on time. on target. - · pdf fileon time. on target. ... talegaon bot project in 18 months,...

6
ORIENTAL On time. On target. Oriental Structural Engineers Pvt. Ltd., OSE Commercial Block, Asset 5B, Aerocity, Hospitality District, IGI Airport, New Delhi – 110 037 Tel: 91-11-4604 4604 Email: [email protected] www.orientalindia.com

Upload: trantram

Post on 12-Mar-2018

215 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: On time. On target. -  · PDF fileOn time. On target. ... Talegaon BOT Project in 18 months, (twelve months ahead of schedule) ... and Rajasthan with an investment of ` 2.32

ORIENTAL

On time. On target.

Oriental Structural Engineers Pvt. Ltd.,OSE Commercial Block,Asset 5B, Aerocity,Hospitality District, IGI Airport,New Delhi – 110 037Tel: 91-11-4604 4604Email: [email protected]

ww

w.o

rie

nta

lin

dia

.co

m

Page 2: On time. On target. -  · PDF fileOn time. On target. ... Talegaon BOT Project in 18 months, (twelve months ahead of schedule) ... and Rajasthan with an investment of ` 2.32

One of the leading construction companies,

has worldwide expertise in construction of rigid

and flexible pavements for roads, highways and

airfield. Our expertise extends to bridges, flyovers

and embankments with reinforced earth and

earthwork.

In the 45 years of its existence, OSE has executed

pavement works, both rigid and flexible, at 39

Airfield and major National / State Highway projects

in India and abroad, having executed contracts

for such esteemed clients as the National Highways

Authority of India (NHAI); the Ministry of Road

Transport & Highway (MoRTH); Roads & Highway

Department; Govt. of Bangladesh; the Indian Air

Force; Central Public Works Department; Airports

Authority of India; State Public Works Departments

and reputed corporate bodies such as Reliance

Utility Engineers Pvt. Ltd.; Jaiprakash Associates;

GMR Group; Tata Realty & Infrastructure Ltd.; IL&FS

and IRB Infrastructure Developers Ltd.

OSE's vast experience of constructing a Greenfield

Airport at Lengpui, Mizoram in the far East;

Suratgarh in the West; Trichi in the South; Car

OSE Nicobar Island in the Bay of Bengal and Agatti Island

in the Arabian Sea, bear testimony to its ability to

work in various parts of the country, across diverse

climatic conditions and geographical locations.

ORIENTAL

Oriental Structural Engineers (OSE) is among the leading Indian Highway Construction Companies

Expertise

With a strong legacy spanning over four decades,

OSE has grown to be one of the top players in the

Indian infrastructure space and has created a

brand that is synonymous with High Quality and

Speedy execution.

From the early focus on airport construction, OSE

has successfully completed pavement works at 39

Indian airports. Today OSE has grown to a ` 22

billion business with four main verticals: Highways

EPC, Highways BOT, Mining Development &

Operations, (MDO )and Optical Fibre Cable (OFC)

laying.

Over the years OSE has constructed 7250 lane

kms of highways and has invested over ` 106.43

Billion in the BOT business. The strong financial

base of the Company is reflected in a top line

CAGR of approximately 15% and the consistent

record of cash profitability - which together

ensure that a maximum number of works are

completed before schedule.

OSE continues on this journey of growth and has

set a target to double its top lines by 2018.

OSE is part of the Bakshi Group of Companies, a

Delhi Based industrial group with an annual

turnover of ` 50 Billion

Page 3: On time. On target. -  · PDF fileOn time. On target. ... Talegaon BOT Project in 18 months, (twelve months ahead of schedule) ... and Rajasthan with an investment of ` 2.32

With a record of having completed large and complex projects well within the contracted schedule,

and an unblemished record for timely execution, OSE has been earning bonus for the early

completion of projects.

OSE is proud to have completed Nagpur – Adilabad Section of NH-7 in the State of Maharashtra for

National Highways Authority of India (NHAI) in 25 months, (five months ahead of schedule) in 2001;

DND Flyway (Noida – Delhi Bridge project) in 25 months,(two months ahead of schedule) in 2001;

Kondhali – Talegaon BOT Project in 18 months, (twelve months ahead of schedule) in 2008; and

four-laning of 176 Kms Nagpur – Betul BOT Project in 33 months (9 months ahead of schedule in

2014). OSE earned bonus for early completion of these projects ahead of schedule.

n During the last 18 years OSE executed more than

7250 lane Kms of National and State Highways in

India and abroad.

n OSE was an active participant in the execution of

National Highways Development Programme

(NHDP) of the Government of India, wherein it

successfully completed 4-laning of 9 Contract

Packages of the “Golden Quadrilateral” and

“North-South-East-West Corridor” funded by

World Bank and Asian Development Bank in the

states of Madhya Pradesh, Bihar, Maharashtra

and Uttar Pradesh totaling 410 Kms in Rigid and

Flexible pavements at a total cost of ` 13,500

million. Though there were several stumbling

blocks, particularly the execution of two projects

in the State of Bihar, all these works were

completed on schedule.

n OSE has successfully completed three World

Bank funded projects covering 197 Kms

of National Highways in Bangladesh during

1994-98.

