Ontario Ministry of the Environment and Climate Change - Record of Site Condition # 217826
Record of Site Condition
Under Part XV.1 of the Environment Protection Act
Summary
Notice to Readers Concerning Due Diligence
This record of site condition has been filed in the Environmental Site Registry to which the public has
access and which contains a notice advising users of the Environmental Site Registry who have dealings
with any property to consider conducting their own due diligence with respect to the environmental
condition of the property, in addition to reviewing information in the Environmental Site Registry.
Contents of this Record of Site Condition
This record of site condition consists (RSC) of this document which is available to be printed directly from
the Environmental Site Registry as well as all supporting documentation indicated in this RSC to have been
submitted in electronic format to the Ministry of the Environment and Climate Change.
Record of Site Condition Number 217826Date Filed to Environmental Site Registry 2015/05/07Certification Date 2015/03/24Current Property Use ResidentialIntended Property Use ResidentialCertificate of Property Use Number No CPUApplicable Site Condition Standards** Full Depth Generic Site Conditions Standard,
with Potable Ground Water, for Residentialproperty use
Property Municipal Address 1176 RUTHERFORD ROAD, VAUGHAN, ON,L6A 1S2
1 of 18Filed Record of Site Condition # 217826 on 2015/05/07
![Page 2: Ontario Ministry of the Environment and Climate Change ... 217826.pdf · Certificate of Property Use has been issued under section 168.6 of the EPA No Filed Record of Site Condition](https://reader035.vdocuments.us/reader035/viewer/2022081614/5fca06be3e03782d5a524619/html5/thumbnails/2.jpg)
PART 1: PROPERTY OWNERSHIP, PROPERTY INFORMATION AND OWNER'S CERTIFICATIONS
Information about the owner who is submitting or authorizing the submission of the RSC
Owner Name NORSTAR BUILDING CORPORATION
Authorized Person AARON BROWN
Mailing Address 102, 7077 KEELE STREET, CONCORDONTARIO, CANADA
Postal Code L4K 0B6
Phone (905) 738-0754
Fax
Email Address [email protected]
2 of 18Filed Record of Site Condition # 217826 on 2015/05/07
![Page 3: Ontario Ministry of the Environment and Climate Change ... 217826.pdf · Certificate of Property Use has been issued under section 168.6 of the EPA No Filed Record of Site Condition](https://reader035.vdocuments.us/reader035/viewer/2022081614/5fca06be3e03782d5a524619/html5/thumbnails/3.jpg)
RSC Property Location Information
Municipal Address(es) 1176 RUTHERFORD ROAD, VAUGHAN, ON L6A 1S2
Municipality Vaughan
Legal Description See Attached Lawyer’s Letter
Assessment Roll Number(s)
19-28-000-210-70500-0000
Property Identifier Number(s)
03341-0003 (LT)
RSC Property Geographical References
Coordinate System UTM
Datum NAD 83
Zone 17
Easting 621,985.84
Northing 4,855,572.37
RSC Property Use Information
The following types of property uses are defined by the Regulation: Agricultural or other use, Commercial use, Community use, Industrial use, Institutional use, Parkland use, and Residential use.
Current Property Use Residential
Intended Property Use Residential
Certificate of Property Use has been issued under section 168.6 of the EPA
No
3 of 18Filed Record of Site Condition # 217826 on 2015/05/07
![Page 4: Ontario Ministry of the Environment and Climate Change ... 217826.pdf · Certificate of Property Use has been issued under section 168.6 of the EPA No Filed Record of Site Condition](https://reader035.vdocuments.us/reader035/viewer/2022081614/5fca06be3e03782d5a524619/html5/thumbnails/4.jpg)
Please See the Signed Statements of Property Owner, or Agent, or Receiver at the End of this RSC
The rest of this page has been left intentionally blank
4 of 18Filed Record of Site Condition # 217826 on 2015/05/07
![Page 5: Ontario Ministry of the Environment and Climate Change ... 217826.pdf · Certificate of Property Use has been issued under section 168.6 of the EPA No Filed Record of Site Condition](https://reader035.vdocuments.us/reader035/viewer/2022081614/5fca06be3e03782d5a524619/html5/thumbnails/5.jpg)
PART 2: LIST OF REPORTS, SUMMARY OF SITE CONDITIONS AND QUALIFIED PERSON’S STATEMENTS AND CERTIFICATIONSQualified Person's Information
Name BOB GORDANIFAR
Type of Licence Under Professional Engineers Act
Licence
Licence Number 90336835
QP Employer Name CCI GROUP INC.
Mailing Address 200, 7900 KEELE STREET, CONCORDONTARIO, L4K 2A3 CANADA
Phone (905) 856-5200
Fax (905) 695-0221
Email Address [email protected]
Municipal Information
Local or Single-Tier Municipality
Vaughan
Upper-Tier Municipality York
Ministry of the Environment and Climate Change District Office
District Office York-Durham District Office
District Office Address 230 Westney Rd. S., 5th floor, Ajax ON L1S 7J5
5 of 18Filed Record of Site Condition # 217826 on 2015/05/07
![Page 6: Ontario Ministry of the Environment and Climate Change ... 217826.pdf · Certificate of Property Use has been issued under section 168.6 of the EPA No Filed Record of Site Condition](https://reader035.vdocuments.us/reader035/viewer/2022081614/5fca06be3e03782d5a524619/html5/thumbnails/6.jpg)
Phase One Environmental Site Assessment ReportDocument used as the phase one environmental site assessment report and updates in submitting the RSC for filing
The date the last work on all of the records review, interviews and site reconnaissance components of the phase one environmental site assessment was done (refer to clause 28(1)(a) of O. Reg. 153/04)
(YYYY/MM/DD)
2015-02-15
Type of Report
Report Title Date of Report (YYYY/MM/DD)
Author of Report
Name of ConsultingCompany
P1 ESA Phase One Environmental Site Assessment 2015-02-17 Bob Gordanifar, P.Eng., QP
CCI GROUP INC.
