ohio epaepa.ohio.gov/portals/28/documents/schedules/2013/richland.pdf · oh7000012 bellville...

254
BELLVILLE VILLAGE WATER OH7000012 ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE 01/01/2013 Effective Date: Community System Type: THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM. Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378 ** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013 Chemicals Monitoring Requirements Operating Period: to 1/1 12/31 Sampling Location Facility ID: SMP ID: 7057645 EP001 Facility Source: Ground Water Facility Class: CLASS 1 Facility Name: BELLVILLE VILLAGE Sample(s) Required between INORGANICS 1 and 1/1/2013 5/31/2013 Sample for all the analytes listed below: ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020 CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085 Sample(s) Required between NITRITE - 1041 1 and 6/1/2013 10/31/2013 Sample(s) Required between NITRATE - 1040 1 and 6/1/2013 10/31/2013 Sample(s) Required between RADIOLOGICALS 1 and 1/1/2013 5/31/2013 Sample for all the analytes listed below: GROSS ALPHA - 4002 RADIUM-228 - 4030 Not Required SYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1 Sample(s) Required between VOLATILE ORGANIC CHEMICALS (VOC) 1 and 1/1/2013 5/31/2013

Upload: others

Post on 07-Oct-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

BELLVILLE VILLAGE WATEROH7000012

ENTRY POINT MONITORING SCHEDULE

Page 1 of 1

2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Chemicals Monitoring Requirements

Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7057645EP001 Facility Source: Ground Water Facility Class: CLASS 1

Facility Name: BELLVILLE VILLAGE

Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:

ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020

CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085

Sample(s) Required betweenNITRITE - 1041 1 and6/1/2013 10/31/2013

Sample(s) Required betweenNITRATE - 1040 1 and6/1/2013 10/31/2013

Sample(s) Required betweenRADIOLOGICALS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:

GROSS ALPHA - 4002 RADIUM-228 - 4030

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 5/31/2013

Page 2: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

BELLVILLE VILLAGE WATEROH7000012

Page 1 of 2

2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

DISTRIBUTION MONITORING SCHEDULE

Groundwater Rule Substantial Treatment System

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS000

Facility Name: BELLVILLE, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1

Not RequiredLEAD - 1030 AND COPPER - 1022

2 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/20132 Sample(s) Required between 2/1/2013 and 2/28/20132 Sample(s) Required between 3/1/2013 and 3/31/20132 Sample(s) Required between 4/1/2013 and 4/30/20132 Sample(s) Required between 5/1/2013 and 5/31/20132 Sample(s) Required between 6/1/2013 and 6/30/20132 Sample(s) Required between 7/1/2013 and 7/31/20132 Sample(s) Required between 8/1/2013 and 8/31/20132 Sample(s) Required between 9/1/2013 and 9/30/20132 Sample(s) Required between 10/1/2013 and 10/31/20132 Sample(s) Required between 11/1/2013 and 11/30/20132 Sample(s) Required between 12/1/2013 and 12/31/2013

2 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/20132 Sample(s) Required between 2/1/2013 and 2/28/20132 Sample(s) Required between 3/1/2013 and 3/31/20132 Sample(s) Required between 4/1/2013 and 4/30/20132 Sample(s) Required between 5/1/2013 and 5/31/20132 Sample(s) Required between 6/1/2013 and 6/30/20132 Sample(s) Required between 7/1/2013 and 7/31/20132 Sample(s) Required between 8/1/2013 and 8/31/20132 Sample(s) Required between 9/1/2013 and 9/30/20132 Sample(s) Required between 10/1/2013 and 10/31/20132 Sample(s) Required between 11/1/2013 and 11/30/20132 Sample(s) Required between 12/1/2013 and 12/31/2013

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS201

Facility Name: BELLVILLE, VILLAGE OF DISTRIBUTIONADDRESS NOT KNOWN

Facility Class: CLASS 1

1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:

TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950

Page 3: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

BELLVILLE VILLAGE WATEROH7000012

Page 2 of 2

2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

DISTRIBUTION MONITORING SCHEDULE

Groundwater Rule Substantial Treatment System

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS202

Facility Name: BELLVILLE, VILLAGE OF DISTRIBUTIONADDRESS NOT KNOWN

Facility Class: CLASS 1

1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:

TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950

Page 4: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

BRIARWOOD ESTATES MHPOH7000112

ENTRY POINT MONITORING SCHEDULE

Page 1 of 1

2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Chemicals Monitoring Requirements

Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7057646EP001 Facility Source: Ground Water Facility Class: CLASS A

Facility Name: BRIARWOOD ESTATES MHP

Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:

ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020

CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085

Sample(s) Required betweenNITRITE - 1041 1 and6/1/2013 10/31/2013

Sample(s) Required betweenNITRATE - 1040 1 and6/1/2013 10/31/2013

Not RequiredRADIOLOGICALS

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Sample(s) Required betweenSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 2 1 and4/1/2013 6/30/2013 Sample for all the analytes listed below:

2,4-D - 2105 CARBOFURAN - 2046 OXAMYL (VYDATE) - 2036

PENTACHLOROPHENOL - 2326 PICLORAM - 2040

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 3

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 4

Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 5/31/2013

Page 5: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

BRIARWOOD ESTATES MHPOH7000112

Page 1 of 1

2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

DISTRIBUTION MONITORING SCHEDULE

Groundwater Rule Substantial Treatment System

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS000

Facility Name: BRIARWOOD ESTATES MHP DISTRIBUTION

Not RequiredLEAD - 1030 AND COPPER - 1022

1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013

1 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS201

Facility Name: BRIARWOOD ESTATES MHP DISTRIBUTIONADDRESS NOT KNOWN

1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:

TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950

Page 6: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

COLONIAL HILLS MHPOH7000312

ENTRY POINT MONITORING SCHEDULE

Page 1 of 1

2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Chemicals Monitoring Requirements

Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7057647EP001 Facility Source: Ground Water Facility Class: CLASS A

Facility Name: COLONIAL HILLS MHP

Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:

ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020

CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085

Sample(s) Required betweenNITRITE - 1041 1 and6/1/2013 10/31/2013

Sample(s) Required betweenNITRATE - 1040 1 and6/1/2013 10/31/2013

Not RequiredRADIOLOGICALS

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Sample(s) Required betweenSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 2 1 and4/1/2013 6/30/2013 Sample for all the analytes listed below:

2,4-D - 2105 CARBOFURAN - 2046 OXAMYL (VYDATE) - 2036

PENTACHLOROPHENOL - 2326 PICLORAM - 2040

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 3

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 4

Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 5/31/2013

Page 7: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

COLONIAL HILLS MHPOH7000312

Page 1 of 1

2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

DISTRIBUTION MONITORING SCHEDULE

Groundwater Rule Substantial Treatment System

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS000

Facility Name: COLONIAL HILLS MHP DISTRIBUTION

5 Sample(s) Required between 6/1/2013LEAD - 1030 AND COPPER - 1022 and 9/30/2013

Lead Consumer Notice needs issued to sampling participants within thirty days of receipt of results and verification submitted to Ohio EPAwithin ninety days from the end of the monitoring period. Submit Form 5105 with appendix to Ohio EPA within ten days from the end of themonitoring period. Forms are available online at: http://epa.ohio.gov/ddagw/reporting.aspx

1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013

1 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS201

Facility Name: COLONIAL HILLS MHP DISTRIBUTIONADDRESS NOT KNOWN

1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:

TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950

Page 8: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

BUTLER VILLAGEOH7000412

ENTRY POINT MONITORING SCHEDULE

Page 1 of 1

2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Chemicals Monitoring Requirements

Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7062134EP004 Facility Source: Ground Water Facility Class: CLASS 1

Facility Name: BUTLER VILLAGE TP 4

Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:

ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020

CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085

Sample(s) Required betweenNITRITE - 1041 1 and1/1/2013 5/31/2013

Sample(s) Required betweenNITRATE - 1040 1 and6/1/2013 10/31/2013

Not RequiredRADIOLOGICALS

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 5/31/2013

Page 9: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

BUTLER VILLAGEOH7000412

Page 1 of 2

2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

DISTRIBUTION MONITORING SCHEDULE

Groundwater Rule Substantial Treatment System

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS000

Facility Name: BUTLER, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1

10 Sample(s) Required between 6/1/2013LEAD - 1030 AND COPPER - 1022 and 9/30/2013

Lead Consumer Notice needs issued to sampling participants within thirty days of receipt of results and verification submitted to Ohio EPAwithin ninety days from the end of the monitoring period. Submit Form 5105 with appendix to Ohio EPA within ten days from the end of themonitoring period. Forms are available online at: http://epa.ohio.gov/ddagw/reporting.aspx

1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013

1 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS201

Facility Name: BUTLER, VILLAGE OF DISTRIBUTIONADDRESS NOT KNOWN

Facility Class: CLASS 1

1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:

TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950

Page 10: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

BUTLER VILLAGEOH7000412

Page 2 of 2

2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

DISTRIBUTION MONITORING SCHEDULE

Groundwater Rule Substantial Treatment System

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS202

Facility Name: BUTLER, VILLAGE OF DISTRIBUTIONADDRESS NOT KNOWN

Facility Class: CLASS 1

1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:

TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950

Page 11: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

CEDAR CREEK MHPOH7000512

ENTRY POINT MONITORING SCHEDULE

Page 1 of 1

2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Chemicals Monitoring Requirements

Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7057649EP001 Facility Source: Ground Water Facility Class: CLASS A

Facility Name: CEDAR CREEK COURT MHP

Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:

ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020

CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085

Sample(s) Required betweenNITRITE - 1041 1 and6/1/2013 10/31/2013

Sample(s) Required betweenNITRATE - 1040 1 and6/1/2013 10/31/2013

Sample(s) Required betweenRADIOLOGICALS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:

GROSS ALPHA - 4002 RADIUM-228 - 4030

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 5/31/2013

Page 12: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

CEDAR CREEK MHPOH7000512

Page 1 of 1

2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

DISTRIBUTION MONITORING SCHEDULE

Groundwater Rule Substantial Treatment System

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS000

Facility Name: CEDAR CREEK MHP DISTRIBUTION

Not RequiredLEAD - 1030 AND COPPER - 1022

1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013

1 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS201

Facility Name: CEDAR CREEK MHP DISTRIBUTIONADDRESS NOT KNOWN

1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:

TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950

Page 13: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

CLEARFORK MHP PWSOH7000612

ENTRY POINT MONITORING SCHEDULE

Page 1 of 1

2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Chemicals Monitoring Requirements

Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7057650EP001 Facility Source: Ground Water Facility Class: CLASS 1

Facility Name: CLEARFORK MHP NO 1

Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:

ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020

CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085

Sample(s) Required betweenNITRITE - 1041 1 and6/1/2013 10/31/2013

Sample(s) Required betweenNITRATE - 1040 1 and6/1/2013 10/31/2013

Sample(s) Required betweenRADIOLOGICALS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:

GROSS ALPHA - 4002 RADIUM-228 - 4030

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 5/31/2013

Page 14: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

CLEARFORK MHP PWSOH7000612

Page 1 of 1

2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

DISTRIBUTION MONITORING SCHEDULE

Groundwater Rule Substantial Treatment System

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS000

Facility Name: CLEARFORK MHP/WELL 1 DISTRIBUTION Facility Class: CLASS 1

Not RequiredLEAD - 1030 AND COPPER - 1022

1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013

1 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS201

Facility Name: CLEARFORK MHP/WELL 1 DISTRIBUTIONADDRESS NOT KNOWN

Facility Class: CLASS 1

1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:

TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950

Page 15: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

COUNTRYSIDE WATER ASSOCIATIONOH7000712

ENTRY POINT MONITORING SCHEDULE

Page 1 of 1

2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Chemicals Monitoring Requirements

Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7057652EP001 Facility Source: Ground Water Facility Class: CLASS A

Facility Name: COUNTRYSIDE WATER ASSOC

Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:

ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020

CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085

Sample(s) Required betweenNITRITE - 1041 1 and6/1/2013 10/31/2013

Sample(s) Required betweenNITRATE - 1040 1 and6/1/2013 10/31/2013

Sample(s) Required betweenRADIOLOGICALS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:

GROSS ALPHA - 4002 RADIUM-228 - 4030

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 5/31/2013

Page 16: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

COUNTRYSIDE WATER ASSOCIATIONOH7000712

Page 1 of 1

2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

DISTRIBUTION MONITORING SCHEDULE

Groundwater Rule Substantial Treatment System

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS000

Facility Name: COUNTRYSIDE WATER ASSOC. DISTRIBUTIO

Not RequiredLEAD - 1030 AND COPPER - 1022

1 Sample(s) Required between 1/1/2013ASBESTOS - 1094 and 5/31/2013

Collect one sample at a tap served by asbestos-cement pipe. Due to limited Laboratory capacity and a 48 hour filtering requirement, contactyour lab early in the monitoring period to schedule a sampling date.

1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013

1 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS201

Facility Name: COUNTRYSIDE WATER ASSOC. DISTRIBUTIOADDRESS NOT KNOWN

1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:

TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950

Page 17: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

CRESTWOOD HILLS C AND R ASSOCIATIONOH7000812

ENTRY POINT MONITORING SCHEDULE

Page 1 of 1

2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Chemicals Monitoring Requirements

Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7057653EP001 Facility Source: Ground Water Facility Class: CLASS 1

Facility Name: CRESTWOOD HILLS C & R ASSOC

Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:

ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020

CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085

Sample(s) Required betweenNITRITE - 1041 1 and6/1/2013 10/31/2013

Sample(s) Required betweenNITRATE - 1040 1 and6/1/2013 10/31/2013

Sample(s) Required betweenRADIOLOGICALS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:

GROSS ALPHA - 4002 RADIUM-228 - 4030

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 5/31/2013

Page 18: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

CRESTWOOD HILLS C AND R ASSOCIATIONOH7000812

Page 1 of 2

2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

DISTRIBUTION MONITORING SCHEDULE

Groundwater Rule Substantial Treatment System

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS000

Facility Name: CRESTWOOD HILLS C&R ASSC DISTRIBUTIO Facility Class: CLASS 1

Not RequiredLEAD - 1030 AND COPPER - 1022

1 Sample(s) Required between 1/1/2013ASBESTOS - 1094 and 5/31/2013

Collect one sample at a tap served by asbestos-cement pipe. Due to limited Laboratory capacity and a 48 hour filtering requirement, contactyour lab early in the monitoring period to schedule a sampling date.

1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013

1 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS201

Facility Name: CRESTWOOD HILLS C&R ASSC DISTRIBUTIOADDRESS NOT KNOWN

Facility Class: CLASS 1

1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:

TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950

Page 19: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

CRESTWOOD HILLS C AND R ASSOCIATIONOH7000812

Page 2 of 2

2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

DISTRIBUTION MONITORING SCHEDULE

Groundwater Rule Substantial Treatment System

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS202

Facility Name: CRESTWOOD HILLS C&R ASSC DISTRIBUTIOADDRESS NOT KNOWN

Facility Class: CLASS 1

1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:

TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950

Page 20: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

EASTVIEW COMMUNITY WATER ASSOCIATIONOH7000912

ENTRY POINT MONITORING SCHEDULE

Page 1 of 1

2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Chemicals Monitoring Requirements

Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7057654EP001 Facility Source: Ground Water Facility Class: CLASS 1

Facility Name: EASTVIEW COMMUNITY WATER ASSN

Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:

ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020

CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085

Sample(s) Required betweenNITRITE - 1041 1 and6/1/2013 10/31/2013

Sample(s) Required betweenNITRATE - 1040 1 and6/1/2013 10/31/2013

Sample(s) Required betweenRADIOLOGICALS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:

GROSS ALPHA - 4002 RADIUM-228 - 4030

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 5/31/2013

Page 21: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

EASTVIEW COMMUNITY WATER ASSOCIATIONOH7000912

Page 1 of 1

2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

DISTRIBUTION MONITORING SCHEDULE

Groundwater Rule Substantial Treatment System

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS000

Facility Name: EASTVIEW COMM WATER ASSN DISTRIBUTIO Facility Class: CLASS 1

Not RequiredLEAD - 1030 AND COPPER - 1022

2 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:

TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950

1 Sample(s) Required between 1/1/2013ASBESTOS - 1094 and 5/31/2013

Collect one sample at a tap served by asbestos-cement pipe. Due to limited Laboratory capacity and a 48 hour filtering requirement, contactyour lab early in the monitoring period to schedule a sampling date.

2 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/20132 Sample(s) Required between 2/1/2013 and 2/28/20132 Sample(s) Required between 3/1/2013 and 3/31/20132 Sample(s) Required between 4/1/2013 and 4/30/20132 Sample(s) Required between 5/1/2013 and 5/31/20132 Sample(s) Required between 6/1/2013 and 6/30/20132 Sample(s) Required between 7/1/2013 and 7/31/20132 Sample(s) Required between 8/1/2013 and 8/31/20132 Sample(s) Required between 9/1/2013 and 9/30/20132 Sample(s) Required between 10/1/2013 and 10/31/20132 Sample(s) Required between 11/1/2013 and 11/30/20132 Sample(s) Required between 12/1/2013 and 12/31/2013

2 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/20132 Sample(s) Required between 2/1/2013 and 2/28/20132 Sample(s) Required between 3/1/2013 and 3/31/20132 Sample(s) Required between 4/1/2013 and 4/30/20132 Sample(s) Required between 5/1/2013 and 5/31/20132 Sample(s) Required between 6/1/2013 and 6/30/20132 Sample(s) Required between 7/1/2013 and 7/31/20132 Sample(s) Required between 8/1/2013 and 8/31/20132 Sample(s) Required between 9/1/2013 and 9/30/20132 Sample(s) Required between 10/1/2013 and 10/31/20132 Sample(s) Required between 11/1/2013 and 11/30/20132 Sample(s) Required between 12/1/2013 and 12/31/2013

Samples should be collected at the same time and place as the Total Coliform samples.

Page 22: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

EXPRESSVIEW COMM WATER ASSOCIATIONOH7001012

ENTRY POINT MONITORING SCHEDULE

Page 1 of 1

2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Chemicals Monitoring Requirements

Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7057655EP001 Facility Source: Ground Water Facility Class: CLASS 1

Facility Name: EXPRESSVIEW COMM WATER

Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:

ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020

CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085

Sample(s) Required betweenNITRITE - 1041 1 and6/1/2013 10/31/2013

Sample(s) Required betweenNITRATE - 1040 1 and6/1/2013 10/31/2013

Sample(s) Required betweenRADIOLOGICALS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:

GROSS ALPHA - 4002 RADIUM-228 - 4030

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 5/31/2013

Page 23: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

EXPRESSVIEW COMM WATER ASSOCIATIONOH7001012

Page 1 of 1

2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

DISTRIBUTION MONITORING SCHEDULE

Groundwater Rule Substantial Treatment System

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS000

Facility Name: EXPRESSVIEW COMM WTR ASSOC DISTRIBU Facility Class: CLASS 1

5 Sample(s) Required between 6/1/2013LEAD - 1030 AND COPPER - 1022 and 9/30/2013

Lead Consumer Notice needs issued to sampling participants within thirty days of receipt of results and verification submitted to Ohio EPAwithin ninety days from the end of the monitoring period. Submit Form 5105 with appendix to Ohio EPA within ten days from the end of themonitoring period. Forms are available online at: http://epa.ohio.gov/ddagw/reporting.aspx

1 Sample(s) Required between 1/1/2013ASBESTOS - 1094 and 5/31/2013

Collect one sample at a tap served by asbestos-cement pipe. Due to limited Laboratory capacity and a 48 hour filtering requirement, contactyour lab early in the monitoring period to schedule a sampling date.

