Introduction of HydrogenTechnologies to Ramea Island
Morel OprisanIEA Wind KWEA Joint Workshop
April, 2007
-
8/13/2019 Oprisan_KWEA_
2/22
2
1. Ramea Island
2. Background3. Hydrogen Integration
4. Project Phases
5. Project Partners
6. Equipment Sizing
7. Project Timeline8. Expected Performance
Presentation Overview
-
8/13/2019 Oprisan_KWEA_
3/22
3
1. Ramea Island
Island of Newfoundland
World class wind resource
Potential for many 100s of MW
Ramea Island
Not connected to Island grid Ferry access only ~ 350 customers 1,078 kW peak load (winter)
Ramea Island
Newfoundland
-
8/13/2019 Oprisan_KWEA_
4/22
4
+12 months of successful operation: CF = 0.33 Wind production ~ 1 million kWh electricity / yr Diesel fuel savings ~ 10% ~ 750 tonnes / yr GHG emissions reductions Improved air quality
2. Background
Commissioning of first Wind-Dieseldemonstration project in Canada in
2004 NRCans unique control
system integrates wind
with existing diesel generation
Windmatic 65 kWTurbine
Town of Ramea
-
8/13/2019 Oprisan_KWEA_
5/22
5
Current Situation on Ramea
Installed wind capacity: 6 x 65 kW = 390 kW
Real wind capacity: 390 kW x 0.33 = 129 kW
Total energy produced = 4,201 MWh in 2005 Diesel / Wind (90% / 10%)
Wind-Diesel System in Ramea,Newfoundland
Installed diesel capacity:3 x 925 kW = 2,775 kW
Often one only diesel generator running at 300 kW
Excess wind energy is dumped,therefore, storage would increasewind penetration
-
8/13/2019 Oprisan_KWEA_
6/22
6
Potential for Commercialization
Existing NL Hydro isolated diesel systems:
Significant potential for deployment in remote communitiesin Canada and around the world
-
8/13/2019 Oprisan_KWEA_
7/22
7
3. Hydrogen Integration
-
8/13/2019 Oprisan_KWEA_
8/22
8
A. Feasibility study Modelling and feasibility study done by NRCan
Goals: Establish potential for hydrogen storage andcontribute to equipment sizing
B. Implementation on Ramea Led by Newfoundland and Labrador Hydro Other Canadian Federal Government funding:
$3M CAD confirmed, $1.7M CAD pending
4. Project Phases
-
8/13/2019 Oprisan_KWEA_
9/22
9
5. Project Partners
FRONTIERPOWER
SYSTEMS
-
8/13/2019 Oprisan_KWEA_
10/22
10
Hydrogen Generator Hydrogen Storage /
Compression
Electrolyzer Wind Capacity
Control System
6. Equipment Sizing
Relationshipbetween
components iscomplex
-
8/13/2019 Oprisan_KWEA_
11/22
11
Hydrogen Generator
-
8/13/2019 Oprisan_KWEA_
12/22
12
Known, reliable internal combustiontechnology
Lower cost than fuel cell Current fuel cell
technology notmature enough Previous operator
experience
Hydrogen Generator
HEC 250 kW H 2 Genset
-
8/13/2019 Oprisan_KWEA_
13/22
13
250 kW (4+1 engines, 4 x 62.5 kW)
Supplied by Hydrogen Engine Center Canada Based on 4.9 L Ford engines
Testing for performance, emissions,modelling parameters inSpring 2007
Post-testing: Loaned anddelivered to NL Hydro
Hydrogen Generator
Interio r View of HEC250 kW H 2 Genset
-
8/13/2019 Oprisan_KWEA_
14/22
14
Other Equipment
-
8/13/2019 Oprisan_KWEA_
15/22
15
Conventional H 2 storage leavessmaller environmental footprint
than batteries Looking at long-term storage
applications towards a H 2economy
Complementary to NRCansexisting R&D into advancedutility-sized batteries(e.g. VRB and NaS)
Hydrogen Storage
Sodium Sulphur Battery
-
8/13/2019 Oprisan_KWEA_
16/22
16
Preliminary Estimate Work backwards from genset
requirement to determine howlarge storage needs to be
Genset H 2 consumption: 250 Nm 3/hr
Hydrogen Storage / Compression
Min genset autonomy: 8 hours8 hr x 250 Nm 3/hr 2000 Nm 3 required storage
At 6700 psi (typical steel storage), require6837 L H 20 equivalent volume
9 x 19-ft cylinders
H2 Storage
-
8/13/2019 Oprisan_KWEA_
17/22
17
Preliminary Estimate
Work backwards from storage requirement todetermine minimum electrolyzer H 2 production
Maximum time to fill H 2 storage: 24 hrs2000 Nm 3 / 24 hrs = 79 Nm 3/hr
+ additional capacity
~ 90 m 3/hr electrolyser
Electrolyzer
Hydrogenics Electrolyzer
-
8/13/2019 Oprisan_KWEA_
18/22
18
Wind Capacity
Preliminary Estimate
Work backwards from electrolyzer electrical
requirement to determine minimum wind capacity (kW) Assume CF = 0.33
0
200
400
600
800
1000
0 10 20 30 40 50 60 70 80 90 100 110 120 130
Electrolyser Output (Nm 3 / hr)
E l e c t r i c a
l P o w e r
R e q u
i r e d
( k W )
~ 1500 kW planned installed wind capacity
-
8/13/2019 Oprisan_KWEA_
19/22
19
Control System
Control system must work with eachcomponents control system and with the
existing wind-diesel control system
Enercon E33 Turbine
Must optimize each components
production so that overall windpenetration is maximized
-
8/13/2019 Oprisan_KWEA_
20/22
20
August 2 7: Project Definition & Sanctioning Committed funding finalized & funding contracts completed Project partnerships established and agreements in place System modelling, component sizing and project design
December 2 8: Project In Service
Finalize equipment selection and design Procure equipment Control system design, testing, development and
commissioning
December 2 11: Three Years Operations & Reporting
7. Project Timeline
-
8/13/2019 Oprisan_KWEA_
21/22
21
8. Expected Performance
Preliminaryperformance will beoptimized throughfeasibility study
Round trip efficiencyexpected to beapproximately 25%
90%Storage +Decompression
25% ApproximateRound TripEfficiency
35%Hydrogen
InternalCombustion
80%Electrolysis +Compression
ApproximateEfficiency
Component
-
8/13/2019 Oprisan_KWEA_
22/22
22
Thank You
Morel Oprisan
Deputy S&T Director, Renewable Energy Technologies