ohio department of transportation official bid tabulation ......may 07, 2020 · project no. 200224...
TRANSCRIPT
Project No. 200224
PID 97045
ASD-SR 3-00.00
Federal
Type: TWO LANE RESURFACING
Completion Date: 10/31/2020
Award Amount: $1,980,466.61
Contract Awarded To: SHELLY & SANDS INC
Letting Date: 5/7/2020
Engineer's Estimate: $2,270,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jack Marchbanks, Ph.D., Director
SHELLY & SANDS INC
1515 HARMON AVE
COLUMBUS, OH 43223
Franklin
Bidder 1
Bid $1,980,466.61
KOKOSING CONSTRUCTION COMPANY INC
6235 WESTERVILLE RD
WESTERVILLE, OH 43081
Franklin
Bidder 2
Bid $2,060,267.01
200224 - Page 1
Ref #1 202E30000 WALK REMOVED, (300 SF)
Awd $1,395.00$4.65
2 $1,395.00$4.65
Ref #2 202E32001 CURB REMOVED, AS PER PLAN, (56 FT)
Awd $504.00$9.00
2 $504.00$9.00
Ref #3 608E52000 CURB RAMP, (300 SF)
Awd $6,525.00$21.75
2 $6,525.00$21.75
Ref #4 609E26001 CURB, TYPE 6, AS PER PLAN, (56 FT)
Awd $1,288.00$23.00
2 $1,288.00$23.00
Ref #5 638E10800 VALVE BOX ADJUSTED TO GRADE, (2 EACH)
Awd $500.00$250.00
2 $1,000.00$500.00
Section 1 - ROADWAY - Totals
Awd $10,212.00
2 $10,712.00
Ref #6 611E98630 CATCH BASIN ADJUSTED TO GRADE, (14 EACH)
Awd $12,040.00$860.00
2 $6,650.00$475.00
Ref #7 611E98635 CATCH BASIN RECONSTRUCTED TO GRADE, AS PER PLAN, (2 EACH)
Awd $3,800.00$1,900.00
2 $6,800.00$3,400.00
Ref #8 611E99150 INLET ADJUSTED TO GRADE, (2 EACH)
Awd $3,900.00$1,950.00
2 $1,000.00$500.00
Ref #9 611E99654 MANHOLE ADJUSTED TO GRADE, (12 EACH)
Awd $4,800.00$400.00
2 $6,300.00$525.00
Section 2 - DRAINAGE - Totals
Awd $24,540.00
2 $20,750.00
Ref #10 251E01030 PARTIAL DEPTH PAVEMENT REPAIR (442), (1200 CY)
Awd $270,000.00$225.00
2 $232,800.00$194.00
Ref #11 253E02000 PAVEMENT REPAIR, (121 CY)
Awd $37,510.00$310.00
2 $27,830.00$230.00
Ref #12 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (1.50"), (139468 SY)
Awd $111,574.40$0.80
2 $160,388.20$1.15
Ref #13 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (3.00"), (10262 SY)
Awd $11,801.30$1.15
2 $20,524.00$2.00
200224 - Page 2
Ref #14 407E10000 TACK COAT (0.04 GAL/SY), (410 GAL)
Awd $676.50$1.65
2 $820.00$2.00
Ref #15 407E10000 TACK COAT (0.08 GAL/SY), (10912 GAL)
Awd $18,004.80$1.65
2 $21,824.00$2.00
Ref #16 407E13900 TACK COAT, 702.13 (0.04 GAL/SY), (821 GAL)
Awd $2,257.75$2.75
2 $1,642.00$2.00
Ref #17 408E10001 PRIME COAT, AS PER PLAN (0.40 GAL/SY), (6230 GAL)
Awd $18,690.00$3.00
2 $18,690.00$3.00
Ref #18 442E00201 ASPHALT CONCRETE SURFACE COURSE, 9.5 MM, TYPE A (4, (356 CY)
Awd $58,384.00$164.00
2 $56,248.00$158.00
Ref #19 442E00201 ASPHALT CONCRETE SURFACE COURSE, 9.5 MM, TYPE A (4, (5825 CY)
Awd $838,800.00$144.00
2 $897,050.00$154.00
Ref #20 442E20201 ASPHALT CONCRETE INTERMEDIATE COURSE, 19 MM, TYPE , (499 CY)
Awd $67,365.00$135.00
2 $64,870.00$130.00
Ref #21 617E10100 COMPACTED AGGREGATE, (1570 CY)
Awd $62,800.00$40.00
2 $47,100.00$30.00
Ref #22 617E20000 SHOULDER PREPARATION, (14950 SY)
Awd $1,495.00$0.10
2 $2,242.50$0.15
Section 3 - PAVEMENT - Totals
Awd $1,499,358.75
2 $1,552,028.70
Ref #23 621E00100 RPM, (439 EACH)
Awd $11,633.50$26.50
2 $11,633.50$26.50
Ref #24 621E54000 RAISED PAVEMENT MARKER REMOVED, (439 EACH)
Awd $1,317.00$3.00
2 $1,756.00$4.00
Ref #25 642E00104 EDGE LINE, 6", TYPE 1 (WHITE), (18.06 MILE)
Awd $11,106.90$615.00
2 $11,106.90$615.00
Ref #26 642E00204 LANE LINE, 6", TYPE 1, (1.01 MILE)
Awd $505.00$500.00
2 $505.00$500.00
Ref #27 642E00300 CENTER LINE, TYPE 1, (7.45 MILE)
Awd $5,885.50$790.00
2 $5,885.50$790.00
200224 - Page 3
Ref #28 644E00400 CHANNELIZING LINE, 8", (1435 FT)
Awd $2,296.00$1.60
2 $2,296.00$1.60
Ref #29 644E00500 STOP LINE (24"), (601 FT)
Awd $3,606.00$6.00
2 $3,606.00$6.00
Ref #30 644E00600 CROSSWALK LINE (12"), (2012 FT)
Awd $7,444.40$3.70
2 $7,444.40$3.70
Ref #31 644E00601 CROSSWALK LINE, AS PER PLAN, (100 FT)
Awd $600.00$6.00
2 $600.00$6.00
Ref #32 644E00700 TRANSVERSE/DIAGONAL LINE (WHITE), (150 FT)
Awd $885.00$5.90
2 $885.00$5.90
Ref #33 644E00700 TRANSVERSE/DIAGONAL LINE (YELLOW), (1233 FT)
Awd $7,274.70$5.90
2 $7,274.70$5.90
Ref #34 644E00900 ISLAND MARKING, (50 SF)
Awd $250.00$5.00
2 $250.00$5.00
Ref #35 644E01200 PARKING LOT STALL MARKING, (1500 FT)
Awd $2,250.00$1.50
2 $2,250.00$1.50
Ref #36 644E01300 LANE ARROW, (21 EACH)
Awd $1,848.00$88.00
2 $1,848.00$88.00
Ref #37 644E01620 BIKE CROSSING SYMBOL, (4 EACH)
Awd $2,800.00$700.00
2 $2,800.00$700.00
Ref #38 644E01630 BIKE LANE SYMBOL MARKING, (2 EACH)
Awd $750.00$375.00
2 $750.00$375.00
Section 4 - TRAFFIC CONTROL - Totals
Awd $60,452.00
2 $60,891.00
Ref #39 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST, (80 HOUR)
Awd $4,000.00$50.00
2 $4,800.00$60.00
Ref #40 614E12460 WORK ZONE MARKING SIGN, (45 EACH)
Awd $2,250.00$50.00
2 $2,250.00$50.00
Ref #41 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC, (25 CY)
Awd $6,250.00$250.00
2 $2,500.00$100.00
200224 - Page 4
Ref #42 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT, (16.12 MILE)
Awd $15,314.00$950.00
2 $15,314.00$950.00
Ref #43 614E23680 WORK ZONE CHANNELIZING LINE, CLASS III, 8", 642 PA, (3253 FT)
Awd $2,439.75$0.75
2 $1,301.20$0.40
Ref #44 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT, (1240 FT)
Awd $4,340.00$3.50
2 $2,480.00$2.00
Ref #45 614E30650 WORK ZONE ARROW, CLASS III, 642 PAINT, (50 EACH)
Awd $2,000.00$40.00
2 $1,500.00$30.00
Section 5 - MAINTENANCE OF TRAFFIC - Totals
Awd $36,593.75
2 $30,145.20
Ref #46 509E10000 EPOXY COATED REINFORCING STEEL, (1424 LB)
Awd $4,001.44$2.81
2 $4,001.44$2.81
Ref #47 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT, (144 EACH)
Awd $3,061.44$21.26
2 $3,061.44$21.26
Ref #48 511E43211 CLASS QC1 CONCRETE, PIER, AS PER PLAN, (15 CY)
Awd $12,000.00$800.00
2 $12,000.00$800.00
Ref #49 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (70 SY)
Awd $1,925.00$27.50
2 $1,925.00$27.50
Ref #50 512E10401 TREATING OF CONCRETE BRIDGE DECK WITH SRS, AS PER , (500 SY)
Awd $6,495.00$12.99
2 $6,495.00$12.99
Ref #51 519E11100 PATCHING CONCRETE STRUCTURE, (585 SF)
Awd $53,574.30$91.58
2 $53,574.30$91.58
Ref #52 606E35150 BRIDGE TERMINAL ASSEMBLY REBUILT, TYPE 4, (4 EACH)
Awd $5,760.00$1,440.00
2 $5,760.00$1,440.00
Section 6 - STRUCTURE REPAIR (ASD-3-0252) - Totals
Awd $86,817.18
2 $86,817.18
Ref #53 202E98200 REMOVAL MISC.: JOINT SEALER, (88 FT)
Awd $171.60$1.95
2 $171.60$1.95
Ref #54 512E10401 TREATING OF CONCRETE BRIDGE DECK WITH SRS, AS PER , (30 SY)
Awd $828.30$27.61
2 $828.30$27.61
200224 - Page 5
Ref #55 516E31000 JOINT SEALER, (88 FT)
Awd $1,828.64$20.78
2 $1,828.64$20.78
Ref #56 519E12300 PATCHING CONCRETE BRIDGE DECK - TYPE B, (14 SY)
Awd $1,727.32$123.38
2 $1,727.32$123.38
Section 7 - STRUCTURE REPAIR (ASD-3-0336) - Totals
Awd $4,555.86
2 $4,555.86
Ref #57 512E10401 TREATING OF CONCRETE BRIDGE DECK WITH SRS, AS PER , (171 SY)
Awd $3,965.49$23.19
2 $3,965.49$23.19
Ref #58 519E11100 PATCHING CONCRETE STRUCTURE, (10 SF)
Awd $915.80$91.58
2 $915.80$91.58
Ref #59 606E35150 BRIDGE TERMINAL ASSEMBLY REBUILT, TYPE 4, (4 EACH)
Awd $5,760.00$1,440.00
2 $5,760.00$1,440.00
Section 8 - STRUCTURE REPAIR (ASD-3-0411) - Totals
Awd $10,641.29
2 $10,641.29
Ref #60 202E98200 REMOVAL MISC.: JOINT SEALER, (104 FT)
Awd $202.80$1.95
2 $202.80$1.95
Ref #61 512E10401 TREATING OF CONCRETE BRIDGE DECK WITH SRS, AS PER , (198 SY)
Awd $4,053.06$20.47
2 $4,053.06$20.47
Ref #62 516E31000 JOINT SEALER, (114 FT)
Awd $2,631.12$23.08
2 $2,631.12$23.08
Ref #63 519E11100 PATCHING CONCRETE STRUCTURE, (32 SF)
Awd $2,930.56$91.58
2 $2,930.56$91.58
Ref #64 519E12300 PATCHING CONCRETE BRIDGE DECK - TYPE B, (24 SY)
Awd $2,961.12$123.38
2 $2,961.12$123.38
Ref #65 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER, (6 CY)
Awd $918.00$153.00
2 $918.00$153.00
Section 9 - STRUCTURE REPAIR (ASD-3-0537) - Totals
Awd $13,696.66
2 $13,696.66
200224 - Page 6
Ref #66 409E30000 SAWING AND SEALING ASPHALT CONCRETE PAVEMENT JOINT, (56 FT)
Awd $1,989.12$35.52
2 $1,989.12$35.52
Section 10 - STRUCTURE REPAIR (ASD-3-0618) - Totals
Awd $1,989.12
2 $1,989.12
Ref #67 100E00300 PREMIUM ON RAILROADS' PROTECTIVE PUBLIC LIABILITY , (LUMP SUM)
Awd $5,000.00$5,000.00
2 $2,250.00$2,250.00
Ref #68 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $10,000.00$10,000.00
2 $8,400.00$8,400.00
Ref #69 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $162,610.00$162,610.00
2 $148,190.00$148,190.00
Ref #70 619E16010 FIELD OFFICE, TYPE B, (4 MNTH)
Awd $10,000.00$2,500.00
2 $7,200.00$1,800.00
Ref #71 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING, (LUMP SUM)
Awd $4,000.00$4,000.00
2 $2,000.00$2,000.00
Ref #72 624E10000 MOBILIZATION, (LUMP SUM)
Awd $40,000.00$40,000.00
2 $100,000.00$100,000.00
Section 11 - INCIDENTALS - Totals
Awd $231,610.00
2 $268,040.00
200224 - Page 7
Project No. 200228
PID 105792
CUY-IR 90-13.45 Superstructure
Federal
Type: BRIDGE REPAIR
Completion Date: 10/15/2021
Award Amount: $4,363,850.22
Contract Awarded To: GREAT LAKES CONSTRUCTION CO
Letting Date: 5/7/2020
Engineer's Estimate: $4,215,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jack Marchbanks, Ph.D., Director
GREAT LAKES CONSTRUCTION CO
2608 GREAT LAKES WAY
HINCKLEY, OH 44233
Medina
Bidder 1
Bid $4,363,850.22
RUHLIN COMPANY
P O BOX 190
SHARON CENTER, OH 44274
Medina
Bidder 2
Bid $4,382,939.97
J D WILLIAMSON CONSTRUCTION CO INC
441 GENEVA AVE, PO BOX 113
TALLMADGE, OH 44278
Summit
Bidder 3
Bid $4,399,039.78
200228 - Page 8
Ref #1 201E11000 CLEARING AND GRUBBING, (LUMP SUM)
Awd $4,500.00$4,500.00
2 $5,000.00$5,000.00
3 $12,000.00$12,000.00
Ref #2 202E23001 PAVEMENT REMOVED, AS PER PLAN, (693 SY)
Awd $9,009.00$13.00
2 $13,860.00$20.00
3 $13,860.00$20.00
Ref #3 202E23901 CONCRETE BASE REMOVED, AS PER PLAN, (257 SY)
Awd $1,542.00$6.00
2 $5,140.00$20.00
3 $5,808.20$22.60
Ref #4 202E30000 WALK REMOVED, (1161 SF)
Awd $1,741.50$1.50
2 $1,741.50$1.50
3 $1,625.40$1.40
Ref #5 202E30701 CONCRETE BARRIER REMOVED, AS PER PLAN, (407 FT)
Awd $7,326.00$18.00
2 $8,140.00$20.00
3 $5,291.00$13.00
Ref #6 202E32000 CURB REMOVED, (317 FT)
Awd $1,585.00$5.00
2 $951.00$3.00
3 $1,981.25$6.25
Ref #7 202E35100 PIPE REMOVED, 24" AND UNDER, (327 FT)
Awd $9,810.00$30.00
2 $8,175.00$25.00
3 $4,905.00$15.00
Ref #8 202E38000 GUARDRAIL REMOVED, (313 FT)
Awd $438.20$1.40
2 $563.40$1.80
3 $438.20$1.40
