7/28/2019 On-Boarding Document 1
http://slidepdf.com/reader/full/on-boarding-document-1 1/32
Project On-Boarding DocumentAIM Company
7/28/2019 On-Boarding Document 1
http://slidepdf.com/reader/full/on-boarding-document-1 2/32
© 2011 SAP AG. All rights reserved. 2
On-Boarding Package Objectives
Assure Team members understand:
Company Overview
Logistics
Consultants Guidelines
Consultant Project Performance Evaluation
AIM Company Key Challenges
Overall Scope & ApproachProject Timelines
Detailed Project Scope
General Project Assumptions
Functional Project Assumptions
Technical Project Assumptions
7/28/2019 On-Boarding Document 1
http://slidepdf.com/reader/full/on-boarding-document-1 3/32
© 2011 SAP AG. All rights reserved. 3
Company Overview
AIM Company
AIM Company is a full-service institution headquartered ...
Recommended Reading
Links to
Link to AIM Company Annual Report 2007
7/28/2019 On-Boarding Document 1
http://slidepdf.com/reader/full/on-boarding-document-1 4/32
© 2011 SAP AG. All rights reserved. 4
Logistics
AIM Company Project Location
Consultants will work at the <City> location for the Blue Print Phase.
Street
Adress
Website
Accommodation
DO NOT BOOK YOUR OWN HOTEL RESERVATIONS!
Accommodations are provide by the client through an agreement with the <Hotel in City>. This hotel islocated directly across the street from the client site. Every effort should be made to make Hotel reservationstwo weeks prior to an onsite visit and must be facilitated between the client representative and the hotel.Forward your arrival and departure date details to <Colleague> at <Mail>. <Colleague> will confirm thereservation with the client for you and send you a confirmation e-mail. When you arrive onsite take a taxi tothe hotel location.
Link of Hotel:
7/28/2019 On-Boarding Document 1
http://slidepdf.com/reader/full/on-boarding-document-1 5/32
© 2011 SAP AG. All rights reserved. 5
Logistics
Directions to the AIM Company from the Hotel
Please add City Map
7/28/2019 On-Boarding Document 1
http://slidepdf.com/reader/full/on-boarding-document-1 6/32
© 2011 SAP AG. All rights reserved. 6
Logistics
Alternative Arrangements
For project resources that will participate in the complete Blueprint phase for the entire 6 months alternativeliving arrangements can be made. The client has identify furnished apartments for those resources that wish
to bring family with them for extended periods. The number of available apartments is limited and availability
is subject to planned travel schedules and expected length of stay as well as arrival date as apartments are
only available on the first of each month. They are rented on a monthly basis and are intended for
resources stay on site for over a month at a time.
To request one of the furnished apartments please forward your arrival and departure date details to
<Colleague> at <Mail>. <Colleague> will confirm the reservation with the client for you and send you aconfirmation e-mail detailing apartment location and key pickup instructions.
7/28/2019 On-Boarding Document 1
http://slidepdf.com/reader/full/on-boarding-document-1 7/32© 2011 SAP AG. All rights reserved. 7
Consultant Guidelines
Blueprint Phase 1 Workshops
Work Week (North American Consultant)
If the schedule starts on Monday consultants are expected to arrive latest 8:30 a.m. Monday morning, leave earliest 4p.m. Friday afternoon.
40 hours per week (for more than 40 hours PM approval is required)
5 days per week onsite at a <Custmer> facility depending on your workshop schedule
When scheduled workshops run over a weekend it is recommended that consultants stay over the weekend onsite.
SO – To be determined. Consultants will be given direction on expenses and time entry once on site.
Work Week (Non North American Consultant) Non North American Consultants are expected to work on-site for the period of 4 weeks
40 hours per week (for more than 40 hours PM approval is required)
Consultants are expected to be onsite for all required workshops related to their specialty. A detailed schedule is
provided starting on slide 20. Team leads are expected to be onsite for planning activities March 31 to April 11 and for the execution of the workshops related to their specialty. The standard will be two weeks on site and one week off.Some team leads will be three weeks on and one week off based on the scheduling of the initial workshops.