1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013

1 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS201

Facility Name: EXPRESSVIEW COMM WTR ASSOC DISTRIBUADDRESS NOT KNOWN

Facility Class: CLASS 1

1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:

TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950

Page 24: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

FAIRVIEW ESTATES MHPOH7001112

ENTRY POINT MONITORING SCHEDULE

Page 1 of 1

2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Chemicals Monitoring Requirements

Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7057656EP001 Facility Source: Ground Water Facility Class: CLASS A

Facility Name: FAIRVIEW ESTATES MHP

Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:

ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020

CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085

Sample(s) Required betweenNITRITE - 1041 1 and6/1/2013 10/31/2013

Sample(s) Required betweenNITRATE - 1040 1 and6/1/2013 10/31/2013

Not RequiredRADIOLOGICALS

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 5/31/2013

Page 25: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

FAIRVIEW ESTATES MHPOH7001112

Page 1 of 1

2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

DISTRIBUTION MONITORING SCHEDULE

Groundwater Rule Substantial Treatment System

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS000

Facility Name: FAIRVIEW ESTATES MHP DISTRIBUTION

5 Sample(s) Required between 6/1/2013LEAD - 1030 AND COPPER - 1022 and 9/30/2013

Lead Consumer Notice needs issued to sampling participants within thirty days of receipt of results and verification submitted to Ohio EPAwithin ninety days from the end of the monitoring period. Submit Form 5105 with appendix to Ohio EPA within ten days from the end of themonitoring period. Forms are available online at: http://epa.ohio.gov/ddagw/reporting.aspx

1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013

1 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS201

Facility Name: FAIRVIEW ESTATES MHP DISTRIBUTIONADDRESS NOT KNOWN

1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:

TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950

Page 26: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

FOREST HILLS MHPOH7001212

ENTRY POINT MONITORING SCHEDULE

Page 1 of 1

2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Chemicals Monitoring Requirements

Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7057657EP001 Facility Source: Ground Water Facility Class: CLASS A

Facility Name: FOREST HILLS MHP

Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:

ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020

CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085

Sample(s) Required betweenNITRITE - 1041 1 and7/1/2013 9/30/2013

Sample(s) Required betweenNITRATE - 1040 1 and7/1/2013 9/30/2013

Sample(s) Required betweenRADIOLOGICALS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:

GROSS ALPHA - 4002 RADIUM-228 - 4030

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Sample(s) Required betweenSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 2 1 and4/1/2013 6/30/2013 Sample for all the analytes listed below:

2,4-D - 2105 CARBOFURAN - 2046 OXAMYL (VYDATE) - 2036

PENTACHLOROPHENOL - 2326 PICLORAM - 2040

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 3

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 4

Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 5/31/2013

Page 27: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

FOREST HILLS MHPOH7001212

Page 1 of 1

2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

DISTRIBUTION MONITORING SCHEDULE

Groundwater Rule Substantial Treatment System

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS000

Facility Name: FOREST HILLS MHP DISTRIBUTION

Not RequiredLEAD - 1030 AND COPPER - 1022

1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013

1 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS201

Facility Name: FOREST HILLS MHP DISTRIBUTIONADDRESS NOT KNOWN

1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:

TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950

Page 28: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

AQUA OHIO - MANSFIELD SYSTEM 4OH7001412

ENTRY POINT MONITORING SCHEDULE

Page 1 of 1

2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Chemicals Monitoring Requirements

Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7057659EP001 Facility Source: Ground Water Facility Class: CLASS A

Facility Name: AQUA OHIO - MANSFIELD SYSTEM 4

Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:

ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020

CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085

Sample(s) Required betweenNITRITE - 1041 1 and6/1/2013 10/31/2013

Sample(s) Required betweenNITRATE - 1040 1 and6/1/2013 10/31/2013

Not RequiredRADIOLOGICALS

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Sample(s) Required betweenSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 2 1 and4/1/2013 6/30/2013 Sample for all the analytes listed below:

2,4-D - 2105 CARBOFURAN - 2046 OXAMYL (VYDATE) - 2036

PENTACHLOROPHENOL - 2326 PICLORAM - 2040

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 3

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 4

Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 3/31/2013Sample(s) Required between1 and4/1/2013 6/30/2013Sample(s) Required between1 and7/1/2013 9/30/2013Sample(s) Required between1 and10/1/2013 12/31/2013

Page 29: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

AQUA OHIO - MANSFIELD SYSTEM 4OH7001412

Page 1 of 1

2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

DISTRIBUTION MONITORING SCHEDULE

Groundwater Rule Substantial Treatment System

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS000

Facility Name: AQUA OHIO - MANSFIELD SYSTEM 4 DIST

Not RequiredLEAD - 1030 AND COPPER - 1022

1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013

1 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS201

Facility Name: AQUA OHIO - MANSFIELD SYSTEM 4 DISTADDRESS NOT KNOWN

1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:

TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950

Page 30: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

HANLEY ACRES WATER ASSOCIATIONOH7001512

ENTRY POINT MONITORING SCHEDULE

Page 1 of 1

2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Chemicals Monitoring Requirements

Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7057660EP001 Facility Source: Ground Water Facility Class: CLASS A

Facility Name: HANLEY ACRES WATER ASSOC

Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:

ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020

CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085

Sample(s) Required betweenNITRITE - 1041 1 and6/1/2013 10/31/2013

Sample(s) Required betweenNITRATE - 1040 1 and6/1/2013 10/31/2013

Sample(s) Required betweenRADIOLOGICALS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:

GROSS ALPHA - 4002 RADIUM-228 - 4030

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 5/31/2013

Page 31: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

HANLEY ACRES WATER ASSOCIATIONOH7001512

Page 1 of 1

2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

DISTRIBUTION MONITORING SCHEDULE

Groundwater Rule Substantial Treatment System

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS000

Facility Name: HANLEY ACRES WATER ASSOC DISTRIBUTIO

5 Sample(s) Required between 6/1/2013LEAD - 1030 AND COPPER - 1022 and 9/30/2013

Lead Consumer Notice needs issued to sampling participants within thirty days of receipt of results and verification submitted to Ohio EPAwithin ninety days from the end of the monitoring period. Submit Form 5105 with appendix to Ohio EPA within ten days from the end of themonitoring period. Forms are available online at: http://epa.ohio.gov/ddagw/reporting.aspx

1 Sample(s) Required between 1/1/2013ASBESTOS - 1094 and 5/31/2013

Collect one sample at a tap served by asbestos-cement pipe. Due to limited Laboratory capacity and a 48 hour filtering requirement, contactyour lab early in the monitoring period to schedule a sampling date.

1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013

1 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS201

Facility Name: HANLEY ACRES WATER ASSOC DISTRIBUTIOADDRESS NOT KNOWN

1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:

TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950

Page 32: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

AQUA OHIO - MANSFIELD SYSTEM 7OH7001612

ENTRY POINT MONITORING SCHEDULE

Page 1 of 1

2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Chemicals Monitoring Requirements

Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7057661EP001 Facility Source: Ground Water Facility Class: CLASS 1

Facility Name: AQUA OHIO - MANSFIELD SYSTEM 7 STU 1

Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:

ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020

CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085

Sample(s) Required betweenNITRITE - 1041 1 and6/1/2013 10/31/2013

Sample(s) Required betweenNITRATE - 1040 1 and6/1/2013 10/31/2013

Sample(s) Required betweenRADIOLOGICALS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:

GROSS ALPHA - 4002 RADIUM-228 - 4030

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 5/31/2013

Page 33: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

AQUA OHIO - MANSFIELD SYSTEM 7OH7001612

ENTRY POINT MONITORING SCHEDULE

Page 1 of 1

2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Chemicals Monitoring Requirements

Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7060585EP002 Facility Source: Ground Water Facility Class: CLASS 1

Facility Name: AQUA OHIO - MANSFIELD SYSTEM 7 STU 2

Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:

ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020

CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085

Sample(s) Required betweenNITRITE - 1041 1 and6/1/2013 10/31/2013

Sample(s) Required betweenNITRATE - 1040 1 and6/1/2013 10/31/2013

Sample(s) Required betweenRADIOLOGICALS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:

GROSS ALPHA - 4002 RADIUM-228 - 4030

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 5/31/2013

Page 34: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

AQUA OHIO - MANSFIELD SYSTEM 7OH7001612

ENTRY POINT MONITORING SCHEDULE

Page 1 of 1

2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Chemicals Monitoring Requirements

Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7060586EP003 Facility Source: Ground Water Facility Class: CLASS 1

Facility Name: AQUA OHIO - MANSFIELD SYSTEM 7 STU 3

Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:

ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020

CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085

Sample(s) Required betweenNITRITE - 1041 1 and7/1/2013 9/30/2013

Sample(s) Required betweenNITRATE - 1040 1 and7/1/2013 9/30/2013

Sample(s) Required betweenRADIOLOGICALS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:

GROSS ALPHA - 4002 RADIUM-228 - 4030

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 5/31/2013

Page 35: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

AQUA OHIO - MANSFIELD SYSTEM 7OH7001612

ENTRY POINT MONITORING SCHEDULE

Page 1 of 1

2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Chemicals Monitoring Requirements

Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7060587EP005 Facility Source: Ground Water Facility Class: CLASS 1

Facility Name: AQUA OHIO - MANSFIELD SYSTEM 7 STU 5

Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:

ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020

CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085

Sample(s) Required betweenNITRITE - 1041 1 and6/1/2013 10/31/2013

Sample(s) Required betweenNITRATE - 1040 1 and6/1/2013 10/31/2013

Not RequiredRADIOLOGICALS

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 5/31/2013

Page 36: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

AQUA OHIO - MANSFIELD SYSTEM 7OH7001612

Page 1 of 2

2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

DISTRIBUTION MONITORING SCHEDULE

Groundwater Rule Substantial Treatment System

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS000

Facility Name: AQUA OHIO - MANSFI SYSTEM 7 DISTRIBUTIO Facility Class: CLASS 1

Not RequiredLEAD - 1030 AND COPPER - 1022

1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013

1 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS201

Facility Name: AQUA OHIO - MANSFI SYSTEM 7 DISTRIBUTIOADDRESS NOT KNOWN

Facility Class: CLASS 1

1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:

TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950

Page 37: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

AQUA OHIO - MANSFIELD SYSTEM 7OH7001612

Page 2 of 2

2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

DISTRIBUTION MONITORING SCHEDULE

Groundwater Rule Substantial Treatment System

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS202

Facility Name: AQUA OHIO - MANSFI SYSTEM 7 DISTRIBUTIOADDRESS NOT KNOWN

Facility Class: CLASS 1

1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:

TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950

Page 38: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

HEATHERWOOD COMMUNITY WATER PWSOH7001712

ENTRY POINT MONITORING SCHEDULE

Page 1 of 1

2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Chemicals Monitoring Requirements

Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7057662EP001 Facility Source: Ground Water Facility Class: CLASS A

Facility Name: HEATHERWOOD COMM

Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:

ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020

CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085

Sample(s) Required betweenNITRITE - 1041 1 and6/1/2013 10/31/2013

Sample(s) Required betweenNITRATE - 1040 1 and6/1/2013 10/31/2013

Not RequiredRADIOLOGICALS

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 5/31/2013

Page 39: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

HEATHERWOOD COMMUNITY WATER PWSOH7001712

Page 1 of 1

2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

DISTRIBUTION MONITORING SCHEDULE

Groundwater Rule Substantial Treatment System

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS000

Facility Name: HEATHERWOOD COMM WATER DISTRIBUTIO

Not RequiredLEAD - 1030 AND COPPER - 1022

1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013

1 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS201

Facility Name: HEATHERWOOD COMM WATER DISTRIBUTIO757 WOODCREST DRIVE

1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:

TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950

Page 40: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

HILLSDALE COMMUNITY WATER ASSOCIATION PWOH7001912

ENTRY POINT MONITORING SCHEDULE

Page 1 of 1

2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Chemicals Monitoring Requirements

Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7057664EP001 Facility Source: Ground Water Facility Class: CLASS A

Facility Name: HILLSDALE COMMUNITY WATER ASSN

Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:

ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020

CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085

Sample(s) Required betweenNITRITE - 1041 1 and6/1/2013 10/31/2013

Sample(s) Required betweenNITRATE - 1040 1 and6/1/2013 10/31/2013

Sample(s) Required betweenRADIOLOGICALS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:

GROSS ALPHA - 4002 RADIUM-228 - 4030

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Sample(s) Required betweenSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 2 1 and4/1/2013 6/30/2013 Sample for all the analytes listed below:

2,4-D - 2105 CARBOFURAN - 2046 OXAMYL (VYDATE) - 2036

PENTACHLOROPHENOL - 2326 PICLORAM - 2040

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 3

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 4

Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 5/31/2013

Page 41: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

HILLSDALE COMMUNITY WATER ASSOCIATION PWOH7001912

Page 1 of 1

2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

DISTRIBUTION MONITORING SCHEDULE

Groundwater Rule Substantial Treatment System

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS000

Facility Name: HILLSDALE COMM WATER ASN DISTRIBUTIO

Not RequiredLEAD - 1030 AND COPPER - 1022

1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013

1 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS201

Facility Name: HILLSDALE COMM WATER ASN DISTRIBUTIOADDRESS NOT KNOWN

1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:

TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950

Page 42: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

HILLSIDE MHPOH7002012

ENTRY POINT MONITORING SCHEDULE

Page 1 of 1

2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Chemicals Monitoring Requirements

Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7057665EP001 Facility Source: Ground Water Facility Class: CLASS A

Facility Name: HILLSIDE MHP

Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:

ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020

CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085

Sample(s) Required betweenNITRITE - 1041 1 and6/1/2013 10/31/2013

Sample(s) Required betweenNITRATE - 1040 1 and6/1/2013 10/31/2013

Sample(s) Required betweenRADIOLOGICALS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:

GROSS ALPHA - 4002 RADIUM-228 - 4030

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 3/31/2013

Page 43: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

HILLSIDE MHPOH7002012

Page 1 of 1

2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

DISTRIBUTION MONITORING SCHEDULE

Groundwater Rule Substantial Treatment System

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS000

Facility Name: HILLSIDE MHP DISTRIBUTION

Not RequiredLEAD - 1030 AND COPPER - 1022

1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013

1 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS201

Facility Name: HILLSIDE MHP DISTRIBUTIONADDRESS NOT KNOWN

1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:

TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950

Page 44: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

WATERFALL ESTATESOH7002112

ENTRY POINT MONITORING SCHEDULE

Page 1 of 1

2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Chemicals Monitoring Requirements

Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7057666EP001 Facility Source: Ground Water Facility Class: CLASS A

Facility Name: WATERFALL ESTATES

Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:

ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020

CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085

Sample(s) Required betweenNITRITE - 1041 1 and6/1/2013 10/31/2013

Sample(s) Required betweenNITRATE - 1040 1 and6/1/2013 10/31/2013

Sample(s) Required betweenRADIOLOGICALS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:

GROSS ALPHA - 4002 RADIUM-228 - 4030

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Sample(s) Required betweenSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 2 1 and4/1/2013 6/30/2013 Sample for all the analytes listed below:

2,4-D - 2105 CARBOFURAN - 2046 OXAMYL (VYDATE) - 2036

PENTACHLOROPHENOL - 2326 PICLORAM - 2040

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 3

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 4

Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 5/31/2013

Page 45: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

WATERFALL ESTATESOH7002112

Page 1 of 1

2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

DISTRIBUTION MONITORING SCHEDULE

Groundwater Rule Substantial Treatment System

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS000

Facility Name: WATERFALL ESTATES DISTRIBUTION

Not RequiredLEAD - 1030 AND COPPER - 1022

1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013

1 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS201

Facility Name: WATERFALL ESTATES DISTRIBUTIONADDRESS NOT KNOWN

1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:

TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950

Page 46: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

LEXINGTON VILLAGEOH7002212

ENTRY POINT MONITORING SCHEDULE

Page 1 of 1

2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Chemicals Monitoring Requirements

Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7057667EP001 Facility Source: Ground Water Facility Class: CLASS 1

Facility Name: LEXINGTON VILLAGE

Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:

ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020

CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085

Sample(s) Required betweenNITRITE - 1041 1 and6/1/2013 10/31/2013

Sample(s) Required betweenNITRATE - 1040 1 and6/1/2013 10/31/2013

Sample(s) Required betweenRADIOLOGICALS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:

GROSS ALPHA - 4002 RADIUM-228 - 4030

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 5/31/2013

Page 47: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

LEXINGTON VILLAGEOH7002212

Page 1 of 2

2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

DISTRIBUTION MONITORING SCHEDULE

Groundwater Rule Substantial Treatment System

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS000

Facility Name: LEXINGTON, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1

20 Sample(s) Required between 6/1/2013LEAD - 1030 AND COPPER - 1022 and 9/30/2013

Lead Consumer Notice needs issued to sampling participants within thirty days of receipt of results and verification submitted to Ohio EPAwithin ninety days from the end of the monitoring period. Submit Form 5105 with appendix to Ohio EPA within ten days from the end of themonitoring period. Forms are available online at: http://epa.ohio.gov/ddagw/reporting.aspx

1 Sample(s) Required between 1/1/2013ASBESTOS - 1094 and 5/31/2013

Collect one sample at a tap served by asbestos-cement pipe. Due to limited Laboratory capacity and a 48 hour filtering requirement, contactyour lab early in the monitoring period to schedule a sampling date.

5 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/20135 Sample(s) Required between 2/1/2013 and 2/28/20135 Sample(s) Required between 3/1/2013 and 3/31/20135 Sample(s) Required between 4/1/2013 and 4/30/20135 Sample(s) Required between 5/1/2013 and 5/31/20135 Sample(s) Required between 6/1/2013 and 6/30/20135 Sample(s) Required between 7/1/2013 and 7/31/20135 Sample(s) Required between 8/1/2013 and 8/31/20135 Sample(s) Required between 9/1/2013 and 9/30/20135 Sample(s) Required between 10/1/2013 and 10/31/20135 Sample(s) Required between 11/1/2013 and 11/30/20135 Sample(s) Required between 12/1/2013 and 12/31/2013

5 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/20135 Sample(s) Required between 2/1/2013 and 2/28/20135 Sample(s) Required between 3/1/2013 and 3/31/20135 Sample(s) Required between 4/1/2013 and 4/30/20135 Sample(s) Required between 5/1/2013 and 5/31/20135 Sample(s) Required between 6/1/2013 and 6/30/20135 Sample(s) Required between 7/1/2013 and 7/31/20135 Sample(s) Required between 8/1/2013 and 8/31/20135 Sample(s) Required between 9/1/2013 and 9/30/20135 Sample(s) Required between 10/1/2013 and 10/31/20135 Sample(s) Required between 11/1/2013 and 11/30/20135 Sample(s) Required between 12/1/2013 and 12/31/2013

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS201

Facility Name: LEXINGTON, VILLAGE OF DISTRIBUTIONADDRESS NOT KNOWN

Facility Class: CLASS 1

1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:

TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950

Page 48: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

LEXINGTON VILLAGEOH7002212

Page 2 of 2

2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

DISTRIBUTION MONITORING SCHEDULE

Groundwater Rule Substantial Treatment System

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS202

Facility Name: LEXINGTON, VILLAGE OF DISTRIBUTIONADDRESS NOT KNOWN

Facility Class: CLASS 1

1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:

TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950

Page 49: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

LEXVIEW ALLOTMENTOH7002312

ENTRY POINT MONITORING SCHEDULE

Page 1 of 1

2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Chemicals Monitoring Requirements

Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7057668EP001 Facility Source: Ground Water Facility Class: CLASS A

Facility Name: LEXVIEW PARK AND WATER BOARD

Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:

ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020

CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085

Sample(s) Required betweenNITRITE - 1041 1 and6/1/2013 10/31/2013

Sample(s) Required betweenNITRATE - 1040 1 and6/1/2013 10/31/2013

Sample(s) Required betweenRADIOLOGICALS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:

GROSS ALPHA - 4002 RADIUM-228 - 4030

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 5/31/2013

Page 50: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

LEXVIEW ALLOTMENTOH7002312

Page 1 of 1

2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

DISTRIBUTION MONITORING SCHEDULE

Groundwater Rule Substantial Treatment System

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS000

Facility Name: LEXVIEW ALLOTMENT DISTRIBUTION

Not RequiredLEAD - 1030 AND COPPER - 1022

1 Sample(s) Required between 1/1/2013ASBESTOS - 1094 and 5/31/2013

Collect one sample at a tap served by asbestos-cement pipe. Due to limited Laboratory capacity and a 48 hour filtering requirement, contactyour lab early in the monitoring period to schedule a sampling date.

1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013

1 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS201

Facility Name: LEXVIEW ALLOTMENT DISTRIBUTIONADDRESS NOT KNOWN

1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:

TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950

Page 51: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

AQUA OHIO - MANSFIELD SYSTEM 9OH7002512

ENTRY POINT MONITORING SCHEDULE

Page 1 of 1

2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Chemicals Monitoring Requirements

Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7057670EP001 Facility Source: Ground Water Facility Class: CLASS A

Facility Name: AQUA OHIO - MANSFIELD SYSTEM 9

Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:

ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020

CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085

Sample(s) Required betweenNITRITE - 1041 1 and1/1/2013 3/31/2013

Sample(s) Required betweenNITRATE - 1040 1 and1/1/2013 3/31/2013

Sample(s) Required betweenRADIOLOGICALS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:

GROSS ALPHA - 4002 RADIUM-228 - 4030

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 5/31/2013

Page 52: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

AQUA OHIO - MANSFIELD SYSTEM 9OH7002512

Page 1 of 1

2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

DISTRIBUTION MONITORING SCHEDULE

Groundwater Rule Substantial Treatment System

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS000

Facility Name: AQUA OHIO - MANSFIELD 9 DISTRIBUTION

Not RequiredLEAD - 1030 AND COPPER - 1022

1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013

1 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS201

Facility Name: AQUA OHIO - MANSFIELD 9 DISTRIBUTIONADDRESS NOT KNOWN

1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:

TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950

Page 53: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

LUCAS VILLAGEOH7002612

ENTRY POINT MONITORING SCHEDULE

Page 1 of 1

2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Chemicals Monitoring Requirements

Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7057671EP001 Facility Source: Ground Water Facility Class: CLASS 1

Facility Name: LUCAS VILLAGE

Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:

ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020

CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085

Sample(s) Required betweenNITRITE - 1041 1 and1/1/2013 5/31/2013

Sample(s) Required betweenNITRATE - 1040 1 and1/1/2013 3/31/2013

Sample(s) Required betweenRADIOLOGICALS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:

GROSS ALPHA - 4002 RADIUM-228 - 4030

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 5/31/2013

Page 54: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

LUCAS VILLAGEOH7002612

Page 1 of 2

2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

DISTRIBUTION MONITORING SCHEDULE

Groundwater Rule Substantial Treatment System

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS000

Facility Name: LUCAS, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1

Not RequiredLEAD - 1030 AND COPPER - 1022

1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013

1 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS201

Facility Name: LUCAS, VILLAGE OF DISTRIBUTION47 LUCAS-PERRYSVILLE ROAD

Facility Class: CLASS 1

1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:

TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950

Page 55: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

LUCAS VILLAGEOH7002612

Page 2 of 2

2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

DISTRIBUTION MONITORING SCHEDULE

Groundwater Rule Substantial Treatment System

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS202

Facility Name: LUCAS, VILLAGE OF DISTRIBUTIONADDRESS NOT KNOWN

Facility Class: CLASS 1

1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:

TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950

Page 56: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

AQUA OHIO - MANSFIELD SYSTEM 1OH7002812

ENTRY POINT MONITORING SCHEDULE

Page 1 of 1

2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Chemicals Monitoring Requirements

Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7057673EP001 Facility Source: Ground Water Facility Class: CLASS 1

Facility Name: AQUA OHIO - MANSFIELD SYSTEM 1

Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:

ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020

CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085

Sample(s) Required betweenNITRITE - 1041 1 and6/1/2013 10/31/2013

Sample(s) Required betweenNITRATE - 1040 1 and6/1/2013 10/31/2013

Sample(s) Required betweenRADIOLOGICALS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:

GROSS ALPHA - 4002 RADIUM-228 - 4030

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 3/31/2013Sample(s) Required between1 and4/1/2013 6/30/2013Sample(s) Required between1 and7/1/2013 9/30/2013Sample(s) Required between1 and10/1/2013 12/31/2013

Page 57: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

AQUA OHIO - MANSFIELD SYSTEM 1OH7002812

Page 1 of 2

2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

DISTRIBUTION MONITORING SCHEDULE

Groundwater Rule Substantial Treatment System

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS000

Facility Name: AQUA OHIO - MANSFIELD SYS 1 DISTRIBUTIO Facility Class: CLASS 1

Not RequiredLEAD - 1030 AND COPPER - 1022

1 Sample(s) Required between 1/1/2013ASBESTOS - 1094 and 5/31/2013

Collect one sample at a tap served by asbestos-cement pipe. Due to limited Laboratory capacity and a 48 hour filtering requirement, contactyour lab early in the monitoring period to schedule a sampling date.

