ops-g forum an appraisal of ground segment & operations standards for esoc
DESCRIPTION
OPS-G Forum An Appraisal of Ground Segment & Operations Standards for ESOC. Michael Jones and Mario Merri OPS-GD. Roadmap. Introduction (MJ) ECSS – Organisation and Standards (MJ) CCSDS – Organisation and Standards (MM) Standardisation in ESA – ESB (MM) Standardisation in D/OPS (MM) - PowerPoint PPT PresentationTRANSCRIPT
OPS-G Forum
An Appraisal of Ground Segment & Operations Standards for ESOC
Michael Jones and Mario MerriOPS-GD
OPS-GD ~ 1 Dec 2006OPS-G Forum - An Appraisal of Ground Segment & Operations Standards for D/OPS 2
Roadmap Introduction (MJ) ECSS – Organisation and Standards (MJ) CCSDS – Organisation and Standards (MM) Standardisation in ESA – ESB (MM) Standardisation in D/OPS (MM) Conclusions (MJ)
OPS-GD ~ 1 Dec 2006OPS-G Forum - An Appraisal of Ground Segment & Operations Standards for D/OPS 3
Why do we need Standards? Standards make the development, manufacturing and supply of
products and services more efficient, safer and cheaper
Standards facilitate smooth and fair trading between organisations
Standards aid in the transfer of knowledge and enhance the engineering capabilities of smaller or developing organisations
Standards assist in the education of today’s and future engineers
conformance to standards avoids "reinventing the wheel"
Standards have an important role in enabling European industry to remain competitive in the marketplace and to conquer new markets
OPS-GD ~ 1 Dec 2006OPS-G Forum - An Appraisal of Ground Segment & Operations Standards for D/OPS 4
What is ECSS? HISTORY:
Established in1993, superseding ESA’s role in producing the Procedures, Standards and Specifications (PSS) series
COMPOSITION:ESA, National Space Agencies and European Space Industry (represented via Eurospace)
OBJECTIVE:To build a complete system of European standards elaborated on a consensual basis by the different partners for the benefit of the whole European space community
ACHIEVEMENT:More than 100 standards have been published since 1996 covering Management, Quality and Engineering
WEB:www.ecss.nl
OPS-GD ~ 1 Dec 2006OPS-G Forum - An Appraisal of Ground Segment & Operations Standards for D/OPS 5
The ECSS Standards Tree
Level 1
Level 2
Level 3
ECSS-E-10System
engineering
ECSS-E-20Electrical and
electronic
ECSS-E-30Mechanical
ECSS-E-40Software
ECSS-E-50Communications
ECSS-E-60Space engineering
control
ECSS-E-70Ground systemsand operations
ECSS-E-00Policy
and principles
Level 3Engineeringstandards
ECSS-S-00ECSS System: Description
and implementation
ECSS-P-001Glossary of termsLevel 0
ECSS-Q-20Quality
assurance
ECSS-Q-30Dependability
ECSS-Q-40Safety
ECSS-Q-60EEE Components
ECSS-Q-70Materials, mechanical parts and processes
ECSS-Q-80Software product
assurance
Level 3Product assurance
standards
Space product assurance
ECSS-Q-00Policy
and principles
ECSS-M-00Policy
and principles
ECSS-M-10Project breakdown
structure
ECSS-M-20Project
organisation
ECSS-M-30Project phasing
and planning
ECSS-M-40Configuration management
ECSS-M-50Information/document
management
ECSS-M-60Cost and schedule
management
ECSS-M-70Integrated
logistic support
Level 3Management
standards
Space project management
Space engineering
OPS-GD ~ 1 Dec 2006OPS-G Forum - An Appraisal of Ground Segment & Operations Standards for D/OPS 6
ECSS: Recent Organisational Developments
BACKGROUND In late 2005 it was recognized by ECSS Steering board
that The maturity of the published standards set was increasing
maintenance required, not all the published material was completely suitable for
direct use in business agreements
CONSEQUENCES To address this, the ECSS Steering board decided
appointed two Task Forces: Task Force #1 - Organization of ECSS, and Task Force #2 - ECSS Content
OPS-GD ~ 1 Dec 2006OPS-G Forum - An Appraisal of Ground Segment & Operations Standards for D/OPS 7
ECSS Task Force #1: The Results Task Force #1 remit:
To assess the current ECSS organization in view of a transition to a phase with the main weight on maintaining the set of standards
from this, to propose a new ECSS organization for SB approval
TF #1 produced 10 recommendations.
