OPS-G Forum An Appraisal of Ground Segment & Operations Standards for ESOC. Michael Jones and Mario Merri OPS-GD. Roadmap. Introduction (MJ) ECSS – Organisation and Standards (MJ) CCSDS – Organisation and Standards (MM) Standardisation in ESA – ESB (MM) Standardisation in D/OPS (MM) - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: OPS-G Forum An Appraisal of Ground Segment & Operations Standards for ESOC

OPS-G Forum

An Appraisal of Ground Segment & Operations Standards for ESOC

Michael Jones and Mario MerriOPS-GD

Page 2: OPS-G Forum An Appraisal of Ground Segment & Operations Standards for ESOC

OPS-GD ~ 1 Dec 2006OPS-G Forum - An Appraisal of Ground Segment & Operations Standards for D/OPS 2

Roadmap Introduction (MJ) ECSS – Organisation and Standards (MJ) CCSDS – Organisation and Standards (MM) Standardisation in ESA – ESB (MM) Standardisation in D/OPS (MM) Conclusions (MJ)

Page 3: OPS-G Forum An Appraisal of Ground Segment & Operations Standards for ESOC

OPS-GD ~ 1 Dec 2006OPS-G Forum - An Appraisal of Ground Segment & Operations Standards for D/OPS 3

Why do we need Standards? Standards make the development, manufacturing and supply of

products and services more efficient, safer and cheaper

Standards facilitate smooth and fair trading between organisations

Standards aid in the transfer of knowledge and enhance the engineering capabilities of smaller or developing organisations

Standards assist in the education of today’s and future engineers

conformance to standards avoids "reinventing the wheel"

Standards have an important role in enabling European industry to remain competitive in the marketplace and to conquer new markets

Page 4: OPS-G Forum An Appraisal of Ground Segment & Operations Standards for ESOC

OPS-GD ~ 1 Dec 2006OPS-G Forum - An Appraisal of Ground Segment & Operations Standards for D/OPS 4

What is ECSS? HISTORY:

Established in1993, superseding ESA’s role in producing the Procedures, Standards and Specifications (PSS) series

COMPOSITION:ESA, National Space Agencies and European Space Industry (represented via Eurospace)

OBJECTIVE:To build a complete system of European standards elaborated on a consensual basis by the different partners for the benefit of the whole European space community

ACHIEVEMENT:More than 100 standards have been published since 1996 covering Management, Quality and Engineering

WEB:www.ecss.nl

Page 5: OPS-G Forum An Appraisal of Ground Segment & Operations Standards for ESOC

OPS-GD ~ 1 Dec 2006OPS-G Forum - An Appraisal of Ground Segment & Operations Standards for D/OPS 5

The ECSS Standards Tree

Level 1

Level 2

Level 3

ECSS-E-10System

engineering

ECSS-E-20Electrical and

electronic

ECSS-E-30Mechanical

ECSS-E-40Software

ECSS-E-50Communications

ECSS-E-60Space engineering

control

ECSS-E-70Ground systemsand operations

ECSS-E-00Policy

and principles

Level 3Engineeringstandards

ECSS-S-00ECSS System: Description

and implementation

ECSS-P-001Glossary of termsLevel 0

ECSS-Q-20Quality

assurance

ECSS-Q-30Dependability

ECSS-Q-40Safety

ECSS-Q-60EEE Components

ECSS-Q-70Materials, mechanical parts and processes

ECSS-Q-80Software product

assurance

Level 3Product assurance

standards

Space product assurance

ECSS-Q-00Policy

and principles

ECSS-M-00Policy

and principles

ECSS-M-10Project breakdown

structure

ECSS-M-20Project

organisation

ECSS-M-30Project phasing

and planning

ECSS-M-40Configuration management

ECSS-M-50Information/document

management

ECSS-M-60Cost and schedule

management

ECSS-M-70Integrated

logistic support

Level 3Management

standards

Space project management

Space engineering

Page 6: OPS-G Forum An Appraisal of Ground Segment & Operations Standards for ESOC

OPS-GD ~ 1 Dec 2006OPS-G Forum - An Appraisal of Ground Segment & Operations Standards for D/OPS 6