Ref #9 202E47000 BRIDGE TERMINAL ASSEMBLY REMOVED, (4 EACH)
Awd $700.00$175.00
2 $460.00$115.00
3 $720.00$180.00
Ref #10 202E58100 CATCH BASIN REMOVED, (2 EACH)
Awd $1,200.00$600.00
2 $1,000.00$500.00
3 $1,000.00$500.00
Ref #11 202E70110 SPECIAL - PIPE CLEANOUT, 24" AND UNDER, (750 FT)
Awd $3,750.00$5.00
2 $18,750.00$25.00
3 $15,000.00$20.00
Ref #12 202E75000 FENCE REMOVED, (306 FT)
Awd $1,530.00$5.00
2 $765.00$2.50
3 $1,530.00$5.00
200228 - Page 9
Ref #13 203E10000 EXCAVATION, (232 CY)
Awd $9,280.00$40.00
2 $8,120.00$35.00
3 $4,640.00$20.00
Ref #14 203E20000 EMBANKMENT, (12 CY)
Awd $600.00$50.00
2 $960.00$80.00
3 $480.00$40.00
Ref #15 204E10000 SUBGRADE COMPACTION, (713 SY)
Awd $2,852.00$4.00
2 $2,852.00$4.00
3 $3,386.75$4.75
Ref #16 606E15050 GUARDRAIL, TYPE MGS, (288 FT)
Awd $4,723.20$16.40
2 $5,529.60$19.20
3 $4,896.00$17.00
Ref #17 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1, (2 EACH)
Awd $4,950.00$2,475.00
2 $4,950.00$2,475.00
3 $5,100.00$2,550.00
Ref #18 606E35102 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 2, (2 EACH)
Awd $2,050.00$1,025.00
2 $1,390.00$695.00
3 $2,100.00$1,050.00
Ref #19 607E23000 FENCE, TYPE CLT, (304 FT)
Awd $8,360.00$27.50
2 $7,387.20$24.30
3 $8,512.00$28.00
Ref #20 608E10000 4" CONCRETE WALK, (602 SF)
Awd $5,418.00$9.00
2 $4,816.00$8.00
3 $3,913.00$6.50
Ref #21 608E52001 CURB RAMP, AS PER PLAN (PER CITY OF CLEVELAND STAN, (351 SF)
Awd $7,371.00$21.00
2 $6,318.00$18.00
3 $4,563.00$13.00
Ref #22 618E40101 RUMBLE STRIPS, SHOULDER (ASPHALT CONCRETE), AS PER, (4175 FT)
Awd $26,093.75$6.25
2 $26,093.75$6.25
3 $29,225.00$7.00
Ref #23 622E10101 CONCRETE BARRIER, SINGLE SLOPE, TYPE B1, AS PER PL, (282 FT)
Awd $56,400.00$200.00
2 $70,500.00$250.00
3 $31,020.00$110.00
Ref #24 622E10200 BARRIER TRANSITION, (2 EACH)
Awd $14,000.00$7,000.00
2 $8,000.00$4,000.00
3 $12,000.00$6,000.00
200228 - Page 10
Ref #25 622E25006 CONCRETE BARRIER, END ANCHORAGE, REINFORCED, TYPE , (3 EACH)
Awd $10,500.00$3,500.00
2 $9,000.00$3,000.00
3 $15,000.00$5,000.00
Ref #26 625E32000 GROUND ROD (FENCING), (4 EACH)
Awd $1,060.00$265.00
2 $1,060.00$265.00
3 $1,100.00$275.00
Section 1 - ROADWAY - Totals
Awd $196,789.65
2 $221,522.45
3 $190,094.80
Ref #27 659E00300 TOPSOIL, (65 CY)
Awd $4,355.00$67.00
2 $4,355.00$67.00
3 $4,550.00$70.00
Ref #28 659E10000 SEEDING AND MULCHING, (586 SY)
Awd $879.00$1.50
2 $879.00$1.50
3 $879.00$1.50
Ref #29 659E14000 REPAIR SEEDING AND MULCHING, (29 SY)
Awd $87.00$3.00
2 $87.00$3.00
3 $87.00$3.00
Ref #30 659E15000 INTER-SEEDING, (29 SY)
Awd $29.00$1.00
2 $0.29$0.01
3 $14.50$0.50
Ref #31 659E20000 COMMERCIAL FERTILIZER, (0.08 TON)
Awd $64.00$800.00
2 $64.00$800.00
3 $66.00$825.00
Ref #32 659E31000 LIME, (0.12 ACRE)
Awd $12.00$100.00
2 $0.01$0.08
3 $0.12$1.00
Ref #33 659E35000 WATER, (2 MGAL)
Awd $2.00$1.00
2 $0.02$0.01
3 $2.00$1.00
Section 2 - EROSION CONTROL - Totals
Awd $5,428.00
2 $5,385.32
3 $5,598.62
200228 - Page 11
Ref #34 605E05200 4" UNCLASSIFIED PIPE UNDERDRAINS, (40 FT)
Awd $1,200.00$30.00
2 $1,400.00$35.00
3 $200.00$5.00
Ref #35 611E04400 12" CONDUIT, TYPE B, (39 FT)
Awd $5,850.00$150.00
2 $5,265.00$135.00
3 $4,290.00$110.00
Ref #36 611E05900 15" CONDUIT, TYPE B, (10 FT)
Awd $1,800.00$180.00
2 $1,000.00$100.00
3 $700.00$70.00
Ref #37 611E98690 CATCH BASIN, MISC.: CLEVELAND CB-1, (2 EACH)
Awd $6,000.00$3,000.00
2 $5,000.00$2,500.00
3 $6,000.00$3,000.00
Ref #38 611E99101 INLET, NO. 3 FOR SINGLE SLOPE BARRIER, TYPE B1, AS, (1 EACH)
Awd $2,000.00$2,000.00
2 $3,500.00$3,500.00
3 $6,200.00$6,200.00
Ref #39 611E99160 INLET FRAME AND GRATE, (1 EACH)
Awd $450.00$450.00
2 $750.00$750.00
3 $450.00$450.00
Ref #40 611E99500 INLET, MISC.:WALLS, STEPS AND BOTTOM SLAB, (1 EACH)
Awd $3,000.00$3,000.00
2 $2,500.00$2,500.00
3 $1,000.00$1,000.00
Ref #41 611E99654 MANHOLE ADJUSTED TO GRADE, (1 EACH)
Awd $700.00$700.00
2 $400.00$400.00
3 $500.00$500.00
Section 3 - DRAINAGE - Totals
Awd $21,000.00
2 $19,815.00
3 $19,340.00
Ref #42 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1.25", (364 SY)
Awd $5,824.00$16.00
2 $5,824.00$16.00
3 $6,279.00$17.25
Ref #43 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1.5", (39583 SY)
Awd $44,332.96$1.12
2 $44,332.96$1.12
3 $47,499.60$1.20
Ref #44 255E20000 FULL DEPTH PAVEMENT SAWING, (1021 FT)
Awd $3,063.00$3.00
2 $1,990.95$1.95
3 $2,297.25$2.25
200228 - Page 12
Ref #45 304E20000 AGGREGATE BASE, (164 CY)
Awd $16,400.00$100.00
2 $12,300.00$75.00
3 $12,300.00$75.00
Ref #46 305E13011 9" CONCRETE BASE, CLASS QC 1P, AS PER PLAN, (364 SY)
Awd $36,400.00$100.00
2 $30,940.00$85.00
3 $29,120.00$80.00
Ref #47 407E10000 TACK COAT, (55 GAL)
Awd $159.50$2.90
2 $159.50$2.90
3 $165.00$3.00
Ref #48 407E20000 NON-TRACKING TACK COAT, (3562 GAL)
Awd $10,151.70$2.85
2 $10,151.70$2.85
3 $10,686.00$3.00
Ref #49 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS, (26 CY)
Awd $14,300.00$550.00
2 $14,300.00$550.00
3 $15,470.00$595.00
Ref #50 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2, (448, (35 CY)
Awd $15,750.00$450.00
2 $15,750.00$450.00
3 $16,975.00$485.00
Ref #51 442E10000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A (, (1650 CY)
Awd $267,300.00$162.00
2 $267,300.00$162.00
3 $280,500.00$170.00
Ref #52 609E26000 CURB, TYPE 6, (127 FT)
Awd $6,350.00$50.00
2 $3,175.00$25.00
3 $2,921.00$23.00
Section 4 - PAVEMENT - Totals
Awd $420,031.16
2 $406,224.11
3 $424,212.85
Ref #53 638E11310 2" AIR RELEASE VALVE, CITY OF CLEVELAND, (1 EACH)
Awd $1,250.00$1,250.00
2 $2,500.00$2,500.00
3 $2,500.00$2,500.00
Ref #54 638E98000 WATER WORK, MISC.: SPECIAL - 6" CUT-IN-VALVE ASSEM, (2 EACH)
Awd $4,200.00$2,100.00
2 $7,000.00$3,500.00
3 $6,000.00$3,000.00
Ref #55 638E98600 WATER WORK, MISC.: SPECIAL - 8" GALVANIZED STEEL P, (292 FT)
Awd $188,340.00$645.00
2 $321,200.00$1,100.00
3 $274,480.00$940.00
200228 - Page 13
Section 5 - WATER WORK - Totals
Awd $193,790.00
2 $330,700.00
3 $282,980.00
Ref #56 625E00450 CONNECTION, FUSED PULL APART, (6 EACH)
Awd $540.00$90.00
2 $540.00$90.00
3 $564.00$94.00
Ref #57 625E00480 CONNECTION, UNFUSED PERMANENT, (18 EACH)
Awd $1,620.00$90.00
2 $1,620.00$90.00
3 $1,692.00$94.00
Ref #58 625E10500 LIGHT POLE, MISC.: ROUND TAPERED FIBERGLASS DECORA, (3 EACH)
Awd $15,000.00$5,000.00
2 $15,000.00$5,000.00
3 $15,600.00$5,200.00
Ref #59 625E10614 LIGHT POLE ANCHOR BOLTS ON STRUCTURE, (12 EACH)
Awd $1,740.00$145.00
2 $1,080.00$90.00
3 $1,800.00$150.00
Ref #60 625E17961 BRACKET ARM, 8', AS PER PLAN, (2 EACH)
Awd $2,250.00$1,125.00
2 $1,900.00$950.00
3 $2,300.00$1,150.00
Ref #61 625E23300 NO. 2 AWG 2400 VOLT DISTRIBUTION CABLE, (1089 FT)
Awd $3,375.90$3.10
2 $3,920.40$3.60
3 $3,539.25$3.25
Ref #62 625E23400 NO. 10 AWG POLE AND BRACKET CABLE, (384 FT)
Awd $552.96$1.44
2 $614.40$1.60
3 $576.00$1.50
Ref #63 625E24330 1-1/2" DUCT CABLE WITH THREE NO. 2 AWG 2400 VOLT C, (51 FT)
Awd $379.95$7.45
2 $382.50$7.50
3 $395.25$7.75
Ref #64 625E25408 CONDUIT, 2", 725.051, (420 FT)
Awd $2,520.00$6.00
2 $4,620.00$11.00
3 $2,520.00$6.00
Ref #65 625E25911 CONDUIT CLEANED AND CABLES REMOVED, AS PER PLAN, (75 FT)
Awd $150.00$2.00
2 $63.75$0.85
3 $150.00$2.00
Ref #66 625E27560 LUMINAIRE, INSTALLATION ONLY, (5 EACH)
Awd $1,000.00$200.00
2 $125.00$25.00
3 $1,000.00$200.00
200228 - Page 14
Ref #67 625E29002 TRENCH, 24" DEEP, (57 FT)
Awd $627.00$11.00
2 $997.50$17.50
3 $655.50$11.50
Ref #68 625E29901 JUNCTION BOX, AS PER PLAN, (2 EACH)
Awd $2,400.00$1,200.00
2 $2,000.00$1,000.00
3 $2,400.00$1,200.00
Ref #69 625E29930 MEDIAN JUNCTION BOX, (1 EACH)
Awd $2,680.00$2,680.00
2 $2,950.00$2,950.00
3 $2,800.00$2,800.00
Ref #70 625E31511 PULL BOX REMOVED, AS PER PLAN, (4 EACH)
Awd $1,360.00$340.00
2 $600.00$150.00
3 $1,420.00$355.00
Ref #71 625E31600 PULL BOX, MISC.: 17" X 30", (4 EACH)
Awd $3,360.00$840.00
2 $4,500.00$1,125.00
3 $3,520.00$880.00
Ref #72 625E32000 GROUND ROD, (2 EACH)
Awd $480.00$240.00
2 $530.00$265.00
3 $500.00$250.00
Ref #73 625E33000 STRUCTURE GROUNDING SYSTEM, (1 EACH)
Awd $6,700.00$6,700.00
2 $4,950.00$4,950.00
3 $7,000.00$7,000.00
Ref #74 625E36000 PLASTIC CAUTION TAPE, (57 FT)
Awd $21.09$0.37
2 $34.20$0.60
3 $22.80$0.40
Ref #75 625E40000 SPECIAL - MAINTAIN EXISTING LIGHTING, (LUMP SUM)
Awd $6,000.00$6,000.00
2 $1,600.00$1,600.00
3 $14,000.00$14,000.00
Ref #76 625E75403 LIGHT POLE REMOVED FOR STORAGE, AS PER PLAN, (2 EACH)
Awd $440.00$220.00
2 $600.00$300.00
3 $450.00$225.00
Ref #77 625E75505 LUMINAIRE REMOVED FOR STORAGE, AS PER PLAN, (3 EACH)
Awd $450.00$150.00
2 $225.00$75.00
3 $465.00$155.00
Ref #78 625E75521 LUMINAIRE SUPPORT REMOVED, AS PER PLAN, (1 EACH)
Awd $260.00$260.00
2 $150.00$150.00
3 $270.00$270.00
200228 - Page 15
Ref #79 625E75801 DISCONNECT CIRCUIT, AS PER PLAN, (2 EACH)
Awd $470.00$235.00
2 $650.00$325.00
3 $490.00$245.00
Ref #80 625E98000 LIGHTING, MISC.: TEST EXISTING CIRCUITS, (1 EACH)
Awd $250.00$250.00
2 $400.00$400.00
3 $260.00$260.00
Ref #81 632E70400 CONDUIT RISER, 2" DIAMETER, (2 EACH)
Awd $850.00$425.00
2 $1,100.00$550.00
3 $880.00$440.00
Ref #82 632E89300 WOOD POLE, (2 EACH)
Awd $3,700.00$1,850.00
2 $3,600.00$1,800.00
3 $3,750.00$1,875.00
Ref #83 632E89400 DOWN GUY, (1 EACH)
Awd $550.00$550.00
2 $425.00$425.00
3 $550.00$550.00
Section 6 - LIGHTING - Totals
Awd $59,726.90
2 $55,177.75
3 $69,569.80
Ref #84 202E98200 REMOVAL MISC.: CONCRETE ENCASED ELECTRIC DUCT BANK, (208 FT)
Awd $15,600.00$75.00
2 $15,600.00$75.00
3 $16,224.00$78.00
Ref #85 503E11100 COFFERDAMS AND EXCAVATION BRACING, (LUMP SUM)
Awd $7,000.00$7,000.00
2 $7,000.00$7,000.00
3 $7,000.00$7,000.00
Ref #86 625E25803 CONDUIT, CONCRETE ENCASED, AS PER PLAN, 18-5" DIA., (189 FT)
Awd $71,820.00$380.00
2 $110,565.00$585.00
3 $75,600.00$400.00
Ref #87 625E25920 CONDUIT, MISC.:5" FIBERGLASS REINFORCED EPOXY COND, (3312 FT)
Awd $129,168.00$39.00
2 $82,800.00$25.00
3 $135,792.00$41.00
Ref #88 625E98000 LIGHTING, MISC.:MANHOLE RECONSTRUCTED, (2 EACH)
Awd $6,000.00$3,000.00
2 $13,000.00$6,500.00
3 $1,000.00$500.00
Ref #89 632E69350 POWER CABLE, MISC.: 4/0 1C-CU-EPR-15kV WITH 133% I, (8424 FT)
Awd $144,218.88$17.12
2 $178,673.04$21.21
3 $151,632.00$18.00
200228 - Page 16
Ref #90 632E69350 POWER CABLE, MISC.: 750 KCMIL-1C-CU-15 kV EPR, (8208 FT)
Awd $227,361.60$27.70
2 $254,694.24$31.03
3 $238,032.00$29.00
