oneone in-4b objective: to construct a catapult or series of catapults in order to test an...
TRANSCRIPT
INSANER Construction
Day 2
oneIN-4b
Objective: To construct a catapult or series of catapults in order to test an
experimental variable.Core Question: How is the experimental variable accounted for?
Drill: 1. Think about your experimental variable.
2. In your Log Book create a list of variations on your variable.
INSANER Construction
Day 2
oneIN-4b
Once your catapult has been created, what do you
need to do next?
Create your Materials List and Experimental
Procedures
INSANER Construction
Day 2
oneIN-4b
Materials Tips1. Your catapult is one of your materials.2. Include amounts with each of you
items.3. Include only those materials necessary
for the conducting of the experiment. Do not list a data chart as one of the materials.
4. The materials will be referenced in the procedures.
INSANER Construction
Day 2
oneIN-4b
Problem Question : How does the color of the base structure of a catapult affect the distance a marble is launched?
LAUNCH PROCEDURES1. Place the catapult on the floor in an open area.2. Pull the spoon over the fulcrum bar so that 13 cm of
the spoon is in front of the bar. The cup part of the spoon should be upward and towards the back of the carton.
3. Pull the spoon downward so that it is at a 5° angle below the horizontal.
4. Place a marshmallow in the cup part of the spoon.
INSANER Construction
Day 2
oneIN-4b
LAUNCH PROCEDURES5. Release the spoon so that the marshmallow is
launched. 6. Mark the landing point.7. Measure the distance from the catapult to the
landing point. Record this distance in the data chart.
8. Repeat steps 2-7, 4 more times.9. Find the average of the 5 trials. Record the
average in the data chart.10.Paint the carton another color.11.Repeat steps 2-10, 4 more times. (Skip step 11
the last time.)
INSANER Construction
Day 2
oneIN-4b
The Effect of Catapult Base Color on Launch Distance
DISTANCE TRAVELLED (cm)
Event #
Base Color
Trial #1
Trial #2
Trial #3
Trial #4
Trial #5
Average
1 Brown
2 Red
3 Green
4 Aqua
5 Tangerine
INSANER Construction
Day 2
oneIN-4b
Homework1. Create launch procedures.2. Create data chart.3. Make sure that everything is ready
for testing.