olsc plm workgroup1 doors input for oslc storyboard v0.1 gray bachelor

10
OLSC PLM Workgroup 1 DOORS input for OSLC Storyboard V0.1 Gray Bachelor

Upload: dennis-houston

Post on 13-Dec-2015

213 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: OLSC PLM Workgroup1 DOORS input for OSLC Storyboard V0.1 Gray Bachelor

OLSC PLM Workgroup 1

DOORS input for OSLC Storyboard

V0.1

Gray Bachelor

Page 2: OLSC PLM Workgroup1 DOORS input for OSLC Storyboard V0.1 Gray Bachelor

OLSC PLM Workgroup 2

Aims and objective

To show how real ALM tools support and represent PLM process and related information

To show how DOORS 9.3 represents the OSLC PLM Reference Model through the selected scenario of a Systems Engineer responds to change in Requirements

Page 3: OLSC PLM Workgroup1 DOORS input for OSLC Storyboard V0.1 Gray Bachelor

OLSC PLM Workgroup 3

Purpose of this document

To summarise the flow of changes to the requirements that DOORS needs to represent

Page 4: OLSC PLM Workgroup1 DOORS input for OSLC Storyboard V0.1 Gray Bachelor

OLSC PLM Workgroup 4

Summary of the key business entities & their relationships

CR

Req Implem

System or product context

Pre-condition (Before

Controlled config

Is based upon or applies to*

Post-condition (After

CR System or product context

Is implemented by

Req Implem

Controlled config

System or product context

Req Implem

Controlled config

* Assuming basic triaging has been done prior to the start of the scenario

At some context version V’

At some new context version V’’

Updated to achieve the CR

Updated to achieve the CR

Page 5: OLSC PLM Workgroup1 DOORS input for OSLC Storyboard V0.1 Gray Bachelor

OLSC PLM Workgroup 5

Overall view of the scenario and naming

Story 1

1st set of changes to requirementsSteps 0.0 to 0.4

Implement the 1st set of changesSteps 1.0 to 1.X

Story 2

2nd set of changes to requirementsSteps 2.0 to 2.X

Implement the 2nd set of changesSteps 3.0 to 3.X

In the kitchenready

Page 6: OLSC PLM Workgroup1 DOORS input for OSLC Storyboard V0.1 Gray Bachelor

OLSC PLM Workgroup 6

Summary of the Scenario flow from a tools perspective – Story 1 0.0 to 0.4

We aim to show the tool status at end phase in the flow

0.0

0.2a

0.2b

0.3

0.4

Page 7: OLSC PLM Workgroup1 DOORS input for OSLC Storyboard V0.1 Gray Bachelor

OLSC PLM Workgroup 7

Story 1 Requirements changes to be shown as DOORS baselines through the scenario Requirement Context from To context Notes

Starting point All 3 exist - Pre condition 0.0

REQ-020181 A

No issatisfiedby

B

No issatisfiedby

Post of Step 0.2a

REQ-020144 A

Issatisfiedby link to

AMG60104/001

B

No issatisfiedby

Post of Step 0.2a

Text changes too Post 02b

AKY251614 A

Association with Product AMG 54556/001 and Implementation AMG60112/001

B

No issatisfiedby

Post Step 0.3

REQ-020144 B

No issatisfiedby

B

Issatisfiedby link to AMG60104/002

Post Step 1.1

AKY251614 B

No issatisfiedby

B

Issatisfiedby link to AMG60112/002

Post Step 1.2

AKY251614 B

Issatisfiedby link to AMG60112/001

B

Association with Product AMG 54556/002 and Issatisfiedby link to AMG60112/002

Post Step 1.3

Page 8: OLSC PLM Workgroup1 DOORS input for OSLC Storyboard V0.1 Gray Bachelor

OLSC PLM Workgroup 8

Story 2 New and changed requirements to be shown as DOORS baselines through the scenario Requirement Context from To context Notes

Starting point All 3 exist - Pre condition based on 1.3

REQ-020186 - A

No issatisfiedby

Post of Step 2.2

REQ-020187 - A

No issatisfiedby

Post of Step 2.2

REQ-020188 - A

No issatisfiedby

Post of Step 2.2

REQ-20144 B Issatisfiedby link to AMG60104/002 C

No issatisfiedby

Post of Step 2.3

REQ-20181 B

No issatisfiedby

C

No issatisfiedby

Post of Step 2.5

AKY251614 B Association with Product AMG 54556/002 and Issatisfiedby link to AMG60112/002

C

No issatisfiedby

Post Step 2.7

AKY251614 C

No issatisfiedby

C

iscomposedof REQ-020186

Post Step 2.7

Page 9: OLSC PLM Workgroup1 DOORS input for OSLC Storyboard V0.1 Gray Bachelor

OLSC PLM Workgroup 9

Story 2 New and changed requirements to be shown as DOORS baselines through the scenario Requirement Context from To context Notes

REQ-20144 C

No issatisfiedby

C

Issatisfiedby link to AMG60104/003 ???

Post 3.2

REQ-020187 C

No issatisfiedby

A

Issatisfiedby link to ???

Post 3.2

REQ-020188 C

No issatisfiedby

A

Issatisfiedby link to ???

Post 3.2

AKY251614 C

Issatisfiedby link to ???

C

Issatisfiedby link to ??? And Association with Product AMG 54556/003

Post 3.3

Page 10: OLSC PLM Workgroup1 DOORS input for OSLC Storyboard V0.1 Gray Bachelor

OLSC PLM Workgroup 10

Links

Mike’s page http://open-services.net/bin/view/Main/PlmScena

riosGm Files used at 14/4

HSUVExample_Story_1.pptx: Story 1 (Requirements Change) Step by Step Description with Pictures (updated to match revisions of above)

# HSUVExample_Story_2.pptx (WORK IN PROCESS) Slides describing the Story 2 sequence, which adds two variants of the emissions requirement