on-demand architecture for network-critical physical infrastructure
DESCRIPTION
On-Demand Architecture for Network-Critical Physical Infrastructure. Large Data Centres Small & Medium Data Centres Computer Rooms & Closets. David Blumanis APC, Data Centre Consultant, Asia Pacific. Network-Critical Physical Infrastructure (NCPI). - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: On-Demand Architecture for Network-Critical Physical Infrastructure](https://reader035.vdocuments.us/reader035/viewer/2022070406/5681409d550346895dac4403/html5/thumbnails/1.jpg)
On-Demand Architecture for Network-Critical Physical Infrastructure
Large Data Centres
Small & Medium Data Centres
Computer Rooms & Closets
David BlumanisAPC, Data Centre Consultant, Asia Pacific
![Page 2: On-Demand Architecture for Network-Critical Physical Infrastructure](https://reader035.vdocuments.us/reader035/viewer/2022070406/5681409d550346895dac4403/html5/thumbnails/2.jpg)
Network-Critical Physical Infrastructure (NCPI)
Essential foundation
of reliability
![Page 3: On-Demand Architecture for Network-Critical Physical Infrastructure](https://reader035.vdocuments.us/reader035/viewer/2022070406/5681409d550346895dac4403/html5/thumbnails/3.jpg)
You have a large NCPI investment
Cooling Equipment: 6%
Power Equipment: 17%
Racks: 3%
Engineering &Installation: 19%
Space: 17%
Electricity: 27%Service: 13%
Typical 10 yr lifecycle TCO from $80K to $140K per rack
Source: APC White Paper #6
![Page 4: On-Demand Architecture for Network-Critical Physical Infrastructure](https://reader035.vdocuments.us/reader035/viewer/2022070406/5681409d550346895dac4403/html5/thumbnails/4.jpg)
Network-Critical Physical Infrastructure Challenges
• Rapid changes in IT technology
• High density
• High operating/service costs
• Increasing availability expectations
• Server consolidation
• Regulatory requirementsIn response, APC is changing the way the world designs, installs, operates, manages and maintains Network-Critical Physical Infrastructure (NCPI)
![Page 5: On-Demand Architecture for Network-Critical Physical Infrastructure](https://reader035.vdocuments.us/reader035/viewer/2022070406/5681409d550346895dac4403/html5/thumbnails/5.jpg)
The Business Value Equation for Network-Critical Physical Infrastructure
Availability Agility
TCOValue
x=
What are the barriers to improving value by 10x?
![Page 6: On-Demand Architecture for Network-Critical Physical Infrastructure](https://reader035.vdocuments.us/reader035/viewer/2022070406/5681409d550346895dac4403/html5/thumbnails/6.jpg)
10 XAvailability Agility
TCOValue
x=
• Equipment Reliability
• Mean-Time-To-Recover
• Human Error
Your entitlement: Reduce downtime by 90%
80% less
50% less
![Page 7: On-Demand Architecture for Network-Critical Physical Infrastructure](https://reader035.vdocuments.us/reader035/viewer/2022070406/5681409d550346895dac4403/html5/thumbnails/7.jpg)
Case Study of Downtime Failures
Root Causes
0%
5%
10%
15%
20%
25%
30%
35%
EquipmentFailure
Human Error ConstructionRelated
DesignRelated
ExternalCauses
Consistent with Surveys which attribute 60% or more of failures to Human Error
![Page 8: On-Demand Architecture for Network-Critical Physical Infrastructure](https://reader035.vdocuments.us/reader035/viewer/2022070406/5681409d550346895dac4403/html5/thumbnails/8.jpg)
Standardisation enables improved availability
• Modularise• Pre-test systems in the
factory• Hot swappable• Pre-Integrate Power-
Cooling-Rack Management & diagnostics
• One-Time Engineering• Unique training
requirements• On-site assembly• On-site testing• Custom programming
Standardise To Eliminate
Standardisation accelerates learning at all levels, reducing human error and increasing availability
![Page 9: On-Demand Architecture for Network-Critical Physical Infrastructure](https://reader035.vdocuments.us/reader035/viewer/2022070406/5681409d550346895dac4403/html5/thumbnails/9.jpg)
Availability
TCOValue
x=
• Speed of Deployment
• Ability to Scale
• Ability to Reconfigure
Your entitlement: As much as 10 x the agility
100% easier
80% less time
100% easier
10 XAgility
![Page 10: On-Demand Architecture for Network-Critical Physical Infrastructure](https://reader035.vdocuments.us/reader035/viewer/2022070406/5681409d550346895dac4403/html5/thumbnails/10.jpg)
Data Centre traditional design
![Page 11: On-Demand Architecture for Network-Critical Physical Infrastructure](https://reader035.vdocuments.us/reader035/viewer/2022070406/5681409d550346895dac4403/html5/thumbnails/11.jpg)
• The Design Concept is built on standardised parts that can be scaled to meet the need?