Major Works Executed

n

largest Greenfield Airport project at LENGPUI

in the mountainous terrain of Mizoram in the

North Eastern State of India in a record time of

24 months in 1998, under the most difficult

working and climatic conditions, involving

intricate logistics.

n OSE has completed five (5) State Highway

projects of 360 Kms length for Public Works

Departments in the States of Gujarat, Karnataka,

Kerala, Uttar Pradesh and Tamil Nadu.

n OSE has completed one of its kind Formula-1

Motor Race Track and access roads in Greater

Noida, U.P. for Jaypee Sports International Ltd.,

in a record time of 18 months in 2011. This new

OSE has successfully completed one of the generation 5.14 Km long Race Track was

constructed with the latest international

technology and the latest instruments to

monitor quality of construction.

n OSE has successfully completed rigid and flexible

pavement works for a total length of 85 Kms as a

part of six laning of Yamuna Expressway project

for Jaiprakash Associates Ltd., comprising of

rigid and flexible pavement completed in a

record time of 24 months in 2011.

n OSE has successfully completed 250 Kms of

four-laning projects in the States of Tamil Nadu

and Maharashtra for Reliance Utility Engineers

Pvt. Ltd., and Tata Realty & Infrastructure Ltd.,

respectively. Both the projects were completed

within the stipulated period in 2012.

ORIENTAL

Page 4: On time. On target. -  · PDF fileOn time. On target. ... Talegaon BOT Project in 18 months, (twelve months ahead of schedule) ... and Rajasthan with an investment of ` 2.32

COMPLETED PROJECTS

OSE has successfully commissioned the following

projects under Public Private Participation (PPP) in

the States of Madhya Pradesh, Uttar Pradesh,

Rajasthan, Karnataka and Maharashtra for National

Highways Authority of India and Ministry of Road

Transport & Highways as a Concessionaire on BOT

basis with a total investment of ̀ 106.43 billion.

n REWA Bypass project in the State of Madhya

Pradesh for Ministry of Road Transport &

Highways with an investment of ` 0.50 billion

with 50% participation in July, 2007.

n Four-laning of Kondhali – Talegaon section of

NH-6 (50 Kms) in the State of Maharashtra with

an investment of ̀ 3.20 billion, 11 months ahead

of schedule with 50% participation for National

Highways Authority of India in March, 2008.

n Four-laning of Agra – Bharatpur section of

NH-11 (45 Kms.) in the Sates of Uttar Pradesh

and Rajasthan with an investment of ` 2.32

billion, with 51% participation for National

Highways Authority of India in July, 2009.

n Four-laning of Indore – Khalghat section of NH-3

(72 Kms) in the State of Madhya Pradesh with

an investment of ` 7.75 billion with 100%

participation for National Highways Authority of

India in July, 2009.

n Four-laning of 98 Kms of NH-7 including

construction of Kampte – Kanhan and Nagpur

Bypass in the State of Maharashtra with an

investment of ` 18.50 billion with 100%

participation for National Highways Authority of

India in May, 2012.

OSE Representation in policy making bodies

OSE is actively represented in the following policy-making bodies of Government of India –

(I) On the Executive Body of National Highway Builders Federation (NHBF);

(ii) On the Executive Body of Project Export Promotion Council of India (PEPCI);

(iii) On the Governing Council of Construction Skill Development Council of India (CSDCI);

(iv) On the Board of Directors of Indian Highways Management Co Ltd (IHMCL);

(v) On the Governing Body of Society for Affordable Redressal of Disputes (SAROD) and

(vi) Member of Several Technical Committees of Indian Roads Congress.

n

section of NH-13 in the State of Karnataka with

an investment of ` 16.50 billion with 63.99%

participation for National Highways Authority of

India in November, 2012.

n Four-laning of 175 Kms of Nagpur – Betul

section of NH- 69 in the States of Madhya

Pradesh and Maharashtra with an investment of

` 35.15 billion with 100% participation for

National Highways Authority of India in

September 2014.

n Six laning of 140 Kms of Etawah – Chakeri

section of NH-2 in the state of Uttar Pradesh

with an investment of ̀ 22.51 billion with 100%

participation for National Highways Authority of

India in May, 2016.