Reports and Other Documents Related to the Phase One Environmental Site AssessmentReports and other documents relied upon in certifying the information set out in section 10 of Schedule A or otherwise used in conducting the phase one environmental site assessment
Report Title Date of Report (YYYY/MM/DD)
Author of Report
Name of ConsultingCompany
N/A
6 of 18Filed Record of Site Condition # 217826 on 2015/05/07
![Page 7: Ontario Ministry of the Environment and Climate Change ... 217826.pdf · Certificate of Property Use has been issued under section 168.6 of the EPA No Filed Record of Site Condition](https://reader035.vdocuments.us/reader035/viewer/2022081614/5fca06be3e03782d5a524619/html5/thumbnails/7.jpg)
Phase Two Environmental Site Assessment ReportDocument used as the phase two environmental site assessment report and updates in submitting the RSC for filing
The date the last work on all of the planning of the site investigation and conducting the site investigation components of the phase two environmental site assessment was done (refer to clause 33.5(1)(a) of O. Reg. 153/04)
(YYYY/MM/DD)
2015-03-24
Type of Report
Report Title Date of Report (YYYY/MM/DD)
Author of Report
Name of ConsultingCompany
P2 ESA Phase Two Environmental Site Assessment 2015-03-27 Bob Gordanifar, P.Eng., QP
CCI GROUP INC.
Reports and Other Documents Related to the Phase Two Environmental Site AssessmentReports and other documents relied upon in making any certifications in the RSC for the purposes of Part IV of Schedule A or otherwise used in conducting the phase two environmental site assessment
Report Title Date of Report (YYYY/MM/DD).
Author of Report
Name of ConsultingCompany
N/A
7 of 18Filed Record of Site Condition # 217826 on 2015/05/07
![Page 8: Ontario Ministry of the Environment and Climate Change ... 217826.pdf · Certificate of Property Use has been issued under section 168.6 of the EPA No Filed Record of Site Condition](https://reader035.vdocuments.us/reader035/viewer/2022081614/5fca06be3e03782d5a524619/html5/thumbnails/8.jpg)
Environmental ConditionSection 41 applies? No
Section 43.1 applies? Yes
Site Condition InformationCertification date (YYYY/MM/DD) 2015/03/24
Total area of RSC property (in hectares) 1.48000
Number of any previously filed RSC that applies to any part of the RSC property
Number of any previously filed Transition Notice that applies to any part of the RSC property
Soil Texture
Assessment/Restoration Approach Full Depth Generic
Site investigation includes the investigation, sampling and analysis of ground water? Yes
Is there soil present that is sufficient to investigate, sample and analyze soil on, in or under the property in accordance with s. 6, Schedule E of O.Reg. 153/04?
Yes
Site investigation includes the investigation, sampling and analysis of soil on, in or under the property which is used in the RSC?
Yes
Name of the laboratory used to analyze any samples collected of soil, ground water or sediment
MAXXAM ANALYTICS
Ground water condition (potable, non-potable) Potable
Applicable Site Condition Standard TABLE 8
8 of 18Filed Record of Site Condition # 217826 on 2015/05/07
![Page 9: Ontario Ministry of the Environment and Climate Change ... 217826.pdf · Certificate of Property Use has been issued under section 168.6 of the EPA No Filed Record of Site Condition](https://reader035.vdocuments.us/reader035/viewer/2022081614/5fca06be3e03782d5a524619/html5/thumbnails/9.jpg)
Table 1 – Maximum Contaminant Concentrations Compared to Applicable Site Condition Standards
Measured Concentration for Contaminants in Soil
ContaminantName
Maximum Concentration
Applicable Site Condition Standard
Unit of Measure
1 Boron (Hot Water Soluble)* 0.55 1.5 µg/g
2 Chromium VI < 0.2 0.66 µg/g
3 Cyanide (CN-) < 0.01 0.051 µg/g
4 Electrical Conductivity 0.52 0.7 mS/cm
5 Mercury < 0.05 0.27 µg/g
6 Sodium Adsorption Ratio 1.9 5
7 Petroleum Hydrocarbons F1**** < 10 25 µg/g
8 Petroleum Hydrocarbons F2 < 10 10 µg/g
9 Petroleum Hydrocarbons F3 < 50 240 µg/g
10 Petroleum Hydrocarbons F4 < 50 120 µg/g
11 Acenaphthene < 0.02 0.072 µg/g
12 Acenaphthylene < 0.02 0.093 µg/g
13 Anthracene < 0.02 0.22 µg/g
14 Benz[a]anthracene 0.059 0.36 µg/g
15 Benzo[a]pyrene 0.071 0.3 µg/g
16 Benzo[b]fluoranthene 0.079 0.47 µg/g
17 Benzo[ghi]perylene 0.11 0.68 µg/g
18 Benzo[k]fluoranthene 0.026 0.48 µg/g
19 Chrysene 0.045 2.8 µg/g
20 Dibenz[a h]anthracene < 0.02 0.1 µg/g
21 Fluoranthene 0.12 0.69 µg/g
22 Fluorene < 0.02 0.19 µg/g
23 Indeno[1 2 3-cd]pyrene 0.073 0.23 µg/g
24 Methlynaphthalene, 2-(1-) *** < 0.028 0.59 µg/g
25 Naphthalene < 0.02 0.09 µg/g
26 Phenanthrene 0.051 0.69 µg/g
27 Pyrene 0.1 1 µg/g
28 Antimony < 0.2 1.3 µg/g
29 Arsenic 3.1 18 µg/g
30 Selenium < 0.5 1.5 µg/g
31 Barium 110 220 µg/g
32 Beryllium 0.76 2.5 µg/g
33 Boron (total) 7.2 36 µg/g
34 Cadmium 0.25 1.2 µg/g
35 Chromium Total 27 70 µg/g
...Continued on next page
9 of 18Filed Record of Site Condition # 217826 on 2015/05/07
![Page 10: Ontario Ministry of the Environment and Climate Change ... 217826.pdf · Certificate of Property Use has been issued under section 168.6 of the EPA No Filed Record of Site Condition](https://reader035.vdocuments.us/reader035/viewer/2022081614/5fca06be3e03782d5a524619/html5/thumbnails/10.jpg)
Table 1 – Maximum Contaminant Concentrations Compared to Applicable Site Condition Standards
Measured Concentration for Contaminants in Soil
Continued from previous page....
