Office of Information Technology Information Technology Improvement Plan Progress Update IT Oversight Committee J. Brice Bible Chief Information Officer Office of Information Technology September 21, 2007

Upload: sandra4211

Post on 23-Jan-2015

315 views

Category:

Documents


1 download

DESCRIPTION

 

TRANSCRIPT

Page 1: OIT Status Fall 2007 - Welcome To Ohio University

Office of Information TechnologyInformation Technology Improvement Plan

Progress UpdateIT Oversight Committee

J. Brice BibleChief Information Officer

Office of Information TechnologySeptember 21, 2007

Page 2: OIT Status Fall 2007 - Welcome To Ohio University

Agenda• Improvement Plan Updates

– Information Security– Systems and Operations– Network Modernization– SIS Readiness Assessment– Black Board Pilot Project– Critical Staffing Status– Budget Update

• University System of Ohio• Oracle Identity Management Insight

Page 3: OIT Status Fall 2007 - Welcome To Ohio University

Update: Information Security

• Firewall Accomplishments– Upgraded the three border firewall operating systems (two main plus

spare), and the corresponding Netscreen Security Manager (NSM) servers

– Installed and configured 6 new data center firewalls (total of 17 physical firewalls)

• FY08 Firewall Plans– Expand the use of the border firewall which currently uses a minimal

rule set and only 4% of the CPU– Install subnet (building level) firewalls around campus as part of the

general network upgrade– Install data center firewall for sensitive data systems

• Music Down-Load Policy (P2P)– Selected Blocking Policy in Place (currently 115th on RIAA list)

Status

Page 4: OIT Status Fall 2007 - Welcome To Ohio University

Update: Information Security

• HIPAA Compliance- HIPAA compliance remediation completed for Hudson Health- VPN , HIPAA policies, and hardened desktops resulted in restarting e-

health systems this Fall

• SSN Removal from ID Cards and Library and Ping Systems• Security Assessment Services

- Tools available for evaluating system security- Completing first customer assessment – Human Resources- Responded to 1000 Email Requests and 2000 Log Issues since Spring

• New Information Security Director – Matthew Dalton- Rochester Institute of Technology Deputy ISO

• Security Plans- Initiate Regular Critical System Assessments- Complete Policy Framework and Incident Response

Status

Page 5: OIT Status Fall 2007 - Welcome To Ohio University

• Data Center and Operations– Conducting joint review of HVAC and electrical capacity with facilities staff– Targeting fall quarter consulting engagement to correlate findings from facilities and

provide roadmap for CSC datacenter• Roadmap will be used for further discussion with facilities planning regarding

funding needs for the facility– UPS upgrade targeted for this FY

• Storage Architecture– RFP Reviews Underway– Largest infrastructure expenditure in FY 08– Vendor finalists presenting the weeks of 9/10 and 9/17

• Targeting magic quadrant partners identified by Gartner research– Targeting week of 10/1 for vendor award– Timeline important to meet other project needs and to mitigate backup risks

Update: Systems and Operations

Systems Update *

* Additional Information in Appendix

Page 6: OIT Status Fall 2007 - Welcome To Ohio University

Status Highlights *• Systems

– Majority of high availability architecture design decisions affecting ERP will occur in the 2nd half of FY 08

– Fall and Winter decisions will focus on stabilizing existing commitments that will retain investment value

• VMWare• AIX and Linux systems

– Targeting OS reduction and a broad move from Unix to Linux• Requires some spending to validate design ideas• Vendor consultation on Oracle host designs

– Plans include review of all hardware based hosting to assess the potential for migration to virtualization

• Virtualization already used for many web and middle tier applications– Legacy Unix system retirement will not begin in earnest until FY 09

• Tru64• Solaris

– A strategic partner will be selected for host hardware similar to storage

Update: Systems and Operations

* Additional Information in Appendix

Page 7: OIT Status Fall 2007 - Welcome To Ohio University

Readiness Assessment• Prepare for Readiness Assessment (Sep – Oct 07)

• Ensure IT Improvement Plan Requirements Underway• Purchase Necessary Peoplesoft Student Software Modules• Prepare Hardware Environment (Collaborative options on hosting at OSU)• Acquire and Prepare Project Team Staff (OHIO functional and technical, PS consultants)

• Conduct Readiness Assessment (Nov 07 – Mar 08)• Conduct Fit/Gap Analysis• Develop Project Charter (objectives, metrics, scope)• Develop Master Plan for Communication, Scope & Risk Management• Develop Resource Master Plan• Develop Project Management Methodologies• Develop Detailed Project Schedule and Costs