ECSS: Recent Organisational Developments

BACKGROUND In late 2005 it was recognized by ECSS Steering board

that The maturity of the published standards set was increasing

maintenance required, not all the published material was completely suitable for

direct use in business agreements

CONSEQUENCES To address this, the ECSS Steering board decided

appointed two Task Forces: Task Force #1 - Organization of ECSS, and Task Force #2 - ECSS Content

Page 7: OPS-G Forum An Appraisal of Ground Segment & Operations Standards for ESOC

OPS-GD ~ 1 Dec 2006OPS-G Forum - An Appraisal of Ground Segment & Operations Standards for D/OPS 7

ECSS Task Force #1: The Results Task Force #1 remit:

To assess the current ECSS organization in view of a transition to a phase with the main weight on maintaining the set of standards

from this, to propose a new ECSS organization for SB approval

TF #1 produced 10 recommendations.

A central one was recommendation #4“To establish a Technical Authority (TA) as the main technical approval authority for all changes to existing ECSS standards and the release of new ECSS standards.

The process of evaluating and implementing changes to existing documents and to endorse new documents will be covered by this single forum providing the technical advisory and approval function of standards within the ECSS organization

TA is composed of Delegates who are not ad personam, they represent their organization and have a mandate to vote on behalf of the member organization”

Page 8: OPS-G Forum An Appraisal of Ground Segment & Operations Standards for ESOC

OPS-GD ~ 1 Dec 2006OPS-G Forum - An Appraisal of Ground Segment & Operations Standards for D/OPS 8

• The previous organization had three panels at the level of the Technical Authority• For a smooth transition, these panels still exist and are attached (as consultative bodies) to

the TA. • Phase-out criteria will be defined by TA and endorsed by SB

Steering Board

Working Group

Executive Secretariat

Technical Authority

Working Group Network

of experts

WorkingGroup

WorkingGroup

New ECSS Organization ex TF #1

Page 9: OPS-G Forum An Appraisal of Ground Segment & Operations Standards for ESOC

OPS-GD ~ 1 Dec 2006OPS-G Forum - An Appraisal of Ground Segment & Operations Standards for D/OPS 9

ECSS Task Force #2: The Results The "ECSS Content Task force" had the tasks of:

Examining the quality of the standards documents Determining the adequacy of the agreed Work Plan completing a

"Minimum set of Standards" suitable for user in business agreements for all types of Space projects.

General Observations of TF#2: The Management Standards are mature

The Quality branch is widely used in space projects and mature, but Some of the standards need improvement 10 documents are “mixtures” of standards and handbook material The Safety standard should be replaced by an equivalent ISO standard

Engineering Branch presents more problems to the user community than the Management or Quality branches:

Not all directly usable in business agreements, especially for “mixture” documents

In some cases, tailoring is essential but non-trivial. As such TF#2 recommended that standard should require only minimal tailoring

Page 10: OPS-G Forum An Appraisal of Ground Segment & Operations Standards for ESOC

OPS-GD ~ 1 Dec 2006OPS-G Forum - An Appraisal of Ground Segment & Operations Standards for D/OPS 10

The E-40 Branch: Software Engineering Software Engineering (presented in OPS-G Forum on 20 Jan 2006)

1. ESOC approach is based on the use of a tailored version of the ECSS standards (SETG)

2. ECSS-E-40 strongly criticised by TF#2 as “too general to be directly applied to common categories of space related software.”

3. TF#2 also required “A normative applicability matrix to be added to define which quality requirement is applicable for software of which criticality class.”

4. The TF2 detailed recommendations are being discussed by BSSC with a approach along the following lines:

Provide a pre-tailoring of E-40 per criticality level in a new E-40 version E-040C Give more precision on testing requirements (e.g. test coverage) Give more precision on the incremental life-cycle model

5. ESOC’s SETG can be updated to E-40C referring to Points 2 and 4 seem to have come from space segment users:

Dealing with point (3) must be considered carefully by ESOC Inappropriate choice of criticality levels could push up costs significantly

Simulator Model Portability 2

Page 11: OPS-G Forum An Appraisal of Ground Segment & Operations Standards for ESOC

OPS-GD ~ 1 Dec 2006OPS-G Forum - An Appraisal of Ground Segment & Operations Standards for D/OPS 11

The E-50 Branch: Communications

1. TF2 recommended that “ECSS produce a set of ECSS communications documents for procurement of European Space Systems. These ECSS documents should be made consistent with the relevant CCSDS documents and may call them up as written where appropriate.”