ContaminantName
Maximum Concentration
Applicable Site Condition Standard
Unit of Measure
36 Cobalt 11 22 µg/g
37 Copper 18 92 µg/g
38 Lead 16 120 µg/g
39 Molybdenum < 0.5 2 µg/g
40 Nickel 20 82 µg/g
41 Silver < 0.2 0.5 µg/g
42 Thallium 0.19 1 µg/g
43 Uranium 1 2.5 µg/g
44 Vanadium 36 86 µg/g
45 Zinc 63 290 µg/g
46 Benzene < 0.02 0.02 µg/g
47 Ethylbenzene < 0.02 0.05 µg/g
48 Toluene < 0.02 0.2 µg/g
49 Xylene Mixture < 0.04 0.05 µg/g
10 of 18Filed Record of Site Condition # 217826 on 2015/05/07
![Page 11: Ontario Ministry of the Environment and Climate Change ... 217826.pdf · Certificate of Property Use has been issued under section 168.6 of the EPA No Filed Record of Site Condition](https://reader035.vdocuments.us/reader035/viewer/2022081614/5fca06be3e03782d5a524619/html5/thumbnails/11.jpg)
Table 1 – Maximum Contaminant Concentrations Compared to Applicable Site Condition Standards (Continued)
Ground Water
ContaminantName
Maximum Concentration
Applicable Site Condition Standard
Unit of Measure
1 Acetone 11 2700 µg/L
2 Bromomethane < 0.5 0.89 µg/L
3 Carbon Tetrachloride < 0.2 0.79 µg/L
4 Chlorobenzene < 0.2 30 µg/L
5 Chloroform 0.22 2.4 µg/L
6 Dichlorobenzene, 1,2- < 0.5 3 µg/L
7 Dichlorobenzene, 1,3- < 0.5 59 µg/L
8 Dichlorobenzene, 1,4- < 0.5 1 µg/L
9 Dichlorodifluoromethane < 1 590 µg/L
10 Dichloroethane, 1,1- < 0.2 5 µg/L
11 Dichloroethane, 1,2- < 0.5 1.6 µg/L
12 Dichloroethylene, 1,1- < 0.2 1.6 µg/L
13 Dichloroethylene, 1,2-cis- < 0.5 1.6 µg/L
14 Dichloroethylene, 1,2-trans- < 0.5 1.6 µg/L
15 Dichloropropane, 1,2- < 0.2 5 µg/L
16 Dichloropropene,1,3- < 0.3 0.5 µg/L
17 Ethylene dibromide < 0.2 0.2 µg/L
18 Hexane (n) < 1 51 µg/L
19 Methyl Ethyl Ketone 16 1800 µg/L
20 Methyl Isobutyl Ketone < 5 640 µg/L
21 Methyl tert-Butyl Ether (MTBE) < 0.5 15 µg/L
22 Methylene Chloride < 2 50 µg/L
23 Styrene < 0.5 5.4 µg/L
24 Tetrachloroethane, 1,1,1,2- < 0.5 1.1 µg/L
25 Tetrachloroethane, 1,1,2,2- < 0.5 1 µg/L
26 Tetrachloroethylene < 0.2 1.6 µg/L
27 Trichloroethane, 1,1,1- < 0.2 200 µg/L
28 Trichloroethane, 1,1,2- < 0.5 4.7 µg/L
29 Trichloroethylene < 0.2 1.6 µg/L
30 Trichlorofluoromethane < 0.5 150 µg/L
31 Vinyl Chloride < 0.2 0.5 µg/L
32 Petroleum Hydrocarbons F1**** < 25 420 µg/L
33 Petroleum Hydrocarbons F2 < 100 150 µg/L
34 Petroleum Hydrocarbons F3 < 200 500 µg/L
35 Petroleum Hydrocarbons F4 < 200 500 µg/L
...Continued on next page
11 of 18Filed Record of Site Condition # 217826 on 2015/05/07
![Page 12: Ontario Ministry of the Environment and Climate Change ... 217826.pdf · Certificate of Property Use has been issued under section 168.6 of the EPA No Filed Record of Site Condition](https://reader035.vdocuments.us/reader035/viewer/2022081614/5fca06be3e03782d5a524619/html5/thumbnails/12.jpg)
Table 1 – Maximum Contaminant Concentrations Compared to Applicable Site Condition Standards (Continued)
Ground Water
Continued from previous page....
