: 0.00numSewageflushfemalebaseline4: 0.00numSewageflushmalebaseline5: 0.00numSewageflushfemalebaseline5: 0.00numSewageflowbaseline1: 0.00numSewageflowbaseline2: 0.00numSewageflowbaseline3: 0.00numSewageflowbaseline4: 0.00numSewageflowbaseline5: 0.00numSewageflowbaseline6: 0.00numSewageflowbaseline7: 0.00numSewageflowbaseline8: 0.00txtEnergytype1: numAnnualuse1: numAnnualcost1: numEnergysupplied1: 0.00txtEnergytype2: numAnnualuse2: numAnnualcost2: numEnergysupplied2: 0.00txtEnergytype3: numAnnualuse3: numAnnualcost3: numEnergysupplied3: 0.00txtEnergytype4: numAnnualuse4: numAnnualcost4: numEnergysupplied4: 0.00txtEnergytype5: numAnnualuse5: numAnnualcost5: numEnergysupplied5: 0.00numTotalannualuse1: numTotalannualcost1: numTotalenergysuppled1: 0.00txtEnergytype6: numAnnualuse6: numAnnualcost6: numEnergysupplied6: 0.00txtEnergytype7: numAnnualuse7: numAnnualcost7: numEnergysupplied7: 0.00txtEnergytype8: numAnnualuse8: numAnnualcost8: numEnergysupplied8: 0.00txtEnergytype9: numAnnualuse9: numAnnualcost9: numEnergysupplied9: 0.00txtEnergytype10: numAnnualuse10: numAnnualcost10: numEnergysupplied10: 0.00numTotalannualuse2: numTotalannualcost2: numTotalenergysuppled2: 0.00numTotalannualuse3: numTotalannualcost3: numTotalenergysuppled3: 0.00txtPoints21: 0txtPoints22: 0chkSuppdocnarrative: 0txtSystem1: txtSystem2: txtSystem3: txtSystem4: txtSystem5: txtSystem6: txtCategory1: txtCategory2: txtCategory3: txtCategory4: txtCategory5: txtCategory6: txtNumber1: txtNumber2: txtNumber3: txtNumber4: txtNumber5: txtNumber6: txtTitle1: txtTitle2: txtTitle3: txtTitle4: txtTitle5: txtTitle6: txtPointsk1: 0txtPointsk2: 0txtPointsk3: 0txtPointsk4: 0txtPointsk5: 0txtPointsk6: 0numOptionk: 0.00000000numOptionb: 0.00000000numOptiond: 0.00000000numOptiong: 0.00000000numOptioni: 0.00000000numOptione: 0.00000000numOptionc: 0.00000000numOptiona: 0.00000000numOptionf: 0.00000000numOptionl: 0.00000000numOptionh: 0.00000000numOptionj: 0.00000000numSubtotal: 0.00000000numRoundedtotal: 0.00000000txtFirstname: ChristinetxtLastname: MagardtmDate: 2008-10-21txtUsername: [email protected]: btnSubmit: btnPrint: txtVersionedit: 2txtVersionid: 10000511