old salt run sw shallotte, nc 28470 · a3.0 elevations a4.0 section a4.1 section / schedules s1.0...
TRANSCRIPT
25' Peripheral Setback
Old Salt Run SW
15' Utility and Drainage Easement
5' S
ide
Set
back
5' Side S
etback
15' Peripheral Buffer
4:124:12
4:12
3:12
8:12
8:12
8:12
8:12
8:128:12
6:12
Release Dates
10/
30/2
018
4:12
:24
PM
C:\Draw\Kent\Tidewater\models\Lot 24 - Beaufort Cottage\Tidewater 24.rvt
Shallotte, N
C 2
8470
Lot 24 -
1638 O
ld S
alt R
un S
W
a1.0
1" = 10'-0"a1.0
1 Site Plan
Drawing ListNumber Description
a1.0 Sitea2.0 Plansa3.0 Elevationsa4.0 Sectiona4.1 Section / Scheduless1.0 Footings
- First release 8.16.18
Site Acreage: 7000 sf
IMPERVIOUS CALCS
Structure Impervious: 2024
Driveway / Walk: 229 sf / 92 SF = 321
Total Impervious: 2345 sf
Impervious Allowed: 2900 sf
1/8" = 1'-0"a1.0
2 Roof Plan
32' - 0"
27' -
10"
15
' - 0
"6'
- 8
"6'
- 2
"1
7' -
2"
45
' - 0
"
14' - 7"4' - 0" 13' - 5" 22' - 0"
22
' - 0
"1
5' -
0"
8' -
0"
10' - 10" 3' - 4" 3' - 9" 13' - 9 1/2"
12' -
10"
3' -
4 1
/2"
5' -
9 1
/2"
1
a4.0
2' - 6"
4' -
9"
12
' - 6
1/2
"
10' - 11"1' - 5 1/2"
MBEDROOM
M CL1 M CL2
M BATH
LIVINGDINING
KITCHEN
LAUNDRY
GARAGE
COVEREDDECK OPEN
DECK
CL 1
STAIRWELL
ENTRYPORCH
HALL /FOYER
PWDR3' - 1" 7' - 1" 4' - 1 1/2"
8' - 3 1/2" 5' - 1 1/2"
1' -
1 3
/4"
8 1
/4"
1' -
5 1
/2"
1' -
0"
1' -
6"
1' - 9 1/2"
3' -
0"
Flower
1' - 5 1/2"
4 1/2"
Ste
p
7' - 6"
2
a4.1
1
a4.1
2870
2870
2470 2470
DH3060 DH3060
DH
3060
DH
3060
DH
3060
DH
3060
3080
2470
3070
G16080
DH
2656
DH
2656
DH2030 C2020
DH2656DH2656
3070FG
DH
3060
3070
2470
3070
FG
1680SL
C20
20
DH3060DH3060
6' -
8 3
/4"
3 1/2"
7 1
/2"
6" Wall
slope slope
3' - 0"
42"
4' - 6"
6" W
all
6x6 Posts Wrapped to 8", typ
EQ EQ EQ EQ
1
a4.0
13' - 10 1/2" 10' - 7 1/2"
14
' - 0
3/4
"
10' - 7 1/2" 10' - 9" 10' - 7 1/2"
5' -
0 3
/4"
5' -
4 1
/2"
7' - 2 1/2"
3' -
11
3/4"
14
' - 0
3/4
"
Pl. Ht. = 4' - 10 1/2" Pl. Ht. = 4' - 10 1/2"
3"
3"
1' -
5"
7'-1 1/4" Plate 9'-0" Clg. Brk.7' - 11 1/4""
Plate
PLAYROOM
BEDROOM1 BEDROOM2
CL 3 CL 2
BATH 1
2
a4.1
Rail
Rai
l
STAIRWEL
4' -
9 1
/4"
Mec51
2850Tub
9'-0" Clg. Brk.
9'-0" Clg. Brk.
