operate surface product flow assets - cop · web viewthis code of practice (cop) covers the...
TRANSCRIPT
Petroleum Development Oman L.L.C.Operation of Surface Product
Flow Assets – Code of Practice
Document ID CP-115
Document Type Code of Practice
Security Unrestricted
Discipline Surface Production
Owner Engineering and Operations Director - UEOD
Issue Date 16th September 2013
Revision 8.0
Copyright: This document is the property of Petroleum Development Oman, LLC. Neither the whole nor any part of this document may be disclosed to others or reproduced, stored in a retrieval system, or transmitted in any form by any means (electronic, mechanical, reprographic recording or otherwise) without prior written consent of the owner.
Petroleum Development Oman LLC Revision: 8.0Effective Sep-13
This page was intentionally left blank
Page 2 CP-115 - Operation of Surface Product Flow Assets – CoP Printed 24/05/23
The controlled version of this CMF Document resides online in Livelink®. Printed copies are UNCONTROLLED.
Petroleum Development Oman LLC Revision: 8.0Effective Sep-13
i Document AuthorisationAuthorised For Issue – 16th September 2013
Page 3 CP-115 - Operation of Surface Product Flow Assets – CoP Printed 24/05/23
The controlled version of this CMF Document resides online in Livelink®. Printed copies are UNCONTROLLED.
Petroleum Development Oman LLC Revision: 8.0Effective Sep-13
ii Revision HistoryThe following is a brief summary of the 4 most recent revisions to this document. Details of all revisions prior to these are held on file by the issuing department.
Revision No.
Date Author Scope / Remarks
8.0 Aug-13 Robin Norman UOP61 3 yearly review (Review period to be increased to 5 years).
DCAF and Critical Documentation requirements added
7.0 Mar-10 Robin Norman UOP6 Full review / revision and reformat.
6.0 Dec 06 Mafiana, Ikechukwu (UOP/2)
Issue for use after comments update.
6.0 Jun 06 Abdullah
Al-Abri (UOP/1)
Update to align with:
New Operating Model,
Global Processes
Minimum Standards
EPBM 4.0
5.0 Dec 03 A. Al-Abri (UOX/2) Concurrent Operations reference included. Deferment Minimum Standard
iii Related Business ProcessesCode Business Process (EPBM 4.0)EP.64 Design, Construct, Modify and Decommission Facilities
EP.65 Execute Operations Readiness & Assurance Activities
EP.72 Maintain & Assure Facilities Integrity
EP.80 Manage Abandonment
iv Related Corporate Management Frame Work (CMF) DocumentsThe related CMF Documents can be retrieved from the CMF Business Control Portal and are listed in Appendix 4
Page 4 CP-115 - Operation of Surface Product Flow Assets – CoP Printed 24/05/23
The controlled version of this CMF Document resides online in Livelink®. Printed copies are UNCONTROLLED.
Petroleum Development Oman LLC Revision: 8.0Effective Sep-13
Table of Contents1 Introduction 7
1.1 Scope 7
1.2 Objectives 7
1.3 Applicability 7
1.4 Document Implementation and Deviation 8
1.5 Review and Improvement 8
2 Operations Management of Surface Product Flow Assets 9
2.1 PL-11 Asset Integrity and Disposal Policy 9
2.2 Corporate Asset Integrity Vision 9
2.3 The Operations Vision 9
2.4 The Operations Strategy 9
2.5 Operations Management Objectives 10
2.6 Operations Management Requirements 10
2.7 Aligned Operations Management Processes 10
3 Operations Lifecycle Management 11
3.1 Scope 11
3.2 Projects 11
3.3 Field Operations 12
3.3.1Asset Reference Plan 12
3.3.2Statement of Fitness (SoF) 12
3.3.3Discipline Control and Assurance Framework (DCAF) 12
3.3.4Procedures and Manuals 13
3.3.5Critical Documentation 13
3.3.6Operator Routines and Handover 14
3.3.7Permit to Work System 15
3.3.8Process Equipment Isolation 15
3.3.9Working on Systems or Equipment with Hydrocarbon or Toxic Risks 15
3.3.10 Scaffolding and Lifting 16
3.3.11 Temporary Registers and Controls 16
3.3.12 Management of Alarms 17
3.3.13 Crude Oil Export Operations 17
3.4 Integrated Activity Planning and Shutdown Management 18
3.5 Programming and Hydrocarbon Allocation 19
3.6 Management of Change20
3.7 Abandonment and Restoration 21
3.7.1Fixed Assets 21
3.7.2Abandonment and Restoration 21
Page 5 CP-115 - Operation of Surface Product Flow Assets – CoP Printed 24/05/23
The controlled version of this CMF Document resides online in Livelink®. Printed copies are UNCONTROLLED.
Petroleum Development Oman LLC Revision: 8.0Effective Sep-13
3.8 Simultaneous and Concurrent Operations 21
3.9 Operations Emergency Response 21
3.10 Skillpool Management 22
3.10.1 Competence Assessment and Assurance 22
3.10.2 Engineers Monitored Professional Development Scheme (EMPDS) 22
3.10.3 Competency Based Development and Progression 22
4 Accountabilities and Responsibilities 23
5 Audit and Review 27
5.1 Corporate Level Audits and Reviews 27
5.2 Functional / Discipline Audits and Reviews 27
5.3 Asset Director (Line) Audits and Reviews 27
5.4 AI PS Assurance Audit 27
Appendix 1 – Glossary of Terms, Definitions and Abbreviations 28
Appendix 2 – Critical Documentation List 29
Appendix 3 – EPBMS Process Flow Charts 34
Appendix 4 – Documents Referenced in CoP 36
Page 6 CP-115 - Operation of Surface Product Flow Assets – CoP Printed 24/05/23
The controlled version of this CMF Document resides online in Livelink®. Printed copies are UNCONTROLLED.
Petroleum Development Oman LLC Revision: 8.0Effective Sep-13
1 Introduction1.1 Scope
This Code of Practice defines the Strategies and Controls that need to be implemented in PDO to ensure safe and effective Operation of Surface Product Flow Assets.
Effective Operations hinges on three main themes: Process, People and Documentation. The integrity of the plant is captured in CP-114 - Maintenance & Integrity Management Code of Practice.
The process is the operation of the integrated product flow assets and associated safeguarding systems within defined operating envelopes. Supporting the process is the need for the correct organisational structure with competent people who are capable of performing their job roles effectively and who are fully aware of their accountabilities, authorities and responsibilities. In addition, these people need effective and current documentation to assist them to carry out operational activities in a controlled, consistent and structured manner.
This Code of Practice makes reference to the Operations Excellence in Production Standard and is aligned to the process. The documentation required to operate the Surface Production Facilities in line with the above standard will be sourced from PDO and LiveLink or the Shell web.
Each discipline will have a standard which will list decisions and deliverables that it will contribute to the Operations Phase and the authority level required to sign that off. This will be in accordance with the Discipline Controls and Assurance Framework (DCAF) application.
1.2 ObjectivesThe purpose of this Code of Practice is to specify the processes and controls necessary to ensure effective Operation Management of all installed assets over their Lifecycle. Effective Operation management shall demonstrate compliance with relevant statutory requirements, PDO Standards and Procedures, and verification requirements.
1.3 ApplicabilityThis Code of Practice is principally applicable to:
- Area Operations Teams;
Operations Managers.
Delivery Team Leaders.
Production Coordinators.
Production Supervisors.
- Production Strategy & Support.
- Programming.
- Integrated Activity Planning.
- Corporate Discipline Functional Heads (CDFH) and Corporate Discipline Focal Points (CDFP)
The secondary target audience are certain members of the Production Support teams and Service Providers, the Petroleum Engineering and Field Engineering teams.
Page 7 CP-115 - Operation of Surface Product Flow Assets – CoP Printed 24/05/23
The controlled version of this CMF Document resides online in Livelink®. Printed copies are UNCONTROLLED.
Petroleum Development Oman LLC Revision: 8.0Effective Sep-13
1.4 Document Implementation and DeviationSection 4 identifies the Accountabilities and Responsibilities for implementation of the requirements of the Code of Practice.
Deviation from this Code of Practice must be approved by the Functional Production Manager (UOP) and authorised by Engineering and Operations Director (UEOD).
