BLDG 4051 | George Brown College| Omer Syed -
100777134
Capstone Report
The integration of BIM in Construction
Organizations amp itrsquos impacts on Productivity
April 21 2016
Intensions amp Assumptions
To explain the concept of BIM and its impacts on productivity in
the Construction Industry
To help educate the reader in understanding what BIM is and
how BIM can be implemented in the workforce
Due to conflicting schedules only 3 in-person interviews could
be used as primary sources of information
Introduction
The Construction Industry accounts for 6 of Canadas GDP (Statistics Canada 2016)
Currently programs like AutoCAD is the popular choice to use when designing and documenting architectural amp construction drawings
However the process can be slow and most of the time is used up in coordination and correcting discrepancies
Which is why increase the productivity and output of construction drawings and documents is a crucial part in a project orientated industry such as the Construction Industry
Thesis Statement
ldquoBIM programs amp practices are not only used
to help with communication and visual
understandings of a project but also have a
great impact on accelerating productivity and
achieving a higher project turnover ratesrdquo
BIM ndash Definition
In 2016 The Us National Building Information Modeling Standard Project Committee defines BIM as
ldquo(BIM) is a digital representation of physical amp functional characteristics of a facility (BIM) is a shared knowledge of resources for information about a facility forming a reliable basis for decisions during its life-cycle defined as existing from earliest conceptions
BIM ndash Dimensions in Construction
BIM ndash History
Charles M Eastman Is a pioneer in AEC
CAD and developed early research on
BIM
In the mid-1970s he focused on the
development for practitioners with the
lsquoBuilding Description Systemrsquo and
lsquoBuilding Product Modelingrsquo (which was
later renamed into lsquoBuilding Information
Modelingrsquo ndash BIM)
Author of BIM Handbook A Guide to
Building Information Modeling for Owners
Managers Designers Engineers and
Charles M Eastman Picture taken in 2014
BIM ndash Off-Site Applications
BIM is mainly used in offices of Construction amp Design
companies
There are 5 main purposes when working with BIM
Gather ndash Collect amp organize Information
Generate ndash Create amp design with the information gathered
Analyze ndash Review the design and it properties
Communicate ndash Present amp document the design amp information
Realize ndash Follow through with the design amp implement it in the
construction phase
BIM ndash On-Site Applications
BIM can be used to facilitate a virtual walkthrough while on a construction site ndash through the use of BIM ldquoappsrdquo Most common BIM apps are listed below
Graphisoft BIMx
Telka BIMSight Mobile
Navigator Pano Review
Autodesk 360 Mobile
Revizto Viewer
BIManywhere
BIM ndash Programs
3D Modeling Software -
Revit Architecture 2011
Features (Autodesk Revit 2016)
4D Project Scheduling - Software Autodesk
Navisworks (Autodesk Navisworks 2016)
5D Estimating Software -
PlanSwift (Planswift 2016)
BIM ndash Productivity Rates
IPD vs Traditional methods
of construction in terms of
Cost Time Efforts
(Hijazi 2015)
BIM ndash Productivity Rates
This graph depicts the total time it takes to
complete a project by using BIM amp CAD
separately
(Graphisoft 2015)
Additionally BIM enabled projects have
reduced the number of RFIrsquos to 10 of the
project (Chelson 2010)
This reduction of rework and idle time due
to site conflicts savings for trade
contractors have been reduced to 9 of
project costs
BIM ndash Productivity Rates
Long term amp short term rates
when a construction company
is working with BIM and
applying BIM to a construction
project
(McGrawHill Construction 2012)
BIM ndash Productivity Rates
Tangible benefits for contractors amp sub-trades working with BIM related programs and implementing BIM practices
(Turner 2015)
BIM ndash Productivity Rates Facts from
Studies
75 of BIM users reported better multi-party
communication
57 of Designers state BIM reduces errors during the
design phase
Average project duration reduced by 37
65 of contractors report BIM reduces rework and cost
overruns
BIM ndash Project Turnover Rates
The
impact
of BIM
on
Project
Turnov
er
Rates
(Becker-
Gerber
2010)
BIM ndash Implementation
Software Hardware Requirements
CPU Types Multi-Core Intel Pentium Xeon or i-Series Porcessor or an AMD equivalent
Memory
4 ndash 8 GB of RAM
Video Graphics Card Direct X11 with Shader Model 3 (As recommended by Autodesk)
Staff Training Requirements
Sufficient Human Capitol to complete the project in a Team Based environment
A diploma in Architectural Technology (or equivalent diploma) is usually required
BIM ndash Challenges
IPD concept education amp ldquoKnow howrdquo
Understanding each otherrsquos role amp
responsibility
Set up communication protocols
Understanding that increase in cost at
early stages can substantially reduce
construction process costs change
orders and requests for information
Contractors amp sub-contractors need to
revise their construction management amp
process
A Typical IPD Diagram
(Hijazi 2015)
Primary Sources ndash Jacek Gorka
Jacek Gorka Dipl Ing ARCH MArch OAA MRAIC - Project Manager
at GorkaArchitects
MrGorka has been working with CAD amp BIM software for the
past 20 years and also has his own practice at GorkaArchitects
ldquoBeing a designer and Project Manager I have noticed that
lsquoElement Redundanciesrsquo have dropped which has
improved project productivities I have also noticed that
over the years with using BIM practices and the Revit
Program is that coordination errors have dropped 90 -
which has greatly improved productivityrdquo ndash (J Gorka personal communication
December 2 2015)
Primary Sources ndash Kaite Kuzan
Katie Kuzan B AS MArch - Project Manager at Kohn Partnership
Architects Inc
ldquoThe growing trend is that a number of trades have
requested the ArchitectClient release the BIM model to
perform Quantity Take-offs at a much faster rate and with
easerdquo - (K Kuzan personal communication
December 3 2015)
MsKuzan has also stated that this trend has increased by as
much as 20 within the past years
She has also stated that this trend is most common within the
Steel Sub-Trade
Primary Sources ndash Nay Calderon
Ney Calderon Dipl Arch Tech - Research and Innovation Lab
Technician Coordinator - CCET
ldquoBIM is a great tool to optimize project results increase
project value for the owner reduce waste and maximize
efficiency throughout all aspects of the projectrdquo - (N Calderon personal
communication December 4 2015)
Mr Calderon has stated that the best way utilize BIM to its
fullest potential is to have everyone on board with the process
and for everyone to understand it
BIM ndash Conclusion amp Recommendations
In conclusion BIM can help Construction Companies
Improve visualization of construction projects
Improves productivity due to easy retrieval of information
Increase coordination of construction documents
Embedding and linking of vital information such as vendors for specific
materials location of details and quantities required for estimation and
tendering
Increased speed of delivery
Reducing production costs and creating a streamlined process
Thank you for Listening
Intensions amp Assumptions
To explain the concept of BIM and its impacts on productivity in
the Construction Industry
To help educate the reader in understanding what BIM is and
how BIM can be implemented in the workforce
Due to conflicting schedules only 3 in-person interviews could
be used as primary sources of information
Introduction
The Construction Industry accounts for 6 of Canadas GDP (Statistics Canada 2016)
Currently programs like AutoCAD is the popular choice to use when designing and documenting architectural amp construction drawings
However the process can be slow and most of the time is used up in coordination and correcting discrepancies
Which is why increase the productivity and output of construction drawings and documents is a crucial part in a project orientated industry such as the Construction Industry
Thesis Statement
ldquoBIM programs amp practices are not only used
to help with communication and visual
understandings of a project but also have a
great impact on accelerating productivity and
achieving a higher project turnover ratesrdquo
BIM ndash Definition
In 2016 The Us National Building Information Modeling Standard Project Committee defines BIM as
ldquo(BIM) is a digital representation of physical amp functional characteristics of a facility (BIM) is a shared knowledge of resources for information about a facility forming a reliable basis for decisions during its life-cycle defined as existing from earliest conceptions
BIM ndash Dimensions in Construction
BIM ndash History
Charles M Eastman Is a pioneer in AEC
CAD and developed early research on
BIM
In the mid-1970s he focused on the
development for practitioners with the
lsquoBuilding Description Systemrsquo and
lsquoBuilding Product Modelingrsquo (which was
later renamed into lsquoBuilding Information
Modelingrsquo ndash BIM)
Author of BIM Handbook A Guide to
Building Information Modeling for Owners
Managers Designers Engineers and
Charles M Eastman Picture taken in 2014
BIM ndash Off-Site Applications
BIM is mainly used in offices of Construction amp Design
companies
There are 5 main purposes when working with BIM
Gather ndash Collect amp organize Information
Generate ndash Create amp design with the information gathered
Analyze ndash Review the design and it properties
Communicate ndash Present amp document the design amp information
Realize ndash Follow through with the design amp implement it in the
construction phase
BIM ndash On-Site Applications
BIM can be used to facilitate a virtual walkthrough while on a construction site ndash through the use of BIM ldquoappsrdquo Most common BIM apps are listed below
Graphisoft BIMx
Telka BIMSight Mobile
Navigator Pano Review
Autodesk 360 Mobile
Revizto Viewer
BIManywhere
BIM ndash Programs
3D Modeling Software -
Revit Architecture 2011
Features (Autodesk Revit 2016)
4D Project Scheduling - Software Autodesk
Navisworks (Autodesk Navisworks 2016)
5D Estimating Software -
PlanSwift (Planswift 2016)
BIM ndash Productivity Rates
IPD vs Traditional methods
of construction in terms of
Cost Time Efforts
(Hijazi 2015)
BIM ndash Productivity Rates
This graph depicts the total time it takes to
complete a project by using BIM amp CAD
separately
(Graphisoft 2015)
Additionally BIM enabled projects have
reduced the number of RFIrsquos to 10 of the
project (Chelson 2010)
This reduction of rework and idle time due
to site conflicts savings for trade
contractors have been reduced to 9 of
project costs
BIM ndash Productivity Rates
Long term amp short term rates
when a construction company
is working with BIM and
applying BIM to a construction
project
(McGrawHill Construction 2012)
BIM ndash Productivity Rates
Tangible benefits for contractors amp sub-trades working with BIM related programs and implementing BIM practices
(Turner 2015)
BIM ndash Productivity Rates Facts from
Studies
75 of BIM users reported better multi-party
communication
57 of Designers state BIM reduces errors during the
design phase
Average project duration reduced by 37
65 of contractors report BIM reduces rework and cost
overruns
BIM ndash Project Turnover Rates
The
impact
of BIM
on
Project
Turnov
er
Rates
(Becker-
Gerber
2010)