2 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/20132 Sample(s) Required between 2/1/2013 and 2/28/20132 Sample(s) Required between 3/1/2013 and 3/31/20132 Sample(s) Required between 4/1/2013 and 4/30/20132 Sample(s) Required between 5/1/2013 and 5/31/20132 Sample(s) Required between 6/1/2013 and 6/30/20132 Sample(s) Required between 7/1/2013 and 7/31/20132 Sample(s) Required between 8/1/2013 and 8/31/20132 Sample(s) Required between 9/1/2013 and 9/30/20132 Sample(s) Required between 10/1/2013 and 10/31/20132 Sample(s) Required between 11/1/2013 and 11/30/20132 Sample(s) Required between 12/1/2013 and 12/31/2013

2 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/20132 Sample(s) Required between 2/1/2013 and 2/28/20132 Sample(s) Required between 3/1/2013 and 3/31/20132 Sample(s) Required between 4/1/2013 and 4/30/20132 Sample(s) Required between 5/1/2013 and 5/31/20132 Sample(s) Required between 6/1/2013 and 6/30/20132 Sample(s) Required between 7/1/2013 and 7/31/20132 Sample(s) Required between 8/1/2013 and 8/31/20132 Sample(s) Required between 9/1/2013 and 9/30/20132 Sample(s) Required between 10/1/2013 and 10/31/20132 Sample(s) Required between 11/1/2013 and 11/30/20132 Sample(s) Required between 12/1/2013 and 12/31/2013

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS201

Facility Name: AQUA OHIO - MANSFIELD SYS 1 DISTRIBUTIOADDRESS NOT KNOWN

Facility Class: CLASS 1

1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:

TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950

Page 58: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

AQUA OHIO - MANSFIELD SYSTEM 1OH7002812

Page 2 of 2

2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

DISTRIBUTION MONITORING SCHEDULE

Groundwater Rule Substantial Treatment System

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS202

Facility Name: AQUA OHIO - MANSFIELD SYS 1 DISTRIBUTIOADDRESS NOT KNOWN

Facility Class: CLASS 1

1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:

TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950

Page 59: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

MANSFIELD CITY PWSOH7002914

ENTRY POINT MONITORING SCHEDULE

Page 1 of 1

2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Chemicals Monitoring Requirements

Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7057674EP001 Facility Source: Surface Water Facility Class: CLASS 4

Facility Name: MANSFIELD WTP

Sample(s) Required betweenINORGANICS 1 and6/1/2013 10/31/2013 Sample for all the analytes listed below:

ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020

CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085

Sample(s) Required betweenNITRITE - 1041 1 and6/1/2013 10/31/2013

Sample(s) Required betweenNITRATE - 1040 1 and1/1/2013 1/31/2013Sample(s) Required between1 and2/1/2013 2/28/2013Sample(s) Required between1 and3/1/2013 3/31/2013Sample(s) Required between1 and4/1/2013 4/30/2013Sample(s) Required between1 and5/1/2013 5/31/2013Sample(s) Required between1 and6/1/2013 6/30/2013Sample(s) Required between1 and7/1/2013 7/31/2013Sample(s) Required between1 and8/1/2013 8/31/2013Sample(s) Required between1 and9/1/2013 9/30/2013Sample(s) Required between1 and10/1/2013 10/31/2013Sample(s) Required between1 and11/1/2013 11/30/2013Sample(s) Required between1 and12/1/2013 12/31/2013

Not RequiredRADIOLOGICALS

Sample(s) Required betweenSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1 1 and4/1/2013 6/30/2013 Sample for all the analytes listed below:

ALACHLOR (LASSO) - 2051 ATRAZINE - 2050 SIMAZINE - 2037

Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and7/1/2013 9/30/2013

Paired Sample Set Required betweenTOTAL ORGANIC CARBON (TOC) 1 and1/1/2013 1/31/2013Paired Sample Set Required between1 and2/1/2013 2/28/2013Paired Sample Set Required between1 and3/1/2013 3/31/2013Paired Sample Set Required between1 and4/1/2013 4/30/2013Paired Sample Set Required between1 and5/1/2013 5/31/2013Paired Sample Set Required between1 and6/1/2013 6/30/2013Paired Sample Set Required between1 and7/1/2013 7/31/2013Paired Sample Set Required between1 and8/1/2013 8/31/2013Paired Sample Set Required between1 and9/1/2013 9/30/2013Paired Sample Set Required between1 and10/1/2013 10/31/2013Paired Sample Set Required between1 and11/1/2013 11/30/2013Paired Sample Set Required between1 and12/1/2013 12/31/2013

A paired sample set refers to one source water and one treated water sample. A sourcewater alkalinity is also required at the same time the TOC sample is taken.

Page 60: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

MANSFIELD CITY PWSOH7002914

Page 1 of 3

2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

DISTRIBUTION MONITORING SCHEDULE

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS000

Facility Name: MANSFIELD, CITY OF DISTRIBUTION Facility Class: CLASS 2

30 Sample(s) Required between 6/1/2013LEAD - 1030 AND COPPER - 1022 and 9/30/2013

Lead Consumer Notice needs issued to sampling participants within thirty days of receipt of results and verification submitted to Ohio EPAwithin ninety days from the end of the monitoring period. Submit Form 5105 with appendix to Ohio EPA within ten days from the end of themonitoring period. Forms are available online at: http://epa.ohio.gov/ddagw/reporting.aspx

60 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/201360 Sample(s) Required between 2/1/2013 and 2/28/201360 Sample(s) Required between 3/1/2013 and 3/31/201360 Sample(s) Required between 4/1/2013 and 4/30/201360 Sample(s) Required between 5/1/2013 and 5/31/201360 Sample(s) Required between 6/1/2013 and 6/30/201360 Sample(s) Required between 7/1/2013 and 7/31/201360 Sample(s) Required between 8/1/2013 and 8/31/201360 Sample(s) Required between 9/1/2013 and 9/30/201360 Sample(s) Required between 10/1/2013 and 10/31/201360 Sample(s) Required between 11/1/2013 and 11/30/201360 Sample(s) Required between 12/1/2013 and 12/31/2013

60 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/201360 Sample(s) Required between 2/1/2013 and 2/28/201360 Sample(s) Required between 3/1/2013 and 3/31/201360 Sample(s) Required between 4/1/2013 and 4/30/201360 Sample(s) Required between 5/1/2013 and 5/31/201360 Sample(s) Required between 6/1/2013 and 6/30/201360 Sample(s) Required between 7/1/2013 and 7/31/201360 Sample(s) Required between 8/1/2013 and 8/31/201360 Sample(s) Required between 9/1/2013 and 9/30/201360 Sample(s) Required between 10/1/2013 and 10/31/201360 Sample(s) Required between 11/1/2013 and 11/30/201360 Sample(s) Required between 12/1/2013 and 12/31/2013

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS201

Facility Name: MANSFIELD, CITY OF DISTRIBUTION506 SOUTH AIRPORT ROAD

Facility Class: CLASS 2

1 Sample(s) Required between 3/1/2013DISINFECTION BYPRODUCTS and 3/7/20131 Sample(s) Required between 6/1/2013 and 6/7/20131 Sample(s) Required between 9/1/2013 and 9/7/20131 Sample(s) Required between 12/1/2013 and 12/7/2013

Sample for all the analytes listed below:

TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950

Page 61: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

MANSFIELD CITY PWSOH7002914

Page 2 of 3

2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

DISTRIBUTION MONITORING SCHEDULE

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS202

Facility Name: MANSFIELD, CITY OF DISTRIBUTION751 ASHLAND RD.

Facility Class: CLASS 2

1 Sample(s) Required between 3/1/2013DISINFECTION BYPRODUCTS and 3/7/20131 Sample(s) Required between 6/1/2013 and 6/7/20131 Sample(s) Required between 9/1/2013 and 9/7/20131 Sample(s) Required between 12/1/2013 and 12/7/2013

Sample for all the analytes listed below:

TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS203

Facility Name: MANSFIELD, CITY OF DISTRIBUTION495 WOODVILLE RD.

Facility Class: CLASS 2

1 Sample(s) Required between 3/1/2013DISINFECTION BYPRODUCTS and 3/7/20131 Sample(s) Required between 6/1/2013 and 6/7/20131 Sample(s) Required between 9/1/2013 and 9/7/20131 Sample(s) Required between 12/1/2013 and 12/7/2013

Sample for all the analytes listed below:

TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS204

Facility Name: MANSFIELD, CITY OF DISTRIBUTION385 SOUTH ILLINOIS AVENUE

Facility Class: CLASS 2

1 Sample(s) Required between 3/1/2013DISINFECTION BYPRODUCTS and 3/7/20131 Sample(s) Required between 6/1/2013 and 6/7/20131 Sample(s) Required between 9/1/2013 and 9/7/20131 Sample(s) Required between 12/1/2013 and 12/7/2013

Sample for all the analytes listed below:

TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS205

Facility Name: MANSFIELD, CITY OF DISTRIBUTION1405 AUER BLVD.

Facility Class: CLASS 2

1 Sample(s) Required between 3/1/2013DISINFECTION BYPRODUCTS and 3/7/20131 Sample(s) Required between 6/1/2013 and 6/7/20131 Sample(s) Required between 9/1/2013 and 9/7/20131 Sample(s) Required between 12/1/2013 and 12/7/2013

Sample for all the analytes listed below:

TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950

Page 62: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

MANSFIELD CITY PWSOH7002914

Page 3 of 3

2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

DISTRIBUTION MONITORING SCHEDULE

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS206

Facility Name: MANSFIELD, CITY OF DISTRIBUTION68 SOUTH HOME ROAD

Facility Class: CLASS 2

1 Sample(s) Required between 3/1/2013DISINFECTION BYPRODUCTS and 3/7/20131 Sample(s) Required between 6/1/2013 and 6/7/20131 Sample(s) Required between 9/1/2013 and 9/7/20131 Sample(s) Required between 12/1/2013 and 12/7/2013

Sample for all the analytes listed below:

TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS207

Facility Name: MANSFIELD, CITY OF DISTRIBUTION345 MARION AVE.

Facility Class: CLASS 2

1 Sample(s) Required between 3/1/2013DISINFECTION BYPRODUCTS and 3/7/20131 Sample(s) Required between 6/1/2013 and 6/7/20131 Sample(s) Required between 9/1/2013 and 9/7/20131 Sample(s) Required between 12/1/2013 and 12/7/2013

Sample for all the analytes listed below:

TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS208

Facility Name: MANSFIELD, CITY OF DISTRIBUTION2255 S. MAIN ST.

Facility Class: CLASS 2

1 Sample(s) Required between 3/1/2013DISINFECTION BYPRODUCTS and 3/7/20131 Sample(s) Required between 6/1/2013 and 6/7/20131 Sample(s) Required between 9/1/2013 and 9/7/20131 Sample(s) Required between 12/1/2013 and 12/7/2013

Sample for all the analytes listed below:

TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950

Page 63: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

MAXWALTON GLENS WATER ASSOCIATION PWSOH7003012

ENTRY POINT MONITORING SCHEDULE

Page 1 of 1

2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Chemicals Monitoring Requirements

Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7057675EP001 Facility Source: Ground Water Facility Class: CLASS A

Facility Name: MAXWALTON GLENS WATER ASSOCIATION

Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:

ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020

CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085

Sample(s) Required betweenNITRITE - 1041 1 and6/1/2013 10/31/2013

Sample(s) Required betweenNITRATE - 1040 1 and6/1/2013 10/31/2013

Sample(s) Required betweenRADIOLOGICALS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:

GROSS ALPHA - 4002 RADIUM-228 - 4030

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 5/31/2013

Page 64: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

MAXWALTON GLENS WATER ASSOCIATION PWSOH7003012

Page 1 of 1

2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

DISTRIBUTION MONITORING SCHEDULE

Groundwater Rule Substantial Treatment System

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS000

Facility Name: MAXWALTON GLENS WTR DISTRIBUTION

1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013

1 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS201

Facility Name: MAXWALTON GLENS WTR DISTRIBUTION1020 MORITZ LANE

1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:

TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950

Page 65: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

MEADOWOOD WATER ASSOCIATION PWSOH7003112

ENTRY POINT MONITORING SCHEDULE

Page 1 of 1

2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Chemicals Monitoring Requirements

Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7057676EP001 Facility Source: Ground Water Facility Class: CLASS A

Facility Name: MEADOWOOD WATER ASSOC

Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:

ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020

CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085

Sample(s) Required betweenNITRITE - 1041 1 and6/1/2013 10/31/2013

Sample(s) Required betweenNITRATE - 1040 1 and6/1/2013 10/31/2013

Not RequiredRADIOLOGICALS

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and4/1/2013 6/30/2013

Page 66: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

MEADOWOOD WATER ASSOCIATION PWSOH7003112

Page 1 of 1

2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

DISTRIBUTION MONITORING SCHEDULE

Groundwater Rule Substantial Treatment System

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS000

Facility Name: MEADOWOOD WATER ASSOC. DISTRIBUTION

Not RequiredLEAD - 1030 AND COPPER - 1022

1 Sample(s) Required between 1/1/2013ASBESTOS - 1094 and 5/31/2013

Collect one sample at a tap served by asbestos-cement pipe. Due to limited Laboratory capacity and a 48 hour filtering requirement, contactyour lab early in the monitoring period to schedule a sampling date.

1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013

1 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS201

Facility Name: MEADOWOOD WATER ASSOC. DISTRIBUTIONADDRESS NOT KNOWN

1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:

TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950

Page 67: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

AQUA OHIO - MANSFIELD SYSTEM 8OH7003212

ENTRY POINT MONITORING SCHEDULE

Page 1 of 1

2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Chemicals Monitoring Requirements

Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7057677EP001 Facility Source: Ground Water Facility Class: CLASS A

Facility Name: AQUA OHIO - MANSFIELD SYSTEM 8

Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:

ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020

CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085

Sample(s) Required betweenNITRITE - 1041 1 and10/1/2013 12/31/2013

Sample(s) Required betweenNITRATE - 1040 1 and10/1/2013 12/31/2013

Sample(s) Required betweenRADIOLOGICALS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:

GROSS ALPHA - 4002 RADIUM-228 - 4030

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Sample(s) Required betweenSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 2 1 and4/1/2013 6/30/2013 Sample for all the analytes listed below:

2,4-D - 2105 CARBOFURAN - 2046 OXAMYL (VYDATE) - 2036

PENTACHLOROPHENOL - 2326 PICLORAM - 2040

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 3

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 4

Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 5/31/2013

Page 68: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

AQUA OHIO - MANSFIELD SYSTEM 8OH7003212

Page 1 of 1

2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

DISTRIBUTION MONITORING SCHEDULE

Groundwater Rule Substantial Treatment System

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS000

Facility Name: AQUA OHIO - MANSFIELD SYS 8 DISTRIBUTIO

Not RequiredLEAD - 1030 AND COPPER - 1022

1 Sample(s) Required between 1/1/2013ASBESTOS - 1094 and 5/31/2013

Collect one sample at a tap served by asbestos-cement pipe. Due to limited Laboratory capacity and a 48 hour filtering requirement, contactyour lab early in the monitoring period to schedule a sampling date.

1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013

1 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS201

Facility Name: AQUA OHIO - MANSFIELD SYS 8 DISTRIBUTIOADDRESS NOT KNOWN

1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:

TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950

Page 69: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

AQUA OHIO - SITES LAKEOH7003312

ENTRY POINT MONITORING SCHEDULE

Page 1 of 1

2013 ENTRY POINT SCHEDULE09/13/2013Effective Date:

CommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Chemicals Monitoring Requirements

Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7057678EP001 Facility Source: Ground Water

Facility Name: AQUA OHIO - SITES LAKE STU 1

Not RequiredINORGANICS

Sample(s) Required betweenNITRITE - 1041 1 and6/1/2013 10/31/2013

Sample(s) Required betweenNITRATE - 1040 1 and6/1/2013 10/31/2013

Sample(s) Required betweenRADIOLOGICALS 1 and1/1/2013 3/31/2013Sample(s) Required between1 and4/1/2013 6/30/2013Sample(s) Required between1 and7/1/2013 9/30/2013Sample(s) Required between1 and10/1/2013 12/31/2013

Sample for all the analytes listed below:

GROSS ALPHA - 4002 RADIUM-228 - 4030

Sample(s) Required betweenSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1 1 and6/1/2013 10/31/2013 Sample for all the analytes listed below:

ALACHLOR (LASSO) - 2051 ATRAZINE - 2050 SIMAZINE - 2037

Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 3/31/2013Sample(s) Required between1 and4/1/2013 6/30/2013Sample(s) Required between1 and7/1/2013 9/30/2013Sample(s) Required between1 and10/1/2013 12/31/2013

Page 70: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

AQUA OHIO - SITES LAKEOH7003312

ENTRY POINT MONITORING SCHEDULE

Page 1 of 1

2013 ENTRY POINT SCHEDULE09/13/2013Effective Date:

CommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Chemicals Monitoring Requirements

Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7061546EP003 Facility Source: Ground Water Facility Class: CLASS 1

Facility Name: AQUA OHIO - SITES LAKE STU 3

Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:

ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020

CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085

Sample(s) Required betweenNITRITE - 1041 1 and6/1/2013 10/31/2013

Sample(s) Required betweenNITRATE - 1040 1 and6/1/2013 10/31/2013

Sample(s) Required betweenRADIOLOGICALS 1 and6/1/2013 10/31/2013 Sample for all the analytes listed below:

GROSS ALPHA - 4002 RADIUM-228 - 4030

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 5/31/2013

Page 71: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

AQUA OHIO - SITES LAKEOH7003312

Page 1 of 1

2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

DISTRIBUTION MONITORING SCHEDULE

Groundwater Rule Substantial Treatment System

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS000

Facility Name: AQUA OHIO - SITES LAKE DISTRIBUTION Facility Class: CLASS 1

Not RequiredLEAD - 1030 AND COPPER - 1022

1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013

1 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS201

Facility Name: AQUA OHIO - SITES LAKE DISTRIBUTIONADDRESS NOT KNOWN

Facility Class: CLASS 1

1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:

TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950

Page 72: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

ONTARIO CITY PWSOH7003512

ENTRY POINT MONITORING SCHEDULE

Page 1 of 1

2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Chemicals Monitoring Requirements

Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7057679EP001 Facility Source: Ground Water Facility Class: CLASS 2

Facility Name: ONTARIO VILLAGE WTP STU 1

Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:

ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020

CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085

Sample(s) Required betweenNITRITE - 1041 1 and6/1/2013 10/31/2013

Sample(s) Required betweenNITRATE - 1040 1 and6/1/2013 10/31/2013

Sample(s) Required betweenRADIOLOGICALS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:

GROSS ALPHA - 4002 RADIUM-228 - 4030

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 5/31/2013

Page 73: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

ONTARIO CITY PWSOH7003512

Page 1 of 2

2013 DISTRIBUTION SCHEDULE10/11/2013Effective Date:

CommunitySystem Type:

DISTRIBUTION MONITORING SCHEDULE

Groundwater Rule Substantial Treatment System

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS000

Facility Name: ONTARIO, CITY OF DISTRIBUTION Facility Class: CLASS 1

Not RequiredLEAD - 1030 AND COPPER - 1022

7 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/20137 Sample(s) Required between 2/1/2013 and 2/28/20137 Sample(s) Required between 3/1/2013 and 3/31/20137 Sample(s) Required between 4/1/2013 and 4/30/20137 Sample(s) Required between 5/1/2013 and 5/31/20137 Sample(s) Required between 6/1/2013 and 6/30/20137 Sample(s) Required between 7/1/2013 and 7/31/20137 Sample(s) Required between 8/1/2013 and 8/31/20137 Sample(s) Required between 9/1/2013 and 9/30/20137 Sample(s) Required between 10/1/2013 and 10/31/20137 Sample(s) Required between 11/1/2013 and 11/30/20137 Sample(s) Required between 12/1/2013 and 12/31/2013

7 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/20137 Sample(s) Required between 2/1/2013 and 2/28/20137 Sample(s) Required between 3/1/2013 and 3/31/20137 Sample(s) Required between 4/1/2013 and 4/30/20137 Sample(s) Required between 5/1/2013 and 5/31/20137 Sample(s) Required between 6/1/2013 and 6/30/20137 Sample(s) Required between 7/1/2013 and 7/31/20137 Sample(s) Required between 8/1/2013 and 8/31/20137 Sample(s) Required between 9/1/2013 and 9/30/20137 Sample(s) Required between 10/1/2013 and 10/31/20137 Sample(s) Required between 11/1/2013 and 11/30/20137 Sample(s) Required between 12/1/2013 and 12/31/2013