1.5 Review and ImprovementThis Code of Practice is owned (document authority) by the Engineering and Operations Director (UEOD) and shall be reviewed and updated on a regular basis (minimum every 5 years).
The Functional Production Manager (UOP) shall be the Custodian and is responsible for the content and upkeep of the Code of Practice. Feedback and change requests shall be addressed to the Functional Production Manager or his delegate. Approved changes shall be incorporated immediately or at the next scheduled update depending on criticality.
Page 8 CP-115 - Operation of Surface Product Flow Assets – CoP Printed 24/05/23
The controlled version of this CMF Document resides online in Livelink®. Printed copies are UNCONTROLLED.
Petroleum Development Oman LLC Revision: 8.0Effective Sep-13
2 Operations Management of Surface Product Flow Assets
2.1 PL-11 Asset Integrity and Disposal PolicyIt is PDO policy that:
Facilities and wells shall be designed, operated and maintained in a manner that safeguards their integrity and ensures their planned availability throughout their life-cycle;
Redundant assets shall be written off and removed where appropriate and the environment restored to, or as reasonably practicable to, it’s original state within an agreed time-frame;
The impact of this policy is that our assets will be operated as intended, within their design envelope, and will be disposed of with due regard to environmental and economic considerations.
The objective of this policy is to:
Ensure that physical assets have design integrity that is based on fit for purpose performance standards;
The designed technical integrity is maintained throughout the Lifecycle up to and including abandonment;
Redundant assets are approved for write-off, disposed of as appropriate and financial records updated accordingly;
This CoP has been developed to provide a framework to ensure adherence to the above policy.
2.2 Corporate Asset Integrity VisionThe PDO Asset Integrity Vision is:-
“Our assets are safe and we know it”For Operations this means that through correct operation and with competent trained personnel, and by following clear rules and procedures we will ensure that our assets are operated safely and produce at design capacities to meet Production Targets.
2.3 The Operations Vision: “Our vision is that by 2020 PDO will be Oman’s most competitive full-life operator of choice, delivering our production safely, at the highest technical capacity and lowest unit cost.”
2.4 The Operations StrategyThe Operations Strategy (delivering the Vision), contains six high-level themes and objectives:
1. People: We will invest in building a fully capable workforce with a strong talent pipeline.
2. Production: We will produce at the highest possible technical capacity.
3. Efficiency: We will achieve best in class process and cost efficiency.
4. Safety: We will strive to achieve Goal Zero in Operations, including no major process safety incidents.
Page 9 CP-115 - Operation of Surface Product Flow Assets – CoP Printed 24/05/23
The controlled version of this CMF Document resides online in Livelink®. Printed copies are UNCONTROLLED.
Petroleum Development Oman LLC Revision: 8.0Effective Sep-13
5. Learning organisation: We will routinely measure ourselves against the best and learn from them.
6. Partners: We will be supported by highly effective and efficient delivery from the wider PDO organization.
The proposed program is extensive, covering all aspects of the Operations value stream, from capability building to performance management; from embedding Lean to Supply Chain Management improvements.
2.5 Operations Management ObjectivesThe objectives of Operations Management in PDO are to:
Safeguard and demonstrate operating and technical integrity of the assets;
Optimise resources and costs involved with operating activities;
Support the Field Operations;
PDO is aligned with the Shell Exploration and Production Operational Excellence Standard and Production Engineering Global Skillpool Strategy.
The following processes will be applicable to this Code of Practice.
- Unscheduled Deferment, ORIP and RCA;
- Hydrocarbon Production Information Management;
- Programming;
- Field Operations;
- Real Time Operations;
- Forecasting;
2.6 Operations Management RequirementsEach Asset shall assure that;
Asset Reference Plan is in place;
Program Build is in place;
Production Operation strategies are linked to the Program Build;
Production Operation activities are adequately budgeted and covered by Operational Expenditure (OPEX);
Production Operations standards, procedures and controls are owned by the appropriate Technical Authority (TA) as specified in DCAF / Asset Control and Assurance Lists (ACAL) and are available to all site personnel;
A review and improvement process is in place which will deliver optimised production operations goals;
The IPP and the IAP are aligned at all times;
2.7 Aligned Operations Management ProcessesPDO is aligned to the following Shell EP Business Model (EPBM) Processes relevant to Production Operations:
EP.71 Produce Hydrocarbons ;
EP.65 Execute Operations Readiness & Assurance Activities ;
EP.80 Manage Abandonment ;
Page 10 CP-115 - Operation of Surface Product Flow Assets – CoP Printed 24/05/23
The controlled version of this CMF Document resides online in Livelink®. Printed copies are UNCONTROLLED.
Petroleum Development Oman LLC Revision: 8.0Effective Sep-13
3 Operations Lifecycle Management3.1 Scope
This Code of Practice (CoP) covers the requirements to assure effective Operations throughout the Lifecycle of Surface Product Flow Assets within the Oil and Gas Directorates.
Health, Safety and Environmental requirements shall be fully integrated in the way Operations Management is executed and are a prerequisite before any process or activity can be undertaken.
The CoP shall cover the processes required for “surface flow assets”, sub-surface and wells being covered by CP-125 - Petroleum Engineering Management – CoP and CP-118 - Well Lifecycle Integrity CoP.
Operations Management will be required throughout the lifecycle of the Asset. Documentation and Processes will require to be implemented to ensure safe and effective operations can be maintained and delivery targets met.
3.2 ProjectsProjects shall be executed in accordance with CP-117 – Project Engineering Code of Practice and are contracted to provide key documentation and processes as part of the “Project Deliverables”.
Operations personnel will be an integral part of the Project Team and implement the Operations Readiness and Assurance processes to ensure the asset is delivered in accordance with all operational requirements.
The key requirements for this CoP are Operations Philosophy, Field Development Plan, Program Build, the Operations Management System and Critical Documentation (refer to Operational Excellence in Production Vol. 2 - The Production Standard and PR-1666 – Engineering and Operations Document, Drawing and Data Control Procedure.). Critical documentation and systems shall be developed or updated during the project and form part of the Critical Deliverables.
Critical Deliverables shall be included in the Project’s Control and Assurance Plan (PCAP) and managed through PDO DCAF system.
Variance to Design and Standards during the Project Phases shall be managed in accordance with the Project Management of Change Procedure.
The following links will provide assistance to understanding and meeting the requirements for the above:
Operations Philosophy ;
CP-117 – Project engineering CoP ;
CP-206 – Management of Change CoP ;
SP-2061 - Technical Authority System ;
PR-1247 - Project Management of Change Procedure ;
PR-1612 – Operations Readiness ;
PR-1666 – Engineering and Operations Document, Drawing and Data Control Procedure;
Operations Management System (OMS):
OMS Guidelines ;
OMS Outline (Presentation);
Page 11 CP-115 - Operation of Surface Product Flow Assets – CoP Printed 24/05/23
The controlled version of this CMF Document resides online in Livelink®. Printed copies are UNCONTROLLED.
Petroleum Development Oman LLC Revision: 8.0Effective Sep-13
Operations Support Documentation ;
3.3 Field OperationsProcesses and procedures shall be put in place or adopted that shall ensure safe and effective operation of the Asset.
Surface Production Operations are responsible for the overall coordination of the safe execution of daily operations, major maintenance, minor projects or well interventions. Ensuring work sites are safely managed in terms of HSSE and operating integrity is key to the success of field operations.
Operating Integrity is the “paying attention process” without which efficient safe field operations will never be achieved. Operators must understand and know their operating limits and stay within them at all times. The assignment of a system owner for each segment of the integrated production system, with responsibility for operating integrity in their segment, is essential.
Production operations shall be aligned with Blade 24 of the Operational Excellence Standard – Field Operations.
3.3.1 Asset Reference PlanThe Asset Reference Plan (ARP) is the principal management tool by which Assets are effectively and efficiently managed throughout their life. The ARP shall be routinely updated, with awareness of the key business drivers that will optimise output, and maximising the best use and value of limited resources locally and globally in order to maximise the value of the Asset.