CURRENT BOT PROJECTS

OSE is presently executing the following BOT

projects for National Highways Authority of India in

the States of Madhya Pradesh and Uttar Pradesh as

Concessionaire on BOT basis with a total investment

of ̀ 15.83 billion.

n Four laning of Biaora – Dewas section of NH-3

from Km 426.000 to Km566.450 in the State of

Madhya Pradeshunder NHDP Phase-IV on

DBFOT basis with a proposed investment of

` 15.83 billion for National Highways Authority

of India.

CURRENT EPC PROJECTS

OSE is presently executing the following EPC

contracts for MoRTH, IL&FS, IRB Infrastructure

Developers Ltd., for a total value of ̀ 34.36 billion.

n Improvement/widening of two-Laning with

paved shoulder of Udaipur – Sabroom section

from Km 55.00 to Km 128.712 of NH-44 under

SARDP (NE) Phase A in the State of Tripura for

Ministry of Road Transport and Highways for a

value of ̀ 4.98 billion.

Four-laning of 97 Kms of Hungund – Hospet

Participation in BOT Projects

ORIENTAL

The Screening Committee of the Project Exports Promotion Council of India, a Government of India agency under the Ministry of Commerce, has granted clearance to OSE to undertake Road, Highway and Airfield Projects internationally, without any financial limit.

Project Export

n Six-laning of Barwa Adda – Panagarh Section of

NH -2from Km 298.240 to Km 521.120 including

Pamagarh Bypass in the State of Jharkhand

and West Bengal - Package III for IL&LS

Transportation Networks Ltd,. for a value of

` 7.69 billion.

n Six-laning of Eastern Peripheral Expressway

(NH No NE-II) - Package-V from Km 93.000 to

Km 114.000 in States of Haryana and Uttar

Pradesh on ECP mode for National Highways

Authority of India, for a value of ̀ 6.59 billion.

n Six-laning of Agra – Etawah Bypass Section of

NH-2 from Km 199.660 to Km 323.525 under

NHDP Phase V in the State of Uttar Pradesh for

IRB Infrastructure Developers Ltd., for a value of

`15.10 billion.

Page 5: On time. On target. -  · PDF fileOn time. On target. ... Talegaon BOT Project in 18 months, (twelve months ahead of schedule) ... and Rajasthan with an investment of ` 2.32

OSE is a professional body employing, over

180 graduate Engineers, 210 Diploma holders,

as well as qualified financial and administrative

managers with individual experience

extending up to 45 years in some cases.

From a modest turnover of ` 40,000 in 1971

the company achieved a gross turnover of

` 15.74 billion in the year 2014-15 which is

expected to go up to ̀ 22.50 billion in the year

2017-18. OSE currently owns equipment worth

` 5.00 – 6.50 billion, has more than 3,000 lane

Kms of BOT roads with ` 106 billion of road

assets.

OSE attributes this success to:

n Effective teamwork of our dedicated

Engineers and Technicians;

n Zeal to develop new techniques enabling

early completion of projects, while

maintaining a high level of quality, at the

minimum possible costs; and

n Ability to stay abreast of the latest

developments in our field of expertise, and

employing the latest technologies at

projects.

and still growing...

OSE has the distinction of executing more than three million cubic meters of Bituminous Pavement work;

four million cubic meters of Cement Concrete Pavement work; fourteen million cubit meters of Base & Sub

Base Courses; one hundred twenty million cubic meters of Earthwork in sub-grade & embankments, and

huge quantities of Reinforced Earth Walls on National Highways / Expressways, State Highways, and

Airfield Runways, Taxiways, Aprons & Parking bays.

In addition, OSE has constructed RCC / PSC bridges, involving well and pile foundations and cross drainage

works, in the course of its 45 years of existence, employing the most modern and sophisticated plant and

machinery, and the latest technologies.