2. TF2 noted that 3 published standards are suitable and that 5 more in various stages of preparation (including ECSS-50-03A Telemetry, ECSS-E-30-04A Telecommand) need to be completed and published urgently

(1) Implies that rewriting of CCSDS documents will be avoided

Page 12: OPS-G Forum An Appraisal of Ground Segment & Operations Standards for ESOC

OPS-GD ~ 1 Dec 2006OPS-G Forum - An Appraisal of Ground Segment & Operations Standards for D/OPS 12

The E-70 Branch: Ground systems and operations standardsTF2 View: TF2 considered that the documents in this branch are good examples of

standards

Available E-70 Standards: E-70A Ground Systems and Operations Part 1 and Part 2 E-70-11 Space Segment Operability E-70-32 Test and Operations Procedure Language E-70-41 Telemetry and Telecommand Packet Utilization (“PUS”)

In Preparation: E-70B – will replace E-70A Part 1 and Part 2 E-70-01 On-board Control Procedures E-70-31 Monitoring and Control Data Definition

Other: Space Link Extension (SLE) services are also in this branch. They will

probably be incorporated via an adoption notice of the ISO/CCSDS standards

Page 13: OPS-G Forum An Appraisal of Ground Segment & Operations Standards for ESOC

OPS-GD ~ 1 Dec 2006OPS-G Forum - An Appraisal of Ground Segment & Operations Standards for D/OPS 13

E-70B: Scope and Status (1) The Standard has been restructured to clearly separate Ground Segment

Engineering and Operations Engineering disciplines (reflecting the fact that there may be different suppliers)

The processes for these engineering disciplines are first defined and then the processes are mapped onto the classical development and operation phases (A,B,C,D,E,F)

The process names (and associated documentation and reviews) have been aligned with E-10 “System Engineering” wherever possible. In a few appropriate cases, they have been tailored for application to the Ground Segment domain

As a departure from the E-70A approach, no reference architecture is assumed for the ground segment. Instead, the generic major functions are identified with no presumption on how they are grouped or distributed

Functions are harmonised with the European technology Harmonisation for Ground Software Systems

Some detailed requirements of E-70A have been deleted (those addressing the “how” rather than the “what”)

Page 14: OPS-G Forum An Appraisal of Ground Segment & Operations Standards for ESOC

OPS-GD ~ 1 Dec 2006OPS-G Forum - An Appraisal of Ground Segment & Operations Standards for D/OPS 14

E-70B Scope and Status (2) The ECSS Task Force 2 identified E-70 Part 2 as being

of the nature of a “Handbook”, rather than a “Standard”. Consequently, Part 2 will lapse and will be replaced instead by a set of new “normative” Annexes to E-70B. The current DRDs will be significantly slimmed-down to retain only the essential requirements for document contents (work in progress)

A new Ground Segment and Operations document has been identified covering “Customer Furnished Items and Services Requirements (CFISRD)”. The generic requirements to be included in this document will be defined in a new Annex to E-70B (work in progress)

Page 15: OPS-G Forum An Appraisal of Ground Segment & Operations Standards for ESOC

OPS-GD ~ 1 Dec 2006OPS-G Forum - An Appraisal of Ground Segment & Operations Standards for D/OPS 15

E-70-01: Satellite On-board Control Procedures

OBJECTIVES To standardise the source language, such that:

procedure scripts can be re-used between missions spacecraft engineers can work with a single language

To standardise the target language, such that: on-board interpreters can be re-used between missions ground tools can be re-used between missions

To standardise the interface between the on-board execution environment and the other on-board systems

To standardise the interface with the spacecraft database (on ground)

STATUS Currently a working group draft

The E-70-01 working group started work in 2005

The standard is expected to be ready for Public Review in mid-2007 and to be published in 2008

SCOPE

STATUS

Page 16: OPS-G Forum An Appraisal of Ground Segment & Operations Standards for ESOC

OPS-GD ~ 1 Dec 2006OPS-G Forum - An Appraisal of Ground Segment & Operations Standards for D/OPS 16

E-70-31: Monitoring and Control Data Definition

OBJECTIVES Specifies the mission-specific data used by ground systems to perform

space system integration, testing and mission operations

Promotes a life-cycle approach to monitoring and control data from low-level testing to in-flight operations

Requirements are defined in terms of “what” data is provided by the supplier to the customer. “How” this data is provided is outside the scope of this standard and may benefit from the CCSDS XTCE work (see later)