BIM ndash Implementation
Software Hardware Requirements
CPU Types Multi-Core Intel Pentium Xeon or i-Series Porcessor or an AMD equivalent
Memory
4 ndash 8 GB of RAM
Video Graphics Card Direct X11 with Shader Model 3 (As recommended by Autodesk)
Staff Training Requirements
Sufficient Human Capitol to complete the project in a Team Based environment
A diploma in Architectural Technology (or equivalent diploma) is usually required
BIM ndash Challenges
IPD concept education amp ldquoKnow howrdquo
Understanding each otherrsquos role amp
responsibility
Set up communication protocols
Understanding that increase in cost at
early stages can substantially reduce
construction process costs change
orders and requests for information
Contractors amp sub-contractors need to
revise their construction management amp
process
A Typical IPD Diagram
(Hijazi 2015)
Primary Sources ndash Jacek Gorka
Jacek Gorka Dipl Ing ARCH MArch OAA MRAIC - Project Manager
at GorkaArchitects
MrGorka has been working with CAD amp BIM software for the
past 20 years and also has his own practice at GorkaArchitects
ldquoBeing a designer and Project Manager I have noticed that
lsquoElement Redundanciesrsquo have dropped which has
improved project productivities I have also noticed that
over the years with using BIM practices and the Revit
Program is that coordination errors have dropped 90 -
which has greatly improved productivityrdquo ndash (J Gorka personal communication
December 2 2015)
Primary Sources ndash Kaite Kuzan
Katie Kuzan B AS MArch - Project Manager at Kohn Partnership
Architects Inc
ldquoThe growing trend is that a number of trades have
requested the ArchitectClient release the BIM model to
perform Quantity Take-offs at a much faster rate and with
easerdquo - (K Kuzan personal communication
December 3 2015)
MsKuzan has also stated that this trend has increased by as
much as 20 within the past years
She has also stated that this trend is most common within the
Steel Sub-Trade
Primary Sources ndash Nay Calderon
Ney Calderon Dipl Arch Tech - Research and Innovation Lab
Technician Coordinator - CCET
ldquoBIM is a great tool to optimize project results increase
project value for the owner reduce waste and maximize
efficiency throughout all aspects of the projectrdquo - (N Calderon personal
communication December 4 2015)
Mr Calderon has stated that the best way utilize BIM to its
fullest potential is to have everyone on board with the process
and for everyone to understand it
BIM ndash Conclusion amp Recommendations
In conclusion BIM can help Construction Companies
Improve visualization of construction projects
Improves productivity due to easy retrieval of information
Increase coordination of construction documents
Embedding and linking of vital information such as vendors for specific
materials location of details and quantities required for estimation and
tendering
Increased speed of delivery
Reducing production costs and creating a streamlined process
Thank you for Listening
Introduction
The Construction Industry accounts for 6 of Canadas GDP (Statistics Canada 2016)
Currently programs like AutoCAD is the popular choice to use when designing and documenting architectural amp construction drawings
However the process can be slow and most of the time is used up in coordination and correcting discrepancies
Which is why increase the productivity and output of construction drawings and documents is a crucial part in a project orientated industry such as the Construction Industry
Thesis Statement
ldquoBIM programs amp practices are not only used
to help with communication and visual
understandings of a project but also have a
great impact on accelerating productivity and
achieving a higher project turnover ratesrdquo
BIM ndash Definition
In 2016 The Us National Building Information Modeling Standard Project Committee defines BIM as
ldquo(BIM) is a digital representation of physical amp functional characteristics of a facility (BIM) is a shared knowledge of resources for information about a facility forming a reliable basis for decisions during its life-cycle defined as existing from earliest conceptions
BIM ndash Dimensions in Construction
BIM ndash History
Charles M Eastman Is a pioneer in AEC
CAD and developed early research on
BIM
In the mid-1970s he focused on the
development for practitioners with the
lsquoBuilding Description Systemrsquo and
lsquoBuilding Product Modelingrsquo (which was
later renamed into lsquoBuilding Information
Modelingrsquo ndash BIM)
Author of BIM Handbook A Guide to
Building Information Modeling for Owners
Managers Designers Engineers and
Charles M Eastman Picture taken in 2014
BIM ndash Off-Site Applications
BIM is mainly used in offices of Construction amp Design
companies
There are 5 main purposes when working with BIM
Gather ndash Collect amp organize Information
Generate ndash Create amp design with the information gathered
Analyze ndash Review the design and it properties
Communicate ndash Present amp document the design amp information
Realize ndash Follow through with the design amp implement it in the
construction phase
BIM ndash On-Site Applications
BIM can be used to facilitate a virtual walkthrough while on a construction site ndash through the use of BIM ldquoappsrdquo Most common BIM apps are listed below
Graphisoft BIMx
Telka BIMSight Mobile
Navigator Pano Review
Autodesk 360 Mobile
Revizto Viewer
BIManywhere
BIM ndash Programs
3D Modeling Software -
Revit Architecture 2011
Features (Autodesk Revit 2016)
4D Project Scheduling - Software Autodesk
Navisworks (Autodesk Navisworks 2016)
5D Estimating Software -
PlanSwift (Planswift 2016)
BIM ndash Productivity Rates
IPD vs Traditional methods
of construction in terms of
Cost Time Efforts
(Hijazi 2015)
BIM ndash Productivity Rates
This graph depicts the total time it takes to
complete a project by using BIM amp CAD
separately
(Graphisoft 2015)
Additionally BIM enabled projects have
reduced the number of RFIrsquos to 10 of the
project (Chelson 2010)
This reduction of rework and idle time due
to site conflicts savings for trade
contractors have been reduced to 9 of
project costs
BIM ndash Productivity Rates
Long term amp short term rates
when a construction company
is working with BIM and
applying BIM to a construction
project
(McGrawHill Construction 2012)
BIM ndash Productivity Rates
Tangible benefits for contractors amp sub-trades working with BIM related programs and implementing BIM practices
(Turner 2015)
BIM ndash Productivity Rates Facts from
Studies
75 of BIM users reported better multi-party
communication
57 of Designers state BIM reduces errors during the
design phase
Average project duration reduced by 37
65 of contractors report BIM reduces rework and cost
overruns
BIM ndash Project Turnover Rates
The
impact
of BIM
on
Project
Turnov
er
Rates
(Becker-
Gerber
2010)
BIM ndash Implementation
Software Hardware Requirements
CPU Types Multi-Core Intel Pentium Xeon or i-Series Porcessor or an AMD equivalent
Memory
4 ndash 8 GB of RAM
Video Graphics Card Direct X11 with Shader Model 3 (As recommended by Autodesk)
Staff Training Requirements
Sufficient Human Capitol to complete the project in a Team Based environment
A diploma in Architectural Technology (or equivalent diploma) is usually required
BIM ndash Challenges
IPD concept education amp ldquoKnow howrdquo
Understanding each otherrsquos role amp
responsibility
Set up communication protocols
Understanding that increase in cost at
early stages can substantially reduce
construction process costs change
orders and requests for information
Contractors amp sub-contractors need to
revise their construction management amp
process
A Typical IPD Diagram
(Hijazi 2015)
Primary Sources ndash Jacek Gorka
Jacek Gorka Dipl Ing ARCH MArch OAA MRAIC - Project Manager
at GorkaArchitects
MrGorka has been working with CAD amp BIM software for the
past 20 years and also has his own practice at GorkaArchitects
ldquoBeing a designer and Project Manager I have noticed that
lsquoElement Redundanciesrsquo have dropped which has
improved project productivities I have also noticed that
over the years with using BIM practices and the Revit
Program is that coordination errors have dropped 90 -
which has greatly improved productivityrdquo ndash (J Gorka personal communication
December 2 2015)
Primary Sources ndash Kaite Kuzan
Katie Kuzan B AS MArch - Project Manager at Kohn Partnership
Architects Inc
ldquoThe growing trend is that a number of trades have
requested the ArchitectClient release the BIM model to
perform Quantity Take-offs at a much faster rate and with
easerdquo - (K Kuzan personal communication
December 3 2015)
MsKuzan has also stated that this trend has increased by as
much as 20 within the past years
She has also stated that this trend is most common within the
Steel Sub-Trade
Primary Sources ndash Nay Calderon
Ney Calderon Dipl Arch Tech - Research and Innovation Lab
Technician Coordinator - CCET
ldquoBIM is a great tool to optimize project results increase
project value for the owner reduce waste and maximize
efficiency throughout all aspects of the projectrdquo - (N Calderon personal
communication December 4 2015)
Mr Calderon has stated that the best way utilize BIM to its
fullest potential is to have everyone on board with the process
and for everyone to understand it
BIM ndash Conclusion amp Recommendations
In conclusion BIM can help Construction Companies
Improve visualization of construction projects
Improves productivity due to easy retrieval of information
Increase coordination of construction documents
Embedding and linking of vital information such as vendors for specific
materials location of details and quantities required for estimation and
tendering
Increased speed of delivery
Reducing production costs and creating a streamlined process
Thank you for Listening
Thesis Statement
ldquoBIM programs amp practices are not only used
to help with communication and visual
understandings of a project but also have a
great impact on accelerating productivity and
achieving a higher project turnover ratesrdquo
BIM ndash Definition
In 2016 The Us National Building Information Modeling Standard Project Committee defines BIM as
ldquo(BIM) is a digital representation of physical amp functional characteristics of a facility (BIM) is a shared knowledge of resources for information about a facility forming a reliable basis for decisions during its life-cycle defined as existing from earliest conceptions
BIM ndash Dimensions in Construction
BIM ndash History
Charles M Eastman Is a pioneer in AEC
CAD and developed early research on
BIM
In the mid-1970s he focused on the
development for practitioners with the
lsquoBuilding Description Systemrsquo and
lsquoBuilding Product Modelingrsquo (which was
later renamed into lsquoBuilding Information
Modelingrsquo ndash BIM)
Author of BIM Handbook A Guide to
Building Information Modeling for Owners
Managers Designers Engineers and
Charles M Eastman Picture taken in 2014
BIM ndash Off-Site Applications
BIM is mainly used in offices of Construction amp Design
companies
There are 5 main purposes when working with BIM
Gather ndash Collect amp organize Information
Generate ndash Create amp design with the information gathered
Analyze ndash Review the design and it properties
Communicate ndash Present amp document the design amp information
Realize ndash Follow through with the design amp implement it in the
construction phase
BIM ndash On-Site Applications