ContaminantName
Maximum Concentration
Applicable Site Condition Standard
Unit of Measure
36 Sodium 130,000 490000 µg/L
37 Antimony 1.4 6 µg/L
38 Arsenic < 1 25 µg/L
39 Selenium < 2 10 µg/L
40 Barium 73 1000 µg/L
41 Beryllium < 0.5 4 µg/L
42 Boron (total) 28 5000 µg/L
43 Cadmium < 0.1 2.1 µg/L
44 Chromium Total < 5 50 µg/L
45 Cobalt 0.8 3.8 µg/L
46 Copper 3 69 µg/L
47 Lead 0.55 10 µg/L
48 Molybdenum 15 70 µg/L
49 Nickel 16 100 µg/L
50 Silver < 0.1 1.2 µg/L
51 Thallium < 0.05 2 µg/L
52 Uranium 4.8 20 µg/L
53 Vanadium 0.57 6.2 µg/L
54 Zinc 6 890 µg/L
55 Benzene < 0.2 5 µg/L
56 Ethylbenzene < 0.2 2.4 µg/L
57 Toluene 0.68 22 µg/L
58 Xylene Mixture 1.1 300 µg/L
12 of 18Filed Record of Site Condition # 217826 on 2015/05/07
![Page 13: Ontario Ministry of the Environment and Climate Change ... 217826.pdf · Certificate of Property Use has been issued under section 168.6 of the EPA No Filed Record of Site Condition](https://reader035.vdocuments.us/reader035/viewer/2022081614/5fca06be3e03782d5a524619/html5/thumbnails/13.jpg)
Remedial Action and Mitigation
Remediated Soils
Estimated quantities of the soil, if any, originating at and remaining on the RSC property that have been remediated, at a location either on or off the property, to reduce the concentration of contaminants in the soil. Indicate the remediation process or processes used and the estimated amount of soil remediated by each identified process.
Soil Remediation Process Estimated Quantity of Soil (in-ground volume in m³)
Description of Remediation
Description of any action taken to reduce the concentration of contaminants (including soil removals) on, in or under the RSC property.
N/A
Soil or Sediment Removed and Not Returned
Estimated quantities of soil or sediment, if any, removed from and not returned to the RSC property.
Estimated Quantity of Soil (in-ground volume in m³) 0.0
Estimated Quantity of Sediment (in-ground volume in m³) 0.0
Soil Brought to the Property
Estimated quantity of the soil, if any, being brought from another property to and deposited at the RSC property, not including any soil that may have originated at but been remediated off the RSC property and that is identified in section 28 of Schedule A.
Estimated Quantity of Soil Brought to the Property(in-ground volume in m³)
0.0
13 of 18Filed Record of Site Condition # 217826 on 2015/05/07
![Page 14: Ontario Ministry of the Environment and Climate Change ... 217826.pdf · Certificate of Property Use has been issued under section 168.6 of the EPA No Filed Record of Site Condition](https://reader035.vdocuments.us/reader035/viewer/2022081614/5fca06be3e03782d5a524619/html5/thumbnails/14.jpg)
Ground Water Control or Treatment Measures
Ground water control or treatment measures that were required for the RSC property prior to the certification date for the purpose of submitting the RSC for filing.
N/A
Ground water control or treatment measures that are required for the RSC property after the certification date.
N/A
Estimated volume of ground water, if any, removed from and not returned to the RSC property.
Estimated Volume of Ground Water (in litres) 0.0
14 of 18Filed Record of Site Condition # 217826 on 2015/05/07
![Page 15: Ontario Ministry of the Environment and Climate Change ... 217826.pdf · Certificate of Property Use has been issued under section 168.6 of the EPA No Filed Record of Site Condition](https://reader035.vdocuments.us/reader035/viewer/2022081614/5fca06be3e03782d5a524619/html5/thumbnails/15.jpg)
Other Activities Including Risk Management Measures
Constructed works that prior to the certification date for the purpose of submitting the RSC for filing, were required to control or otherwise mitigate the release or movement of known existing contaminants at the RSC property.
N/A
Constructed works that after the certification date, are required to control or otherwise mitigate the release or movement of known existing contaminants at the RSC property.
N/A
Monitoring or Maintenance
Soil Management Measures
Soil monitoring requirements or any requirements for care, maintenance or replacement or any monitoring or control works for known existing contaminants, if any, on the RSC property, after the certification date.
N/A
Ground Water Management Measures
Ground water monitoring requirements or requirements for care, maintenance or replacement of any monitoring or control works or known existing contaminants, if any, on the RSC property, after the certification date.
N/A
Remediated or Removed Soil, Sediment or Ground Water From Near Property Boundary
Has any soil, sediment or ground water at the RSC property that is or was located within 3 metres of the RSC property boundary been remediated or removed for the purpose of remediation?
No
15 of 18Filed Record of Site Condition # 217826 on 2015/05/07
![Page 16: Ontario Ministry of the Environment and Climate Change ... 217826.pdf · Certificate of Property Use has been issued under section 168.6 of the EPA No Filed Record of Site Condition](https://reader035.vdocuments.us/reader035/viewer/2022081614/5fca06be3e03782d5a524619/html5/thumbnails/16.jpg)
Qualified Person’s Statements and CertificationsAs the qualified person, I certify that:
A phase one environmental site assessment of the RSC property, which includes the evaluation of the information gathered from a records review, site reconnaissance, interviews, a report and any updates required, has been conducted in accordance with the regulation by or under the supervision of a qualified person as required by the regulation.
A phase two environmental site assessment of the RSC property, which includes the evaluation of the information gathered from planning and conducting a site investigation, a report, and any updates required, has been conducted in accordance with the regulation by or under the supervision of a qualified person as required by the regulation.
The information represents the site conditions at the sampling points at the time of sampling only and the conditions between and beyond the sampling points may vary.
As of 2015/03/24, in my opinion, based on the phase one environmental site assessment and the phase two environmental site assessment, and any confirmatory sampling, there is no evidence of any contaminants in the soil, ground water or sediment on, in or under the RSC property that would interfere with the type of property use to which the RSC property will be put, as specified in the RSC.
Ground water sampling has been conducted in accordance with the regulation by or under the supervision of a qualified person as required by the regulation.