A central one was recommendation #4“To establish a Technical Authority (TA) as the main technical approval authority for all changes to existing ECSS standards and the release of new ECSS standards.
The process of evaluating and implementing changes to existing documents and to endorse new documents will be covered by this single forum providing the technical advisory and approval function of standards within the ECSS organization
TA is composed of Delegates who are not ad personam, they represent their organization and have a mandate to vote on behalf of the member organization”
OPS-GD ~ 1 Dec 2006OPS-G Forum - An Appraisal of Ground Segment & Operations Standards for D/OPS 8
• The previous organization had three panels at the level of the Technical Authority• For a smooth transition, these panels still exist and are attached (as consultative bodies) to
the TA. • Phase-out criteria will be defined by TA and endorsed by SB
Steering Board
Working Group
Executive Secretariat
Technical Authority
Working Group Network
of experts
WorkingGroup
WorkingGroup
New ECSS Organization ex TF #1
OPS-GD ~ 1 Dec 2006OPS-G Forum - An Appraisal of Ground Segment & Operations Standards for D/OPS 9
ECSS Task Force #2: The Results The "ECSS Content Task force" had the tasks of:
Examining the quality of the standards documents Determining the adequacy of the agreed Work Plan completing a
"Minimum set of Standards" suitable for user in business agreements for all types of Space projects.
General Observations of TF#2: The Management Standards are mature
The Quality branch is widely used in space projects and mature, but Some of the standards need improvement 10 documents are “mixtures” of standards and handbook material The Safety standard should be replaced by an equivalent ISO standard
Engineering Branch presents more problems to the user community than the Management or Quality branches:
Not all directly usable in business agreements, especially for “mixture” documents
In some cases, tailoring is essential but non-trivial. As such TF#2 recommended that standard should require only minimal tailoring
OPS-GD ~ 1 Dec 2006OPS-G Forum - An Appraisal of Ground Segment & Operations Standards for D/OPS 10
The E-40 Branch: Software Engineering Software Engineering (presented in OPS-G Forum on 20 Jan 2006)
1. ESOC approach is based on the use of a tailored version of the ECSS standards (SETG)
2. ECSS-E-40 strongly criticised by TF#2 as “too general to be directly applied to common categories of space related software.”
3. TF#2 also required “A normative applicability matrix to be added to define which quality requirement is applicable for software of which criticality class.”
4. The TF2 detailed recommendations are being discussed by BSSC with a approach along the following lines:
Provide a pre-tailoring of E-40 per criticality level in a new E-40 version E-040C Give more precision on testing requirements (e.g. test coverage) Give more precision on the incremental life-cycle model
5. ESOC’s SETG can be updated to E-40C referring to Points 2 and 4 seem to have come from space segment users:
Dealing with point (3) must be considered carefully by ESOC Inappropriate choice of criticality levels could push up costs significantly
Simulator Model Portability 2
OPS-GD ~ 1 Dec 2006OPS-G Forum - An Appraisal of Ground Segment & Operations Standards for D/OPS 11
The E-50 Branch: Communications
1. TF2 recommended that “ECSS produce a set of ECSS communications documents for procurement of European Space Systems. These ECSS documents should be made consistent with the relevant CCSDS documents and may call them up as written where appropriate.”