BIM can be used to facilitate a virtual walkthrough while on a construction site ndash through the use of BIM ldquoappsrdquo Most common BIM apps are listed below
Graphisoft BIMx
Telka BIMSight Mobile
Navigator Pano Review
Autodesk 360 Mobile
Revizto Viewer
BIManywhere
BIM ndash Programs
3D Modeling Software -
Revit Architecture 2011
Features (Autodesk Revit 2016)
4D Project Scheduling - Software Autodesk
Navisworks (Autodesk Navisworks 2016)
5D Estimating Software -
PlanSwift (Planswift 2016)
BIM ndash Productivity Rates
IPD vs Traditional methods
of construction in terms of
Cost Time Efforts
(Hijazi 2015)
BIM ndash Productivity Rates
This graph depicts the total time it takes to
complete a project by using BIM amp CAD
separately
(Graphisoft 2015)
Additionally BIM enabled projects have
reduced the number of RFIrsquos to 10 of the
project (Chelson 2010)
This reduction of rework and idle time due
to site conflicts savings for trade
contractors have been reduced to 9 of
project costs
BIM ndash Productivity Rates
Long term amp short term rates
when a construction company
is working with BIM and
applying BIM to a construction
project
(McGrawHill Construction 2012)
BIM ndash Productivity Rates
Tangible benefits for contractors amp sub-trades working with BIM related programs and implementing BIM practices
(Turner 2015)
BIM ndash Productivity Rates Facts from
Studies
75 of BIM users reported better multi-party
communication
57 of Designers state BIM reduces errors during the
design phase
Average project duration reduced by 37
65 of contractors report BIM reduces rework and cost
overruns
BIM ndash Project Turnover Rates
The
impact
of BIM
on
Project
Turnov
er
Rates
(Becker-
Gerber
2010)
BIM ndash Implementation
Software Hardware Requirements
CPU Types Multi-Core Intel Pentium Xeon or i-Series Porcessor or an AMD equivalent
Memory
4 ndash 8 GB of RAM
Video Graphics Card Direct X11 with Shader Model 3 (As recommended by Autodesk)
Staff Training Requirements
Sufficient Human Capitol to complete the project in a Team Based environment
A diploma in Architectural Technology (or equivalent diploma) is usually required
BIM ndash Challenges
IPD concept education amp ldquoKnow howrdquo
Understanding each otherrsquos role amp
responsibility
Set up communication protocols
Understanding that increase in cost at
early stages can substantially reduce
construction process costs change
orders and requests for information
Contractors amp sub-contractors need to
revise their construction management amp
process
A Typical IPD Diagram
(Hijazi 2015)
Primary Sources ndash Jacek Gorka
Jacek Gorka Dipl Ing ARCH MArch OAA MRAIC - Project Manager
at GorkaArchitects
MrGorka has been working with CAD amp BIM software for the
past 20 years and also has his own practice at GorkaArchitects
ldquoBeing a designer and Project Manager I have noticed that
lsquoElement Redundanciesrsquo have dropped which has
improved project productivities I have also noticed that
over the years with using BIM practices and the Revit
Program is that coordination errors have dropped 90 -
which has greatly improved productivityrdquo ndash (J Gorka personal communication
December 2 2015)
Primary Sources ndash Kaite Kuzan
Katie Kuzan B AS MArch - Project Manager at Kohn Partnership
Architects Inc
ldquoThe growing trend is that a number of trades have
requested the ArchitectClient release the BIM model to
perform Quantity Take-offs at a much faster rate and with
easerdquo - (K Kuzan personal communication
December 3 2015)
MsKuzan has also stated that this trend has increased by as
much as 20 within the past years
She has also stated that this trend is most common within the
Steel Sub-Trade
Primary Sources ndash Nay Calderon
Ney Calderon Dipl Arch Tech - Research and Innovation Lab
Technician Coordinator - CCET
ldquoBIM is a great tool to optimize project results increase
project value for the owner reduce waste and maximize
efficiency throughout all aspects of the projectrdquo - (N Calderon personal
communication December 4 2015)
Mr Calderon has stated that the best way utilize BIM to its
fullest potential is to have everyone on board with the process
and for everyone to understand it
BIM ndash Conclusion amp Recommendations
In conclusion BIM can help Construction Companies
Improve visualization of construction projects
Improves productivity due to easy retrieval of information
Increase coordination of construction documents
Embedding and linking of vital information such as vendors for specific
materials location of details and quantities required for estimation and
tendering
Increased speed of delivery
Reducing production costs and creating a streamlined process
Thank you for Listening
BIM ndash Definition
In 2016 The Us National Building Information Modeling Standard Project Committee defines BIM as
ldquo(BIM) is a digital representation of physical amp functional characteristics of a facility (BIM) is a shared knowledge of resources for information about a facility forming a reliable basis for decisions during its life-cycle defined as existing from earliest conceptions
BIM ndash Dimensions in Construction
BIM ndash History
Charles M Eastman Is a pioneer in AEC
CAD and developed early research on
BIM
In the mid-1970s he focused on the
development for practitioners with the
lsquoBuilding Description Systemrsquo and
lsquoBuilding Product Modelingrsquo (which was
later renamed into lsquoBuilding Information
Modelingrsquo ndash BIM)
Author of BIM Handbook A Guide to
Building Information Modeling for Owners
Managers Designers Engineers and
Charles M Eastman Picture taken in 2014
BIM ndash Off-Site Applications
BIM is mainly used in offices of Construction amp Design
companies
There are 5 main purposes when working with BIM
Gather ndash Collect amp organize Information
Generate ndash Create amp design with the information gathered
Analyze ndash Review the design and it properties
Communicate ndash Present amp document the design amp information
Realize ndash Follow through with the design amp implement it in the
construction phase
BIM ndash On-Site Applications
BIM can be used to facilitate a virtual walkthrough while on a construction site ndash through the use of BIM ldquoappsrdquo Most common BIM apps are listed below
Graphisoft BIMx
Telka BIMSight Mobile
Navigator Pano Review
Autodesk 360 Mobile
Revizto Viewer
BIManywhere
BIM ndash Programs
3D Modeling Software -
Revit Architecture 2011
Features (Autodesk Revit 2016)
4D Project Scheduling - Software Autodesk
Navisworks (Autodesk Navisworks 2016)
5D Estimating Software -
PlanSwift (Planswift 2016)
BIM ndash Productivity Rates
IPD vs Traditional methods
of construction in terms of
Cost Time Efforts
(Hijazi 2015)
BIM ndash Productivity Rates
This graph depicts the total time it takes to
complete a project by using BIM amp CAD
separately
(Graphisoft 2015)
Additionally BIM enabled projects have
reduced the number of RFIrsquos to 10 of the
project (Chelson 2010)
This reduction of rework and idle time due
to site conflicts savings for trade
contractors have been reduced to 9 of
project costs
BIM ndash Productivity Rates
Long term amp short term rates
when a construction company
is working with BIM and
applying BIM to a construction
project
(McGrawHill Construction 2012)
BIM ndash Productivity Rates
Tangible benefits for contractors amp sub-trades working with BIM related programs and implementing BIM practices
(Turner 2015)
BIM ndash Productivity Rates Facts from
Studies
75 of BIM users reported better multi-party
communication
57 of Designers state BIM reduces errors during the
design phase
Average project duration reduced by 37
65 of contractors report BIM reduces rework and cost
overruns
BIM ndash Project Turnover Rates
The
impact
of BIM
on
Project
Turnov
er
Rates
(Becker-
Gerber
2010)
BIM ndash Implementation
Software Hardware Requirements
CPU Types Multi-Core Intel Pentium Xeon or i-Series Porcessor or an AMD equivalent
Memory
4 ndash 8 GB of RAM
Video Graphics Card Direct X11 with Shader Model 3 (As recommended by Autodesk)
Staff Training Requirements
Sufficient Human Capitol to complete the project in a Team Based environment
A diploma in Architectural Technology (or equivalent diploma) is usually required
BIM ndash Challenges
IPD concept education amp ldquoKnow howrdquo
Understanding each otherrsquos role amp
responsibility
Set up communication protocols
Understanding that increase in cost at
early stages can substantially reduce
construction process costs change
orders and requests for information
Contractors amp sub-contractors need to
revise their construction management amp
process
A Typical IPD Diagram
(Hijazi 2015)
Primary Sources ndash Jacek Gorka
Jacek Gorka Dipl Ing ARCH MArch OAA MRAIC - Project Manager
at GorkaArchitects
MrGorka has been working with CAD amp BIM software for the
past 20 years and also has his own practice at GorkaArchitects
ldquoBeing a designer and Project Manager I have noticed that
lsquoElement Redundanciesrsquo have dropped which has
improved project productivities I have also noticed that
over the years with using BIM practices and the Revit
Program is that coordination errors have dropped 90 -
which has greatly improved productivityrdquo ndash (J Gorka personal communication
December 2 2015)
Primary Sources ndash Kaite Kuzan
Katie Kuzan B AS MArch - Project Manager at Kohn Partnership
Architects Inc
ldquoThe growing trend is that a number of trades have
requested the ArchitectClient release the BIM model to
perform Quantity Take-offs at a much faster rate and with
easerdquo - (K Kuzan personal communication
December 3 2015)
MsKuzan has also stated that this trend has increased by as
much as 20 within the past years
She has also stated that this trend is most common within the
Steel Sub-Trade
Primary Sources ndash Nay Calderon
Ney Calderon Dipl Arch Tech - Research and Innovation Lab
Technician Coordinator - CCET
ldquoBIM is a great tool to optimize project results increase
project value for the owner reduce waste and maximize
efficiency throughout all aspects of the projectrdquo - (N Calderon personal
communication December 4 2015)
Mr Calderon has stated that the best way utilize BIM to its
fullest potential is to have everyone on board with the process
and for everyone to understand it
BIM ndash Conclusion amp Recommendations
In conclusion BIM can help Construction Companies
Improve visualization of construction projects
Improves productivity due to easy retrieval of information
Increase coordination of construction documents
Embedding and linking of vital information such as vendors for specific
materials location of details and quantities required for estimation and
tendering
Increased speed of delivery
Reducing production costs and creating a streamlined process
Thank you for Listening
BIM ndash Dimensions in Construction
BIM ndash History
Charles M Eastman Is a pioneer in AEC
CAD and developed early research on
BIM
In the mid-1970s he focused on the
development for practitioners with the
lsquoBuilding Description Systemrsquo and
lsquoBuilding Product Modelingrsquo (which was
later renamed into lsquoBuilding Information
Modelingrsquo ndash BIM)
Author of BIM Handbook A Guide to
Building Information Modeling for Owners
Managers Designers Engineers and
Charles M Eastman Picture taken in 2014
BIM ndash Off-Site Applications
BIM is mainly used in offices of Construction amp Design
companies
There are 5 main purposes when working with BIM
Gather ndash Collect amp organize Information
Generate ndash Create amp design with the information gathered