• Continually Pursue and Develop Possible State Alliances• Four State Universities Using Same SIS Solution

• Three at Approximately Same Step in Implementation Process• Provide Detailed Funding Proposal for Board of Trustees in Spring 2008

• Determine Sources and Availability of Funding for Entire Project

Update: Student Information System (SIS) Update

Page 8: OIT Status Fall 2007 - Welcome To Ohio University

Legacy Network

• Initial rollout: 1996-1998• Bandwidth to desktop: 10 Mbps• Bandwidth to building: 100 Mbps• Scope: Athens campus

Update: Network Modernization Update

Page 9: OIT Status Fall 2007 - Welcome To Ohio University

Current Network Architecture (abbreviated)

Router

1

2

3

4

5

FANSTATUS

6

Catalyst4506

WS-C4506

INPUT OK

FAN OK

OUTPUT FAIL

1300ACV

100-240 V~

12-5 A

50/60 Hz

Switch must be in off "O" position to Install/Remove power supply.Fastener must be fully enaged prior to operating power supply.

INPUT

INPUT OK

FAN OK

OUTPUT FAIL

1300ACV

100-240 V~

12-5 A

50/60 Hz

Switch must be in off "O" position to Install/Remove power supply.Fastener must be fully enaged prior to operating power supply.

INPUT

WS-X4013+ SUPERVISOR ENGINE II PLUS

STATUS

UPLINK 1

LINK ACTIVE

UPLINK 2

ACTIVELINK ACTIVE 1% 100%

UTILIZATION

CONSOLE

LINK

10/100MGT

FLASH

EJECT

RESET

UTILSTAT

DUPLEXSPEED

SYSTEMRPS

CATALYST 35503

4

5

6

7

8

9

10

11

12

1

2

15

16

17

18

19

20

21

22

23

24

13

14

1 2

WS-C3550-24-SMI

UTILSTAT

DUPLEXSPEED

SYSTEMRPS

CATALYST 35503

4

5

6

7

8

9

10

11

12

1

2

15

16

17

18

19

20

21

22

23

24

13

14

1 2

WS-C3550-24-SMI

UTILSTAT

DUPLEXSPEED

SYSTEMRPS

CATALYST 3550

2

1

35

36

37

38

39

40

41

42

33

34

43

44

45

46

47

48

19

20

21

22

23

24

25

26

17

18

27

28

29

30

31

32

3

4

5

6

7

8

9

10

1

2

11

12

13

14

15

16

WS-C3550-48-SMI

STATUS4 5 6 7 8 9 10 11 12 13 14 15321

1413

1211

109

87

65

43

21

WS-X4448-GB-RJ45

2625

2827

3029

3231

3433

3635

3837

4039

4241

4443

4645

4847

2019

2221

2423

1817

1615

48 PORT

BASE-T10/100/1000

16

MULTI-SPEED GIGABIT

MODULEETHERNET SWITCHING

313029282726252423222120191817 48474645444342414039383736353432 33

STATUS

WS-X4306-GB

1000 BASE-X SWITCHING MODULE1 2 3 4 5 6

STATUS

WS-X4148-RJ

37 38 39 40 42 44 45 46 47 4841 4325 26 27 28 30 32 33 34 35 3629 3113 14 15 16 18 20 21 22 2317 19 241 2 3 4 6 8 9 10 11 125 7

1112

910

78

56

34

12

1314

2324

2122

1920

1718

1516

2526

3536

3334

3132

2930

2728

3738

4748

3940

4142

4344

4546

STATUS

WS-X4148-RJ

37 38 39 40 42 44 45 46 47 4841 4325 26 27 28 30 32 33 34 35 3629 3113 14 15 16 18 20 21 22 2317 19 241 2 3 4 6 8 9 10 11 125 7

1112

910

78

56

34

12

1314

2324

2122

1920

1718

1516

2526

3536

3334

3132

2930

2728

3738

4748

3940

4142

4344

4546

`

Computer `

Computer

`

Computer`

Computer

`

Computer

`

Computer

`

Computer`

Computer

`

Computer

`

Computer

`

Computer`

Computer

`

Computer `

Server

`

Computer`

Computer

Router

10/100 Mbps Ethernet

Gig Ethernet

Update: Network Modernization Update

Page 10: OIT Status Fall 2007 - Welcome To Ohio University

Next Generation Network (10 Gbps project)

• Initial rollout: 2007/08 (Pending Governance Review)

• Bandwidth to desktop: 100 Mbps or 1.0Gbps

• Bandwidth to building: 10 Gbps for Major Buildings (1 Gbps where appropriate)

