Page 1: On-Site Leaching Chamber Specifications & Features

1

On-Site Leaching Chamber Specifications & Features

Design & Installation Manual – North Carolina

Page 2: On-Site Leaching Chamber Specifications & Features

1

Page 3: On-Site Leaching Chamber Specifications & Features

2

•This manual provides general design and installation information for Arc/BioDiffuserLeachingChambers.

•Thismanual containsabriefdescription foreachchambermodeland generaldesignandinstallationprocedures.Formoredetailedinformation pleasecontactcustomerserviceat1-800-733-0535.

•ForCADdrawings,refertoourwebsite:www.arc-chamber.com.

•AllArc/BioDiffuserchamberconfigurationsandinstallationsmust complywithstateandlocalrules.

ContentsIntroduction 2

ProductSpecifications

Arc36System 4

Arc36HCSystem 6

11"StandardSystem 8

Arc24System 10

Bio3System 12

InstallationInstructions 14-15

StandardInstallations 16-17

AdditionalSystemConfigurations 18-21

SerialConfiguration 18

SerialConfiguration-SidePortCoupler 19

FillSystem 19

PumpSystem-PressureDistribution 20

PumpSystem-PressureDispersal 21

SystemSizingCharts 22-23

Page 4: On-Site Leaching Chamber Specifications & Features

3

FPO

Arc36HCSystem•34"WideChamber•NewLightweightDesignwith ArticulatingJoints• H–10 load rated with proper installation.•SeePages6-7

Arc36System•34"WideChamber•NewLightweightDesignwith ArticulatingJoints• H–10 load rated with proper installation.•SeePages4-5

Bio3System•22"WideChamber•H–10 load rated with proper installation.•SeePages12-13

Arc24System•22"WideChamber•New Lightweight Design with Articulating Joints and Pivot LockoutFeature•H–10 load rated with proper installation.•SeePages10-11

11"StandardSystem•34"WideChamber•H–10 load rated with proper installation.•SeePages8-9

INCLUDEDSYSTEMS

Page 5: On-Site Leaching Chamber Specifications & Features

4

Beforebeginninginstallation,pleasenotethefollowingengineeredfeaturesoftheArc36modelchambersandendcaps.

Arc36System•Each chamber end is either marked “Dome” or “Post” on the roundobservation/ventknockoutports.Theseindicatedirectionof assembly,domeoverpost.

60"EffectiveLength 34"

Arc36ChamberLength 63"

RepeatLength 60"OverallWidth 34"

SidewallHeight 7.13"OverallHeight 13"

Capacity 8.04cuft(60.14gal)

Calculationsanddimensionsarenominal

Arc36Chamber—Top,Side,andEndViews(nottoscale)

Arc36EndCap—Side,andEndViews(nottoscale)

ArC36SYSTEM

Page 6: On-Site Leaching Chamber Specifications & Features

5

Arc36SidePortCoupler(SPC)•SPC component snaps in place to allow side entry atanyjointthroughoutthetrenchline.Thisaccessoryprovides avarietyofdesignandinstallationoptions.Refertopages17 fordesignconfigurations.

Arc36Features•The post and dome creates a positive lock securing the chambersforfinalengagement.Lockanddropfeaturefor fasterinstallation.•TheArc36chamberfeetaredesignedwithanextralarge surfaceareatoprovidesupport,particularlyinsandysoils.•Sidewall louversaredesigned toalloweffluent toexit the chambersidewallsinhighflowsituations,whilepreventing soilsfrommigratingintothechambervoid.•Observation/venting knockout ports provide for inspection ofsystemperformanceaswellasaconvenientlocationfor drainfieldventilationpipes.•Eachchamberendhassmallknockoutsontheroofpositioned inthe“Post”endjoint.Whenremoved,theseknockoutsallow fortheuseofziptiestosupportpipingindosingsystems.

Arc36UniversalEndCap•UpperandlowerknockoutsaccommodatebothSchedule 40 and SDR 35 piping. Dimples are also offered for thepositioningofholesawpilotdrills.•Endcapsaredesignedtoattachtothechamber’sdomeor postendinthesamefashionforeachendwiththeArc36 logofacingoutward.

Arc36SwivelFeature•The engagement mechanism of the Arc 36 chamber is designedtoallowforapivotbetweenjoinedchambersofupto 10°ineitherdirection.

Arc36SystemConfigurations•TrenchInstallation:Page16•BedInstallation:Page17•AdditionalConfigurations:Pages18-21

•ObservationPort

ArC36SYSTEM

•LockandDrop •LouversandFeet

Page 7: On-Site Leaching Chamber Specifications & Features

6

Beforebeginninginstallation,pleasenotethefollowingengineeredfeaturesoftheArc36HCmodelchambersandendcaps.