Analyze ndash Review the design and it properties
Communicate ndash Present amp document the design amp information
Realize ndash Follow through with the design amp implement it in the
construction phase
BIM ndash On-Site Applications
BIM can be used to facilitate a virtual walkthrough while on a construction site ndash through the use of BIM ldquoappsrdquo Most common BIM apps are listed below
Graphisoft BIMx
Telka BIMSight Mobile
Navigator Pano Review
Autodesk 360 Mobile
Revizto Viewer
BIManywhere
BIM ndash Programs
3D Modeling Software -
Revit Architecture 2011
Features (Autodesk Revit 2016)
4D Project Scheduling - Software Autodesk
Navisworks (Autodesk Navisworks 2016)
5D Estimating Software -
PlanSwift (Planswift 2016)
BIM ndash Productivity Rates
IPD vs Traditional methods
of construction in terms of
Cost Time Efforts
(Hijazi 2015)
BIM ndash Productivity Rates
This graph depicts the total time it takes to
complete a project by using BIM amp CAD
separately
(Graphisoft 2015)
Additionally BIM enabled projects have
reduced the number of RFIrsquos to 10 of the
project (Chelson 2010)
This reduction of rework and idle time due
to site conflicts savings for trade
contractors have been reduced to 9 of
project costs
BIM ndash Productivity Rates
Long term amp short term rates
when a construction company
is working with BIM and
applying BIM to a construction
project
(McGrawHill Construction 2012)
BIM ndash Productivity Rates
Tangible benefits for contractors amp sub-trades working with BIM related programs and implementing BIM practices
(Turner 2015)
BIM ndash Productivity Rates Facts from
Studies
75 of BIM users reported better multi-party
communication
57 of Designers state BIM reduces errors during the
design phase
Average project duration reduced by 37
65 of contractors report BIM reduces rework and cost
overruns
BIM ndash Project Turnover Rates
The
impact
of BIM
on
Project
Turnov
er
Rates
(Becker-
Gerber
2010)
BIM ndash Implementation
Software Hardware Requirements
CPU Types Multi-Core Intel Pentium Xeon or i-Series Porcessor or an AMD equivalent
Memory
4 ndash 8 GB of RAM
Video Graphics Card Direct X11 with Shader Model 3 (As recommended by Autodesk)
Staff Training Requirements
Sufficient Human Capitol to complete the project in a Team Based environment
A diploma in Architectural Technology (or equivalent diploma) is usually required
BIM ndash Challenges
IPD concept education amp ldquoKnow howrdquo
Understanding each otherrsquos role amp
responsibility
Set up communication protocols
Understanding that increase in cost at
early stages can substantially reduce
construction process costs change
orders and requests for information
Contractors amp sub-contractors need to
revise their construction management amp
process
A Typical IPD Diagram
(Hijazi 2015)
Primary Sources ndash Jacek Gorka
Jacek Gorka Dipl Ing ARCH MArch OAA MRAIC - Project Manager
at GorkaArchitects
MrGorka has been working with CAD amp BIM software for the
past 20 years and also has his own practice at GorkaArchitects
ldquoBeing a designer and Project Manager I have noticed that
lsquoElement Redundanciesrsquo have dropped which has
improved project productivities I have also noticed that
over the years with using BIM practices and the Revit
Program is that coordination errors have dropped 90 -
which has greatly improved productivityrdquo ndash (J Gorka personal communication
December 2 2015)
Primary Sources ndash Kaite Kuzan
Katie Kuzan B AS MArch - Project Manager at Kohn Partnership
Architects Inc
ldquoThe growing trend is that a number of trades have
requested the ArchitectClient release the BIM model to
perform Quantity Take-offs at a much faster rate and with
easerdquo - (K Kuzan personal communication
December 3 2015)
MsKuzan has also stated that this trend has increased by as
much as 20 within the past years
She has also stated that this trend is most common within the
Steel Sub-Trade
Primary Sources ndash Nay Calderon
Ney Calderon Dipl Arch Tech - Research and Innovation Lab
Technician Coordinator - CCET
ldquoBIM is a great tool to optimize project results increase
project value for the owner reduce waste and maximize
efficiency throughout all aspects of the projectrdquo - (N Calderon personal
communication December 4 2015)
Mr Calderon has stated that the best way utilize BIM to its
fullest potential is to have everyone on board with the process
and for everyone to understand it
BIM ndash Conclusion amp Recommendations
In conclusion BIM can help Construction Companies
Improve visualization of construction projects
Improves productivity due to easy retrieval of information
Increase coordination of construction documents
Embedding and linking of vital information such as vendors for specific
materials location of details and quantities required for estimation and
tendering
Increased speed of delivery
Reducing production costs and creating a streamlined process
Thank you for Listening
BIM ndash History
Charles M Eastman Is a pioneer in AEC
CAD and developed early research on
BIM
In the mid-1970s he focused on the
development for practitioners with the
lsquoBuilding Description Systemrsquo and
lsquoBuilding Product Modelingrsquo (which was
later renamed into lsquoBuilding Information
Modelingrsquo ndash BIM)
Author of BIM Handbook A Guide to
Building Information Modeling for Owners
Managers Designers Engineers and
Charles M Eastman Picture taken in 2014
BIM ndash Off-Site Applications
BIM is mainly used in offices of Construction amp Design
companies
There are 5 main purposes when working with BIM
Gather ndash Collect amp organize Information
Generate ndash Create amp design with the information gathered
Analyze ndash Review the design and it properties
Communicate ndash Present amp document the design amp information
Realize ndash Follow through with the design amp implement it in the
construction phase
BIM ndash On-Site Applications
BIM can be used to facilitate a virtual walkthrough while on a construction site ndash through the use of BIM ldquoappsrdquo Most common BIM apps are listed below
Graphisoft BIMx
Telka BIMSight Mobile
Navigator Pano Review
Autodesk 360 Mobile
Revizto Viewer
BIManywhere
BIM ndash Programs
3D Modeling Software -
Revit Architecture 2011
Features (Autodesk Revit 2016)
4D Project Scheduling - Software Autodesk
Navisworks (Autodesk Navisworks 2016)
5D Estimating Software -
PlanSwift (Planswift 2016)
BIM ndash Productivity Rates
IPD vs Traditional methods
of construction in terms of
Cost Time Efforts
(Hijazi 2015)
BIM ndash Productivity Rates
This graph depicts the total time it takes to
complete a project by using BIM amp CAD
separately
(Graphisoft 2015)
Additionally BIM enabled projects have
reduced the number of RFIrsquos to 10 of the
project (Chelson 2010)
This reduction of rework and idle time due
to site conflicts savings for trade
contractors have been reduced to 9 of
project costs
BIM ndash Productivity Rates
Long term amp short term rates
when a construction company
is working with BIM and
applying BIM to a construction
project
(McGrawHill Construction 2012)
BIM ndash Productivity Rates
Tangible benefits for contractors amp sub-trades working with BIM related programs and implementing BIM practices
(Turner 2015)
BIM ndash Productivity Rates Facts from
Studies
75 of BIM users reported better multi-party
communication
57 of Designers state BIM reduces errors during the
design phase
Average project duration reduced by 37
65 of contractors report BIM reduces rework and cost
overruns
BIM ndash Project Turnover Rates
The
impact
of BIM
on
Project
Turnov
er
Rates
(Becker-
Gerber
2010)
BIM ndash Implementation
Software Hardware Requirements
CPU Types Multi-Core Intel Pentium Xeon or i-Series Porcessor or an AMD equivalent
Memory
4 ndash 8 GB of RAM
Video Graphics Card Direct X11 with Shader Model 3 (As recommended by Autodesk)
Staff Training Requirements
Sufficient Human Capitol to complete the project in a Team Based environment
A diploma in Architectural Technology (or equivalent diploma) is usually required
BIM ndash Challenges
IPD concept education amp ldquoKnow howrdquo
Understanding each otherrsquos role amp
responsibility
Set up communication protocols
Understanding that increase in cost at
early stages can substantially reduce
construction process costs change
orders and requests for information
Contractors amp sub-contractors need to
revise their construction management amp
process
A Typical IPD Diagram
(Hijazi 2015)
Primary Sources ndash Jacek Gorka
Jacek Gorka Dipl Ing ARCH MArch OAA MRAIC - Project Manager
at GorkaArchitects
MrGorka has been working with CAD amp BIM software for the
past 20 years and also has his own practice at GorkaArchitects
ldquoBeing a designer and Project Manager I have noticed that
lsquoElement Redundanciesrsquo have dropped which has
improved project productivities I have also noticed that
over the years with using BIM practices and the Revit
Program is that coordination errors have dropped 90 -
which has greatly improved productivityrdquo ndash (J Gorka personal communication
December 2 2015)
Primary Sources ndash Kaite Kuzan
Katie Kuzan B AS MArch - Project Manager at Kohn Partnership
Architects Inc
ldquoThe growing trend is that a number of trades have
requested the ArchitectClient release the BIM model to
perform Quantity Take-offs at a much faster rate and with
easerdquo - (K Kuzan personal communication
December 3 2015)
MsKuzan has also stated that this trend has increased by as
much as 20 within the past years
She has also stated that this trend is most common within the
Steel Sub-Trade
Primary Sources ndash Nay Calderon
Ney Calderon Dipl Arch Tech - Research and Innovation Lab
Technician Coordinator - CCET
ldquoBIM is a great tool to optimize project results increase
project value for the owner reduce waste and maximize
efficiency throughout all aspects of the projectrdquo - (N Calderon personal
communication December 4 2015)
Mr Calderon has stated that the best way utilize BIM to its
fullest potential is to have everyone on board with the process
and for everyone to understand it
BIM ndash Conclusion amp Recommendations
In conclusion BIM can help Construction Companies
Improve visualization of construction projects
Improves productivity due to easy retrieval of information
Increase coordination of construction documents
Embedding and linking of vital information such as vendors for specific
materials location of details and quantities required for estimation and
tendering
Increased speed of delivery
Reducing production costs and creating a streamlined process
Thank you for Listening
BIM ndash Off-Site Applications
BIM is mainly used in offices of Construction amp Design
companies
There are 5 main purposes when working with BIM
Gather ndash Collect amp organize Information
Generate ndash Create amp design with the information gathered
Analyze ndash Review the design and it properties
Communicate ndash Present amp document the design amp information
Realize ndash Follow through with the design amp implement it in the
construction phase
BIM ndash On-Site Applications
BIM can be used to facilitate a virtual walkthrough while on a construction site ndash through the use of BIM ldquoappsrdquo Most common BIM apps are listed below
Graphisoft BIMx
Telka BIMSight Mobile
Navigator Pano Review
Autodesk 360 Mobile
Revizto Viewer
BIManywhere
BIM ndash Programs
3D Modeling Software -
Revit Architecture 2011
Features (Autodesk Revit 2016)
4D Project Scheduling - Software Autodesk
Navisworks (Autodesk Navisworks 2016)
5D Estimating Software -