When scheduled workshops run over a weekend it is recommended that consultants stay over the weekend onsite.
SO - To be determined. Consultants will be given direction on expenses and time entry once on site.
Detailed blueprint organizational charts, Phase 1 workshop schedules and individual resource onsite ramp up traveldetails are available starting on page 20.
7/28/2019 On-Boarding Document 1
http://slidepdf.com/reader/full/on-boarding-document-1 8/32© 2011 SAP AG. All rights reserved. 8
Consultant Guidelines
Blueprint Phases II and III
Work Week (North American Consultant)
If the schedule starts on Monday consultants are expected to arrive latest 9 a.m. Monday morning, leave earliest 4p.m. Thursday afternoon.
If the schedule starts on Tuesday consultants are expected to arrive latest 9 a.m. Tuesday morning, leave earliest4 p.m. Friday afternoon.
40 hours per week (for more than 40 hours PM approval is required)
4 days per week onsite at a AIM Company facility, 1 day per week remotely
SO - To be determined. Consultants will be given direction on expenses and time entry once on site.
Work Week (Non North American Consultant)
Non North American Consultants are expected to work on-site for the period of 3 weeks and one week remotely.
40 hours per week (for more than 40 hours PM approval is required)
SO - To be determined. Consultants will be given direction on expenses and time entry once on site.
7/28/2019 On-Boarding Document 1
http://slidepdf.com/reader/full/on-boarding-document-1 9/32© 2011 SAP AG. All rights reserved. 9
Consultant Guidelines
Expenses
All expenses must comply with SAP travel policy (available on SAP Portal or from the PM)
Global Travel Air Policy
International Travel Policy
North American Travel Policy
SAP Resources - Expenses should be submitted following SAP‟s expense policy
Please print copies of expenses and provide them to the PM (receipts
are not required)
Partner Resources – Expenses should be submitted following contracted processes.
Please provide the PM with a copy of your expenses for approval.
Try to minimize expenses
Book flights in advance (at least 14 days)
Stay in hotels with SAP rates (See Accommodation)
AdministrationSAP Resources - Time and Expenses have to be entered every week by Sunday night latest in ISP
Please provide copies of both to the PM by Monday the following week
Partner Resources – Time and Expenses have to be provided to the PM for review andauthorization every week by Friday afternoon
7/28/2019 On-Boarding Document 1
http://slidepdf.com/reader/full/on-boarding-document-1 10/32© 2011 SAP AG. All rights reserved. 10
Consultant Guidelines
Dress CodeDress code is business professional dress and we try to keep our appearance one step up from the
customers‟ (dress neatly). Make sure that you have done your homework of reviewing existing documentation before you start
asking questions (avoid unnecessary reiterations).Keep your expert opinion to your area of responsibility, for other areas make sure you provide your
input to the responsible consultant (one consistent message).
All new consulting requirements need to be directed to your SAP Lead (one standard procedure).Regardless of your contracting company, you represent TeamSAP in the eyes of the customer (makeus proud!).
Always support and encourage the other consultants, we are a team and our successes andchallenges are everyone's.
Keep your working area neat and clean (image is everything!)Maintain professional communications at all times, both at the company site and in town. You never
know who is sitting next to you at a restaurant or in the airport.Notify your Lead if your are running late or will be absent
Plan your vacation or absence with your SAP Lead and your AIM Company counterpart, 30 days inadvance of taking the time off
7/28/2019 On-Boarding Document 1
http://slidepdf.com/reader/full/on-boarding-document-1 11/32© 2011 SAP AG. All rights reserved. 11
AIM Company Key Challenges
AIM Company is replacing its business solution to provide the flexibility to meet the needs of AIM
Company‟s growing business. The primary business objectives in pursuing core replacement include:
Improved customer experience - more robust customer experience, respond more quickly tocustomer demands for new products and services, and to improve the AIM Company‟srelationship with its customers; An enhanced CIF that is utilized by all channels, business unitsand areas of AIM Company will improve the consistency and allow AIM Company to improve itsknowledge of the customer.