Arc36HCSystem

60"EffectiveLength 34"

Arc36HCChamberLength 63"

RepeatLength 60"OverallWidth 34"

SidewallHeight 7.13"OverallHeight 13"

Capacity 8.04cuft(60.14gal)

Calculationsanddimensionsarenominal

Arc36HCChamber—Top,Side,andEndViews(nottoscale)

Arc36HCEndCap—Side,andEndViews(nottoscale)

ArC36HCSYSTEM

Page 8: On-Site Leaching Chamber Specifications & Features

7

Arc36HCFeatures•The post and dome creates a positive lock securing the chambersforfinalengagement.Lockanddropfeaturefor fasterinstallation.•TheArc36HCchamberfeetaredesignedwithanextralarge surfaceareatoprovidesupport,particularlyinsandysoils.•Sidewall louversaredesigned toalloweffluent toexit the chambersidewallsinhighflowsituations,whilepreventing soilsfrommigratingintothechambervoid.•Observation/venting knockout ports provide for inspection ofsystemperformanceaswellasaconvenientlocationfor drainfieldventilationpipes.•Each chamber end has small knockouts on the roofpositioned in the “Post" end joint. When removed, theseknockoutsallowfortheuseofziptiestosupportpipingindosingsystems.

Arc36HCUniversalEndCap•UpperandlowerknockoutsaccommodatebothSchedule 40 and SDR 35 piping. Knockouts can be removed with a knife or hole saw. Dimples are also offered for thepositioningofholesawpilotdrills.•Endcapsaredesignedtoattachtothechamber’sdomeor postendinthesamefashionforeachendwiththeArc36 logofacingoutward.

•ObservationPort

ArC36HCSYSTEM

•LockandDrop •LouversandFeet

Arc36HCSwivelFeature•The engagement mechanism of the Arc 36 chamber is designedtoallowforapivotbetweenjoinedchambersofupto 10°ineitherdirection.

Arc36HCSystemConfigurations•TrenchInstallation:Page16•BedInstallation:Page17

Arc36HCSidePortCoupler•SidePortCouplercomponentsnapsinplacetoallowsideentry atanyjointthroughoutthetrenchline.Thisaccessoryprovides avarietyofdesignandinstallationoptions.Refertopages22 and23fordesignconfigurations.

Page 9: On-Site Leaching Chamber Specifications & Features

8

Beforebeginninginstallation,pleasenotethefollowingengineeredfeaturesofthe11"Standardmodelchambersandendcaps.

11"StandardSystem• Each chamber end is either marked “Dome” or “Post” on the roundobservation/ventknockoutports.Theseindicatedirectionof assembly,domeoverpost.

11"StdChamberLength 76"

RepeatLength 75"OverallWidth 34"

SidewallHeight 6.35"OverallHeight 11"

Capacity 9.21cuft(68.42gal)

Calculationsanddimensionsarenominal

75"EffectiveLength 34"

11"STANDArDSYSTEM

11"StandardChamber—Top,Side,andEndViews(nottoscale)

11"StandardEndCap—Side,andEndViews (nottoscale)

Page 10: On-Site Leaching Chamber Specifications & Features

9

11"StandardFeatures•The post and dome creates a positive lock securing the chambersforfinalengagement.•The11"Standardchamberfeetaredesignedwithanextra largesurfaceareatoprovidesupport,particularlyinsandy soils.•Sidewall louversaredesignedtoalloweffluent toexit the chambersidewallsinhighflowsituations,whilepreventing soilsfrommigratingintothechambervoid.•Observation/ventingknockoutportsprovideforinspectionof systemperformanceaswell as a convenient location for drainfieldventilationpipes.•Each chamber end has small knockouts on the roof positioned in the “Post" end joint.When removed, these knockoutsallfortheuseofziptiestosupportpipingindosing systems.

11"StandardUniversalEndCap•UpperandlowerknockoutsaccommodatebothSchedule 40 and SDR 35 piping. Dimples are also offered for thepositioningofholesawpilotdrills.•Endcapsaredesignedtoattach thechamber’sdomeor postend.

11"StandardSystemConfigurations•TrenchInstallation:Page16•BedInstallation:Page17•AdditionalConfigurations:Pages18-21

•Interlockingjoint •LouversandFeet

•ObservationPort •ZipTieKnockouts

11"STANDArDSYSTEM

Page 11: On-Site Leaching Chamber Specifications & Features

10

Arc24System•Each chamber end is either marked “Dome" or “Post” on the roundobservation/ventknockoutports.Theseindicatedirectionof assembly,domeoverpost.