DH2856 DH2856DH2856
DH
2846
DH
2846
2668
DH
2846
DH
2846
C20
20
2470
5070
BD
5070
BD
26686"
4' -
9 1
/4"
2' - 0" 2' - 0"
Acces
Release Dates
10/
30/2
018
4:12
:28
PM
C:\Draw\Kent\Tidewater\models\Lot 24 - Beaufort Cottage\Tidewater 24.rvt
Shallotte, N
C 2
8470
Lot 24 -
1638 O
ld S
alt R
un S
W
a2.0
1/4" = 1'-0"a2.0
1 First Floor
1/4" = 1'-0"a2.0
2 Second Floor
--
Floor Schedule
Area Description Type Level Comments
491 SF a-concrete-4 Garage Garage60 SF Wood Deck Garage Wood Deck at Garage Back Door176 SF a-concrete-4 First Floor Entry Porch133 SF Wood Deck First Floor Rear Wood Deck1285 SF a-concrete-4 First Floor HSF79 SF a-concrete-4 First Floor Rear Concrete Covered porch660 SF a-14" truss Second Floor HSF
- First release 8.16.18
1' - 6"
10"
1' - 6"
8' -
0"
Metal Roof
1' - 6" 124
Asphalt Roof
12
8
8' -
0"
7' -
0"
Siding
Board and 1x4 Batten
126
128
6' -
6"
128
123
124
10"
2x12 Band
Metal Roofing
7' -
0"
8' -
0"
6' -
6"
2' - 0"
1' - 6"
1' - 6"
Metal Roofing
Metal Roofing
Release Dates
10/
30/2
018
4:12
:33
PM
C:\Draw\Kent\Tidewater\models\Lot 24 - Beaufort Cottage\Tidewater 24.rvt
Shallotte, N
C 2
8470
Lot 24 -
1638 O
ld S
alt R
un S
W
a3.0
1/4" = 1'-0"a3.0
1 Entry
--
1/4" = 1'-0"a3.0
2 Right
1/4" = 1'-0"a3.0
3 Rear 1/4" = 1'-0"a3.0
4 Left
- First release 8.16.18
9' - 1 1/2"1' - 2 3/4"
1' -
6"
2' -
0"
6x6
Pos
t W
rapp
ed to
8"
2x8
Raf
ters
/ M
etal
R
oofin
g
1x10
4" C
oncr
ete
8' D
oor
2x12
Ban
d
3/4"
Ply
woo
d C
eilin
g w
/ 1x
4 B
atte
ns. S
ee R
ef
clg
plan
2/a
4.0
2x6
Cei
ling
Win
dow
Uni
t
2x6
Trim
1x S
offit
1x H
eade
r
14"
Tru
sses
2x4
Stu
d W
all w
/ 1/2
" sh
eath
ing
and
R-1
9 in
sula
tion.
Cem
ent f
iber
si
ding
, 7 1
/4"
expo
sure
2x3
Sto
op T
rim
HA
LL
/F
OY
ER
EN
TR
YP
OR
CH
2x4
Stu
d W
all,
16"
o.c.
w/ R
-19
Insu
latio
n
GR
AD
E
(2)
#5 C
ontin
uous
Reb
ar
8" C
MU
Fill
ed a
t Rod
Loca
tions
4" C
oncr
ete,
300
0 ps
i on
Wel
l Com
pact
ed F
ill
8"
2' -
0"
Dou
ble
Bot
tom
Pla
te(B
otto
m P
late
Sun
ken)
5/8"
Thr
eade
d R
od @
8'
o.c.
, 12"
Fro
m C
orne
rs, t
yp.
6x6
WW
M O
ver
6 m
il
1' - 3 1/2"
Cle
an, W
ell C
ompa
cted
F
ill
6"
Dou
ble
Bot
tom
Pla
te(B
otto
m P
late
Sun
ken)
1x4 Typ.
Release Dates
10/
30/2
018
4:12
:37
PM
C:\Draw\Kent\Tidewater\models\Lot 24 - Beaufort Cottage\Tidewater 24.rvt
Shallotte, N
C 2
8470
Lot 24 -
1638 O
ld S
alt R
un S
W
a4.0
--
1 1
/2"
= 1
'-0"
a4.
0
1S
ect ion T
hro
ugh P
orc
h / W
all
3/8" = 1'-0"a4.0
2 Entry Porch Ref. Ceiling Plan
- First release 8.16.18
10
' - 0
1/4
"
Thi
s pl
ht t
o be
det
erm
ined
by
the
heig
ht o
f the
roo
f bey
ond.
Eav
es a
re
to m
atch
.