As of 2015/03/24, in my opinion, based on the phase one and phase two environmental site assessments and any confirmatory sampling, the RSC property meets the applicable full depth generic site condition standards prescribed by section 36 of the regulation for all contaminants prescribed by the regulation in relation to the type of property use for which this RSC is filed, except for those contaminants (if any) specified in this RSC at Table 2, Maximum Contaminant Concentrations Compared to Standards Specified in a Risk Assessment.
As of 2015/03/24, the maximum known concentration of each contaminant in soil, sediment and ground water at the RSC property for which sampling and analysis has been performed is specified in this RSC at Table 1, Maximum Contaminant Concentrations Compared to Applicable Site Condition Standards.
I am a qualified person and have the qualifications required by section 5 of the regulation.
I have in place an insurance policy that satisfies the requirements of section 7 of the regulation.
I acknowledge that the RSC will be submitted for filing in the Environmental Site Registry, that records of site condition that are filed in the Registry are available for examination by the public and that the Registry contains a notice advising users of the Registry who have dealings with any property to consider conducting their own due diligence with respect to the environmental condition of the property, in addition to reviewing information in the Registry.
The opinions expressed in this RSC are engineering or scientific opinions made in accordance with generally accepted principles and practices as recognized by members of the environmental engineering or science profession or discipline practising at the same time and in the same or similar location.
I do not hold and have not held and my employer CCI GROUP INC.does not hold and has not held a direct or indirect interest in the RSC property or any property which includes the RSC property and was the subject of a phase one or two environmental site assessmentor risk assessment upon which this record of site condition is based
To the best of my knowledge, the certifications and statements in this part of the RSC are true as of 2015/03/24.
By signing this RSC, I make no express or implied warranties or guarantees.
By checking the boxes above, and entering my membership/licence number in this submission, I, BOB GORDANIFAR, a qualified person as defined in section 5 of O. Reg. 153/04 am, on 2015/04/21:
a) signing this record of site condition submission as a qualified person; and b) making all certifications required as a qualified person for this record of site condition.
I Agree
16 of 18Filed Record of Site Condition # 217826 on 2015/05/07
![Page 17: Ontario Ministry of the Environment and Climate Change ... 217826.pdf · Certificate of Property Use has been issued under section 168.6 of the EPA No Filed Record of Site Condition](https://reader035.vdocuments.us/reader035/viewer/2022081614/5fca06be3e03782d5a524619/html5/thumbnails/17.jpg)
Additional Documentation Provided by Property Owner or AgentThe following documents have been submitted to the Ministry of the Environment and Climate Changeas part of the record of site condition
Certificate of Status or equivalent for the owner
Lawyer’s letter consisting of a legal description of the property
Copy of any deed(s), transfer(s) or other document(s) by which the RSC property was acquired
A Current plan of Survey
Area(s) of Potential Environmental Concern
Table of Current and Past Uses of the Phase One Property
Phase 2 Conceptual Site Model
Owner or agent certification statements
6.1.2
17 of 18Filed Record of Site Condition # 217826 on 2015/05/07
![Page 18: Ontario Ministry of the Environment and Climate Change ... 217826.pdf · Certificate of Property Use has been issued under section 168.6 of the EPA No Filed Record of Site Condition](https://reader035.vdocuments.us/reader035/viewer/2022081614/5fca06be3e03782d5a524619/html5/thumbnails/18.jpg)
![Page 19: Ontario Ministry of the Environment and Climate Change ... 217826.pdf · Certificate of Property Use has been issued under section 168.6 of the EPA No Filed Record of Site Condition](https://reader035.vdocuments.us/reader035/viewer/2022081614/5fca06be3e03782d5a524619/html5/thumbnails/19.jpg)
![Page 20: Ontario Ministry of the Environment and Climate Change ... 217826.pdf · Certificate of Property Use has been issued under section 168.6 of the EPA No Filed Record of Site Condition](https://reader035.vdocuments.us/reader035/viewer/2022081614/5fca06be3e03782d5a524619/html5/thumbnails/20.jpg)
![Page 21: Ontario Ministry of the Environment and Climate Change ... 217826.pdf · Certificate of Property Use has been issued under section 168.6 of the EPA No Filed Record of Site Condition](https://reader035.vdocuments.us/reader035/viewer/2022081614/5fca06be3e03782d5a524619/html5/thumbnails/21.jpg)
![Page 22: Ontario Ministry of the Environment and Climate Change ... 217826.pdf · Certificate of Property Use has been issued under section 168.6 of the EPA No Filed Record of Site Condition](https://reader035.vdocuments.us/reader035/viewer/2022081614/5fca06be3e03782d5a524619/html5/thumbnails/22.jpg)
PARCEL REGISTER (ABBREVIATED) FOR PROPERTY IDENTIFIER
LAND PAGE 1 OF 2
REGISTRY PREPARED FOR T.S.
OFFICE #65 03341−0003 (LT) ON 2015/01/06 AT 13:12:31
* CERTIFIED IN ACCORDANCE WITH THE LAND TITLES ACT * SUBJECT TO RESERVATIONS IN CROWN GRANT *
PROPERTY DESCRIPTION: PT LT 16 CON 2 VAUGHAN AS IN VA71501 EXCEPT PT 13 EXPROP PL VA81617 & PTS 1 & 2 65R11000 ; VAUGHAN
PROPERTY REMARKS:
ESTATE/QUALIFIER: RECENTLY: PIN CREATION DATE:FEE SIMPLELT CONVERSION QUALIFIED
RE−ENTRY FROM 03341−0056 1999/01/22
OWNERS’ NAMES CAPACITY SHARENORSTAR BUILDING CORPORATION ROWN
REG. NUM.
