oppdateringer av norsok n-standarder€¦ · oppdateringer av norsok n-standarder author: oddgeir...
TRANSCRIPT
-
•
•
•
•
•
-
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
-
8
Standardisation of Offshore Structures Specifications
• An IOGP initiative, funded by JIP35, following the successful IOGP JIP33 initiative on the
standardisation of equipment specifications
• 10 Contributing Operators: BP, Chevron, ENI, Equinor, ExxonMobil, INPEX, Shell, Suncor, Total,
Woodside making up the Offshore Structures Specifications Task Force, under the Offshore
Structures Subcommittee
• Objective: Selection of an agreed base standard; using these operators’ specifications as input,
identify and agree minimum, essential common requirements, documenting these in jointly
approved supplementary specifications, published by IOGP
• 12 Teams covering: Concrete, General Requirements, Metocean, Stationkeeping, Marine Soil
Investigations, Seismic, Foundations, Weight Management, Topsides, Fixed Jackets, Floating
Structures, Arctic
• Task Force Chairman: Simen Moxnes of Equinor; Task Force Vice-Chair: Philip Smedley of BP
-
9
Topic (IOGP Supplementary Specification)Total Company
Requirements
Minimum Essential
Requirements
General Reqs (S-631-01) – Published 44 5
Concrete (S-631-03) – Published 216 43
Seismic (S-631-08) – Published 255 5
Arctic (S-631-02) – Published 170 0
Marine Soil Invest. (S-631-10) – Published 883 90
Stationkeeping (S-631-07) – Published 1111 53
Topsides (S-631-04) – Published 1936 60
Fixed Jacket (S-631-11) – Publish September 2020 1931 ~90
Consolidation and Reduction of Company Requirements
-
10
Available on IOGP website – www.iogp.org/jip35
Publications: Supplementary Specifications
https://www.iogp.org/jip35/