Ref #91 690E98000 SPECIAL - PRECAST ELECTRIC MANHOLE, (2 EACH)
Awd $50,000.00$25,000.00
2 $73,000.00$36,500.00
3 $64,000.00$32,000.00
Ref #92 804E15011 FIBER OPTIC CABLE, 24 FIBER, AS PER PLAN, (4120 FT)
Awd $14,832.00$3.60
2 $24,720.00$6.00
3 $15,450.00$3.75
Section 7 - OTHER UTILITIES - Totals
Awd $666,000.48
2 $760,052.28
3 $704,730.00
Ref #93 621E00100 RPM, (153 EACH)
Awd $7,994.25$52.25
2 $7,573.50$49.50
3 $7,650.00$50.00
Ref #94 621E54000 RAISED PAVEMENT MARKER REMOVED, (153 EACH)
Awd $1,565.19$10.23
2 $841.50$5.50
3 $918.00$6.00
Ref #95 625E32000 GROUND ROD, (4 EACH)
Awd $960.00$240.00
2 $1,060.00$265.00
3 $1,100.00$275.00
Ref #96 626E00102 BARRIER REFLECTOR, TYPE 1(BI-DIRECTIONAL), (5 EACH)
Awd $50.00$10.00
2 $40.00$8.00
3 $40.00$8.00
Ref #97 626E00110 BARRIER REFLECTOR, TYPE 2(ONE-WAY), (9 EACH)
Awd $108.00$12.00
2 $72.00$8.00
3 $72.00$8.00
Ref #98 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST, (77 FT)
Awd $462.00$6.00
2 $646.80$8.40
3 $654.50$8.50
Ref #99 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST, (28.5 FT)
Awd $190.95$6.70
2 $285.00$10.00
3 $285.00$10.00
Ref #100 630E08600 SIGN POST REFLECTOR, (6 EACH)
Awd $171.00$28.50
2 $270.00$45.00
3 $282.00$47.00
200228 - Page 17
Ref #101 630E45500 OVERHEAD SIGN SUPPORT, TYPE TC-7.65, DESIGN 8, (2 EACH)
Awd $83,700.00$41,850.00
2 $79,750.00$39,875.00
3 $86,000.00$43,000.00
Ref #102 630E55000 CONCRETE BARRIER MEDIAN OVERHEAD SIGN SUPPORT FOUN, (2 EACH)
Awd $9,200.00$4,600.00
2 $13,500.00$6,750.00
3 $14,000.00$7,000.00
Ref #103 630E79500 SIGN SUPPORT ASSEMBLY, POLE MOUNTED, (3 EACH)
Awd $194.40$64.80
2 $435.00$145.00
3 $450.00$150.00
Ref #104 630E80100 SIGN, FLAT SHEET, (62.8 SF)
Awd $700.22$11.15
2 $879.20$14.00
3 $926.30$14.75
Ref #105 630E80224 SIGN, OVERHEAD EXTRUSHEET, (830 SF)
Awd $13,072.50$15.75
2 $15,604.00$18.80
3 $15,770.00$19.00
Ref #106 630E84510 RIGID OVERHEAD SIGN SUPPORT FOUNDATION, (2 EACH)
Awd $13,600.00$6,800.00
2 $10,250.00$5,125.00
3 $11,000.00$5,500.00
Ref #107 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL, (5 EACH)
Awd $64.00$12.80
2 $50.00$10.00
3 $50.00$10.00
Ref #108 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA, (5 EACH)
Awd $102.00$20.40
2 $75.00$15.00
3 $75.00$15.00
Ref #109 630E86310 REMOVAL OF STRUCTURE MOUNTED SIGN AND DISPOSAL, (7 EACH)
Awd $1,708.00$244.00
2 $1,575.00$225.00
3 $1,645.00$235.00
Ref #110 630E86320 REMOVAL OF STRUCTURE MOUNTED SIGN AND REERECTION, (2 EACH)
Awd $1,290.00$645.00
2 $950.00$475.00
3 $1,000.00$500.00
Ref #111 630E87500 REMOVAL OF POLE MOUNTED SIGN AND DISPOSAL, (3 EACH)
Awd $63.00$21.00
2 $60.00$20.00
3 $60.00$20.00
Ref #112 631E94350 REMOVAL OF DISCONNECT SWITCH, (1 EACH)
Awd $105.00$105.00
2 $160.00$160.00
3 $167.00$167.00
200228 - Page 18
Ref #113 631E94406 REMOVAL OF SIGNS WIRED, (1 EACH)
Awd $350.00$350.00
2 $350.00$350.00
3 $365.00$365.00
Ref #114 646E10000 EDGE LINE, 4", (0.16 MILE)
Awd $534.40$3,340.00
2 $448.00$2,800.00
3 $469.60$2,935.00
Ref #115 646E10010 EDGE LINE, 6", (1.92 MILE)
Awd $7,219.20$3,760.00
2 $7,296.00$3,800.00
3 $7,584.00$3,950.00
Ref #116 646E10110 LANE LINE, 6", (3.13 MILE)
Awd $8,810.95$2,815.00
2 $7,199.00$2,300.00
3 $7,512.00$2,400.00
Ref #117 646E10300 CHANNELIZING LINE, 8", (392 FT)
Awd $588.00$1.50
2 $744.80$1.90
3 $744.80$1.90
Ref #118 646E10310 CHANNELIZING LINE, 12", (171 FT)
Awd $342.00$2.00
2 $427.50$2.50
3 $444.60$2.60
Ref #119 646E10400 STOP LINE, (95 FT)
Awd $997.50$10.50
2 $1,140.00$12.00
3 $1,187.50$12.50
Ref #120 646E10500 CROSSWALK LINE, (462 FT)
Awd $3,465.00$7.50
2 $2,772.00$6.00
3 $2,887.50$6.25
Ref #121 646E10600 TRANSVERSE/DIAGONAL LINE, (185 FT)
Awd $1,757.50$9.50
2 $1,480.00$8.00
3 $1,526.25$8.25
Ref #122 646E20300 LANE ARROW, (14 EACH)
Awd $2,450.00$175.00
2 $2,310.00$165.00
3 $2,422.00$173.00
Ref #123 646E20502 DOTTED LINE, 4", (383 FT)
Awd $536.20$1.40
2 $1,149.00$3.00
3 $1,149.00$3.00
Ref #124 646E20506 DOTTED LINE, 8", (89 FT)
Awd $129.05$1.45
2 $356.00$4.00
3 $356.00$4.00
200228 - Page 19
Ref #125 646E20600 BIKE LANE SYMBOL MARKING, (3 EACH)
Awd $1,350.00$450.00
2 $825.00$275.00
3 $840.00$280.00
Ref #126 646E20650 SHARED LANE MARKING, (2 EACH)
Awd $1,000.00$500.00
2 $590.00$295.00
3 $610.00$305.00
Section 8 - TRAFFIC CONTROL - Totals
Awd $164,830.31
2 $161,164.30
3 $170,243.05
Ref #127 625E25408 CONDUIT, 2", 725.051, (498 FT)
Awd $2,988.00$6.00
2 $5,478.00$11.00
3 $5,602.50$11.25
Ref #128 625E25504 CONDUIT, 3", 725.051, (120 FT)
Awd $889.20$7.41
2 $1,320.00$11.00
3 $1,350.00$11.25
Ref #129 625E29000 TRENCH, (163 FT)
Awd $1,793.00$11.00
2 $2,852.50$17.50
3 $2,934.00$18.00
Ref #130 625E29901 JUNCTION BOX, AS PER PLAN, (4 EACH)
Awd $4,800.00$1,200.00
2 $4,000.00$1,000.00
3 $4,000.00$1,000.00
Ref #131 625E31600 PULL BOX, MISC.: 13" X 24", (7 EACH)
Awd $4,480.00$640.00
2 $6,300.00$900.00
3 $6,580.00$940.00
Ref #132 625E32000 GROUND ROD, (1 EACH)
Awd $240.00$240.00
2 $265.00$265.00
3 $275.00$275.00
Ref #133 625E36000 PLASTIC CAUTION TAPE, (163 FT)
Awd $60.31$0.37
2 $97.80$0.60
3 $97.80$0.60
Ref #134 632E20730 PEDESTRIAN SIGNAL HEAD (LED), TYPE D2, COUNTDOWN, (1 EACH)
Awd $494.00$494.00
2 $600.00$600.00
3 $625.00$625.00
Ref #135 632E26000 PEDESTRIAN PUSHBUTTON, (1 EACH)
Awd $210.00$210.00
2 $185.00$185.00
3 $190.00$190.00
200228 - Page 20
Ref #136 632E40300 SIGNAL CABLE, 3 CONDUCTOR, NO. 14 AWG, (105 FT)
Awd $178.50$1.70
2 $269.85$2.57
3 $278.25$2.65
Ref #137 632E40500 SIGNAL CABLE, 5 CONDUCTOR, NO. 14 AWG, (113 FT)
Awd $203.40$1.80
2 $305.10$2.70
3 $316.40$2.80
Ref #138 632E64020 PEDESTAL FOUNDATION, (1 EACH)
Awd $790.00$790.00
2 $1,000.00$1,000.00
3 $1,000.00$1,000.00
Ref #139 632E68300 POWER CABLE, 3 CONDUCTOR, NO. 6 AWG, (423 FT)
Awd $1,649.70$3.90
2 $1,269.00$3.00
3 $1,269.00$3.00
Ref #140 632E70400 CONDUIT RISER, 2" DIAMETER, (2 EACH)
Awd $850.00$425.00
2 $1,200.00$600.00
3 $1,250.00$625.00
Ref #141 632E89900 PEDESTAL, 8', TRANSFORMER BASE, (1 EACH)
Awd $625.00$625.00
2 $900.00$900.00
3 $940.00$940.00
Ref #142 632E90101 REMOVAL OF TRAFFIC SIGNAL INSTALLATION, AS PER PLA, (1 EACH)
Awd $3,800.00$3,800.00
2 $850.00$850.00
3 $875.00$875.00
Ref #143 633E45000 GPS (GLOBAL POSITIONING SYSTEM) CLOCK ASSEMBLY, (2 EACH)
Awd $1,050.00$525.00
2 $5,300.00$2,650.00
3 $5,400.00$2,700.00
Ref #144 633E99000 CONTROLLER ITEM, MISC.: CONTROLLER CABINET MODIFIC, (2 EACH)
Awd $4,800.00$2,400.00
2 $2,000.00$1,000.00
3 $200.00$100.00
Section 9 - TRAFFIC SIGNALS - Totals
Awd $29,901.11
2 $34,192.25
3 $33,182.95
Ref #145 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST, (300 HOUR)
Awd $23,100.00$77.00
2 $22,500.00$75.00
3 $22,500.00$75.00
Ref #146 614E11630 INCREASED BARRIER DELINEATION, (2060 FT)
Awd $1,545.00$0.75
2 $5,150.00$2.50
3 $4,120.00$2.00
200228 - Page 21
Ref #147 614E12336 WORK ZONE IMPACT ATTENUATOR (UNIDIRECTIONAL), (9 EACH)
Awd $17,775.00$1,975.00
2 $12,600.00$1,400.00
3 $18,000.00$2,000.00
Ref #148 614E12420 DETOUR SIGNING, (LUMP SUM)
Awd $8,402.00$8,402.00
2 $7,250.00$7,250.00
3 $15,000.00$15,000.00
Ref #149 614E12801 WORK ZONE RAISED PAVEMENT MARKER, AS PER PLAN, (1340 EACH)
Awd $7,906.00$5.90
2 $10,050.00$7.50
3 $10,050.00$7.50
Ref #150 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC, (300 CY)
Awd $36,000.00$120.00
2 $60,000.00$200.00
3 $30,000.00$100.00
Ref #151 614E13310 BARRIER REFLECTOR, TYPE 1, ONE-WAY, (55 EACH)
Awd $286.00$5.20
2 $550.00$10.00
3 $550.00$10.00
Ref #152 614E13350 OBJECT MARKER, ONE WAY, (55 EACH)
Awd $671.00$12.20
2 $715.00$13.00
3 $660.00$12.00
Ref #153 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN, (14 SNMT)
Awd $8,960.00$640.00
2 $7,700.00$550.00
3 $11,200.00$800.00
Ref #154 614E20110 WORK ZONE LANE LINE, CLASS I, 6", 642 PAINT, (3.06 MILE)
Awd $1,055.70$345.00
2 $1,055.70$345.00
3 $1,101.60$360.00
Ref #155 614E20510 WORK ZONE LANE LINE, CLASS II, 6", 642 PAINT, (3.06 MILE)
Awd $2,738.70$895.00
2 $2,738.70$895.00
3 $2,830.50$925.00
Ref #156 614E22110 WORK ZONE EDGE LINE, CLASS I, 6", 642 PAINT, (3.86 MILE)
Awd $2,682.70$695.00
2 $2,682.70$695.00
3 $2,798.50$725.00
Ref #157 614E22200 WORK ZONE EDGE LINE, CLASS I, 4", 740.06, TYPE I, (0.14 MILE)
Awd $924.00$6,600.00
2 $850.08$6,072.00
3 $868.00$6,200.00
Ref #158 614E23210 WORK ZONE CHANNELIZING LINE, CLASS I, 12", 642 PAI, (16125 FT)
Awd $12,093.75$0.75
2 $12,093.75$0.75
3 $12,093.75$0.75
200228 - Page 22
Ref #159 614E24400 WORK ZONE DOTTED LINE, CLASS I, 4", 740.06, TYPE I, (940 FT)
Awd $808.40$0.86
2 $3,525.00$3.75
3 $3,666.00$3.90
Ref #160 616E10000 WATER, (55 MGAL)
Awd $605.00$11.00
2 $2,750.00$50.00
3 $275.00$5.00
Ref #161 622E41100 PORTABLE BARRIER, UNANCHORED, (2700 FT)
Awd $32,400.00$12.00
2 $22,950.00$8.50
3 $32,400.00$12.00
Ref #162 630E07500 GROUND MOUNTED STRUCTURAL BEAM SUPPORT, W10X22, (47.4 FT)
Awd $1,753.80$37.00
2 $3,199.50$67.50
3 $3,318.00$70.00
Ref #163 630E09000 BREAKAWAY STRUCTURAL BEAM CONNECTION, (2 EACH)
Awd $1,160.00$580.00
2 $1,240.00$620.00
3 $1,300.00$650.00
Ref #164 630E84500 GROUND MOUNTED STRUCTURAL BEAM SUPPORT FOUNDATION, (2 EACH)
Awd $2,450.00$1,225.00
2 $1,970.00$985.00
3 $2,000.00$1,000.00
Section 10 - MAINTENANCE OF TRAFFIC - Totals
Awd $163,317.05
2 $181,570.43
3 $174,731.35
Ref #165 202E11203 PORTIONS OF STRUCTURE REMOVED, OVER 20 FOOT SPAN, , (LUMP SUM)
Awd $418,000.00$418,000.00
2 $225,000.00$225,000.00
3 $330,000.00$330,000.00
Ref #166 202E22900 APPROACH SLAB REMOVED, (240 SY)
Awd $8,640.00$36.00
2 $8,400.00$35.00
3 $12,000.00$50.00
Ref #167 202E23500 WEARING COURSE REMOVED, (240 SY)
Awd $1,200.00$5.00
2 $720.00$3.00
3 $1,920.00$8.00
Ref #168 503E11100 COFFERDAMS AND EXCAVATION BRACING, (LUMP SUM)
Awd $100.00$100.00
2 $1.00$1.00
3 $200.00$200.00
Ref #169 509E10000 EPOXY COATED REINFORCING STEEL, (106810 LB)
Awd $117,491.00$1.10
2 $122,831.50$1.15
3 $106,810.00$1.00
200228 - Page 23
Ref #170 510E10000 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT, (362 EACH)
Awd $7,240.00$20.00
2 $7,240.00$20.00
3 $7,240.00$20.00
Ref #172 511E34450 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK (PARAPE, (45 CY)
Awd $55,575.00$1,235.00
2 $38,250.00$850.00
3 $39,375.00$875.00
Ref #173 511E42510 CLASS QC1 CONCRETE, PIER CAP, (12 CY)
Awd $12,420.00$1,035.00
2 $14,400.00$1,200.00
3 $8,700.00$725.00
Ref #174 511E45710 CLASS QC1 CONCRETE, ABUTMENT, (55 CY)
Awd $64,900.00$1,180.00
