Integrated Project Delivery
“Empowering YOU to deliver WOW projects”
![Page 2: Online Integrated Project Delivery Course](https://reader033.vdocuments.us/reader033/viewer/2022052700/55babc5fbb61eb36528b45e5/html5/thumbnails/2.jpg)
Why not adopt the Toyota Production System for
Construction?
![Page 3: Online Integrated Project Delivery Course](https://reader033.vdocuments.us/reader033/viewer/2022052700/55babc5fbb61eb36528b45e5/html5/thumbnails/3.jpg)
Then we could eliminate the$500 Billion/year of waste in the North American building industry!
![Page 4: Online Integrated Project Delivery Course](https://reader033.vdocuments.us/reader033/viewer/2022052700/55babc5fbb61eb36528b45e5/html5/thumbnails/4.jpg)
A way of THINKING? ….. Culture?
How?
A System?
![Page 5: Online Integrated Project Delivery Course](https://reader033.vdocuments.us/reader033/viewer/2022052700/55babc5fbb61eb36528b45e5/html5/thumbnails/5.jpg)
Lean for Construction is based upon the “Toyota Production System”
It is called Integrated Project Delivery (IPD). It includes two main systems
Last Planner: Collaborative System for Constraint Free Work Flow Target Cost Design: Collaborative System for Design
A way of THINKING about eliminating waste
![Page 6: Online Integrated Project Delivery Course](https://reader033.vdocuments.us/reader033/viewer/2022052700/55babc5fbb61eb36528b45e5/html5/thumbnails/6.jpg)
University of Winnipeg Science Complex& Richardson College for the EnvironmentUniversity of Winnipeg Science Complex
& Richardson College for the EnvironmentThe EVIDENCE shows that IPD works!
200% Productivity … 40% less Capital Cost … 30% less Operating Cost
![Page 7: Online Integrated Project Delivery Course](https://reader033.vdocuments.us/reader033/viewer/2022052700/55babc5fbb61eb36528b45e5/html5/thumbnails/7.jpg)
University of Winnipeg Science Complex& Richardson College for the EnvironmentUniversity of Winnipeg Science Complex& Richardson College for the Environment
Lean is becoming a “New Religion”Lean Construction Communities of Practice
![Page 8: Online Integrated Project Delivery Course](https://reader033.vdocuments.us/reader033/viewer/2022052700/55babc5fbb61eb36528b45e5/html5/thumbnails/8.jpg)
Lean Construction Institute - Canada
![Page 9: Online Integrated Project Delivery Course](https://reader033.vdocuments.us/reader033/viewer/2022052700/55babc5fbb61eb36528b45e5/html5/thumbnails/9.jpg)
Why Integrated Project Delivery
1. The building industry wastes $500 Billion per year2. Lean is a new way of THINKING about collaboration and
continuous improvement3. Integrated Project Delivery (IPD) is a project delivery approach
based upon lean principles 4. Think of it as the Toyota Production SYSTEM for Construction5. IPD includes a collaborative planning system (Last Planner)6. IPD includes a collaborative design system (Target Cost Design)7. IPD has proven results 200-40-308. IPD is supported by the Lean Construction Institute9. LCI - Canada has recently been formed
![Page 10: Online Integrated Project Delivery Course](https://reader033.vdocuments.us/reader033/viewer/2022052700/55babc5fbb61eb36528b45e5/html5/thumbnails/10.jpg)
WOW Projects … Need just 3 Things
1.Team that are capable of a championship performance.
2.System that enables work to flow
3.Collaborate2 to create WOW
![Page 11: Online Integrated Project Delivery Course](https://reader033.vdocuments.us/reader033/viewer/2022052700/55babc5fbb61eb36528b45e5/html5/thumbnails/11.jpg)
TEAM
A team becomes more than just a collection of people when a strong sense of mutual commitment creates
synergy, thus generating performance greater than the sum of the performance of its individual members.
![Page 12: Online Integrated Project Delivery Course](https://reader033.vdocuments.us/reader033/viewer/2022052700/55babc5fbb61eb36528b45e5/html5/thumbnails/12.jpg)
Why not start with a Performance Team?
![Page 13: Online Integrated Project Delivery Course](https://reader033.vdocuments.us/reader033/viewer/2022052700/55babc5fbb61eb36528b45e5/html5/thumbnails/13.jpg)
Moneyball ….. Dispelling the Myth that High Performance Costs More
Billy Bean at LCI Story
![Page 14: Online Integrated Project Delivery Course](https://reader033.vdocuments.us/reader033/viewer/2022052700/55babc5fbb61eb36528b45e5/html5/thumbnails/14.jpg)
University of Winnipeg Science Complex& Richardson College for the EnvironmentUniversity of Winnipeg Science Complex
& Richardson College for the EnvironmentWe need to perform like the Oakland A’s
By build a TEAM by finding undervalued performance the Oakland A’s have consistently outperformed the competition and have demonstrated a new RULE
Rule: There does NOT need to be tradeoffs between cost and performance.
