opal experiment seen from lead glass counters

19
PAL Experiment Seen from Lead Glass Counter Tomio Kobayashi ICEPP, Univ. of Tokyo OPAL “Reunion” 21. Oct. 2010

Upload: zocha

Post on 12-Jan-2016

30 views

Category:

Documents


0 download

DESCRIPTION

OPAL Experiment Seen from Lead Glass Counters. Tomio Kobayashi ICEPP, Univ. of Tokyo. OPAL “Reunion” 21. Oct. 2010. Original OPAL Design a la JADE (LOI, Jan.1982). LEPC Advice on LG: parallel geometry → pointing geometry. Semi-Pointing Geometry. Performance is good, - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: OPAL Experiment Seen from Lead Glass Counters

OPAL Experiment Seen from Lead Glass Counters

Tomio KobayashiICEPP, Univ. of Tokyo

OPAL “Reunion”21. Oct. 2010

Page 2: OPAL Experiment Seen from Lead Glass Counters

Original OPAL Design a la JADE (LOI, Jan.1982)

LEPC Advice on LG: parallel geometry → pointing geometry

Page 3: OPAL Experiment Seen from Lead Glass Counters

Semi-Pointing Geometry

Performance is good,but construction is difficult

and expensive.

Page 4: OPAL Experiment Seen from Lead Glass Counters

… while EE could stay in parallel geometry

Page 5: OPAL Experiment Seen from Lead Glass Counters

Main Parts of an EB LG Counter

SF57 (Schott)R2238 (Hamamatsu)

× 9440 pcs

Page 6: OPAL Experiment Seen from Lead Glass Counters

Assembly Line of LG Modules

B.192

Page 7: OPAL Experiment Seen from Lead Glass Counters
Page 8: OPAL Experiment Seen from Lead Glass Counters

Many Ideas and Inventions …

10 sec×10,000 pcs = 105 sec → practically 1 week of work

Page 9: OPAL Experiment Seen from Lead Glass Counters

Combined Beam Test

with “Chicago Stage”

in X5 Beam Line

Page 10: OPAL Experiment Seen from Lead Glass Counters

5 Different LG Modulesand “Mitsui Stage”

Page 11: OPAL Experiment Seen from Lead Glass Counters
Page 12: OPAL Experiment Seen from Lead Glass Counters
Page 13: OPAL Experiment Seen from Lead Glass Counters

“Incident” (July 1986)

Page 14: OPAL Experiment Seen from Lead Glass Counters

Beam Calibration with “Mitsui Stage”

(1986 – 1988)

X5 beam line

Page 15: OPAL Experiment Seen from Lead Glass Counters

Installation of HR’s in OPAL Pit with “Mitsui Mounting Device”

Page 16: OPAL Experiment Seen from Lead Glass Counters

Only 5 counters exchangedbetween the beam calibration

and the installation

Page 17: OPAL Experiment Seen from Lead Glass Counters

All of them(9440 pcs) worked so wellfrom the start(1989) till the

end(2000)

Gain calibration 2000(R3F) by S.Asai

Bhabha 2000ECM = 206 GeV

(R3F)

Page 18: OPAL Experiment Seen from Lead Glass Counters

“The Secret”

Page 19: OPAL Experiment Seen from Lead Glass Counters

“Historical” Reconciliation (Oct.2004)

… with Mr. Hakamada (Director of Sales, Hamamatsu Photonics)