Energizing the Waste:Baku Waste to Energy Plan
Presenter: Oktay Mammadov,
Head of Project Management and PR Department, «Tamiz Shahar» JSC
Event: Asia Clean Energy Forum 2012
Date: June 4-8, 2012
Venue: Manila, Philippines
«Tamiz Shahar»
Joint Stock Company
7/31/2019 Oktay Mammadov - Energizing the Waste Baku Waste to Energy Plan
http://slidepdf.com/reader/full/oktay-mammadov-energizing-the-waste-baku-waste-to-energy-plan 2/10
Baku city and waste management
Location:
Caspian Sea
Territory:
2 130 km2
Population:
2.5-3 mln
Commercial, cultural and scientific centre in the Caucasus
The municipal solid waste per capita is about 350 kg per annum.
The main reason is increase of welfare and consumption basket
7/31/2019 Oktay Mammadov - Energizing the Waste Baku Waste to Energy Plan
http://slidepdf.com/reader/full/oktay-mammadov-energizing-the-waste-baku-waste-to-energy-plan 3/10
Solution: establishment of «Tamiz Shahar» JSC
To improve the ecological situation in the city;
To build and manage solid municipal waste placement and disposal in
accordance with up-to-date standards;
To develop this area by stages based on the principles of market
economy in the future.
7/31/2019 Oktay Mammadov - Energizing the Waste Baku Waste to Energy Plan
http://slidepdf.com/reader/full/oktay-mammadov-energizing-the-waste-baku-waste-to-energy-plan 4/10
Solid Municipal Waste: 500 000 tons/year;
Clinical waste: 10 000 tons/year;
Ministry of Economic Developmentof Azerbaijan Republic
Key step – Baku Waste-to-Energy Plant
cofinanced by I slamic Development Bank and Azerbaijan Government
7/31/2019 Oktay Mammadov - Energizing the Waste Baku Waste to Energy Plan
http://slidepdf.com/reader/full/oktay-mammadov-energizing-the-waste-baku-waste-to-energy-plan 5/10
Waste-to-Energy Plant (2009-2012)
2009
2010
2011
2012 Electric energy generation: 231,5 million kW-h/year;
Plant construction period: 40 months;
Completion of works: end of 2012
7/31/2019 Oktay Mammadov - Energizing the Waste Baku Waste to Energy Plan
http://slidepdf.com/reader/full/oktay-mammadov-energizing-the-waste-baku-waste-to-energy-plan 6/10
Waste-to-Energy Plant
Technology applied: 4th Generation
Waste bunker
Boiler
Flue gas treatment
Heating system Control panel
7/31/2019 Oktay Mammadov - Energizing the Waste Baku Waste to Energy Plan
http://slidepdf.com/reader/full/oktay-mammadov-energizing-the-waste-baku-waste-to-energy-plan 7/10
Technology used
The success of Waste to Energy plants depends on several
parameters like the characteristics of the waste and theadopted technology
Principles andadvantages:
- Reverse regime
- Sufficient mixing awaste
- Mixing ofderivative fuel
- High temperatureresistant metal
- up to 40% energyefficiency
7/31/2019 Oktay Mammadov - Energizing the Waste Baku Waste to Energy Plan
http://slidepdf.com/reader/full/oktay-mammadov-energizing-the-waste-baku-waste-to-energy-plan 8/10
Risk distribution and management
Associated risks:
The realization costs can exceed the anticipated budgetThe realization time can exceed the anticipated scheduleThe O&M costs might exceed the ones that have beenassumedThe performances might not be at the expected levelThe quality of the equipment or the O&M performances mightcause lack of availabilityThe quantity or the quality of the wastes might not be asexpected
The project risks should be allocated to the parties who arethe most suitable to face and to manage them and this througha proper and fair contractual structure
The appropriate risks allocation with the relevant contractualconditions are essential for reducing the total costs and for anefficient delivery
7/31/2019 Oktay Mammadov - Energizing the Waste Baku Waste to Energy Plan
http://slidepdf.com/reader/full/oktay-mammadov-energizing-the-waste-baku-waste-to-energy-plan 9/10
Reliable partner is essential!
Construction of 150 EfW plants since 50 years (23 millions tons ofwaste treated per year)
CNIM Turnkey “culture” for design, construction and operation ofMunicipal Solid Waste thermal treatment including LAB Air
Pollution Control equipments
FromParis/ 2x50t/h
in 1969
to Baku/ 500,000t/y in 2012
CNIM experience in the waste treatment as turnkey contractor:
7/31/2019 Oktay Mammadov - Energizing the Waste Baku Waste to Energy Plan
http://slidepdf.com/reader/full/oktay-mammadov-energizing-the-waste-baku-waste-to-energy-plan 10/10
Thank you for attention!
«Tamiz Shahar» JSC
55, Khojali ave, AZ 1025, Baku, Azerbaijan
Tel.: (+99412) 4644110; 4644111
Fax: (+99412) 4644112