online consultation: western alignment and vehicle maintenance and storage facility
DESCRIPTION
Metrolinx and the TTC invite you to participate in an online consultation to learn about a number of new developments and improvements for the project and to share your input on preliminary plans for the Western Alignment and Vehicle Maintenance and Storage Facility for Keele Street to Jane Street. Have your say at thecrosstown.ca.TRANSCRIPT
Western Alignment & Future Vehicle Maintenance and Storage Facility Update
1
Welcome to the OnlineConsultationWestern Alignment & Vehicle Maintenance & Storage Facility Update
Please review the presentation and complete the survey by July 10, 2012.
Western Alignment & Future Vehicle Maintenance and Storage Facility Update
1
Format for Feedback•Pleasecompletetheonlinesurveyatwww.thecrosstown.caby
July 10, 2012
•Aconsultationreporttoinformthedesignerswillbepostedonline at: www.thecrosstown.ca
Western Alignment & Future Vehicle Maintenance and Storage Facility Update
2
Online Consultation Overview Part 1 •CrosstownBackground,KeyDevelopments&ConstructionUpdate
Part 2•NewKeeleStreettoWestonRoadRouting–PreliminaryPlanning
Part 3•VehicleFacility–PreliminaryPlanning
*MetrolinxisbeginningtheMountDennisMobilityHubStudyfortheareaaround the station.
Western Alignment & Future Vehicle Maintenance and Storage Facility Update
3
The Purpose of this Online Consultation
•Provideabriefprojectupdate•Presentproposedchanges&improvementstothealignmentfromKeeleStreettoWestonRoad
•ProvideanoverviewoftheMaintenanceandStorageFacilitylayout&challenges
Most importantly: • Get your input on the Preliminary Planning early in this process. A second community consultation will be held in Fall, 2012
Western Alignment & Future Vehicle Maintenance and Storage Facility Update
4
Presentation Part 1: CrosstownBackground,KeyDevelopments&Construction Update
Western Alignment & Future Vehicle Maintenance and Storage Facility Update
5
What was determined in 2010 KeeletoJaneSectionAstreet-levelLRTalignmentonthefollowingpanelwasapprovedthroughastudy(TransitProjectAssessment)in2010.
Western Alignment & Future Vehicle Maintenance and Storage Facility Update
6
2010Alignment(StreetLevel)
Western Alignment & Future Vehicle Maintenance and Storage Facility Update
7
Whatweheardin2009–2010 Community Concerns were raised during the previous study. The new study will address these:
•TrafficconcernsatBlackCreekDrive
•PedestrianCrossingsatWestonRoad
•PropertyimpactsinthevicinityofWestonRoad
•PlanforCrosstownconnectiontoGOTransit
Western Alignment & Future Vehicle Maintenance and Storage Facility Update
8
KeyProjectDevelopmentssince2010• Anoff-street(elevated) route is now proposed from a portal west ofKeeleStreettoBlackCreek
• UndergroundLRTisnowproposedfromBlackCreektoWestonRoad
• An underground“WestonRd/MtDennisStation”isnowproposed,justeastofWestonRoad
• Protecting for future GO Transit connection
•PreliminaryplansaredevelopingtoretainKodakBuilding
Western Alignment & Future Vehicle Maintenance and Storage Facility Update
9
ProposedNewRouteAlignment–2012•ThisprojectincludesconstructiontoWestonRd/MtDennis
Station to be complete in 2020
•ThetimingandconstructionmethodforWestonRoadtoJaneStreetisTBDthroughfurtherstudy
Western Alignment & Future Vehicle Maintenance and Storage Facility Update
10
PotentialBenefitsoftheNewLRTRouteProposal
•ImproveaccesstotheproposedVehicleMaintenanceandStorageFacility(MSF)• BuildanewundergroundLRTstationnearWestonRoad• Improve pedestrian connections at the newly proposed Station• ProvideanewbusterminalforconnectiontoproposedWestonRoad/MountDennisStation
• PreservetheformerKodakEmployeesBuildingforfuturere-development• ProtectforafutureGOTransittoCrosstownLRTconnection
A new study will now assess the pros and cons of the design changes and identify measurestomitigateanyimpactssuchasthoserelatedto“WestonRd/MtDennis”Station.
