PENNDOT PROJECT INFORMATION NEVILLE ISLAND BRIDGE BRIDGE REHABILITATION PROJECT SR 0079 SECTION A61 ROBINSON AND NEVILLE TOWNSHIPS AND GLENFIELD BOROUGH, ALLEGHENY COUNTY SR 0079 A61 Neville Island Bridge Preservation MPMS 87756 OHIO RIVER

Upload: others

Post on 26-Jun-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: OHIO RIVER - penndot.gov › RegionalOffices › district-11...• Project includes 27-span structure over RR Tracks, Ohio River Backchannel, Ohio River Main Channel and SR 0065 Ohio

PENNDOT PROJECT INFORMATION

NEVILLE ISLAND BRIDGEBRIDGE REHABILITATION PROJECT

SR 0079 SECTION A61ROBINSON AND NEVILLE TOWNSHIPS AND GLENFIELD

BOROUGH, ALLEGHENY COUNTY

SR 0079 A61 NevilleIsland BridgePreservationMPMS 87756

OHIO RIVER

Page 2: OHIO RIVER - penndot.gov › RegionalOffices › district-11...• Project includes 27-span structure over RR Tracks, Ohio River Backchannel, Ohio River Main Channel and SR 0065 Ohio

PROJECT TEAM

PENNDOT DESIGN DIVISION

Direct Questions to:

• Michael P. Sokol, P.E. | Senior Bridge Project Manager/PA Turnpike CoordinatorPA Department of TransportationEngineering District 11-0 | Project Delivery Unit45 Thoms Run Road | Bridgeville, PA 15017Phone: 412.429.4898 | [email protected]

• Nick Krobot, P.E. | Assistant Environmental Engineering Manager

PENNDOT PRESS OFFICE• Steve Cowan | District Press Officer

PLEASE COMPLETE SURVEY AT END OF PRESENTATION

SR 0079 A61 NevilleIsland BridgePreservationMPMS 87756

Page 3: OHIO RIVER - penndot.gov › RegionalOffices › district-11...• Project includes 27-span structure over RR Tracks, Ohio River Backchannel, Ohio River Main Channel and SR 0065 Ohio

PROJECT SUMMARY

• Bridge Concrete Substructure Repairs• (including work on Neville Island)• Bridge Repainting – All Steel Members• Drainage Repairs• Bridge Barrier Repairs

Cost and Schedule:• Estimated Construction Cost

$60M

• Anticipated Construction Duration

The let date for the project is 12-12-19. Physical construction is likely to begin with containment erection in March/April 2020. The project should be complete in the fall of 2022. 2021 – Fall 2022

Due to the site constraints of the project location and geometry, as well as most of the work occurring on limited access ramps to the interstate, bicycle traffic cannot be maintained on the highway shoulder. A bicycle detour route will be signed using the Sewickley Bridge

• Project includes 27-span structure over RR Tracks, Ohio River Backchannel, Ohio River Main Channel and SR 0065 Ohio River Boulevard and the smaller 4-span structure to the north over Kilbuck Street

• Project Purpose: To maintain safe and reliable travel on this portion of I-79

• Project Need: Due to the physical deficiencies of the existing bridges causing Fair to Poor Condition ratings.

Major Construction Activities:• Bridge Expansion Dam Replacements• Bridge Deck Repairs and Overlays• Bridge Structure Steel Repairs• Bridge Bearing Replacements

SR 0079 A61 NevilleIsland BridgePreservationMPMS 87756

Page 4: OHIO RIVER - penndot.gov › RegionalOffices › district-11...• Project includes 27-span structure over RR Tracks, Ohio River Backchannel, Ohio River Main Channel and SR 0065 Ohio

STRUCTURE OVERVIEWSR 0079 A61 NevilleIsland BridgePreservationMPMS 87756

4-Span Structure over Deer Run Road

27-Span Structure over Ohio River and Neville Island

NEVILLEISLAND

To Pittsburgh

Page 5: OHIO RIVER - penndot.gov › RegionalOffices › district-11...• Project includes 27-span structure over RR Tracks, Ohio River Backchannel, Ohio River Main Channel and SR 0065 Ohio

Project Effects on the Traveling PublicProject Overview (Main Span and Back Channel Span over Ohio River)

SR 0079 A61 NevilleIsland BridgePreservationMPMS 87756

See Detail

OHIO RIVER BACK CHANNEL

OHIO RIVER

Page 6: OHIO RIVER - penndot.gov › RegionalOffices › district-11...• Project includes 27-span structure over RR Tracks, Ohio River Backchannel, Ohio River Main Channel and SR 0065 Ohio

Project Effects on the Traveling PublicProject Overview (Main Span and Back Channel Span over Ohio River)

SR 0079 A61 NevilleIsland BridgePreservationMPMS 87756

I-79 over the Ohio River

- During nighttime hours 8 p.m. to 6 a.m.: I-79 single lane and right-shoulder closures in the northbound and southbound directions. I-79 remains open with lane restrictions, no detour.

- During weekday off-peak hours 9 a.m. to 3 p.m.: I-79 single lane and right-shoulder closures in the northbound and southbound directions on the main arch span. Two (of three) I-79 lanes remain open in each direction, no detour.

- For bicycle traffic only, bicycle route normally on I-79 right shoulder will be detoured via SR 0051, Sewickley Bridge, Broad Street, Beaver Street, SR 4028 Redgate Road.

- During weekends from 9 p.m. Friday to 5 a.m. Monday: I-79 complete closure and detour northbound and southbound (only one direction closed at a time, four (4) northbound I-79 closures and four (4) southbound I-79 closures). Detour via Sewickley Bridge.