![Page 15: Online Integrated Project Delivery Course](https://reader033.vdocuments.us/reader033/viewer/2022052700/55babc5fbb61eb36528b45e5/html5/thumbnails/15.jpg)
High Performance at Less Cost
The problem with the building industry is that we act like the New York Yankees when it comes to delivering GREEN building projects. We get out our checkbooks buy sexy green technologies, field a team of disintegrated high priced performers that stumble their way to Net 0 energy performance at a significant cost premium. It doesn’t have to be this way!
We need to adopt similar processes as Billy Beane did in baseball or Edward Deming, who proved that “Quality is Free” in the automobile industry.
![Page 16: Online Integrated Project Delivery Course](https://reader033.vdocuments.us/reader033/viewer/2022052700/55babc5fbb61eb36528b45e5/html5/thumbnails/16.jpg)
Integrated Project Delivery
“High Performance at Less Cost”
![Page 17: Online Integrated Project Delivery Course](https://reader033.vdocuments.us/reader033/viewer/2022052700/55babc5fbb61eb36528b45e5/html5/thumbnails/17.jpg)
WOW Projects … Need just 3 Things
1.Team that are capable of a championship performance.
2.System that enables work to flow3.Collaborate2 to create WOW
![Page 18: Online Integrated Project Delivery Course](https://reader033.vdocuments.us/reader033/viewer/2022052700/55babc5fbb61eb36528b45e5/html5/thumbnails/18.jpg)
AIA developed the “Integrated Project Delivery” process
![Page 19: Online Integrated Project Delivery Course](https://reader033.vdocuments.us/reader033/viewer/2022052700/55babc5fbb61eb36528b45e5/html5/thumbnails/19.jpg)
University of Winnipeg Science Complex& Richardson College for the EnvironmentUniversity of Winnipeg Science Complex
Called & Richardson College for the EnvironmentTarget Cost Design
Otherwise there will be waste in rework and waiting!
![Page 20: Online Integrated Project Delivery Course](https://reader033.vdocuments.us/reader033/viewer/2022052700/55babc5fbb61eb36528b45e5/html5/thumbnails/20.jpg)
University of Winnipeg Science Complex& Richardson College for the EnvironmentUniversity of Winnipeg Science Complex
& Richardson College for the EnvironmentTarget Cost Design is
“Integrated Design on Steroids”
Recipe: Minimum Viable Product + Value Management + Real Time Life Cycle Costing
![Page 21: Online Integrated Project Delivery Course](https://reader033.vdocuments.us/reader033/viewer/2022052700/55babc5fbb61eb36528b45e5/html5/thumbnails/21.jpg)
![Page 22: Online Integrated Project Delivery Course](https://reader033.vdocuments.us/reader033/viewer/2022052700/55babc5fbb61eb36528b45e5/html5/thumbnails/22.jpg)
To create Predictable Work Flow
![Page 23: Online Integrated Project Delivery Course](https://reader033.vdocuments.us/reader033/viewer/2022052700/55babc5fbb61eb36528b45e5/html5/thumbnails/23.jpg)
Systems enable Teams to collaborate and get the right work done
![Page 24: Online Integrated Project Delivery Course](https://reader033.vdocuments.us/reader033/viewer/2022052700/55babc5fbb61eb36528b45e5/html5/thumbnails/24.jpg)
WOW Projects … Need just 3 Things
1.Team that are capable of a championship performance.
2.System that enables work to flow3.Collaborate2 to create WOW
![Page 25: Online Integrated Project Delivery Course](https://reader033.vdocuments.us/reader033/viewer/2022052700/55babc5fbb61eb36528b45e5/html5/thumbnails/25.jpg)
Collaborate2
![Page 26: Online Integrated Project Delivery Course](https://reader033.vdocuments.us/reader033/viewer/2022052700/55babc5fbb61eb36528b45e5/html5/thumbnails/26.jpg)
University of Winnipeg Science Complex& Richardson College for the EnvironmentUniversity of Winnipeg Science Complex& Richardson College for the Environment
We need the TEAM to collaborate on setting a challenging but attainable TARGET
![Page 27: Online Integrated Project Delivery Course](https://reader033.vdocuments.us/reader033/viewer/2022052700/55babc5fbb61eb36528b45e5/html5/thumbnails/27.jpg)
The TEAM needs the on right tools and a place for productive work to occur
![Page 28: Online Integrated Project Delivery Course](https://reader033.vdocuments.us/reader033/viewer/2022052700/55babc5fbb61eb36528b45e5/html5/thumbnails/28.jpg)
We also need a virtual work room
![Page 29: Online Integrated Project Delivery Course](https://reader033.vdocuments.us/reader033/viewer/2022052700/55babc5fbb61eb36528b45e5/html5/thumbnails/29.jpg)
University of Winnipeg Science Complex& Richardson College for the EnvironmentUniversity of Winnipeg Science Complex
& IBuilding Information Modeling can help to facilitate collaboration
Warning: BIM is LIKE another language if everyone speaks it, BIM can be GREAT or else it can be a barrier to effective communications
![Page 30: Online Integrated Project Delivery Course](https://reader033.vdocuments.us/reader033/viewer/2022052700/55babc5fbb61eb36528b45e5/html5/thumbnails/30.jpg)
Collaboration enables the right work to be done
in the right order
![Page 31: Online Integrated Project Delivery Course](https://reader033.vdocuments.us/reader033/viewer/2022052700/55babc5fbb61eb36528b45e5/html5/thumbnails/31.jpg)
This sums it up pretty good!