PlanSwift (Planswift 2016)
BIM ndash Productivity Rates
IPD vs Traditional methods
of construction in terms of
Cost Time Efforts
(Hijazi 2015)
BIM ndash Productivity Rates
This graph depicts the total time it takes to
complete a project by using BIM amp CAD
separately
(Graphisoft 2015)
Additionally BIM enabled projects have
reduced the number of RFIrsquos to 10 of the
project (Chelson 2010)
This reduction of rework and idle time due
to site conflicts savings for trade
contractors have been reduced to 9 of
project costs
BIM ndash Productivity Rates
Long term amp short term rates
when a construction company
is working with BIM and
applying BIM to a construction
project
(McGrawHill Construction 2012)
BIM ndash Productivity Rates
Tangible benefits for contractors amp sub-trades working with BIM related programs and implementing BIM practices
(Turner 2015)
BIM ndash Productivity Rates Facts from
Studies
75 of BIM users reported better multi-party
communication
57 of Designers state BIM reduces errors during the
design phase
Average project duration reduced by 37
65 of contractors report BIM reduces rework and cost
overruns
BIM ndash Project Turnover Rates
The
impact
of BIM
on
Project
Turnov
er
Rates
(Becker-
Gerber
2010)
BIM ndash Implementation
Software Hardware Requirements
CPU Types Multi-Core Intel Pentium Xeon or i-Series Porcessor or an AMD equivalent
Memory
4 ndash 8 GB of RAM
Video Graphics Card Direct X11 with Shader Model 3 (As recommended by Autodesk)
Staff Training Requirements
Sufficient Human Capitol to complete the project in a Team Based environment
A diploma in Architectural Technology (or equivalent diploma) is usually required
BIM ndash Challenges
IPD concept education amp ldquoKnow howrdquo
Understanding each otherrsquos role amp
responsibility
Set up communication protocols
Understanding that increase in cost at
early stages can substantially reduce
construction process costs change
orders and requests for information
Contractors amp sub-contractors need to
revise their construction management amp
process
A Typical IPD Diagram
(Hijazi 2015)
Primary Sources ndash Jacek Gorka
Jacek Gorka Dipl Ing ARCH MArch OAA MRAIC - Project Manager
at GorkaArchitects
MrGorka has been working with CAD amp BIM software for the
past 20 years and also has his own practice at GorkaArchitects
ldquoBeing a designer and Project Manager I have noticed that
lsquoElement Redundanciesrsquo have dropped which has
improved project productivities I have also noticed that
over the years with using BIM practices and the Revit
Program is that coordination errors have dropped 90 -
which has greatly improved productivityrdquo ndash (J Gorka personal communication
December 2 2015)
Primary Sources ndash Kaite Kuzan
Katie Kuzan B AS MArch - Project Manager at Kohn Partnership
Architects Inc
ldquoThe growing trend is that a number of trades have
requested the ArchitectClient release the BIM model to
perform Quantity Take-offs at a much faster rate and with
easerdquo - (K Kuzan personal communication
December 3 2015)
MsKuzan has also stated that this trend has increased by as
much as 20 within the past years
She has also stated that this trend is most common within the
Steel Sub-Trade
Primary Sources ndash Nay Calderon
Ney Calderon Dipl Arch Tech - Research and Innovation Lab
Technician Coordinator - CCET
ldquoBIM is a great tool to optimize project results increase
project value for the owner reduce waste and maximize
efficiency throughout all aspects of the projectrdquo - (N Calderon personal
communication December 4 2015)
Mr Calderon has stated that the best way utilize BIM to its
fullest potential is to have everyone on board with the process
and for everyone to understand it
BIM ndash Conclusion amp Recommendations
In conclusion BIM can help Construction Companies
Improve visualization of construction projects
Improves productivity due to easy retrieval of information
Increase coordination of construction documents
Embedding and linking of vital information such as vendors for specific
materials location of details and quantities required for estimation and
tendering
Increased speed of delivery
Reducing production costs and creating a streamlined process
Thank you for Listening
BIM ndash On-Site Applications
BIM can be used to facilitate a virtual walkthrough while on a construction site ndash through the use of BIM ldquoappsrdquo Most common BIM apps are listed below
Graphisoft BIMx
Telka BIMSight Mobile
Navigator Pano Review
Autodesk 360 Mobile
Revizto Viewer
BIManywhere
BIM ndash Programs
3D Modeling Software -
Revit Architecture 2011
Features (Autodesk Revit 2016)
4D Project Scheduling - Software Autodesk
Navisworks (Autodesk Navisworks 2016)
5D Estimating Software -
PlanSwift (Planswift 2016)
BIM ndash Productivity Rates
IPD vs Traditional methods
of construction in terms of
Cost Time Efforts
(Hijazi 2015)
BIM ndash Productivity Rates
This graph depicts the total time it takes to
complete a project by using BIM amp CAD
separately
(Graphisoft 2015)
Additionally BIM enabled projects have
reduced the number of RFIrsquos to 10 of the
project (Chelson 2010)
This reduction of rework and idle time due
to site conflicts savings for trade
contractors have been reduced to 9 of
project costs
BIM ndash Productivity Rates
Long term amp short term rates
when a construction company
is working with BIM and
applying BIM to a construction
project
(McGrawHill Construction 2012)
BIM ndash Productivity Rates
Tangible benefits for contractors amp sub-trades working with BIM related programs and implementing BIM practices
(Turner 2015)
BIM ndash Productivity Rates Facts from
Studies
75 of BIM users reported better multi-party
communication
57 of Designers state BIM reduces errors during the
design phase
Average project duration reduced by 37
65 of contractors report BIM reduces rework and cost
overruns
BIM ndash Project Turnover Rates
The
impact
of BIM
on
Project
Turnov
er
Rates
(Becker-
Gerber
2010)
BIM ndash Implementation
Software Hardware Requirements
CPU Types Multi-Core Intel Pentium Xeon or i-Series Porcessor or an AMD equivalent
Memory
4 ndash 8 GB of RAM
Video Graphics Card Direct X11 with Shader Model 3 (As recommended by Autodesk)
Staff Training Requirements
Sufficient Human Capitol to complete the project in a Team Based environment
A diploma in Architectural Technology (or equivalent diploma) is usually required
BIM ndash Challenges
IPD concept education amp ldquoKnow howrdquo
Understanding each otherrsquos role amp
responsibility
Set up communication protocols
Understanding that increase in cost at
early stages can substantially reduce
construction process costs change
orders and requests for information
Contractors amp sub-contractors need to
revise their construction management amp
process
A Typical IPD Diagram
(Hijazi 2015)
Primary Sources ndash Jacek Gorka
Jacek Gorka Dipl Ing ARCH MArch OAA MRAIC - Project Manager
at GorkaArchitects
MrGorka has been working with CAD amp BIM software for the
past 20 years and also has his own practice at GorkaArchitects
ldquoBeing a designer and Project Manager I have noticed that
lsquoElement Redundanciesrsquo have dropped which has
improved project productivities I have also noticed that
over the years with using BIM practices and the Revit
Program is that coordination errors have dropped 90 -
which has greatly improved productivityrdquo ndash (J Gorka personal communication
December 2 2015)
Primary Sources ndash Kaite Kuzan
Katie Kuzan B AS MArch - Project Manager at Kohn Partnership
Architects Inc
ldquoThe growing trend is that a number of trades have
requested the ArchitectClient release the BIM model to
perform Quantity Take-offs at a much faster rate and with
easerdquo - (K Kuzan personal communication
December 3 2015)
MsKuzan has also stated that this trend has increased by as
much as 20 within the past years
She has also stated that this trend is most common within the
Steel Sub-Trade
Primary Sources ndash Nay Calderon
Ney Calderon Dipl Arch Tech - Research and Innovation Lab
Technician Coordinator - CCET
ldquoBIM is a great tool to optimize project results increase
project value for the owner reduce waste and maximize
efficiency throughout all aspects of the projectrdquo - (N Calderon personal
communication December 4 2015)
Mr Calderon has stated that the best way utilize BIM to its
fullest potential is to have everyone on board with the process
and for everyone to understand it
BIM ndash Conclusion amp Recommendations
In conclusion BIM can help Construction Companies
Improve visualization of construction projects
Improves productivity due to easy retrieval of information
Increase coordination of construction documents
Embedding and linking of vital information such as vendors for specific
materials location of details and quantities required for estimation and
tendering
Increased speed of delivery
Reducing production costs and creating a streamlined process
Thank you for Listening
BIM ndash Programs
3D Modeling Software -
Revit Architecture 2011
Features (Autodesk Revit 2016)
4D Project Scheduling - Software Autodesk
Navisworks (Autodesk Navisworks 2016)
5D Estimating Software -
PlanSwift (Planswift 2016)
BIM ndash Productivity Rates
IPD vs Traditional methods
of construction in terms of
Cost Time Efforts
(Hijazi 2015)
BIM ndash Productivity Rates
This graph depicts the total time it takes to
complete a project by using BIM amp CAD
separately
(Graphisoft 2015)
Additionally BIM enabled projects have
reduced the number of RFIrsquos to 10 of the
project (Chelson 2010)
This reduction of rework and idle time due
to site conflicts savings for trade
contractors have been reduced to 9 of
project costs
BIM ndash Productivity Rates
Long term amp short term rates
when a construction company
is working with BIM and
applying BIM to a construction
project
(McGrawHill Construction 2012)
BIM ndash Productivity Rates
Tangible benefits for contractors amp sub-trades working with BIM related programs and implementing BIM practices
(Turner 2015)
BIM ndash Productivity Rates Facts from
Studies
75 of BIM users reported better multi-party
communication
57 of Designers state BIM reduces errors during the
design phase
Average project duration reduced by 37
65 of contractors report BIM reduces rework and cost
overruns
BIM ndash Project Turnover Rates
The
impact
of BIM
on
Project
Turnov
er
Rates
(Becker-
Gerber
2010)
BIM ndash Implementation
Software Hardware Requirements
CPU Types Multi-Core Intel Pentium Xeon or i-Series Porcessor or an AMD equivalent
Memory
4 ndash 8 GB of RAM
Video Graphics Card Direct X11 with Shader Model 3 (As recommended by Autodesk)
Staff Training Requirements
Sufficient Human Capitol to complete the project in a Team Based environment
A diploma in Architectural Technology (or equivalent diploma) is usually required
BIM ndash Challenges
IPD concept education amp ldquoKnow howrdquo
Understanding each otherrsquos role amp
responsibility
Set up communication protocols
Understanding that increase in cost at
early stages can substantially reduce
construction process costs change
orders and requests for information
Contractors amp sub-contractors need to
revise their construction management amp
process
A Typical IPD Diagram
(Hijazi 2015)
Primary Sources ndash Jacek Gorka
Jacek Gorka Dipl Ing ARCH MArch OAA MRAIC - Project Manager
at GorkaArchitects
MrGorka has been working with CAD amp BIM software for the
past 20 years and also has his own practice at GorkaArchitects
ldquoBeing a designer and Project Manager I have noticed that