• Construction Design incorporates a “Lego Block” approach of pre-engineered components?
• Construction is mainly done in a factory instead of on-site?
• Commissioning tests pre-integrated infrastructure systems.
What if……
![Page 12: On-Demand Architecture for Network-Critical Physical Infrastructure](https://reader035.vdocuments.us/reader035/viewer/2022070406/5681409d550346895dac4403/html5/thumbnails/12.jpg)
20% lessAvailability Agility
TCOValue
x=
• Capital Cost
• Electricity Costs
• Service Costs
Your entitlement: As much 20% overall NCPI TCO
10% less
30% less
30% less
![Page 13: On-Demand Architecture for Network-Critical Physical Infrastructure](https://reader035.vdocuments.us/reader035/viewer/2022070406/5681409d550346895dac4403/html5/thumbnails/13.jpg)
Waste due to oversizing
Reference: APC White paper #37
![Page 14: On-Demand Architecture for Network-Critical Physical Infrastructure](https://reader035.vdocuments.us/reader035/viewer/2022070406/5681409d550346895dac4403/html5/thumbnails/14.jpg)
The Business Value Equation for Network-Critical Physical Infrastructure
Availability Agility
TCOValue
x=
![Page 15: On-Demand Architecture for Network-Critical Physical Infrastructure](https://reader035.vdocuments.us/reader035/viewer/2022070406/5681409d550346895dac4403/html5/thumbnails/15.jpg)
Brayton International“ InfraStruXure™ gives control of the power to the IT professional. I can allocate the power the way I want to, without calling in an electrician.”
INDUSTRYManufacturing
APPLICATIONNew data centre
REQUIREMENTAdaptability and control
Markus M. Hill, Director, Technology & Information Services
High Point, NCUnited States
![Page 16: On-Demand Architecture for Network-Critical Physical Infrastructure](https://reader035.vdocuments.us/reader035/viewer/2022070406/5681409d550346895dac4403/html5/thumbnails/16.jpg)
Olympus Corporation
“ Above all we wanted to avoid having to spend a fortune on initial costs before the server room was even filled.”
Masashi AsanoAssistant ManagerInformation Systems DepartmentTokyo, Japan
INDUSTRYTechnology
APPLICATIONNew server room
REQUIREMENTScalability
![Page 17: On-Demand Architecture for Network-Critical Physical Infrastructure](https://reader035.vdocuments.us/reader035/viewer/2022070406/5681409d550346895dac4403/html5/thumbnails/17.jpg)
ADCS Inc
INDUSTRY
Finance
APPLICATION
New data center
REQUIREMENT
Higher availability with lower total cost of ownership
Cliff Rittel
Director of IT
Poway, CA
United States
“ With InfraStruXure™, the total cost of ownership was much lower. This was the deciding factor.”
![Page 18: On-Demand Architecture for Network-Critical Physical Infrastructure](https://reader035.vdocuments.us/reader035/viewer/2022070406/5681409d550346895dac4403/html5/thumbnails/18.jpg)
Avon Old Farms School“ With only two systems people to support the entire campus, it’s an immense help to have such an easy-to-manage solution as InfraStruXure™.”
Deb CaseDirector of Information Technology Avon, CT
INDUSTRYEducation
APPLICATIONNew data CentreREQUIREMENTAbility to manage with limited personnel
![Page 19: On-Demand Architecture for Network-Critical Physical Infrastructure](https://reader035.vdocuments.us/reader035/viewer/2022070406/5681409d550346895dac4403/html5/thumbnails/19.jpg)