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS201

Facility Name: ONTARIO, CITY OF DISTRIBUTIONADDRESS NOT KNOWN

Facility Class: CLASS 1

1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:

TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950

Page 74: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

ONTARIO CITY PWSOH7003512

Page 2 of 2

2013 DISTRIBUTION SCHEDULE10/11/2013Effective Date:

CommunitySystem Type:

DISTRIBUTION MONITORING SCHEDULE

Groundwater Rule Substantial Treatment System

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS202

Facility Name: ONTARIO, CITY OF DISTRIBUTIONADDRESS NOT KNOWN

Facility Class: CLASS 1

1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:

TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950

Page 75: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

COUNTRY MEADOW CARE CENTEROH7003612

ENTRY POINT MONITORING SCHEDULE

Page 1 of 1

2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Chemicals Monitoring Requirements

Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7057680EP001 Facility Source: Ground Water Facility Class: CLASS A

Facility Name: COUNTRY MEADOWS CARE

Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:

ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020

CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085

Sample(s) Required betweenNITRITE - 1041 1 and6/1/2013 10/31/2013

Sample(s) Required betweenNITRATE - 1040 1 and6/1/2013 10/31/2013

Not RequiredRADIOLOGICALS

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 5/31/2013

Page 76: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

COUNTRY MEADOW CARE CENTEROH7003612

Page 1 of 1

2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

DISTRIBUTION MONITORING SCHEDULE

Groundwater Rule Substantial Treatment System

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS000

Facility Name: COUNTRY MEADOW CARE CENT DISTRIBUTI

Not RequiredLEAD - 1030 AND COPPER - 1022

1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013

1 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS201

Facility Name: COUNTRY MEADOW CARE CENT DISTRIBUTIADDRESS NOT KNOWN

1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:

TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950

Page 77: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

PEYTON COMMUNITY WELLOH7003712

ENTRY POINT MONITORING SCHEDULE

Page 1 of 1

2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Chemicals Monitoring Requirements

Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7057681EP001 Facility Source: Ground Water Facility Class: CLASS A

Facility Name: PEYTON COMMUNITY WELL

Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:

ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020

CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085

Sample(s) Required betweenNITRITE - 1041 1 and6/1/2013 10/31/2013

Sample(s) Required betweenNITRATE - 1040 1 and6/1/2013 10/31/2013

Sample(s) Required betweenRADIOLOGICALS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:

GROSS ALPHA - 4002 RADIUM-228 - 4030

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Sample(s) Required betweenSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 2 1 and4/1/2013 6/30/2013 Sample for all the analytes listed below:

2,4-D - 2105 CARBOFURAN - 2046 OXAMYL (VYDATE) - 2036

PENTACHLOROPHENOL - 2326 PICLORAM - 2040

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 3

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 4

Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 5/31/2013

Page 78: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

PEYTON COMMUNITY WELLOH7003712

Page 1 of 1

2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

DISTRIBUTION MONITORING SCHEDULE

Groundwater Rule Substantial Treatment System

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS000

Facility Name: PEYTON COMMUNITY WELL DISTRIBUTION

Not RequiredLEAD - 1030 AND COPPER - 1022

1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013

1 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS201

Facility Name: PEYTON COMMUNITY WELL DISTRIBUTIONADDRESS NOT KNOWN

1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:

TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950

Page 79: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

PIN OAK ESTATESOH7003812

ENTRY POINT MONITORING SCHEDULE

Page 1 of 1

2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Chemicals Monitoring Requirements

Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7057682EP001 Facility Source: Ground Water Facility Class: CLASS A

Facility Name: PIN OAK ESTATES

Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:

ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020

CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085

Sample(s) Required betweenNITRITE - 1041 1 and6/1/2013 10/31/2013

Sample(s) Required betweenNITRATE - 1040 1 and6/1/2013 10/31/2013

Not RequiredRADIOLOGICALS

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 5/31/2013

Page 80: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

PIN OAK ESTATESOH7003812

Page 1 of 1

2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

DISTRIBUTION MONITORING SCHEDULE

Groundwater Rule Substantial Treatment System

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS000

Facility Name: PIN OAK ESTATES DISTRIBUTION Facility Class: CLASS 1

Not RequiredLEAD - 1030 AND COPPER - 1022

1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013

1 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS201

Facility Name: PIN OAK ESTATES DISTRIBUTIONADDRESS NOT KNOWN

Facility Class: CLASS 1

1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:

TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950

Page 81: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

PLYMOUTH VILLAGEOH7004003

Page 1 of 2

2013 DISTRIBUTION SCHEDULE01/11/2013Effective Date:

CommunitySystem Type:

DISTRIBUTION MONITORING SCHEDULE

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS000

Facility Name: PLYMOUTH, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1

Not RequiredLEAD - 1030 AND COPPER - 1022

1 Sample(s) Required between 1/1/2013ASBESTOS - 1094 and 5/31/2013

Collect one sample at a tap served by asbestos-cement pipe. Due to limited Laboratory capacity and a 48 hour filtering requirement, contactyour lab early in the monitoring period to schedule a sampling date.

2 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/20132 Sample(s) Required between 2/1/2013 and 2/28/20132 Sample(s) Required between 3/1/2013 and 3/31/20132 Sample(s) Required between 4/1/2013 and 4/30/20132 Sample(s) Required between 5/1/2013 and 5/31/20132 Sample(s) Required between 6/1/2013 and 6/30/20132 Sample(s) Required between 7/1/2013 and 7/31/20132 Sample(s) Required between 8/1/2013 and 8/31/20132 Sample(s) Required between 9/1/2013 and 9/30/20132 Sample(s) Required between 10/1/2013 and 10/31/20132 Sample(s) Required between 11/1/2013 and 11/30/20132 Sample(s) Required between 12/1/2013 and 12/31/2013

2 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/20132 Sample(s) Required between 2/1/2013 and 2/28/20132 Sample(s) Required between 3/1/2013 and 3/31/20132 Sample(s) Required between 4/1/2013 and 4/30/20132 Sample(s) Required between 5/1/2013 and 5/31/20132 Sample(s) Required between 6/1/2013 and 6/30/20132 Sample(s) Required between 7/1/2013 and 7/31/20132 Sample(s) Required between 8/1/2013 and 8/31/20132 Sample(s) Required between 9/1/2013 and 9/30/20132 Sample(s) Required between 10/1/2013 and 10/31/20132 Sample(s) Required between 11/1/2013 and 11/30/20132 Sample(s) Required between 12/1/2013 and 12/31/2013

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS201

Facility Name: PLYMOUTH, VILLAGE OF DISTRIBUTION30 MILLS ST

Facility Class: CLASS 1

1 Sample(s) Required between 1/1/2013DISINFECTION BYPRODUCTS and 1/7/20131 Sample(s) Required between 4/1/2013 and 4/7/20131 Sample(s) Required between 7/1/2013 and 7/7/20131 Sample(s) Required between 10/1/2013 and 10/7/2013

Sample for all the analytes listed below:

TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950

Page 82: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

PLYMOUTH VILLAGEOH7004003

Page 2 of 2

2013 DISTRIBUTION SCHEDULE01/11/2013Effective Date:

CommunitySystem Type:

DISTRIBUTION MONITORING SCHEDULE

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS202

Facility Name: PLYMOUTH, VILLAGE OF DISTRIBUTION28 BROOKS COURT

Facility Class: CLASS 1

1 Sample(s) Required between 1/1/2013DISINFECTION BYPRODUCTS and 1/7/20131 Sample(s) Required between 4/1/2013 and 4/7/20131 Sample(s) Required between 7/1/2013 and 7/7/20131 Sample(s) Required between 10/1/2013 and 10/7/2013

Sample for all the analytes listed below:

TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950

Page 83: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

DAYSPRING ASSISTED LIVING AND CAREOH7004112

ENTRY POINT MONITORING SCHEDULE

Page 1 of 1

2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Chemicals Monitoring Requirements

Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7057685EP001 Facility Source: Ground Water Facility Class: CLASS A

Facility Name: DAYSPRING ASSISTED LIVING AND CARE

Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:

ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020

CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085

Sample(s) Required betweenNITRITE - 1041 1 and6/1/2013 10/31/2013

Sample(s) Required betweenNITRATE - 1040 1 and6/1/2013 10/31/2013

Sample(s) Required betweenRADIOLOGICALS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:

GROSS ALPHA - 4002 RADIUM-228 - 4030

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 5/31/2013

Page 84: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

DAYSPRING ASSISTED LIVING AND CAREOH7004112

Page 1 of 1

2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

DISTRIBUTION MONITORING SCHEDULE

Groundwater Rule Substantial Treatment System

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS000

Facility Name: DAYSPRING ASSIST LIVING AND CARE DIST

Not RequiredLEAD - 1030 AND COPPER - 1022

1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013

1 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS201

Facility Name: DAYSPRING ASSIST LIVING AND CARE DISTADDRESS NOT KNOWN

1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:

TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950

Page 85: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

EDGEWOOD AND EDGEWATER, LLCOH7004412

ENTRY POINT MONITORING SCHEDULE

Page 1 of 1

2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Chemicals Monitoring Requirements

Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7057687EP001 Facility Source: Ground Water Facility Class: CLASS A

Facility Name: EDGEWOOD ESTATES

Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:

ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020

CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085

Sample(s) Required betweenNITRITE - 1041 1 and6/1/2013 10/31/2013

Sample(s) Required betweenNITRATE - 1040 1 and6/1/2013 10/31/2013

Sample(s) Required betweenRADIOLOGICALS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:

GROSS ALPHA - 4002 RADIUM-228 - 4030

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 5/31/2013

Page 86: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

EDGEWOOD AND EDGEWATER, LLCOH7004412

Page 1 of 1

2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

DISTRIBUTION MONITORING SCHEDULE

Groundwater Rule Substantial Treatment System

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS000

Facility Name: EDGEWOOD ESTATES DISTRIBUTION

Not RequiredLEAD - 1030 AND COPPER - 1022

1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013

1 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS201

Facility Name: EDGEWOOD ESTATES DISTRIBUTIONADDRESS NOT KNOWN

1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:

TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950

Page 87: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

SHELBY CITYOH7004511

ENTRY POINT MONITORING SCHEDULE

Page 1 of 1

2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Chemicals Monitoring Requirements

Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7057688EP001 Facility Source: Surface Water Facility Class: CLASS 3

Facility Name: SHELBY CITY

Sample(s) Required betweenINORGANICS 1 and6/1/2013 10/31/2013 Sample for all the analytes listed below:

ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020

CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085

Sample(s) Required betweenNITRITE - 1041 1 and6/1/2013 10/31/2013

Sample(s) Required betweenNITRATE - 1040 1 and1/1/2013 1/31/2013Sample(s) Required between1 and2/1/2013 2/28/2013Sample(s) Required between1 and3/1/2013 3/31/2013Sample(s) Required between1 and4/1/2013 4/30/2013Sample(s) Required between1 and5/1/2013 5/31/2013Sample(s) Required between1 and6/1/2013 6/30/2013Sample(s) Required between1 and7/1/2013 7/31/2013Sample(s) Required between1 and8/1/2013 8/31/2013Sample(s) Required between1 and9/1/2013 9/30/2013Sample(s) Required between1 and10/1/2013 10/31/2013Sample(s) Required between1 and11/1/2013 11/30/2013Sample(s) Required between1 and12/1/2013 12/31/2013

Not RequiredRADIOLOGICALS

Sample(s) Required betweenSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1 1 and4/1/2013 6/30/2013 Sample for all the analytes listed below:

ALACHLOR (LASSO) - 2051 ATRAZINE - 2050 SIMAZINE - 2037

Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and6/1/2013 10/31/2013

Paired Sample Set Required betweenTOTAL ORGANIC CARBON (TOC) 1 and1/1/2013 1/31/2013Paired Sample Set Required between1 and2/1/2013 2/28/2013Paired Sample Set Required between1 and3/1/2013 3/31/2013Paired Sample Set Required between1 and4/1/2013 4/30/2013Paired Sample Set Required between1 and5/1/2013 5/31/2013Paired Sample Set Required between1 and6/1/2013 6/30/2013Paired Sample Set Required between1 and7/1/2013 7/31/2013Paired Sample Set Required between1 and8/1/2013 8/31/2013Paired Sample Set Required between1 and9/1/2013 9/30/2013Paired Sample Set Required between1 and10/1/2013 10/31/2013Paired Sample Set Required between1 and11/1/2013 11/30/2013Paired Sample Set Required between1 and12/1/2013 12/31/2013

A paired sample set refers to one source water and one treated water sample. A sourcewater alkalinity is also required at the same time the TOC sample is taken.

Page 88: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

SHELBY CITYOH7004511

Page 1 of 2

2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

DISTRIBUTION MONITORING SCHEDULE

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS000

Facility Name: SHELBY, CITY OF DISTRIBUTION Facility Class: CLASS 1

20 Sample(s) Required between 6/1/2013LEAD - 1030 AND COPPER - 1022 and 9/30/2013

Lead Consumer Notice needs issued to sampling participants within thirty days of receipt of results and verification submitted to Ohio EPAwithin ninety days from the end of the monitoring period. Submit Form 5105 with appendix to Ohio EPA within ten days from the end of themonitoring period. Forms are available online at: http://epa.ohio.gov/ddagw/reporting.aspx

1 Sample(s) Required between 1/1/2013ASBESTOS - 1094 and 5/31/2013

Collect one sample at a tap served by asbestos-cement pipe. Due to limited Laboratory capacity and a 48 hour filtering requirement, contactyour lab early in the monitoring period to schedule a sampling date.

10 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/201310 Sample(s) Required between 2/1/2013 and 2/28/201310 Sample(s) Required between 3/1/2013 and 3/31/201310 Sample(s) Required between 4/1/2013 and 4/30/201310 Sample(s) Required between 5/1/2013 and 5/31/201310 Sample(s) Required between 6/1/2013 and 6/30/201310 Sample(s) Required between 7/1/2013 and 7/31/201310 Sample(s) Required between 8/1/2013 and 8/31/201310 Sample(s) Required between 9/1/2013 and 9/30/201310 Sample(s) Required between 10/1/2013 and 10/31/201310 Sample(s) Required between 11/1/2013 and 11/30/201310 Sample(s) Required between 12/1/2013 and 12/31/2013

10 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/201310 Sample(s) Required between 2/1/2013 and 2/28/201310 Sample(s) Required between 3/1/2013 and 3/31/201310 Sample(s) Required between 4/1/2013 and 4/30/201310 Sample(s) Required between 5/1/2013 and 5/31/201310 Sample(s) Required between 6/1/2013 and 6/30/201310 Sample(s) Required between 7/1/2013 and 7/31/201310 Sample(s) Required between 8/1/2013 and 8/31/201310 Sample(s) Required between 9/1/2013 and 9/30/201310 Sample(s) Required between 10/1/2013 and 10/31/201310 Sample(s) Required between 11/1/2013 and 11/30/201310 Sample(s) Required between 12/1/2013 and 12/31/2013

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS201

Facility Name: SHELBY, CITY OF DISTRIBUTION27 RYAN RD

Facility Class: CLASS 1

1 Sample(s) Required between 3/8/2013DISINFECTION BYPRODUCTS and 3/14/20131 Sample(s) Required between 6/8/2013 and 6/14/20131 Sample(s) Required between 9/8/2013 and 9/14/2013

Page 89: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

SHELBY CITYOH7004511

Page 2 of 2

2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

DISTRIBUTION MONITORING SCHEDULE

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS201

Facility Name: SHELBY, CITY OF DISTRIBUTION27 RYAN RD

Facility Class: CLASS 1

1 Sample(s) Required between 12/8/2013DISINFECTION BYPRODUCTS and 12/14/2013 Sample for all the analytes listed below:

TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS202

Facility Name: SHELBY, CITY OF DISTRIBUTION527 S. GAMBLE ST

Facility Class: CLASS 1

1 Sample(s) Required between 3/8/2013DISINFECTION BYPRODUCTS and 3/14/20131 Sample(s) Required between 6/8/2013 and 6/14/20131 Sample(s) Required between 9/8/2013 and 9/14/20131 Sample(s) Required between 12/8/2013 and 12/14/2013

Sample for all the analytes listed below:

TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950

Page 90: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

SHELLY ACRES WATER ASSOCIATIONOH7004612

ENTRY POINT MONITORING SCHEDULE

Page 1 of 1

2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Chemicals Monitoring Requirements

Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7057689EP001 Facility Source: Ground Water Facility Class: CLASS 1

Facility Name: SHELLY ACRES WATER ASSOC

Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:

ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020

CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085

Sample(s) Required betweenNITRITE - 1041 1 and6/1/2013 10/31/2013

Sample(s) Required betweenNITRATE - 1040 1 and6/1/2013 10/31/2013

Sample(s) Required betweenRADIOLOGICALS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:

GROSS ALPHA - 4002 RADIUM-228 - 4030

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 5/31/2013

Page 91: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

SHELLY ACRES WATER ASSOCIATIONOH7004612

Page 1 of 1

2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

DISTRIBUTION MONITORING SCHEDULE

Groundwater Rule Substantial Treatment System

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS000

Facility Name: SHELLY ACRES WATER ASSOC DISTRIBUTIO Facility Class: CLASS 1

Not RequiredLEAD - 1030 AND COPPER - 1022

1 Sample(s) Required between 1/1/2013ASBESTOS - 1094 and 5/31/2013

Collect one sample at a tap served by asbestos-cement pipe. Due to limited Laboratory capacity and a 48 hour filtering requirement, contactyour lab early in the monitoring period to schedule a sampling date.

1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013

1 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS201

Facility Name: SHELLY ACRES WATER ASSOC DISTRIBUTIOADDRESS NOT KNOWN

Facility Class: CLASS 1

1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:

TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950

Page 92: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

SHILOH VILLAGE OFOH7004712

ENTRY POINT MONITORING SCHEDULE

Page 1 of 1

2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Chemicals Monitoring Requirements

Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7057690EP001 Facility Source: Ground Water Facility Class: CLASS 1

Facility Name: SHILOH WTP

Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:

ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020

CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085

Sample(s) Required betweenNITRITE - 1041 1 and6/1/2013 10/31/2013

Sample(s) Required betweenNITRATE - 1040 1 and6/1/2013 10/31/2013

Sample(s) Required betweenRADIOLOGICALS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:

GROSS ALPHA - 4002 RADIUM-228 - 4030

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 5/31/2013

Page 93: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

SHILOH VILLAGE OFOH7004712

Page 1 of 2

2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

DISTRIBUTION MONITORING SCHEDULE

Groundwater Rule Substantial Treatment System

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS000

Facility Name: SHILOH, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1

10 Sample(s) Required between 6/1/2013LEAD - 1030 AND COPPER - 1022 and 9/30/2013

Lead Consumer Notice needs issued to sampling participants within thirty days of receipt of results and verification submitted to Ohio EPAwithin ninety days from the end of the monitoring period. Submit Form 5105 with appendix to Ohio EPA within ten days from the end of themonitoring period. Forms are available online at: http://epa.ohio.gov/ddagw/reporting.aspx

1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013

1 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS201

Facility Name: SHILOH, VILLAGE OF DISTRIBUTIONADDRESS NOT KNOWN

Facility Class: CLASS 1

1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:

TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950

Page 94: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

SHILOH VILLAGE OFOH7004712

Page 2 of 2

2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

DISTRIBUTION MONITORING SCHEDULE

Groundwater Rule Substantial Treatment System

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS202

Facility Name: SHILOH, VILLAGE OF DISTRIBUTIONADDRESS NOT KNOWN

Facility Class: CLASS 1

1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:

TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950

Page 95: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

SOUTHERN ESTATES WATER ASSOC PWSOH7004812

ENTRY POINT MONITORING SCHEDULE

Page 1 of 1

2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Chemicals Monitoring Requirements

Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7057691EP001 Facility Source: Ground Water Facility Class: CLASS A

Facility Name: SOUTHERN EST WATER ASSOC

Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:

ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020

CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085

Sample(s) Required betweenNITRITE - 1041 1 and6/1/2013 10/31/2013

Sample(s) Required betweenNITRATE - 1040 1 and6/1/2013 10/31/2013

Sample(s) Required betweenRADIOLOGICALS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:

GROSS ALPHA - 4002 RADIUM-228 - 4030

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 5/31/2013

Page 96: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

SOUTHERN ESTATES WATER ASSOC PWSOH7004812

Page 1 of 1

2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

DISTRIBUTION MONITORING SCHEDULE

Groundwater Rule Substantial Treatment System

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS000

Facility Name: SOUTHERN EST WATER ASSOC DIST

5 Sample(s) Required between 6/1/2013LEAD - 1030 AND COPPER - 1022 and 9/30/2013

Lead Consumer Notice needs issued to sampling participants within thirty days of receipt of results and verification submitted to Ohio EPAwithin ninety days from the end of the monitoring period. Submit Form 5105 with appendix to Ohio EPA within ten days from the end of themonitoring period. Forms are available online at: http://epa.ohio.gov/ddagw/reporting.aspx

1 Sample(s) Required between 1/1/2013ASBESTOS - 1094 and 5/31/2013

Collect one sample at a tap served by asbestos-cement pipe. Due to limited Laboratory capacity and a 48 hour filtering requirement, contactyour lab early in the monitoring period to schedule a sampling date.