2 $55,000.00$1,000.00
3 $41,250.00$750.00
Ref #175 511E51512 CLASS QC2 CONCRETE WITH QC/QA, SIDEWALK, (133 CY)
Awd $41,895.00$315.00
2 $49,875.00$375.00
3 $53,200.00$400.00
Ref #176 512E10050 SEALING OF CONCRETE SURFACES (NON-EPOXY), (462 SY)
Awd $3,003.00$6.50
2 $3,003.00$6.50
3 $4,158.00$9.00
Ref #177 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (1082 SY)
Awd $24,345.00$22.50
2 $24,345.00$22.50
3 $22,722.00$21.00
Ref #178 512E10600 CONCRETE REPAIR BY EPOXY INJECTION, (33 FT)
Awd $2,970.00$90.00
2 $2,970.00$90.00
3 $3,300.00$100.00
Ref #179 512E33000 TYPE 2 WATERPROOFING, (11 SY)
Awd $440.00$40.00
2 $440.00$40.00
3 $209.00$19.00
Ref #180 513E10280 STRUCTURAL STEEL MEMBERS, LEVEL 4, (265003 LB)
Awd $455,805.16$1.72
2 $598,906.78$2.26
3 $561,806.36$2.12
Ref #181 513E20000 WELDED STUD SHEAR CONNECTORS, (3168 EACH)
Awd $10,771.20$3.40
2 $10,296.00$3.25
3 $11,088.00$3.50
Ref #182 514E00060 FIELD PAINTING STRUCTURAL STEEL, INTERMEDIATE COAT, (14468 SF)
Awd $115,744.00$8.00
2 $72,340.00$5.00
3 $72,340.00$5.00
200228 - Page 24
Ref #183 514E00066 FIELD PAINTING STRUCTURAL STEEL, FINISH COAT, (14468 SF)
Awd $63,659.20$4.40
2 $65,106.00$4.50
3 $68,723.00$4.75
Ref #184 516E11210 STRUCTURAL EXPANSION JOINT INCLUDING ELASTOMERIC S, (101 FT)
Awd $60,600.00$600.00
2 $63,125.00$625.00
3 $61,610.00$610.00
Ref #185 516E13600 1" PREFORMED EXPANSION JOINT FILLER, (86 SF)
Awd $1,290.00$15.00
2 $688.00$8.00
3 $516.00$6.00
Ref #186 516E44100 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO, (12 EACH)
Awd $7,800.00$650.00
2 $9,600.00$800.00
3 $9,600.00$800.00
Ref #187 516E44200 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO, (6 EACH)
Awd $9,390.00$1,565.00
2 $10,800.00$1,800.00
3 $9,000.00$1,500.00
Ref #188 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC, (45 CY)
Awd $6,075.00$135.00
2 $4,500.00$100.00
3 $4,050.00$90.00
Ref #189 519E11101 PATCHING CONCRETE STRUCTURE, AS PER PLAN, (537 SF)
Awd $45,645.00$85.00
2 $45,645.00$85.00
3 $53,700.00$100.00
Ref #190 526E30011 REINFORCED CONCRETE APPROACH SLABS WITH QC/QA (T=1, (318 SY)
Awd $82,680.00$260.00
2 $84,270.00$265.00
3 $95,400.00$300.00
Ref #191 526E90010 TYPE A INSTALLATION, (96 FT)
Awd $22,080.00$230.00
2 $14,400.00$150.00
3 $12,000.00$125.00
Ref #192 530E13000 SPECIAL - FORM LINER, (733 SF)
Awd $8,796.00$12.00
2 $5,131.00$7.00
3 $13,194.00$18.00
Ref #193 607E39901 VANDAL PROTECTION FENCE, 6' STRAIGHT, COATED FABRI, (367 FT)
Awd $26,791.00$73.00
2 $30,607.80$83.40
3 $33,030.00$90.00
Ref #195 690E98000 SPECIAL - DOMINION ENERGY ROLLER GUIDE/SUPPORT, (11 EACH)
Awd $6,325.00$575.00
2 $7,700.00$700.00
3 $8,250.00$750.00
200228 - Page 25
Ref #196 844E10001 CONCRETE PATCHING WITH GALVANIC ANODE PROTECTION, , (743 SF)
Awd $70,585.00$95.00
2 $70,585.00$95.00
3 $74,300.00$100.00
Ref #300 601E20010 CRUSHED AGGREGATE SLOPE PROTECTION, (37 CY)
Awd $3,700.00$100.00
2 $3,145.00$85.00
3 $5,365.00$145.00
Ref #301 511E34447 CLASS QC2 CONCRETE WITH QC/QA, BRIDGE DECK, AS PER, (269 CY)
Awd $220,580.00$820.00
2 $170,815.00$635.00
3 $188,300.00$700.00
Section 11 - STRUCTURE OVER 20 FOOT SPAN (CTY-RTE-SEC - Totals
Awd $1,976,535.56
2 $1,820,136.08
3 $1,913,356.36
Ref #197 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $65,000.00$65,000.00
2 $45,000.00$45,000.00
3 $42,000.00$42,000.00
Ref #198 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $274,000.00$274,000.00
2 $192,500.00$192,500.00
3 $235,000.00$235,000.00
Ref #199 619E16011 FIELD OFFICE, TYPE B, AS PER PLAN, (5 MNTH)
Awd $17,500.00$3,500.00
2 $15,000.00$3,000.00
3 $14,000.00$2,800.00
Ref #200 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING, (LUMP SUM)
Awd $10,000.00$10,000.00
2 $34,500.00$34,500.00
3 $20,000.00$20,000.00
Ref #201 624E10000 MOBILIZATION, (LUMP SUM)
Awd $100,000.00$100,000.00
2 $100,000.00$100,000.00
3 $100,000.00$100,000.00
Section 12 - INCIDENTALS - Totals
Awd $466,500.00
2 $387,000.00
3 $411,000.00
200228 - Page 26
Project No. 200240
PID 94407
LUC-US 20A-03.55/04.55 Rndbts
Federal
Type: MINOR RECONSTRUCTION
Completion Date: 10/31/2020
Award Amount: $2,136,226.40
Contract Awarded To: VERNON NAGEL INC
Letting Date: 5/7/2020
Engineer's Estimate: $2,340,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jack Marchbanks, Ph.D., Director
VERNON NAGEL INC
O154 CO RD 11-C
NAPOLEON, OH 43545
Henry
Bidder 1
Bid $2,136,226.40
GEDDIS PAVING & EXCAVATING INC
1019 WAMBA AVE
TOLEDO, OH 43607
Lucas
Bidder 2
Bid $2,146,152.15
BEAVER EXCAVATING COMPANY
P O BOX 6059
CANTON, OH 44706
Stark
Bidder 3
Bid $2,279,966.01
SHELLY COMPANY
80 PARK DR BOX 266
THORNVILLE, OH 43076
Perry
Bidder 4
Bid $2,298,558.11
MILLER BROS CONST INC
1613 S DEFIANCE ST P O BOX 30
ARCHBOLD, OH 43502
Fulton
Bidder 5
Bid $2,375,809.49
CRESTLINE PAVING & EXCAVATING CO INC
1913 NEBRASKA AVE
TOLEDO, OH 43607
Lucas
Bidder 6
Bid $2,458,397.95
ECLIPSE CO LLC
11554 EAST WASHINGTON ST
CHAGRIN FALLS, OH 44023
Geauga
Bidder 7
Bid $2,507,232.46
GERKEN PAVING INC
9072 CO RD 424
NAPOLEON, OH 43545
Henry
Bidder 8
Bid $2,642,112.21
200240 - Page 27
Ref #1 201E11000 CLEARING AND GRUBBING, (LUMP SUM)
Awd $5,500.00$5,500.00
2 $9,000.00$9,000.00
3 $19,300.00$19,300.00
4 $80,000.00$80,000.00
5 $21,000.00$21,000.00
6 $5,000.00$5,000.00
7 $4,604.50$4,604.50
8 $52,000.00$52,000.00
Ref #2 202E20010 HEADWALL REMOVED, (7 EACH)
Awd $1,750.00$250.00
2 $402.50$57.50
3 $4,900.00$700.00
4 $2,660.00$380.00
5 $3,150.00$450.00
6 $2,100.00$300.00
7 $2,481.50$354.50
8 $5,670.00$810.00
Ref #3 202E23000 PAVEMENT REMOVED, (10499 SY)
Awd $157,485.00$15.00
2 $91,866.25$8.75
3 $73,493.00$7.00
4 $47,245.50$4.50
5 $41,996.00$4.00
6 $125,988.00$12.00
7 $78,742.50$7.50
8 $76,117.75$7.25
Ref #5 202E35100 PIPE REMOVED, 24" AND UNDER, (110 FT)
Awd $660.00$6.00
2 $1,705.00$15.50
3 $1,980.00$18.00
4 $2,255.00$20.50
5 $3,300.00$30.00
6 $1,870.00$17.00
7 $1,980.00$18.00
8 $715.00$6.50
Ref #6 202E35200 PIPE REMOVED, OVER 24", (130 FT)
Awd $6,500.00$50.00
2 $6,630.00$51.00
3 $3,250.00$25.00
4 $3,835.00$29.50
5 $3,900.00$30.00
6 $3,120.00$24.00
7 $2,925.00$22.50
8 $17,680.00$136.00
Ref #7 202E58100 CATCH BASIN REMOVED, (1 EACH)
Awd $200.00$200.00
2 $210.00$210.00
3 $150.00$150.00
4 $550.00$550.00
5 $300.00$300.00
6 $350.00$350.00
7 $318.50$318.50
8 $360.00$360.00
200240 - Page 28
Ref #8 202E75000 FENCE REMOVED, (443 FT)
Awd $2,215.00$5.00
2 $1,882.75$4.25
3 $1,772.00$4.00
4 $1,661.25$3.75
5 $1,661.25$3.75
6 $2,215.00$5.00
7 $1,772.00$4.00
8 $1,661.25$3.75
Ref #9 203E10000 EXCAVATION, (1787 CY)
Awd $32,166.00$18.00
2 $16,083.00$9.00
3 $44,675.00$25.00
4 $23,231.00$13.00
5 $17,870.00$10.00
6 $33,953.00$19.00
7 $38,420.50$21.50
8 $43,781.50$24.50
Ref #10 203E20000 EMBANKMENT, (10486 CY)
Awd $125,832.00$12.00
2 $94,374.00$9.00
3 $136,318.00$13.00
4 $136,318.00$13.00
5 $209,720.00$20.00
6 $241,178.00$23.00
7 $241,178.00$23.00
8 $256,907.00$24.50
Ref #11 204E10000 SUBGRADE COMPACTION, (16567 SY)
Awd $16,567.00$1.00
2 $6,626.80$0.40
3 $33,134.00$2.00
4 $10,768.55$0.65
5 $8,283.50$0.50
6 $16,567.00$1.00
7 $33,134.00$2.00
8 $19,880.40$1.20
Ref #12 204E13000 EXCAVATION OF SUBGRADE, (765 CY)
Awd $7,650.00$10.00
2 $9,945.00$13.00
3 $9,180.00$12.00
4 $14,917.50$19.50
5 $11,857.50$15.50
6 $14,535.00$19.00
7 $9,562.50$12.50
8 $13,961.25$18.25
Ref #13 204E13001 EXCAVATION OF SUBGRADE, AS PER PLAN, (1150 CY)
Awd $8,050.00$7.00
2 $14,950.00$13.00
3 $13,800.00$12.00
4 $22,425.00$19.50
5 $13,225.00$11.50
6 $21,850.00$19.00
7 $14,375.00$12.50
8 $18,400.00$16.00
200240 - Page 29
Ref #14 204E30010 GRANULAR MATERIAL, TYPE B, (765 CY)
Awd $30,600.00$40.00
2 $26,392.50$34.50
3 $22,950.00$30.00
4 $28,305.00$37.00
5 $29,835.00$39.00
6 $28,305.00$37.00
7 $32,895.00$43.00
8 $27,540.00$36.00
Ref #15 204E30011 GRANULAR MATERIAL, TYPE B, AS PER PLAN, (1150 CY)
Awd $37,950.00$33.00
2 $39,675.00$34.50
3 $34,500.00$30.00
4 $42,550.00$37.00
5 $34,500.00$30.00
6 $42,550.00$37.00
7 $47,725.00$41.50
8 $39,100.00$34.00
Ref #16 204E45000 PROOF ROLLING, (8 HOUR)
Awd $800.00$100.00
2 $784.00$98.00
3 $1,600.00$200.00
4 $1,800.00$225.00
5 $760.00$95.00
6 $792.00$99.00
7 $8,040.00$1,005.00
8 $800.00$100.00
Ref #17 606E15050 GUARDRAIL, TYPE MGS, (112.5 FT)
Awd $2,790.00$24.80
2 $3,093.75$27.50
3 $2,790.00$24.80
4 $2,790.00$24.80
5 $2,790.00$24.80
6 $3,262.50$29.00
7 $2,981.25$26.50
8 $2,790.00$24.80
Ref #18 606E26150 ANCHOR ASSEMBLY, MGS TYPE E, MASH 2016, (1 EACH)
Awd $2,575.00$2,575.00
2 $2,575.00$2,575.00
3 $2,575.00$2,575.00
4 $2,575.00$2,575.00
5 $2,575.00$2,575.00
6 $2,575.00$2,575.00
7 $1,050.00$1,050.00
8 $2,575.00$2,575.00
Ref #19 606E26550 ANCHOR ASSEMBLY, MGS TYPE T, (1 EACH)
Awd $1,045.00$1,045.00
2 $1,470.00$1,470.00
3 $1,045.00$1,045.00
4 $1,045.00$1,045.00
5 $1,045.00$1,045.00
6 $1,045.00$1,045.00
7 $1,050.00$1,050.00
8 $1,045.00$1,045.00
200240 - Page 30
Ref #20 607E98000 FENCE, MISC.: CONSTRUCTION FENCE, (315 FT)
Awd $3,150.00$10.00
2 $2,835.00$9.00
3 $1,890.00$6.00
4 $2,598.75$8.25
5 $2,598.75$8.25
6 $2,835.00$9.00
7 $2,520.00$8.00
8 $2,835.00$9.00
Ref #21 623E38500 MONUMENT ASSEMBLY, (1 EACH)
Awd $700.00$700.00
2 $485.00$485.00
3 $1,000.00$1,000.00
4 $1,000.00$1,000.00
5 $845.00$845.00
6 $1,100.00$1,100.00
7 $1,249.00$1,249.00
8 $975.00$975.00
Section 1 - ROADWAY - Totals
Awd $444,185.00
2 $330,985.55
3 $410,302.00
4 $428,530.55
5 $411,212.00
6 $551,190.50
7 $527,004.25
8 $584,794.15
Ref #22 601E21050 TIED CONCRETE BLOCK MAT, TYPE 1, (32 SY)
Awd $2,240.00$70.00
2 $7,680.00$240.00
3 $6,400.00$200.00
4 $5,920.00$185.00
5 $6,208.00$194.00
6 $3,136.00$98.00
7 $3,008.00$94.00
8 $4,160.00$130.00
Ref #23 601E32204 ROCK CHANNEL PROTECTION, TYPE C WITH GEOTEXTILE FA, (58 CY)
Awd $4,640.00$80.00
2 $10,150.00$175.00
3 $8,700.00$150.00
4 $14,210.00$245.00
5 $8,468.00$146.00
6 $11,310.00$195.00
7 $5,075.00$87.50
8 $9,048.00$156.00
200240 - Page 31
Ref #24 616E10000 WATER, (23 MGAL)
Awd $230.00$10.00
2 $23.00$1.00
3 $1,035.00$45.00
4 $2,070.00$90.00
5 $2,035.50$88.50
6 $230.00$10.00
7 $253.00$11.00
8 $1,495.00$65.00
Ref #25 659E00300 TOPSOIL, (1273 CY)
Awd $31,825.00$25.00
2 $45,828.00$36.00
3 $15,276.00$12.00
4 $91,656.00$72.00
5 $45,828.00$36.00
6 $61,104.00$48.00
7 $61,104.00$48.00
8 $45,828.00$36.00
Ref #26 659E10000 SEEDING AND MULCHING, (11466 SY)
Awd $8,599.50$0.75
2 $8,599.50$0.75