Beforebeginninginstallation,pleasenotethefollowingengineeredfeaturesoftheArc24modelchambersandendcaps.

Arc24ChamberLength 67"

RepeatLength 60"OverallWidth 22"

SidewallHeight 7.5"OverallHeight 12"

Capacity 5.02cuft(37.5gal)

Calculationsanddimensionsarenominal

60"EffectiveLength 22"

ArC24SYSTEM

Arc24EndCap—Side,andEndViews(nottoscale)

Arc24Chamber—Top,Side,andEndViews(nottoscale)

Page 12: On-Site Leaching Chamber Specifications & Features

11

Arc24Features•Baseflangesonthechambersendsoverlockduringfinal engagementtoformaverystrongjoint.•TheArc24chamberfeetaredesignedwithanextralarge surfaceareatoprovidesupportparticularlyinsandysoils.•Sidewall louversaredesignedtoalloweffluent toexit the chambersidewallsinhighflowsituations,whilepreventing soilsfrommigratingintothechambervoid.•Observation/ventingknockoutportsprovideforinspectionof systemperformanceaswell as a convenient location for drainfieldventilationpipes.•Each chamber end has small knockouts on the roof positioned in the “Post” end joint.When removed, these knockoutsallfortheuseofziptiestosupportpipingindosing systems.

Arc24EndCap•UpperandlowerknockoutsaccommodatebothSchedule 40 and SDR 35 piping. Dimples are also offered for thepositioningofholesawpilotdrills.•Endcapsaredesignedtoattachthechamber’sdomeor postend.

Arc24SystemConfigurations•TrenchInstallation:Page16•BedInstallation:Page17•AdditionalConfigurations:Pages18-21

•OverlockingEnds •LouversandFeet

•ObservationPort •ZipTieKnockouts

ArC24SYSTEM

Arc24SwivelFeature•Eachchamber’spostendhasswivellockouttabsateitherbaseflange.Whenremoved,theincomingchamberwillturnuptotendegreesinthedirectionoftheremovedlockouttab.Withoutremovaloftheswivellockouttab,thechamberswillaligninastraightpattern.•Swivellockouttabsmayberemovedwithastrikingblowtothetabandthenpeelingofftheremainingpieceofplastic.

Arc24SidePortCoupler(SPC)•SPC component snaps in place to allow side entry atanyjointthroughoutthetrenchline.Thisaccessoryprovides avarietyofdesignandinstallationoptions.Refertopage17for designconfigurations.

Page 13: On-Site Leaching Chamber Specifications & Features

12

Beforebeginninginstallation,pleasenotethefollowingengineeredfeaturesoftheBio3modelchambersandendcaps.

Bio3System•Each chamber end is either marked “Dome” or “Post” on the roundobservation/ventknockoutports.Theseindicatedirectionof assembly,domeoverpost.

Bio3ChamberLength 87"

RepeatLength 86"OverallWidth 22"

SidewallHeight 9.03"OverallHeight 12"

Capacity 8.5cuft(62.8gal)

Calculationsanddimensionsarenominal

86"EffectiveLength 22"

BIO3SYSTEM

Bio3EndCap—Side,andEndViews(nottoscale)

Bio3Chamber—Top,Side,andEndViews(nottoscale)

Page 14: On-Site Leaching Chamber Specifications & Features

13

Bio3Features•Baseflangesonthechambersendsoverlockduringfinal engagementtoformaverystrongjoint.•TheBio3chamberfeetaredesignedwithanextralarge surface area to provide support, particularly in sandy soils.•Sidewalllouversaredesignedtoalloweffluenttoexitthe chambersidewallsinhighflowsituations,whilepreventing soilsfrommigratingintothechambervoid.•Observation/ventingknockoutportsprovideforinspection ofsystemperformanceaswellasaconvenient location fordrainfieldventilationpipes.•Each chamber end has small knockouts on the roof positionedinthe“Post”endjoint.Whenremoved,these knockoutsall for theuseofzip ties tosupportpiping in dosingsystems.

Bio3UniversalEndCap•UpperandlowerknockoutsaccommodatebothSchedule 40 and SDR 35 piping. Dimples are also offered for thepositioningofholesawpilotdrills.•Endcapsaredesigned toattach thechamber’sdomeor postend.

