ONAP – From the inside looking outThe journey, status and Dublin Release expectations
Catherine Lefevre, AT&T, ONAP TSC Chair
Stephen Terrill, Ericsson, ONAP Architecture Chair
2
Introducing ONAP
ONAP Design Time
ONAP Run Time
Managed Environment
Open/Closed Control Loop
Instantiate/Modify
Exposed APIs
Designers
Onboard
Design
Operations
ONAP provides an automation platform for managing services and resources throughout their entire life cycle.
It provides a reference functional architecture
It provides a reference Component Definition
& Interfaces
It provides reference source code
It provides requirements on the
managed V/P NFs
3
The ONAP Journey
ECOMP OPEN-O
• Successful merge to ONAP
• Established structure
• Established way of working
• Validated with vCPE, vFW/vDNS, vVoLTE blueprints
• Introduced S3P
• Adopt CII badging
• Containerized
• Introduced End-User Authority Group
• Validated with Change Management/Scaling foundations
• Introduced Control loop sub-committee
• Increased standards alignment.
• Validated with more blue prints and use cases i.e. 5G, CCVPN
One Modular Platform
Deployment ReadyOut-of-box
Deployment
Scope under discussion
Expand
• Increase 5G Use Cases
• Footprint Optimization
• Model Driven Control loop
• …
4
Industry Influences
5
How We Currently Work
ONAP Technical Steering Committee
Security
Architecture
Use Case
Modelling
Control LoopCoordinators
Project
LFN GBLFN TAC
StructureSub-committees
Projects & Releases
Projects scope is defined independent of the release. The project decides to contribute to a release.
General Workflow Release Lifecycle
Kickoff
M1 Planning
M2 Functionality Freeze
M3 API Freeze M4 Code Freeze
ReleaseCandidates
RC0RC1RC2
Release
SCT
Our Community Achievements
6
Diversity
Explore / Innovate
End User Adoption
Commercial Ecosystem
DUBLIN – In Progress3,655 changesets310 Authors
CASABLANCA11,307 changesets501 Authors
BEIJING12,604 changesets473 Authors
AMSTERDAM9,819 changesets324 Authors
Dublin Release Expectations
7
Broadband Services
Footprint Optimization
5G Use Cases
Model Driven Control Loop
Further Standards Alignment
PNF Upgrade
PNF Plug n play
Slicing
ETSI-NFVTMF
MEF LSO
Existing Blue Print Evolution
Change ManagementContainer VNF Orchestration
CCVPN
HW Platform Awareness
Challenges & Opportunities
8
Release Cadence
Prioritization
Integration Capacity
End User Advisory Group
What’s Next ...
9
Culture Shift: Maintain Innovation while Performing Continuous Improvement
Engagement Model:Evolve our Subcommittee Scope/Interaction
Vision: Build our 3 Years ONAP Roadmap
s