DATE
INSTRUMENT TYPE
AMOUNT
PARTIES FROM
PARTIES TO
CERT/CHKD
**EFFECTIVE 2000/07/29 THE NOTATION OF THE " BLOCK IMPLEMENTATION DATE" OF 1997/04/07 ON THIS PIN**
**WAS REPLACED WITH THE " PIN CREATION DATE" OF 1999/01/22**
** PRINTOUT INCLUDES ALL DOCUMENT TYPES AND DELETED INSTRUMENTS SINCE: 1999/01/22 **
**SUBJECT, ON FIRST REGISTRATION UNDER THE LAND TITLES ACT, TO:
** SUBSECTION 44(1) OF THE LAND TITLES ACT, EXCEPT PARAGRAPH 11, PARAGRAPH 14, PROVINCIAL SUCCESSION DUTIES *
** AND ESCHEATS OR FORFEITURE TO THE CROWN.
** THE RIGHTS OF ANY PERSON WHO WOULD, BUT FOR THE LAND TITLES ACT, BE ENTITLED TO THE LAND OR ANY PART OF
** IT THROUGH LENGTH OF ADVERSE POSSESSION, PRESCRIPTION, MISDESCRIPTION OR BOUNDARIES SETTLED BY
** CONVENTION.
** ANY LEASE TO WHICH THE SUBSECTION 70(2) OF THE REGISTRY ACT APPLIES.
**DATE OF CONVERSION TO LAND TITLES: 1999/01/25 **
VA71501 1973/01/10 TRANSFER *** DELETED AGAINST THIS PROPERTY *** DISERA, RAFFEAL
YR235785 2002/11/25 TRANSMISSION−LAND *** COMPLETELY DELETED *** DISERA, RAFFEAL (DECEASED) DISERA, RAFFEAL − ESTATE DISERA, FIORE DISERA, BRYON DISERA, DAVID
YR241149 2002/12/04 CHARGE *** COMPLETELY DELETED *** DISERA, FIORE CANALETTO INVESTMENTS LIMITED DISERA, BRYON DISERA, DAVID
YR460537 2004/04/29 CHARGE *** COMPLETELY DELETED ***
NOTE: ADJOINING PROPERTIES SHOULD BE INVESTIGATED TO ASCERTAIN DESCRIPTIVE INCONSISTENCIES, IF ANY, WITH DESCRIPTION REPRESENTED FOR THIS PROPERTY. NOTE: ENSURE THAT YOUR PRINTOUT STATES THE TOTAL NUMBER OF PAGES AND THAT YOU HAVE PICKED THEM ALL UP.
![Page 23: Ontario Ministry of the Environment and Climate Change ... 217826.pdf · Certificate of Property Use has been issued under section 168.6 of the EPA No Filed Record of Site Condition](https://reader035.vdocuments.us/reader035/viewer/2022081614/5fca06be3e03782d5a524619/html5/thumbnails/23.jpg)
PARCEL REGISTER (ABBREVIATED) FOR PROPERTY IDENTIFIER
LAND PAGE 2 OF 2
REGISTRY PREPARED FOR T.S.
OFFICE #65 03341−0003 (LT) ON 2015/01/06 AT 13:12:31
* CERTIFIED IN ACCORDANCE WITH THE LAND TITLES ACT * SUBJECT TO RESERVATIONS IN CROWN GRANT *
REG. NUM.
DATE
INSTRUMENT TYPE
AMOUNT
PARTIES FROM
PARTIES TO
CERT/CHKD
DISERA, BRYON CANALETTO INVESTMENTS LIMITED DISERA, DAVID DISERA, FIORE
YR460538 2004/04/29 DISCH OF CHARGE *** COMPLETELY DELETED *** CANALETTO INVESTMENTS LIMITED REMARKS: RE: YR241149
YR470417 2004/05/19 CERT TAX ARREARS *** COMPLETELY DELETED *** THE CORPORATION OF THE CITY OF VAUGHAN
YR754143 2005/12/22 APL (GENERAL) *** COMPLETELY DELETED *** THE CORPORATION OF THE CITY OF VAUGHAN REMARKS: YR470417
YR1198901 2008/07/28 TRANS PERSONAL REP $2,121,750 DISERA, BRYON NORSTAR BUILDING CORPORATION C DISERA, DAVID DISERA, FIORE REMARKS: PLANNING ACT STATEMENTS
YR1198902 2008/07/28 DISCH OF CHARGE *** COMPLETELY DELETED *** CANALETTO INVESTMENTS LIMITED REMARKS: RE: YR460537
NOTE: ADJOINING PROPERTIES SHOULD BE INVESTIGATED TO ASCERTAIN DESCRIPTIVE INCONSISTENCIES, IF ANY, WITH DESCRIPTION REPRESENTED FOR THIS PROPERTY. NOTE: ENSURE THAT YOUR PRINTOUT STATES THE TOTAL NUMBER OF PAGES AND THAT YOU HAVE PICKED THEM ALL UP.
![Page 24: Ontario Ministry of the Environment and Climate Change ... 217826.pdf · Certificate of Property Use has been issued under section 168.6 of the EPA No Filed Record of Site Condition](https://reader035.vdocuments.us/reader035/viewer/2022081614/5fca06be3e03782d5a524619/html5/thumbnails/24.jpg)
� �� � � �� �� � � � � � � � �� � � � ��
![Page 25: Ontario Ministry of the Environment and Climate Change ... 217826.pdf · Certificate of Property Use has been issued under section 168.6 of the EPA No Filed Record of Site Condition](https://reader035.vdocuments.us/reader035/viewer/2022081614/5fca06be3e03782d5a524619/html5/thumbnails/25.jpg)
Area of Potential
Environmental Concern
(APEC)
Location of APEC
on Phase One
Property
Potentially Contaminating
Activity (PCA) Location of PCA
Contaminants of
Potential Concern
Media Potentially Affected
(groundwater, soil, and/or
sediment)
(1) Spill listing at the
northeast corner
intersection of Rutherford
Road and Dufferin Street
from 2013
Southwestern most
portion of the Site.