Bio3SystemConfigurations•TrenchInstallation:Page16•BedInstallation:Page17•AdditionalConfigurations:Pages18-21

•InterlockingJoint •LouversandFeet

•ObservationPort •ZipTieKnockouts

BIO3SYSTEMS

Page 15: On-Site Leaching Chamber Specifications & Features

14

Preparation•Excavatetoproperwidthanddepthasdescribedinthesystem plans, design and/or permit. All excavationsmust complywithstateand local rulesaswell as theappropriateNCDENRsystemapproval.

•Smoothirregularitiesintheexcavationandclearrocksand debris from the bottom surface area. For trenchinstallations,thebottomisrecommendedtobelevel,butnogreaterthanone-inchoffallisallowedper100feet.Forbedinstallations,thebottomshallbelevelandthereshallbea1-3 inchseparationbetweenchamber linesmeasuredfromtheedgeofthechamber.

Installation•Installation of the any ADS/Hancor Arc/BioDiffuserleachingsystembeginswithlayingthefirstchamberontothepreparedbottomsurfacearea,withthe“dome”endofthechamberattheheaderendoftheexcavation.Eachadditionalincomingchamberistheninstalledbyplacingitsdomeoverthepostofthechamberalreadyinplace.

A slight tug of the chamberwill “lock” the joint to thepreviously installedchamber.Once“lock”engagementoccurs,“drop”(lower)theincomingchamberintoplace.

•As the incoming chamber is lowered down onto theexcavationbottom,thetwochambersfullyengageinastraight-linepatterncreatingaverystrongjoint.

Note:ifthefollowingchamberissimplylaidontotheprecedingchamberthejointwillnotbefullyengaged.Turns•TheArc36andArc24chambersaredesignedwithanarticulatingjointthatallowsforaturnofupto20°,withmaximumof10°ineitherdirection.

Turns (continued)(Note:TheArc24isdesignedwithlockouttabs)

•Ifa turnapplication isdesiredwith theArc24chamber,the lockout tab shouldbe removedbefore installing theincomingchamber.Thelockouttabislocatedatthebaseflangeof thepreviously–installedchamber (on its “Post”end).

InstallationofEndCaps&PipeConnections•Prior to installing end caps, remove the appropriateknockout for pipe connections. Snap an end cap oneach end of the drain lines with the product orcompany logo facing out (knockouts can be removedwithaknifeora4"holesaw).

•Upperendcap4"knockouts—shallalwaysbeusedasinletforeachline.Afour-inchholesawmaybeused.

•Lower end cap 4" knockouts—may be used to createturns in the drain lines greater than the ten degreesprovidedbythechamberswivelfeature.

SplashPlates•Splashplatesareoptionaloneachinletendcapforgravitydeliveryofeffluent.

•Company-providedsplashplatesare installedbysimplyaligningtheholesonthesplashplatewiththecorrespondingdimplesontheendcapandsnappingintoplace.

•Splashplatesaresoldseparately.•A custom "receivingarea" is requiredonallBioDiffuser/ARCchambersystemswhereeffluent isprovidedtothesystemunderpressure(seepages20&21).

ArC/BIODIFFUSErLEACHINGSYSTEMS:INSTALLATIONPrOCEDUrES

Page 16: On-Site Leaching Chamber Specifications & Features

15

•Modestly compact the sidewall area backfillmaterial by simply walking down the sides of thechambers. Sidewall compaction is important tobeginthestabilizationprocessofthesoil,tosupportthe chamber sidewalls, and help prevent fine sandmigration into thechamber louvers.Thisproceduremaybeaccomplishedanytimeduringtheinstallationorcoveringprocess.

•All ARC chambers are H-10 load rated. Wherevehicular loading is anticipated during installation ofthesystemorconstructionofthefacility,H-10loading(16,000 lbs/axle) is achieved by backfilling with aminimumof12"ofproperlycompactedcover.•Do not drive heavy equipment over a system comprisedofnon-compactedcovermaterialwithout first bridging the excavation. Use lightweight or trackedequipmenttopushthesoilontothesystemto theproperheightsetforthbylocalandstatecodes.

FinalGrade •Make certain that storm water runoff is divertedawayfromthedrainfield.Systemfinalgradeshouldbe crested or sloped, never left flat or concave.Channelwaterawayfromthedrainfield.

•Final grading subcontractors and landscapersshouldbealertedandinstructedtopropercoveringprocedures, cover materials, and finish contoursandelevations.

•Finalgradematerialshouldbeshapedandsmoothedwithminimumequipmenttraffictohelpmaintainanaerobicstateinthedrainfield.

•Stabilize the drain field area with grass-typevegetationpriortoheavyrainsifpossible.