Reference: Asset Reference Planning Guide
3.3.2 Statement of Fitness (SoF)Throughout the Operations Phase a Statement of Fitness shall be required as assurance that the facility / plant / equipment is safe to operate. The SoF shall be required to be submitted before;
starting or commissioning a new asset or a modification to an existing asset and;
restarting an asset after an incident involving uncontrolled shutdown, or an overhaul or a turnaround, or when the asset has been subjected to conditions outside the equipment constraints or experienced environmental conditions beyond the original design parameters;
following a Process Safety Incident;
Reference: Statement of Fitness Guidance Notes
3.3.3 Discipline Control and Assurance Framework (DCAF)In accordance with DCAF requirements during the Operations Phase there is a requirement to maintain an Asset Control and Assurance List. The list shall be kept in PDO’s DCAF tool.
The UOP Function shall be accountable for the Corporate ACAL;
Operations Managers shall be responsible for Asset Specific ACALs;
All step outs from Corporate ACAL shall be approved by UOP and respective DisciplineTA1;
Documentation owners shall be Accountable Technical Authority (ATA) as specified in ACAL and Discipline Authority Manual;
Page 12 CP-115 - Operation of Surface Product Flow Assets – CoP Printed 24/05/23
The controlled version of this CMF Document resides online in Livelink®. Printed copies are UNCONTROLLED.
Petroleum Development Oman LLC Revision: 8.0Effective Sep-13
Documentation authors shall be assigned as per requirements of Management of Change Process;
3.3.4 Procedures and ManualsOperation Specifications, Procedures and GuidelinesSpecification, procedures and guidelines at functional level will be maintained to assist Production Operations. These documents will be high level and generic for all assets and will be owned and maintained by Functional Production Operations (UOP), and held on a secure server (LiveLink) accessible to all operations personnel.
Operations procedures will be produced in a consistent format and managed in accordance with PR-1072 - Preparations and Management of Operations Procedures.
Plant Operating Manuals (POM’s)Plant Operating Manuals will be developed during the project phase for new builds and after handover they will be maintained throughout the Lifecycle of each Asset.
The manuals will cover the operating of the asset / plant at field level and shall be owned by the Operations Manager (North, South, Gas and Infrastructure) and managed by the each asset.
Brownfield modifications / expansions and engineering projects shall include updating / revision of the POM within their scope of work and will hand over the revised manual as part of their deliverables.
The Plant Operating Procedures will be produced in a consistent format, managed and reviewed in accordance with:
SP-1074 - Preparation of Plant Operating Manuals Specification
PR-1052 - Preparation and Updating of Station Plant Operating Manuals
Review and revalidation will be undertaken at 3 yearly intervals and will be auditable.
IMPORTANT: Some of the Procedures and Manuals maintained and managed by Functional Production and Operations will be part of the Tier 1 and 2 Critical Documentation covered in 3.3.4 below.
3.3.5 Critical Documentation
3.3.5.1 Tier 1 Critical DocumentationTier 1 Critical Documentation (refer to Appendix 2) requirements will be aligned with Operational Excellence in Production Vol. 2 The Production Standard and shall be;
included in the corporate ACAL as single line items with identification of accountable and responsible Technical Authorities;
subject to the Management of Change process in accordance with CP-206 – Management of Change CoP;
verified for completeness and accuracy and updated if required every 5 years;
controlled by Asset Information Centre (AIC) and maintained in a secure environment within LiveLink and / or SAP;
a minimum requirement to meet the Operational Excellence Standard;
Page 13 CP-115 - Operation of Surface Product Flow Assets – CoP Printed 24/05/23
The controlled version of this CMF Document resides online in Livelink®. Printed copies are UNCONTROLLED.
Petroleum Development Oman LLC Revision: 8.0Effective Sep-13
3.3.5.2 Tier 2 Critical DocumentationTier 2 Critical Documentation (refer to Appendix 2) requirements will be aligned with Operational Excellence in Production Vol. 2 The Production Standard and shall be;
included in the corporate ACAL as composite items with identification of accountable and responsible Technical Authorities;
subject to the Management of Change process in accordance with CP-206 – Management of Change CoP;
reviewed and updated as per requirements established by responsible discipline Technical Authority;
controlled by Asset Information Centre (AIC) and maintained in a secure environment within LiveLink and / or SAP;
3.3.5.3 Live Operating EnvelopesLive Operating envelope which provide the capacity constraints of a system, piece of equipment (e.g. separator, dehydration tank, compressor, etc.), well, pipeline or a production station will be handed over to Operations as part of the project deliverables and updated during the operations phase whenever there are changes made.
3.3.6 Operator Routines and HandoverProcedures and documentation will be available to provide Operations personnel with guidance as to their roles and responsibilities, and to ensure critical information is recorded and transferred across at shift and crew changes.
Operator routines are covered in PR-1100 - Operator Routine Functions.
Shift handovers will be in accordance with PR-1000 - Operations Handover Procedure
Each facility / site shall organise pro-active monitoring activities as follows:
Formal, maintained list of activities that shall be performed during the operator rounds covering both field (outside) and control room operators;
Data from the rounds will be recorded and trended where appropriate;
Undesired condition found during the round will be actioned by the operator where possible or a SAP Notification raised to correct the condition;
NOTE: This is in addition to the normal HSSE responsibility to stop unsafe acts. If the condition persists it should be treated as an abnormal situation, escalated accordingly and reported as a non-conformance.
Any tasks not performed should be highlighted to the shift supervisor and re-scheduled if necessary;
Additional monitoring shall be performed as conditions warrant;
Operators shall communicate issues found while performing the rounds, which may impact on personnel on site, upstream or downstream equipment;
Work requests should be created as appropriate;
Page 14 CP-115 - Operation of Surface Product Flow Assets – CoP Printed 24/05/23
The controlled version of this CMF Document resides online in Livelink®. Printed copies are UNCONTROLLED.
Petroleum Development Oman LLC Revision: 8.0Effective Sep-13
3.3.7 Permit to Work SystemAll works undertaken during normal operations shall be carried out under the Permit to Work System (PTW) where appropriate. Use of the PTW System is Mandatory.
Permits will be issued in accordance with PR-1172 – Permit to Work Procedure, for work in areas where there may be a hazard to Personnel, Asset, or Environment. These hazards may not necessarily be related to hydrocarbons.
Well work that requires the well site / well to be handed over to the Drilling Contractor or Completions and Well Intervention (C&WI) Team shall require a transfer of custodianship in accordance with PR-1098 Well Activity Co-ordination & Control Procedure. The party requesting the Custodianship shall have demonstrated to PDO that they have the necessary procedures and safeguards in position to manage any HSSE incidents.
Level 3 Audits of the PTW System will be periodically carried out using the Permit to Work Effectiveness Monitoring Tool.
3.3.8 Process Equipment IsolationWhenever process plant, equipment or systems require to be taken out of service for maintenance, repair or modification, then positive isolations shall be provided between the process plant, equipment or system and any potential hazardous energy source.
Process equipment isolations will be applied and managed in accordance with:
PR-1172 – Permit to Work Procedure ;
PR-1076 - Isolation of Process Equipment ;
PR-1086 - Locked Valve and Spectacle Blind Control ;
3.3.9 Working on Systems or Equipment with Hydrocarbon or Toxic RisksWork shall not be undertaken in, on or around systems and equipment where hydrocarbon or toxic risks exist or can exist until the systems and equipment have been prepared in accordance with the following:
PR-1073 - Gas Freeing, Purging & Leak Testing of Process Equipment (Excluding Tanks);
PR-1077 - Preparation of Static Equipment for Internal Maintenance and Inspection ;
PR-1079 - Gas Freeing and Purging of Tanks Procedure ;
Man entry into vessels, tanks, well cellars, sewers etc., and working in the vicinity of the hydrocarbon and toxic risks such as on the tops of floating roof tanks etc, shall be in accordance with the:
PR-1083 - Safe Work on Floating Roof Tanks Procedure ;
PR-1148 - Entry into a Confined Space Procedure ;
PR-1515 - Onsite Mercury Management Procedure ;
Hydrocarbon or toxic systems shall be reinstated and tested in accordance with the following;
SP-2020 - Flange Connections Bolt Torquing and Tensioning ;
PR-1073 - Gas Freeing, Purging & Leak Testing of Process Equipment (Excluding Tanks);
Page 15 CP-115 - Operation of Surface Product Flow Assets – CoP Printed 24/05/23
The controlled version of this CMF Document resides online in Livelink®. Printed copies are UNCONTROLLED.