3 $8,599.50$0.75
4 $8,599.50$0.75
5 $8,370.18$0.73
6 $8,599.50$0.75
7 $9,746.10$0.85
8 $8,370.18$0.73
Ref #27 659E20000 COMMERCIAL FERTILIZER, (1.55 TON)
Awd $930.00$600.00
2 $1,240.00$800.00
3 $930.00$600.00
4 $930.00$600.00
5 $1,240.00$800.00
6 $930.00$600.00
7 $651.00$420.00
8 $1,240.00$800.00
Ref #28 659E35000 WATER, (62 MGAL)
Awd $62.00$1.00
2 $62.00$1.00
3 $62.00$1.00
4 $62.00$1.00
5 $0.62$0.01
6 $62.00$1.00
7 $62.00$1.00
8 $0.62$0.01
Ref #29 832E15000 STORM WATER POLLUTION PREVENTION PLAN, (LUMP SUM)
Awd $2,500.00$2,500.00
2 $1,150.00$1,150.00
3 $2,000.00$2,000.00
4 $1,050.00$1,050.00
5 $1,285.00$1,285.00
6 $1,200.00$1,200.00
7 $2,310.00$2,310.00
8 $1,300.00$1,300.00
200240 - Page 32
Ref #30 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS, (LUMP SUM)
Awd $2,500.00$2,500.00
2 $1,200.00$1,200.00
3 $4,350.00$4,350.00
4 $9,525.00$9,525.00
5 $4,830.00$4,830.00
6 $3,000.00$3,000.00
7 $9,450.00$9,450.00
8 $4,200.00$4,200.00
Ref #31 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA, (LUMP SUM)
Awd $7,850.00$7,850.00
2 $8,700.00$8,700.00
3 $8,000.00$8,000.00
4 $9,420.00$9,420.00
5 $8,000.00$8,000.00
6 $8,000.00$8,000.00
7 $3,780.00$3,780.00
8 $10,000.00$10,000.00
Ref #32 832E30000 EROSION CONTROL, (44000 EACH)
Awd $44,000.00$1.00
2 $44,000.00$1.00
3 $44,000.00$1.00
4 $44,000.00$1.00
5 $44,000.00$1.00
6 $44,000.00$1.00
7 $44,000.00$1.00
8 $44,000.00$1.00
Section 2 - EROSION CONTROL - Totals
Awd $105,376.50
2 $128,632.50
3 $99,352.50
4 $187,442.50
5 $130,265.30
6 $141,571.50
7 $139,439.10
8 $129,641.80
Ref #33 602E20000 CONCRETE MASONRY, (2.4 CY)
Awd $3,600.00$1,500.00
2 $6,240.00$2,600.00
3 $4,800.00$2,000.00
4 $7,200.00$3,000.00
5 $4,440.00$1,850.00
6 $5,400.00$2,250.00
7 $6,810.00$2,837.50
8 $4,560.00$1,900.00
200240 - Page 33
Ref #34 605E13300 6" UNCLASSIFIED PIPE UNDERDRAINS, (3123 FT)
Awd $31,230.00$10.00
2 $42,160.50$13.50
3 $37,476.00$12.00
4 $30,449.25$9.75
5 $24,984.00$8.00
6 $31,230.00$10.00
7 $46,845.00$15.00
8 $56,214.00$18.00
Ref #35 605E14000 6" BASE PIPE UNDERDRAINS, (2453 FT)
Awd $24,530.00$10.00
2 $33,115.50$13.50
3 $29,436.00$12.00
4 $22,077.00$9.00
5 $29,436.00$12.00
6 $26,983.00$11.00
7 $36,795.00$15.00
8 $29,436.00$12.00
Ref #36 611E01500 6" CONDUIT, TYPE F, (512 FT)
Awd $10,240.00$20.00
2 $8,192.00$16.00
3 $8,192.00$16.00
4 $8,320.00$16.25
5 $11,776.00$23.00
6 $14,336.00$28.00
7 $9,728.00$19.00
8 $7,168.00$14.00
Ref #37 611E04400 12" CONDUIT, TYPE B, (313 FT)
Awd $17,215.00$55.00
2 $16,276.00$52.00
3 $14,398.00$46.00
4 $24,727.00$79.00
5 $20,345.00$65.00
6 $24,727.00$79.00
7 $21,597.00$69.00
8 $17,215.00$55.00
Ref #38 611E04900 12" CONDUIT, TYPE D, (64 FT)
Awd $2,432.00$38.00
2 $2,592.00$40.50
3 $3,584.00$56.00
4 $6,208.00$97.00
5 $2,240.00$35.00
6 $3,264.00$51.00
7 $3,712.00$58.00
8 $2,688.00$42.00
Ref #39 611E05700 15" CONDUIT, TYPE A, (71 FT)
Awd $4,402.00$62.00
2 $4,544.00$64.00
3 $5,112.00$72.00
4 $7,739.00$109.00
5 $5,680.00$80.00
6 $6,745.00$95.00
7 $5,005.50$70.50
8 $4,402.00$62.00
200240 - Page 34
Ref #40 611E05900 15" CONDUIT, TYPE B, (67 FT)
Awd $4,154.00$62.00
2 $4,053.50$60.50
3 $4,958.00$74.00
4 $6,097.00$91.00
5 $4,690.00$70.00
6 $6,365.00$95.00
7 $5,025.00$75.00
8 $4,422.00$66.00
Ref #41 611E98180 CATCH BASIN, NO. 3A, (1 EACH)
Awd $2,500.00$2,500.00
2 $1,650.00$1,650.00
3 $3,300.00$3,300.00
4 $1,950.00$1,950.00
5 $2,500.00$2,500.00
6 $3,500.00$3,500.00
7 $2,383.50$2,383.50
8 $2,600.00$2,600.00
Ref #42 611E99574 MANHOLE, NO. 3, (2 EACH)
Awd $6,400.00$3,200.00
2 $4,100.00$2,050.00
3 $5,600.00$2,800.00
4 $4,000.00$2,000.00
5 $6,000.00$3,000.00
6 $7,000.00$3,500.00
7 $6,328.00$3,164.00
8 $6,600.00$3,300.00
Ref #43 611E99710 PRECAST REINFORCED CONCRETE OUTLET, (18 EACH)
Awd $4,050.00$225.00
2 $6,840.00$380.00
3 $3,600.00$200.00
4 $5,400.00$300.00
5 $3,600.00$200.00
6 $3,150.00$175.00
7 $7,785.00$432.50
8 $3,600.00$200.00
Section 3 - DRAINAGE - Totals
Awd $110,753.00
2 $129,763.50
3 $120,456.00
4 $124,167.25
5 $115,691.00
6 $132,700.00
7 $152,014.00
8 $138,905.00
200240 - Page 35
Ref #44 301E46000 ASPHALT CONCRETE BASE, PG64-22, (2890 CY)
Awd $294,780.00$102.00
2 $294,780.00$102.00
3 $294,780.00$102.00
4 $294,780.00$102.00
5 $294,780.00$102.00
6 $358,360.00$124.00
7 $297,670.00$103.00
8 $332,350.00$115.00
Ref #45 304E20000 AGGREGATE BASE, (2497 CY)
Awd $99,880.00$40.00
2 $112,365.00$45.00
3 $137,335.00$55.00
4 $96,134.50$38.50
5 $119,856.00$48.00
6 $107,371.00$43.00
7 $112,365.00$45.00
8 $132,341.00$53.00
Ref #46 407E10000 TACK COAT, (1254 GAL)
Awd $2,508.00$2.00
2 $2,508.00$2.00
3 $2,508.00$2.00
4 $2,508.00$2.00
5 $2,508.00$2.00
6 $3,135.00$2.50
7 $2,508.00$2.00
8 $2,382.60$1.90
Ref #47 442E10001 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A (, (477 CY)
Awd $79,659.00$167.00
2 $79,659.00$167.00
3 $79,659.00$167.00
4 $79,659.00$167.00
5 $79,659.00$167.00
6 $91,107.00$191.00
7 $81,090.00$170.00
8 $77,274.00$162.00
Ref #48 442E10101 ASPHALT CONCRETE INTERMEDIATE COURSE, 19 MM, TYPE , (554 CY)
Awd $79,222.00$143.00
2 $79,222.00$143.00
3 $79,222.00$143.00
4 $79,222.00$143.00
5 $79,222.00$143.00
6 $90,856.00$164.00
7 $80,330.00$145.00
8 $81,438.00$147.00
Ref #49 452E14110 11" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P, (721 SY)
Awd $50,470.00$70.00
2 $58,401.00$81.00
3 $46,144.00$64.00
4 $46,144.00$64.00
5 $49,208.25$68.25
6 $51,912.00$72.00
7 $56,598.50$78.50
8 $47,586.00$66.00
200240 - Page 36
Ref #50 609E12001 COMBINATION CURB AND GUTTER, TYPE 2, AS PER PLAN, (2796 FT)
Awd $55,920.00$20.00
2 $55,920.00$20.00
3 $53,124.00$19.00
4 $55,920.00$20.00
5 $61,931.40$22.15
6 $58,716.00$21.00
7 $76,890.00$27.50
8 $58,716.00$21.00
Ref #51 609E14000 CURB, TYPE 2-A, (427 FT)
Awd $4,270.00$10.00
2 $5,551.00$13.00
3 $2,135.00$5.00
4 $2,135.00$5.00
5 $2,135.00$5.00
6 $5,124.00$12.00
7 $5,337.50$12.50
8 $3,736.25$8.75
Ref #52 609E18001 COMBINATION CURB AND GUTTER, TYPE 3, AS PER PLAN, (787 FT)
Awd $15,740.00$20.00
2 $18,888.00$24.00
3 $13,379.00$17.00
4 $17,314.00$22.00
5 $19,006.05$24.15
6 $17,314.00$22.00
7 $22,036.00$28.00
8 $17,904.25$22.75
Ref #53 609E20000 CURB, TYPE 3-A, (83 FT)
Awd $830.00$10.00
2 $805.10$9.70
3 $415.00$5.00
4 $415.00$5.00
5 $415.00$5.00
6 $996.00$12.00
7 $996.00$12.00
8 $726.25$8.75
Ref #54 609E26000 CURB, TYPE 6, (1666 FT)
Awd $23,324.00$14.00
2 $23,324.00$14.00
3 $23,324.00$14.00
4 $16,660.00$10.00
5 $19,325.60$11.60
6 $24,157.00$14.50
7 $26,656.00$16.00
8 $24,157.00$14.50
Ref #55 609E54001 6" CONCRETE TRAFFIC ISLAND, AS PER PLAN, SPLITTER , (1055 SY)
Awd $52,750.00$50.00
2 $64,355.00$61.00
3 $43,255.00$41.00
4 $43,255.00$41.00
5 $46,420.00$44.00
6 $58,025.00$55.00
7 $68,047.50$64.50
8 $64,355.00$61.00
200240 - Page 37
Ref #56 609E57001 8" CONCRETE TRAFFIC ISLAND, AS PER PLAN, TRUCK APR, (953 SY)
Awd $62,898.00$66.00
2 $74,334.00$78.00
3 $47,650.00$50.00
4 $47,650.00$50.00
5 $50,756.78$53.26
6 $66,710.00$70.00
7 $72,428.00$76.00
8 $59,086.00$62.00
Section 4 - PAVEMENT - Totals
Awd $822,251.00
2 $870,112.10
3 $822,930.00
4 $781,796.50
5 $825,223.08
6 $933,783.00
7 $902,952.50
8 $902,052.35
Ref #57 625E00450 CONNECTION, FUSED PULL APART, (32 EACH)
Awd $4,160.00$130.00
2 $4,064.00$127.00
3 $4,176.00$130.50
4 $4,176.00$130.50
5 $4,176.00$130.50
6 $4,064.00$127.00
7 $4,384.00$137.00
8 $4,034.24$126.07
Ref #58 625E10491 LIGHT POLE, CONVENTIONAL, AS PER PLAN, A0B30, (16 EACH)
Awd $32,800.00$2,050.00
2 $27,856.00$1,741.00
3 $32,925.60$2,057.85
4 $32,925.60$2,057.85
5 $32,925.60$2,057.85
6 $27,856.00$1,741.00
7 $34,568.00$2,160.50
8 $27,856.00$1,741.00
Ref #59 625E14000 LIGHT POLE FOUNDATION, 24" X 6' DEEP, (16 EACH)
Awd $17,440.00$1,090.00
2 $15,200.00$950.00
3 $17,440.00$1,090.00
4 $17,440.00$1,090.00
5 $17,440.00$1,090.00
6 $15,200.00$950.00
7 $18,312.00$1,144.50
8 $15,200.00$950.00
200240 - Page 38
Ref #60 625E23200 NO. 4 AWG 2400 VOLT DISTRIBUTION CABLE, (1557 FT)
Awd $4,048.20$2.60
2 $3,892.50$2.50
3 $4,079.34$2.62
4 $4,079.34$2.62
5 $4,079.34$2.62
6 $3,736.80$2.40
7 $4,671.00$3.00
8 $3,736.80$2.40
Ref #61 625E23400 NO. 10 AWG POLE AND BRACKET CABLE, (1280 FT)
Awd $1,984.00$1.55
2 $1,280.00$1.00
3 $1,984.00$1.55
4 $1,984.00$1.55
5 $1,984.00$1.55
6 $1,075.20$0.84
7 $1,920.00$1.50
8 $1,075.20$0.84
Ref #62 625E24320 1-1/2" DUCT CABLE WITH THREE NO. 4 AWG 2400 VOLT C, (1400 FT)
Awd $8,400.00$6.00
2 $14,000.00$10.00
3 $8,414.00$6.01
4 $8,414.00$6.01
5 $8,414.00$6.01
6 $13,748.00$9.82
7 $9,100.00$6.50
8 $13,748.00$9.82
Ref #63 625E25500 CONDUIT, 3", 725.04, (1567 FT)
Awd $23,505.00$15.00
2 $16,453.50$10.50
3 $23,536.34$15.02
4 $23,536.34$15.02
5 $23,536.34$15.02
6 $16,453.50$10.50
7 $25,072.00$16.00
8 $16,390.82$10.46
Ref #64 625E26253 LUMINAIRE, CONVENTIONAL, SOLID STATE (LED), AS PER, (16 EACH)
Awd $11,520.00$720.00
2 $18,800.00$1,175.00
3 $11,484.00$717.75
4 $11,484.00$717.75
5 $11,484.00$717.75
6 $18,800.00$1,175.00
7 $12,056.00$753.50
8 $18,788.96$1,174.31
Ref #65 625E29002 TRENCH, 24" DEEP, (1577 FT)
Awd $8,831.20$5.60
2 $9,462.00$6.00
3 $8,815.43$5.59
4 $8,815.43$5.59
5 $8,815.43$5.59
6 $9,462.00$6.00
7 $9,462.00$6.00
8 $9,462.00$6.00
200240 - Page 39
Ref #66 625E30700 PULL BOX, 725.08, 18", (18 EACH)
Awd $15,750.00$875.00
2 $13,500.00$750.00
3 $15,750.00$875.00
4 $15,750.00$875.00
5 $15,750.00$875.00
6 $13,500.00$750.00
7 $16,542.00$919.00
8 $13,500.00$750.00
Ref #67 625E32000 GROUND ROD, (16 EACH)
Awd $3,848.00$240.50
2 $2,928.00$183.00
3 $3,848.00$240.50
4 $3,840.00$240.00
5 $3,848.00$240.50
6 $2,928.00$183.00
7 $4,040.00$252.50
8 $2,928.00$183.00
Ref #68 625E34001 POWER SERVICE, AS PER PLAN, (2 EACH)
Awd $11,560.00$5,780.00
2 $24,000.00$12,000.00
3 $11,560.00$5,780.00
4 $11,560.00$5,780.00
5 $11,560.00$5,780.00
6 $24,000.00$12,000.00
7 $12,138.00$6,069.00
8 $24,000.00$12,000.00
Ref #69 625E36000 PLASTIC CAUTION TAPE, (1515 FT)
Awd $757.50$0.50
2 $454.50$0.30
3 $727.20$0.48
4 $727.20$0.48
5 $727.20$0.48
6 $378.75$0.25
7 $757.50$0.50
8 $378.75$0.25
Section 5 - LIGHTING - Totals
Awd $144,603.90
2 $151,890.50
3 $144,739.91
4 $144,731.91
5 $144,739.91
6 $151,202.25
7 $153,022.50
8 $151,098.77
200240 - Page 40
Ref #70 620E70000 DELINEATOR, MISC.:BASE MOUNTED DELINEATOR, YELLOW, (8 EACH)
Awd $2,160.00$270.00
2 $1,760.00$220.00
3 $1,744.00$218.00
4 $2,000.00$250.00
5 $2,000.00$250.00
6 $1,800.00$225.00