FilterFabricThe use of filter fabric is recommended, and may berequired,incertainsoilconditions.Ifused,drapethefabrictocompletelycoverthelouveredsidewallsofthechamberstopreventsoilintrusion,whileallowingwaterandairtopassthrough.

The followingsingleor combinationof conditionswarranttheuseoffilterfabric:•Thebackfillmaterialisfineorveryfineuniformsand.•Thedrainfieldwillbeleftuncovered.•Thedrainfieldwill notbeprotected fromsurface runoffdrainage,(i.e.downspouts,barrel-tileroofs,pavedareas,andneighboringproperty).

•Thebottomof thedrainfieldwill be less than12" fromseasonalhighwaterlevel.

•Filter fabric shall meet the following specifications andcan be purchased from your ADS/Hancor BioDiffuserdistributors:

•Fabric:Spunbonded,madeupofnylonfibers,hydrophilicinnature.

•Weight:0.35–1oz/yd2•AOS:20-30U.S.Sieve(ASTND4571)

VentilationDrainfieldventilationisrecommended,butnotrequired,toallowoxygentoaccessthedrainfieldespeciallywhencoversoilqualityisquestionable.•Knockouts are provided on the 11" Standard,Arc 36, andBio3chambers.Thedome/postfeatureoftheArc 24 chamber also acts as a knock-out for observation/ ventports.HereaPVCpipemaybeintroducedintothe chamberandventedtoatmosphere.•Makecertainthatventsareassembledinsuchafashionastopreventrainwaterfromenteringandeffluentfromexitingthechamberline.

•Severaloutletproductsareavailableforthispurpose.

Backfilling • Afterchamberassemblyiscompleted,fillthatarea adjacenttothelouveredsidewallwithloosesoilthatis freefromclodsorrocks.

ArC/BIODIFFUSErLEACHINGSYSTEMS:INSTALLATIONPrOCEDUrES

Page 17: On-Site Leaching Chamber Specifications & Features

16

TypicalTrench:CrossSection

36"Typ

34"

6"Min

Walk-inCompactedFill

Backfill

Schedule40

SepticTankD-Box

InspectionPorts EndCapsMustbeInstalledonBothEndsofEveryChamberRow

MinimumCenter-to-CenterSpacingAsPerApproval-9'for34"WideChambersand7'for22"WideChambers

TypicalInstallation:I.TrenchConfiguration•Thetypicalinstallationisutilizedonlevelsites.

TypicalTrench:PlanView

Page 18: On-Site Leaching Chamber Specifications & Features

17

TypicalInstallation:II.BedConfiguration

TypicalBed:CrossSection

36"Typ

34"

6"MinTopsoil

Backfill

TypicalBed:PlanView

Schedule40

SepticTankD-Box

InspectionPortsEndCapsMustbeInstalledonBothEndsofEveryChamberRow

1-3"SeparationBetweenIndividualChamberRows

Page 19: On-Site Leaching Chamber Specifications & Features

18

AdditionalConfigurations:I.SerialConfiguration–Direct(EndCap-to-EndCap)•Thisconfigurationisinstalledonslopingorlevelsites.

36"Typ34"

6"MinTopsoilBackfill

Schedule40

InspectionPorts

MinimumCenter-to-CenterSpacingAsPerApproval-9'for34"WideChambersand7'for22"WideChambers

MinimumCenter-to-CenterSpacingAsPerApproval-

9'for34"WideChambersand7'for22"WideChambers

CrossoverPipeShallBeInstalledonStableUndisturbedBedding

SerialtoDirect:CrossSection(level)

SerialtoDirect:PlanView

SerialtoDirect:CrossSection(slope)

SepticTank

EndCapsMustbeInstalledonBothEndsofEveryChamberRow

CrossoverPipeShallBeInstalledonStableUndisturbedBedding

Page 20: On-Site Leaching Chamber Specifications & Features

19

Schedule40

EndCap

FromSepticSystem

ARCSidePortChamber

MinimumCenter-to-CenterSpacingAsPerApproval-9'for34"WideChambersand7'for22"WideChambers

CrossoverPipeShallBeInstalledonStable,UndisturbedBedding

AdditionalConfigurations:II.SerialConfiguration–SidePortCouplertoSidePortCoupler(SPCtoSPC)

AdditionalConfigurations:III.FillSystem

34"Typ

Topsoil

3'to9'Center-to-Center

DepthPerDesignFillPerSpec

Break-UpandMixNativeSoilPerDesign

Native Soil

6"Minimum1:3Gradient(Typ.)