Improved time to market - New products and services can be offered more rapidly.Increased product innovation - A modern platform will allow AIM Company to respond to changes in
product demand and to create more innovative products for customersImproved cost efficiency - Due to the heterogeneous and tightly integrated nature of the current
environment, changes and maintenance are significantly higher cost and/or longer to implementthan for a modern system. A modern platform would improve AIM Company‟s operatingefficiency.
Improved service levels - Moving to a modern system without a batch outage window will allow AIMCompany to improve service levels to all channels
7/28/2019 On-Boarding Document 1
http://slidepdf.com/reader/full/on-boarding-document-1 12/32© 2011 SAP AG. All rights reserved. 12
AIM Company Key Challenges (Continued)
Improved scalability - As a high growth organization AIM Company is looking for a solution that is
able to scale, to meet customer demand.Improved integration - Moving to a modern, SOA enabled platform will allow AIM Company to
decrease the effort associated with cross system integration and improve the governanceapplied to enterprise integration.
Eliminate Functional gaps - There are gaps in the functionality of the current system that modernCore Solutions can address. Due to the inflexibility of the current core system, several systemshave been built outside of the core system that would be more appropriate as part of the core.
Link to AIM Company Business Plan 2007 –
2010 http://www.AIM-Company.de
7/28/2019 On-Boarding Document 1
http://slidepdf.com/reader/full/on-boarding-document-1 13/32© 2011 SAP AG. All rights reserved. 13
Overall Scope & Approach
The project includes the following solutions:
<SAP Industry>: Deposit, Loan, Collaterals, Syndication Management, Master ContractManagement, Payments, Treasury, Currency Management, Capital Yield Tax, Reserved for Bad Debt, Trade Finance, Analytical Banking, Business Partner, and CRM
<SAP Component>: Financial Accounting, Asset Accounting, Accounts Payable, and ControllingOverall Program Management will be < PM> (Program Director), <PM> (<SAP Industry>), and
<PM> (<SAP Component>).The first twelve weeks of the Blueprinting Phase will be used to determine a detailed scope and
overall implementation plan.
Once the Blueprinting Phase is completed, a refined project plan can be developed, which mayhave an impact on the timeline and budget.
The SAP Consultant(s) assigned to the Project will assist in the implementation of the SAPSoftware and assist Licensee in gaining a better understanding of the SAP Softwareapplications.
The scope of the Services to be provided by the SAP consultant(s) (Consultant(s)) is described inExhibit 1 attached hereto.
Licensee is owner of the Project and is responsible for and controls the implementation, scope,
costs, resources and targeted solutions. Licensee shall designate a Project Manager to workwith the Consultant(s) to facilitate the provision of the Services. It is mutually understood thatbusiness requirements, resources and dates may change. Licensee is responsible for revisingthe estimated Project plans and requesting changes to the requirements for Services.