lsquoElement Redundanciesrsquo have dropped which has
improved project productivities I have also noticed that
over the years with using BIM practices and the Revit
Program is that coordination errors have dropped 90 -
which has greatly improved productivityrdquo ndash (J Gorka personal communication
December 2 2015)
Primary Sources ndash Kaite Kuzan
Katie Kuzan B AS MArch - Project Manager at Kohn Partnership
Architects Inc
ldquoThe growing trend is that a number of trades have
requested the ArchitectClient release the BIM model to
perform Quantity Take-offs at a much faster rate and with
easerdquo - (K Kuzan personal communication
December 3 2015)
MsKuzan has also stated that this trend has increased by as
much as 20 within the past years
She has also stated that this trend is most common within the
Steel Sub-Trade
Primary Sources ndash Nay Calderon
Ney Calderon Dipl Arch Tech - Research and Innovation Lab
Technician Coordinator - CCET
ldquoBIM is a great tool to optimize project results increase
project value for the owner reduce waste and maximize
efficiency throughout all aspects of the projectrdquo - (N Calderon personal
communication December 4 2015)
Mr Calderon has stated that the best way utilize BIM to its
fullest potential is to have everyone on board with the process
and for everyone to understand it
BIM ndash Conclusion amp Recommendations
In conclusion BIM can help Construction Companies
Improve visualization of construction projects
Improves productivity due to easy retrieval of information
Increase coordination of construction documents
Embedding and linking of vital information such as vendors for specific
materials location of details and quantities required for estimation and
tendering
Increased speed of delivery
Reducing production costs and creating a streamlined process
Thank you for Listening
BIM ndash Productivity Rates
IPD vs Traditional methods
of construction in terms of
Cost Time Efforts
(Hijazi 2015)
BIM ndash Productivity Rates
This graph depicts the total time it takes to
complete a project by using BIM amp CAD
separately
(Graphisoft 2015)
Additionally BIM enabled projects have
reduced the number of RFIrsquos to 10 of the
project (Chelson 2010)
This reduction of rework and idle time due
to site conflicts savings for trade
contractors have been reduced to 9 of
project costs
BIM ndash Productivity Rates
Long term amp short term rates
when a construction company
is working with BIM and
applying BIM to a construction
project
(McGrawHill Construction 2012)
BIM ndash Productivity Rates
Tangible benefits for contractors amp sub-trades working with BIM related programs and implementing BIM practices
(Turner 2015)
BIM ndash Productivity Rates Facts from
Studies
75 of BIM users reported better multi-party
communication
57 of Designers state BIM reduces errors during the
design phase
Average project duration reduced by 37
65 of contractors report BIM reduces rework and cost
overruns
BIM ndash Project Turnover Rates
The
impact
of BIM
on
Project
Turnov
er
Rates
(Becker-
Gerber
2010)
BIM ndash Implementation
Software Hardware Requirements
CPU Types Multi-Core Intel Pentium Xeon or i-Series Porcessor or an AMD equivalent
Memory
4 ndash 8 GB of RAM
Video Graphics Card Direct X11 with Shader Model 3 (As recommended by Autodesk)
Staff Training Requirements
Sufficient Human Capitol to complete the project in a Team Based environment
A diploma in Architectural Technology (or equivalent diploma) is usually required
BIM ndash Challenges
IPD concept education amp ldquoKnow howrdquo
Understanding each otherrsquos role amp
responsibility
Set up communication protocols
Understanding that increase in cost at
early stages can substantially reduce
construction process costs change
orders and requests for information
Contractors amp sub-contractors need to
revise their construction management amp
process
A Typical IPD Diagram
(Hijazi 2015)
Primary Sources ndash Jacek Gorka
Jacek Gorka Dipl Ing ARCH MArch OAA MRAIC - Project Manager
at GorkaArchitects
MrGorka has been working with CAD amp BIM software for the
past 20 years and also has his own practice at GorkaArchitects
ldquoBeing a designer and Project Manager I have noticed that
lsquoElement Redundanciesrsquo have dropped which has
improved project productivities I have also noticed that
over the years with using BIM practices and the Revit
Program is that coordination errors have dropped 90 -
which has greatly improved productivityrdquo ndash (J Gorka personal communication
December 2 2015)
Primary Sources ndash Kaite Kuzan
Katie Kuzan B AS MArch - Project Manager at Kohn Partnership
Architects Inc
ldquoThe growing trend is that a number of trades have
requested the ArchitectClient release the BIM model to
perform Quantity Take-offs at a much faster rate and with
easerdquo - (K Kuzan personal communication
December 3 2015)
MsKuzan has also stated that this trend has increased by as
much as 20 within the past years
She has also stated that this trend is most common within the
Steel Sub-Trade
Primary Sources ndash Nay Calderon
Ney Calderon Dipl Arch Tech - Research and Innovation Lab
Technician Coordinator - CCET
ldquoBIM is a great tool to optimize project results increase
project value for the owner reduce waste and maximize
efficiency throughout all aspects of the projectrdquo - (N Calderon personal
communication December 4 2015)
Mr Calderon has stated that the best way utilize BIM to its
fullest potential is to have everyone on board with the process
and for everyone to understand it
BIM ndash Conclusion amp Recommendations
In conclusion BIM can help Construction Companies
Improve visualization of construction projects
Improves productivity due to easy retrieval of information
Increase coordination of construction documents
Embedding and linking of vital information such as vendors for specific
materials location of details and quantities required for estimation and
tendering
Increased speed of delivery
Reducing production costs and creating a streamlined process
Thank you for Listening
BIM ndash Productivity Rates
This graph depicts the total time it takes to
complete a project by using BIM amp CAD
separately
(Graphisoft 2015)
Additionally BIM enabled projects have
reduced the number of RFIrsquos to 10 of the
project (Chelson 2010)
This reduction of rework and idle time due
to site conflicts savings for trade
contractors have been reduced to 9 of
project costs
BIM ndash Productivity Rates
Long term amp short term rates
when a construction company
is working with BIM and
applying BIM to a construction
project
(McGrawHill Construction 2012)
BIM ndash Productivity Rates
Tangible benefits for contractors amp sub-trades working with BIM related programs and implementing BIM practices
(Turner 2015)
BIM ndash Productivity Rates Facts from
Studies
75 of BIM users reported better multi-party
communication
57 of Designers state BIM reduces errors during the
design phase
Average project duration reduced by 37
65 of contractors report BIM reduces rework and cost
overruns
BIM ndash Project Turnover Rates
The
impact
of BIM
on
Project
Turnov
er
Rates
(Becker-
Gerber
2010)
BIM ndash Implementation
Software Hardware Requirements
CPU Types Multi-Core Intel Pentium Xeon or i-Series Porcessor or an AMD equivalent
Memory
4 ndash 8 GB of RAM
Video Graphics Card Direct X11 with Shader Model 3 (As recommended by Autodesk)
Staff Training Requirements
Sufficient Human Capitol to complete the project in a Team Based environment
A diploma in Architectural Technology (or equivalent diploma) is usually required
BIM ndash Challenges
IPD concept education amp ldquoKnow howrdquo
Understanding each otherrsquos role amp
responsibility
Set up communication protocols
Understanding that increase in cost at
early stages can substantially reduce
construction process costs change
orders and requests for information
Contractors amp sub-contractors need to
revise their construction management amp
process
A Typical IPD Diagram
(Hijazi 2015)
Primary Sources ndash Jacek Gorka
Jacek Gorka Dipl Ing ARCH MArch OAA MRAIC - Project Manager
at GorkaArchitects
MrGorka has been working with CAD amp BIM software for the
past 20 years and also has his own practice at GorkaArchitects
ldquoBeing a designer and Project Manager I have noticed that
lsquoElement Redundanciesrsquo have dropped which has
improved project productivities I have also noticed that
over the years with using BIM practices and the Revit
Program is that coordination errors have dropped 90 -
which has greatly improved productivityrdquo ndash (J Gorka personal communication
December 2 2015)
Primary Sources ndash Kaite Kuzan
Katie Kuzan B AS MArch - Project Manager at Kohn Partnership
Architects Inc
ldquoThe growing trend is that a number of trades have
requested the ArchitectClient release the BIM model to
perform Quantity Take-offs at a much faster rate and with
easerdquo - (K Kuzan personal communication
December 3 2015)
MsKuzan has also stated that this trend has increased by as
much as 20 within the past years
She has also stated that this trend is most common within the
Steel Sub-Trade
Primary Sources ndash Nay Calderon
Ney Calderon Dipl Arch Tech - Research and Innovation Lab
Technician Coordinator - CCET
ldquoBIM is a great tool to optimize project results increase
project value for the owner reduce waste and maximize
efficiency throughout all aspects of the projectrdquo - (N Calderon personal
communication December 4 2015)
Mr Calderon has stated that the best way utilize BIM to its
fullest potential is to have everyone on board with the process
and for everyone to understand it
BIM ndash Conclusion amp Recommendations
In conclusion BIM can help Construction Companies
Improve visualization of construction projects
Improves productivity due to easy retrieval of information
Increase coordination of construction documents
Embedding and linking of vital information such as vendors for specific
materials location of details and quantities required for estimation and
tendering
Increased speed of delivery
Reducing production costs and creating a streamlined process
Thank you for Listening
BIM ndash Productivity Rates
Long term amp short term rates
when a construction company
is working with BIM and
applying BIM to a construction
project
(McGrawHill Construction 2012)
BIM ndash Productivity Rates
Tangible benefits for contractors amp sub-trades working with BIM related programs and implementing BIM practices
(Turner 2015)
BIM ndash Productivity Rates Facts from
Studies
75 of BIM users reported better multi-party
communication
57 of Designers state BIM reduces errors during the
design phase
Average project duration reduced by 37
65 of contractors report BIM reduces rework and cost
overruns
BIM ndash Project Turnover Rates
The
impact
of BIM
on
Project
Turnov
er
Rates
(Becker-
Gerber
2010)
BIM ndash Implementation
Software Hardware Requirements
CPU Types Multi-Core Intel Pentium Xeon or i-Series Porcessor or an AMD equivalent
Memory
4 ndash 8 GB of RAM
Video Graphics Card Direct X11 with Shader Model 3 (As recommended by Autodesk)
Staff Training Requirements
Sufficient Human Capitol to complete the project in a Team Based environment
A diploma in Architectural Technology (or equivalent diploma) is usually required
BIM ndash Challenges
IPD concept education amp ldquoKnow howrdquo
Understanding each otherrsquos role amp
responsibility
Set up communication protocols
Understanding that increase in cost at
early stages can substantially reduce