In his book “Quality is Free”, Philip Crosby says it all.
When we confront conventional wisdom that there is a tradeoff between quality and cost with optimism and an open mind we can do so much better!
![Page 32: Online Integrated Project Delivery Course](https://reader033.vdocuments.us/reader033/viewer/2022052700/55babc5fbb61eb36528b45e5/html5/thumbnails/32.jpg)
“The definition of insanity is doing the same thing over and over and expecting different results.”
Albert Einstein
![Page 33: Online Integrated Project Delivery Course](https://reader033.vdocuments.us/reader033/viewer/2022052700/55babc5fbb61eb36528b45e5/html5/thumbnails/33.jpg)
University of Winnipeg Science Complex& Richardson College for the EnvironmentUniversity of Winnipeg Science Complex
& Richardson College for the EnvironmentWOW
Less time, less cost, less risk, higher performance
Technique/Tool: Value Stream Mapping
![Page 34: Online Integrated Project Delivery Course](https://reader033.vdocuments.us/reader033/viewer/2022052700/55babc5fbb61eb36528b45e5/html5/thumbnails/34.jpg)
![Page 35: Online Integrated Project Delivery Course](https://reader033.vdocuments.us/reader033/viewer/2022052700/55babc5fbb61eb36528b45e5/html5/thumbnails/35.jpg)
Online Education ExpertDarren Cannel recently completed his
doctorate with a specialization in E-Learning and teaching online. Having recently retired as the administrator of the Saskatoon Catholic Cyber School, Darren and his team at TADO Group are working with companies like Integrated Designs to create and host E-Learning courses that provide engaging and productive learning experiences.
Darren is working with Murray to create an exceptional online Lean Learning Laboratory experience and training on the Integrated Project Delivery process. Darren is also a Google Certified Instructor, Microsoft Innovative Teacher and Cartoonist.
![Page 36: Online Integrated Project Delivery Course](https://reader033.vdocuments.us/reader033/viewer/2022052700/55babc5fbb61eb36528b45e5/html5/thumbnails/36.jpg)
![Page 37: Online Integrated Project Delivery Course](https://reader033.vdocuments.us/reader033/viewer/2022052700/55babc5fbb61eb36528b45e5/html5/thumbnails/37.jpg)
IPD Facilitation ExpertMurray Guy has spent the last 20 years learning how to deliver high performance projects based upon lean and integrated practices. He sits on the board of the recently formed Lean Construction Institute – Canada, owns and operates Integrated Design, a Project Management and Commissioning company that has experience on 10 IPD projects.
Murray is convinced that Integrated Project Delivery is the key to fixing a broken building industry that wastes $500B per year because of inefficiency and bad behavior. Murray’s goal is to help eliminate this waste and by demonstrating that we can deliver Net 0 buildings at Net 0 additional cost, enabling a transformation to a more sustainable building industry.
The Integrated Project Delivery process has huge potential, but is in serious need of practitioners, which is why he is devoting his time to building capacity in the emerging lean construction industry.
![Page 38: Online Integrated Project Delivery Course](https://reader033.vdocuments.us/reader033/viewer/2022052700/55babc5fbb61eb36528b45e5/html5/thumbnails/38.jpg)
Lab 1 (Sept): How to deliver an IPD project.Lab 2:(Oct) How facilitate the Target Cost Design process.Lab 3: (Jan) How to manage lean construction utilizing the Last Planner System.Lab 4: (Feb) How to manage create collaborative work environments.
We limit course size to 25, so sign-up early and receive the discount!
Sign-up for one or all of our IPD courses & experience the benefits of a Collaborative Online Learning Experience
![Page 39: Online Integrated Project Delivery Course](https://reader033.vdocuments.us/reader033/viewer/2022052700/55babc5fbb61eb36528b45e5/html5/thumbnails/39.jpg)
Empowering YOU to deliver WOW
Our guarantee: If you are not completely satisfied with your experience we will refund
your $$$$$$ [email protected]