7 $1,832.00$229.00
8 $1,744.00$218.00
Ref #71 621E00100 RPM, (114 EACH)
Awd $4,674.00$41.00
2 $4,674.00$41.00
3 $5,130.00$45.00
4 $5,130.00$45.00
5 $5,301.00$46.50
6 $4,674.00$41.00
7 $6,954.00$61.00
8 $5,301.00$46.50
Ref #72 630E03101 GROUND MOUNTED SUPPORT, NO. 3 POST, AS PER PLAN, (1150 FT)
Awd $10,350.00$9.00
2 $11,500.00$10.00
3 $10,350.00$9.00
4 $11,500.00$10.00
5 $11,500.00$10.00
6 $10,695.00$9.30
7 $2,875.00$2.50
8 $10,350.00$9.00
Ref #73 630E08302 GROUND MOUNTED WOODEN BOX BEAM SUPPORT, TYPE M BEA, (20 FT)
Awd $1,700.00$85.00
2 $1,700.00$85.00
3 $1,700.00$85.00
4 $3,000.00$150.00
5 $3,000.00$150.00
6 $1,760.00$88.00
7 $70.00$3.50
8 $1,700.00$85.00
Ref #74 630E08601 SIGN POST REFLECTOR, AS PER PLAN, (29 EACH)
Awd $1,305.00$45.00
2 $1,305.00$45.00
3 $1,305.00$45.00
4 $1,160.00$40.00
5 $1,160.00$40.00
6 $1,348.50$46.50
7 $768.50$26.50
8 $1,305.00$45.00
Ref #75 630E80100 SIGN, FLAT SHEET, (588.4 SF)
Awd $8,826.00$15.00
2 $8,826.00$15.00
3 $8,826.00$15.00
4 $10,591.20$18.00
5 $10,591.20$18.00
6 $9,120.20$15.50
7 $15,592.60$26.50
8 $8,826.00$15.00
200240 - Page 41
Ref #76 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL, (77 EACH)
Awd $770.00$10.00
2 $770.00$10.00
3 $770.00$10.00
4 $770.00$10.00
5 $770.00$10.00
6 $770.00$10.00
7 $2,310.00$30.00
8 $770.00$10.00
Ref #77 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION, (4 EACH)
Awd $240.00$60.00
2 $240.00$60.00
3 $240.00$60.00
4 $300.00$75.00
5 $300.00$75.00
6 $248.00$62.00
7 $1,182.00$295.50
8 $240.00$60.00
Ref #78 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA, (45 EACH)
Awd $450.00$10.00
2 $450.00$10.00
3 $450.00$10.00
4 $450.00$10.00
5 $450.00$10.00
6 $450.00$10.00
7 $1,372.50$30.50
8 $450.00$10.00
Ref #79 644E00100 EDGE LINE, 4", (1.38 MILE)
Awd $6,210.00$4,500.00
2 $5,520.00$4,000.00
3 $6,210.00$4,500.00
4 $6,210.00$4,500.00
5 $6,210.00$4,500.00
6 $6,210.00$4,500.00
7 $1,449.00$1,050.00
8 $6,210.00$4,500.00
Ref #80 644E00300 CENTER LINE, (0.52 MILE)
Awd $3,380.00$6,500.00
2 $3,640.00$7,000.00
3 $3,380.00$6,500.00
4 $3,380.00$6,500.00
5 $3,380.00$6,500.00
6 $3,380.00$6,500.00
7 $546.00$1,050.00
8 $3,380.00$6,500.00
Ref #81 644E00700 TRANSVERSE/DIAGONAL LINE, (42 FT)
Awd $336.00$8.00
2 $420.00$10.00
3 $336.00$8.00
4 $336.00$8.00
5 $336.00$8.00
6 $336.00$8.00
7 $2,205.00$52.50
8 $336.00$8.00
200240 - Page 42
Ref #82 644E01300 LANE ARROW, (8 EACH)
Awd $800.00$100.00
2 $800.00$100.00
3 $800.00$100.00
4 $800.00$100.00
5 $800.00$100.00
6 $800.00$100.00
7 $420.00$52.50
8 $800.00$100.00
Ref #83 644E01520 DOTTED LINE, 12", (381 FT)
Awd $1,143.00$3.00
2 $762.00$2.00
3 $1,143.00$3.00
4 $1,143.00$3.00
5 $1,143.00$3.00
6 $1,143.00$3.00
7 $6,096.00$16.00
8 $1,143.00$3.00
Ref #84 644E20800 YIELD LINE, (183 FT)
Awd $1,098.00$6.00
2 $3,660.00$20.00
3 $1,098.00$6.00
4 $1,098.00$6.00
5 $1,098.00$6.00
6 $1,098.00$6.00
7 $2,928.00$16.00
8 $1,098.00$6.00
Section 6 - TRAFFIC CONTROL - Totals
Awd $43,442.00
2 $46,027.00
3 $43,482.00
4 $47,868.20
5 $48,039.20
6 $43,832.70
7 $46,600.60
8 $43,653.00
Ref #85 653E10000 TOPSOIL FURNISHED AND PLACED, (92 CY)
Awd $3,220.00$35.00
2 $5,520.00$60.00
3 $2,300.00$25.00
4 $8,280.00$90.00
5 $5,520.00$60.00
6 $4,600.00$50.00
7 $2,898.00$31.50
8 $5,520.00$60.00
200240 - Page 43
Section 7 - LANDSCAPING - Totals
Awd $3,220.00
2 $5,520.00
3 $2,300.00
4 $8,280.00
5 $5,520.00
6 $4,600.00
7 $2,898.00
8 $5,520.00
Ref #88 503E11100 COFFERDAMS AND EXCAVATION BRACING, (LUMP SUM)
Awd $8,500.00$8,500.00
2 $10,000.00$10,000.00
3 $10,000.00$10,000.00
4 $6,000.00$6,000.00
5 $50,000.00$50,000.00
6 $25,000.00$25,000.00
7 $18,945.00$18,945.00
8 $18,195.00$18,195.00
Ref #89 503E21300 UNCLASSIFIED EXCAVATION (WINGWALL FOOTING), (LUMP SUM)
Awd $6,500.00$6,500.00
2 $2,000.00$2,000.00
3 $15,000.00$15,000.00
4 $12,000.00$12,000.00
5 $8,500.00$8,500.00
6 $5,700.00$5,700.00
7 $5,061.00$5,061.00
8 $34,944.00$34,944.00
Ref #90 509E10000 EPOXY COATED REINFORCING STEEL, (4140 LB)
Awd $7,245.00$1.75
2 $8,487.00$2.05
3 $9,066.60$2.19
4 $4,761.00$1.15
5 $8,280.00$2.00
6 $5,796.00$1.40
7 $16,560.00$4.00
8 $6,831.00$1.65
Ref #91 511E46010 CLASS QC1 CONCRETE, RETAINING/WINGWALL NOT INCLUDI, (14 CY)
Awd $14,000.00$1,000.00
2 $25,200.00$1,800.00
3 $23,800.00$1,700.00
4 $40,600.00$2,900.00
5 $24,500.00$1,750.00
6 $30,100.00$2,150.00
7 $25,207.00$1,800.50
8 $16,651.60$1,189.40
200240 - Page 44
Ref #92 511E46510 CLASS QC1 CONCRETE, FOOTING, (35 CY)
Awd $15,750.00$450.00
2 $16,625.00$475.00
3 $18,725.00$535.00
4 $31,500.00$900.00
5 $28,000.00$800.00
6 $25,900.00$740.00
7 $13,825.00$395.00
8 $32,332.65$923.79
Ref #93 511E46610 CLASS QC1 CONCRETE, HEADWALL, (2 CY)
Awd $1,000.00$500.00
2 $3,000.00$1,500.00
3 $3,600.00$1,800.00
4 $2,400.00$1,200.00
5 $1,800.00$900.00
6 $3,200.00$1,600.00
7 $1,607.00$803.50
8 $2,605.44$1,302.72
Ref #94 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (47 SY)
Awd $940.00$20.00
2 $799.00$17.00
3 $1,880.00$40.00
4 $1,833.00$39.00
5 $1,645.00$35.00
6 $1,645.00$35.00
7 $869.50$18.50
8 $1,292.50$27.50
Ref #95 512E33000 TYPE 2 WATERPROOFING, (608 SY)
Awd $9,728.00$16.00
2 $16,416.00$27.00
3 $13,376.00$22.00
4 $8,816.00$14.50
5 $13,984.00$23.00
6 $11,552.00$19.00
7 $11,552.00$19.00
8 $13,935.36$22.92
Ref #96 512E33010 TYPE 3 WATERPROOFING, (544 SY)
Awd $15,232.00$28.00
2 $18,224.00$33.50
3 $21,760.00$40.00
4 $15,531.20$28.55
5 $19,040.00$35.00
6 $17,952.00$33.00
7 $16,592.00$30.50
8 $20,720.96$38.09
Ref #97 516E13600 1" PREFORMED EXPANSION JOINT FILLER, (30 SF)
Awd $300.00$10.00
2 $270.00$9.00
3 $240.00$8.00
4 $300.00$10.00
5 $300.00$10.00
6 $300.00$10.00
7 $210.00$7.00
8 $294.90$9.83
200240 - Page 45
Ref #98 518E21230 POROUS BACKFILL WITH GEOTEXTILE FABRIC, (LUMP SUM)
Awd $4,500.00$4,500.00
2 $4,500.00$4,500.00
3 $4,000.00$4,000.00
4 $3,400.00$3,400.00
5 $1,750.00$1,750.00
6 $2,500.00$2,500.00
7 $2,067.00$2,067.00
8 $1,261.81$1,261.81
Ref #99 611E94900 8' X 5' CONDUIT, TYPE A, 706.05, (432 FT)
Awd $216,000.00$500.00
2 $237,600.00$550.00
3 $327,456.00$758.00
4 $302,400.00$700.00
5 $349,920.00$810.00
6 $237,600.00$550.00
7 $248,400.00$575.00
8 $297,781.92$689.31
Section 8 - STRUCTURE UNDER 20 FOOT SPAN (LUC-20A-4. - Totals
Awd $299,695.00
2 $343,121.00
3 $448,903.60
4 $429,541.20
5 $507,719.00
6 $367,245.00
7 $360,895.50
8 $446,847.14
Ref #100 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $20,000.00$20,000.00
2 $16,750.00$16,750.00
3 $12,000.00$12,000.00
4 $6,000.00$6,000.00
5 $12,000.00$12,000.00
6 $10,000.00$10,000.00
7 $56,182.79$56,182.79
8 $18,000.00$18,000.00
Ref #101 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $13,000.00$13,000.00
2 $25,000.00$25,000.00
3 $10,500.00$10,500.00
4 $8,000.00$8,000.00
5 $40,000.00$40,000.00
6 $39,000.00$39,000.00
7 $20,000.00$20,000.00
8 $82,000.00$82,000.00
200240 - Page 46
Ref #102 619E16020 FIELD OFFICE, TYPE C, (6 MNTH)
Awd $5,700.00$950.00
2 $13,350.00$2,225.00
3 $21,000.00$3,500.00
4 $13,200.00$2,200.00
5 $11,400.00$1,900.00
6 $11,400.00$1,900.00
7 $3,000.00$500.00
8 $15,600.00$2,600.00
Ref #103 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING, (LUMP SUM)
Awd $20,000.00$20,000.00
2 $30,000.00$30,000.00
3 $40,000.00$40,000.00
4 $15,000.00$15,000.00
5 $20,000.00$20,000.00
6 $19,780.00$19,780.00
7 $32,723.22$32,723.22
8 $30,000.00$30,000.00
Ref #104 624E10000 MOBILIZATION, (LUMP SUM)
Awd $100,000.00$100,000.00
2 $40,000.00$40,000.00
3 $100,000.00$100,000.00
4 $100,000.00$100,000.00
5 $100,000.00$100,000.00
6 $48,093.00$48,093.00
7 $100,000.00$100,000.00
8 $90,000.00$90,000.00
Ref #200 614E12420 DETOUR SIGNING, (LUMP SUM)
Awd $4,000.00$4,000.00
2 $15,000.00$15,000.00
3 $4,000.00$4,000.00
4 $4,000.00$4,000.00
5 $4,000.00$4,000.00
6 $4,000.00$4,000.00
7 $10,500.00$10,500.00
8 $4,000.00$4,000.00
Section 9 - INCIDENTALS - Totals
Awd $162,700.00
2 $140,100.00
3 $187,500.00
4 $146,200.00
5 $187,400.00
6 $132,273.00
7 $222,406.01
8 $239,600.00
200240 - Page 47
Project No. 200247
PID 95722
WOO-SR 25-15.82 Resurf
Federal
Type: FOUR LANE RESURFACING
Completion Date: 9/30/2020
Award Amount: $1,919,473.43
Contract Awarded To: SHELLY COMPANY
Letting Date: 5/7/2020
Engineer's Estimate: $2,344,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jack Marchbanks, Ph.D., Director
SHELLY COMPANY
80 PARK DR BOX 266
THORNVILLE, OH 43076
Perry
Bidder 1
Bid $1,919,473.43
GERKEN PAVING INC
9072 CO RD 424
NAPOLEON, OH 43545
Henry
Bidder 2
Bid $2,255,768.16
200247 - Page 48
Ref #1 202E20010 HEADWALL REMOVED, (1 EACH)
Awd $550.00$550.00
2 $175.00$175.00
Ref #2 202E23000 PAVEMENT REMOVED, (394 SY)
Awd $6,304.00$16.00
2 $5,811.50$14.75
Ref #3 202E35100 PIPE REMOVED, 24" AND UNDER, (94 FT)
Awd $1,598.00$17.00
2 $1,339.50$14.25
Ref #4 202E58100 CATCH BASIN REMOVED, (1 EACH)
Awd $500.00$500.00
2 $175.00$175.00
Ref #5 203E10000 EXCAVATION, (240 CY)
Awd $4,800.00$20.00
2 $7,200.00$30.00
Ref #6 204E10000 SUBGRADE COMPACTION, (901 SY)
Awd $450.50$0.50
2 $991.10$1.10
Ref #7 209E60500 LINEAR GRADING, (17 MILE)
Awd $16,150.00$950.00
2 $30,600.00$1,800.00
Ref #8 209E72050 PREPARING SUBGRADE FOR SHOULDER PAVING, (16.4 MILE)
Awd $15,580.00$950.00
2 $8,200.00$500.00
Section 1 - ROADWAY - Totals
Awd $45,932.50
2 $54,492.10
Ref #9 832E30000 EROSION CONTROL, (1000 EACH)
Awd $1,000.00$1.00
2 $1,000.00$1.00
Section 2 - EROSION CONTROL - Totals
Awd $1,000.00
2 $1,000.00
Ref #10 602E20000 CONCRETE MASONRY, (0.49 CY)
Awd $686.00$1,400.00
2 $1,225.00$2,500.00
Ref #11 611E02000 8" CONDUIT, TYPE C, (10 FT)
Awd $700.00$70.00
2 $480.00$48.00
Ref #12 611E07401 18" CONDUIT, TYPE B, AS PER PLAN, (58 FT)
Awd $16,240.00$280.00
2 $6,496.00$112.00
Ref #13 611E07600 18" CONDUIT, TYPE C, (26 FT)
Awd $3,770.00$145.00
2 $1,352.00$52.00
200247 - Page 49
Ref #14 611E98630 CATCH BASIN ADJUSTED TO GRADE, (21 EACH)
Awd $21,000.00$1,000.00
2 $17,325.00$825.00
Ref #15 611E99574 MANHOLE, NO. 3, (1 EACH)
Awd $2,500.00$2,500.00
2 $3,000.00$3,000.00
Ref #16 611E99654 MANHOLE ADJUSTED TO GRADE, (7 EACH)
Awd $7,000.00$1,000.00
2 $6,650.00$950.00
Section 3 - DRAINAGE - Totals
Awd $51,896.00
2 $36,528.00
Ref #17 253E02000 PAVEMENT REPAIR, (596 CY)
Awd $89,400.00$150.00
2 $103,704.00$174.00
Ref #18 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE , 1 3/4", (110497 SY)
Awd $66,298.20$0.60
2 $107,182.09$0.97