7/28/2019 On-Boarding Document 1
http://slidepdf.com/reader/full/on-boarding-document-1 14/32© 2011 SAP AG. All rights reserved. 14
Core <Industry> Solution Scope for AIM Company
SAP for <Industry> software solutions:
SAP Collateral ManagementSAP Syndications ManagementSAP Deposits ManagementSAP Loans ManagementBusiness Partner SAP Business Intelligence (BI)SAP Currency Management and OptimizationSAP Bank Analyzer SAP Capital Yield Tax (CYT)Misys - Global Trade Finance (Treasury)SAP PI Base EngineSAP Limit ManagementSAP Asset Liability ManagementSAP Reserve for Bad DebtSAP Profitability ManagementSAP Financial Database
7/28/2019 On-Boarding Document 1
http://slidepdf.com/reader/full/on-boarding-document-1 15/32© 2011 SAP AG. All rights reserved. 15
SAP <Component> Solution Scope for AIM Company
SAP <Component> Software Solutions Account & Contact Management for FSTotal Commitment Activity ManagementOpportunity ManagementQuotation Management for FSProduct Management incl. Bundles for FSBusiness Rule FrameworkElectronic Credit File (Case Management) Integration in Collateral and LoanManagement Systems (XI Content for FS)Customer Scoring & Credit Rating Request
Sales Force Automation (including Account Management, Contact Management, Activity Management, Opportunity Management)Field SalesInteraction Center Campaign Planning (including List Management)Multi-Channel Campaign Execution (incl. Couponing & Segmentation)Lead ManagementDigital Asset ManagementResource Optimization (Scenario & Forecast planning; Budget & Cost Planning)
E-MarketingCase and Incident ManagementE-ServiceChannel ServiceKnown to be in scope
7/28/2019 On-Boarding Document 1
http://slidepdf.com/reader/full/on-boarding-document-1 16/32© 2011 SAP AG. All rights reserved. 16
SAP ERP Solution Scope for AIM Company
FinancialsGeneral Ledger Controlling (Cost Center and Profit Center Accounting)Fixed Asset Management Accounts PayableConsolidationsTreasury
7/28/2019 On-Boarding Document 1
http://slidepdf.com/reader/full/on-boarding-document-1 17/32© 2011 SAP AG. All rights reserved. 17
SAP Netweaver Solution Scope for AIM Company
The SAP Netweaver solution is within the Project scope but limited to the following. The
complete solutions will be reviewed during the Project taking into account the associatedassumptions outlined below.
Workflow
The solution will use SAP standard Workflow functionality. The number of workflows will be
validated during the Project.
Authorization/Control
The approximate number of Authorization roles will be determined during the project.
LSMW (Legacy System Migration Workbench)It is recommended that this SAP tool will be used for data conversion. This will be reviewed and
confirmed during the Project.
Transport Management
SAP GUI
7/28/2019 On-Boarding Document 1
http://slidepdf.com/reader/full/on-boarding-document-1 18/32
© 2011 SAP AG. All rights reserved. 18
Project Timelines
Project Preparation – 10 weeks (Feb 4 – April 11)
Blueprint Step 1 - 5 weeks (Apr 14 – May 14)
Blueprint Step 2 – 8 weeks (May 19 – July 11)
Blueprint Step 3 – 12 weeks (July 14 – Oct 3)
7/28/2019 On-Boarding Document 1
http://slidepdf.com/reader/full/on-boarding-document-1 19/32
© 2011 SAP AG. All rights reserved. 19
Organization Chart
<Overal l Organization> Use SAP Presentation Wizard
N.N
Portfolio Director
N.N
Program Director
Technical
InfrastructureArchitecture
N.N
Project Manager
Core Banking
Training
N.N
PMO Support
N.N
Team Lead GDC
Loans Deposits
Analytical
Banking
Business
Partner
Business
SupportCRM
TBD
PMO Support
N.N
Portfolio Manager
7/28/2019 On-Boarding Document 1
http://slidepdf.com/reader/full/on-boarding-document-1 20/32
© 2011 SAP AG. All rights reserved. 20
Organization Chart
<Area 1>
N.N
Project Manager
TBD
Team Lead Loans
LoansReserve for Bad