1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013

1 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS201

Facility Name: SOUTHERN EST WATER ASSOC DISTADDRESS NOT KNOWN

1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:

TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950

Page 97: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

AQUA OHIO - MANSFIELD SYSTEM 5OH7004912

ENTRY POINT MONITORING SCHEDULE

Page 1 of 1

2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Chemicals Monitoring Requirements

Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7057692EP001 Facility Source: Ground Water Facility Class: CLASS A

Facility Name: AQUA OHIO - MANSFIELD SYSTEM 5

Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:

ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020

CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085

Sample(s) Required betweenNITRITE - 1041 1 and6/1/2013 10/31/2013

Sample(s) Required betweenNITRATE - 1040 1 and6/1/2013 10/31/2013

Sample(s) Required betweenRADIOLOGICALS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:

GROSS ALPHA - 4002 RADIUM-228 - 4030

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 5/31/2013

Page 98: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

AQUA OHIO - MANSFIELD SYSTEM 5OH7004912

Page 1 of 1

2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

DISTRIBUTION MONITORING SCHEDULE

Groundwater Rule Substantial Treatment System

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS000

Facility Name: AQUA OHIO - MANSFIELD SYSTEM 5 DIST

Not RequiredLEAD - 1030 AND COPPER - 1022

1 Sample(s) Required between 1/1/2013ASBESTOS - 1094 and 5/31/2013

Collect one sample at a tap served by asbestos-cement pipe. Due to limited Laboratory capacity and a 48 hour filtering requirement, contactyour lab early in the monitoring period to schedule a sampling date.

1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013

1 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS201

Facility Name: AQUA OHIO - MANSFIELD SYSTEM 5 DISTADDRESS NOT KNOWN

1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:

TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950

Page 99: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

WALNUT HILLS WATEROH7005032

ENTRY POINT MONITORING SCHEDULE

Page 1 of 1

2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Chemicals Monitoring Requirements

Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7057695EP001 Facility Source: Ground Water Facility Class: CLASS 1

Facility Name: WALNUT HILLS WATER TREATMENT PLANT

Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:

ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020

CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085

Sample(s) Required betweenNITRITE - 1041 1 and6/1/2013 10/31/2013

Sample(s) Required betweenNITRATE - 1040 1 and6/1/2013 10/31/2013

Sample(s) Required betweenRADIOLOGICALS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:

GROSS ALPHA - 4002 RADIUM-228 - 4030

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 5/31/2013

Page 100: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

WALNUT HILLS WATEROH7005032

Page 1 of 2

2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

DISTRIBUTION MONITORING SCHEDULE

Groundwater Rule Substantial Treatment System

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS000

Facility Name: WALNUT HILLS WATER DISTRIBUTION Facility Class: CLASS 1

Not RequiredLEAD - 1030 AND COPPER - 1022

1 Sample(s) Required between 1/1/2013ASBESTOS - 1094 and 5/31/2013

Collect one sample at a tap served by asbestos-cement pipe. Due to limited Laboratory capacity and a 48 hour filtering requirement, contactyour lab early in the monitoring period to schedule a sampling date.

1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013

1 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS201

Facility Name: WALNUT HILLS WATER DISTRIBUTIONADDRESS NOT KNOWN

Facility Class: CLASS 1

1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:

TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950

Page 101: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

WALNUT HILLS WATEROH7005032

Page 2 of 2

2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

DISTRIBUTION MONITORING SCHEDULE

Groundwater Rule Substantial Treatment System

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS202

Facility Name: WALNUT HILLS WATER DISTRIBUTIONADDRESS NOT KNOWN

Facility Class: CLASS 1

1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:

TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950

Page 102: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

WILLOW PARK WATER ASSOCIATIONOH7005112

ENTRY POINT MONITORING SCHEDULE

Page 1 of 1

2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Chemicals Monitoring Requirements

Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7057696EP001 Facility Source: Ground Water Facility Class: CLASS A

Facility Name: WILLOW PARK WATER ASSOCIATION

Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:

ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020

CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085

Sample(s) Required betweenNITRITE - 1041 1 and6/1/2013 10/31/2013

Sample(s) Required betweenNITRATE - 1040 1 and6/1/2013 10/31/2013

Sample(s) Required betweenRADIOLOGICALS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:

GROSS ALPHA - 4002 RADIUM-228 - 4030

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 5/31/2013

Page 103: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

WILLOW PARK WATER ASSOCIATIONOH7005112

Page 1 of 1

2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

DISTRIBUTION MONITORING SCHEDULE

Groundwater Rule Substantial Treatment System

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS000

Facility Name: WILLOW PARK WATER ASSOCI DISTRIBUTIO

Not RequiredLEAD - 1030 AND COPPER - 1022

1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013

1 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS201

Facility Name: WILLOW PARK WATER ASSOCI DISTRIBUTIOADDRESS NOT KNOWN

1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:

TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950

Page 104: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

ALTMAN HTS COMM WATER ASSOCIATIONOH7005312

ENTRY POINT MONITORING SCHEDULE

Page 1 of 1

2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Chemicals Monitoring Requirements

Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7057697EP001 Facility Source: Ground Water Facility Class: CLASS A

Facility Name: ALTMAN HEIGHTS ALLOTMENT

Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:

ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020

CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085

Sample(s) Required betweenNITRITE - 1041 1 and6/1/2013 10/31/2013

Sample(s) Required betweenNITRATE - 1040 1 and6/1/2013 10/31/2013

Sample(s) Required betweenRADIOLOGICALS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:

GROSS ALPHA - 4002 RADIUM-228 - 4030

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 5/31/2013

Page 105: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

ALTMAN HTS COMM WATER ASSOCIATIONOH7005312

Page 1 of 1

2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

DISTRIBUTION MONITORING SCHEDULE

Groundwater Rule Substantial Treatment System

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS000

Facility Name: ALTMAN HTS COMM WTR ASSO DISTRIBUTIO

5 Sample(s) Required between 6/1/2013LEAD - 1030 AND COPPER - 1022 and 9/30/2013

Lead Consumer Notice needs issued to sampling participants within thirty days of receipt of results and verification submitted to Ohio EPAwithin ninety days from the end of the monitoring period. Submit Form 5105 with appendix to Ohio EPA within ten days from the end of themonitoring period. Forms are available online at: http://epa.ohio.gov/ddagw/reporting.aspx

1 Sample(s) Required between 1/1/2013ASBESTOS - 1094 and 5/31/2013

Collect one sample at a tap served by asbestos-cement pipe. Due to limited Laboratory capacity and a 48 hour filtering requirement, contactyour lab early in the monitoring period to schedule a sampling date.

1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013

1 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS201

Facility Name: ALTMAN HTS COMM WTR ASSO DISTRIBUTIOADDRESS NOT KNOWN

1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:

TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950

Page 106: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

HANLEY VILLAGE WATER ASSOCIATION PWSOH7005412

ENTRY POINT MONITORING SCHEDULE

Page 1 of 1

2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Chemicals Monitoring Requirements

Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7057698EP001 Facility Source: Ground Water Facility Class: CLASS A

Facility Name: HANLEY VLG WATER ASSOC

Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:

ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020

CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085

Sample(s) Required betweenNITRITE - 1041 1 and6/1/2013 10/31/2013

Sample(s) Required betweenNITRATE - 1040 1 and6/1/2013 10/31/2013

Sample(s) Required betweenRADIOLOGICALS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:

GROSS ALPHA - 4002 RADIUM-228 - 4030

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 5/31/2013

Page 107: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

HANLEY VILLAGE WATER ASSOCIATION PWSOH7005412

Page 1 of 1

2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

DISTRIBUTION MONITORING SCHEDULE

Groundwater Rule Substantial Treatment System

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS000

Facility Name: HANLEY VLG. WATER ASSOC. DISTRIBUTION

Not RequiredLEAD - 1030 AND COPPER - 1022

1 Sample(s) Required between 1/1/2013ASBESTOS - 1094 and 5/31/2013

Collect one sample at a tap served by asbestos-cement pipe. Due to limited Laboratory capacity and a 48 hour filtering requirement, contactyour lab early in the monitoring period to schedule a sampling date.

1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013

1 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS201

Facility Name: HANLEY VLG. WATER ASSOC. DISTRIBUTIONADDRESS NOT KNOWN

1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:

TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950

Page 108: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

LINCOLN TERRACE COMMUNITY WATEROH7005512

ENTRY POINT MONITORING SCHEDULE

Page 1 of 1

2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Chemicals Monitoring Requirements

Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7057699EP001 Facility Source: Ground Water Facility Class: CLASS 1

Facility Name: LINCOLN TERRACE COMMUNITY

Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:

ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020

CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085

Sample(s) Required betweenNITRITE - 1041 1 and7/1/2013 9/30/2013

Sample(s) Required betweenNITRATE - 1040 1 and7/1/2013 9/30/2013

Not RequiredRADIOLOGICALS

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Sample(s) Required betweenSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 2 1 and4/1/2013 6/30/2013 Sample for all the analytes listed below:

2,4-D - 2105 CARBOFURAN - 2046 OXAMYL (VYDATE) - 2036

PENTACHLOROPHENOL - 2326 PICLORAM - 2040

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 3

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 4

Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 5/31/2013

Page 109: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

LINCOLN TERRACE COMMUNITY WATEROH7005512

Page 1 of 1

2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

DISTRIBUTION MONITORING SCHEDULE

Groundwater Rule Substantial Treatment System

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS000

Facility Name: LINCOLN TERR. COMM. WELL DISTRIBUTION

Not RequiredLEAD - 1030 AND COPPER - 1022

1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013

1 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS201

Facility Name: LINCOLN TERR. COMM. WELL DISTRIBUTIONADDRESS NOT KNOWN

1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:

TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950

Page 110: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

AQUA OHIO - MANSFIELD SYSTEM 6OH7005612

ENTRY POINT MONITORING SCHEDULE

Page 1 of 1

2013 ENTRY POINT SCHEDULE04/15/2013Effective Date:

CommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Chemicals Monitoring Requirements

Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7057700EP001 Facility Source: Ground Water Facility Class: CLASS 1

Facility Name: AQUA OHIO - MANSFIELD SYSTEM 6 STU 1

Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:

ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020

CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085

Sample(s) Required betweenNITRITE - 1041 1 and6/1/2013 10/31/2013

Sample(s) Required betweenNITRATE - 1040 1 and6/1/2013 10/31/2013

Not RequiredRADIOLOGICALS

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 5/31/2013

Page 111: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

AQUA OHIO - MANSFIELD SYSTEM 6OH7005612

ENTRY POINT MONITORING SCHEDULE

Page 1 of 1

2013 ENTRY POINT SCHEDULE04/15/2013Effective Date:

CommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Chemicals Monitoring Requirements

Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7060590EP002 Facility Source: Ground Water Facility Class: CLASS 1

Facility Name: AQUA OHIO - MANSFIELD SYSTEM 6 STU 2

Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:

ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020

CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085

Sample(s) Required betweenNITRITE - 1041 1 and6/1/2013 10/31/2013

Sample(s) Required betweenNITRATE - 1040 1 and6/1/2013 10/31/2013

Sample(s) Required betweenRADIOLOGICALS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:

GROSS ALPHA - 4002 RADIUM-228 - 4030

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 5/31/2013

Page 112: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

AQUA OHIO - MANSFIELD SYSTEM 6OH7005612

Page 1 of 1

2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

DISTRIBUTION MONITORING SCHEDULE

Groundwater Rule Substantial Treatment System

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS000

Facility Name: AQUA OHIO - MANSFIELD #6 DISTRIBUTION Facility Class: CLASS 1

Not RequiredLEAD - 1030 AND COPPER - 1022

1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013

1 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS201

Facility Name: AQUA OHIO - MANSFIELD #6 DISTRIBUTIONADDRESS NOT KNOWN

Facility Class: CLASS 1

1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:

TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950

Page 113: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

AQUA OHIO - MANSFIELD SYSTEM 3OH7005812

ENTRY POINT MONITORING SCHEDULE

Page 1 of 1

2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Chemicals Monitoring Requirements

Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7057701EP001 Facility Source: Ground Water Facility Class: CLASS 1

Facility Name: AQUA OHIO - MANSFIELD SYSTEM 3

Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:

ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020

CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085

Sample(s) Required betweenNITRITE - 1041 1 and6/1/2013 10/31/2013

Sample(s) Required betweenNITRATE - 1040 1 and6/1/2013 10/31/2013

Sample(s) Required betweenRADIOLOGICALS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:

GROSS ALPHA - 4002 RADIUM-228 - 4030

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 5/31/2013

Page 114: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

AQUA OHIO - MANSFIELD SYSTEM 3OH7005812

Page 1 of 2

2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

DISTRIBUTION MONITORING SCHEDULE

Groundwater Rule Substantial Treatment System

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS000

Facility Name: AQUA OHIO - MANSFIELD SYS 3 DISTRIBUTIO Facility Class: CLASS 1

Not RequiredLEAD - 1030 AND COPPER - 1022

1 Sample(s) Required between 1/1/2013ASBESTOS - 1094 and 5/31/2013

Collect one sample at a tap served by asbestos-cement pipe. Due to limited Laboratory capacity and a 48 hour filtering requirement, contactyour lab early in the monitoring period to schedule a sampling date.

1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013

1 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS201

Facility Name: AQUA OHIO - MANSFIELD SYS 3 DISTRIBUTIOADDRESS NOT KNOWN

Facility Class: CLASS 1

1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:

TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950

Page 115: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

AQUA OHIO - MANSFIELD SYSTEM 3OH7005812

Page 2 of 2

2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

DISTRIBUTION MONITORING SCHEDULE

Groundwater Rule Substantial Treatment System

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS202

Facility Name: AQUA OHIO - MANSFIELD SYS 3 DISTRIBUTIOADDRESS NOT KNOWN

Facility Class: CLASS 1

1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:

TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950

Page 116: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

AQUA OHIO - MANSFIELD SYSTEM 2OH7005912

ENTRY POINT MONITORING SCHEDULE

Page 1 of 1

2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Chemicals Monitoring Requirements

Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7057702EP001 Facility Source: Ground Water Facility Class: CLASS 1

Facility Name: AQUA OHIO - MANSFIELD SYSTEM 2

Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:

ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020

CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085

Sample(s) Required betweenNITRITE - 1041 1 and6/1/2013 10/31/2013

Sample(s) Required betweenNITRATE - 1040 1 and6/1/2013 10/31/2013

Sample(s) Required betweenRADIOLOGICALS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:

GROSS ALPHA - 4002 RADIUM-228 - 4030

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 5/31/2013

Page 117: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

AQUA OHIO - MANSFIELD SYSTEM 2OH7005912

Page 1 of 2

2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

DISTRIBUTION MONITORING SCHEDULE

Groundwater Rule Substantial Treatment System

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS000

Facility Name: AQUA OHIO - MANSFIELD SYS 2 DISTRIBUTIO Facility Class: CLASS 1

Not RequiredLEAD - 1030 AND COPPER - 1022

1 Sample(s) Required between 1/1/2013ASBESTOS - 1094 and 5/31/2013

Collect one sample at a tap served by asbestos-cement pipe. Due to limited Laboratory capacity and a 48 hour filtering requirement, contactyour lab early in the monitoring period to schedule a sampling date.

1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013

1 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS201

Facility Name: AQUA OHIO - MANSFIELD SYS 2 DISTRIBUTIOADDRESS NOT KNOWN

Facility Class: CLASS 1

1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:

TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950

Page 118: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

AQUA OHIO - MANSFIELD SYSTEM 2OH7005912

Page 2 of 2

2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

DISTRIBUTION MONITORING SCHEDULE

Groundwater Rule Substantial Treatment System

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS202

Facility Name: AQUA OHIO - MANSFIELD SYS 2 DISTRIBUTIOADDRESS NOT KNOWN

Facility Class: CLASS 1

1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:

TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950

Page 119: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

HEATHERWOOD TERRACE TOWNHOUSESOH7006012

ENTRY POINT MONITORING SCHEDULE

Page 1 of 1

2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Chemicals Monitoring Requirements

Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7057703EP001 Facility Source: Ground Water Facility Class: CLASS 1

Facility Name: HEATHERWOOD TERRACE TOWNHOUSES

Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:

ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020

CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085

Sample(s) Required betweenNITRITE - 1041 1 and6/1/2013 10/31/2013

Sample(s) Required betweenNITRATE - 1040 1 and6/1/2013 10/31/2013

Sample(s) Required betweenRADIOLOGICALS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:

GROSS ALPHA - 4002 RADIUM-228 - 4030

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Sample(s) Required betweenSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 2 1 and4/1/2013 6/30/2013 Sample for all the analytes listed below:

2,4-D - 2105 CARBOFURAN - 2046 OXAMYL (VYDATE) - 2036

PENTACHLOROPHENOL - 2326 PICLORAM - 2040

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 3

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 4

Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 5/31/2013

Page 120: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

HEATHERWOOD TERRACE TOWNHOUSESOH7006012

Page 1 of 1

2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

DISTRIBUTION MONITORING SCHEDULE

Groundwater Rule Substantial Treatment System

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS000

Facility Name: HEATHERWOOD TERRACE TOWNHOUSES DI Facility Class: CLASS 1

Not RequiredLEAD - 1030 AND COPPER - 1022

1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013

1 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS201

Facility Name: HEATHERWOOD TERRACE TOWNHOUSES DIADDRESS NOT KNOWN

Facility Class: CLASS 1

1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:

TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950

Page 121: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

MIFFLIN CARE CENTEROH7006412

ENTRY POINT MONITORING SCHEDULE

Page 1 of 1

2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Chemicals Monitoring Requirements

Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7057707EP001 Facility Source: Ground Water Facility Class: CLASS A

Facility Name: MIFFLIN CARE CENTER

Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:

ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020

CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085

Sample(s) Required betweenNITRITE - 1041 1 and6/1/2013 10/31/2013

Sample(s) Required betweenNITRATE - 1040 1 and6/1/2013 10/31/2013

Sample(s) Required betweenRADIOLOGICALS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:

GROSS ALPHA - 4002 RADIUM-228 - 4030

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 5/31/2013

Page 122: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

MIFFLIN CARE CENTEROH7006412

Page 1 of 1

2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

DISTRIBUTION MONITORING SCHEDULE

Groundwater Rule Substantial Treatment System

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS000

Facility Name: MIFFLIN CARE CENTER DISTRIBUTION

Not RequiredLEAD - 1030 AND COPPER - 1022

1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013

1 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS201

Facility Name: MIFFLIN CARE CENTER DISTRIBUTIONADDRESS NOT KNOWN

1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:

TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950

Page 123: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

AQUA OHIO - MANSFIELD SYSTEM 10OH7006612

ENTRY POINT MONITORING SCHEDULE

Page 1 of 1

2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Chemicals Monitoring Requirements

Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7057708EP001 Facility Source: Ground Water Facility Class: CLASS A

Facility Name: AQUA OHIO - MANSFIELD SYSTEM 10

Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:

ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020

CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085

Sample(s) Required betweenNITRITE - 1041 1 and6/1/2013 10/31/2013

Sample(s) Required betweenNITRATE - 1040 1 and6/1/2013 10/31/2013

Sample(s) Required betweenRADIOLOGICALS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:

GROSS ALPHA - 4002 RADIUM-228 - 4030

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 5/31/2013

Page 124: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

AQUA OHIO - MANSFIELD SYSTEM 10OH7006612

Page 1 of 1

2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

DISTRIBUTION MONITORING SCHEDULE

Groundwater Rule Substantial Treatment System

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS000

Facility Name: AQUA OHIO - MANSFIELD SYS 10 DIST

5 Sample(s) Required between 6/1/2013LEAD - 1030 AND COPPER - 1022 and 9/30/2013

Lead Consumer Notice needs issued to sampling participants within thirty days of receipt of results and verification submitted to Ohio EPAwithin ninety days from the end of the monitoring period. Submit Form 5105 with appendix to Ohio EPA within ten days from the end of themonitoring period. Forms are available online at: http://epa.ohio.gov/ddagw/reporting.aspx

1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013

1 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS201

Facility Name: AQUA OHIO - MANSFIELD SYS 10 DISTADDRESS NOT KNOWN

1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:

TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950

Page 125: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

MADISON WATER DISTRICTOH7006712

ENTRY POINT MONITORING SCHEDULE

Page 1 of 1

2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Chemicals Monitoring Requirements

Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7057709EP001 Facility Source: Ground Water Facility Class: CLASS 1

Facility Name: MADISON WATER DISTRICT

Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:

ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020

CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085

Sample(s) Required betweenNITRITE - 1041 1 and6/1/2013 10/31/2013

Sample(s) Required betweenNITRATE - 1040 1 and6/1/2013 10/31/2013

Sample(s) Required betweenRADIOLOGICALS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:

GROSS ALPHA - 4002 RADIUM-228 - 4030

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 5/31/2013

Page 126: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

MADISON WATER DISTRICTOH7006712

Page 1 of 2

2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

DISTRIBUTION MONITORING SCHEDULE

Groundwater Rule Substantial Treatment System

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS000

Facility Name: MADISON WATER DISTRICT DISTRIBUTION Facility Class: CLASS 1

Not RequiredLEAD - 1030 AND COPPER - 1022

2 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/20132 Sample(s) Required between 2/1/2013 and 2/28/20132 Sample(s) Required between 3/1/2013 and 3/31/20132 Sample(s) Required between 4/1/2013 and 4/30/20132 Sample(s) Required between 5/1/2013 and 5/31/20132 Sample(s) Required between 6/1/2013 and 6/30/20132 Sample(s) Required between 7/1/2013 and 7/31/20132 Sample(s) Required between 8/1/2013 and 8/31/20132 Sample(s) Required between 9/1/2013 and 9/30/20132 Sample(s) Required between 10/1/2013 and 10/31/20132 Sample(s) Required between 11/1/2013 and 11/30/20132 Sample(s) Required between 12/1/2013 and 12/31/2013