OSE has successfully completed Construction, Strengthening and Resurfacing of runway / taxiway / apron

with flexible / rigid pavements at the following airfield to the complete satisfaction of all its customers:

1. AGARTALA

2. AGATTI

3. AHMEDABAD

4. AURANGABAD

5. AIZAWL

6. AMRITSAR

7. BHATINDA

8. BHUBANESHWAR

9. BHUJ, GUJARAT

10. BIKANER (NAL)

11. BOMBAY

12. CALCUTTA

13. CALICUT

14. CARNICOBAR

15. COCHIN

16. DELHI

17. DOOM DOOMA

18. DIMAPUR

19. FURSATGANJ

20. GAYA

21. GUWAHATI

22. HASHIMARA

23. IMPHAL

24. JAGDALPUR

25. JAMNAGAR

26. JORHAT

27. KHAJURAHO, M.P.

28. KULLU, H.P.

29. LILABARI, ASSAM

30. LENGPUI, MIZORAM

31. MOHANBARI, ASSAM

32. NASHIK, MAHARASHTRA

33. PATNA

34. RANCHI

35. SILCHAR, ASSAM

36. SHIMLA

37. SURATGAR, RAJASTHAN

38. TEZPUR, ASSAM

39. VARANASI

AchievementsORIENTAL

Page 6: On time. On target. -  · PDF fileOn time. On target. ... Talegaon BOT Project in 18 months, (twelve months ahead of schedule) ... and Rajasthan with an investment of ` 2.32

OSE has embarked upon Coal Mining projects with a vision to establish

itself as a Mine Development Operator. Currently OSE has bagged four coal

mining projects from Bharat Coaking Coal Ltd., and Mahanadi Coalfields.

for a total value of ̀ 120.00 billion for extraction of 16.98 million MT of Coal

and removal of 61.55 million CM of over burden.

OSE has experience of laying 355 Kms of Optical Fibre Cables on its own

highway projects and has bagged similar projects worth ` 386.50 million

for a total length of 924 Kms in the State of Rajasthan from

Telecommunication Consultants India Ltd.

In August, 2008 OSE established its mining and quarrying operations by

incorporating Oriental Quarries & Mines Pvt. Ltd. (OQMPL) as its

subsidiary. Subsequently, in April, 2009 a Joint Venture was entered into

between OSE and Ackermans & Van Haaren (AvH), a Belgium based

investment Company, on a share holding of 50:50 basis. OQMPL has

commenced mining and quarrying operations in Rajasthan, Madhya

Pradesh and Tripura by installing three crushing units with an installed

capacity of three million tonnes per annum. It has a target to achieve six

million tonnes per annum by the year 2017. Another crushing unit has

become operational in Karnataka. During the year 2009-10 the crushing

units in Rajasthan and Madhya Pradesh have produced aggregates of

various sizes amounting to 1.2 million metric tonne and sold 1.30 million in

the market.

AvH is a listed company with Euronext Brussels is active in various sectors

such as Dredging, General Contracting, Real Estate, Financial Services and

Private Equity. AvH has recently become active in exploitation, processing,

distribution and sale of industrial minerals and aggregates.

OSE, through its associate company, SWETA Estates Pvt. Ltd., has

embarked upon the development of large Residential and Commercial

Complexes and Five Star Hotels in the National Capital Region of Delhi

under the brand name of Central Park. It has developed expertise in

construction of high quality mass housing complexes using precast

technology. Tilting tables were used in casting of elements. By 2017 SWETA

Estates Pvt. Ltd., have a target to construct 200,000 high quality mass

housing units per year.

The futureDiversification

ORIENTAL

Our Clientele

n

India n Airports Authority of Indian Ministry of Road Transport &

Highways (Govt. of India)n Road Highway Dept., Ministry

of Communication (Govt. of Bangladesh)

n Public Works Depts. of various States in India;

n Jaiprakash Associates Ltd.n Reliance Utility Engineers Pvt.

Ltd.n Delhi International Airport Ltd.

(GMR group) n JPSK Sports Pvt. Ltd.

(Jaiprakash Associates Ltd.) n Tata Realty & Infrastructure Ltd.

etc.n IL&FS Transport Networks Ltd.n IRB Infrastructure Developers

Ltd., etc.

National Highways Authority of

With its strong financial base, invaluable experience in

the execution of highway projects in India and abroad,

and the vast resources of trained manpower and

modern Plant and Machinery at its disposal, OSE is

looking ahead to procure large projects in the areas of

Water Treatment & Distribution, Airports, Railways and

Hydroelectric Power Generation on Public Private

Partnership basis with substantial investment in the

form of equity participation.

OSE reaffirms its commitment of completing projects

ahead of schedule, to valued customers who have

bestowed their faith in the company, as is evident from

the repeat projects awarded to OSE time and again.

OSE proposes to invest more than ` 50 billion in

forthcoming infrastructure projects in India and abroad

within a span of 3-5 years.