DebtCollateral
Syndications
Management
N.N
Sr. Consultant
N.N
Consultant
N.N Principal Consultant
N.N
Consultant
TBD
Jr. Consultant
TBD Consultant
N.N
Sr. Consultant
N.Ni
Consultant
TBD
Jr. Consultant
Trade Finance
TBD
Principal Consultant
TBD
Consultant
Use SAP Presentation Wizard
7/28/2019 On-Boarding Document 1
http://slidepdf.com/reader/full/on-boarding-document-1 21/32
© 2011 SAP AG. All rights reserved. 21
Organization Chart
<Technical & Infrastruc ture>
N.N
Program Director
Development NetWeaver & PISolution
Developers
N.N
Development
Team Lead
N.N
Consultant
N.N
Senior Developer
Functional
TBD
Sr. Dev Consultant
TBD
Dev Consultant
Banking
TBD
Dev Consultant
Banking
TBD
Sr. Consultant
TBD
Solution Developer
Technical
Basis
TBD
Basis Consultant
TBD
Technical &
Infrastructure
Team Lead
TBD
ABAP Dev Lead
Consultant
TBD
ABAP Dev
Consultant
Use SAP Presentation Wizard
7/28/2019 On-Boarding Document 1
http://slidepdf.com/reader/full/on-boarding-document-1 22/32
© 2011 SAP AG. All rights reserved. 22
Workshop Schedule
Overall
Mo Tu We Th Fr Mo Tu We Th Fr Mo Tu We Th Fr Mo Tu We Th Fr
April 14, 2008 April 21, 2008 April 28, 2008 May 5, 2008
Mo Tu We Th Fr
May 12, 2008
Business Partner
- Services
- Mobile
- CRM Incentive & Comm Mgmt.
- CRM Account Origination
- CRM Marketing
- CRM CIC
- CRM Sales
CRM
4 Days
April 21 – May 14
2 Days
2 Days
2 Days
2 Days
2 Days
2 Days
2 Days
April 15 – April 18
April 21 – April 22
April 25 – April 28
April 29 – April 30
May 1 – May 2
May 5 –
May 6
May 7 – May 8
May 13 – May 14
Use SAP Presentation Wizard
7/28/2019 On-Boarding Document 1
http://slidepdf.com/reader/full/on-boarding-document-1 23/32
© 2011 SAP AG. All rights reserved. 23
Workshop Schedule
Area 1
Deposits
- Syndications Mgmt. &Securitization
- Collaterals
- Reserve for Bad Debt (RBD)
- Loans
Loans
- Master Contract Mgmt.
- Capital Yield Tax (CYT)
- Deposits
Mo Tu We Th Fr Mo Tu We Th Fr Mo Tu We Th Fr Mo Tu We Th Fr
April 14, 2008 April 21, 2008 April 28, 2008 May 5, 2008
Mo Tu We Th Fr
May 12, 2008
April 21 – May 1
5 Days
2 Days
2 Days
April 22 -May 14
6 Days
2 Days
3 Days
4 Days
April 21 – April 25
April 28 – April 29
April 30 –
May 1
April 22 – April 29
April 30 – May 1
May 6 –
May 8
May 9 – May 14
Use SAP Presentation Wizard
7/28/2019 On-Boarding Document 1
http://slidepdf.com/reader/full/on-boarding-document-1 24/32
© 2011 SAP AG. All rights reserved. 24
Workshop Schedule
Technical Infrastructure
Mo Tu We Th Fr Mo Tu We Th Fr Mo Tu We Th Fr Mo Tu We Th Fr
April 14, 2008 April 21, 2008 April 28, 2008 May 5, 2008
Mo Tu We Th Fr
May 12, 2008
Technical Infrastructure
- Interfaces / Integration
- Hardware Requirements
- System Landscape
April 15 – May 6
2 Days
2 Days
4 Days consol.
April 15 – April 16
April 17 – April 18
April 18 – April 23 May 5 - May 6
Use SAP Presentation Wizard
7/28/2019 On-Boarding Document 1
http://slidepdf.com/reader/full/on-boarding-document-1 25/32
© 2011 SAP AG. All rights reserved. 25
General Project Assumptions
Relevant AIM Company project team members will be available through out the project as per
the staffing model.Network and hardware design and final hardware sizing are responsibility of AIM Company for
this project.Data gathering, normalization and cleansing required for the implementation will be AIM
Company responsibility, unless contracted with SAP Consulting Services. All other SAP functionality, not identified in this document as being in scope, shall be
considered out of scope. AIM Company and SAP project leadership will formally sign off all key project milestones and
phase exit signoffs.Prior to starting the project, the following documents must be executed: an SAP End User
License Agreement, an SAP Professional Services Agreement (PSA) and an SAPStatement of Work (SOW).
