ohio’s transportation outlook • june 2019
TRANSCRIPT
2 |
To provide easy movement of people and goods from place to place, we will:__________________________________
Take care of what we have;_________________________________
Make our system work better;_________________________________
Improve safety;_________________________________
Enhance capacity.
ODOT’S MISSION
6 |
OHIO GENERAL ASSEMBLY RESPONSE TO H.B. 62
The Conference Committee responded with the following compromise on 4/02/19:10.5 cents user fee increase on gasoline (not indexed) beginning July 1, 2019
19 cents user fee increase on diesel (not indexed) beginning July 1, 2019
Changes formula from 60/40 ODOT/Local to 55%/45% for new monies
Removed ODOT’s flexing of Federal dollars to transit agencies from current $33 m/year and increased transit funding to $70 million annually from the State GRF budget
Increased registration fees for all electric vehicles by $200 annually, Increased registration fees for hybrid vehicles by $100 annually. Now captures Compressed Natural Gas to diesel levels.
7 |
FINAL RESULTS
H.B. 62 was signed into law April 3rd, 2019 by Governor Mike DeWineBill gives ODOT an additional $450 million annually.Bill gives Local Governments around Ohio just over $370 million annuallyCities receive a 62.5% increase in MFT, Townships receive a 67% increaseEvery County Engineers receives a $1.53 million increase from MFT (62.8%)
Estimated Gas Tax Revenues For Each County EngineerSFY 2020 SFY 2021
Original 28cpg
HB 6228cpg + 10.5cpg Gas/19cpg Diesel
Original 28cpg
HB 6228cpg + 10.5cpg Gas/19cpg Diesel
$2,436,948 $3,967,041 $2,467,630 $4,011,374
HOUSE BILL 62 ESTIMATED DISTRIBUTIONS
City of Columbus$26,573,674 $43,191,551 $26,909,488 $43,670,275
City of Cincinatti$8,194,950 $13,319,671 $8,298,510 $13,467,303
City of Akron$5,329,980 $8,663,089 $5,397,336 $8,759,109
16 |
TOAST TOOLMin Max0% 50% 0
50% 55% 155% 60% 260% 65% 365% 70% 470% 75% 575% 80% 680% 85% 785% 90% 890% 95% 995% 100% 10
0 2,200 102,200 2,700 92,700 3,300 83,300 3,900 73,900 4,400 64,400 5,400 55,400 6,600 46,600 9,700 39,700 15,300 2
15,300 30,500 130,500 0
0 1,000 101,000 5,000 95,000 10,000 8
10,000 15,000 715,000 25,000 625,000 35,000 535,000 45,000 445,000 55,000 355,000 65,000 265,000 75,000 175,000 0
Max ScoreCriteria Calculated by Value RangeRange Normalized
Value
Score (%)
Number Vehicles
Weighting % Multiplier
60
8 8023.5%
17.6% 6Volume per Lane 0 - 110,000+
Travel Time Performance
0-100%
50Bottlenecks 0-75,000+
Impact Factor = Avg duration (minutes) x
Avg max length x Number occurances
14.7% 5
o Data Categories:o Travel Time o Volumeo Bottleneckso Safety Performanceo Clearance Timeso Secondary Crasheso Freight Corridors
o TSMO/Operations priority routes