Petroleum Development Oman LLC Revision: 8.0Effective Sep-13
3.3.10Scaffolding and LiftingThe erection of scaffolding and the use of lifting equipment shall be strictly controlled and in accordance with:
CP-189 - Lifting And Hoisting ;
PR-1172 – Permit to Work Procedure ;
PR-1708 - Lifting and Hoisting Procedure Inspection Testing and Certification ;
PR-1709 - Lifting and Hoisting Procedure Lift Planning Execution;
SP-1251 - Training Requirement for Lifting Operations Personnel ;
SP-1257 - HSE Specification - Scaffolding, Working at Heights or Over Water, Lifting Operations and Earthworks;
3.3.11 Temporary Registers and ControlsFacilities / stations will be required to maintain registers and logs of the temporary changes to normal operations status and equipment conditions. The following, as a minimum, shall be recorded / verified on formal, auditable registers:
Process overrides and inhibits;
Locked open and/or closed valves;
Swung spades;
Temporary equipment;
Passing valves;
Temporary repairs;
Temporary leak repairs;
The format of the register will be at the discretion of area but as a minimum should record:
Reason for application;
Mitigation of risk as applicable;
Tag number and location;
Date applied / installed;
Date last physically checked on location;
Date removed;
Management of the temporary registers and controls shall be in accordance with the governing procedure.
Reference should be made to:
PR-1000 - Operations Handover Procedure ;
PR-1086 – Locked Valve and Spectacle Blind Control ;
PR-1960 – Control of Portable Temporary Equipment ;
PR-1961 – Process Leak Management ;
PR-2049 – Passing Valve Management ;
Page 16 CP-115 - Operation of Surface Product Flow Assets – CoP Printed 24/05/23
The controlled version of this CMF Document resides online in Livelink®. Printed copies are UNCONTROLLED.
Petroleum Development Oman LLC Revision: 8.0Effective Sep-13
3.3.12Management of AlarmsOperations will manage alarms in such a manner that the operators’ ability to manage the process is not impaired. Alarm management will be in accordance with GU-513 - Guidelines for Alarm Management And Rationalisation.
Alarm management will also be aligned with:
Blade 24 of the Operational Excellence Standard – Field Operations ;
DEP 32.80.10.14.Gen - Alarm Management ;
The following references fully describe Safeguarding System Design and Instrument Protective Functions (IPF) which relate to the above.
API RP 14C Design of Safeguarding Systems (summarised in EP95-0230 Design Section 6.3 Process Safeguarding);
DEP 32.80.10.10 Gen Classification and Implementation of Instrumented Protective Functions;
3.3.13Crude Oil Export OperationsAll crude production from the interior is transported by pipeline to the Tank Storage and Marine Terminal facility at Mina Al Fahal.
NOTE: The proximity of the terminal to the shore and office complex means anyone can observe the day to day vessel mooring and cargo handling operations. Such scrutiny together with tight environmental legislation further emphasises the need for marine personnel to carry out their duties to the highest possible standard.
The tank storage facility will provide an interface between the interior and the marine terminal and allow for continuous production from the fields and settlement of the inventory prior to offloading to the tankers. Operations at the tank storage facility (tank farm) shall be in accordance with the following procedures:
PR-1073 - Gas Freeing, Purging & Leak Testing of Process Equipment (Excluding Tanks);
PR-1076 - Isolation of Process Equipment ;
PR-1077 - Preparation of Static Equipment for Internal Maintenance and Inspection;
PR-1079 - Gas Freeing and Purging of Tanks Procedure ;
PR-1083 - Safe Work on Floating Roof Tanks Procedure ;
PR-1092 - Tank Topping - MAF Tank Farm ;
PR-1148 - Entry into a Confined Space Procedure ;
PR-1156 - Precautions for Heavy Rain at MAF Tank Farm ;
PR-1172 – Permit to Work Procedure ;
PR-1157 - Storage Tank Oil Water Interface Measurement ;
PR-1349 - Ship-shore Differences on Completion of Loading ;
PR-1350 - Oil Export Quality and Demurrage Control ;
The Marine Terminal, which includes tanker berthing and loading, shall be in accordance with PR-1563 - MAF Marine Terminal Marine Procedures.
3.4 Integrated Activity Planning and Shutdown ManagementIntegrated Activity Planning (IAP) is an important optimisation process that is an integral part of managing production and activities. It is the integration and rationalisation of
Page 17 CP-115 - Operation of Surface Product Flow Assets – CoP Printed 24/05/23
The controlled version of this CMF Document resides online in Livelink®. Printed copies are UNCONTROLLED.
Petroleum Development Oman LLC Revision: 8.0Effective Sep-13
plans provided by different functions or departments to achieve minimum scheduled deferment, optimum efficient use of resources, avoid clashes and ensure attainment of company objectives.
The IAP and Shutdown forums with its associated deliverables (agreed plans) are key enablers for the asset operator to control their assets.
In PDO, IAP shall be primarily used to:
Maximise availability of production facilities;
Align and optimise Gas demand versus available capacity;
Optimise resource deployment;
Reduce and control costs;
Provide a basis for delivering an accurate production forecast;
Reduce HSE exposure;
Serve as a common reference for controlling the Execution phase (stability and PTW);
Provide a means to analyse the Planning / Scheduling and Execution phases;
Alignment with the 5 year Program Build (yearly input as well as inclusion of new activities / projects);
Establish the High level Shutdown window overview and form the starting point for detailed shutdown planning process;
The IAP Process includes integration of all activities that impact field operations (including all production impacting activities) and / or make use of shared critical resources within the 14d, 90d and 2 year windows. The Permit To Work process uses area 14 day plans as the reference for all plannable work.
The Shutdown Management Process is a process that stipulates in detail how Shutdowns are prepared, executed and reviewed. This is in addition to the routine cyclic IAP process. These shutdowns are often the ultimate form of integration of many activities with increased associated HSE and business risks. Therefore this is described separately in a dedicated procedure (PR-1721 - Shutdown Management). Much emphasis is on identifying and mitigating cross functional HSE risks.
Typical examples of integration are; carrying out well test during shutdowns; combining several project tie-ins into a single SD date; integration of all Operations and Engineering shutdown requirements; and aligning inter-directorate impacting activities such as MOL or Power outages.
IAP and associated processes are covered in more detail by
CP-156 - Integrated Activity Planning ;
PR-1721 - Shutdown Management ;
Blade 9 – Integrated Activity Planning ;
EP 2006-5471 Integrated Activity Planning Process Guide ;
EP 2006-5081 Shutdown Management Process Guide ;
3.5 Programming and Hydrocarbon AllocationProduction Programming and hydrocarbon allocation manages the short and medium term production, injection and optimisation and then allocates these fluids back to wells and reservoirs.
Specifically Programming involves:
Page 18 CP-115 - Operation of Surface Product Flow Assets – CoP Printed 24/05/23
The controlled version of this CMF Document resides online in Livelink®. Printed copies are UNCONTROLLED.
Petroleum Development Oman LLC Revision: 8.0Effective Sep-13
Performing exception based surveillance, monitoring and evaluation of wells and facilities. Trouble shooting any production anomalies;
Meeting sales commitments (rate and quality), injection targets and to optimise short-term cash flow. This involves the near 'real-time' to short-term scheduling, deferment reduction and optimisation of production and injection rates with due consideration for well and reservoir management, technical integrity and HSSE issues;
Creating the short-term (ST) production plan (IPP) in order to meet short-term sales commitments, whilst meeting sales commitments based on the medium-term (MT) forecast. Taking into consideration integrated production planning (scheduled deferment) new oil, constraints and unscheduled deferment as well as NFA production;
Manage the planned vs. actual reporting to the HCA / Forecasting team;
Requesting and evaluating well tests, samples and ad hoc data for trouble shooting;
Ensure that data of the required quality is recorded, so that it can be made available to functions that need it;
Ensuring that there is a closed improvement loop for production operations by managing activities to ensure that smart field loops are completed / closed;
Monitoring metering performance for product flow measurements and managing data / meter corrections via the field operations / metering teams;
Provides a smooth interface between Production Operations and other departments, especially WRFM teams, engineering and well engineering e.g. leading and co-ordinating collaboration centres for near real-time optimisation;
Production programming will be aligned with Blade 23 of the Operational Excellence Standard - Programming.