Ref #19 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 3 1/2", (39552 SY)
Awd $37,178.88$0.94
2 $75,148.80$1.90
Ref #20 257E10000 DIAMOND GRINDING PORTLAND CEMENT CONCRETE PAVEMENT, (847 SY)
Awd $6,437.20$7.60
2 $6,403.32$7.56
Ref #21 301E46000 ASPHALT CONCRETE BASE, PG64-22, (208 CY)
Awd $28,704.00$138.00
2 $31,200.00$150.00
Ref #22 304E20000 AGGREGATE BASE, (158 CY)
Awd $7,426.00$47.00
2 $11,060.00$70.00
Ref #23 407E20000 NON-TRACKING TACK COAT, (21128 GAL)
Awd $42,256.00$2.00
2 $40,143.20$1.90
Ref #24 442E10000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A (, (7390 CY)
Awd $968,090.00$131.00
2 $1,108,500.00$150.00
Ref #25 442E10100 ASPHALT CONCRETE INTERMEDIATE COURSE, 19 MM, TYPE , (2045 CY)
Awd $245,400.00$120.00
2 $276,075.00$135.00
Ref #26 617E10100 COMPACTED AGGREGATE, (1665 CY)
Awd $66,600.00$40.00
2 $79,920.00$48.00
Ref #27 618E40600 RUMBLE STRIPS, SHOULDER (ASPHALT CONCRETE), (16.5 MILE)
Awd $16,912.50$1,025.00
2 $13,447.50$815.00
200247 - Page 50
Ref #28 875E10000 LONGITUDINAL JOINT ADHESIVE, (12574 LB)
Awd $6,287.00$0.50
2 $16,974.90$1.35
Section 4 - PAVEMENT - Totals
Awd $1,580,989.78
2 $1,869,758.81
Ref #29 638E10800 VALVE BOX ADJUSTED TO GRADE, (2 EACH)
Awd $1,200.00$600.00
2 $850.00$425.00
Section 5 - WATER WORK - Totals
Awd $1,200.00
2 $850.00
Ref #30 621E00100 RPM, (717 EACH)
Awd $18,462.75$25.75
2 $18,462.75$25.75
Ref #31 621E54000 RAISED PAVEMENT MARKER REMOVED, (706 EACH)
Awd $4,236.00$6.00
2 $3,530.00$5.00
Ref #32 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST, (27 FT)
Awd $405.00$15.00
2 $1,161.00$43.00
Ref #33 630E80100 SIGN, FLAT SHEET, (7.08 SF)
Awd $212.40$30.00
2 $354.00$50.00
Ref #34 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL, (1 EACH)
Awd $25.00$25.00
2 $10.00$10.00
Ref #35 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA, (1 EACH)
Awd $25.00$25.00
2 $10.00$10.00
Ref #36 642E00104 EDGE LINE, 6", TYPE 1, (15 MILE)
Awd $12,000.00$800.00
2 $10,500.00$700.00
Ref #37 642E00204 LANE LINE, 6", TYPE 1, (9 MILE)
Awd $4,500.00$500.00
2 $5,850.00$650.00
Ref #38 642E00300 CENTER LINE, TYPE 1, (1 MILE)
Awd $1,000.00$1,000.00
2 $1,000.00$1,000.00
Ref #39 644E00400 CHANNELIZING LINE, 8", (5018 FT)
Awd $7,527.00$1.50
2 $10,036.00$2.00
Ref #40 644E00500 STOP LINE, (359 FT)
Awd $2,154.00$6.00
2 $2,872.00$8.00
200247 - Page 51
Ref #41 644E00600 CROSSWALK LINE, (504 FT)
Awd $2,520.00$5.00
2 $3,024.00$6.00
Ref #42 644E00700 TRANSVERSE/DIAGONAL LINE, (550 FT)
Awd $2,750.00$5.00
2 $3,300.00$6.00
Ref #43 644E00720 CHEVRON MARKING, (363 FT)
Awd $1,815.00$5.00
2 $2,904.00$8.00
Ref #44 644E01300 LANE ARROW, (38 EACH)
Awd $3,420.00$90.00
2 $3,230.00$85.00
Ref #45 644E01500 DOTTED LINE, 4", (2586 FT)
Awd $3,879.00$1.50
2 $2,586.00$1.00
Section 6 - TRAFFIC CONTROL - Totals
Awd $64,931.15
2 $68,829.75
Ref #46 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST, (200 HOUR)
Awd $10,000.00$50.00
2 $16,000.00$80.00
Ref #47 614E12460 WORK ZONE MARKING SIGN, (40 EACH)
Awd $5,400.00$135.00
2 $4,400.00$110.00
Ref #48 614E12500 REPLACEMENT SIGN, (10 EACH)
Awd $1,920.00$192.00
2 $900.00$90.00
Ref #49 614E12600 REPLACEMENT DRUM, (10 EACH)
Awd $560.00$56.00
2 $450.00$45.00
Ref #50 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN, (1 SNMT)
Awd $1,000.00$1,000.00
2 $1,400.00$1,400.00
Ref #51 614E20100 WORK ZONE LANE LINE, CLASS I, 4", 642 PAINT, (20 MILE)
Awd $9,000.00$450.00
2 $10,000.00$500.00
Ref #52 614E21100 WORK ZONE CENTER LINE, CLASS I, 642 PAINT, (3 MILE)
Awd $2,550.00$850.00
2 $3,000.00$1,000.00
Ref #53 614E22010 WORK ZONE EDGE LINE, CLASS I, 6", (35 MILE)
Awd $22,750.00$650.00
2 $24,500.00$700.00
Ref #54 614E23200 WORK ZONE CHANNELIZING LINE, CLASS I, 8", 642 PAIN, (13382 FT)
Awd $6,691.00$0.50
2 $10,036.50$0.75
200247 - Page 52
Ref #55 614E26200 WORK ZONE STOP LINE, CLASS I, 642 PAINT, (1021 FT)
Awd $3,063.00$3.00
2 $3,063.00$3.00
Ref #56 614E30000 WORK ZONE ARROW, CLASS I, (66 EACH)
Awd $1,980.00$30.00
2 $3,630.00$55.00
Section 7 - MAINTENANCE OF TRAFFIC - Totals
Awd $64,914.00
2 $77,379.50
Ref #57 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $5,000.00$5,000.00
2 $9,930.00$9,930.00
Ref #58 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $57,000.00$57,000.00
2 $80,000.00$80,000.00
Ref #59 623E10001 CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P, (LUMP SUM)
Awd $6,610.00$6,610.00
2 $7,000.00$7,000.00
Ref #60 624E10000 MOBILIZATION, (LUMP SUM)
Awd $40,000.00$40,000.00
2 $50,000.00$50,000.00
Section 8 - INCIDENTALS - Totals
Awd $108,610.00
2 $146,930.00
200247 - Page 53
Project No. 200260
PID 103924
MED-SR 162-11.70
Non-Federal
Type: CULVERT REPLACEMENT
Completion Date: 11/6/2020
Award Amount: $198,265.46
Contract Awarded To: GREAT LAKES DEMOLITION COMPANY
Letting Date: 5/7/2020
Engineer's Estimate: $298,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jack Marchbanks, Ph.D., Director
GREAT LAKES DEMOLITION COMPANY
1787 North State Route 510
VICKERY, OH 43464
Sandusky
Bidder 1
Bid $198,265.46
ADENA CORPORATION
1310 WEST FOURTH ST
MANSFIELD, OH 44906
Richland
Bidder 2
Bid $205,375.45
STANLEY MILLER CONSTRUCTION COMPANY
2250 HOWENSTINE DR SE
EAST SPARTA, OH 44626
Stark
Bidder 3
Bid $210,126.79
DIGIOIA-SUBURBAN EXCAVATING LLC
11293 ROYALTON RD
N ROYALTON, OH 44133
Cuyahoga
Bidder 4
Bid $218,034.20
LOCKHART CONCRETE CO
800 W WATERLOO RD
AKRON, OH 44314
Summit
Bidder 5
Bid $259,004.50
RUHLIN COMPANY
P O BOX 190
SHARON CENTER, OH 44274
Medina
Bidder 6
Bid $277,754.92
ECLIPSE CO LLC
11554 EAST WASHINGTON ST
CHAGRIN FALLS, OH 44023
Geauga
Bidder 7
Bid $281,150.53
200260 - Page 54
Ref #1 201E11000 CLEARING AND GRUBBING, (LUMP SUM)
Awd $1,700.00$1,700.00
2 $5,548.90$5,548.90
3 $4,333.00$4,333.00
4 $6,200.00$6,200.00
5 $9,000.00$9,000.00
6 $14,200.00$14,200.00
7 $5,355.00$5,355.00
Ref #2 202E11001 STRUCTURE REMOVED, AS PER PLAN, (LUMP SUM)
Awd $4,000.00$4,000.00
2 $7,399.43$7,399.43
3 $2,467.00$2,467.00
4 $5,750.00$5,750.00
5 $29,000.00$29,000.00
6 $4,500.00$4,500.00
7 $3,434.00$3,434.00
Ref #3 202E23000 PAVEMENT REMOVED, (126 SY)
Awd $2,520.00$20.00
2 $3,957.66$31.41
3 $1,764.00$14.00
4 $3,685.50$29.25
5 $1,512.00$12.00
6 $3,780.00$30.00
7 $2,709.00$21.50
Ref #4 202E35100 PIPE REMOVED, 24" AND UNDER, (44 FT)
Awd $440.00$10.00
2 $193.16$4.39
3 $264.00$6.00
4 $726.00$16.50
5 $440.00$10.00
6 $242.00$5.50
7 $1,276.00$29.00
Ref #5 202E35200 PIPE REMOVED, OVER 24", (61 FT)
Awd $610.00$10.00
2 $269.01$4.41
3 $549.00$9.00
4 $1,098.00$18.00
5 $1,220.00$20.00
6 $341.60$5.60
7 $1,159.00$19.00
Ref #6 202E38000 GUARDRAIL REMOVED, (275 FT)
Awd $440.00$1.60
2 $1,369.50$4.98
3 $550.00$2.00
4 $481.25$1.75
5 $825.00$3.00
6 $440.00$1.60
7 $962.50$3.50
200260 - Page 55
Ref #7 202E42000 ANCHOR ASSEMBLY REMOVED, TYPE A, (3 EACH)
Awd $795.00$265.00
2 $304.59$101.53
3 $918.00$306.00
4 $810.00$270.00
5 $750.00$250.00
6 $795.00$265.00
7 $703.50$234.50
Ref #8 202E42040 ANCHOR ASSEMBLY REMOVED, TYPE T, (1 EACH)
Awd $105.00$105.00
2 $152.29$152.29
3 $139.00$139.00
4 $107.00$107.00
5 $250.00$250.00
6 $105.00$105.00
7 $234.50$234.50
Ref #9 203E10000 EXCAVATION, (211 CY)
Awd $3,165.00$15.00
2 $2,994.09$14.19
3 $4,642.00$22.00
4 $4,589.25$21.75
5 $4,220.00$20.00
6 $1,793.50$8.50
7 $6,224.50$29.50
Ref #10 203E20000 EMBANKMENT, (282 CY)
Awd $6,486.00$23.00
2 $4,235.64$15.02
3 $11,280.00$40.00
4 $8,770.20$31.10
5 $8,460.00$30.00
6 $3,948.00$14.00
7 $4,512.00$16.00
Ref #11 204E10000 SUBGRADE COMPACTION, (158 SY)
Awd $316.00$2.00
2 $571.96$3.62
3 $158.00$1.00
4 $355.50$2.25
5 $316.00$2.00
6 $632.00$4.00
7 $474.00$3.00
Ref #12 606E15050 GUARDRAIL, TYPE MGS, (200 FT)
Awd $3,840.00$19.20
2 $3,936.00$19.68
3 $3,660.00$18.30
4 $3,900.00$19.50
5 $5,000.00$25.00
6 $3,840.00$19.20
7 $5,300.00$26.50
200260 - Page 56
Ref #13 606E15350 GUARDRAIL, TYPE MGS WITH SOCKETED POSTS, (25 FT)
Awd $4,563.00$182.52
2 $3,660.75$146.43
3 $3,475.00$139.00
4 $4,625.00$185.00
5 $3,125.00$125.00
6 $4,562.50$182.50
7 $2,937.50$117.50
Ref #14 606E26150 ANCHOR ASSEMBLY, MGS TYPE E (MASH 2016), (2 EACH)
Awd $4,740.00$2,370.00
2 $8,200.50$4,100.25
3 $7,778.00$3,889.00
4 $4,800.00$2,400.00
5 $4,500.00$2,250.00
6 $4,740.00$2,370.00
7 $5,040.00$2,520.00
Ref #15 606E26550 ANCHOR ASSEMBLY, MGS TYPE T, (2 EACH)
Awd $1,970.00$985.00
2 $3,221.62$1,610.81
3 $3,056.00$1,528.00
4 $2,000.00$1,000.00
5 $2,200.00$1,100.00
6 $1,970.00$985.00
7 $2,100.00$1,050.00
Section 1 - ROADWAY - Totals
Awd $35,690.00
2 $46,015.10
3 $45,033.00
4 $47,897.70
5 $70,818.00
6 $45,889.60
7 $42,421.50
Ref #16 601E11000 RIPRAP, TYPE D, (17 SY)
Awd $1,445.00$85.00
2 $3,455.76$203.28
3 $3,213.00$189.00
4 $850.00$50.00
5 $2,550.00$150.00
6 $1,700.00$100.00
7 $2,694.50$158.50
Ref #17 601E32100 ROCK CHANNEL PROTECTION, TYPE B WITH FILTER, (53 CY)
Awd $5,035.00$95.00
2 $5,480.20$103.40
3 $3,710.00$70.00
4 $5,406.00$102.00
5 $6,625.00$125.00
6 $5,830.00$110.00
7 $6,492.50$122.50
200260 - Page 57
Ref #18 659E00100 SOIL ANALYSIS TEST, (2 EACH)
Awd $300.00$150.00
2 $200.00$100.00
3 $200.00$100.00
4 $300.00$150.00
5 $1,000.00$500.00
6 $200.00$100.00
7 $210.00$105.00
Ref #19 659E00300 TOPSOIL, (105 CY)
Awd $4,725.00$45.00
2 $2,879.10$27.42
3 $3,675.00$35.00
4 $6,195.00$59.00
5 $3,150.00$30.00
6 $5,775.00$55.00
7 $4,882.50$46.50
Ref #20 659E10000 SEEDING AND MULCHING, (943 SY)
Awd $943.00$1.00
2 $2,583.82$2.74
3 $7,072.50$7.50
4 $1,178.75$1.25
5 $943.00$1.00
6 $1,225.90$1.30
7 $3,300.50$3.50
Ref #21 659E14000 REPAIR SEEDING AND MULCHING, (47 SY)
Awd $188.00$4.00
2 $47.00$1.00
3 $47.00$1.00
4 $611.00$13.00
5 $47.00$1.00
6 $141.00$3.00
7 $164.50$3.50
Ref #22 659E15000 INTER-SEEDING, (47 SY)
Awd $188.00$4.00
2 $47.00$1.00
3 $141.00$3.00
4 $96.35$2.05
5 $47.00$1.00
6 $47.00$1.00
7 $164.50$3.50
Ref #23 659E20000 COMMERCIAL FERTILIZER, (0.13 TON)
Awd $130.00$1,000.00
2 $292.34$2,248.77
3 $104.00$800.00
4 $70.85$545.00
5 $91.00$700.00
6 $104.00$800.00
7 $83.27$640.54
200260 - Page 58
Ref #24 659E31000 LIME, (0.19 ACRE)
Awd $105.07$553.00
2 $184.25$969.74
3 $19.00$100.00
4 $8.95$47.11
5 $114.00$600.00
6 $0.95$5.00
7 $14.92$78.53
Ref #25 659E35000 WATER, (5.22 MGAL)
Awd $51.99$9.96
2 $5.22$1.00
3 $5.22$1.00
4 $3,575.70$685.00
5 $261.00$50.00
6 $5.22$1.00
7 $5.22$1.00
Ref #26 670E00520 SLOPE EROSION PROTECTION MAT, TYPE B, (226 SY)
Awd $452.00$2.00
2 $472.34$2.09