STATUS Public Review completed in 2005. More than 200 DRRs were received

from ECSS partners

The E-70-31 working group has processed the DRRs and updated the standard accordingly. The new draft is under final review by the ECSS Engineering Panel

SCOPE

STATUS

Page 17: OPS-G Forum An Appraisal of Ground Segment & Operations Standards for ESOC

OPS-GD ~ 1 Dec 2006OPS-G Forum - An Appraisal of Ground Segment & Operations Standards for D/OPS 17

Roadmap Introduction (MJ) ECSS – Organisation and Standards (MJ)

CCSDS – Organisation and Standards (MM) Standardisation in ESA – ESB (MM) Standardisation in D/OPS (MM) Conclusions (MJ)

Page 18: OPS-G Forum An Appraisal of Ground Segment & Operations Standards for ESOC

OPS-GD ~ 1 Dec 2006OPS-G Forum - An Appraisal of Ground Segment & Operations Standards for D/OPS 18

What is CCSDS? The Consultative Committee for Space Data Systems (CCSDS)

formed in 1982 by the major space agencies of the world provides a forum for discussion of common problems in the development

and operation of space data systems

It is currently composed of 10 member agencies

ASI, BNSC, CNES, CSA, DLR, ESA, FSA, INPE, JAXA, NASA 22 observer agencies over 100 industrial associate

CCSDS develops Recommendations for data- and information-systems standards to

reduce the cost to the various agencies of performing common data functions by eliminating unjustified project-unique design and development, and

promote interoperability and cross support among cooperating space agencies to reduce operations costs by sharing facilities

Page 19: OPS-G Forum An Appraisal of Ground Segment & Operations Standards for ESOC

OPS-GD ~ 1 Dec 2006OPS-G Forum - An Appraisal of Ground Segment & Operations Standards for D/OPS 19

CCSDS - Overview and Organisation

Page 20: OPS-G Forum An Appraisal of Ground Segment & Operations Standards for ESOC

OPS-GD ~ 1 Dec 2006OPS-G Forum - An Appraisal of Ground Segment & Operations Standards for D/OPS 20

CCSDS WGs More general info and

docs download:www.ccsds.org

More about WGs:

public.ccsds.org/sites/cwe/default.aspx

ESAmember

ESAlead

Page 21: OPS-G Forum An Appraisal of Ground Segment & Operations Standards for ESOC

OPS-GD ~ 1 Dec 2006OPS-G Forum - An Appraisal of Ground Segment & Operations Standards for D/OPS 21

CCSDS: Systems Engineering Area (SEA) Security WG

Encryption Standard [Q2/07] Authentication Standard [Q2/07] see D. Fischer’s OPS-G forum of 3rd Nov 06

XML Standards & Guidelines SIG

Delta-Differential One-way Ranging (Delta-DOR) Green book in preparation

Page 22: OPS-G Forum An Appraisal of Ground Segment & Operations Standards for ESOC

OPS-GD ~ 1 Dec 2006OPS-G Forum - An Appraisal of Ground Segment & Operations Standards for D/OPS 22

CCSDS: Mission Operations and Information Management Services Area (MOIMS) Data Archive Ingestion WG

Standardise archive submission information (e.g. metadata keywords ) Submission Information Package (SIP) [Q3/07]

Navigation WG Standardise data content and formats of tracking, attitude, trajectory,

and ancillary data: Orbit Data Message (ODM) [available] Attitude Data Message (ADM) [Q2/07] Tracking Data Message (TDM) [Q3/07] XML Navigation Data Message [Q4/07]

Information Packaging and Registries WG Standardise information packaging (i.e. how to associate and package

data and metadata) XML Formatted Data Unit (XFDU) [Q3/07]

Spacecraft Monitoring & Control WG Standardise Mission Operations Services to enable build up M&C

systems by use of “plug & play” components, maybe from different Agencies, systems and suppliers

Set of SM&C Services [Q4/07] XML Telemetric and Command Exchange (XTCE) [Q2/07]

Page 23: OPS-G Forum An Appraisal of Ground Segment & Operations Standards for ESOC

OPS-GD ~ 1 Dec 2006OPS-G Forum - An Appraisal of Ground Segment & Operations Standards for D/OPS 23

CCSDS: Cross Support Services Area (CSS)