Programming activities including deferment administration, well testing will be managed in accordance with:
PR-1080 - Well Testing, Scheduling, Sampling and Validation ;
PR-1096 - Sampling of Oilfield Liquids and Gases Procedure ;
GU-620 Deferment and Reporting Guidelines ;
Shell Programming Process Guide EP2009-9015
EP 2007-9017 Deferment Administration Manual ;
Programming also has a strong link the with Blade 27 Well and Reservoir and Facility Management process of the OE Standard
Forecasting will be managed using the following documents and is aligned with Blade 26 Forecasting of the OE Standard
CP-153 – Production Forecasting – CoP;
EP 2008-1913 Production Forecasting Process Guide ;.
Metering will be managed by the following documents:
PR-1304 - Product Flow Measurement ;
PR-1099 - Metering Flow Factor Update Procedure ;
PR-1293 - MOL Metering System Verification Procedure ;
Specifically Hydrocarbon Allocation involves:
Page 19 CP-115 - Operation of Surface Product Flow Assets – CoP Printed 24/05/23
The controlled version of this CMF Document resides online in Livelink®. Printed copies are UNCONTROLLED.
Petroleum Development Oman LLC Revision: 8.0Effective Sep-13
Allocation and reconciliation of all produced and injected fluids (including oil, gas, water, steam) from export at the terminal back to the individual wells and reservoirs on a daily and monthly basis;
Daily allocation data entry and data verification by the field operations team including gas / water injection, oil production, well testing results, tank stocks and supporting data. With further quality control by programming and HCA teams;
Manage the water and gas balances and monitor and improve the Reconciliation Factor (RF);
The daily and monthly allocation processes and reporting are managed by the corporate HCA team;
Supporting the Monthly IPP, and medium term STPF and business plan forecasts and reporting to management;
Hydrocarbon Allocation will be managed in accordance with the following documents;
EP 2007-9015 Hydrocarbon Allocation Manual ;
PR-2005 - Hydrocarbon Accounting Manual ;
3.6 Management of ChangePermanent and temporary changes during the Operations phase shall be reviewed, risk assessed and approved at the correct level of technical authority before being undertaken.
Permanent changes to facilities will be managed through the Facility Change Proposal process which is part of facility Upgrade Management System.
Temporary changes will be managed by the electronic Management of Change (e-MOC). The e-MOC processes cover;
Temporary Overriding of Safeguarding Systems;
Temporary organisational Changes;
Temporary Changes to Locked Valves;
Operations Procedure Temporary Variance;
Temporary Equipment;
Temporary Alarm Changes;
An integral part of all temporary changes will be the requirement for a Risk Assessment which will be attached electronically to the change request.
IMPORTANT: The update of Tier 1 Critical Documentation will also be included in the Facilities Change Proposal Request form (Facility Upgrade Management System). These will be identified as part of the process and must be delivered before the FCP can be closed out. This includes updating the Masters and all Controlled Hardcopies.
Page 20 CP-115 - Operation of Surface Product Flow Assets – CoP Printed 24/05/23
The controlled version of this CMF Document resides online in Livelink®. Printed copies are UNCONTROLLED.
Petroleum Development Oman LLC Revision: 8.0Effective Sep-13
Reference should be made to:
CP-206 – Management of Change CoP .
SP-2120 - Specification for Change Management and Operations Variance.
PR-1001a - Facility Change Proposal Procedure.
PR-1001c - Temporary Override of Safeguarding System Procedure.
PR-1001e - Operations Procedure Temporary Variance.
PR-1960 - Control of Temporary Portable Equipment.
3.7 Abandonment and Restoration
3.7.1 Fixed AssetsThroughout the life of the Asset it may / will become necessary to abandon and remove some of the ‘fixed assets’. Such works shall be in accordance with:
PR-1164 - Fixed Asset Abandonment Procedure.
PR-1576 - Fixed, Movable Assets and Stock Write-off.
PR-1311 - Disposal of Obsolete Stock, Fixed and Moveable Assets Procedure.
3.7.2 Abandonment and RestorationAt the end of the Asset Lifecycle abandonment and restoration will be required. Abandonment will be aligned with Shell Exploration and Production Business Management System (EPBMS) EP 80 Manage Abandonment and in accordance with PR-1419 - Abandonment and Restoration Procedure.
3.8 Simultaneous and Concurrent OperationsSimultaneous and Concurrent Operations shall be managed and documented. For the purpose of this Code of Practice, Simultaneous Operations (SIMOPS) will be defined as any two or more defined operations carried out concurrently and covered by different Management Systems, whereas Concurrent Operations are covered by the same Management System.
SIMOPS procedures shall be developed or amended (if already existing) by the participating parties prior to the operations commencing.
Concurrent operations for drilling and well service work shall be in accordance with SP-1220 - Concurrent Operations and PR-1046 - Concurrent Drilling, Hoist and Production Operations.
3.9 Operations Emergency ResponseEmergency response shall be carried out in accordance with the following procedures:
CP-123 - Emergency Response Documents Part I – CoP ;
PR-1065 - Emergency Response Documents Part II - Company Procedure ;
PR-1066 - Emergency Response document Part III Contingency Plan, Volume III Production Operations;
PR-1067 - Emergency Response Documents Part III, Contingency Plan Volume 4 Main Oil Line;
PR-1068 - Emergency Response Document part III Contingency Plan Volume V Terminal & Tank Farm Operations;
Page 21 CP-115 - Operation of Surface Product Flow Assets – CoP Printed 24/05/23
The controlled version of this CMF Document resides online in Livelink®. Printed copies are UNCONTROLLED.
Petroleum Development Oman LLC Revision: 8.0Effective Sep-13
PR-1069 - Emergency Response Document Part III Contingency Plans Volume VI Marine Operations;
3.10 Skillpool ManagementStructured and managed processes shall be in place to ensure all Production Operations personnel have the correct training and competences to perform their duties.
Skillpool management will be aligned with Blade 4 of the Operational Excellence Standard – Competence and Skills.
3.10.1 Competence Assessment and AssuranceOperator and Technician competence will be confirmed using a robust system to ensure that they can carry out their assigned duties, correctly and safely. The designated system shall be mandatory for all personnel who hold Safety Critical positions. These positions will include but are not limited to:
Delivery Team Leader;
Production Coordinator;
Production Supervisor;
Control Room Operator;
Production Operator;
Mechanical Technician;
Electrical Technician;
Instrument Technician;
Reference should be made to PR-1029 – Competence Assessment and Assurance Section 2.
3.10.2 Engineers Monitored Professional Development Scheme (EMPDS)Graduate Omani engineers require to be provided with the necessary competencies and skills that shall enable them to perform their duties with no or minimal assistance. The Engineers Monitored Professional Development scheme shall be used to achieve this.
Reference should be made to PR-1029 – Competence Assessment and Assurance Section 3.
3.10.3 Competency Based Development and ProgressionA process is in place which supports PDO’s business objective to develop, maintain and deploy a competent and motivated workforce. The core aims of the process are to:
standardised competence for the workforce and ensure adoptions of these standards are adhered to throughout the PDO workforce;
make competence in PDO visible and to motivate staff to improve their performance; and;
recognise and reward staff for skills and expertise applied in their work;
Reference should be made to PR-1029 – Competence Assessment and Assurance Section 4.
Page 22 CP-115 - Operation of Surface Product Flow Assets – CoP Printed 24/05/23
The controlled version of this CMF Document resides online in Livelink®. Printed copies are UNCONTROLLED.
Petroleum Development Oman LLC Revision: 8.0Effective Sep-13
4 Accountabilities and ResponsibilitiesProduction Operations Management accountabilities and responsibilities are discharged by designated staff as defined in Table 1.