1' - 6"
truss with
GW
7' -
1 1
/4"
9' -
1 1
/2"
9' -
1 1
/2"
1' -
2 3
/4"
9' -
1 1
/2"
2' - 0"
PLAYROOM
HALL /FOYER
MBEDROOM
ENTRYPORCH
BATH 1
1' - 6"
Release Dates
10/
30/2
018
4:12
:41
PM
C:\Draw\Kent\Tidewater\models\Lot 24 - Beaufort Cottage\Tidewater 24.rvt
Shallotte, N
C 2
8470
Lot 24 -
1638 O
ld S
alt R
un S
W
a4.1
1/2" = 1'-0"a4.1
1 Section Through Garage
Door Schedule
TypeMark Quantity Unit Width
UnitHeight Comments
2470 5 2' - 4" 7' - 0" Single2668 2 2' - 6" 6' - 8" Single2870 2 2' - 8" 7' - 0" Single3070 2 3' - 0" 7' - 0" Single3070FG 2 3' - 0" 7' - 0" Single Full Glass3080 1 3' - 0" 8' - 0" Single5070BD 2 5' - 0" 7' - 0" Barn DoorG16080 1 16' - 0" 8' - 0" Garage
Room Finish Schedule
Name Floor Finish Wall Finish Ceiling Finish Base Finish Area Comments
LAUNDRY 78 SFLIVING 151 SFM BATH 74 SFM BEDROOM 285 SFM CL1 37 SFM CL2 29 SFOPEN DECK 204 SFPLAYROOM 159 SFPWDR 24 SFSTAIRWELL 40 SF
Room Finish Schedule
Name Floor Finish Wall Finish Ceiling Finish Base Finish Area Comments
BATH 1 69 SFBEDROOM2 137 SFBEDROOM 1 137 SFCL 1 11 SFCL 2 48 SFCL 3 48 SFCOVERED DECK 78 SFDINING 154 SFENTRY PORCH 173 SFGARAGE 469 SFHALL / FOYER 174 SFKITCHEN 126 SF
Window Schedule
Unit #Quantit
y Manufacturer Width Height Comments
1680SL 1 1' - 6" 8' - 0" Side-liteC2020 3 2' - 0" 2' - 0" CasementDH2030 1 2' - 0" 3' - 0" Double HungDH2656 4 2' - 6" 5' - 6" Double HungDH2846 4 2' - 8" 4' - 6" Double HungDH2856 3 2' - 8" 5' - 6" Double HungDH3060 9 3' - 0" 6' - 0" Double Hung
3/8" = 1'-0"a4.1
2 Schematic Latitudinal Section
- First release 8.16.18
WD
RE
F.
UP
4" Concrete Slab
3
s1.0
Sim
3
s1.0
Sim
2
s1.0
Sim
2
s1.0
Sim
4" Concrete Slab
3
s1.0
Sim
3
s1.0
Sim
14' - 7" 13' - 5"
2' - 0"
2' -
0"
22' - 0"
Sim
s1.04
22
' - 0
"
22' - 0"
3' - 1 3/4"16' - 2"2' - 8 1/4"
15
' - 0
"
3' - 10 3/4"24' - 2 1/2"3' - 10 3/4"
32' - 0"
1' -
6"
12' - 0" 8' - 0" 12' - 0"
7' -
7 1
/4"
15
' - 0
"6
' - 8
"
2' - 6"
6' -
2"
4' - 0"
17
' - 2
"
(2) #5 Continuous Rebar
4" Conc. SlabFloor
Interior LOAD Bearing Wall
8"
1' - 4"
2x12 Trim to Align w/ Porch Trim
GRADE
(2) #5 Continuous Rebar
8" CMU Filled at Rod Locations
4" Concrete, 3000 psi on Well Compacted Fill
8"
2' - 0"
Double Bottom Plate
5/8" Threaded Rod @ 8' o.c., 12" From Corners, typ.
6x6 WWM Over 6 mil Poly
1'-0
" M
in.
Clean, Well Compacted Fill
1' -
0"
2' - 6"
2' -
6"
#5 Rebar, typ
Release Dates
10/
30/2
018
4:12
:46
PM
C:\Draw\Kent\Tidewater\models\Lot 24 - Beaufort Cottage\Tidewater 24.rvt
Shallotte, N
C 2
8470
Lot 24 -
1638 O
ld S
alt R
un S
W
s1.0
1/4" = 1'-0"s1.0
1 First Floor Footers
3" = 1'-0"s1.0
3Interior Load Bearing Wall LugFooting
1 1/2" = 1'-0"s1.0
2Garage Slab Section StemWall First Issue 5-08-18-
3/4" = 1'-0"s1.0
4 Footer for Posts
- First release 8.16.18