Service Management WG Standardise the arranging, scheduling, control, and

monitoring of SLE TT&C services Space Link Extension - Service Management - Service Specification

[Q2/07]

Cross Support Transfer Service WG Standardise the SLE transfer services

Return All Frames (RAF) [available] Return Channel Frames (RCF) [available] Return Operational Control Fields (ROCF) [available] Forward CLTU [available] Forward Space Packet (FSP) [available] Use of SLE Transfer Services over TCP/IP [Q2/07] Specification of APIs for each Transfer Services [Q2/07]

Page 24: OPS-G Forum An Appraisal of Ground Segment & Operations Standards for ESOC

OPS-GD ~ 1 Dec 2006OPS-G Forum - An Appraisal of Ground Segment & Operations Standards for D/OPS 24

CCSDS: Spacecraft Onboard Interface Services Area (SOIS) It defines generic services to simplify the way flight

software interacts with flight hardware and permit interoperability and reusability

Not relevant to D/OPS as it deals mainly with on-board interfaces

Page 25: OPS-G Forum An Appraisal of Ground Segment & Operations Standards for ESOC

OPS-GD ~ 1 Dec 2006OPS-G Forum - An Appraisal of Ground Segment & Operations Standards for D/OPS 25

CCSDS: Space Link Services Area (SLS) RF and Modulation WG

Standardisation of RF and Modulation in 26 and 32 GHz frequency band [Q1/09]

Space Link Coding and Synchronization WG Standardisation of High Performance Coding

Serially Concatenated Convolutional Codes [Q4/07] Digital Video Broadcasting Usage by Space Missions (DBV-S2) [Q4/07] Long Erasure Codes [Q4/07]

Data Compression WG Standardisation of highly efficient data compression schemes

Lossless Data Compression [available] Image Data Compression [available]

Ranging WG Standardisation of ranging for interplanetary missions

Pseudo-Noise Ranging [Q3/08]

Page 26: OPS-G Forum An Appraisal of Ground Segment & Operations Standards for ESOC

OPS-GD ~ 1 Dec 2006OPS-G Forum - An Appraisal of Ground Segment & Operations Standards for D/OPS 26

CCSDS: Space Internetworking Services Area (SIS)

It provides services and protocols to address networked interactions of many forms: between spacecraft and earth-based resources among spacecraft between spacecraft and landed elements, and within heterogeneous spacecraft

Not that relevant to D/OPS with the exception of CCSDS File Transfer Protocol [available] Mars communication profile BOF

Page 27: OPS-G Forum An Appraisal of Ground Segment & Operations Standards for ESOC

OPS-GD ~ 1 Dec 2006OPS-G Forum - An Appraisal of Ground Segment & Operations Standards for D/OPS 27

Where and How does ESA Fit?

ESB

Page 28: OPS-G Forum An Appraisal of Ground Segment & Operations Standards for ESOC

OPS-GD ~ 1 Dec 2006OPS-G Forum - An Appraisal of Ground Segment & Operations Standards for D/OPS 28

The ESA Context and D/OPS Focus

ESSBESA Standardisation

Steering Board

ESSBESA Standardisation

Steering Board

PA-CCB

PA & Safety Configuration Control Board

PA-CCB

PA & Safety Configuration Control Board

ESB

Engineering Standardisation

Board

ESB

Engineering Standardisation

Board

MSSGManagement

Standards Steering Group

MSSGManagement

Standards Steering Group

DG

BSSCBoard for Software

Standardisation & Control

BSSCBoard for Software

Standardisation & Control

MESBMechanical Eng.

Standardisation Board

MESBMechanical Eng.

Standardisation Board

CESBControl Engineering

Standardisation Board

CESBControl Engineering

Standardisation Board

EESBElectrical Engineering Standardisation Board

EESBElectrical Engineering Standardisation Board SESB

System Engineering Standardisation Board

SESBSystem Engineering

Standardisation BoardGOSBGround Systems & Ops Standardisation Board

GOSBGround Systems & Ops Standardisation Board STAB

Standards Approval Board for TLM & TLC

STABStandards Approval Board for TLM & TLC

ESSBESA Standardisation

Steering Board

ESSBESA Standardisation

Steering Board

PA-CCB

PA & Safety Configuration Control Board

PA-CCB

PA & Safety Configuration Control Board

ESB

Engineering Standardisation

Board

ESB

Engineering Standardisation

Board

MSSGManagement

Standards Steering Group

MSSGManagement

Standards Steering Group

DG

BSSCBoard for Software

Standardisation & Control

BSSCBoard for Software

Standardisation & Control

MESBMechanical Eng.