2 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/20132 Sample(s) Required between 2/1/2013 and 2/28/20132 Sample(s) Required between 3/1/2013 and 3/31/20132 Sample(s) Required between 4/1/2013 and 4/30/20132 Sample(s) Required between 5/1/2013 and 5/31/20132 Sample(s) Required between 6/1/2013 and 6/30/20132 Sample(s) Required between 7/1/2013 and 7/31/20132 Sample(s) Required between 8/1/2013 and 8/31/20132 Sample(s) Required between 9/1/2013 and 9/30/20132 Sample(s) Required between 10/1/2013 and 10/31/20132 Sample(s) Required between 11/1/2013 and 11/30/20132 Sample(s) Required between 12/1/2013 and 12/31/2013

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS201

Facility Name: MADISON WATER DISTRICT DISTRIBUTIONADDRESS NOT KNOWN

Facility Class: CLASS 1

1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:

TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950

Page 127: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

MADISON WATER DISTRICTOH7006712

Page 2 of 2

2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

DISTRIBUTION MONITORING SCHEDULE

Groundwater Rule Substantial Treatment System

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS202

Facility Name: MADISON WATER DISTRICT DISTRIBUTIONADDRESS NOT KNOWN

Facility Class: CLASS 1

1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:

TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950

Page 128: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

WERNER-GOMPF FUNERAL SERVICES, LTD

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH7030112 Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Minimal Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: WERNER-GOMPF FUNERAL SERVICES DISTGround Water

DS1

Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: WERNER-GOMPF FUNERAL SERVICESGround Water

7057711

Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013

Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* PressureTank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

DistributionSystem

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 129: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

COMMUNITY BIBLE CHURCH

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH7030512 Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Minimal Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: COMM BAPTIST BIBLE CH DISTRIBUTIONGround Water

DS1

Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: COMMUNITY BIBLE CHURCH MANSFIELDGround Water

7057713

Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013

Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* PressureTank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

DistributionSystem

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 130: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

BG'S ANGELINES PIZZA

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH7030912 Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Minimal Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: BG'S ANGELINES PIZZA DISTRIBUTIONGround Water

DS1

Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: BG'S ANGELINES PIZZA WTPGround Water

7061337

Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013

Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* PressureTank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

DistributionSystem

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 131: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

DUKES BAR PWS

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH7031412 Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Minimal Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: DUKES BAR DISTRIBUTIONGround Water

DS1

Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: DUKES TAVERNGround Water

7057717

Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013

Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* PressureTank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

DistributionSystem

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 132: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

OHIO HILLTOP

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH7032212 Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Minimal Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: OHIO HILLTOP DISTRIBUTIONGround Water

DS1

Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: OHIO HILLTOPGround Water

7057720

Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013

Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* PressureTank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

DistributionSystem

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 133: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

LEWS TAVERN

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH7032912 Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Minimal Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: LEWS TAVERN DISTRIBUTIONGround Water

DS1

Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: LEWS TAVERNGround Water

7057722

Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013

Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* PressureTank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

DistributionSystem

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 134: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

MIFFLIN ELEMENTARY SCHOOLOH7033412

ENTRY POINT MONITORING SCHEDULE

Page 1 of 1

2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:

Nontransient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7057725EP001 Facility Source: Ground Water Facility Class: CLASS 1

Facility Name: MIFFLIN ELEMENTARY SCHOOL

Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:

ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020

CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085

Sample(s) Required betweenNITRITE - 1041 1 and6/1/2013 10/31/2013

Sample(s) Required betweenNITRATE - 1040 1 and6/1/2013 10/31/2013

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 3/31/2013

Page 135: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

MIFFLIN ELEMENTARY SCHOOLOH7033412

Page 1 of 1

2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:

Nontransient NoncommunitySystem Type:

DISTRIBUTION MONITORING SCHEDULE

Groundwater Rule Substantial Treatment System

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS000

Facility Name: MIFFLIN ELEMENTARY SCHOOL DISTRIBUTIO

Not RequiredLEAD - 1030 AND COPPER - 1022

1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 3/31/20131 Sample(s) Required between 4/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 12/31/2013

1 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 3/31/20131 Sample(s) Required between 4/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 12/31/2013

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS201

Facility Name: MIFFLIN ELEMENTARY SCHOOL DISTRIBUTIOADDRESS NOT KNOWN

1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:

TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950

Page 136: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

CORNELL ABRAXAS OHIOOH7033512

ENTRY POINT MONITORING SCHEDULE

Page 1 of 1

2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Chemicals Monitoring Requirements

Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7057726EP001 Facility Source: Ground Water Facility Class: CLASS A

Facility Name: CORNELL ABRAXAS OHIO

Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:

ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020

CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085

Sample(s) Required betweenNITRITE - 1041 1 and6/1/2013 10/31/2013

Sample(s) Required betweenNITRATE - 1040 1 and6/1/2013 10/31/2013

Sample(s) Required betweenRADIOLOGICALS 1 and6/1/2013 10/31/2013 Sample for all the analytes listed below:

GROSS ALPHA - 4002 RADIUM-228 - 4030

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 5/31/2013

Page 137: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

CORNELL ABRAXAS OHIOOH7033512

Page 1 of 1

2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:

CommunitySystem Type:

DISTRIBUTION MONITORING SCHEDULE

Groundwater Rule Substantial Treatment System

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2013

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS000

Facility Name: CORNELL OHIO DISTRIBUTION

5 Sample(s) Required between 6/1/2013LEAD - 1030 AND COPPER - 1022 and 9/30/2013

Lead Consumer Notice needs issued to sampling participants within thirty days of receipt of results and verification submitted to Ohio EPAwithin ninety days from the end of the monitoring period. Submit Form 5105 with appendix to Ohio EPA within ten days from the end of themonitoring period. Forms are available online at: http://epa.ohio.gov/ddagw/reporting.aspx

1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013

1 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/20131 Sample(s) Required between 2/1/2013 and 2/28/20131 Sample(s) Required between 3/1/2013 and 3/31/20131 Sample(s) Required between 4/1/2013 and 4/30/20131 Sample(s) Required between 5/1/2013 and 5/31/20131 Sample(s) Required between 6/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 7/31/20131 Sample(s) Required between 8/1/2013 and 8/31/20131 Sample(s) Required between 9/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 10/31/20131 Sample(s) Required between 11/1/2013 and 11/30/20131 Sample(s) Required between 12/1/2013 and 12/31/2013

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS201

Facility Name: CORNELL OHIO DISTRIBUTIONADDRESS NOT KNOWN

1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:

TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950

Page 138: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

ODOT REST AREA 3-33 EAST

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH7034012 Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Minimal Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: ODOT-REST AREA 3-33 DISTRIBUTIONGround Water

DS1

Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: ODOT REST AREA 3-33Ground Water Facility Class: CLASS A

7057727

Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013

Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* PressureTank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

DistributionSystem

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 139: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

ODOT REST AREA 3-34 WEST

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH7034112 Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Minimal Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: ODOT-REST AREA 3-34 DISTRIBUTIONGround Water

DS1

Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: ODOT REST AREA 3-34Ground Water Facility Class: CLASS A

7057728

Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013

Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* PressureTank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

DistributionSystem

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 140: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

SNOW TRAILS NO 1 - RENTAL

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH7034712 Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Minimal Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to12/1 3/31

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: SNOW TRAILS DISTRIBUTIONGround Water

DS1

Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 10/1/20131 and 12/31/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: SNOW TRAILSGround Water

7057730

Sample(s) Required between 1/1/2013NITRITE - 1041 1 and 5/31/2013

Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* PressureTank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

DistributionSystem

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 141: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

SPRINGMILL DRIVE-IN THEATRE

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH7034812 Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Minimal Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to4/1 9/30

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: SPRINGMILL DR-IN THEATRE DISTRIBUTIONGround Water

DS1

Sample(s) Required between 4/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: SPRINGMILL DR-IN THEATREGround Water

7057731

Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013

Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* PressureTank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

DistributionSystem

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 142: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

ST MARY OF THE SNOWS SCHOOLOH7035012

ENTRY POINT MONITORING SCHEDULE

Page 1 of 1

2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:

Nontransient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7057732EP001 Facility Source: Ground Water Facility Class: CLASS A

Facility Name: ST MARY OF THE SNOWS SCHOOL

Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:

ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020

CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085

Sample(s) Required betweenNITRITE - 1041 1 and6/1/2013 10/31/2013

Sample(s) Required betweenNITRATE - 1040 1 and6/1/2013 10/31/2013

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 5/31/2013

Page 143: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

ST MARY OF THE SNOWS SCHOOLOH7035012

Page 1 of 1

2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:

Nontransient NoncommunitySystem Type:

DISTRIBUTION MONITORING SCHEDULE

Groundwater Rule Substantial Treatment System

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS000

Facility Name: ST MARYS CHURCH & SCHOOL DISTRIBUTIO

Not RequiredLEAD - 1030 AND COPPER - 1022

1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 3/31/20131 Sample(s) Required between 4/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 12/31/2013

1 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 3/31/20131 Sample(s) Required between 4/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 12/31/2013

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS201

Facility Name: ST MARYS CHURCH & SCHOOL DISTRIBUTIOADDRESS NOT KNOWN

1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:

TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950

Page 144: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

CHURCH OF GOD PWS

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH7035212 Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Minimal Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: CHURCH OF GOD DISTRIBUTIONGround Water

DS1

Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: CHURCH OF GODGround Water

7057733

Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013

Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* PressureTank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

DistributionSystem

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 145: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

WALTON LAKE COMPANY 1

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH7035812 Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Minimal Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to5/1 9/30

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: WALTON LAKE COMPANY 1 DISTRIBUTIONGround Water

DS1

Sample(s) Required between 4/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: WALTON LAKE CO NO 1Ground Water

7057736

Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013

Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* PressureTank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

DistributionSystem

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 146: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

WALTON LAKE COMPANY 3 PWS

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH7036012 Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Minimal Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: WALTON LAKE COMPANY 3 DISTRIBUTIONGround Water

DS1

Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: WALTON LAKE CO NO 3Ground Water

7057738

Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013

Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* PressureTank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

DistributionSystem

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 147: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

WESTBROOK COUNTRY CLUBOH7036112

ENTRY POINT MONITORING SCHEDULE

Page 1 of 1

2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:

Nontransient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7057739EP001 Facility Source: Ground Water Facility Class: CLASS A

Facility Name: WESTBROOK COUNTRY CLUB

Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:

ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020

CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085

Sample(s) Required betweenNITRITE - 1041 1 and6/1/2013 10/31/2013

Sample(s) Required betweenNITRATE - 1040 1 and6/1/2013 10/31/2013

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 3/31/2013Sample(s) Required between1 and4/1/2013 6/30/2013Sample(s) Required between1 and7/1/2013 9/30/2013Sample(s) Required between1 and10/1/2013 12/31/2013

Page 148: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

WESTBROOK COUNTRY CLUBOH7036112

Page 1 of 1

2013 DISTRIBUTION SCHEDULE10/11/2013Effective Date:

Nontransient NoncommunitySystem Type:

DISTRIBUTION MONITORING SCHEDULE

Groundwater Rule Substantial Treatment System

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS000

Facility Name: WESTBROOK COUNTRY CLUB DISTRIBUTION

Not RequiredLEAD - 1030 AND COPPER - 1022

1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 3/31/20131 Sample(s) Required between 4/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 12/31/2013

1 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 3/31/20131 Sample(s) Required between 4/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 12/31/2013

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS201

Facility Name: WESTBROOK COUNTRY CLUB DISTRIBUTIONADDRESS NOT KNOWN

1 Sample(s) Required between 11/8/2013DISINFECTION BYPRODUCTS and 11/14/2013 Sample for all the analytes listed below:

TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950

Page 149: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

APOSTOLIC CHRISTIAN CHURCH

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH7036312 Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Minimal Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: APOSTOLIC CHRISTIAN CH. DISTRIBUTIONGround Water

DS1

Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: APOSTOLIC CHRISTIAN CHURCHGround Water

7057740

Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013

Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* PressureTank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

DistributionSystem

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 150: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

TEMPLED HILLS

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH7036512 Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Substantial Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: TEMPLED HILLS DISTRIBUTIONGround Water

DS1

Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: TEMPLED HILLSGround Water

7057741

Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013

Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* PressureTank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

DistributionSystem

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 151: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

CLAY MEMORIAL LUTHERAN

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH7036812 Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Minimal Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: CLAY MEMORIAL LUTHERAN DISTRIBUTIONGround Water

DS1

Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: CLAY MEMORIAL LUTHERANGround Water

7057743

Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013

Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* PressureTank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

DistributionSystem

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 152: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

HERITAGE INN

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH7037712 Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Substantial Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: HERITAGE INN DISTRIBUTIONGround Water

DS1

Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: HERITAGE INNGround Water

7057749

Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013

Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* PressureTank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

DistributionSystem

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 153: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

SACRED HEART SCHOOLOH7037812

ENTRY POINT MONITORING SCHEDULE

Page 1 of 1

2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:

Nontransient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7057750EP001 Facility Source: Ground Water Facility Class: CLASS A

Facility Name: SACRED HEART SCHOOL

Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:

ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020

CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085

Sample(s) Required betweenNITRITE - 1041 1 and6/1/2013 10/31/2013

Sample(s) Required betweenNITRATE - 1040 1 and6/1/2013 10/31/2013

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 5/31/2013

Page 154: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

SACRED HEART SCHOOLOH7037812

Page 1 of 1

2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:

Nontransient NoncommunitySystem Type:

DISTRIBUTION MONITORING SCHEDULE

Groundwater Rule Minimal Treatment System

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS000

Facility Name: SACRED HEART SCHOOL DISTRIBUTION

5 Sample(s) Required between 6/1/2013LEAD - 1030 AND COPPER - 1022 and 9/30/2013

Lead Consumer Notice needs issued to sampling participants within thirty days of receipt of results and verification submitted to Ohio EPAwithin ninety days from the end of the monitoring period. Submit Form 5105 with appendix to Ohio EPA within ten days from the end of themonitoring period. Forms are available online at: http://epa.ohio.gov/ddagw/reporting.aspx

1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 3/31/20131 Sample(s) Required between 4/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 12/31/2013

Page 155: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

ODNR-MALABAR FARM STATE PARK INN

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH7037912 Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Minimal Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to2/1 12/31

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: ODNR-MALABAR ST PK INN DISTRIBUTIONGround Water

DS1

Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: ODNR MALABAR ST PK INNGround Water

7057751

Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013

Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* PressureTank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

DistributionSystem

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 156: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

MILLIRON IRON AND METALOH7038212

ENTRY POINT MONITORING SCHEDULE

Page 1 of 1

2013 ENTRY POINT SCHEDULE01/11/2013Effective Date:

Nontransient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7057752EP001 Facility Source: Ground Water Facility Class: CLASS A

Facility Name: MILLIRON INDUSTRIES

Sample(s) Required betweenARSENIC - 1005 1 and1/1/2013 3/31/2013Sample(s) Required between1 and4/1/2013 6/30/2013Sample(s) Required between1 and7/1/2013 9/30/2013Sample(s) Required between1 and10/1/2013 12/31/2013

Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:

ANTIMONY, TOTAL - 1074 BARIUM - 1010 BERYLLIUM, TOTAL CADMIUM - 1015 CHROMIUM - 1020 CYANIDE - 1024

FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL -

Sample(s) Required betweenNITRITE - 1041 1 and6/1/2013 10/31/2013

Sample(s) Required betweenNITRATE - 1040 1 and6/1/2013 10/31/2013

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 5/31/2013

Page 157: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

MILLIRON IRON AND METALOH7038212

Page 1 of 1

2013 DISTRIBUTION SCHEDULE01/11/2013Effective Date:

Nontransient NoncommunitySystem Type:

DISTRIBUTION MONITORING SCHEDULE

Groundwater Rule Minimal Treatment System

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS000

Facility Name: MILLIRON IRON & METAL DISTRIBUTION

Not RequiredLEAD - 1030 AND COPPER - 1022

1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 3/31/20131 Sample(s) Required between 4/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 12/31/2013

Page 158: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

MOOSE LODGE #341

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH7038312 Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Minimal Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: MOOSE LODGE DISTRIBUTIONGround Water

DS1

Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: MOOSE LODGEGround Water

7057753

Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013

Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* PressureTank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

DistributionSystem

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 159: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

PEBBLE CREEK GOLF CLUB

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH7038512 Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Minimal Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to4/1 10/31

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: PEBBLE CREEK GOLF CLUB DISTRIBUTIONGround Water

DS1

Sample(s) Required between 4/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: PEBBLE CREEK GOLF CLUBGround Water

7057754

Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013

Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* PressureTank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

DistributionSystem

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 160: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

ROME COMMUNITY CHURCH

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH7039112 Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Minimal Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: ROME COMMUNITY CHURCH DISTRIBUTIONGround Water

DS1

Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: ROME COMMUNITY CHURCHGround Water

7057758

Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013

Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* PressureTank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

DistributionSystem

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 161: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

SAINT TIMOTHY LUTHERAN CHURCH

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH7039212 Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Minimal Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: ST TIMOTHY LUTH CHURCH DISTRIBUTIONGround Water

DS1

Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: SAINT TIMOTHY LUTH CHURCHGround Water

7057759

Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013

Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* PressureTank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

DistributionSystem

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 162: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

SHELBY COUNTRY CLUB

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH7039312 Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Minimal Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to4/1 10/31

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: SHELBY COUNTRY CLUBGround Water

7057760

Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013

Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* PressureTank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

DistributionSystem

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 163: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

SOUTHSIDE DRIVE THRU

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH7039612 Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Minimal Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: SOUTHSIDE DRIVE THRU DISTRIBUTIONGround Water

DS1

Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: SOUTHSIDE DRUVE THRUGround Water

7057761

Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013

Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* PressureTank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

DistributionSystem

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 164: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

SUNSET DRIVE-IN

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH7039912 Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Minimal Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to4/1 9/30

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: SUNSET DRIVE-IN DISTRIBUTIONGround Water

DS1

Sample(s) Required between 4/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: SUNSET DRIVE-INGround Water

7057763

Sample(s) Required between 7/1/2013NITRITE - 1041 1 and 9/30/2013

Sample(s) Required between 4/1/2013NITRATE - 1040 1 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* PressureTank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

DistributionSystem

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 165: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

TAYLORTOWN COMMUNITY CHURCH

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH7040012 Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Substantial Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: TAYLORTOWN COMMUNITY CH. DISTRIBUTIONGround Water

DS1

Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: TAYLORTOWN COMMUNITY CHURCHGround Water

7057764

Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013

Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* PressureTank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

DistributionSystem

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 166: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

NORTH BEND CHURCH OF THE BRETHREN

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH7040812 Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Minimal Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: NORTH BEND CH OF THE BRTHRN DISTRIBUTIONGround Water

DS1

Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: NORTH BEND CH OF THE BRETHRENGround Water

7057768

Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013

Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* PressureTank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

DistributionSystem

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 167: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

CAMP MOWANA-ONEIDA LODGE

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH7041112 Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Minimal Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: CAMP MOWANA-ONEIDA LODGE DISTRIBUTIONGround Water

DS1

Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: CAMP MOWANA ONEIDA LODGEGround Water

7057770

Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013

Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* PressureTank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

DistributionSystem

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 168: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

CAMP MOWANA-OSWEGO LODGE

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH7041212 Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Substantial Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: CAMP MOWANA-OSWEGO LODGE DISTRIBUTIONGround Water

DS1

Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: CAMP MOWANA OSWEGO LODGEGround Water

7057771

Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013

Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* PressureTank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

DistributionSystem

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 169: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

CAMP MOWANA-INTER HILL

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH7041312 Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Minimal Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to4/1 9/30

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: CAMP MOWANA-INTER HILL DISTRIBUTIONGround Water

DS1

Sample(s) Required between 4/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: CAMP MOWANA INTER HILLGround Water

7057772

Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013

Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* PressureTank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

DistributionSystem

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 170: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

CAMP MOWANA-MOHICAN LODGE

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH7041412 Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Minimal Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: CAMP MOWANA MOHICAN LODGEGround Water

7057773

Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013

Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* PressureTank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

DistributionSystem

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 171: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

CAMP OTYOKWAH

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH7041512 Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Minimal Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: CAMP OTYOKWAH DISTRIBUTIONGround Water

DS1

Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: CAMP OTYOKWAHGround Water

7057774

Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013

Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* PressureTank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

DistributionSystem

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 172: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

CLEAR FORK SCHOOLSOH7041812

ENTRY POINT MONITORING SCHEDULE

Page 1 of 1

2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:

Nontransient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7057775EP001 Facility Source: Ground Water Facility Class: CLASS 1

Facility Name: CLEAR FORK SCHOOLS

Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:

ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020

CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085

Sample(s) Required betweenNITRITE - 1041 1 and6/1/2013 10/31/2013

Sample(s) Required betweenNITRATE - 1040 1 and6/1/2013 10/31/2013

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 5/31/2013

Page 173: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

CLEAR FORK SCHOOLSOH7041812

Page 1 of 2

2013 DISTRIBUTION SCHEDULE03/18/2013Effective Date:

Nontransient NoncommunitySystem Type:

DISTRIBUTION MONITORING SCHEDULE

Groundwater Rule Substantial Treatment System

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS000

Facility Name: CLEAR FORK SCHOOLS DISTRIBUTION

Not RequiredLEAD - 1030 AND COPPER - 1022

2 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/20132 Sample(s) Required between 2/1/2013 and 2/28/20132 Sample(s) Required between 3/1/2013 and 3/31/20132 Sample(s) Required between 4/1/2013 and 4/30/20132 Sample(s) Required between 5/1/2013 and 5/31/20132 Sample(s) Required between 6/1/2013 and 6/30/20132 Sample(s) Required between 7/1/2013 and 7/31/20132 Sample(s) Required between 8/1/2013 and 8/31/20132 Sample(s) Required between 9/1/2013 and 9/30/20132 Sample(s) Required between 10/1/2013 and 10/31/20132 Sample(s) Required between 11/1/2013 and 11/30/20132 Sample(s) Required between 12/1/2013 and 12/31/2013

2 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/20132 Sample(s) Required between 2/1/2013 and 2/28/20132 Sample(s) Required between 3/1/2013 and 3/31/20132 Sample(s) Required between 4/1/2013 and 4/30/20132 Sample(s) Required between 5/1/2013 and 5/31/20132 Sample(s) Required between 6/1/2013 and 6/30/20132 Sample(s) Required between 7/1/2013 and 7/31/20132 Sample(s) Required between 8/1/2013 and 8/31/20132 Sample(s) Required between 9/1/2013 and 9/30/20132 Sample(s) Required between 10/1/2013 and 10/31/20132 Sample(s) Required between 11/1/2013 and 11/30/20132 Sample(s) Required between 12/1/2013 and 12/31/2013

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS201

Facility Name: CLEAR FORK SCHOOLS DISTRIBUTIONADDRESS NOT KNOWN

1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:

TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950

Page 174: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

CLEAR FORK SCHOOLSOH7041812

Page 2 of 2

2013 DISTRIBUTION SCHEDULE03/18/2013Effective Date:

Nontransient NoncommunitySystem Type:

DISTRIBUTION MONITORING SCHEDULE

Groundwater Rule Substantial Treatment System

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS202

Facility Name: CLEAR FORK SCHOOLS DISTRIBUTIONADDRESS NOT KNOWN

1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:

TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950

Page 175: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

7-ELEVEN STORE # 36177

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH7041912 Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Substantial Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: 7-ELEVEN STORE # 36177 DISTRIBUTIONGround Water

DS1

Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 2 and 1/31/2013Sample(s) Required between 2/1/20132 and 2/28/2013Sample(s) Required between 3/1/20132 and 3/31/2013Sample(s) Required between 4/1/20132 and 4/30/2013Sample(s) Required between 5/1/20132 and 5/31/2013Sample(s) Required between 6/1/20132 and 6/30/2013Sample(s) Required between 7/1/20132 and 7/31/2013Sample(s) Required between 8/1/20132 and 8/31/2013Sample(s) Required between 9/1/20132 and 9/30/2013Sample(s) Required between 10/1/20132 and 10/31/2013Sample(s) Required between 11/1/20132 and 11/30/2013Sample(s) Required between 12/1/20132 and 12/31/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: 7-ELEVEN STORE # 36177Ground Water Facility Class: CLASS A

7057776

Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013

Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* PressureTank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

DistributionSystem

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 176: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

HIDDEN HOLLOW PWS

Page 1 of 1

2013 MONITORING SCHEDULE07/12/2013Effective Date:

OH7042112 Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Minimal Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: HIDDEN HOLLOW DISTRIBUTIONGround Water

DS1

Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: HIDDEN HOLLOWGround Water

7062486

Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013

Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* PressureTank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

DistributionSystem

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 177: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

LAKE MARIA, INC.

