operated by brookhaven science associates for the u.s. department of energy a pion production and...

1
Operated by Brookhaven Science Associates for the U.S. D Energy A Pion Production and Capture System for a 4 MW Target Station X. Ding, D. Cline, UCLA, Los Angeles, CA 90095, USA H. Kirk, J. S. Berg, BNL, Upton, NY 11973, USA A study of a pion production and capture system for a 4MW target station for a neutrino factory or muon collider is presented. Using the MARS code, we simulate the pion production produced by the interaction of a free liquid mercury jet with an intense proton beam. We study the variation of meson production with the direction of the proton beam relative to the target. We also examine the influence on the meson production by the focusing of the proton beam. The energy deposition in the capture system is determined and the shielding required in order to avoid radiation damage is discussed. Radiation Dose and Life Time of Superconducting Coil Target parameters is optimized to maximize the pion production. The pion production and the pion-production efficiencies as a function of the primary proton of KE between 2 and 100 GeV are calculated. X. Ding et al., "Optimized Parameters for a Mercury Jet Target," in Proceedings of PAC09, Vancouver, Canada, May 2009, paper WE6PFP102. Conclusion 1. Based on the study of meson production efficiency per unit proton beam power as a function of the primary proton energy, we favor the energy range of 5~15 GeV for the incoming protons. 2. Modeling has explored a range of proton beam entry angles with a view to optimizing the production efficiency of the pions as well as offering an opportunity to explore the possibility of multiple beam entry points for the proton beam onto the jet. 3. The examination of the influence on the meson production by the focusing of the proton beam shows the meson production loss is negligible (< 1%) for the beta function to be 0.3 m or higher. 4. The energy deposition of incoming 4 MW proton beam in the target is investigated. It shows that the bulk of power is deposited in the tungsten- carbide & water (WC) shield, the mercury jet and the stainless steel bottle. Also, we found the power deposition in the first superconducting coil (SC1) is high and enhanced shielding is required to lower the radiation dose and increase the lifetime of SC1. 4. Focused Incident Proton Beam 1. Schematic of the Target System 5. Energy Deposition 2. Pion Production 3. Multiple Proton Beam Entry Directions Energy Deposition (ED) of 4 MW Beam in the Target System Component ED Power P/P beam WC Shield 4.60 GeV 1838 kW 46.0 % Hg Jet 1.07 GeV 426 kW 10.7 % STST Bottle 1.17 GeV 468 kW 11.7 % Res Sol 0.26 GeV 105 kW 2.6 % Hg Pool 4.89*10 -2 GeV 19.5 kW 0.5 % FeCo 2.25*10 -2 GeV 9 kW 0.23 % Be Window 6.22*10 -3 GeV 2.5 kW 0.06 % SC1 5.52*10 -2 GeV 22.1 kW 0.55 % SC2 5.99*10 -3 GeV 2.4 kW 0.06 % SC3 3.30*10 -3 GeV 1.3 kW 0.03 % SC4 1.19*10 -3 GeV 0.5 kW 0.01 % Pre-Trgt <10 -3 GeV Air <10 -3 GeV Component Dose/yr Max allowed Dose 4 MW life Superconducting coil (Study II) (24GeV, 1MW proton beam) 6*10 6 Gy/yr 10 8 Gy 4 yr SC1 (10GeV, 4MW proton beam) 8*10 7 Gy/yr 10 8 Gy 1.25 yr Comparison of Calculated Energy Deposition between MARS and FLUKA Code Region P [kW] % (MARS15) P [kW] % (FLUKA) Hg Jet Hg Pool inside WC shield WC shield (z < 27 cm) WC shield (z ≥ 27 cm) Outer Fe yoke (z < −165 cm) Inner Fe yoke (z ≥ −165 cm) Inner Cu coil (18 ≤ r ≤ 23 cm) Outer Cu coil (23 < r ≤ 49 cm) SC Coil 1 SC Coil 2 SC Coil 3 SC Coil 4 SC Coil 5 SC Coil 6 SC Coil 7 SC Coil 8 SC Coil 9 SC Coil 10 SC Coil 11 SC Coil 12 SC Coil 13 Be window at 6m 426.0 10.7 19.5 0.5 1838 (WC shield) 46.0 468 (STST Bottle) 11.7 9.0 0.2 (FeCo) 105 2.6 (Res Sol) 22.1 0.6 2.4 0.1 1.3 ----- 0.5 ----- 0.1 ----- <0.1 ----- 3.5 ----- 1.5 ----- 0.9 ----- 0.7 ----- 0.5 ----- 0.4 ----- 2.6 ----- 2.5 ----- 400.9 10.0 12.5 0.3 1845.5 46.1 848.3 21.1 ----- ----- 15.2 0.4 142.0 3.6 90.3 2.3 52.7 1.3 5.5 0.1 1.2 ----- 0.4 ----- 0.1 ----- <0.1 ----- 1.1 ----- 0.5 ----- 0.2 ----- 0.1 ----- 0.1 ----- 0.1 ----- 0.7 ----- 1.7 ----- Distribution of Energy Deposition (GeV/g per proton) of 4 MW Beam in the Target System jet p0 f=24° f=48° f=72° f=96° f=120° f=144° f=168° f=192° f=216° f=240° f=264° f=288° f=312° f=336° f=0° p1 p2 p3 p4 Optimizationstudycase p5 p6 p7 p8 p9 p10 p11 p12 p An asymmetry layout in the 8GeV proton beam case at z=- 75cm is required to achieve the same beam/jet crossing angle at z=-37.5 cm. We found a correlation between the distance of beam relative to the jet and the meson production. The peak meson production is about 8% higher than for the lowest case. X. Ding et al., "Meson Production Simulations for a Mercury Jet Target," in Proceedings of NuFact09, Chicago (2009), AIP Conference Proceedings 1222 (2010), p.323. The layout of multiple proton beam entry directions relative to mercury jet at z=-75cm. Enhanced Shielding for SC1 Coil According to J. Back’s simulation, the energy showers are more “Penetrating” in FLUKA than in MARS . J. Back, Private Communication. Power deposition in SC1 coil could be decreased from 22.1 kW to 4.8 kW if WC & water shield region is extended from 50 to 63 cm in radius. Power deposition in SC1 coil could be further decreased to 1.3 kW if Resistive inner copper coils are replaced by WC & water shield. SolenoidAxis H g Jet Proton Beam q BEAM q CROSS r JET -75 cm -37.5cm 0 cm Jet/B ea m D i r e c tio The mercury jet target geometry. -6 -4 -2 0 2 4 6 -6 -4 -2 0 2 4 6 y,cm x,cm z=0 cm z=-37.5 cm z=-75 cm 0.92 0.93 0.94 0.95 0.96 0.97 0.98 0.99 1 1.01 1.02 1.03 0 0.5 1 1.5 2 2.5 3 Nom alized M esonsto Sim ple Gaussian Beam Betaxand Betayatz=-37.5 cm ,m Focused proton beam Fitwithy=a1-a2exp(-kx) Fitwithy=(b+cx)/(a+x) 0 30 60 90 120 120 cm 0 300 600 600 cm 10 −3 10 −4 10 −5 10 −6 10 −7 10 −8 10 −9 10 −10 10 −11 10 −12 10 −13 10 −14 10 −15 10 −16 10 −17 10 −18 10 −19 4.2e−04 0