construction process costs change
orders and requests for information
Contractors amp sub-contractors need to
revise their construction management amp
process
A Typical IPD Diagram
(Hijazi 2015)
Primary Sources ndash Jacek Gorka
Jacek Gorka Dipl Ing ARCH MArch OAA MRAIC - Project Manager
at GorkaArchitects
MrGorka has been working with CAD amp BIM software for the
past 20 years and also has his own practice at GorkaArchitects
ldquoBeing a designer and Project Manager I have noticed that
lsquoElement Redundanciesrsquo have dropped which has
improved project productivities I have also noticed that
over the years with using BIM practices and the Revit
Program is that coordination errors have dropped 90 -
which has greatly improved productivityrdquo ndash (J Gorka personal communication
December 2 2015)
Primary Sources ndash Kaite Kuzan
Katie Kuzan B AS MArch - Project Manager at Kohn Partnership
Architects Inc
ldquoThe growing trend is that a number of trades have
requested the ArchitectClient release the BIM model to
perform Quantity Take-offs at a much faster rate and with
easerdquo - (K Kuzan personal communication
December 3 2015)
MsKuzan has also stated that this trend has increased by as
much as 20 within the past years
She has also stated that this trend is most common within the
Steel Sub-Trade
Primary Sources ndash Nay Calderon
Ney Calderon Dipl Arch Tech - Research and Innovation Lab
Technician Coordinator - CCET
ldquoBIM is a great tool to optimize project results increase
project value for the owner reduce waste and maximize
efficiency throughout all aspects of the projectrdquo - (N Calderon personal
communication December 4 2015)
Mr Calderon has stated that the best way utilize BIM to its
fullest potential is to have everyone on board with the process
and for everyone to understand it
BIM ndash Conclusion amp Recommendations
In conclusion BIM can help Construction Companies
Improve visualization of construction projects
Improves productivity due to easy retrieval of information
Increase coordination of construction documents
Embedding and linking of vital information such as vendors for specific
materials location of details and quantities required for estimation and
tendering
Increased speed of delivery
Reducing production costs and creating a streamlined process
Thank you for Listening
BIM ndash Productivity Rates
Tangible benefits for contractors amp sub-trades working with BIM related programs and implementing BIM practices
(Turner 2015)
BIM ndash Productivity Rates Facts from
Studies
75 of BIM users reported better multi-party
communication
57 of Designers state BIM reduces errors during the
design phase
Average project duration reduced by 37
65 of contractors report BIM reduces rework and cost
overruns
BIM ndash Project Turnover Rates
The
impact
of BIM
on
Project
Turnov
er
Rates
(Becker-
Gerber
2010)
BIM ndash Implementation
Software Hardware Requirements
CPU Types Multi-Core Intel Pentium Xeon or i-Series Porcessor or an AMD equivalent
Memory
4 ndash 8 GB of RAM
Video Graphics Card Direct X11 with Shader Model 3 (As recommended by Autodesk)
Staff Training Requirements
Sufficient Human Capitol to complete the project in a Team Based environment
A diploma in Architectural Technology (or equivalent diploma) is usually required
BIM ndash Challenges
IPD concept education amp ldquoKnow howrdquo
Understanding each otherrsquos role amp
responsibility
Set up communication protocols
Understanding that increase in cost at
early stages can substantially reduce
construction process costs change
orders and requests for information
Contractors amp sub-contractors need to
revise their construction management amp
process
A Typical IPD Diagram
(Hijazi 2015)
Primary Sources ndash Jacek Gorka
Jacek Gorka Dipl Ing ARCH MArch OAA MRAIC - Project Manager
at GorkaArchitects
MrGorka has been working with CAD amp BIM software for the
past 20 years and also has his own practice at GorkaArchitects
ldquoBeing a designer and Project Manager I have noticed that
lsquoElement Redundanciesrsquo have dropped which has
improved project productivities I have also noticed that
over the years with using BIM practices and the Revit
Program is that coordination errors have dropped 90 -
which has greatly improved productivityrdquo ndash (J Gorka personal communication
December 2 2015)
Primary Sources ndash Kaite Kuzan
Katie Kuzan B AS MArch - Project Manager at Kohn Partnership
Architects Inc
ldquoThe growing trend is that a number of trades have
requested the ArchitectClient release the BIM model to
perform Quantity Take-offs at a much faster rate and with
easerdquo - (K Kuzan personal communication
December 3 2015)
MsKuzan has also stated that this trend has increased by as
much as 20 within the past years
She has also stated that this trend is most common within the
Steel Sub-Trade
Primary Sources ndash Nay Calderon
Ney Calderon Dipl Arch Tech - Research and Innovation Lab
Technician Coordinator - CCET
ldquoBIM is a great tool to optimize project results increase
project value for the owner reduce waste and maximize
efficiency throughout all aspects of the projectrdquo - (N Calderon personal
communication December 4 2015)
Mr Calderon has stated that the best way utilize BIM to its
fullest potential is to have everyone on board with the process
and for everyone to understand it
BIM ndash Conclusion amp Recommendations
In conclusion BIM can help Construction Companies
Improve visualization of construction projects
Improves productivity due to easy retrieval of information
Increase coordination of construction documents
Embedding and linking of vital information such as vendors for specific
materials location of details and quantities required for estimation and
tendering
Increased speed of delivery
Reducing production costs and creating a streamlined process
Thank you for Listening
BIM ndash Productivity Rates Facts from
Studies
75 of BIM users reported better multi-party
communication
57 of Designers state BIM reduces errors during the
design phase
Average project duration reduced by 37
65 of contractors report BIM reduces rework and cost
overruns
BIM ndash Project Turnover Rates
The
impact
of BIM
on
Project
Turnov
er
Rates
(Becker-
Gerber
2010)
BIM ndash Implementation
Software Hardware Requirements
CPU Types Multi-Core Intel Pentium Xeon or i-Series Porcessor or an AMD equivalent
Memory
4 ndash 8 GB of RAM
Video Graphics Card Direct X11 with Shader Model 3 (As recommended by Autodesk)
Staff Training Requirements
Sufficient Human Capitol to complete the project in a Team Based environment
A diploma in Architectural Technology (or equivalent diploma) is usually required
BIM ndash Challenges
IPD concept education amp ldquoKnow howrdquo
Understanding each otherrsquos role amp
responsibility
Set up communication protocols
Understanding that increase in cost at
early stages can substantially reduce
construction process costs change
orders and requests for information
Contractors amp sub-contractors need to
revise their construction management amp
process
A Typical IPD Diagram
(Hijazi 2015)
Primary Sources ndash Jacek Gorka
Jacek Gorka Dipl Ing ARCH MArch OAA MRAIC - Project Manager
at GorkaArchitects
MrGorka has been working with CAD amp BIM software for the
past 20 years and also has his own practice at GorkaArchitects
ldquoBeing a designer and Project Manager I have noticed that
lsquoElement Redundanciesrsquo have dropped which has
improved project productivities I have also noticed that
over the years with using BIM practices and the Revit
Program is that coordination errors have dropped 90 -
which has greatly improved productivityrdquo ndash (J Gorka personal communication
December 2 2015)
Primary Sources ndash Kaite Kuzan
Katie Kuzan B AS MArch - Project Manager at Kohn Partnership
Architects Inc
ldquoThe growing trend is that a number of trades have
requested the ArchitectClient release the BIM model to
perform Quantity Take-offs at a much faster rate and with
easerdquo - (K Kuzan personal communication
December 3 2015)
MsKuzan has also stated that this trend has increased by as
much as 20 within the past years
She has also stated that this trend is most common within the
Steel Sub-Trade
Primary Sources ndash Nay Calderon
Ney Calderon Dipl Arch Tech - Research and Innovation Lab
Technician Coordinator - CCET
ldquoBIM is a great tool to optimize project results increase
project value for the owner reduce waste and maximize
efficiency throughout all aspects of the projectrdquo - (N Calderon personal
communication December 4 2015)
Mr Calderon has stated that the best way utilize BIM to its
fullest potential is to have everyone on board with the process
and for everyone to understand it
BIM ndash Conclusion amp Recommendations
In conclusion BIM can help Construction Companies
Improve visualization of construction projects
Improves productivity due to easy retrieval of information
Increase coordination of construction documents
Embedding and linking of vital information such as vendors for specific
materials location of details and quantities required for estimation and
tendering
Increased speed of delivery
Reducing production costs and creating a streamlined process
Thank you for Listening
BIM ndash Project Turnover Rates
The
impact
of BIM
on
Project
Turnov
er
Rates
(Becker-
Gerber
2010)
BIM ndash Implementation
Software Hardware Requirements
CPU Types Multi-Core Intel Pentium Xeon or i-Series Porcessor or an AMD equivalent
Memory
4 ndash 8 GB of RAM
Video Graphics Card Direct X11 with Shader Model 3 (As recommended by Autodesk)
Staff Training Requirements
Sufficient Human Capitol to complete the project in a Team Based environment
A diploma in Architectural Technology (or equivalent diploma) is usually required
BIM ndash Challenges
IPD concept education amp ldquoKnow howrdquo
Understanding each otherrsquos role amp
responsibility
Set up communication protocols
Understanding that increase in cost at
early stages can substantially reduce
construction process costs change
orders and requests for information
Contractors amp sub-contractors need to
revise their construction management amp
process
A Typical IPD Diagram
(Hijazi 2015)
Primary Sources ndash Jacek Gorka
Jacek Gorka Dipl Ing ARCH MArch OAA MRAIC - Project Manager
at GorkaArchitects
MrGorka has been working with CAD amp BIM software for the
past 20 years and also has his own practice at GorkaArchitects
ldquoBeing a designer and Project Manager I have noticed that
lsquoElement Redundanciesrsquo have dropped which has
improved project productivities I have also noticed that
over the years with using BIM practices and the Revit
Program is that coordination errors have dropped 90 -
which has greatly improved productivityrdquo ndash (J Gorka personal communication
December 2 2015)
Primary Sources ndash Kaite Kuzan
Katie Kuzan B AS MArch - Project Manager at Kohn Partnership
Architects Inc
ldquoThe growing trend is that a number of trades have
requested the ArchitectClient release the BIM model to
perform Quantity Take-offs at a much faster rate and with
easerdquo - (K Kuzan personal communication
December 3 2015)
MsKuzan has also stated that this trend has increased by as
much as 20 within the past years
She has also stated that this trend is most common within the
Steel Sub-Trade
Primary Sources ndash Nay Calderon
Ney Calderon Dipl Arch Tech - Research and Innovation Lab
Technician Coordinator - CCET
ldquoBIM is a great tool to optimize project results increase
project value for the owner reduce waste and maximize
