only three stations up to = 1.6 re i/3 rei/2 rei/1 rpc re restoration

18
Only Three stations up to = 1.6 RE 1/1 RE 1/2 RE 1/3 RE 2/1 RE 2/2 RE 2/3 RE 3/1 RE 3/2 RE 3/3 RE 4/1 RE 4/2 RE 4/3 No. of chambers 36*2 36*2 36*2 18*2 36*2 36*2 18*2 36*2 36*2 18*2 36*2 36*2 RE i/3 REi/2 REi/1 RPC RE restoration

Upload: nicholas-sanders

Post on 29-Jan-2016

218 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Only Three stations up to  = 1.6 RE i/3 REi/2 REi/1 RPC RE restoration

Only Three stations up to = 1.6 Only Three stations up to = 1.6

RE 1/1

RE 1/2

RE 1/3

RE 2/1

RE 2/2

RE 2/3

RE 3/1

RE 3/2

RE 3/3

RE 4/1

RE 4/2

RE 4/3

No. of chambers 36*2 36*2 36*2 18*2 36*2 36*2 18*2 36*2 36*2 18*2 36*2 36*2

RE i/3

REi/2REi/1

RPC RPC RE restoration

Page 2: Only Three stations up to  = 1.6 RE i/3 REi/2 REi/1 RPC RE restoration

RE 1/1

RE 1/2

RE 1/3

RE 2/1

RE 2/2

RE 2/3

RE 3/1

RE 3/2

RE 3/3

RE 4/1

RE 4/2

RE 4/3

No. of chambers 36*2 36*2 36*2 18*2 36*2 36*2 18*2 36*2 36*2 18*2 36*2 36*2

RPC RPC RE restoration

Page 3: Only Three stations up to  = 1.6 RE i/3 REi/2 REi/1 RPC RE restoration

2011Restore end cap low

2011Restore end cap low

2013Restore end cap high

2013Restore end cap high

a b

RPC RPC RE restoration

Page 4: Only Three stations up to  = 1.6 RE i/3 REi/2 REi/1 RPC RE restoration

CMSSW 1.7.5, three stations

Importance of four stations restoration Importance of four stations restoration

RPC RPC RE restoration

Increasing the number of station the algorithm has a better efficiency and is less affected by noise

Increasing the number of station the algorithm has a better efficiency and is less affected by noise

Page 5: Only Three stations up to  = 1.6 RE i/3 REi/2 REi/1 RPC RE restoration

Built a double station with OR/AND capability

Built a double station with OR/AND capability

Reduce the correlated noise Increase the efficiency at low noise

Reduce the correlated noise Increase the efficiency at low noise

RPC RPC RE restoration

Page 6: Only Three stations up to  = 1.6 RE i/3 REi/2 REi/1 RPC RE restoration

Move actual station 2 to layer 4Move actual station 2 to layer 4

Built a double station for layer 2Built a double station for layer 2

RE 1/1

RE 1/2

RE 1/3

RE 2/1

RE 2/2

RE 2/3

RE 3/1

RE 3/2

RE 3/3

RE 4/1

RE 4/2

RE 4/3

No. of chambers 36*2 36*2 36*2 18*2 36*2 36*2 18*2 36*2 36*2 18*2 36*2 36*2

4th station

RPC RPC RE restoration low

Page 7: Only Three stations up to  = 1.6 RE i/3 REi/2 REi/1 RPC RE restoration

RPC RPC The collaboration

GapsGaps

Chamber mechanics Chamber mechanics Chamber assembly Chamber assembly HPL production HPL production

Chamber assembly Chamber assembly

Integration and logisticIntegration and logistic

Trigger electronicsTrigger electronics

Page 8: Only Three stations up to  = 1.6 RE i/3 REi/2 REi/1 RPC RE restoration

• Table for HPL resistivity measurement re-commissioned in Pavia

• About 200 HPL foils produced and tested last week (yield of 70%) for Phoenix

• The full chain “production-test-cut-surface cleaning” resumed. CMS was involved in the work (Crotty).

• Contacts with GT re-established for the HPL surface cleaning and the gap production. Quotations are available.

• Baseline for gap production is Kodel. However the option of a share between Kodel and GT is being considered.

• Table for HPL resistivity measurement re-commissioned in Pavia

• About 200 HPL foils produced and tested last week (yield of 70%) for Phoenix

• The full chain “production-test-cut-surface cleaning” resumed. CMS was involved in the work (Crotty).

• Contacts with GT re-established for the HPL surface cleaning and the gap production. Quotations are available.

• Baseline for gap production is Kodel. However the option of a share between Kodel and GT is being considered.