• Core routers: Redundant links to distributed hub sites

• Distributed router hub sites: Redundant links to buildings

• Initial Scope: Athens Campus

Update: Network Modernization Update

Page 11: OIT Status Fall 2007 - Welcome To Ohio University

Next Generation Network Architecture * (abbreviated)

10 Gig Ethernet

RouterHub Site 1A

RouterHub Site 1B

Router Router

RouterHub Site 2A

RouterHub Site 2B

Green 1 Green 2

Core

Data Center

Update: Network Modernization Update

* Additional Information in Appendix

Page 12: OIT Status Fall 2007 - Welcome To Ohio University

New Recruitment Strategies and Initiatives for IT Positions

Update: Critical Staffing Status

• Proactive Recruitment of Passive Job Seekers- Post Job Vacancies on Monster.com- Search Monster Resume Database and Solicit Candidates for Current

and/or Upcoming Positions- Solicit Potential Candidates at national Educause Conference

• Post Positions on Several University Gateway Listservs• Develop Recruiting Brochure to Introduce Candidates to OHIO

and Southeastern Ohio• Post Vacancies with the Top 10 Colleges and Universities

producing African American Master's Degrees in Computer and Information Sciences

Page 13: OIT Status Fall 2007 - Welcome To Ohio University

1st Quarter Mission Critical Posting Update

Position Status

Director of IT Security HIRED. Matthew Dalton. 9-1-07

Director of Systems and Operations Interviews currently underway.

Firewall Administrator Position currently posted.

Windows Administrator Search committee reviewing candidates.

Blackboard Apps Administrator Posting pending.

Update: Critical Staffing Status

Page 14: OIT Status Fall 2007 - Welcome To Ohio University

2nd Quarter Mission Critical Anticipated Postings

Position Department

Director of Customer Services Customer Service

Unix Administrators (2 positions) Systems & Operations

Security Analyst IT Security

Database Administrator Application Information Solutions

Update: Critical Staffing Additions

Page 15: OIT Status Fall 2007 - Welcome To Ohio University

FY 2008 Summary of ExpendituresDepartmentName

StaffingCosts

Operations, Licensing, Work Orders

Program/Project Funds

TelephoneOperations

TOTAL

Office of the CIO $514,790 $24,970 $3,120,216 $3,680,076

Academic Technology

$1,414,121 $156,561 $1,800,952

Customer Support Services

3,343,545 $645,222 $50,000 $4,100,544

Applications Solutions

$3,454,845 $645,999 $4,100,844

Information Security

$403,044 $26,263 $59,950 $489,217

Systems and Operations

$2,314,691 $1,566,541 $3,500 $3,884,732

Business Services $860,047 $577,352 $1,437,399

Telephone Auxiliary

$2,065,000 $2,065,000

TOTAL $11,844,598 $3,916,046 $3,247,754 $2,065,000 $21,073,398

Update: OIT Budget

Page 16: OIT Status Fall 2007 - Welcome To Ohio University

Project Description OIT FY08 Base Funding

Black Board Enhancement Project $60,000

IT Business Continuity $5,000

Additional ID Card Costs $25,000

Apple Site License Renewal $59,000

Data Center Firewall $50,000

Network 10 Gb Upgrade Project (Year 1) $750,000

Blue Light Replacement $30,000

Security Monitoring and Compliance System $250,000

Storage Infrastructure (Lease) $500,000

SIS-OSU Disaster Recovery Services $83,100

VM Capacity Expansion $64,500

IronPort Expansion $70,000

Identity Management (Pilot) $300,000

Oracle e-Business Upgrade/SIS Testbed $366,000

E-Mail Replacement (Tru64) $143,200

Enterprise Architecture Test Environment $87,600

Available Funds

Deferred or Other Funds

FY 2008 Program/Project Expenditures

Update: OIT Budget

Page 17: OIT Status Fall 2007 - Welcome To Ohio University

Inherited FY07 OIT Budget Challenges

Update: OIT Budget

• Mainframe Upgrade (stabilization until new SIS)

• Required Budget Reductions ($1,071,386)- Actual FY07 Reductions - $377,683- Cost-Savings Measures in FY08 - $274,800- Additional Reduction in FY08 Base - $418,903

• Increased Licensing and Service Cost - $275,000

• Unfunded Staffing and Salary Increases $294,000

• Increased Security Staff and Services - $120,917

Page 18: OIT Status Fall 2007 - Welcome To Ohio University

University System of OhioStrategic Initiatives in Information Technology

HIGH POTENTIAL OPPORTUNITIESNear Term (One/Two Years):• Shared Emergency Notification Services• Co-Located Disaster Recovery / Backup• Common Admissions Application Portal• Consolidated IT Contracting and Procurement