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH7042612 Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Minimal Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to4/1 9/30

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: LAKE MARIA, INC. DISTRIBUTIONGround Water

DS1

Sample(s) Required between 4/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: LAKE MARIA INCGround Water

7057780

Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013

Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* PressureTank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

DistributionSystem

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 178: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

LAKE TIMBERLIN CAMP RESORT

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH7042712 Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Minimal Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to4/1 10/31

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: LAKE TIMBERLIN CAMP RESORT DISTRIBUTIONGround Water

DS1

Sample(s) Required between 4/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: LAKE TIMBERLIN CAMP RESORT TPGround Water

7057781

Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013

Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* PressureTank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

DistributionSystem

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 179: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

LITTLE WASHINGTON CONGREGATIONAL CHURCH

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH7043012 Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Minimal Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: LITTLE WASH.CONGR.CHURCH DISTRIBUTIONGround Water

DS1

Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: LITTLE WASH CONGR CHURCHGround Water

7057783

Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013

Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* PressureTank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

DistributionSystem

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 180: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

MADISON SOUTH ELEMENTARYOH7043112

ENTRY POINT MONITORING SCHEDULE

Page 1 of 1

2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:

Nontransient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7057784EP001 Facility Source: Ground Water Facility Class: CLASS 1

Facility Name: MADISON SOUTH ELEMENTARY SCH

Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:

ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020

CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085

Sample(s) Required betweenNITRITE - 1041 1 and6/1/2013 10/31/2013

Sample(s) Required betweenNITRATE - 1040 1 and6/1/2013 10/31/2013

Sample(s) Required betweenSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1 3 and6/1/2013 10/31/2013 Sample for all the analytes listed below:

ALACHLOR (LASSO) - 2051 ATRAZINE - 2050 SIMAZINE - 2037

Sample(s) Required betweenSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 2 1 and4/1/2013 6/30/2013 Sample for all the analytes listed below:

2,4-D - 2105 CARBOFURAN - 2046 OXAMYL (VYDATE) - 2036

PENTACHLOROPHENOL - 2326 PICLORAM - 2040

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 3

Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 5/31/2013

Page 181: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

MADISON SOUTH ELEMENTARYOH7043112

Page 1 of 1

2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:

Nontransient NoncommunitySystem Type:

DISTRIBUTION MONITORING SCHEDULE

Groundwater Rule Minimal Treatment System

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS000

Facility Name: MADISON SOUTH ELEMENTARY DISTRIBUTIO

Not RequiredLEAD - 1030 AND COPPER - 1022

1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 3/31/20131 Sample(s) Required between 4/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 12/31/2013

Page 182: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

MADISON COMPREHENSIVE HIGH SCHOOLOH7043212

ENTRY POINT MONITORING SCHEDULE

Page 1 of 1

2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:

Nontransient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7057785EP001 Facility Source: Ground Water Facility Class: CLASS 1

Facility Name: MADISON COMPREHENSIVE HIGH SCHOOL

Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:

ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020

CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085

Sample(s) Required betweenNITRITE - 1041 1 and6/1/2013 10/31/2013

Sample(s) Required betweenNITRATE - 1040 1 and6/1/2013 10/31/2013

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 5/31/2013

Page 183: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

MADISON COMPREHENSIVE HIGH SCHOOLOH7043212

Page 1 of 2

2013 DISTRIBUTION SCHEDULE03/18/2013Effective Date:

Nontransient NoncommunitySystem Type:

DISTRIBUTION MONITORING SCHEDULE

Groundwater Rule Substantial Treatment System

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS000

Facility Name: MADISON COMP HIGH SCHOOL DISTRIBUTIO

Not RequiredLEAD - 1030 AND COPPER - 1022

2 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/20132 Sample(s) Required between 2/1/2013 and 2/28/20132 Sample(s) Required between 3/1/2013 and 3/31/20132 Sample(s) Required between 4/1/2013 and 4/30/20132 Sample(s) Required between 5/1/2013 and 5/31/20132 Sample(s) Required between 6/1/2013 and 6/30/20132 Sample(s) Required between 7/1/2013 and 7/31/20132 Sample(s) Required between 8/1/2013 and 8/31/20132 Sample(s) Required between 9/1/2013 and 9/30/20132 Sample(s) Required between 10/1/2013 and 10/31/20132 Sample(s) Required between 11/1/2013 and 11/30/20132 Sample(s) Required between 12/1/2013 and 12/31/2013

2 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/20132 Sample(s) Required between 2/1/2013 and 2/28/20132 Sample(s) Required between 3/1/2013 and 3/31/20132 Sample(s) Required between 4/1/2013 and 4/30/20132 Sample(s) Required between 5/1/2013 and 5/31/20132 Sample(s) Required between 6/1/2013 and 6/30/20132 Sample(s) Required between 7/1/2013 and 7/31/20132 Sample(s) Required between 8/1/2013 and 8/31/20132 Sample(s) Required between 9/1/2013 and 9/30/20132 Sample(s) Required between 10/1/2013 and 10/31/20132 Sample(s) Required between 11/1/2013 and 11/30/20132 Sample(s) Required between 12/1/2013 and 12/31/2013

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS201

Facility Name: MADISON COMP HIGH SCHOOL DISTRIBUTIOADDRESS NOT KNOWN

1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:

TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950

Page 184: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

MADISON COMPREHENSIVE HIGH SCHOOLOH7043212

Page 2 of 2

2013 DISTRIBUTION SCHEDULE03/18/2013Effective Date:

Nontransient NoncommunitySystem Type:

DISTRIBUTION MONITORING SCHEDULE

Groundwater Rule Substantial Treatment System

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS202

Facility Name: MADISON COMP HIGH SCHOOL DISTRIBUTIOADDRESS NOT KNOWN

1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:

TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950

Page 185: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

ODNR- MALABAR FARM STATE PARK BIG HOUSE

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH7043512 Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Substantial Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: ODNR MALABAR FARM BIG HOUSE DISTRIBUTIONGround Water

DS1

Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: ODNR MALABAR FARM ST PARK BIG HOUSEGround Water

7057786

Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013

Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* PressureTank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

DistributionSystem

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 186: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

MANSFIELD INN PWS

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH7043712 Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Substantial Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: MANSFIELD INN DISTRIBUTIONGround Water

DS1

Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: MANSFIELD INNGround Water Facility Class: CLASS A

7057787

Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013

Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* PressureTank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

DistributionSystem

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 187: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

OAK PARK TAVERN

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH7044012 Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Minimal Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: OAK PARK TAVERN DISTRIBUTIONGround Water

DS1

Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: OAK PARK TAVERNGround Water

7057788

Sample(s) Required between 4/1/2013NITRITE - 1041 1 and 6/30/2013

Sample(s) Required between 4/1/2013NITRATE - 1040 1 and 6/30/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* PressureTank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

DistributionSystem

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 188: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

PLEASANT HILL GOLF COURSE

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH7044112 Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Substantial Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to4/1 9/30

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: PLEASANT HILL GOLF COURS DISTRIBUTIONGround Water

DS1

Sample(s) Required between 4/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: PLEASANT HILL GOLF COURSEGround Water

7057789

Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013

Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* PressureTank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

DistributionSystem

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 189: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

JR PROPERTIES OF MANSFIELD - SR 430

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH7044412 Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Minimal Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: JR PROP OF MF - SR 430 DISTRIBUTIONGround Water

DS1

Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: JR PROPERTIES OF MANSFIELD - SR 430 TPGround Water

7057790

Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013

Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* PressureTank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

DistributionSystem

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 190: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

RICHLAND RURAL LIFE CENTER PWS

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH7044512 Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Minimal Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: RICHLAND RURAL LIFE CTR. DISTRIBUTIONGround Water

DS1

Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: RICHLAND RURAL LIFE CTRGround Water

7057791

Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013

Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* PressureTank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

DistributionSystem

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 191: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

SKYWAY EAST

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH7044712 Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Minimal Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: SKYWAY EAST DISTRIBUTIONGround Water

DS1

Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: SKYWAY EASTGround Water

7057792

Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013

Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* PressureTank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

DistributionSystem

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 192: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

BUTLER MOHICAN KOA

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH7045012 Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Minimal Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to5/1 10/31

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: BUTLER MOHICAN KOA DISTRIBUTIONGround Water

DS1

Sample(s) Required between 4/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: BUTLER MOHICAN KOAGround Water

7057795

Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013

Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* PressureTank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

DistributionSystem

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 193: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

PLEASANT HILL OUTDOOR CENTER

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH7045412 Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Minimal Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: PLEASANT HILL OUTDOOR CENTER DISTGround Water

DS1

Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: PLEASANT HILL OUTDOOR CENTERGround Water

7057799

Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013

Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* PressureTank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

DistributionSystem

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 194: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

MADISON EARLY CHILDHOOD LEARNING CENTEROH7045512

ENTRY POINT MONITORING SCHEDULE

Page 1 of 1

2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:

Nontransient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7057800EP001 Facility Source: Ground Water Facility Class: CLASS 1

Facility Name: MADISON EARLY CHILDHOOD LEARNING CENTER

Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:

ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020

CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085

Sample(s) Required betweenNITRITE - 1041 1 and10/1/2013 12/31/2013

Sample(s) Required betweenNITRATE - 1040 1 and10/1/2013 12/31/2013

Sample(s) Required betweenSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1 3 and6/1/2013 10/31/2013 Sample for all the analytes listed below:

ALACHLOR (LASSO) - 2051 ATRAZINE - 2050 SIMAZINE - 2037

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 3

Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 3/31/2013Sample(s) Required between1 and4/1/2013 6/30/2013Sample(s) Required between1 and7/1/2013 9/30/2013Sample(s) Required between1 and10/1/2013 12/31/2013

Page 195: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

MADISON EARLY CHILDHOOD LEARNING CENTEROH7045512

Page 1 of 1

2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:

Nontransient NoncommunitySystem Type:

DISTRIBUTION MONITORING SCHEDULE

Groundwater Rule Minimal Treatment System

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS000

Facility Name: MADISON EARLY CHILDHOOD LEARNING CT

5 Sample(s) Required between 6/1/2013LEAD - 1030 AND COPPER - 1022 and 9/30/2013

Lead Consumer Notice needs issued to sampling participants within thirty days of receipt of results and verification submitted to Ohio EPAwithin ninety days from the end of the monitoring period. Submit Form 5105 with appendix to Ohio EPA within ten days from the end of themonitoring period. Forms are available online at: http://epa.ohio.gov/ddagw/reporting.aspx

1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 3/31/20131 Sample(s) Required between 4/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 12/31/2013

Page 196: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

JOURNEY LIFE CENTER PWS

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH7046112 Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Minimal Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: JOURNEY LIFE CENTER DISTRIBUTIONGround Water

DS1

Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: JOURNEY LIFE CENTERGround Water Facility Class: CLASS A

7057806

Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013

Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* PressureTank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

DistributionSystem

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 197: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

MCDONALDS RESTAURANT-HANLEYOH7046312

ENTRY POINT MONITORING SCHEDULE

Page 1 of 1

2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:

Nontransient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7057808EP001 Facility Source: Ground Water Facility Class: CLASS 1

Facility Name: MCDONALDS RESTAURANT HANLEY

Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:

ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020

CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085

Sample(s) Required betweenNITRITE - 1041 1 and6/1/2013 10/31/2013

Sample(s) Required betweenNITRATE - 1040 1 and6/1/2013 10/31/2013

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 5/31/2013

Page 198: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

MCDONALDS RESTAURANT-HANLEYOH7046312

Page 1 of 1

2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:

Nontransient NoncommunitySystem Type:

DISTRIBUTION MONITORING SCHEDULE

Groundwater Rule Substantial Treatment System

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS000

Facility Name: MCDONALDS RESTAURANT-HANLEY DISTRI

Not RequiredLEAD - 1030 AND COPPER - 1022

2 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/20132 Sample(s) Required between 2/1/2013 and 2/28/20132 Sample(s) Required between 3/1/2013 and 3/31/20132 Sample(s) Required between 4/1/2013 and 4/30/20132 Sample(s) Required between 5/1/2013 and 5/31/20132 Sample(s) Required between 6/1/2013 and 6/30/20132 Sample(s) Required between 7/1/2013 and 7/31/20132 Sample(s) Required between 8/1/2013 and 8/31/20132 Sample(s) Required between 9/1/2013 and 9/30/20132 Sample(s) Required between 10/1/2013 and 10/31/20132 Sample(s) Required between 11/1/2013 and 11/30/20132 Sample(s) Required between 12/1/2013 and 12/31/2013

2 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/20132 Sample(s) Required between 2/1/2013 and 2/28/20132 Sample(s) Required between 3/1/2013 and 3/31/20132 Sample(s) Required between 4/1/2013 and 4/30/20132 Sample(s) Required between 5/1/2013 and 5/31/20132 Sample(s) Required between 6/1/2013 and 6/30/20132 Sample(s) Required between 7/1/2013 and 7/31/20132 Sample(s) Required between 8/1/2013 and 8/31/20132 Sample(s) Required between 9/1/2013 and 9/30/20132 Sample(s) Required between 10/1/2013 and 10/31/20132 Sample(s) Required between 11/1/2013 and 11/30/20132 Sample(s) Required between 12/1/2013 and 12/31/2013

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS201

Facility Name: MCDONALDS RESTAURANT-HANLEY DISTRIADDRESS NOT KNOWN

1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:

TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950

Page 199: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

SPEEDWAY 9190

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH7046612 Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Substantial Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: SPEEDWAY 9190 DISTRIBUTIONGround Water

DS1

Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 2 and 1/31/2013Sample(s) Required between 2/1/20132 and 2/28/2013Sample(s) Required between 3/1/20132 and 3/31/2013Sample(s) Required between 4/1/20132 and 4/30/2013Sample(s) Required between 5/1/20132 and 5/31/2013Sample(s) Required between 6/1/20132 and 6/30/2013Sample(s) Required between 7/1/20132 and 7/31/2013Sample(s) Required between 8/1/20132 and 8/31/2013Sample(s) Required between 9/1/20132 and 9/30/2013Sample(s) Required between 10/1/20132 and 10/31/2013Sample(s) Required between 11/1/20132 and 11/30/2013Sample(s) Required between 12/1/20132 and 12/31/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: SPEEDWAY 9190Ground Water Facility Class: CLASS A

7057810

Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013

Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* PressureTank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

DistributionSystem

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 200: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

ENGLEFIELD OIL/RTE. 97 DUCHESS

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH7046812 Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Minimal Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: ENGLEFIELD OIL DISTRIBUTIONGround Water

DS1

Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: ENGLEFIELD OILGround Water Facility Class: CLASS A

7057812

Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013

Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* PressureTank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

DistributionSystem

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 201: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

KOREAN UNITED METHODIST CHURCH PWS

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH7047312 Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Minimal Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: KOREAN UN METHODIST CHURCHGround Water

7057816

Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013

Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* PressureTank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

DistributionSystem

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 202: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

MADISON COMMUNITY YOUTH PARK PWS

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH7047612 Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Minimal Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to4/1 8/31

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: MADISON COMM. YOUTH PARK DISTRIBUTIONGround Water

DS1

Sample(s) Required between 4/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: MADISON COMM YOUTH PARKGround Water

7057819

Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013

Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* PressureTank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

DistributionSystem

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 203: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

MCDONALDS RESTAURANT-BELLVILLEOH7048312

ENTRY POINT MONITORING SCHEDULE

Page 1 of 1

2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:

Nontransient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7057822EP001 Facility Source: Ground Water Facility Class: CLASS A

Facility Name: MCDONALDS RESTAURANT BELLVILLE

Not RequiredINORGANICS

Sample(s) Required betweenNITRITE - 1041 1 and6/1/2013 10/31/2013

Sample(s) Required betweenNITRATE - 1040 1 and6/1/2013 10/31/2013

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 5/31/2013

Page 204: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

MCDONALDS RESTAURANT-BELLVILLEOH7048312

Page 1 of 1

2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:

Nontransient NoncommunitySystem Type:

DISTRIBUTION MONITORING SCHEDULE

Groundwater Rule Substantial Treatment System

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS000

Facility Name: MCDONALDS RESTAURANT-BE DISTRIBUTIO

Not RequiredLEAD - 1030 AND COPPER - 1022

2 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/20132 Sample(s) Required between 2/1/2013 and 2/28/20132 Sample(s) Required between 3/1/2013 and 3/31/20132 Sample(s) Required between 4/1/2013 and 4/30/20132 Sample(s) Required between 5/1/2013 and 5/31/20132 Sample(s) Required between 6/1/2013 and 6/30/20132 Sample(s) Required between 7/1/2013 and 7/31/20132 Sample(s) Required between 8/1/2013 and 8/31/20132 Sample(s) Required between 9/1/2013 and 9/30/20132 Sample(s) Required between 10/1/2013 and 10/31/20132 Sample(s) Required between 11/1/2013 and 11/30/20132 Sample(s) Required between 12/1/2013 and 12/31/2013

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS201

Facility Name: MCDONALDS RESTAURANT-BE DISTRIBUTIOADDRESS NOT KNOWN

1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:

TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950

Page 205: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

KCS STEAK AND RIBS PWS

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH7048812 Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Minimal Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: KCS STEAK & RIBS DISTRIBUTIONGround Water

DS1

Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: KCS STEAK & RIBSGround Water

7057827

Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013

Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* PressureTank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

DistributionSystem

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 206: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

MICKEY MART #21

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH7048912 Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Minimal Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: MICKEY MART DISTRIBUTIONGround Water

DS1

Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: MICKEY MART #21Ground Water Facility Class: CLASS A

7057828

Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013

Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* PressureTank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

DistributionSystem

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 207: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

INNOVATIVE CARE AND SERVICES LLCOH7049112

ENTRY POINT MONITORING SCHEDULE

Page 1 of 1

2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:

Nontransient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7057830EP001 Facility Source: Ground Water Facility Class: CLASS A

Facility Name: PARK AVENUE CHILD CARE AND EDUCATION

Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:

ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020

CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085

Sample(s) Required betweenNITRITE - 1041 1 and6/1/2013 10/31/2013

Sample(s) Required betweenNITRATE - 1040 1 and6/1/2013 10/31/2013

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 3/31/2013Sample(s) Required between1 and4/1/2013 6/30/2013Sample(s) Required between1 and7/1/2013 9/30/2013Sample(s) Required between1 and10/1/2013 12/31/2013

Page 208: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

INNOVATIVE CARE AND SERVICES LLCOH7049112

Page 1 of 1

2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:

Nontransient NoncommunitySystem Type:

DISTRIBUTION MONITORING SCHEDULE

Groundwater Rule Minimal Treatment System

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS000

Facility Name: PARK AVENUE CHILD CARE AND EDUCATION

5 Sample(s) Required between 6/1/2013LEAD - 1030 AND COPPER - 1022 and 9/30/2013

Lead Consumer Notice needs issued to sampling participants within thirty days of receipt of results and verification submitted to Ohio EPAwithin ninety days from the end of the monitoring period. Submit Form 5105 with appendix to Ohio EPA within ten days from the end of themonitoring period. Forms are available online at: http://epa.ohio.gov/ddagw/reporting.aspx

1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 3/31/20131 Sample(s) Required between 4/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 12/31/2013

Page 209: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

MILLIRON AUTO PARTS

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH7049212 Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Minimal Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: MILLIRON AUTO PARTS DISTRIBUTIONGround Water

DS1

Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: MILLIRON AUTO PARTSGround Water

7057831

Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013

Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* PressureTank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

DistributionSystem

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 210: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