2. TF2 noted that 3 published standards are suitable and that 5 more in various stages of preparation (including ECSS-50-03A Telemetry, ECSS-E-30-04A Telecommand) need to be completed and published urgently
(1) Implies that rewriting of CCSDS documents will be avoided
OPS-GD ~ 1 Dec 2006OPS-G Forum - An Appraisal of Ground Segment & Operations Standards for D/OPS 12
The E-70 Branch: Ground systems and operations standardsTF2 View: TF2 considered that the documents in this branch are good examples of
standards
Available E-70 Standards: E-70A Ground Systems and Operations Part 1 and Part 2 E-70-11 Space Segment Operability E-70-32 Test and Operations Procedure Language E-70-41 Telemetry and Telecommand Packet Utilization (“PUS”)
In Preparation: E-70B – will replace E-70A Part 1 and Part 2 E-70-01 On-board Control Procedures E-70-31 Monitoring and Control Data Definition
Other: Space Link Extension (SLE) services are also in this branch. They will
probably be incorporated via an adoption notice of the ISO/CCSDS standards
OPS-GD ~ 1 Dec 2006OPS-G Forum - An Appraisal of Ground Segment & Operations Standards for D/OPS 13
E-70B: Scope and Status (1) The Standard has been restructured to clearly separate Ground Segment
Engineering and Operations Engineering disciplines (reflecting the fact that there may be different suppliers)
The processes for these engineering disciplines are first defined and then the processes are mapped onto the classical development and operation phases (A,B,C,D,E,F)
The process names (and associated documentation and reviews) have been aligned with E-10 “System Engineering” wherever possible. In a few appropriate cases, they have been tailored for application to the Ground Segment domain
As a departure from the E-70A approach, no reference architecture is assumed for the ground segment. Instead, the generic major functions are identified with no presumption on how they are grouped or distributed
Functions are harmonised with the European technology Harmonisation for Ground Software Systems
Some detailed requirements of E-70A have been deleted (those addressing the “how” rather than the “what”)
OPS-GD ~ 1 Dec 2006OPS-G Forum - An Appraisal of Ground Segment & Operations Standards for D/OPS 14
E-70B Scope and Status (2) The ECSS Task Force 2 identified E-70 Part 2 as being
of the nature of a “Handbook”, rather than a “Standard”. Consequently, Part 2 will lapse and will be replaced instead by a set of new “normative” Annexes to E-70B. The current DRDs will be significantly slimmed-down to retain only the essential requirements for document contents (work in progress)
A new Ground Segment and Operations document has been identified covering “Customer Furnished Items and Services Requirements (CFISRD)”. The generic requirements to be included in this document will be defined in a new Annex to E-70B (work in progress)
OPS-GD ~ 1 Dec 2006OPS-G Forum - An Appraisal of Ground Segment & Operations Standards for D/OPS 15
E-70-01: Satellite On-board Control Procedures
OBJECTIVES To standardise the source language, such that:
procedure scripts can be re-used between missions spacecraft engineers can work with a single language
To standardise the target language, such that: on-board interpreters can be re-used between missions ground tools can be re-used between missions
To standardise the interface between the on-board execution environment and the other on-board systems
To standardise the interface with the spacecraft database (on ground)
STATUS Currently a working group draft
The E-70-01 working group started work in 2005
The standard is expected to be ready for Public Review in mid-2007 and to be published in 2008
SCOPE
STATUS
OPS-GD ~ 1 Dec 2006OPS-G Forum - An Appraisal of Ground Segment & Operations Standards for D/OPS 16