Table 1 – Principal Roles and Responsibilities
Role Accountabilities / ResponsibilitiesTechnical Directors Group Oversee the Production Operations Management
process and ensure that all Operations risks are understood controlled and managed
Ensure a uniform PDO approach to Production Operations Management
Provide the necessary organisation and resources to implement and improve Operations Management
Operations & Engineering Functional Director
Accountable for the Production Operations Management Processes Document Authority for the Code of Practice (Owner) Member of the Technical Directors Group
Oil and Gas Directors Accountable for Production Operations Management in their Directorate
Members of the Technical Directors Group Accountable for all Assets in the Directorate (Asset Owner) Accountable for authorising asset abandonment
within their Directorate
Operations Managers Responsible to the respective Oil or Gas Director for Production Operations Management within the Directorate
Operational Responsibility for all Assets within the Directorate (Asset Holder)
Responsible for asset specific Asset Control and Assurance List (ACAL)
Owner of Asset specific documentation Responsible for ensuring documentation is up to date To drive Operations Excellence in the Directorate Own the 2Y IAP Plan
Functional Production Manager / CFDH Production Operation
Responsible for the Production Operations Management Processes Responsible for the Corporate Asset Control and Assurance List
(ACAL) and its definition in PDO’s DCAF system Document Authority for Standards, Specifications and Procedures
(Owner) relating to Production Operations Management Responsible for assuring compliance to Production Operations
Management Processes by the Assets To drive Operations Excellence in the Function and Field Approval of Step-Outs to Production Operations processes
CFDH Provide Technical Authority structure required to review and approve changes and improvements to designs and strategies
Accountable for control and assurance of DCAF documentation where their discipline is Accountable Technical Authority
CDFP Provide technical support to assets on matters effecting Production Operations
Discipline Engineers assigned as TA2 / TA3
Responsible for control and assurance of DCAF documentation where their discipline is Accountable Technical Authority
Document custodian for documentation as defined in DCAF
Asset Information Center Responsible for managing documentation in corporate electronic repository
Page 23 CP-115 - Operation of Surface Product Flow Assets – CoP Printed 24/05/23
The controlled version of this CMF Document resides online in Livelink®. Printed copies are UNCONTROLLED.
Petroleum Development Oman LLC Revision: 8.0Effective Sep-13
Role Accountabilities / Responsibilities Responsible for tracking update of controlled hardcopies in the
Assets
Functional Production Team (UOP)
Responsible to the Functional Operations Manager for development and improvement of Production Operations Management processes
Provide assets with support on:
o Production Operations Management
o External, Corporate and Local Audits
o IAP
o Programming and HCA
o Skillpool & Competency Management
o OR&A
o Permit to Work Management
o Improvements and new technology
o Documentation development and management
Production Strategy & Support Team
The Production Strategy & Support Team provide: Lifecycle planning Operations Project support and commissioning Production System Optimisation Facility improvement and integrity restoration
Production Programming Team
The Production Programming Team provide: Programming, Production Planning and Hydrocarbon administration
process for the Asset A record of current well behaviour and identify scope oil, currently un-
produced oil, through structured review of existing well performance against theoretical production potential
Input into the 90 Day Plan Outline well activity programmes for all non-standard well entries
(repairs, surveys, stimulations etc) Area-specific targets (production, flare, injection, reservoir
management) through planning, monitoring and feedback with directives
Integrated Activity Planning Team
The Production Programming Team provide: Effective and efficient Integrated Activity Planning (IAP) IAP capability and support management Optimised plans for production (IPP) and cost with due regards to
HSE Input into lifecycle planning and Program Build Input to and support directorate and company targets
Inter directional interfaces between different functions engaging with team leaders and management to ensure good understanding and cooperation
A good working planning outfit that satisfies the internal customers (operations managers, delivery team leader and coordinators)
Page 24 CP-115 - Operation of Surface Product Flow Assets – CoP Printed 24/05/23
The controlled version of this CMF Document resides online in Livelink®. Printed copies are UNCONTROLLED.
Petroleum Development Oman LLC Revision: 8.0Effective Sep-13
Role Accountabilities / ResponsibilitiesDelivery Team Leader Deliver oil production as per target derived from Short Term
Production Forecast Deliver the Integrated Activity Plan and associated Integrated
Production Plan. Manage integrated activities of Engineering, Petroleum Engineers,
Programmers, and Operation Support groups. Optimise production through optimum performance of surface
equipment. Ensure appropriately authorised change control is in place for every
non conformance to the plan having impact on production, integrity or cost.
Ensure facilities are operated within allowed envelopes and PDO standards
Ensure compliance to the PTW Procedure Ensure that HSE-Critical Tasks, as defined in the HSE Case, are
undertaken and executed Own the 90D IAP Plan Own or delegate the Shutdown
Production Coordinator Deliver the daily production targets
Execute all production activities according to the 14 day schedule (compliance) within budget and to the required quality.
Daily optimization of wells and facilities within the specified operating envelopes
Proactively manage all HSE aspects of production activity execution.
Manage the PTW system and ensure compliance.
Record KPIs and monitor for improvement
Ensure safeguarding integrity of facilities
Coordinate major facilities shutdown
Ensure that HSE-Critical Tasks, as defined in the HSE Case, are undertaken and executed.
Own the 14D Plan
Production Supervisor Deliver the daily production targets
Execute all production activities according to the 14 day schedule (compliance) within budget and to the required quality and PDO standard with due regard to safety.
Daily optimization of wells and facilities within the specified operating envelopes
Liaise with Maintenance Supervisors to ensure efficient execution of production and maintenance activities.
Prepare plant, wells and equipment for handover to maintenance and well engineering for required planned activities
Ensure all production related data is accurately recorded in the appropriate system in a timely manner
Participate in HAZOPS & Design Reviews.
Ensure that HSE-Critical Tasks, as defined in the HSE Case, are undertaken and executed.
Ensure HSE systems are in place before starting a job, ensure proper use of tools and PPE, conduct regular site visits, advice co-workers on potential hazards, check safety equipment, notify management of unsafe working conditions, report HSE incidents, actively participate in HSE meetings, action the GD HSE plan and attend mandatory HSE courses.
Ensure daily activities are managed to avoid conflict
Page 25 CP-115 - Operation of Surface Product Flow Assets – CoP Printed 24/05/23
The controlled version of this CMF Document resides online in Livelink®. Printed copies are UNCONTROLLED.
Petroleum Development Oman LLC Revision: 8.0Effective Sep-13
Role Accountabilities / ResponsibilitiesProduction Technicians Deliver the daily production targets
Prepare plant, wells and equipment for handover to maintenance and well engineering for required planned activities under the direction of the production Supervisor
Ensure all production related data is accurately recorded in the appropriate system in a timely manner
Ensure that PR-1172 requirements are met at the work place
Comply with the requirements of PR-1100 – Operator Routine Functions
Page 26 CP-115 - Operation of Surface Product Flow Assets – CoP Printed 24/05/23
The controlled version of this CMF Document resides online in Livelink®. Printed copies are UNCONTROLLED.
Petroleum Development Oman LLC Revision: 8.0Effective Sep-13
5 Audit and Review5.1 Corporate Level Audits and Reviews
The PDO “Audit and Review” Policy states that “compliance with the company technical integrity framework shall be systematically and rigorously assessed by independent internal and where appropriate external audits and review”. This is done for example through Technical Integrity – Hardware Barrier Verification (TI-HBV) and Operational Excellence in Production (OE) reviews.
External audits shall be conducted by Shareholders representatives on both planned and ad-hoc basis. These audits shall be included in the corporate Integrated Audit Plan.
5.2 Functional / Discipline Audits and ReviewsCorporate Functional Discipline Heads (CFDH’s), as part of their mandate, shall be responsible for conducting periodic lower level audits of the systems and processes under their area of control (this may include inspections or checks of selected major equipment and operational sites). Findings and records of these audits shall be submitted to the Asset Director through Fountain.
5.3 Asset Director (Line) Audits and ReviewsSimilar to the Corporate and the Functional Audits and Reviews, the Asset Directors have the responsibility to conduct periodic audits and reviews of their systems and processes. This shall include inspections and checks of major equipment and operational sites.
The scope, style and frequencies of such audits and reviews should be developed and be in line with CP-142 Audits and Reviews - CoP and Operations Excellence in Production Blade 5 Performance Standard.