CRESTVIEW LOCAL SCHOOLOH7049412

ENTRY POINT MONITORING SCHEDULE

Page 1 of 1

2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:

Nontransient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7057833EP001 Facility Source: Ground Water Facility Class: CLASS 1

Facility Name: CRESTVIEW LOCAL SCHOOL

Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:

ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020

CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085

Sample(s) Required betweenNITRITE - 1041 1 and1/1/2013 3/31/2013Sample(s) Required between1 and4/1/2013 6/30/2013Sample(s) Required between1 and7/1/2013 9/30/2013Sample(s) Required between1 and10/1/2013 12/31/2013

Sample(s) Required betweenNITRATE - 1040 1 and6/1/2013 10/31/2013

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 5/31/2013

Page 211: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

CRESTVIEW LOCAL SCHOOLOH7049412

Page 1 of 2

2013 DISTRIBUTION SCHEDULE03/18/2013Effective Date:

Nontransient NoncommunitySystem Type:

DISTRIBUTION MONITORING SCHEDULE

Groundwater Rule Substantial Treatment System

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS000

Facility Name: CRESTVIEW LOCAL SCHOOL DISTRIBUTION

Not RequiredLEAD - 1030 AND COPPER - 1022

2 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 1/31/20132 Sample(s) Required between 2/1/2013 and 2/28/20132 Sample(s) Required between 3/1/2013 and 3/31/20132 Sample(s) Required between 4/1/2013 and 4/30/20132 Sample(s) Required between 5/1/2013 and 5/31/20132 Sample(s) Required between 6/1/2013 and 6/30/20132 Sample(s) Required between 7/1/2013 and 7/31/20132 Sample(s) Required between 8/1/2013 and 8/31/20132 Sample(s) Required between 9/1/2013 and 9/30/20132 Sample(s) Required between 10/1/2013 and 10/31/20132 Sample(s) Required between 11/1/2013 and 11/30/20132 Sample(s) Required between 12/1/2013 and 12/31/2013

2 Sample(s) Required between 1/1/2013TOTAL CHLORINE - 1000 and 1/31/20132 Sample(s) Required between 2/1/2013 and 2/28/20132 Sample(s) Required between 3/1/2013 and 3/31/20132 Sample(s) Required between 4/1/2013 and 4/30/20132 Sample(s) Required between 5/1/2013 and 5/31/20132 Sample(s) Required between 6/1/2013 and 6/30/20132 Sample(s) Required between 7/1/2013 and 7/31/20132 Sample(s) Required between 8/1/2013 and 8/31/20132 Sample(s) Required between 9/1/2013 and 9/30/20132 Sample(s) Required between 10/1/2013 and 10/31/20132 Sample(s) Required between 11/1/2013 and 11/30/20132 Sample(s) Required between 12/1/2013 and 12/31/2013

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS201

Facility Name: CRESTVIEW LOCAL SCHOOL DISTRIBUTIONADDRESS NOT KNOWN

1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:

TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950

Page 212: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

CRESTVIEW LOCAL SCHOOLOH7049412

Page 2 of 2

2013 DISTRIBUTION SCHEDULE03/18/2013Effective Date:

Nontransient NoncommunitySystem Type:

DISTRIBUTION MONITORING SCHEDULE

Groundwater Rule Substantial Treatment System

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS202

Facility Name: CRESTVIEW LOCAL SCHOOL DISTRIBUTIONADDRESS NOT KNOWN

1 Sample(s) Required between 7/1/2013DISINFECTION BYPRODUCTS and 9/30/2013 Sample for all the analytes listed below:

TOTAL HALOACETIC ACIDS (HAA5) - 2456 TTHM - 2950

Page 213: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

VOISARD MANUFACTURINGOH7049512

ENTRY POINT MONITORING SCHEDULE

Page 1 of 1

2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:

Nontransient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7057834EP001 Facility Source: Ground Water Facility Class: CLASS A

Facility Name: VOISARD MFG INC

Sample(s) Required betweenARSENIC - 1005 1 and1/1/2013 3/31/2013Sample(s) Required between1 and4/1/2013 6/30/2013Sample(s) Required between1 and7/1/2013 9/30/2013Sample(s) Required between1 and10/1/2013 12/31/2013

Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:

ANTIMONY, TOTAL - 1074 BARIUM - 1010 BERYLLIUM, TOTAL CADMIUM - 1015 CHROMIUM - 1020 CYANIDE - 1024

FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL -

Sample(s) Required betweenNITRITE - 1041 1 and6/1/2013 10/31/2013

Sample(s) Required betweenNITRATE - 1040 1 and6/1/2013 10/31/2013

Sample(s) Required betweenSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1 3 and6/1/2013 10/31/2013 Sample for all the analytes listed below:

ALACHLOR (LASSO) - 2051 ATRAZINE - 2050 SIMAZINE - 2037

Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 5/31/2013

Page 214: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

VOISARD MANUFACTURINGOH7049512

Page 1 of 1

2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:

Nontransient NoncommunitySystem Type:

DISTRIBUTION MONITORING SCHEDULE

Groundwater Rule Minimal Treatment System

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS000

Facility Name: VOISARD MANUFACTURING INC. DISTRIBUTI

Not RequiredLEAD - 1030 AND COPPER - 1022

1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 3/31/20131 Sample(s) Required between 4/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 12/31/2013

Page 215: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

CORNERSTONE GRACE BRETHREN CHURCH PWS

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH7049912 Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Minimal Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: CORNERSTONE GRACE BRETHE DISTRIBUTIONGround Water

DS1

Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: CORNERSTONE GRACE BRETHERNGround Water

7057837

Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013

Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* PressureTank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

DistributionSystem

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 216: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

QUEST WORSHIP CENTER, INC.

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH7051212 Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Minimal Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: QUEST WORSHIP CENTER DISTRIBUTIONGround Water

DS1

Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: QUEST WORSHIP CENTERGround Water

7057844

Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013

Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* PressureTank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

DistributionSystem

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 217: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

COLUMBIA GAS TRANS-PAVON

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH7051612 Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Minimal Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: COLUMBIA GAS TRANS-PAVON DISTRIBUTIONGround Water

DS1

Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: COLUMBIA GAS TRANSMISSION CORP PAVONIA CGround Water

7057847

Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013

Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* PressureTank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

DistributionSystem

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 218: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

GORMAN NATURE CENTER

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH7051712 Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Minimal Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: GORMAN NATURE CENTER DISTRIBUTIONGround Water

DS1

Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: GORMAN NATURE CENTERGround Water

7057848

Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013

Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* PressureTank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

DistributionSystem

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 219: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

FIVE POINTS COUNTRY MARKET PWS

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH7052012 Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Minimal Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: FIVE POINTS COUNTRY MARK DISTRIBUTIONGround Water

DS1

Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: FIVE POINTS COUNTY MARKETGround Water

7057851

Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013

Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* PressureTank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

DistributionSystem

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 220: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

OHIO BIRD SANCTUARY - UPPER BUILDING

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH7052212 Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Minimal Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to4/1 11/30

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: OHIO BIRD SANCTUARY - UPPER DISTRIBUTIONGround Water

DS1

Sample(s) Required between 4/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: OHIO BIRD SANCTUARY - UPPERGround Water

7057853

Not RequiredNITRITE - 1041

Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* PressureTank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

DistributionSystem

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 221: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

WESTBROOK COUNTRY CLUB- SHOP

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH7052812 Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Minimal Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: WESTBROOK G COURSE SHOP TPGround Water

7057859

Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013

Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* PressureTank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

DistributionSystem

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 222: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

WESTBROOK COUNTRY CLUB HOLE # 12

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH7052912 Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Minimal Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to4/1 10/31

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: WESTBROOK GOLF COURSE DISTRIBUTIONGround Water

DS1

Sample(s) Required between 4/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: WESTBROOK COUNTY HOLE # 12Ground Water

7057860

Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013

Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* PressureTank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

DistributionSystem

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 223: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

SAVE-A-LOT MARKET-ASHLAND ROAD PWS

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH7053112 Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Minimal Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: SAVE-A-LOT MKT-ASHLAND ROAD DISTRIBUTIONGround Water

DS1

Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: SAVE-A-LOT MARKETGround Water Facility Class: CLASS A

7057861

Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013

Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* PressureTank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

DistributionSystem

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 224: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

RUMPKE OF NORTHERN OHIO

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH7053212 Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Minimal Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: RUMPKE NORTHERN OHIO DISTRIBUTIONGround Water

DS1

Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: RUMPKE NORTHERN OHIO MANSFIELD HAULINGGround Water Facility Class: CLASS A

7057862

Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013

Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* PressureTank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

DistributionSystem

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 225: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

OHIO BIRD SANCTUARY - LOWER BUILDING

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH7053412 Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Minimal Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: OHIO BIRD SANCTUARY LOWER DISTRIBUTIONGround Water

DS1

Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: OHIO BIRD SANCTUARY - LOWERGround Water

7057864

Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013

Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* PressureTank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

DistributionSystem

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 226: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

SHOWTIME

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH7053512 Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Minimal Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: SHOWTIME DISTRIBUTIONGround Water

DS1

Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: SHOWTIMEGround Water

7057865

Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013

Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* PressureTank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

DistributionSystem

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 227: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

DOLLAR GENERAL STORE NO 324

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH7053612 Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Minimal Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: DOLLAR GENERAL STORE DISTRIBUTIONGround Water

DS1

Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: DOLLAR GENERAL STOREGround Water Facility Class: CLASS A

7060655

Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013

Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* PressureTank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

DistributionSystem

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 228: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

MOHICAN SCHOOL 2 -GROVE PORT RIVER LODGE

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH7054212 Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Minimal Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: GROVE PORT RIVER LODGE 2 DISTRIBUTIONGround Water

DS1

Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: GROVE PORT RIVER LODGE 2Ground Water

7060671

Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013

Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* PressureTank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

DistributionSystem

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 229: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

MOHICAN SCHOOL 3 - CHING ACH GOOK

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH7054312 Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Minimal Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: MOHICAN SCHL - CHING ACH GOOK 3 DISTGround Water

DS1

Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: MOHICAN SCHOOL - CHING ACH GOOK 3 TPGround Water

7060672

Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013

Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* PressureTank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

DistributionSystem

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 230: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

ODNR MALABAR FARMS ST PARK HORSE CAMP PW

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH7054412 Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Minimal Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to4/1 11/30

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: ODNR MALABAR FARMS ST PARK HORSE CAMP DIGround Water

DS1

Sample(s) Required between 4/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: ODNR MALABAR FARMS ST PARK HORSE CAMPGround Water

7060840

Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013

Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* PressureTank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

DistributionSystem

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 231: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

AUTO ZONE #0783

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH7054912 Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Substantial Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: AUTO ZONE DISTRIBUTIONGround Water

DS1

Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: AUTO ZONEGround Water

7061192

Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013

Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* PressureTank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

DistributionSystem

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 232: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

MAYFLOWER CONGREGATIONAL CHURCH

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH7055112 Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Minimal Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: MAYFLOWER CONGREGATIONAL CHURCH DISTRIBUGround Water

DS1

Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: MAYFLOWER CONGREGATIONAL CHURCHGround Water

7061207

Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013

Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* PressureTank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

DistributionSystem

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 233: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

MCELROY CHURCH OF CHRIST PWS

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH7055212 Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Minimal Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: MCELROY CHURCH OF CHRIST DISTRIBUTIONGround Water

DS1

Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: CHURCH OF CHRISTGround Water

7061208

Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013

Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* PressureTank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

DistributionSystem

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 234: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

CAMP MOWANA-RETREAT PWS

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH7055412 Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Minimal Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: CAMP MOWANA - RETREAT DISTRIBUTIONGround Water

DS1

Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: CAMP MOWANA - RETREATGround Water

7061227

Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013

Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* PressureTank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

DistributionSystem

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 235: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

POSSUM RUN GREENHOUSES INC PWS

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH7055712 Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Substantial Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: POSSUM RUN GREENHOUSES INC. DISTRIBUTIONGround Water

DS1

Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: POSSUM RUN GREENHOUSES INCGround Water

7061421

Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013

Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* PressureTank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

DistributionSystem

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 236: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

FREEWILL BAPTIST CHURCH PWS

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH7055812 Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Minimal Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: FREEWILL BAPTIST CHURCH TRUSTEES DISTRIBGround Water

DS1

Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: FREEWILL BAPTIST CHURCHGround Water

7061524

Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013

Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* PressureTank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

DistributionSystem

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 237: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

BIBLE WALK PWS

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH7055912 Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Minimal Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: BIBLE WALK DISTRIBUTIONGround Water

DS1

Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: BIBLE WALKGround Water

7061569

Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013

Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* PressureTank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

DistributionSystem

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 238: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

DIAMOND HILL CATHEDRAL CHURCH PWS

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH7056012 Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Minimal Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: DIAMOND HILL CATHEDRAL DISTRIBUTIONGround Water

DS1

Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: DIAMOND HILL CATHEDRAL CHURCHGround Water Facility Class: CLASS A

7061570

Sample(s) Required between 10/1/2013NITRITE - 1041 1 and 12/31/2013

Sample(s) Required between 10/1/2013NITRATE - 1040 1 and 12/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* PressureTank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

DistributionSystem

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 239: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

SHELLY ACRES SWIM CLUB PWS

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH7056112 Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Minimal Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to6/1 9/30

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: SHELLY ACRES SWIM CLUB DISTRIBUTIONGround Water

DS1

Sample(s) Required between 4/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: SHELLY ACRES SWIM CLUBGround Water

7061587

Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013

Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* PressureTank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

DistributionSystem

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 240: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

SHELBY DRIVING RANGE PWS

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH7056212 Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Minimal Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to4/1 9/30

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: SHELBY DRIVING RANGE DISTRIBUTIONGround Water

DS1

Sample(s) Required between 4/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: SHELBY DRIVING RANGEGround Water

7061720

Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013

Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* PressureTank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

DistributionSystem

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 241: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

HDT TACTICAL SYSTEMSOH7056312

ENTRY POINT MONITORING SCHEDULE

Page 1 of 1

2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:

Nontransient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7061772EP001 Facility Source: Ground Water

Facility Name: HDT TACTICAL SYSTEMS, INC TP

Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:

ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020

CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085

Sample(s) Required betweenNITRITE - 1041 1 and7/1/2013 9/30/2013

Sample(s) Required betweenNITRATE - 1040 1 and7/1/2013 9/30/2013

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Sample(s) Required betweenSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 2 1 and4/1/2013 6/30/2013 Sample for all the analytes listed below:

2,4-D - 2105 CARBOFURAN - 2046 OXAMYL (VYDATE) - 2036

PENTACHLOROPHENOL - 2326 PICLORAM - 2040

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 3

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 4

Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 5/31/2013

Page 242: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

HDT TACTICAL SYSTEMSOH7056312

Page 1 of 1

2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:

Nontransient NoncommunitySystem Type:

DISTRIBUTION MONITORING SCHEDULE

Groundwater Rule Minimal Treatment System

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS000

Facility Name: HDT TACTICAL SYSTEMS, INC DISTRIBUTION

1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 3/31/20131 Sample(s) Required between 4/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 12/31/2013

Page 243: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

ARMOR BEARERS MINISTRIES INT'L, INC.

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH7056512 Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Minimal Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: ARMOR BEARERS MINISTRIES DISTRIBUTIONGround Water

DS1

Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: ARMOR BEARERS MINISTRIES INT'L, INC.Ground Water

7061979

Not RequiredNITRITE - 1041

Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* PressureTank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

DistributionSystem

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 244: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

ODNR - MALABAR FARM - LOUIS BROMFIELD

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH7056612 Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Minimal Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: LOUIS BROMFIELD VISITOR CENTER DISTRIBUTGround Water

DS1

Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: LOUIS BROMFIELD VISITOR SITEGround Water

7061994

Not RequiredNITRITE - 1041

Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* PressureTank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

DistributionSystem

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 245: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

IMPACT WORSHIP CENTER

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH7056812 Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Substantial Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: IMPACT WORSHIP CENTER DISTRIBUTIONGround Water

DS1

Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: IMPACT WORSHIP CENTERGround Water Facility Class: CLASS A

7062075

Not RequiredNITRITE - 1041

Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* PressureTank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

DistributionSystem

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 246: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

OHIO DREAMS ACTION SPORTS CAMP

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH7056912 Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Minimal Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: OHIO DREAMS ACTION SPORTS CAMP DISTGround Water

DS1

Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: OHIO DREAMS ACTION SPORTS CAMPGround Water

7062080

Not RequiredNITRITE - 1041

Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* PressureTank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

DistributionSystem

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 247: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

SNOW TRAILS NO 2 HOUSE PWS

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH7057012 Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Minimal Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to12/1 3/31

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: SNOW TRAILS NO 2 DISTRIBUTIONGround Water

DS1

Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 10/1/20131 and 12/31/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: SNOW TRAILS NO 2Ground Water

7062081

Not RequiredNITRITE - 1041

Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* PressureTank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

DistributionSystem

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 248: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

FAITH UM CHURCH OF RICHLAND COUNTYOH7057112

ENTRY POINT MONITORING SCHEDULE

Page 1 of 1

2013 ENTRY POINT SCHEDULE01/01/2013Effective Date:

Nontransient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7062434EP002 Facility Source: Ground Water Facility Class: CLASS A

Facility Name: TREATMENT PLANT

Sample(s) Required betweenINORGANICS 1 and1/1/2013 5/31/2013 Sample for all the analytes listed below:

ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020

CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085

Sample(s) Required betweenNITRITE - 1041 1 and1/1/2013 5/31/2013

Sample(s) Required betweenNITRATE - 1040 1 and6/1/2013 10/31/2013

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 and1/1/2013 5/31/2013

Page 249: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

FAITH UM CHURCH OF RICHLAND COUNTYOH7057112

Page 1 of 1

2013 DISTRIBUTION SCHEDULE01/01/2013Effective Date:

Nontransient NoncommunitySystem Type:

DISTRIBUTION MONITORING SCHEDULE

Groundwater Rule Minimal Treatment System

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. Forwater emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1DS000

Facility Name: DISTRIBUTION SYSTEM

5 Sample(s) Required between 6/1/2013LEAD - 1030 AND COPPER - 1022 and 9/30/2013

Lead Consumer Notice needs issued to sampling participants within thirty days of receipt of results and verification submitted to Ohio EPAwithin ninety days from the end of the monitoring period. Submit Form 5105 with appendix to Ohio EPA within ten days from the end of themonitoring period. Forms are available online at: http://epa.ohio.gov/ddagw/reporting.aspx

1 Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 and 3/31/20131 Sample(s) Required between 4/1/2013 and 6/30/20131 Sample(s) Required between 7/1/2013 and 9/30/20131 Sample(s) Required between 10/1/2013 and 12/31/2013

Page 250: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

ONTARIO CHRISTIAN FELLOWSHIP

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH7057212 Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Minimal Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: ONTARIO CHRISTIAN FELLOWSHIP DISTRIBUTIOGround Water

DS1

Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: ONTARIO CHRISTIAN FELLOWSHIPGround Water Facility Class: CLASS A

7062227

Not RequiredNITRITE - 1041

Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* PressureTank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

DistributionSystem

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 251: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

APOSTOLIC CHRISTIAN CH-FELLOW HALL

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH7057312 Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Minimal Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: APOSTOLIC CHRISTIAN-FELLOWSHIP HALL DISTGround Water

DS1

Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: APOSTOLIC CHRISTIAN CH-FELLOWSHIP HALLGround Water

7062240

Not RequiredNITRITE - 1041

Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* PressureTank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

DistributionSystem

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 252: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

MANSFIELD FUEL AND FOOD PWS

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH7057412 Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Minimal Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to1/1 12/31

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: MANSFIELD FUEL AND FOOD DISTRIBUTIONGround Water

DS1

Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 4/1/20131 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: MANSFIELD FUEL AND FOODGround Water Facility Class: CLASS A

7062322

Not RequiredNITRITE - 1041

Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* PressureTank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

DistributionSystem

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 253: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

SNOW TRAILS NO 3 TUBING PWS

Page 1 of 1

2013 MONITORING SCHEDULE01/01/2013Effective Date:

OH7057512 Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.

Groundwater Rule Minimal Treatment System

Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to12/1 3/31

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: SNOW TRAILS NO 3 DISTRIBUTIONGround Water

DS1

Sample(s) Required between 1/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 3/31/2013Sample(s) Required between 10/1/20131 and 12/31/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: SNOW TRAILS NO 3Ground Water

7062431

Sample(s) Required between 1/1/2013NITRITE - 1041 1 and 5/31/2013

Sample(s) Required between 1/1/2013NITRATE - 1040 1 and 5/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* PressureTank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

DistributionSystem

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.

Page 254: Ohio EPAepa.ohio.gov/Portals/28/documents/schedules/2013/Richland.pdf · OH7000012 BELLVILLE VILLAGE WATER ENTRY POINT MONITORING SCHEDULE Page 1 of 1 2013 ENTRY POINT SCHEDULE Effective

RIVER TRAIL CROSSING RV PARK PWS

Page 1 of 1

2013 MONITORING SCHEDULE04/15/2013Effective Date:

OH7084812 Transient NoncommunitySystem Type:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule. For water emergencies that occur after hours, please call 800-282-9378

Operating Period: to4/1 10/31

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: RIVER TRAIL CROSSING RV PARK DISTGround Water

DS1

Sample(s) Required between 4/1/2013TOTAL COLIFORM (TCR) - 3100 1 and 6/30/2013Sample(s) Required between 7/1/20131 and 9/30/2013Sample(s) Required between 10/1/20131 and 12/31/2013

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: RIVER TRAIL CROSSING RV PARKGround Water

7062487

Sample(s) Required between 6/1/2013NITRITE - 1041 1 and 10/31/2013

Sample(s) Required between 6/1/2013NITRATE - 1040 1 and 10/31/2013

Well

Where to Collect Samples For a Small Public Water System

Treatment* PressureTank*

(First available tap after treatment*): use for NITRATEand NITRITE samples

(Taps in Distribution System): use forTOTAL COLIFORM (TCR) samples

DistributionSystem

EP001

DS000

* If system does not have treatment, EP001 is the first tap after the well.