RPC RPC Detector

• Design studies for the new station 2 and its integration in CMS well advanced

• Components to be procured in Belgium and China

• Milestone to have an integrated mechanical prototype by the end of the year

• Design studies for the new station 2 and its integration in CMS well advanced

• Components to be procured in Belgium and China

• Milestone to have an integrated mechanical prototype by the end of the year

Page 9: Only Three stations up to  = 1.6 RE i/3 REi/2 REi/1 RPC RE restoration

• KODEL has proved in the past to be capable of producing large amount of high quality gas gaps

• The presence of a group of motivated physicist to follow up the production and QC is an asset for the collaboration

• The interest of Phenix for the KODEL facility put some pressure on the group and it imply some duplication of efforts and infrastructures. This might results in an increase of the cost and in a more complicated schedule

• KODEL has proved in the past to be capable of producing large amount of high quality gas gaps

• The presence of a group of motivated physicist to follow up the production and QC is an asset for the collaboration

• The interest of Phenix for the KODEL facility put some pressure on the group and it imply some duplication of efforts and infrastructures. This might results in an increase of the cost and in a more complicated schedule

RPC RPC Gap production

• GT had a major role in the barrel RPC system production. Production tools are fully operation and are ready to be re-activated

• Logistics is easier in term of transport. Cost is lower ( 10%)

• The manpower load for the QC would be on CERN/European responsibily

• GT had a major role in the barrel RPC system production. Production tools are fully operation and are ready to be re-activated

• Logistics is easier in term of transport. Cost is lower ( 10%)

• The manpower load for the QC would be on CERN/European responsibily

Page 10: Only Three stations up to  = 1.6 RE i/3 REi/2 REi/1 RPC RE restoration

Front-end• VLSI available (some need to be packed)

• Design of the auxiliary OR/AND board ready (Flavio). Five prototypes ordered for testing

• Other FEB test facilities available in Bari

• Baseline for FEB production at Matrix (Italy). Other options are being considered (India, Pakistan) that however require additional investigation and work.

Front-end• VLSI available (some need to be packed)

• Design of the auxiliary OR/AND board ready (Flavio). Five prototypes ordered for testing

• Other FEB test facilities available in Bari

• Baseline for FEB production at Matrix (Italy). Other options are being considered (India, Pakistan) that however require additional investigation and work.

RPC RPC Electronics

Link Boards

• Interest of Warsaw and Lappeenranta groups

• No change in the design.

• Production and quality certification as in the past

Link Boards

• Interest of Warsaw and Lappeenranta groups

• No change in the design.

• Production and quality certification as in the past

Page 11: Only Three stations up to  = 1.6 RE i/3 REi/2 REi/1 RPC RE restoration

RPC RPC Schedule

A short TDR document has been prepared and approved by the institutions. Neeed approval as son as possible. Also some funds are available.

Ready to start HPL production

A short TDR document has been prepared and approved by the institutions. Neeed approval as son as possible. Also some funds are available.

Ready to start HPL production

Page 12: Only Three stations up to  = 1.6 RE i/3 REi/2 REi/1 RPC RE restoration

RPC RPC Cost & contributions

ITEM TOT(kCHF)

RE2/2 (kCHF)

RE2/3 (kCHF)

Detector components

1450 290x2 435x2

Front-end electronics

320 80x2 80x2

Off detector electronics

600 150x2 150x2

HV LV systems 600 150x2 150x2

Services/ infrastructure

350 87.5x2 87.5x2

Cable 280 74.5x2 65.5x2

Logistic CERN 700

Assembly & installation

130 32.5x2 32.5x2

Monitoring 30 7.5x2 7.5x2

4460 872x2 1008x2

Country kCHF Tot

kCHF 2008

Korea 400 400

Pakistan 1250 250

China 500 250

Belgium 800 400

India 800 400

CERN 700 250

4450

Expected contributions. Part can be pledged already in 2008

Expected contributions. Part can be pledged already in 2008

Cost subdivided into the major categories of expenditures.The cost per ring is also given.

Cost subdivided into the major categories of expenditures.The cost per ring is also given.

Page 13: Only Three stations up to  = 1.6 RE i/3 REi/2 REi/1 RPC RE restoration

RPC RPC Cost & contributions

Details Details

Page 14: Only Three stations up to  = 1.6 RE i/3 REi/2 REi/1 RPC RE restoration

RPC RPC Task responsibilities

Item BL CH CN IN IT KL FI PK PL

HPL prod. X X X

HPL QA X X

Gap prod. X

Chamber. mech X

Chamber assem. X X X

Front-end design X

Front-end prod. X X X

HV/LV system X X X

LB design X X

LB prod. X X X X X

Infrastructure X

Overview of the tasks responsibilities (legend: BL=Belgium, CH=CERN, CN=China, IN=India, KL=Korea, FI=Finland, PK=Pakistan, PL=Poland).