Policy decisions will be made within strict turn around guidelines, normally within 24 to 48hours.
SAP proposes a 5-4-3 workweek for the consulting team. Consultants will work a minimum of five 8-hour days per week, 4 days per week onsite at a AIM Company facility, 1 day per week remotely, thereby limiting out of town stays for consultants to 3 or 4 nights per week,
reducing overall travel expenses. AIM Company executive leaders will gain an understanding of Enterprise and CRM Systems
Software and SAP through executive briefings, especially an appreciation of businesschange impacts.
A Steering Committee of Senior Company management will be in place to guide and advisethe Project Team.
All language translations will be provided by AIM Company.
7/28/2019 On-Boarding Document 1
http://slidepdf.com/reader/full/on-boarding-document-1 26/32
© 2011 SAP AG. All rights reserved. 26
General Project Assumptions
Licensee is responsible for providing appropriate Project resources in a timely and sufficient
manner, including but not limited to equipment, data, information, workspace andappropriate and cooperative personnel, to facilitate the performance of the Services.
Licensee resources are defined in Exhibit 1 of this SOW. The assumptions and Licenseeresponsibilities for this Project are also defined in Exhibit 1 of this SOW.
Licensee agrees that any estimates provided in this SOW may be subject to change if Licensee‟s responsibilities and the Project assumptions are not fulfilled.
Prior to starting the project, the following documents must be executed: an SAP End User License Agreement, an SAP Professional Services Agreement (PSA) and an SAP
Statement of Work (SOW).Policy decisions will be made within strict turn around guidelines, normally within 24 to 48hours.
A Steering Committee of Senior Company management will be in place to guide and advisethe Project Team.
AIM Company will commit the necessary internal resources for project management andprovide a lead to manage the development, execution and knowledge transfer of thechange management and training solutions.
7/28/2019 On-Boarding Document 1
http://slidepdf.com/reader/full/on-boarding-document-1 27/32
© 2011 SAP AG. All rights reserved. 27
General Project Assumptions
SAP will have access to AIM Company subject matter experts (SMEs), who will be identified
during the Project Preparation phase. Selected SMEs will have the requisite authority tomake decisions regarding materials content and format in their area of responsibility.
SAP will have access to those individuals designated as project sponsors for the purpose of data gathering, validation, assessment and project leadership vision.
AIM Company staff has knowledge of the existing legacy systems from a technical perspective. Additionally, it is anticipated that any support from other AIM Company entities, as mightbe needed (infrastructure, network, desktop support, web-based programming), will beavailable to the project team and will not detrimentally impact the project timeline.
Additionally, AIM Company will provide data-entry resources to load conversion data if it ismutually agreed that this is the most efficient method.
The AIM Company project resource estimates does not include AIM Company resources for testing (e.g., integration testing, user acceptance testing, volume & stress testing, etc.)
7/28/2019 On-Boarding Document 1
http://slidepdf.com/reader/full/on-boarding-document-1 28/32
© 2011 SAP AG. All rights reserved. 28
Functional Project Assumptions
Assumptions for <SAP Industry>
Utilization of Best Practices for ERP <SAP Component> will be implemented with minimalmodifications.
AIM Company agrees to change their business processes to fit SAP‟s Best Practices.
Assumptions for <SAP Solution>
SAP data bases will not hold all Upload Profile, Session, and Media fields. It will hold only the
fields that are relevant to Rights Management and Contracts. The other fields and thefunctionalities will remain with the current AIM Company systems and will not be migratedto SAP.