5.4 AI PS Assurance AuditAI PS Assurance Audits are carried out to assist Operations Personnel in the field and at MAF to evaluate and record their compliance to standards, procedures and practices. The audits are conducted on-site by independent auditors from within PDO in the course of normal and abnormal operations. The AI PS Assurance audit shall be in accordance with PR-1712 - AI PS Assurance Procedure.
Page 27 CP-115 - Operation of Surface Product Flow Assets – CoP Printed 24/05/23
The controlled version of this CMF Document resides online in Livelink®. Printed copies are UNCONTROLLED.
Petroleum Development Oman LLC Revision: 8.0Effective Sep-13
Page 28 CP-115 - Operation of Surface Product Flow Assets – CoP Printed 24/05/23
The controlled version of this CMF Document resides online in Livelink®. Printed copies are UNCONTROLLED.
Petroleum Development Oman LLC Revision: 8.0Effective Sep-13
Appendix 1 – Glossary of Terms, Definitions and Abbreviations
ACAL Asset Control and Assurance List
C&WI Completions and Well Intervention
CDFP Corporate Discipline Focal Point (Technical Authority Level 2)
CFDH Corporate Functional Discipline Head (Technical Authority Level 1)
CoP Code of Practice
DCAF Discipline Control and Assurance Framework
EORD Engineering and Operations Reference Data
EPBMS Exploration and Production Business Management System
HCA Hydrocarbon Accounting
HSSE Health Safety Security and Environment
IAP Integrated Activity Plan.
IPP Integrated Production Plan
MT Medium Term
NFA No Further Activities
OMS Operations Management System
OPEX Operating Expenditure
OR&A Operations Readiness and Assurance
ORIP Operations Reliability Improvement Process
PCAP Project Control and Assurance Plan
PTW Permit to Work System
RCA Root Cause Analysis
RF Reconciliation Factor
SCADA Supervisory Control and Data Acquisition
SIMOPS Simultaneous Operations
ST Short Term
TA Technical Authority
Page 29 CP-115 - Operation of Surface Product Flow Assets – CoP Printed 24/05/23
The controlled version of this CMF Document resides online in Livelink®. Printed copies are UNCONTROLLED.
Petroleum Development Oman LLC Revision: 8.0Effective Sep-13
Appendix 2 – Critical Documentation ListItem Title Tier Lead Discipline /
Accountable TAAccessible from
Cause and Effects Diagrams
1 Control and Automation CMF – Corporate electronic repository
Controlled Hardcopy in Station CR
General Arrangement Drawings/Plot Plans (including portable/ temporary facilities)
1 Engineering (Civil) Corporate electronic repository
Controlled Hardcopy in Station CR
Process Safeguarding Flow Schemes
1 Process Engineering Corporate electronic repository
Controlled Hardcopy in Station CR
Process Safeguarding Memorandum
1 Process Engineering Corporate electronic repository
Controlled Hardcopy in Station CR
Hazardous Area Classification Drawing
1 Technical Safety Engineering
Corporate electronic repository
Controlled Hardcopy in Station CR
Process Engineering Flow Schemes and Utilities Engineering Flow Schemes
1 Process Engineering Corporate electronic repository
Controlled Hardcopy in Station CR
Trip Settings 1 Process Engineering Corporate electronic repository
Controlled Hardcopy in Station CR
Page 30 CP-115 - Operation of Surface Product Flow Assets – CoP Printed 24/05/23
The controlled version of this CMF Document resides online in Livelink®. Printed copies are UNCONTROLLED.
Petroleum Development Oman LLC Revision: 8.0Effective Sep-13
Item Title Tier Lead Discipline / Accountable TA
Accessible from
Asset Register (in Computerised Maintenance Management System - CMMS)
1 Maintenance & Integrity Corporate CMMS
List of Safety Critical Elements (SCEs) with their Performance Standards (in CMMS)
1 Maintenance & Integrity Corporate CMMS
SCEs Inspection Program and Preventive Maintenance Routines (in CMMS
1 Maintenance & Integrity Corporate CMMS
SCEs Maintenance History (in CMMS)
1 Maintenance & Integrity Corporate CMMS
Emergency Response Plan 1 Operations Corporate electronic repository
Controlled Hardcopy in Station CR
Operating Procedures (including Plant Operating Manuals and Standing Orders) 1
1 Operations Corporate electronic repository
Controlled Hardcopy in Station CR
Alarm Catalogue / Variable Table
1 Operations Corporate electronic repository
Operations HSSE case (including SIMOPS and MOPO, to be maintained according to HSSE Case Standard requirements)
1 Operations Corporate electronic repository
HAZOP Report (to be maintained according to HEMP Standard requirements)
1 Technical Safety Corporate electronic repository
Fire and Gas Field Detector Layouts
1 Control and Automation Corporate electronic repository
Controlled Hardcopy in Station CR
Page 31 CP-115 - Operation of Surface Product Flow Assets – CoP Printed 24/05/23
The controlled version of this CMF Document resides online in Livelink®. Printed copies are UNCONTROLLED.
Petroleum Development Oman LLC Revision: 8.0Effective Sep-13
Item Title Tier Lead Discipline / Accountable TA
Accessible from
Escape Routes, Fire Fighting and Life Saving Equipment Layouts
1 Technical Safety Corporate electronic repository
Controlled Hardcopy in Station CR
Helideck General Arrangement Drawings
1 Not Applicable to PDO
Load Plans - Weight Control Report (all platforms) & Stability Manual (floaters only)
1 Not Applicable to PDO
Control System Block Diagrams
2 Control and Automation Corporate electronic repository
Functional Logic diagrams (DCS and Safeguarding
2 Control and Automation Corporate electronic repository
Telecommunications General Arrangement Diagrams
2 Control and Automation Corporate electronic repository
Instrument cable terminations
2 Control and Automation Corporate electronic repository
Instrument Signal Loop Diagrams
2 Control and Automation Corporate electronic repository
Panel Lay-outs (alarm display and F&G detection display)
2 Control and Automation Corporate electronic repository
Earthing General Arrangement Diagrams (Power and Instruments)
2 Control and Automation / Electrical
Corporate electronic repository
Lighting Lay-out (emergency)
2 Electrical Corporate electronic repository
Electrical Single Line Diagrams
2 Electrical Corporate electronic repository
Electrical Control System Block Diagram
2 Electrical Corporate electronic repository
Page 32 CP-115 - Operation of Surface Product Flow Assets – CoP Printed 24/05/23
The controlled version of this CMF Document resides online in Livelink®. Printed copies are UNCONTROLLED.
Petroleum Development Oman LLC Revision: 8.0Effective Sep-13
Item Title Tier Lead Discipline / Accountable TA
Accessible from
Cable Routing Drawings (including underground)
2 Electrical Corporate electronic repository
Electrical Key-One Line Diagrams
2 Electrical Corporate electronic repository
Navigational Aids General Arrangement
2 Electrical Corporate electronic repository
Corrosion Management Framework
2 Materials and Corrosion Engineering
Corporate electronic repository
Cathodic Protection Diagrams
2 Materials and Corrosion Engineering / Electrical
Corporate electronic repository
Piping Layouts (including underground)
2 Mechanical Static / Rotating Corporate electronic repository
HVAC General Arrangement Diagrams (for Hazardous Areas, LQs, TRs)
2 Mechanical Static Corporate electronic repository
Fixed Cranes General Arrangement and Load Diagrams
2 Mechanical Static / Rotating Corporate electronic repository
Firewater demand/distribution report
2 Mechanical Static /
Safety
Corporate electronic repository
Passive Fire Protection Schedules
2 Mechanical Static / Engineering (Civil)
Corporate electronic repository
Blast and fire walls General Arrangement Drawings
2 Not Applicable to PDO Corporate electronic repository
Primary Structural Steel Drawings
2 Not Applicable to PDO Corporate electronic repository
Underground Facilities Layouts
2 Engineering (Civil) Corporate electronic repository
Operations Philosophy 2 Operations Corporate electronic repository
Pipeline Routing Diagrams 2 Pipeline Engineering Corporate electronic repository
Page 33 CP-115 - Operation of Surface Product Flow Assets – CoP Printed 24/05/23
The controlled version of this CMF Document resides online in Livelink®. Printed copies are UNCONTROLLED.