FillSystem:SectionView

Notes:• FillsystemstypicallyfoundinthecoastalplainregionofNCinaGroupIsoil.• Therise:runratiodepictedintheconfigurationaboveis1:3.ForGroupII,III,andIVtheratiois1:4.• Removelayersofvegetation(i.e.grass)andproperlyincorporate/mix(homogeneous)suitablefillmaterial withthenaturalsoilsurfaceattheinterface.• Atleast6-inchesofGroupIIand/orGroupIIIsoilcoverisrequiredtopromotevegetativegrowthandreduce erosion.

Page 21: On-Site Leaching Chamber Specifications & Features

20

AdditionalConfigurations: IV.PumpSystems:PressureDistribution–Highflowdissapationisrequiredonallofthesesystems–Approvedpressuredistributiondevicemethodsincludepressuremanifold,flowsplitteranddistributionbox.

PrESSUrEDISTrIBUTION:INSTALLATIONINTrUCTIONSFOrrECEIVINGArEA,OBSErVATIONPOrT,ANDVENTPIPE

20"GravelPad

Useof3"orSmallerPVCasInletRequiresUseofAppropriateHoleSaw.

PressureDistribution:receivingArea•Thisspecificationisrequiredforalldosedsystems.

PositionPVCInlet/HeaderPipeThroughUpperEndCapKnockoutandAttachElbow(90°)Fitting.Cen-teroftheElbowShallbeLocatedInsidetheCenterofthe“ReceivingArea,"PointingDownward. 16"x16"ConcretePaver

orApprovedEquivalent

BackgroundSystems utilizing pressure dosingmust be inspected priorto final backfill, and vented. Because effluent entering achamberlineunderpressuremaydisturbthebiomatonthetrench bottom infiltrative surface, a “receiving area “mustbecreatedtodissipatethisflow.Wheninstallingapressuredosedsystem,thefollowingstepsmustbeperformed.

SidePortCoupler(SPC)• Inordertoprovideforanobservationportdirectlyabove thereceivingarea,aSPC,withanendcap,mustbeusedontheinletendofeachchamberline.

receivingArea• TheContractorshallpreparea“receivingarea”bycenteringa16”x16”concretepaver(oranapprovedequivalent)overa20”x20”x2”deepgravel(washedstone)bed.This“receivingarea”shallbeginwheretheendcapisplacedagainsttheSPC.

InletPipe• A1-1/2" to3"PVCpipeshallbeusedasan inletpipe.Thecontractormustuseanappropriate-sizedholesawtocreateanentranceholeforthe1-1/2"to3"PVCinletpipeintheendcap.

• The inlet pipe shall endwith an elbow (90 degree fitting),thecenterofwhichistobelocatedinsidethechambervoidspacedirectlyoverthecenterofthereceivingarea,pointingdownward(seedrawingonpage17).

• The inletpipeshallbefirmlyembeddedontheoutsideof thechambertopreventmovementorsettlingduringsystembackfill.

InspectionPipe• 4"Sch.40or4"PVCpipeshallbeusedfortheobservationport.

• Selectedpipeshouldbeinstalledusingappropriatecoupler.CouplershouldseatonSPCatknockoutprovidedincentercorrugation.

• Pipegoinguptogradeshouldbecuttoappropriatelength.Pipe going into chamber void should be cut very short, toallowforadequatelengthsoastosecureinstallationthroughknockout,butnotsolongastointerferewiththesysteminletpipe.

VentPipe• Install3"or4"PVCoutletpipeintoeachendcap(note:aholesawisrequiredfor3"pipe).

• Interconnect(manifold)alloutletpipesusingappropriatePVCfittings.

• Prepareaventpipebydrillingaminimumof12–5/8"diameterholesintotheupper8"ofthepipe,toprovideforadequateairmovement.

• Installventpipe.Theventpipeshallbe3"or4"PVC,andshallbeinstalledintotheroofknockoutofthelastchamberintheupperchamberline(note:aholesawisrequiredfor3"pipe).Thepipeshallbesecuredat thechamberusingacoupler,andextendintothechambervoidonlysofarasnecessarytostayinplace.

• Complete the vent pipewith aSch. 40 cap extending 12"abovethegroundsurface.

Note:Thismethodofprovidingventilationisonlyonewayinwhichthe chamber linemay be vented.Othermeans of providingeffectiveventilationmaybeallowedby thestateand/or localauthority,includinguseoftheobservationports.