Overview of the tasks responsibilities (legend: BL=Belgium, CH=CERN, CN=China, IN=India, KL=Korea, FI=Finland, PK=Pakistan, PL=Poland).

Page 15: Only Three stations up to  = 1.6 RE i/3 REi/2 REi/1 RPC RE restoration

RPC RPC Project coordination chart

Steering Committee (one representative per Institution): Chair S. Park

Project Manager (PM) in Europe and deputy (DPM) in Asia: Iaselli, Hoorani

Technical Coordinator (TC) and deputy (DTC) in Asia: Van Doninck, Pant

Resource Manager (RM): Van Doninck

Steering Committee (one representative per Institution): Chair S. Park

Project Manager (PM) in Europe and deputy (DPM) in Asia: Iaselli, Hoorani

Technical Coordinator (TC) and deputy (DTC) in Asia: Van Doninck, Pant

Resource Manager (RM): Van Doninck

Sub-task groups coordinators:

• HPL I. Crotty

• Gap S. Lee

• Front-end electronics Waqar Ahmed, F. Loddo

• Off detector electronics M. Kudla

• Design & Integration L. Van Lancker, Ishtiaq Hussain

• Chamber assembly M. Tytgat, M. Salah ,Y. Ban

• R&DKODEL (tbd)

• CERN infrastructure A. Sharma

• Commissioning & Installation Hassan Shahzad, India (tbd)

• Services & gas I. Crotty, Belgium

Sub-task groups coordinators:

• HPL I. Crotty

• Gap S. Lee

• Front-end electronics Waqar Ahmed, F. Loddo

• Off detector electronics M. Kudla

• Design & Integration L. Van Lancker, Ishtiaq Hussain

• Chamber assembly M. Tytgat, M. Salah ,Y. Ban

• R&DKODEL (tbd)

• CERN infrastructure A. Sharma

• Commissioning & Installation Hassan Shahzad, India (tbd)

• Services & gas I. Crotty, Belgium

Page 16: Only Three stations up to  = 1.6 RE i/3 REi/2 REi/1 RPC RE restoration

η = 2.1η = 1.6

RE1/1

RE2/1RE3/1

RE4/1

RE4/3

RE4/2

Six chambers are in production by Kodel and we be installed soon

Six chambers are in production by Kodel and we be installed soon

RPC RPC RE restoration high

Page 17: Only Three stations up to  = 1.6 RE i/3 REi/2 REi/1 RPC RE restoration

• Additional R&D on RPC needed

• Develop a detector suitable of operation at 1-10 kHz/cm2

• New Link Board should be designed (smaller boards)

• Additional R&D on RPC needed

• Develop a detector suitable of operation at 1-10 kHz/cm2

• New Link Board should be designed (smaller boards)

However the high region problem should be also considered in the contest future of possible future upgrade for SLHC at higher luminosity

However the high region problem should be also considered in the contest future of possible future upgrade for SLHC at higher luminosity

• Gas re-circulation and HF production to be studied

• Some GIF activities should be resumed with the closed loop gas system

• Prove the filter purification scheme to be effective

• Gas re-circulation and HF production to be studied

• Some GIF activities should be resumed with the closed loop gas system

• Prove the filter purification scheme to be effective

RPC RPC RE restoration high

Page 18: Only Three stations up to  = 1.6 RE i/3 REi/2 REi/1 RPC RE restoration

Final remarksFinal remarks

The new groups (Belgium, India) already very active:

• Belgium is contributing significantly to the detector commissioning

• India ha already built and tested 10 RE2 chambers now at CERN (to be considered as spares for the present detector and future RE4)

• CERN infrastructure (ISR) operational

The new groups (Belgium, India) already very active:

• Belgium is contributing significantly to the detector commissioning

• India ha already built and tested 10 RE2 chambers now at CERN (to be considered as spares for the present detector and future RE4)

• CERN infrastructure (ISR) operational

• Cash flow from funding agencies may be a problem. Need to work out a scheme

• Schedule is very (very) optimistic

• Some construction activities could interfere with detector running at CERN

• Secure more contributions ( INFN?)

• Cash flow from funding agencies may be a problem. Need to work out a scheme

• Schedule is very (very) optimistic

• Some construction activities could interfere with detector running at CERN

• Secure more contributions ( INFN?)