Standardisation Board

MESBMechanical Eng.

Standardisation Board

CESBControl Engineering

Standardisation Board

CESBControl Engineering

Standardisation Board

EESBElectrical Engineering Standardisation Board

EESBElectrical Engineering Standardisation Board SESB

System Engineering Standardisation Board

SESBSystem Engineering

Standardisation BoardGOSBGround Systems & Ops Standardisation Board

GOSBGround Systems & Ops Standardisation Board STAB

Standards Approval Board for TLM & TLC

STABStandards Approval Board for TLM & TLC

Full D/OPS involvement

Partial D/OPS involvement

Page 29: OPS-G Forum An Appraisal of Ground Segment & Operations Standards for ESOC

OPS-GD ~ 1 Dec 2006OPS-G Forum - An Appraisal of Ground Segment & Operations Standards for D/OPS 29

ESB Workflow

Workplan Approval

proposals decisions

Activities’ Monitor &

Control

reporting

controllingESB

Sub-Board

ESA Rep.

ECSS/CCSDSWG

ESB

Sub-Board

ESA Rep.

ECSS/CCSDSWG

Tech. Rep.

ESB recommends inclusion of published standards in the “ESA Approved Standards” list, which makes their use mandatory for future missions!

http://ids2.esa.int:81/ATTACHEMENTS/A132787/index.htm

Page 30: OPS-G Forum An Appraisal of Ground Segment & Operations Standards for ESOC

OPS-GD ~ 1 Dec 2006OPS-G Forum - An Appraisal of Ground Segment & Operations Standards for D/OPS 30

1.Interoperable

Onboard Interfaces

2. Highly Efficient

Communications in Resource-

Constrained Environments 3.

Mission Operations

Services

4.Data Interchange

and Archiving Services

5.System Engineering

6.Software

Engineering

D/OPS Standardization Framework

STABSTAB

GOSBGOSB

GOSBGOSB

SESBSESB

BSSCBSSC

CESBCESB

Page 31: OPS-G Forum An Appraisal of Ground Segment & Operations Standards for ESOC

OPS-GD ~ 1 Dec 2006OPS-G Forum - An Appraisal of Ground Segment & Operations Standards for D/OPS 31

Safeguarding D/OPS’s Interests Invest in the development of standards that meets the

D/OPS strategy objectives:1. Reduce technical risks in ground segment systems and

operations2. Reduce cost of ground segment systems and operations3. Establish the baseline for the development of the ESA ground

segment infrastructure4. Allow interoperability within and across organisations5. Increase competitiveness of ground segment European

Industry6. Maintain the leadership in ground segment systems and

operations and avoid insurgence of undesired standards Provide D/OPS with visibility on the status of relevant

activities

Page 32: OPS-G Forum An Appraisal of Ground Segment & Operations Standards for ESOC

OPS-GD ~ 1 Dec 2006OPS-G Forum - An Appraisal of Ground Segment & Operations Standards for D/OPS 32

Approach to D/OPS Standardization Planning

Use already in place organisation (ESB) for an ESA-wide-consistent standardization workplan

Rely on D/OPS representatives in ESB to assure compliance to D/OPS objectives

J.F. Kaufeler, OPS-G, D/OPS member in ESB M. Merri, OPS-GD, ESB Secretary and GOSB chair M. Spada, OPS-GD, co-chair of BSSC D/OPS representative in sub-boards and working groups

Document workplan fit to D/OPS objectives in “D/OPS Engineering Standardization Plan and Report” (once per year in Nov)

Execution Use already in place organisation (ESB) to

monitor and control activities Improve reporting capabilities of:

ESB on activities’ status Creation of central ESB DB agreed at last ESB meeting

D/OPS on resource utilisation One-to-one correspondence between approved workplan and PFMS Authorisation procedure for Mission Travels and Industrial Costs Reporting to D/OPS on resource utilisation in Appendix of “D/OPS Engineering

Standardization Plan and Report” (twice per year in Nov and Jul)

Workplan Approval

proposals decisions

ESB

Sub-Board

ESA Rep.