Page 22: On-Site Leaching Chamber Specifications & Features

21

AdditionalConfigurations:

Chamber

PressurePipewithHolesat12O'clock,PlusTwoWeepHolesPerLine,OneatEachEnd,at6O'clockorDripTubing

4"PerforatedPipewithAllWeatherPipeStrapsatEveryChamberConnection

PressureDispersal:PipeSupportInstallationCrossSection

PressureDispersal:DetailwithArcSidePortCoupler

PressureDispersal:ObservationPort/VentPipe

ApprovedpressuredispersaldevicesandmethodsincludeLPPandDrip.

SidePortCoupler(SPC)

SidePortCoupler(SPC)

InstallInspection/VentPipeUsingSch.40PipeandCoupler

Position1-1/2"to3"PVCInlet/HeaderPipeThroughEndCapandAttachElbow(90˚Fitting).CenteroftheElbowShallbeLocatedInsidetheChamberVoidSpaceDirectlyOvertheCenterofthe"ReceivingArea,"PointingDownward.

ReceivingArea:TheContractorshallpreparethereceivingareabycenteringa16”x16”concretepaver(oranapprovedequivalent)overa20”x20”x2”deepgravel(washedstone)bed.

Arc36EndPlate

20"GravelPadBeddingandBackfillasSpecifiedbyProjectPlansandLocalInstallationRegulations

InstallInspection/VentPipeUsingSch.40PipeandCoupler

V.PressureDispersal

Page 23: On-Site Leaching Chamber Specifications & Features

22

SYSTEMSIzINGCHArTSArc36Systems: 4.61FT2/LF-35%I/Areduction

ConventionalStoneandPipeTrench Arc36Model

TexturalGroup

NaturalSoilLTAR(gpd/sf)

2BRTrenchLength(ft)

3BRTrenchLength(ft)

4BRTrenchLength(ft)

2BRTrenchChambersLengthRequired

(ft)

3BRTrenchChambersLengthRequired

(ft)

4BRTrenchChambersLengthRequired

(ft)

ISands

1.0 80 120 160 52 11 78 16 104 210.9 89 133 178 58 12 87 18 116 24

IICoarseLoams

0.8 100 150 200 65 13 98 20 130 260.7 114 171 229 74 15 112 23 149 30

IIIFineLoams

0.6 133 200 267 87 18 130 26 174 350.5 160 240 320 104 21 156 32 208 420.4 200 300 400 130 26 195 39 260 52

IVClays

0.3 267 400 533 174 35 260 52 347 700.2 400 600 800 260 52 390 78 521 1050.1 800 1,200 1,600 521 105 781 157 1,041 209

Arc36Systems:4.0FT2/LF-25%ApprovedSystemStatusreductionConventional

StoneandPipeTrench Arc36Model

TexturalGroup

NaturalSoilLTAR(gpd/sf)

2BRTrenchLength(ft)

3BRTrenchLength(ft)

4BRTrenchLength(ft)

2BRTrenchChambersLengthRequired

(ft)

3BRTrenchChambersLengthRequired

(ft)

4BRTrenchChambersLengthRequired

(ft)

ISands

1.0 80 120 160 60 12 90 18 120 240.9 89 133 178 67 14 100 20 133 27

IICoarseLoams

0.8 100 150 200 75 15 113 23 150 300.7 114 171 229 86 18 129 26 171 35

IIIFineLoams

0.6 133 200 267 100 20 150 30 200 400.5 160 240 320 120 24 180 36 240 480.4 200 300 400 150 30 225 45 300 60

IVClays

0.3 267 400 533 200 40 300 60 400 800.2 400 600 800 300 60 450 90 600 1200.1 800 1,200 1,600 600 120 900 180 1,200 240

11"StandardSystems:4.61FT2/LF-35%I/AreductionConventional

StoneandPipeTrench11"StandardModel

BioDiffuser

TexturalGroup

NaturalSoilLTAR(gpd/sf)

2BRTrenchLength(ft)

3BRTrenchLength(ft)

4BRTrenchLength(ft)

2BRTrenchChambersLengthRequired

(ft)

3BRTrenchChambersLengthRequired

(ft)

4BRTrenchChambersLengthRequired

(ft)

ISands

1.0 80 120 160 52 9 78 13 104 170.9 89 133 178 58 10 87 14 116 19

IICoarseLoams

0.8 100 150 200 65 11 98 16 130 210.7 114 171 229 74 12 112 18 149 24

IIIFineLoams

0.6 133 200 267 87 14 130 21 174 280.5 160 240 320 104 17 156 25 208 340.4 200 300 400 130 21 195 32 260 42

IVClays

0.3 267 400 533 174 28 260 42 347 560.2 400 600 800 260 42 390 63 521 840.1 800 1,200 1,600 521 84 781 125 1,041 167

