The Engineering of a Process Plant
• The role of Engineering
• The work process
© 2
01
5 – H
ervé Baro
n
Oil & Gas Project demands on Engineering
© 2
01
5 – H
ervé Baro
n
Oil & Gas Project demands on Engineering
The Engineering of a Process Plant
• The role of Engineering
• The work process
© 2
01
5 – H
ervé Baro
n
Oil & Gas Project demands on Engineering
Process Flow
Diagrams, Heat &
Material Balance
Process Equipment
sizing
Utility consumption
Utility Units Design
Plant Layout
Equipment design by vendors
Piping & Instrumentation
Diagrams
Piping Routing
Instrumentation & Control design
Fluids composition & conditions
Material selection and specifications
Civil design ( foundations)
Structural steel design
Electrical power generation & distribution
Process Design
Civil design (UG networks)
© 2
01
5 – H
ervé Baro
n
Oil & Gas Project demands on Engineering
The Engineering of a Process Plant
Fast track execution
• From sequential to concurrent E/P/C
• Consequences for Engineering: Early quantity estimates and commitments
• Awareness and compliance with construction work sequence
• Knowledge and focus on fundamentals
© 2
01
5 – H
ervé Baro
n
From sequential to concurrent Project execution
ENGINEERING
PROCUREMENT
CONSTRUCTION
Bill of materials
Drawings
© 2
01
5 – H
ervé Baro
n
ENGINEERING
PROCUREMENT
CONSTRUCTION
From sequential to concurrent Project execution
ENGINEERING PROCUREMENT CONSTRUCTION
© 2
01
5 – H
ervé Baro
n
Oil & Gas Project demands on Engineering
The Engineering of a Process Plant
Fast track execution
• From sequential to concurrent E/P/C
• Consequences for Engineering: Early quantity estimates and commitments
• Awareness and compliance with construction work sequence
• Knowledge and focus on fundamentals
© 2
01
5 – H
ervé Baro
n
ENGINEERING
PROCUREMENT
From sequential to concurrent Project execution
Fabrication + transport Up to 7-9 months on large projects
© 2
01
5 – H
ervé Baro
n
ENGINEERING
CONSTRUCTION
From sequential to concurrent Project execution
QUANTITIES TO ERECT
© 2
01
5 – H
ervé Baro
n
Oil & Gas Project demands on Engineering
The Engineering of a Process Plant
Fast track execution
• From sequential to concurrent E/P/C
• Consequences for Engineering: Early quantity estimates and commitments
• Awareness and compliance with construction work sequence
• Knowledge and focus on fundamentals
© 2
01
5 – H
ervé Baro
n
Awareness and compliance with construction sequence
Process simulations
Equipment selection &
purchase
Foundation drawings
Process data sheet
Vendor data
© 2
01
5 – H
ervé Baro
n
Awareness and compliance with construction sequence
Engineering must adjust its schedule to match the construction sequence…
© 2
01
5 – H
ervé Baro
n
Engineering must adjust its schedule to match the construction sequence… Undergrounds are installed first but usually designed last!
Awareness and compliance with construction sequence
© 2
01
5 – H
ervé Baro
n
Oil & Gas Project demands on Engineering
The Engineering of a Process Plant
Fast track execution
• From sequential to concurrent E/P/C
• Consequences for Engineering: Early quantity estimates and commitments
• Awareness and compliance with construction work sequence
• Knowledge and focus on fundamentals
© 2
01
5 – H
ervé Baro
n
Oil & Gas Project demands on Engineering
The Engineering of a Process Plant
Fast track execution
• From sequential to concurrent E/P/C
• Consequences for Engineering: Early quantity estimates and commitments
• Awareness and compliance with construction work sequence
• Knowledge and focus on fundamentals
• Piping chain
© 2
01
5 – H
ervé Baro
n
The most likely critical path of an Oil & Gas Project
© 2
01
5 – H
ervé Baro
n
Elementary work in Piping
Drawing + matching materials available Pre-fabrication: cutting, welding, NDE, blasting, painting (primer) Erection: fit-up, welding, NDE, PWHT, supports, hydrotest, cleaning, re-instatement, painting, insulation
© 2
01
5 – H
ervé Baro
n
Oil & Gas Project demands on Engineering
The Engineering of a Process Plant
Fast track execution
• From sequential to concurrent E/P/C
• Consequences for Engineering: Early quantity estimates and commitments
• Awareness and compliance with construction work sequence
• Knowledge and focus on fundamentals
• Piping chain
• Integration of Equipment
© 2
01
5 – H
ervé Baro
n
Management of information from Vendors
© 2
01
5 – H
ervé Baro
n
Management of information from Vendors
Initial package layout Final Package layout
© 2
01
5 – H
ervé Baro
n
Management of information from Vendors
Vendor Instrumentation &
Control
Electrical
Plant Layout
Civil
Piping
Process
© 2
01
5 – H
ervé Baro
n
Oil & Gas Project demands on Engineering
The last word: Engineering in a nutshell
© 2
01
5 – H
ervé Baro
n
Oil & Gas Project demands on Engineering
© 2
01
5 – H
ervé Baro
n
Oil & Gas Project demands on Engineering
To order: http://www.editionstechnip.com/fr/c atalogue-detail/1111/oil-gas-engineering-guide-the.html