Western Alignment & Future Vehicle Maintenance and Storage Facility Update
11
TheEglintonCrosstownPlan2012
•19kmRapidTransitLine(Jane/BlackCreekDrivetoKennedyStation)
•10kmUndergroundTunnel(KeeleAreatoLairdDrive*)
•SRTReplacement,Enhancement&ExtensionfromKennedyStationtoSheppardAvenueEast
•60% faster than bus service today
*ExactalignmentwestofKeeleStreetTBDthroughthisstudy
Western Alignment & Future Vehicle Maintenance and Storage Facility Update
12
TheCrosstown–2012*FinalnumberandlocationofstationssubjecttoProvincialreview
•60%fasterthancurrent bus routes
•15minutesfromKeeleto Yonge
Western Alignment & Future Vehicle Maintenance and Storage Facility Update
13
Implementation•TheKeeletoWestonRd/MtDennis
Station segment is part of the ProvinceofOntario’s$8.4Billioninvestment for Transit expansion in Toronto
• CrosstownPhase1(2011–2020)
– TunnelcontractforKeeletoYongeandKeelesdaleParkBridgearecurrently being tendered for bids
– 6LRTStationsarecurrentlyunderdesign(KeeletoChaplin)
Future Community CentreFutureBridge
Western Alignment & Future Vehicle Maintenance and Storage Facility Update
14
Crosstown Construction Update
•TunnelpreparationworkatBlackCreekandEglintoninKeelesdalePark
•Pilingrigsarebuildingconcretesupport walls for the future west tunnel launch shaft
•Thewestlaunchshaftwillenabletunnelling works in late 2012 towardsAllenRoad
Western Alignment & Future Vehicle Maintenance and Storage Facility Update
15
Presentation Part 2: RouteAlignmentUpdateKeeleStreettoJaneStreet
Western Alignment & Future Vehicle Maintenance and Storage Facility Update
16
Guiding Principles The plans being presented today are conceptual, andwillberefinedoverthecomingmonthsto:
• Minimize impacts to the natural environment
• Reducepropertyimpactsifpossible
• Minimize costs
• Minimize impacts to buildings
• Enhanceaccesstovehiclefacility
Western Alignment & Future Vehicle Maintenance and Storage Facility Update
17
Study Areas
* For future study
*
Western Alignment & Future Vehicle Maintenance and Storage Facility Update
18
2012 – New Proposed Plan/Profile
Western Alignment & Future Vehicle Maintenance and Storage Facility Update
19
Weston Rd / Mt Dennis Station
Western Alignment & Future Vehicle Maintenance and Storage Facility Update
20
Presentation Part 3: Vehicle Maintenance & Storage Facility
Preliminary Planning
Western Alignment & Future Vehicle Maintenance and Storage Facility Update
21
Maintenance and Storage FacilityRequirements
•17hectares(42acres)offlatproperty
•Vacantpropertypreferredorpropertywhichcausesminimaldisplacementofexistingcommercial/industrialactivities
•Ideallyzonedforindustrial/employmentortransportationuse
•ProximitytotheEglintonline–ideallylessthan1kilometre
•IdeallyclosetofutureintersectingLRTlines.
Western Alignment & Future Vehicle Maintenance and Storage Facility Update
22
Maintenance and Storage Facility
Western Alignment & Future Vehicle Maintenance and Storage Facility Update
23
Maintenance and Storage Facility Concept
Western Alignment & Future Vehicle Maintenance and Storage Facility Update
24
BusTerminalTheWestonRd/MtDennisLRTStationwill be connected to anew15-baybusterminal.