E-70-31: Monitoring and Control Data Definition
OBJECTIVES Specifies the mission-specific data used by ground systems to perform
space system integration, testing and mission operations
Promotes a life-cycle approach to monitoring and control data from low-level testing to in-flight operations
Requirements are defined in terms of “what” data is provided by the supplier to the customer. “How” this data is provided is outside the scope of this standard and may benefit from the CCSDS XTCE work (see later)
STATUS Public Review completed in 2005. More than 200 DRRs were received
from ECSS partners
The E-70-31 working group has processed the DRRs and updated the standard accordingly. The new draft is under final review by the ECSS Engineering Panel
SCOPE
STATUS
OPS-GD ~ 1 Dec 2006OPS-G Forum - An Appraisal of Ground Segment & Operations Standards for D/OPS 17
Roadmap Introduction (MJ) ECSS – Organisation and Standards (MJ)
CCSDS – Organisation and Standards (MM) Standardisation in ESA – ESB (MM) Standardisation in D/OPS (MM) Conclusions (MJ)
OPS-GD ~ 1 Dec 2006OPS-G Forum - An Appraisal of Ground Segment & Operations Standards for D/OPS 18
What is CCSDS? The Consultative Committee for Space Data Systems (CCSDS)
formed in 1982 by the major space agencies of the world provides a forum for discussion of common problems in the development
and operation of space data systems
It is currently composed of 10 member agencies
ASI, BNSC, CNES, CSA, DLR, ESA, FSA, INPE, JAXA, NASA 22 observer agencies over 100 industrial associate
CCSDS develops Recommendations for data- and information-systems standards to
reduce the cost to the various agencies of performing common data functions by eliminating unjustified project-unique design and development, and
promote interoperability and cross support among cooperating space agencies to reduce operations costs by sharing facilities
OPS-GD ~ 1 Dec 2006OPS-G Forum - An Appraisal of Ground Segment & Operations Standards for D/OPS 19
CCSDS - Overview and Organisation
OPS-GD ~ 1 Dec 2006OPS-G Forum - An Appraisal of Ground Segment & Operations Standards for D/OPS 20
CCSDS WGs More general info and
docs download:www.ccsds.org
More about WGs:
public.ccsds.org/sites/cwe/default.aspx
ESAmember
ESAlead
OPS-GD ~ 1 Dec 2006OPS-G Forum - An Appraisal of Ground Segment & Operations Standards for D/OPS 21
CCSDS: Systems Engineering Area (SEA) Security WG
Encryption Standard [Q2/07] Authentication Standard [Q2/07] see D. Fischer’s OPS-G forum of 3rd Nov 06
XML Standards & Guidelines SIG
Delta-Differential One-way Ranging (Delta-DOR) Green book in preparation
OPS-GD ~ 1 Dec 2006OPS-G Forum - An Appraisal of Ground Segment & Operations Standards for D/OPS 22
CCSDS: Mission Operations and Information Management Services Area (MOIMS) Data Archive Ingestion WG
Standardise archive submission information (e.g. metadata keywords ) Submission Information Package (SIP) [Q3/07]
Navigation WG Standardise data content and formats of tracking, attitude, trajectory,
and ancillary data: Orbit Data Message (ODM) [available] Attitude Data Message (ADM) [Q2/07] Tracking Data Message (TDM) [Q3/07] XML Navigation Data Message [Q4/07]
Information Packaging and Registries WG Standardise information packaging (i.e. how to associate and package
data and metadata) XML Formatted Data Unit (XFDU) [Q3/07]
Spacecraft Monitoring & Control WG Standardise Mission Operations Services to enable build up M&C
systems by use of “plug & play” components, maybe from different Agencies, systems and suppliers
Set of SM&C Services [Q4/07] XML Telemetric and Command Exchange (XTCE) [Q2/07]
OPS-GD ~ 1 Dec 2006OPS-G Forum - An Appraisal of Ground Segment & Operations Standards for D/OPS 23
CCSDS: Cross Support Services Area (CSS)
Service Management WG Standardise the arranging, scheduling, control, and