Petroleum Development Oman LLC Revision: 8.0Effective Sep-13
Item Title Tier Lead Discipline / Accountable TA
Accessible from
Relief, Flare and Vent Study Report
2 Process Engineering Corporate electronic repository
Basis for Design 2 Project Engineering Corporate electronic repository
Material Certificates (for Safety Critical Elements)
2 Various Corporate electronic repository
Vendor Manuals (for Safety Critical Equipment)
2 Various Corporate electronic repository
Page 34 CP-115 - Operation of Surface Product Flow Assets – CoP Printed 24/05/23
The controlled version of this CMF Document resides online in Livelink®. Printed copies are UNCONTROLLED.
Petroleum Development Oman LLC Revision: 8.0Effective Sep-13
Appendix 3 – EPBMS Process Flow ChartsPDO is aligned with the Shell EPBMS Processes.
EP.71 – Produce Hydrocarbons
Page 35 CP-115 - Operation of Surface Product Flow Assets – CoP Printed 24/05/23
The controlled version of this CMF Document resides online in Livelink®. Printed copies are UNCONTROLLED.
Petroleum Development Oman LLC Revision: 8.0Effective Sep-13
EP.80 – Manage Abandonment
Page 36 CP-115 - Operation of Surface Product Flow Assets – CoP Printed 24/05/23
The controlled version of this CMF Document resides online in Livelink®. Printed copies are UNCONTROLLED.
Petroleum Development Oman LLC Revision: 8.0Effective Sep-13
Appendix 4 – Documents Referenced in CoPPDO Policies
PL-11 Integrity Policy
PDO Codes of Practice, Specifications, Procedures and Guidelines
CP-114 - Maintenance & Integrity Management Code of Practice
CP-117 – Project engineering - CoP
CP-118 - Well Lifecycle Integrity - CoP
CP-121 – Production Chemistry - CoP
CP-122 – Health, Safety and Environmental Management System - CoP
CP-123 - Emergency Response Documents Part I – CoP
CP-125 - Petroleum Engineering Management – CoP
CP-126 – Personnel and Asset Security - CoP
CP-136 – Planning in PDO - CoP
CP-139 – Corporate Data Management - CoP
CP-142 - Audits and Reviews - CoP
CP-152 – Resourcing and Leadership Development - CoP
CP-153 - Production Forecasting - CoP
CP-156 - Integrated Activity Planning
CP-178 – Well Delivery - CoP
CP-180 – Recruitment - CoP
CP-186 - Hydrocarbon Resource Volume Classification, Estimation and Reporting - CoP
CP-189 - Lifting And Hoisting
CP-193 – Inventory Management - CoP
CP-206 – Management of Change CoP
PDO Specifications
SP-1074 - Preparation of Plant Operation Manuals Specification
SP-1220 - Concurrent Operations
SP-1251 - Training Requirement for Lifting Operations Personnel
SP-1257 - HSE Specification - Scaffolding, Working at Heights or Over Water, Lifting Operations and Earthworks
SP-2087 – Specification for On-Site Mercury Management
Page 37 CP-115 - Operation of Surface Product Flow Assets – CoP Printed 24/05/23
The controlled version of this CMF Document resides online in Livelink®. Printed copies are UNCONTROLLED.
Petroleum Development Oman LLC Revision: 8.0Effective Sep-13
PDO Procedures
PR-1000 - Operations Handover Procedure
PR-1001a – Field Change Proposal
PR-1001c - Temporary Override of Safeguarding Systems
PR-1001e Operations Procedure Temporary Variance.
PR-1029 – Competence Assessment and Assurance
PR-1046 - Concurrent Drilling, Hoist and Production Operations
PR-1052 - Preparation and Updating of Station Plant Operating Manuals
PR-1065 - Emergency Response Documents Part II - Company Procedure
PR-1066 - Emergency Response document Part III Contingency Plan, Volume III Production Operations
PR-1067 - Emergency Response Documents Part III, Contingency Plan Volume 4 Main Oil Line
PR-1068 - Emergency Response Document part III Contingency Plan Volume V Terminal & Tank Farm Operations
PR-1069 - Emergency Response Document Part III Contingency Plans Volume VI Marine Operations
PR-1072 - Preparations and Management of Operations Procedures
PR-1076 - Isolation of Process Equipment.
PR-1073 - Gas Freeing, Purging & Leak Testing of Process Equipment (Excluding Tanks)
PR-1077 - Preparation of Static Equipment for Internal Maintenance and Inspection
PR-1079 - Gas Freeing and Purging of Tanks Procedure
PR-1080 - Well Testing, Scheduling, Sampling and Validation PR-1086 - Locked Valve Control Requirements
PR-1083 - Safe Work on Floating Roof Tanks Procedure
PR-1086 - Locked Valve and Spectacle Blind Control
PR-1092 - Tank Topping - MAF Tank Farm
PR-1096 - Sampling of Oilfield Liquids and Gases Procedure
PR-1098 Well Activity Co-ordination & Control Procedure
PR-1099 - Metering Flow Factor Update Procedure
PR-1100 - Operator Routine Functions
PR-1156 - Precautions for Heavy Rain at MAF Tank Farm
PR-1157 - Storage Tank Oil Water Interface Measurement
PR-1164 - Fixed Asset Abandonment Procedure
PR-1172 – Permit to Work Procedure
PR-1247 - Project Management of Change Procedure
PR-1293 - MOL Metering System Verification Procedure
PR-1311 - Disposal of Obsolete Stock, Fixed and Moveable Assets Procedure
Page 38 CP-115 - Operation of Surface Product Flow Assets – CoP Printed 24/05/23
The controlled version of this CMF Document resides online in Livelink®. Printed copies are UNCONTROLLED.
Petroleum Development Oman LLC Revision: 8.0Effective Sep-13
PR-1349 - Ship-shore Differences on Completion of Loading
PR-1350 - Oil Export Quality and Demurrage Control
PR-1419 - Abandonment and Restoration Procedure
PR-1515 - Onsite Mercury Management Procedure
PR-1563 - MAF Marine Terminal Marine Procedures
PR-1576 - Fixed, Movable Assets and Stock Write-off
PR-1612- Operations Readiness and Assurance
PR-1708 - Lifting and Hoisting Procedure Inspection Testing and Certification
PR-1709 - Lifting and Hoisting Procedure Lift Planning Execution
PR-1712 - Level 3 Audit
PR-1721 - Shutdown Management
PR-1960 – Control of Portable Temporary Equipment
PR-1961 – Process Leak Management
PR-2049 – Passing Valve Management
PDO Guidelines
GU-513 - Guidelines for Alarm Management And Rationalisation.
Shell Document
Operations Philosophy
Asset Reference Plan
Operations Management System (OMS)
- OMS Guidelines
- OMS Outline (Presentation)
- Operations Support Documentation
- Management of Change Standard
- Technical Authorities Procedure
Element 4 of the Operational Excellence Standard – Competence and Skills.
Element 9 of the Operational Excellence Standard
Element 23 of the Operational Excellence Standard - Programming
Element 24 of the Operational Excellence Standard – Field Operations
DEP 32.80.10.10 General Classification and Implementation of Instrumented Protective Functions
DEP 32.80.10.12 General Management of Instrumented Protective Functions
DEP 32.80.10.14.Gen - Alarm Management
EP 2006-5471 Integrated Activity Planning Process Guide
EP 2006-5081 Shutdown Management Process Guide
EP 2007-9015 Hydrocarbon Allocation Manual
EP 2007-9017 Deferment Administration Manual
Page 39 CP-115 - Operation of Surface Product Flow Assets – CoP Printed 24/05/23
The controlled version of this CMF Document resides online in Livelink®. Printed copies are UNCONTROLLED.
Petroleum Development Oman LLC Revision: 8.0Effective Sep-13
Shell Business Processes
EP.71 Produce Hydrocarbons
EP.80 Manage Abandonment
International Standards
API RP 14C Design of Safeguarding Systems (summarised in EP95-0230 Design Section 6.3 Process Safeguarding)
Page 40 CP-115 - Operation of Surface Product Flow Assets – CoP Printed 24/05/23
The controlled version of this CMF Document resides online in Livelink®. Printed copies are UNCONTROLLED.