efficiency throughout all aspects of the projectrdquo - (N Calderon personal
communication December 4 2015)
Mr Calderon has stated that the best way utilize BIM to its
fullest potential is to have everyone on board with the process
and for everyone to understand it
BIM ndash Conclusion amp Recommendations
In conclusion BIM can help Construction Companies
Improve visualization of construction projects
Improves productivity due to easy retrieval of information
Increase coordination of construction documents
Embedding and linking of vital information such as vendors for specific
materials location of details and quantities required for estimation and
tendering
Increased speed of delivery
Reducing production costs and creating a streamlined process
Thank you for Listening
BIM ndash Implementation
Software Hardware Requirements
CPU Types Multi-Core Intel Pentium Xeon or i-Series Porcessor or an AMD equivalent
Memory
4 ndash 8 GB of RAM
Video Graphics Card Direct X11 with Shader Model 3 (As recommended by Autodesk)
Staff Training Requirements
Sufficient Human Capitol to complete the project in a Team Based environment
A diploma in Architectural Technology (or equivalent diploma) is usually required
BIM ndash Challenges
IPD concept education amp ldquoKnow howrdquo
Understanding each otherrsquos role amp
responsibility
Set up communication protocols
Understanding that increase in cost at
early stages can substantially reduce
construction process costs change
orders and requests for information
Contractors amp sub-contractors need to
revise their construction management amp
process
A Typical IPD Diagram
(Hijazi 2015)
Primary Sources ndash Jacek Gorka
Jacek Gorka Dipl Ing ARCH MArch OAA MRAIC - Project Manager
at GorkaArchitects
MrGorka has been working with CAD amp BIM software for the
past 20 years and also has his own practice at GorkaArchitects
ldquoBeing a designer and Project Manager I have noticed that
lsquoElement Redundanciesrsquo have dropped which has
improved project productivities I have also noticed that
over the years with using BIM practices and the Revit
Program is that coordination errors have dropped 90 -
which has greatly improved productivityrdquo ndash (J Gorka personal communication
December 2 2015)
Primary Sources ndash Kaite Kuzan
Katie Kuzan B AS MArch - Project Manager at Kohn Partnership
Architects Inc
ldquoThe growing trend is that a number of trades have
requested the ArchitectClient release the BIM model to
perform Quantity Take-offs at a much faster rate and with
easerdquo - (K Kuzan personal communication
December 3 2015)
MsKuzan has also stated that this trend has increased by as
much as 20 within the past years
She has also stated that this trend is most common within the
Steel Sub-Trade
Primary Sources ndash Nay Calderon
Ney Calderon Dipl Arch Tech - Research and Innovation Lab
Technician Coordinator - CCET
ldquoBIM is a great tool to optimize project results increase
project value for the owner reduce waste and maximize
efficiency throughout all aspects of the projectrdquo - (N Calderon personal
communication December 4 2015)
Mr Calderon has stated that the best way utilize BIM to its
fullest potential is to have everyone on board with the process
and for everyone to understand it
BIM ndash Conclusion amp Recommendations
In conclusion BIM can help Construction Companies
Improve visualization of construction projects
Improves productivity due to easy retrieval of information
Increase coordination of construction documents
Embedding and linking of vital information such as vendors for specific
materials location of details and quantities required for estimation and
tendering
Increased speed of delivery
Reducing production costs and creating a streamlined process
Thank you for Listening
BIM ndash Challenges
IPD concept education amp ldquoKnow howrdquo
Understanding each otherrsquos role amp
responsibility
Set up communication protocols
Understanding that increase in cost at
early stages can substantially reduce
construction process costs change
orders and requests for information
Contractors amp sub-contractors need to
revise their construction management amp
process
A Typical IPD Diagram
(Hijazi 2015)
Primary Sources ndash Jacek Gorka
Jacek Gorka Dipl Ing ARCH MArch OAA MRAIC - Project Manager
at GorkaArchitects
MrGorka has been working with CAD amp BIM software for the
past 20 years and also has his own practice at GorkaArchitects
ldquoBeing a designer and Project Manager I have noticed that
lsquoElement Redundanciesrsquo have dropped which has
improved project productivities I have also noticed that
over the years with using BIM practices and the Revit
Program is that coordination errors have dropped 90 -
which has greatly improved productivityrdquo ndash (J Gorka personal communication
December 2 2015)
Primary Sources ndash Kaite Kuzan
Katie Kuzan B AS MArch - Project Manager at Kohn Partnership
Architects Inc
ldquoThe growing trend is that a number of trades have
requested the ArchitectClient release the BIM model to
perform Quantity Take-offs at a much faster rate and with
easerdquo - (K Kuzan personal communication
December 3 2015)
MsKuzan has also stated that this trend has increased by as
much as 20 within the past years
She has also stated that this trend is most common within the
Steel Sub-Trade
Primary Sources ndash Nay Calderon
Ney Calderon Dipl Arch Tech - Research and Innovation Lab
Technician Coordinator - CCET
ldquoBIM is a great tool to optimize project results increase
project value for the owner reduce waste and maximize
efficiency throughout all aspects of the projectrdquo - (N Calderon personal
communication December 4 2015)
Mr Calderon has stated that the best way utilize BIM to its
fullest potential is to have everyone on board with the process
and for everyone to understand it
BIM ndash Conclusion amp Recommendations
In conclusion BIM can help Construction Companies
Improve visualization of construction projects
Improves productivity due to easy retrieval of information
Increase coordination of construction documents
Embedding and linking of vital information such as vendors for specific
materials location of details and quantities required for estimation and
tendering
Increased speed of delivery
Reducing production costs and creating a streamlined process
Thank you for Listening
Primary Sources ndash Jacek Gorka
Jacek Gorka Dipl Ing ARCH MArch OAA MRAIC - Project Manager
at GorkaArchitects
MrGorka has been working with CAD amp BIM software for the
past 20 years and also has his own practice at GorkaArchitects
ldquoBeing a designer and Project Manager I have noticed that
lsquoElement Redundanciesrsquo have dropped which has
improved project productivities I have also noticed that
over the years with using BIM practices and the Revit
Program is that coordination errors have dropped 90 -
which has greatly improved productivityrdquo ndash (J Gorka personal communication
December 2 2015)
Primary Sources ndash Kaite Kuzan
Katie Kuzan B AS MArch - Project Manager at Kohn Partnership
Architects Inc
ldquoThe growing trend is that a number of trades have
requested the ArchitectClient release the BIM model to
perform Quantity Take-offs at a much faster rate and with
easerdquo - (K Kuzan personal communication
December 3 2015)
MsKuzan has also stated that this trend has increased by as
much as 20 within the past years
She has also stated that this trend is most common within the
Steel Sub-Trade
Primary Sources ndash Nay Calderon
Ney Calderon Dipl Arch Tech - Research and Innovation Lab
Technician Coordinator - CCET
ldquoBIM is a great tool to optimize project results increase
project value for the owner reduce waste and maximize
efficiency throughout all aspects of the projectrdquo - (N Calderon personal
communication December 4 2015)
Mr Calderon has stated that the best way utilize BIM to its
fullest potential is to have everyone on board with the process
and for everyone to understand it
BIM ndash Conclusion amp Recommendations
In conclusion BIM can help Construction Companies
Improve visualization of construction projects
Improves productivity due to easy retrieval of information
Increase coordination of construction documents
Embedding and linking of vital information such as vendors for specific
materials location of details and quantities required for estimation and
tendering
Increased speed of delivery
Reducing production costs and creating a streamlined process
Thank you for Listening
Primary Sources ndash Kaite Kuzan
Katie Kuzan B AS MArch - Project Manager at Kohn Partnership
Architects Inc
ldquoThe growing trend is that a number of trades have
requested the ArchitectClient release the BIM model to
perform Quantity Take-offs at a much faster rate and with
easerdquo - (K Kuzan personal communication
December 3 2015)
MsKuzan has also stated that this trend has increased by as
much as 20 within the past years
She has also stated that this trend is most common within the
Steel Sub-Trade
Primary Sources ndash Nay Calderon
Ney Calderon Dipl Arch Tech - Research and Innovation Lab
Technician Coordinator - CCET
ldquoBIM is a great tool to optimize project results increase
project value for the owner reduce waste and maximize
efficiency throughout all aspects of the projectrdquo - (N Calderon personal
communication December 4 2015)
Mr Calderon has stated that the best way utilize BIM to its
fullest potential is to have everyone on board with the process
and for everyone to understand it
BIM ndash Conclusion amp Recommendations
In conclusion BIM can help Construction Companies
Improve visualization of construction projects
Improves productivity due to easy retrieval of information
Increase coordination of construction documents
Embedding and linking of vital information such as vendors for specific
materials location of details and quantities required for estimation and
tendering
Increased speed of delivery
Reducing production costs and creating a streamlined process
Thank you for Listening
Primary Sources ndash Nay Calderon
Ney Calderon Dipl Arch Tech - Research and Innovation Lab
Technician Coordinator - CCET
ldquoBIM is a great tool to optimize project results increase
project value for the owner reduce waste and maximize
efficiency throughout all aspects of the projectrdquo - (N Calderon personal
communication December 4 2015)
Mr Calderon has stated that the best way utilize BIM to its
fullest potential is to have everyone on board with the process
and for everyone to understand it
BIM ndash Conclusion amp Recommendations
In conclusion BIM can help Construction Companies
Improve visualization of construction projects
Improves productivity due to easy retrieval of information
Increase coordination of construction documents
Embedding and linking of vital information such as vendors for specific
materials location of details and quantities required for estimation and
tendering
Increased speed of delivery
Reducing production costs and creating a streamlined process
Thank you for Listening
BIM ndash Conclusion amp Recommendations
In conclusion BIM can help Construction Companies
Improve visualization of construction projects
Improves productivity due to easy retrieval of information
Increase coordination of construction documents
Embedding and linking of vital information such as vendors for specific
materials location of details and quantities required for estimation and
tendering
Increased speed of delivery
Reducing production costs and creating a streamlined process
Thank you for Listening