Western Alignment & Future Vehicle Maintenance and Storage Facility Update
25
BusRoutesServingtheBusTerminalItisproposedthatthefollowingTTCbusrouteswillservethenewbus terminal:
•19JaneSouth(new)•32EglintonWest•35Jane•35EJaneExpress•71Runnymede•89Weston(localnorthbound)
•89Weston(localsouthbound)•161RogersRd•168Symington•170Emmett(new)•171MountDennis•TTCWheel-Trans
Western Alignment & Future Vehicle Maintenance and Storage Facility Update
26
BusTerminal:MSFSitewithKodakBuilding
EglintonAveW
ExistingBuilding
BlackCreekDr
PhotographyDr
Western Alignment & Future Vehicle Maintenance and Storage Facility Update
27
Study ProcessesTransitProjectAssessment(TPAP)
•The alignment study focuses on the proposed changes to the approvedEglinton-CrosstownLRTplan,andwillassesstheimpacts of the changes using the same assessment factors as the previous study.
•The public will be provided opportunities to review and comment on the assessment of the impacts of the proposed design changes, and measures to mitigate those impacts.
•The impact assessment and results of the study will be documentedinareportfortheEglintonCrosstownLRTProject.
•The Vehicle Facility will also undergo study under the TPAP
Western Alignment & Future Vehicle Maintenance and Storage Facility Update
28
EnvironmentalImpactAssessmentandMitigationoftheProject
•AspartoftheTransitProjectAssessmentProcess(TPAP),theprojectteamwill:
•Documenttheassessmentandevaluation of the impactsoftheprojectontheenvironment;
•Exploreandincorporatemeasures to mitigatenegativeimpactsoftheproject;and,
•Developmeanstomonitororverifytheeffectivenessofmitigationmeasures.
•Theprojectteamincludesnatural,socio-economicandculturalenvironmentspecialistssuchas:
•airquality •geotechnical •safety
•archaeological •healtheffects •naturalenvironment
•economic •heritage •traffic
•fisheries •noise
•Theresultsoftheimpactassessmentwillbedocumentedandreviewedbyvariousgovernmentagenciesand members of the public.
The following display provides a summary of the issues that will be explored.
Western Alignment & Future Vehicle Maintenance and Storage Facility Update
29
EnvironmentalFactorAreas•NaturalEnvironment •CulturalEnvironment •Fisheriesandaquatichabitat •Culturalheritagefeatures •Terrestrialhabitatandspecies •Archaeologicalresources •Speciallydesignatedfeaturesandspecies •Constitutionallyprotectedaboriginalor •Groundwater treatyright •Contaminationproperties
•Socio-EconomicEnvironment •Directimpactsonresidentsandbusinessesincludingthingssuchas: •Displacementofresidences •Displacementofbusinesses •Displacementofcommunityfeatures •Indirectimpactsonresidentsandbusinessesincludingthingssuchas: •Changestonoiselevels–comparingfuture‘donothing’tofuturewiththeproject •Changesinlocalandregionalairqualityandtheimplicationsonhumanhealth •Changestoaestheticenvironment •Changestoaccess,travelpatternsandtraffic
Western Alignment & Future Vehicle Maintenance and Storage Facility Update
30
Alignment & Facility - Consultation ProcessTimelinesOnline Consultation — June26–July10,2012
Consultation #2 — Fall, 2012
•UpdateonAlignment.Respondtoconsultation#1Input
•Update to layout of Vehicle Maintenance & Storage Facility
Western Alignment & Future Vehicle Maintenance and Storage Facility Update
31
The Crosstown Team Please get in touch with usDevinHorne,FrancaDiGiovanni,DeniseJayawardene E-mail:[email protected]: www.thecrosstown.caTel: 416-338-6310Fax:416-397-8193TTY:416-481-2523Visit our West Community Officeat1848EglintonAvenueWest(atDufferin)
Community Office Hours — 2012Monday, Wednesday, Friday: 9:00a.m.–5:00p.m.Tuesday & Thursday: by appointment
Western Alignment & Future Vehicle Maintenance and Storage Facility Update
32
NextSteps•PleasesubmitcommentstotheprojectteambyJuly10th,2012•Refinethepreferredprojectoption•Assesstheprojectimpacts•Developmitigationmethods•Second Public Consultation in Fall, 2012 •Prepare a draft study summary report for public and agency review
THANKYOU!