Parent Use/Specific Use and Geography are the only rights related restrictions among theRights Model
Domain data and IP Variables. The others are usage related restrictions.Parent Use and Specific Use have a hierarchical relationship - Specific Use nodes are the
"children" of a Parent Use node.
Media ingest, media management, upload profiles, and session data management will not beincluded in scope for the SAP solution. We are assuming that Sample Company Name'MediaSuite functionality will be enhanced to accommodate this functionality. However,relevant fields from upload profiles, sessions, etc. will be included in the media recordinterface with SAP.
7/28/2019 On-Boarding Document 1
http://slidepdf.com/reader/full/on-boarding-document-1 29/32
© 2011 SAP AG. All rights reserved. 29
Functional Project Assumptions (Continued) -
Sample
Assumptions for SAP <SAP Component –
Functional Area>
Relevant AIM Company resources will be available for „touch points‟ during the implementation in
the following areas: CRM Sales, CRM Service, SAP Financials, Project Systems, SAP BI, MS
Exchange to support CRM Marketing functionality.
Assumptions for SAP <SAP Component – Funct io nal Area>
For Assisted Sales, “out of the box” CRM Internet Sales Application (ISA) will be used.
CRM Sales Application will be used for complete Sales Order Processing. CRM Sales integrates
with backend SAP ERP for the following activities:
Order Fulfillment
Integrating Sales / Service documents with ERP Internal Orders other Cost elements for ERP
Controlling activities.
7/28/2019 On-Boarding Document 1
http://slidepdf.com/reader/full/on-boarding-document-1 30/32
© 2011 SAP AG. All rights reserved. 30
Functional Project Assumptions (Continued) –
Sample
Assumptions for SAP <SAP Component – Functional Area>
CRM will be integrated to back end SAP ERP for Fulfillment, Billing, and Financial Accounting.
CRM will be master system for all Business Partner and Product Master Data.
CRM Internet Pricing Configurator will be the source of all pricing related information, with data
copied to the SAP ERP system when necessary
Assumptions for SAP <SAP Component – Functional Area>
SAP CRM Service opportunities will be used to trigger creation of Projects in SAP ERP.
Service fees are always at a fixed flat fee.
SAP Solution will not capture actual time and labor associated to service activities.
The Artist Representation scenario and the Emerging Market Business (EMB) scenario will serve
as
The model for other service requirements. CRM Service Products will not be used: SAP ERP Materials will be used for Services.
Service Contracts will not be used. The Service Fee items will be discounted based on Sales
Contract
Pricing Agreements.
7/28/2019 On-Boarding Document 1
http://slidepdf.com/reader/full/on-boarding-document-1 31/32
© 2011 SAP AG. All rights reserved. 31
Technical Project Assumptions - Sample
1. BW InfoCubes and Queries will not be created for any of AIM Company historical/Legacy
data that remains outside of SAP.2. BI reports will be on-demand only.
3. Regarding any RICEFW (Reports, Interfaces, Conversions, Enhancements, Forms, and
Workflows), AIM Company will formally sign off all generated functional and technical
specifications.
4. The number of Marketing workflows is not currently known and is not included in this
estimate.
5. Outside (unassisted) sales UI will be provided by AIM Company Web UI. The exact detailsfor interfacing with XYZ have not been determined.
6. Requirements for the various Approval Workflows do not include any potential development
of HR Mini-Master. Note this will be confirmed during the Blueprint phase.
7. The AIM Company team will be responsible for creating mock-up data for all testing
8. The complexity of SAP CRM Middleware cannot be estimated at this point and therefore,
additional middleware development might require extra CRM middleware consulting
resources
7/28/2019 On-Boarding Document 1
http://slidepdf.com/reader/full/on-boarding-document-1 32/32
Thank You!
Contact information:
F name MI. L name
Title
Address
Phone number