monitoring of SLE TT&C services Space Link Extension - Service Management - Service Specification
[Q2/07]
Cross Support Transfer Service WG Standardise the SLE transfer services
Return All Frames (RAF) [available] Return Channel Frames (RCF) [available] Return Operational Control Fields (ROCF) [available] Forward CLTU [available] Forward Space Packet (FSP) [available] Use of SLE Transfer Services over TCP/IP [Q2/07] Specification of APIs for each Transfer Services [Q2/07]
OPS-GD ~ 1 Dec 2006OPS-G Forum - An Appraisal of Ground Segment & Operations Standards for D/OPS 24
CCSDS: Spacecraft Onboard Interface Services Area (SOIS) It defines generic services to simplify the way flight
software interacts with flight hardware and permit interoperability and reusability
Not relevant to D/OPS as it deals mainly with on-board interfaces
OPS-GD ~ 1 Dec 2006OPS-G Forum - An Appraisal of Ground Segment & Operations Standards for D/OPS 25
CCSDS: Space Link Services Area (SLS) RF and Modulation WG
Standardisation of RF and Modulation in 26 and 32 GHz frequency band [Q1/09]
Space Link Coding and Synchronization WG Standardisation of High Performance Coding
Serially Concatenated Convolutional Codes [Q4/07] Digital Video Broadcasting Usage by Space Missions (DBV-S2) [Q4/07] Long Erasure Codes [Q4/07]
Data Compression WG Standardisation of highly efficient data compression schemes
Lossless Data Compression [available] Image Data Compression [available]
Ranging WG Standardisation of ranging for interplanetary missions
Pseudo-Noise Ranging [Q3/08]
OPS-GD ~ 1 Dec 2006OPS-G Forum - An Appraisal of Ground Segment & Operations Standards for D/OPS 26
CCSDS: Space Internetworking Services Area (SIS)
It provides services and protocols to address networked interactions of many forms: between spacecraft and earth-based resources among spacecraft between spacecraft and landed elements, and within heterogeneous spacecraft
Not that relevant to D/OPS with the exception of CCSDS File Transfer Protocol [available] Mars communication profile BOF
OPS-GD ~ 1 Dec 2006OPS-G Forum - An Appraisal of Ground Segment & Operations Standards for D/OPS 27
Where and How does ESA Fit?
ESB
OPS-GD ~ 1 Dec 2006OPS-G Forum - An Appraisal of Ground Segment & Operations Standards for D/OPS 28
The ESA Context and D/OPS Focus
ESSBESA Standardisation
Steering Board
ESSBESA Standardisation
Steering Board
PA-CCB
PA & Safety Configuration Control Board
PA-CCB
PA & Safety Configuration Control Board
ESB
Engineering Standardisation
Board
ESB
Engineering Standardisation
Board
MSSGManagement
Standards Steering Group
MSSGManagement
Standards Steering Group
DG
BSSCBoard for Software
Standardisation & Control
BSSCBoard for Software
Standardisation & Control
MESBMechanical Eng.
Standardisation Board
MESBMechanical Eng.
Standardisation Board
CESBControl Engineering
Standardisation Board
CESBControl Engineering
Standardisation Board
EESBElectrical Engineering Standardisation Board
EESBElectrical Engineering Standardisation Board SESB
System Engineering Standardisation Board
SESBSystem Engineering
Standardisation BoardGOSBGround Systems & Ops Standardisation Board
GOSBGround Systems & Ops Standardisation Board STAB
Standards Approval Board for TLM & TLC
STABStandards Approval Board for TLM & TLC
ESSBESA Standardisation
Steering Board
ESSBESA Standardisation
Steering Board
PA-CCB
PA & Safety Configuration Control Board
PA-CCB
PA & Safety Configuration Control Board
ESB
Engineering Standardisation
Board
ESB
Engineering Standardisation
Board
MSSGManagement
Standards Steering Group
MSSGManagement
Standards Steering Group
DG
BSSCBoard for Software
Standardisation & Control
BSSCBoard for Software
Standardisation & Control
MESBMechanical Eng.
Standardisation Board
MESBMechanical Eng.