Page 24: On-Site Leaching Chamber Specifications & Features

23

11"StandardSystems: 4.0FT2/LF-25%ApprovedSystemStatusreductionConventional

StoneandPipeTrench11"StandardModel

BioDiffuser

TexturalGroup

NaturalSoilLTAR(gpd/sf)

2BRTrenchLength(ft)

3BRTrenchLength(ft)

4BRTrenchLength(ft)

2BRTrenchChambersLengthRequired

(ft)

3BRTrenchChambersLengthRequired

(ft)

4BRTrenchChambersLengthRequired

(ft)

ISands

1.0 80 120 160 60 10 90 15 120 200.9 89 133 178 67 11 100 16 133 22

IICoarseLoams

0.8 100 150 200 75 12 113 18 150 240.7 114 171 229 86 14 129 21 171 28

IIIFineLoams

0.6 133 200 267 100 16 150 24 200 320.5 160 240 320 120 20 180 29 240 390.4 200 300 400 150 24 225 36 300 48

IVClays

0.3 267 400 533 200 32 300 48 400 640.2 400 600 800 300 48 450 72 600 960.1 800 1,200 1,600 600 96 900 144 1,200 192

Arc24Systems: 3.0FT2/LFConventional

StoneandPipeTrench Arc24Model

TexturalGroup

NaturalSoilLTAR(gpd/sf)

2BRTrenchLength(ft)

3BRTrenchLength(ft)

4BRTrenchLength(ft)

2BRTrenchChambersLengthRequired

(ft)

3BRTrenchChambersLengthRequired

(ft)

4BRTrenchChambersLengthRequired

(ft)

ISands

1.0 80 120 160 80 16 120 24 160 320.9 89 133 178 89 18 133 27 178 36

IICoarseLoams

0.8 100 150 200 100 20 150 30 200 400.7 114 171 229 114 23 171 35 229 46

IIIFineLoams

0.6 133 200 267 133 27 200 40 267 540.5 160 240 320 160 32 240 48 320 640.4 200 300 400 200 40 300 60 400 80

IVClays

0.3 267 400 533 267 54 400 80 533 1070.2 400 600 800 400 80 600 120 800 1600.1 800 1,200 1,600 800 160 1,200 240 1,600 320

Bio3Systems: 3.0FT2/LFConventional

Stone and Pipe Trench Bio 3 Model

TexturalGroup

NaturalSoilLTAR(gpd/sf)

2BRTrenchLength(ft)

3BRTrenchLength(ft)

4BRTrenchLength(ft)

2BRTrenchChambersLengthRequired

(ft)

3BRTrenchChambersLengthRequired

(ft)

4BRTrenchChambersLengthRequired

(ft)

ISands

1.0 80 120 160 80 12 120 17 160 230.9 89 133 178 89 13 133 19 178 25

IICoarseLoams

0.8 100 150 200 100 14 150 21 200 280.7 114 171 229 114 16 171 24 229 32

IIIFineLoams

0.6 133 200 267 133 19 200 28 267 380.5 160 240 320 160 23 240 34 320 450.4 200 300 400 200 28 300 42 400 56

IVClays

0.3 267 400 533 267 38 400 56 533 750.2 400 600 800 400 56 600 84 800 1120.1 800 1,200 1,600 800 112 1,200 168 1,600 224

SYSTEMSIzINGCHArTS:(continued)

Page 25: On-Site Leaching Chamber Specifications & Features

24

NOTES/COMMENTS

Page 26: On-Site Leaching Chamber Specifications & Features

2522

NOTES/COMMENTS

Page 27: On-Site Leaching Chamber Specifications & Features

24

NOTES/COMMENTS

Innovation in product, process and technology.

That’s ADS and Hancor.

Beginning with single wall corrugated polyethylene pipe, ADS and Hancor have

continually introduced drainage products that have set the industry standard –

bringing to market a remarkable alternative to concrete and steel pipe. Our

commitment to being the best means that we continue to refine the structural

design of our pipe and redefine the limits of its application in the structural

design community.

Advanced Drainage Systems, the ADS logo, the green stripe, “The Most Advanced Name in Drainage Systems” and ARC™ are registered trademarks of Advanced Drainage Systems, Inc. Hancor is a

registered trademark of Hancor, Inc. ADS “Terms and Conditions of Sale” are available on the ADS website, www.ads-pipe.com. © 2009 Advanced Drainage Systems, Inc.

INS10623/0110

800-733-3555 www.ads-pipe.com

888-FOR PIPE (367-7473)www.hancor.com