WG

Activities’Monitor & Control

reporting

controlling

ESB

Sub-Board

ESA Rep.

WG

Page 33: OPS-G Forum An Appraisal of Ground Segment & Operations Standards for ESOC

OPS-GD ~ 1 Dec 2006OPS-G Forum - An Appraisal of Ground Segment & Operations Standards for D/OPS 33

Nature of Standardization Work Standardization work is a very particular type of work

it has not all the characteristics of a typical project its lifecycle can hardly be paced by a normal Project

Management Plan In fact, standardization work is:

speculative and experimental in several aspects typically based on “compromise engineering” where a large

consensus must be achieved conducted by joining the forces of several organizations, each

with very different agendas, different resource level, different interests and different authorities. This implies:

More difficult to reach consensus More difficult to manage manpower and industrial cost expenses More difficult to control the schedule and the deliverables

often done on a voluntary basis by staff who work on mission/infrastructure projects which naturally take priority

Page 34: OPS-G Forum An Appraisal of Ground Segment & Operations Standards for ESOC

OPS-GD ~ 1 Dec 2006OPS-G Forum - An Appraisal of Ground Segment & Operations Standards for D/OPS 34

Услуги взаимнойподдержки

Услуги поинтерфейсукосмическихаппаратов

Услуги по поддержкеиз космоса работы

сети Интернет

Услуги каналовсвязи с

космическимиаппаратами

Услуги по управлениюполётами и

обработке информации.

Системноепроектиро-

вание

Another Challenge of International Standardisation

Page 35: OPS-G Forum An Appraisal of Ground Segment & Operations Standards for ESOC

OPS-GD ~ 1 Dec 2006OPS-G Forum - An Appraisal of Ground Segment & Operations Standards for D/OPS 35

Summary of 2006 Achievements

BSSC CESB GOSB SESB STAB Tot

No. Public Reviews 1 0 7 1 3 12

No. Documents Published 0 0 9 0 7 16

Page 36: OPS-G Forum An Appraisal of Ground Segment & Operations Standards for ESOC

OPS-GD ~ 1 Dec 2006OPS-G Forum - An Appraisal of Ground Segment & Operations Standards for D/OPS 36

AEO

LUS

AU

RO

RA

B-C

CLU

STER

-IIC

RYO

SAT-

2EA

RTH

CA

RE

ENVI

SAT

ERS-

2G

AIA

GA

LILE

OG

IOVE

-AG

IOVE

-BG

OC

EH

PJW

STIN

TEG

RA

LLP

FM

ETO

PM

EXM

SGPR

OB

A -2

RO

SETT

ASE

NTI

NEL

SMA

RT-

1SW

AR

MU

LYSS

ESVE

XXM

MD

/OPS

I/F

1. Interoperable On-board InterfacesCESB06/ECSS: Standard S/C AOCS Reqs Spec ? ? ? ? ? n/a

2. Highly Efficient Communications in Resource-Constrained EnvironmentsCCSDS: CFDP ? ? ? ? X ? ?CCSDS: Data Compression ? ? ? ? X ?CCSDS: Proximity Links X X X SCCSDS/ECSS: Packet TM,TC, AOS X X X P X X P X X X X X X X X X X X X X X X X X X SCCSDS/ECSS: RF, Modulation and Coding X X X X X X X X X X X X X X X X X X X X X X X X X X X SECSS: Ranging X X X X X X X X X X X X X X X X X X X X X X X X X X SSTAB04/ECSS: TM Transfer Frame Protocol X X X X X X X SSTAB05/ECSS: TC Protocols, Synchronization and Channel Coding X X X X X X X SSTAB07/ESSC: TM Synchronization and Channel Coding X X X X X X X SSTAB14/CCSDS: High Performance Coding ? ? ?STAB14/CCSDS: Higher Frequency Bandwidth-Efficient Modulation ? X ?STAB14/CCSDS: Pseudo-Noise Ranging X 09STAB15/ECSS: RF and Modulation X X X X X X X SSTAB16/ESA: Space Frequency Coordination Group X X X X X X X X X X X X X X X X X X X X X X X X X X n/aSTAB19/ECSS: E-50 Level 2 Update X X X X X X n/a