Post on 19-Dec-2015

214 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: Operated by Brookhaven Science Associates for the U.S. Department of Energy A Pion Production and Capture System for a 4 MW Target Station X. Ding, D

Operated by Brookhaven Science Associates for the U.S. Department of Energy

A Pion Production and Capture System for a 4 MW Target Station

X. Ding, D. Cline, UCLA, Los Angeles, CA 90095, USA H. Kirk, J. S. Berg, BNL, Upton, NY 11973, USA

A study of a pion production and capture system for a 4MW target station for a neutrino factory or muon collider is presented. Using the MARS code, we simulate the pion production produced by the interaction of a free liquid mercury jet with an intense proton beam. We study the variation of meson production with the direction of the proton beam relative to the target. We also examine the influence on the meson production by the focusing of the proton beam. The energy deposition in the capture system is determined and the shielding required in order to avoid radiation damage is discussed.

Radiation Dose and Life Time of Superconducting Coil

• Target parameters is optimized to maximize the pion production.

• The pion production and the pion-production efficiencies as a function of the primary proton of KE between 2 and 100 GeV are calculated.

X. Ding et al., "Optimized Parameters for a Mercury Jet Target," in Proceedings of PAC09, Vancouver, Canada, May 2009, paper WE6PFP102.

Conclusion

1. Based on the study of meson production efficiency per unit proton beam power as a function of the primary proton energy, we favor the energy range of 5~15 GeV for the incoming protons.

2. Modeling has explored a range of proton beam entry angles with a view to optimizing the production efficiency of the pions as well as offering an opportunity to explore the possibility of multiple beam entry points for the proton beam onto the jet.

3. The examination of the influence on the meson production by the focusing of the proton beam shows the meson production loss is negligible (< 1%) for the beta function to be 0.3 m or higher.

4. The energy deposition of incoming 4 MW proton beam in the target is investigated. It shows that the bulk of power is deposited in the tungsten-carbide & water (WC) shield, the mercury jet and the stainless steel bottle. Also, we found the power deposition in the first superconducting coil (SC1) is high and enhanced shielding is required to lower the radiation dose and increase the lifetime of SC1.