Not Applicable - diesel fuel
spill from a collision/
accident.
Off-Site PHC F1-F4 and BTEX Soil & Groundwater
(2) Debris identified at the
northwest part of the
property during the Site
Reconnaissance
North of the Site
building in the
Northwestern section
of the Site
30) Importation of fill material
of unknown quality On-Site
PHC F1-F4, PAHs and
Metals Soil & Groundwater
![Page 26: Ontario Ministry of the Environment and Climate Change ... 217826.pdf · Certificate of Property Use has been issued under section 168.6 of the EPA No Filed Record of Site Condition](https://reader035.vdocuments.us/reader035/viewer/2022081614/5fca06be3e03782d5a524619/html5/thumbnails/26.jpg)
Current and Past Uses of the Site
Year Name of Owner(s)
Description of Property (including tenants)
Property Use
Observations from the Chain of Title, Aerial Photographs, Fire Insurance Plans (FIPs), etc.
1842 to 1878 Thomas Cook
The Site was undeveloped and densely forested. Rutherford Road and Dufferin Street are present to the west and south, respectively.
Agricultural or Other Use
Ownership identified from Chain of Title. Aerial photographs identified that prior to 1971, the Site was undeveloped and densely forested. No listings were available in reviewed Might’s Directories for the Site.
1878 to 1913 William Cook
1913 to 1936 Wilbert Bone
1936 to 1943 Thomas H. Rea
1943 to 1970 Gilbert A Labine, Blanche Labine
1970 to 1971 Clerio Spacca, Luigi Quiguero
1971 to 1973
Ralph Disera, Fred Disera, Sam Disera (Disera Investments)
1176 Rutherford Road (single family dwelling)
Residential
Ownership identified from Chain of Title.
1973 to 2002 Raffael Disera
Ownership identified from Chain of Title.
A 1982 aerial photograph identifies that
the Site had been developed with the
existing single storey dwelling. The north
portion of the Site had been cleared of
trees. No significant changes to the Site
were observed in aerial photos dated after
1982.
2002 to 2008
Raffael Disera – Estate, Fiore Disera, Bryon Disera, David Disera
Ownership identified from Chain of Title.
2008 to present
Norstar Building Corporation
Ownership identified from Chain of Title.
![Page 27: Ontario Ministry of the Environment and Climate Change ... 217826.pdf · Certificate of Property Use has been issued under section 168.6 of the EPA No Filed Record of Site Condition](https://reader035.vdocuments.us/reader035/viewer/2022081614/5fca06be3e03782d5a524619/html5/thumbnails/27.jpg)
Phase Two ESA
Conceptual Site Model
![Page 28: Ontario Ministry of the Environment and Climate Change ... 217826.pdf · Certificate of Property Use has been issued under section 168.6 of the EPA No Filed Record of Site Condition](https://reader035.vdocuments.us/reader035/viewer/2022081614/5fca06be3e03782d5a524619/html5/thumbnails/28.jpg)
Phase Two Conceptual Site Model 1176 Rutherford Road, Vaughan, ON
1
1.1 Site Description
The Site (Phase Two RSC Property) is located on the northeast corner of the intersection of
Rutherford Road and Dufferin Street, in Vaughan, Ontario. The Site measures 1.48 hectares
(approximately 3.66 acres) and is currently utilized for residential purposes, occupied by a
single storey residential dwelling with a basement walkout. The Site is planned for
redevelopment with two (2) multi-storey, residential condominiums.
1.2 Background
The need for the Phase Two ESA was identified in the CCIG Phase One ESA completed for the
Site in December 2014. The Phase One ESA identified the following APECs during the
completion of the Phase One ESA.
Area of
Potential
Environmental
Concern (APEC)
Location of
APEC on
Phase One
Property
Potentially
Contaminating
Activity (PCA)
Location of
PCA
Contaminants
of Potential
Concern
Media Potentially
Affected
(groundwater,
soil, and/or
sediment)
(1) Spill listing at
the northeast
corner
intersection of
Rutherford Road
and Dufferin
Street from 2013
Southwestern
most portion
of the Site. Not Applicable -
diesel fuel spill from
a collision/ accident.
Off-Site PHC F1-F4
and BTEX
Soil & Groundwater
(2) Debris
identified at the
northwest part of
the property
during the Site
Reconnaissance
North of the
Site building
in the
Northwestern
section of the
Site
30) Importation of
fill material of
unknown quality
On-Site PHC F1-F4,
PAHs, and
Metals
Soil & Groundwater
The spill that occurred to the southwest of the Site may have impacted the Site through
groundwater migration. Debris observed in the northwest portion of the Site has the potential to
impact shallow soil at the Site.
1.3 Scope of Work
In order to investigate the APECs identified, a Phase Two ESA investigation, consisting of
drilling, soil and groundwater sampling, and chemical analyses was conducted at the Site. The
Phase Two ESA was conducted in accordance with the requirements of Ontario Regulation
153/04, as amended.
CCIG supervised the drilling and monitoring well installation conducted by Fisher Environmental
Drilling between January 27 and February 4, 2015, and by Fadroy Drilling on March 23, 2015.
![Page 29: Ontario Ministry of the Environment and Climate Change ... 217826.pdf · Certificate of Property Use has been issued under section 168.6 of the EPA No Filed Record of Site Condition](https://reader035.vdocuments.us/reader035/viewer/2022081614/5fca06be3e03782d5a524619/html5/thumbnails/29.jpg)
Phase Two Conceptual Site Model 1176 Rutherford Road, Vaughan, ON
2
Four (4) boreholes, BH1(MW), BH2(MW), BH2A(MW) and BH3(MW), with monitoring well
installations, were advanced to depths ranging from 6.1 meters below grade (mbg) to 12.2 mbg.