Standardisation Board
CESBControl Engineering
Standardisation Board
CESBControl Engineering
Standardisation Board
EESBElectrical Engineering Standardisation Board
EESBElectrical Engineering Standardisation Board SESB
System Engineering Standardisation Board
SESBSystem Engineering
Standardisation BoardGOSBGround Systems & Ops Standardisation Board
GOSBGround Systems & Ops Standardisation Board STAB
Standards Approval Board for TLM & TLC
STABStandards Approval Board for TLM & TLC
Full D/OPS involvement
Partial D/OPS involvement
OPS-GD ~ 1 Dec 2006OPS-G Forum - An Appraisal of Ground Segment & Operations Standards for D/OPS 29
ESB Workflow
Workplan Approval
proposals decisions
Activities’ Monitor &
Control
reporting
controllingESB
Sub-Board
ESA Rep.
ECSS/CCSDSWG
ESB
Sub-Board
ESA Rep.
ECSS/CCSDSWG
Tech. Rep.
ESB recommends inclusion of published standards in the “ESA Approved Standards” list, which makes their use mandatory for future missions!
http://ids2.esa.int:81/ATTACHEMENTS/A132787/index.htm
OPS-GD ~ 1 Dec 2006OPS-G Forum - An Appraisal of Ground Segment & Operations Standards for D/OPS 30
1.Interoperable
Onboard Interfaces
2. Highly Efficient
Communications in Resource-
Constrained Environments 3.
Mission Operations
Services
4.Data Interchange
and Archiving Services
5.System Engineering
6.Software
Engineering
D/OPS Standardization Framework
STABSTAB
GOSBGOSB
GOSBGOSB
SESBSESB
BSSCBSSC
CESBCESB
OPS-GD ~ 1 Dec 2006OPS-G Forum - An Appraisal of Ground Segment & Operations Standards for D/OPS 31
Safeguarding D/OPS’s Interests Invest in the development of standards that meets the
D/OPS strategy objectives:1. Reduce technical risks in ground segment systems and
operations2. Reduce cost of ground segment systems and operations3. Establish the baseline for the development of the ESA ground
segment infrastructure4. Allow interoperability within and across organisations5. Increase competitiveness of ground segment European
Industry6. Maintain the leadership in ground segment systems and
operations and avoid insurgence of undesired standards Provide D/OPS with visibility on the status of relevant
activities
OPS-GD ~ 1 Dec 2006OPS-G Forum - An Appraisal of Ground Segment & Operations Standards for D/OPS 32
Approach to D/OPS Standardization Planning
Use already in place organisation (ESB) for an ESA-wide-consistent standardization workplan
Rely on D/OPS representatives in ESB to assure compliance to D/OPS objectives
J.F. Kaufeler, OPS-G, D/OPS member in ESB M. Merri, OPS-GD, ESB Secretary and GOSB chair M. Spada, OPS-GD, co-chair of BSSC D/OPS representative in sub-boards and working groups
Document workplan fit to D/OPS objectives in “D/OPS Engineering Standardization Plan and Report” (once per year in Nov)
Execution Use already in place organisation (ESB) to
monitor and control activities Improve reporting capabilities of:
ESB on activities’ status Creation of central ESB DB agreed at last ESB meeting
D/OPS on resource utilisation One-to-one correspondence between approved workplan and PFMS Authorisation procedure for Mission Travels and Industrial Costs Reporting to D/OPS on resource utilisation in Appendix of “D/OPS Engineering
Standardization Plan and Report” (twice per year in Nov and Jul)
Workplan Approval
proposals decisions
ESB
Sub-Board
ESA Rep.
WG
Activities’Monitor & Control
reporting
controlling
ESB
Sub-Board
ESA Rep.