4. Focused Incident Proton Beam

1. Schematic of the Target System 5. Energy Deposition

2. Pion Production

3. Multiple Proton Beam Entry Directions

Energy Deposition (ED) of 4 MW Beam in the Target System

Component ED Power P/Pbeam

WC Shield 4.60 GeV 1838 kW 46.0 %

Hg Jet 1.07 GeV 426 kW 10.7 %

STST Bottle 1.17 GeV 468 kW 11.7 %

Res Sol 0.26 GeV 105 kW 2.6 %

Hg Pool 4.89*10-2 GeV 19.5 kW 0.5 %

FeCo 2.25*10-2 GeV 9 kW 0.23 %

Be Window 6.22*10-3 GeV 2.5 kW 0.06 %

SC1 5.52*10-2 GeV 22.1 kW 0.55 %

SC2 5.99*10-3 GeV 2.4 kW 0.06 %

SC3 3.30*10-3 GeV 1.3 kW 0.03 %

SC4 1.19*10-3 GeV 0.5 kW 0.01 %

Pre-Trgt <10-3 GeV

Air <10-3 GeV

Component Dose/yr Max allowed Dose 4 MW life

Superconducting coil (Study II)(24GeV, 1MW proton beam)

6*106 Gy/yr 108 Gy 4 yr

SC1 (10GeV, 4MW proton beam)

8*107 Gy/yr 108 Gy 1.25 yr

Comparison of Calculated Energy Deposition between MARS and FLUKA Code

Region P [kW] % (MARS15) P [kW] %

(FLUKA)

Hg Jet

Hg Pool inside WC shield

WC shield (z < 27 cm)

WC shield (z ≥ 27 cm)

Outer Fe yoke (z < −165 cm)

Inner Fe yoke (z ≥ −165 cm)

Inner Cu coil (18 ≤ r ≤ 23 cm)

Outer Cu coil (23 < r ≤ 49 cm)

SC Coil 1

SC Coil 2

SC Coil 3

SC Coil 4

SC Coil 5

SC Coil 6

SC Coil 7

SC Coil 8

SC Coil 9

SC Coil 10

SC Coil 11

SC Coil 12

SC Coil 13

Be window at 6m

426.0 10.7

19.5 0.5

1838 (WC shield) 46.0

468 (STST Bottle) 11.7

9.0 0.2

(FeCo)

105 2.6

(Res Sol)

22.1 0.6

2.4 0.1

1.3 -----

0.5 -----

0.1 -----

<0.1 -----

3.5 -----

1.5 -----

0.9 -----

0.7 -----

0.5 -----

0.4 -----

2.6 -----

2.5 -----

400.9 10.0

12.5 0.3

1845.5 46.1

848.3 21.1

----- -----

15.2 0.4

142.0 3.6

90.3 2.3

52.7 1.3

5.5 0.1

1.2 -----

0.4 -----

0.1 -----

<0.1 -----

1.1 -----

0.5 -----

0.2 -----

0.1 -----

0.1 -----

0.1 -----

0.7 -----

1.7 -----

Distribution of Energy Deposition (GeV/g per proton) of 4 MW Beam in the Target System

jet

p0

f=24°

f=48°

f=72°

f=96°

f=120°

f=144°

f=168°f=192°

f=216°

f=240°

f=264°

f=288°

f=312°

f=336°

f=0°

p1

p2

p3

p4

Optimization study casep5

p6

p7p8p9

p10

p11

p12

p

• An asymmetry layout in the 8GeV proton beam case at z=-75cm is required to achieve the same beam/jet crossing angle at z=-37.5 cm.

• We found a correlation between the distance of beam relative to the jet and the meson production. The peak meson production is about 8% higher than for the lowest case.

X. Ding et al., "Meson Production Simulations for a Mercury Jet Target," in Proceedings of NuFact09, Chicago (2009), AIP Conference Proceedings 1222 (2010), p.323.

The layout of multiple proton beam entry directions relative to mercury jet at z=-75cm .

Enhanced Shielding for SC1 Coil

• According to J. Back’s simulation, the energy showers are more “Penetrating” in FLUKA than in MARS .

J. Back, Private Communication.

• Power deposition in SC1 coil could be decreased from 22.1 kW to 4.8 kW if WC & water shield region is extended from 50 to 63 cm in radius.

• Power deposition in SC1 coil could be further decreased to 1.3 kW if Resistive inner copper coils are replaced by WC & water shield.

Solenoid Axis

Hg Jet

Proton BeamqBEAM

qCROSS

rJET

-75 cm -37.5 cm 0 cm

Jet/Beam Directio

The mercury jet target geometry.

-6

-4

-2

0

2

4

6

-6 -4 -2 0 2 4 6

y,cm

x, cm

z=0 cmz=-37.5 cmz=-75 cm

0.92

0.93

0.94

0.95

0.96

0.97

0.98

0.99

1

1.01

1.02

1.03

0 0.5 1 1.5 2 2.5 3

Nom

alized

Mes

onsto

Sim

pleGau

ssianBea

m

Betax and Betay at z=-37.5 cm, m

Focused proton beamFit with y=a1-a2exp(-kx)Fit with y=(b+cx)/(a+x)

0

30

60

90

120120

cm

0 300 600600cm

10−3

10−4

10−5

10−6

10−7

10−8

10−9

10−10

10−11

10−12

10−13

10−14

10−15

10−16

10−17

10−18

10−19

4.2e−04 0