For assessment purposes, CCIG selected the Ministry of Environment and Climate Change
(MOECC) 2011 Table 8 Site Condition Standards (SCS) for Residential/Parkland/Institutional
property use.
1.4 Results
In general, the soil stratigraphy comprised of fill material (consisting of reworked native soil
originating on-Site) underlain by sandy silt and silty clay till to the end depth of the boreholes.
Cross-sections illustrating the subsurface strata and monitoring well screen depths are
illustrated in Figures 3 and 4.
The MOECC Table 8 Standards were selected for the Phase Two ESA based on the following
rationale:
The Phase Two RSC Property is not considered environmentally sensitive as per the criteria
in Section 41 of O.Reg. 153/04:
the Site is not within, adjacent to, and does not include land within 30 m of an area of
natural significance. Based on the Areas of Natural and Scientific Interest (ANSI) map
provided by EcoLog ERIS Ltd., there are no Areas of Natural Significance located within
the Phase One Study Area.
Soil samples submitted for laboratory analysis for pH, from above 1.5 m (surface soils)
and below 1.5 m (sub-surface soils) identified pH values of 7.69 and 7.68, respectively.
These values are within the acceptable range of 5 to 9 for surface soils, and 5 to 11 for
sub-surface soils.
The Phase Two RSC Property is subject to Section 43.1 of O.Reg. 153/04, due to the
presence of a water body within 30 m of the Site.
The property is designated as residential property use, and no change in land use is
planned.
The Site is covered with more than 2 m of overburden.
The predominant soil type on the properties is considered to be medium/fine textured. A
grain size analysis conducted by CCIG on a soil sample determined that 53.6 % by mass of
the soil sample passed through a 75 µm sieve. This indicated that the soil texture applicable
to the Site is fine.
Monitoring wells were installed during this Phase Two ESA in the unconfined aquifer at the Site.
The measured depths to the groundwater table ranged from 4.96 mbg to 11.24 mbg. Due to
slow groundwater recovery in BH2(MW), BH2A(MW) was installed at a greater depth to obtain
groundwater in the vicinity of BH2(MW). No free product or oily sheen was observed in any of
![Page 30: Ontario Ministry of the Environment and Climate Change ... 217826.pdf · Certificate of Property Use has been issued under section 168.6 of the EPA No Filed Record of Site Condition](https://reader035.vdocuments.us/reader035/viewer/2022081614/5fca06be3e03782d5a524619/html5/thumbnails/30.jpg)
Phase Two Conceptual Site Model 1176 Rutherford Road, Vaughan, ON
3
the monitoring wells. Based on the groundwater elevation contours, we have interpreted the
inferred direction of the groundwater flow to be in a southeasterly direction.
Bedrock was not encountered in boreholes drilled during this investigation. However, based on
available bedrock topography maps, bedrock is expected to occur at approximately 150 mbg.
The horizontal hydraulic gradient was calculated based on two sets of monitoring wells and
ranged from 0.016 m/m [BH1(MW) to BH3(MW)] to 0.068 m/m [BH1(MW) to BH2A(MW)], with
an average horizontal hydraulic gradient of 0.042 m/m.
A total of seven (7) soil samples and five (5) groundwater samples, including one (1) duplicate
sample of each soil and groundwater and two (2) trip blanks for groundwater, were analyzed by
Maxxam Analytics for the presence of various contaminants of concern (COCs) to investigate
soil and groundwater quality impacts related to the aforementioned APECs. These COCs
included: PHC F1-F4, volatile organic compounds (VOCs), polycyclic aromatic hydrocarbons
(PAHs), metals and inorganics.
The results of chemical analyses identified no exceedences of the MOECC Table 8 Standards
in any tested soil and groundwater samples on the Phase Two RSC Property.
We understand that no fill material has ever been imported to the Site.
We do not expect that underground utilities would act as contaminant transport at the Site.
The exact location of the future building development at the Site is not known; however, there
are no known soil vapours that could impact any future developments at the Site.
Based on the results of the Phase Two ESA investigations conducted at the Site, there are no
contaminants present in soil or groundwater in the tested locations at concentrations exceeding
the applicable MOECC Table 8 Standards.
![Page 31: Ontario Ministry of the Environment and Climate Change ... 217826.pdf · Certificate of Property Use has been issued under section 168.6 of the EPA No Filed Record of Site Condition](https://reader035.vdocuments.us/reader035/viewer/2022081614/5fca06be3e03782d5a524619/html5/thumbnails/31.jpg)
![Page 32: Ontario Ministry of the Environment and Climate Change ... 217826.pdf · Certificate of Property Use has been issued under section 168.6 of the EPA No Filed Record of Site Condition](https://reader035.vdocuments.us/reader035/viewer/2022081614/5fca06be3e03782d5a524619/html5/thumbnails/32.jpg)
![Page 33: Ontario Ministry of the Environment and Climate Change ... 217826.pdf · Certificate of Property Use has been issued under section 168.6 of the EPA No Filed Record of Site Condition](https://reader035.vdocuments.us/reader035/viewer/2022081614/5fca06be3e03782d5a524619/html5/thumbnails/33.jpg)
![Page 34: Ontario Ministry of the Environment and Climate Change ... 217826.pdf · Certificate of Property Use has been issued under section 168.6 of the EPA No Filed Record of Site Condition](https://reader035.vdocuments.us/reader035/viewer/2022081614/5fca06be3e03782d5a524619/html5/thumbnails/34.jpg)