WG
OPS-GD ~ 1 Dec 2006OPS-G Forum - An Appraisal of Ground Segment & Operations Standards for D/OPS 33
Nature of Standardization Work Standardization work is a very particular type of work
it has not all the characteristics of a typical project its lifecycle can hardly be paced by a normal Project
Management Plan In fact, standardization work is:
speculative and experimental in several aspects typically based on “compromise engineering” where a large
consensus must be achieved conducted by joining the forces of several organizations, each
with very different agendas, different resource level, different interests and different authorities. This implies:
More difficult to reach consensus More difficult to manage manpower and industrial cost expenses More difficult to control the schedule and the deliverables
often done on a voluntary basis by staff who work on mission/infrastructure projects which naturally take priority
OPS-GD ~ 1 Dec 2006OPS-G Forum - An Appraisal of Ground Segment & Operations Standards for D/OPS 34
Услуги взаимнойподдержки
Услуги поинтерфейсукосмическихаппаратов
Услуги по поддержкеиз космоса работы
сети Интернет
Услуги каналовсвязи с
космическимиаппаратами
Услуги по управлениюполётами и
обработке информации.
Системноепроектиро-
вание
Another Challenge of International Standardisation
OPS-GD ~ 1 Dec 2006OPS-G Forum - An Appraisal of Ground Segment & Operations Standards for D/OPS 35
Summary of 2006 Achievements
BSSC CESB GOSB SESB STAB Tot
No. Public Reviews 1 0 7 1 3 12
No. Documents Published 0 0 9 0 7 16
OPS-GD ~ 1 Dec 2006OPS-G Forum - An Appraisal of Ground Segment & Operations Standards for D/OPS 36
AEO
LUS
AU
RO
RA
B-C
CLU
STER
-IIC
RYO
SAT-
2EA
RTH
CA
RE
ENVI
SAT
ERS-
2G
AIA
GA
LILE
OG
IOVE
-AG
IOVE
-BG
OC
EH
PJW
STIN
TEG
RA
LLP
FM
ETO
PM
EXM
SGPR
OB
A -2
RO
SETT
ASE
NTI
NEL
SMA
RT-
1SW
AR
MU
LYSS
ESVE
XXM
MD
/OPS
I/F
1. Interoperable On-board InterfacesCESB06/ECSS: Standard S/C AOCS Reqs Spec ? ? ? ? ? n/a
2. Highly Efficient Communications in Resource-Constrained EnvironmentsCCSDS: CFDP ? ? ? ? X ? ?CCSDS: Data Compression ? ? ? ? X ?CCSDS: Proximity Links X X X SCCSDS/ECSS: Packet TM,TC, AOS X X X P X X P X X X X X X X X X X X X X X X X X X SCCSDS/ECSS: RF, Modulation and Coding X X X X X X X X X X X X X X X X X X X X X X X X X X X SECSS: Ranging X X X X X X X X X X X X X X X X X X X X X X X X X X SSTAB04/ECSS: TM Transfer Frame Protocol X X X X X X X SSTAB05/ECSS: TC Protocols, Synchronization and Channel Coding X X X X X X X SSTAB07/ESSC: TM Synchronization and Channel Coding X X X X X X X SSTAB14/CCSDS: High Performance Coding ? ? ?STAB14/CCSDS: Higher Frequency Bandwidth-Efficient Modulation ? X ?STAB14/CCSDS: Pseudo-Noise Ranging X 09STAB15/ECSS: RF and Modulation X X X X X X X SSTAB16/ESA: Space Frequency Coordination Group X X X X X X X X X X X X X X X X X X X X X X X X X X n/aSTAB19/ECSS: E-50 Level 2 Update X X X X X X n/a