3. Mission Operations ServicesECSS: Packet Utilisation Standard (PUS) X X X X X X X X X X X X X X X X X X X X X SCCSDS: Space Link Extension Transfer Services X X X X X X X X X X X X X X X X X X X X X X X X X SECSS: Procedure Definition Language X X X X X X X X X X X X X X 07ECSS: Space Segment Operability X X X X X X X X X n/aGOSB06/CCSDS: Delta-Differential One-way Ranging (Delta-DOR) ? X X X X ?GOSB06/CCSDS: Navigation X X X ? ? ? ? ? ? ? 07GOSB12/CCSDS: Space link Extension Service Management X X X X X X X 07GOSB14/CCSDS: Cross Support Transfer Services X X X X X X 08GOSB16/ECSS: Telemetry and Telecommand Data Description ? ? ? ? ? ? ? ? 07GOSB20/CCSDS: Security Activities ? ? ? X ? ?GOSB22/CCSDS: Spacecraft Monitor & Control ? ? ? ? ? ?GOSB22/CCSDS-OMG: XML Telemetric and Command Exchange ? ? ? ? X ? ? ? 08GOSB27/ECSS: On-board Control Procedures ? ? ? ? ? ? ? ? ?GOSB28/ECSS: E-70 Level 2 Consolidation X X X X X X n/a

4. Data Interchange and Archiving ServicesGOSB02/CCSDS: Data Archive Ingestion X X X X X X X 09GOSB18/CCSDS: Information Packaging & Registries X ? ? X X X X X ? ? X X X X X X X 08

5. System EngineeringECSS: System Engineering X X X X X X X X X X X X X X X n/aSESB05/ECSS: System Modelling & Simulations X X X X X X n/aSESB09/ECSS: Reference Coordinate Systems X X X X X X n/aSESB14/ECSS: Engineering Database X X X X X X n/aSESB17/ECSS: Space Environment X X X X X X n/aSESB18/ECSS: System Engineering X X X X X X n/aSESB30/ECSS: Space Debris X X X X X X n/aSESBzz/ECSS: Flight Mechanics (launchers & reentry vehicles) X X X X X X n/a

6. Software EngineeringECSS: Software Engineering X X X X X X X X X X X X X X X X X X X X X X X X X X n/aBSSC05/ECSS: Ground Segment Software X X X X X X n/aBSSC06/ECSS: Ground Segment Software Engineering Handbook X X X X X X n/aBSSC09/ECSS: Software Reuse Engineering Handbook X X X X X X n/aBSSC10/ECSS: Simulator Model Portability 2 X X X X X X X 07

Available, On-Going/Future X =used P =partially used ? =unknown 07 =supported in 2007 S =already supported n/a =not applicable

and Infra-structure

Applicability of D/OPS Standardization to Missions

Page 37: OPS-G Forum An Appraisal of Ground Segment & Operations Standards for ESOC

OPS-GD ~ 1 Dec 2006OPS-G Forum - An Appraisal of Ground Segment & Operations Standards for D/OPS 37

Representation (ESA/OPS) ECSS

1/0 ECSS Steering Board 2/0 ECSS Executive 1/0 Engineering Panel 31/4 working group chairs

Calzolari (GI), Gomez (GI), Jones (GD), Vassallo (OW) 122/18 members in 61 working groups

OPS TEC SCI EOP EUI LAU EXT TotalWG Chair 4 27 31WG Member 18 88 6 7 2 1 122Total 22 115 6 7 2 1 0 153

OPS TEC SCI EOP EUI LAU EXT TotalWG Chair 7 5 12WG Member 10 10 2 1 23Total 17 15 0 2 0 0 1 35

CCSDS 1/1 ESA representative in CMC (J.F.Kaufeler) 1/1 deputy CESG chair (N. Peccia) 3/1 area directors (6 in total)

Peccia (GI) 12/7 working group chairs

3xCalzolari (GI), Doat (GI), Merri (GD), 2xVassallo (OW) 23/10 members in 35 working groups

OMG Passive role (observer)

Page 38: OPS-G Forum An Appraisal of Ground Segment & Operations Standards for ESOC

OPS-GD ~ 1 Dec 2006OPS-G Forum - An Appraisal of Ground Segment & Operations Standards for D/OPS 38

Conclusions

ESOC Staff are heavily involved in preparing standards

There are mature standards that are applicable to ESOC’s work

We have highlighted newer or emerging standards that will be applicable or useful for ESOC

A D/OPS standardization plan is now in place

Measures are being put in place to allow better monitoring and reporting of standardization activities in ESA