– Central Licensing– Group Purchasing

• Statewide Policies and Procedures

Medium Term (Three Years):• Federated IdM Model• Course Management Toolkit (universal access) • Common Applications (help desk, email, anti-virus)• Central NOSC• Long Term (Three/Five Years):• VOIP / Unified Messaging / Advanced Applications• Shared State-HE Data Center• Common ERP

ISSUES• Lack of Central Contracting Authority

Hinders Collaboration• IUC Commitment To Collaboration

Model

Update: Statewide Discussions

Page 19: OIT Status Fall 2007 - Welcome To Ohio University

Appendix

Page 20: OIT Status Fall 2007 - Welcome To Ohio University

Data Center Facility Details

• Most systems same age as last renovation ~ 15 years ago– Door security – Fire Alarm– Fire Suppression– Cooling– UPS– PDUs

• Other Known Deficiencies– Door Cameras and monitors

• Non-recorded• No service contract

– Generator• Security questionable

Update: Systems and Operations

Page 21: OIT Status Fall 2007 - Welcome To Ohio University

Systems Details• Systems by major service

– Blackboard instructional system• Hardware and OS components range 3-5 years old• Not on latest release of the product• High availability limited by one datacenter

– Web• Front end systems virtualized ~ 2 years old• Back end system ~ 5 years old• Legacy system still in use due to slow adoption rate; ~ 9 years old• No high availability

– Email• System hardware components range from 3-5 years old

– Has been through several design revisions• System OS and Hardware support end of life by manufacturer by 2011• Service will be reviewed in second half of FY 08 for future roadmap• High availability limited by one datacenter

– SIS• Product end of life• Newest of two mainframes only one year old• System required until new SIS comes on-line• High availibility limited by one datacenter

– Financial and HR Systems• Hardware 5 years old; development and test 7 years old• Current Oracle eBusiness solution requires upgrade that hardware cannot support• Requires new investment FY 08• No inherent high availability

Update: Systems and Operations

Page 22: OIT Status Fall 2007 - Welcome To Ohio University

Systems Details• Systems by major service

– Calendaring• Hardware and OS less than one year old• Migrated from Unix to Linux to stabilize environment previously on 7 year old hardware• Second phase of project will bring better synchronization support• Service will be reviewed with email in second half of FY 08 for future roadmap• No inherent high availability

– Identity Management System• Core engine developed by OHIO staff• System OS and hardware support end of life by manufacturer by 2011• High availability limited by one datacenter

– ID card system• Hardware 6 years old• System operates as backend of point of sale systems for auxiliaries

– Directory Services• Active Directory in production since 2002• Hardware ranges from 3-5 years old• Improvements to user provisioning Fall 2007

– File Services• No commonly adopted solution; split between email system and Novell• Novell crippled by no strategy and inadequate staff• Novell hardware out of warranty• Email system storage not highly adopted due to poor user access methods• Targeting a solution tied to new Network Attached Storage offerings in new storage solution

– Targeting testing second half of FY 08

Update: Systems and Operations

Page 23: OIT Status Fall 2007 - Welcome To Ohio University

Storage Details• Systems

– Storage Subsystems • 3-6 years of age• Disjointed fabrics due to old systems functional structure across departments• Management spread across staffSAN switches - anywhere from 7 to 2 years in production

– Tape Libraries• 4-8 years of age• Only backup method available on enterprise systems today• Over reliance on tape means slower restore times and risks of failed restores

– Current data• ~20 TB and 225 million files• Growth patterns in Oracle ERP, Email, and Blackboard instructional system

– This does not include a highly adopted central storage solution for personal storage

• Storage Initiative– Guiding principles

• Mitigate Backup/DR risk – Gain backup and recovery efficiency – Collaborate with OSU

• Establish a foundation for future growth needs – Acquire robust, fault tolerant, and scalable systems – Design for single site HA in the near term – Plan for future HA capabilities across sites

• Consolidation of storage sub-systems and networks • Storage management simplification

Update: Systems and Operations

Page 24: OIT Status Fall 2007 - Welcome To Ohio University

Network Upgrade Status

• Gathered preliminary design requirements• Consulted with various vendors and outside

engineers• Completed the basic architectural design• Developed design options with associated

costs and time lines

Update: Network Modernization Update

Page 25: OIT Status Fall 2007 - Welcome To Ohio University

Next Steps

• Seek high level design approval/option selection

• Seek high level deployment priority guidance• Identify additional requirements• Develop detailed deployment plan• Seek final approval (via ITAC)• Initiate deployment (Late FY08)

Update: Network Modernization Update