3. Mission Operations ServicesECSS: Packet Utilisation Standard (PUS) X X X X X X X X X X X X X X X X X X X X X SCCSDS: Space Link Extension Transfer Services X X X X X X X X X X X X X X X X X X X X X X X X X SECSS: Procedure Definition Language X X X X X X X X X X X X X X 07ECSS: Space Segment Operability X X X X X X X X X n/aGOSB06/CCSDS: Delta-Differential One-way Ranging (Delta-DOR) ? X X X X ?GOSB06/CCSDS: Navigation X X X ? ? ? ? ? ? ? 07GOSB12/CCSDS: Space link Extension Service Management X X X X X X X 07GOSB14/CCSDS: Cross Support Transfer Services X X X X X X 08GOSB16/ECSS: Telemetry and Telecommand Data Description ? ? ? ? ? ? ? ? 07GOSB20/CCSDS: Security Activities ? ? ? X ? ?GOSB22/CCSDS: Spacecraft Monitor & Control ? ? ? ? ? ?GOSB22/CCSDS-OMG: XML Telemetric and Command Exchange ? ? ? ? X ? ? ? 08GOSB27/ECSS: On-board Control Procedures ? ? ? ? ? ? ? ? ?GOSB28/ECSS: E-70 Level 2 Consolidation X X X X X X n/a
4. Data Interchange and Archiving ServicesGOSB02/CCSDS: Data Archive Ingestion X X X X X X X 09GOSB18/CCSDS: Information Packaging & Registries X ? ? X X X X X ? ? X X X X X X X 08
5. System EngineeringECSS: System Engineering X X X X X X X X X X X X X X X n/aSESB05/ECSS: System Modelling & Simulations X X X X X X n/aSESB09/ECSS: Reference Coordinate Systems X X X X X X n/aSESB14/ECSS: Engineering Database X X X X X X n/aSESB17/ECSS: Space Environment X X X X X X n/aSESB18/ECSS: System Engineering X X X X X X n/aSESB30/ECSS: Space Debris X X X X X X n/aSESBzz/ECSS: Flight Mechanics (launchers & reentry vehicles) X X X X X X n/a
6. Software EngineeringECSS: Software Engineering X X X X X X X X X X X X X X X X X X X X X X X X X X n/aBSSC05/ECSS: Ground Segment Software X X X X X X n/aBSSC06/ECSS: Ground Segment Software Engineering Handbook X X X X X X n/aBSSC09/ECSS: Software Reuse Engineering Handbook X X X X X X n/aBSSC10/ECSS: Simulator Model Portability 2 X X X X X X X 07
Available, On-Going/Future X =used P =partially used ? =unknown 07 =supported in 2007 S =already supported n/a =not applicable
and Infra-structure
Applicability of D/OPS Standardization to Missions
OPS-GD ~ 1 Dec 2006OPS-G Forum - An Appraisal of Ground Segment & Operations Standards for D/OPS 37
Representation (ESA/OPS) ECSS
1/0 ECSS Steering Board 2/0 ECSS Executive 1/0 Engineering Panel 31/4 working group chairs
Calzolari (GI), Gomez (GI), Jones (GD), Vassallo (OW) 122/18 members in 61 working groups
OPS TEC SCI EOP EUI LAU EXT TotalWG Chair 4 27 31WG Member 18 88 6 7 2 1 122Total 22 115 6 7 2 1 0 153
OPS TEC SCI EOP EUI LAU EXT TotalWG Chair 7 5 12WG Member 10 10 2 1 23Total 17 15 0 2 0 0 1 35
CCSDS 1/1 ESA representative in CMC (J.F.Kaufeler) 1/1 deputy CESG chair (N. Peccia) 3/1 area directors (6 in total)
Peccia (GI) 12/7 working group chairs
3xCalzolari (GI), Doat (GI), Merri (GD), 2xVassallo (OW) 23/10 members in 35 working groups
OMG Passive role (observer)
OPS-GD ~ 1 Dec 2006OPS-G Forum - An Appraisal of Ground Segment & Operations Standards for D/OPS 38
Conclusions
ESOC Staff are heavily involved in preparing standards
There are mature standards that are applicable to ESOC’s work
We have highlighted newer or emerging standards that will be applicable or useful for ESOC
A D/OPS standardization plan is now in place
Measures are being put in place to allow better monitoring and reporting of standardization activities in ESA
OPS-GD ~ 1 Dec 2006OPS-G Forum - An Appraisal of Ground Segment & Operations Standards for D/OPS 39