Page 7: OHIO RIVER - penndot.gov › RegionalOffices › district-11...• Project includes 27-span structure over RR Tracks, Ohio River Backchannel, Ohio River Main Channel and SR 0065 Ohio

Project Effects on the Traveling PublicProject Overview (Main over Ohio River)

SR 0079 A61 NevilleIsland BridgePreservationMPMS 87756

I-79 over the Ohio River, Daytime Off-Peak Single Lane Closures on Arch Span, 9 a.m. to 3 p.m.

Page 8: OHIO RIVER - penndot.gov › RegionalOffices › district-11...• Project includes 27-span structure over RR Tracks, Ohio River Backchannel, Ohio River Main Channel and SR 0065 Ohio

Project Effects on the Traveling PublicProject Overview (Main Span and Back Channel Span over Ohio River)

SR 0079 A61 NevilleIsland BridgePreservationMPMS 87756

Ramp H, Exit 65 connecting Grand Avenue (Neville Island) with I-79 Southbound

- Long-term closure and detour of Ramp H via EXIT 66 Emsworth Sewickley interchange. Closure is needed for long-term setup for parking and operating paint trucks and other equipment on right shoulders within the gore and ramp area.

Ramp E, Exit 65 connecting Grand Avenue (Neville Island) with I-79 Northbound

- Long-term closure and detour of Ramp E Coraopolis Bridge and EXIT 64 Coraopolis McKees Rocks interchange. Closure is needed for long-term setup for parking and operating paint trucks and other equipment on right shoulders within the gore and ramp area.

Page 9: OHIO RIVER - penndot.gov › RegionalOffices › district-11...• Project includes 27-span structure over RR Tracks, Ohio River Backchannel, Ohio River Main Channel and SR 0065 Ohio

Project Effects on the Traveling PublicProject Overview (Main Span and Back Channel Span over Ohio River)

SR 0079 A61 NevilleIsland BridgePreservationMPMS 87756

Grand Avenue on Neville Island

- Short-term single-lane closures for installation and removal of the underdeck encapsulation overhead and work on concrete piers adjacent to the sidewalk.

- Contractor will stop construction activities and utilize flaggers to allow safe passage of pedestrians passing through the workzone on the sidewalk. Resume work once pedestrians have safely passed.

- For the eastbound lanes, contractor will close the right lane (left lane) of Grand Avenue Eastbound and merge the right lane (left lane) into the left lane (right lane) and maintain one 11-foot lane of traffic on Grand Avenue Eastbound.

- Contractor will repeat the same process of left lane and right lane closures on the westbound lanes on Grand Avenue.

Page 10: OHIO RIVER - penndot.gov › RegionalOffices › district-11...• Project includes 27-span structure over RR Tracks, Ohio River Backchannel, Ohio River Main Channel and SR 0065 Ohio

Project Effects on the Traveling PublicProject Overview (North of Ohio River)

SR 0079 A61 NevilleIsland BridgePreservationMPMS 87756

See Detail

Page 11: OHIO RIVER - penndot.gov › RegionalOffices › district-11...• Project includes 27-span structure over RR Tracks, Ohio River Backchannel, Ohio River Main Channel and SR 0065 Ohio

Project Effects on the Traveling PublicProject Overview (North of Ohio River)

SR 0079 A61 NevilleIsland BridgePreservationMPMS 87756

Ramps A1 and A2, Exit 66, connecting SR 0065 with I-79 Southbound

- Long-term closure and detour of Ramps A1 and A2 via Kilbuck Street, Deer Run Road and Ramp A3. Closure is needed due to limited vertical clearance, for installation and removal of overhead encapsulation and during painting of the four-span structure over Deer Run Road.

Ramps A1, A2 and A3 Exit 66, connecting SR 0065 and Deer Run Road with I-79 Southbound

- Long-term closure and detour of Ramp A via EXIT 68 Mount Nebo Road interchange. Closure is needed due to construction vehicles blocking on-ramp to perform superstructure work requiring access from the I-79 bridge deck.

Page 12: OHIO RIVER - penndot.gov › RegionalOffices › district-11...• Project includes 27-span structure over RR Tracks, Ohio River Backchannel, Ohio River Main Channel and SR 0065 Ohio

Project Effects on the Traveling PublicProject Overview (North of Ohio River)

SR 0079 A61 NevilleIsland BridgePreservationMPMS 87756

Ramp B2, Exit 66, connecting I-79 Northbound with SR 0065 Northbound

- Long-term closure and detour of Ramp B2 via EXIT 68 Mount Nebo Road interchange for installation and removal of encapsulation overhead, work on Abutment 2 and other activities.

SR 0065 Northbound passing under I-79

- Half-width construction over SR 0065 via long-term closure of SR 0065 northbound right lane, followed by long-term closure of the left lane, for installation and removal of encapsulation overhead.

SR 0065 Southbound passing under I-79

- Half-width construction over SR 0065 via short-term closure of SR 0065 southbound right lane, followed by short-term closure of the left lane, for installation and removal of encapsulation overhead.

Page 13: OHIO RIVER - penndot.gov › RegionalOffices › district-11...• Project includes 27-span structure over RR Tracks, Ohio River Backchannel, Ohio River Main Channel and SR 0065 Ohio

Project Effects on the Traveling PublicProject Overview (North of Ohio River)

SR 0079 A61 NevilleIsland BridgePreservationMPMS 87756

Glenfield Viaduct

- Half-width construction on the Glenfield Viaduct via short-term closure of southbound right lane, followed by short-term closure of the left lane, for installation and removal of encapsulation overhead.

Ramp S

- Long-term closure and detour of Ramp S via Coraopolis Bridge, SR 0051 and Sewickley Bridge for installation and removal of encapsulation overhead. Ramp S connects Kilbuck Street to SR 0065 Northbound.