3 $904.00$4.00
4 $655.40$2.90
5 $1,130.00$5.00
6 $791.00$3.50
7 $565.00$2.50
Ref #27 832E30000 EROSION CONTROL, (2000 EACH)
Awd $2,000.00$1.00
2 $2,000.00$1.00
3 $2,000.00$1.00
4 $2,000.00$1.00
5 $2,000.00$1.00
6 $2,000.00$1.00
7 $2,000.00$1.00
Section 2 - EROSION CONTROL - Totals
Awd $15,563.06
2 $17,647.03
3 $21,090.72
4 $20,948.00
5 $17,958.00
6 $17,820.07
7 $20,577.41
Ref #28 605E31100 AGGREGATE DRAINS, (87 FT)
Awd $2,175.00$25.00
2 $444.57$5.11
3 $783.00$9.00
4 $543.75$6.25
5 $1,305.00$15.00
6 $783.00$9.00
7 $1,087.50$12.50
200260 - Page 59
Ref #29 611E06400 15" CONDUIT, TYPE D, (60 FT)
Awd $2,100.00$35.00
2 $1,732.80$28.88
3 $2,010.00$33.50
4 $2,040.00$34.00
5 $5,700.00$95.00
6 $4,080.00$68.00
7 $4,890.00$81.50
Ref #30 611E13900 30" CONDUIT, TYPE D, (136 FT)
Awd $9,248.00$68.00
2 $9,428.88$69.33
3 $5,576.00$41.00
4 $7,344.00$54.00
5 $13,600.00$100.00
6 $12,036.00$88.50
7 $13,192.00$97.00
Ref #31 611E53300 53" X 83" CONDUIT, TYPE A, 706.04, (36 FT)
Awd $23,220.00$645.00
2 $25,838.64$717.74
3 $24,300.00$675.00
4 $20,880.00$580.00
5 $36,000.00$1,000.00
6 $28,800.00$800.00
7 $24,030.00$667.50
Ref #32 611E98470 CATCH BASIN, NO. 2-2B, (1 EACH)
Awd $1,500.00$1,500.00
2 $1,065.62$1,065.62
3 $1,587.00$1,587.00
4 $1,900.00$1,900.00
5 $1,500.00$1,500.00
6 $2,900.00$2,900.00
7 $2,153.00$2,153.00
Ref #33 611E98510 CATCH BASIN, NO. 2-3, (1 EACH)
Awd $1,750.00$1,750.00
2 $1,569.36$1,569.36
3 $1,660.00$1,660.00
4 $2,000.00$2,000.00
5 $2,000.00$2,000.00
6 $2,900.00$2,900.00
7 $2,206.50$2,206.50
Section 3 - DRAINAGE - Totals
Awd $39,993.00
2 $40,079.87
3 $35,916.00
4 $34,707.75
5 $60,105.00
6 $51,499.00
7 $47,559.00
200260 - Page 60
Ref #34 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (3.0"), (128 SY)
Awd $2,560.00$20.00
2 $2,624.00$20.50
3 $3,136.00$24.50
4 $2,848.00$22.25
5 $1,920.00$15.00
6 $3,584.00$28.00
7 $2,944.00$23.00
Ref #35 301E46000 ASPHALT CONCRETE BASE, PG64-22, (34 CY)
Awd $7,650.00$225.00
2 $10,356.06$304.59
3 $8,126.00$239.00
4 $7,386.50$217.25
5 $10,200.00$300.00
6 $10,200.00$300.00
7 $7,684.00$226.00
Ref #36 304E20000 AGGREGATE BASE, (74 CY)
Awd $4,810.00$65.00
2 $7,800.34$105.41
3 $5,446.40$73.60
4 $5,735.00$77.50
5 $3,700.00$50.00
6 $5,180.00$70.00
7 $5,069.00$68.50
Ref #37 407E10000 TACK COAT, (49 GAL)
Awd $186.20$3.80
2 $573.79$11.71
3 $274.40$5.60
4 $247.45$5.05
5 $98.00$2.00
6 $147.00$3.00
7 $269.50$5.50
Ref #38 408E10001 PRIME COAT, AS PER PLAN, (54 GAL)
Awd $270.00$5.00
2 $1,265.22$23.43
3 $599.40$11.10
4 $545.40$10.10
5 $108.00$2.00
6 $162.00$3.00
7 $567.00$10.50
Ref #39 442E10501 ASPHALT CONCRETE SURFACE COURSE, 9.5 MM, TYPE A (4, (25 CY)
Awd $8,250.00$330.00
2 $8,932.50$357.30
3 $9,725.00$389.00
4 $8,837.50$353.50
5 $7,500.00$300.00
6 $10,625.00$425.00
7 $9,187.50$367.50
200260 - Page 61
Section 4 - PAVEMENT - Totals
Awd $23,726.20
2 $31,551.91
3 $27,307.20
4 $25,599.85
5 $23,526.00
6 $29,898.00
7 $25,721.00
Ref #40 621E00100 RPM, (2 EACH)
Awd $1,970.00$985.00
2 $2,928.74$1,464.37
3 $200.00$100.00
4 $1,212.00$606.00
5 $700.00$350.00
6 $2,345.00$1,172.50
7 $2,100.00$1,050.00
Ref #41 621E54000 RAISED PAVEMENT MARKER REMOVED, (2 EACH)
Awd $100.00$50.00
2 $50.00$25.00
3 $100.00$50.00
4 $22.00$11.00
5 $300.00$150.00
6 $10.00$5.00
7 $48.00$24.00
Ref #42 626E00110 BARRIER REFLECTOR, TYPE 2 (BIDIRECTIONAL), (11 EACH)
Awd $83.05$7.55
2 $109.45$9.95
3 $104.50$9.50
4 $88.00$8.00
5 $132.00$12.00
6 $93.50$8.50
7 $115.50$10.50
Ref #43 642E00104 EDGE LINE, 6", TYPE 1, (0.12 MILE)
Awd $837.00$6,975.00
2 $980.55$8,171.25
3 $930.00$7,750.00
4 $670.20$5,585.00
5 $720.00$6,000.00
6 $837.00$6,975.00
7 $2,142.00$17,850.00
Ref #44 642E00300 CENTER LINE, TYPE 1, (0.06 MILE)
Awd $558.00$9,300.00
2 $653.70$10,895.00
3 $620.04$10,334.00
4 $446.70$7,445.00
5 $480.00$8,000.00
6 $558.00$9,300.00
7 $1,071.00$17,850.00
200260 - Page 62
Section 5 - TRAFFIC CONTROL - Totals
Awd $3,548.05
2 $4,722.44
3 $1,954.54
4 $2,438.90
5 $2,332.00
6 $3,843.50
7 $5,476.50
Ref #45 614E12420 DETOUR SIGNING, (LUMP SUM)
Awd $2,865.00$2,865.00
2 $3,356.35$3,356.35
3 $3,183.00$3,183.00
4 $2,700.00$2,700.00
5 $3,000.00$3,000.00
6 $2,865.00$2,865.00
7 $6,066.62$6,066.62
Ref #46 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN, (2 SNMT)
Awd $2,000.00$1,000.00
2 $2,225.84$1,112.92
3 $2,112.00$1,056.00
4 $1,900.00$950.00
5 $2,000.00$1,000.00
6 $1,050.00$525.00
7 $2,079.00$1,039.50
Section 6 - MAINTENANCE OF TRAFFIC - Totals
Awd $4,865.00
2 $5,582.19
3 $5,295.00
4 $4,600.00
5 $5,000.00
6 $3,915.00
7 $8,145.62
Ref #47 503E11100 COFFERDAMS AND EXCAVATION BRACING, (LUMP SUM)
Awd $2,000.00$2,000.00
2 $4,048.05$4,048.05
3 $4,445.00$4,445.00
4 $5,580.00$5,580.00
5 $5,000.00$5,000.00
6 $7,000.00$7,000.00
7 $19,546.00$19,546.00
Ref #48 503E21300 UNCLASSIFIED EXCAVATION, (LUMP SUM)
Awd $3,000.00$3,000.00
2 $4,352.64$4,352.64
3 $4,045.00$4,045.00
4 $8,530.00$8,530.00
5 $2,000.00$2,000.00
6 $16,000.00$16,000.00
7 $5,668.50$5,668.50
200260 - Page 63
Ref #49 509E10000 EPOXY COATED REINFORCING STEEL, (5243 LB)
Awd $5,505.15$1.05
2 $8,021.79$1.53
3 $6,868.33$1.31
4 $5,243.00$1.00
5 $5,243.00$1.00
6 $17,039.75$3.25
7 $15,729.00$3.00
Ref #50 511E46010 CLASS QC1 CONCRETE, RETAINING/WINGWALL NOT INCLUDI, (13 CY)
Awd $10,400.00$800.00
2 $7,860.71$604.67
3 $9,347.00$719.00
4 $9,841.00$757.00
5 $13,000.00$1,000.00
6 $19,500.00$1,500.00
7 $10,270.00$790.00
Ref #51 511E46510 CLASS QC1 CONCRETE, FOOTING, (29 CY)
Awd $23,200.00$800.00
2 $11,668.15$402.35
3 $11,281.00$389.00
4 $21,953.00$757.00
5 $21,750.00$750.00
6 $27,550.00$950.00
7 $12,919.50$445.50
Ref #52 511E46610 CLASS QC1 CONCRETE, HEADWALL, (4 CY)
Awd $3,200.00$800.00
2 $1,704.52$426.13
3 $3,528.00$882.00
4 $3,028.00$757.00
5 $8,000.00$2,000.00
6 $3,900.00$975.00
7 $7,640.00$1,910.00
Ref #53 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (126 SY)
Awd $4,032.00$32.00
2 $2,096.64$16.64
3 $2,646.00$21.00
4 $3,906.00$31.00
5 $724.50$5.75
6 $3,150.00$25.00
7 $1,953.00$15.50
Ref #54 512E33000 TYPE 2 WATERPROOFING, (44 SY)
Awd $1,232.00$28.00
2 $1,686.96$38.34
3 $2,156.00$49.00
4 $1,144.00$26.00
5 $528.00$12.00
6 $3,828.00$87.00
7 $550.00$12.50
200260 - Page 64
Ref #55 516E13600 1" PREFORMED EXPANSION JOINT FILLER, (42 SF)
Awd $42.00$1.00
2 $181.44$4.32
3 $168.00$4.00
4 $42.00$1.00
5 $210.00$5.00
6 $630.00$15.00
7 $273.00$6.50
Ref #56 518E21230 POROUS BACKFILL WITH GEOTEXTILE FABRIC, (LUMP SUM)
Awd $2,499.00$2,499.00
2 $3,137.39$3,137.39
3 $1,837.00$1,837.00
4 $2,400.00$2,400.00
5 $2,000.00$2,000.00
6 $1,400.00$1,400.00
7 $7,700.50$7,700.50
Section 7 - STRUCTURE 20 FOOT SPAN AND UNDER (MED-16 - Totals
Awd $55,110.15
2 $44,758.29
3 $46,321.33
4 $61,667.00
5 $58,455.50
6 $99,997.75
7 $82,249.50
Ref #57 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $2,770.00$2,770.00
2 $1,991.55$1,991.55
3 $2,800.00$2,800.00
4 $1,300.00$1,300.00
5 $6,700.00$6,700.00
6 $1,232.00$1,232.00
7 $8,500.00$8,500.00
Ref #58 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $2,000.00$2,000.00
2 $2,143.84$2,143.84
3 $3,797.00$3,797.00
4 $6,875.00$6,875.00
5 $4,110.00$4,110.00
6 $10,000.00$10,000.00
7 $10,500.00$10,500.00
Ref #59 619E16000 FIELD OFFICE, TYPE A, (2 MNTH)
Awd $1,000.00$500.00
2 $1,054.34$527.17
3 $3,000.00$1,500.00
4 $2,000.00$1,000.00
5 $1,000.00$500.00
6 $1,660.00$830.00
7 $1,000.00$500.00
200260 - Page 65
Ref #60 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING, (LUMP SUM)
Awd $4,000.00$4,000.00
2 $2,624.16$2,624.16
3 $7,778.00$7,778.00
4 $3,500.00$3,500.00
5 $5,000.00$5,000.00
6 $4,500.00$4,500.00
7 $14,000.00$14,000.00
Ref #61 624E10000 MOBILIZATION, (LUMP SUM)
Awd $10,000.00$10,000.00
2 $7,204.73$7,204.73
3 $9,834.00$9,834.00
4 $6,500.00$6,500.00
5 $4,000.00$4,000.00
6 $7,500.00$7,500.00
7 $15,000.00$15,000.00
Section 8 - INCIDENTALS - Totals
Awd $19,770.00
2 $15,018.62
3 $27,209.00
4 $20,175.00
5 $20,810.00
6 $24,892.00
7 $49,000.00
200260 - Page 66
Project No. 200261
PID 103016
ASD-US 250-12.22
Federal
Type: TWO LANE RESURFACING
Completion Date: 11/1/2020
Award Amount: $1,131,600.14
Contract Awarded To: SHELLY & SANDS INC
Letting Date: 5/7/2020
Engineer's Estimate: $1,600,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jack Marchbanks, Ph.D., Director
SHELLY & SANDS INC
1515 HARMON AVE
COLUMBUS, OH 43223
Franklin
Bidder 1
Bid $1,131,600.14
KOKOSING CONSTRUCTION COMPANY INC
6235 WESTERVILLE RD
WESTERVILLE, OH 43081
Franklin
Bidder 2
Bid $1,170,551.20
KARVO COMPANIES INC
4524 HUDSON DR
STOW, OH 44224-1702
Bidder 3
Bid $1,235,438.47
BARBICAS CONSTRUCTION COMPANY INC
124 DARROW RD
AKRON, OH 44305
Summit
Bidder 4
Bid $1,351,882.30
200261 - Page 67
Ref #1 202E38000 GUARDRAIL REMOVED, (737.5 FT)
Awd $1,327.50$1.80
2 $1,327.50$1.80
3 $1,327.50$1.80
4 $1,327.50$1.80
Ref #2 202E38200 GUARDRAIL REMOVED FOR REUSE, (437.5 FT)
Awd $4,900.00$11.20
2 $4,900.00$11.20
3 $4,900.00$11.20
4 $4,900.00$11.20
Ref #3 202E42040 ANCHOR ASSEMBLY REMOVED, TYPE T, (1 EACH)
Awd $95.00$95.00
2 $95.00$95.00
3 $95.00$95.00
4 $95.00$95.00
Ref #4 202E42050 ANCHOR ASSEMBLY REMOVED, TYPE B, (8 EACH)
Awd $920.00$115.00
2 $920.00$115.00
3 $920.00$115.00
4 $920.00$115.00
Ref #5 202E47200 BRIDGE TERMINAL ASSEMBLY REMOVED FOR REUSE, (4 EACH)
Awd $260.00$65.00
2 $260.00$65.00
3 $260.00$65.00
4 $260.00$65.00
Ref #6 203E20001 EMBANKMENT, AS PER PLAN, (114 CY)
Awd $7,353.00$64.50
2 $7,353.00$64.50
3 $7,353.00$64.50
4 $7,353.00$64.50
Ref #7 209E15000 RESHAPING UNDER GUARDRAIL, (21.32 STA)
Awd $852.80$40.00
2 $852.80$40.00
3 $852.80$40.00
4 $852.80$40.00
Ref #8 209E60500 LINEAR GRADING, (8.58 MILE)
Awd $10,296.00$1,200.00
2 $6,006.00$700.00
3 $12,012.00$1,400.00
4 $3,432.00$400.00
Ref #9 209E80000 GRADING MAILBOX APPROACHES, (3 EACH)
Awd $150.00$50.00
2 $30.00$10.00
3 $420.00$140.00
4 $600.00$200.00
Ref #10 606E13000 GUARDRAIL, TYPE 5, (737.5 FT)
Awd $12,095.00$16.40
2 $12,095.00$16.40
3 $12,095.00$16.40
4 $12,095.00$16.40
200261 - Page 68
Ref #11 606E16500 GUARDRAIL REBUILT, TYPE 5, (125 FT)
Awd $1,450.00$11.60
2 $1,450.00$11.60
3 $1,450.00$11.60
4 $1,450.00$11.60
Ref #12 606E17000 RAISING TYPE 5 GUARDRAIL, (600 FT)
Awd $2,640.00$4.40
2 $2,640.00$4.40
3 $2,940.00$4.90
4 $2,940.00$4.90
Ref #13 606E26000 ANCHOR ASSEMBLY, TYPE B, (8 EACH)
Awd $12,520.00$1,565.00
2 $12,520.00$1,565.00
3 $12,520.00$1,565.00
4 $12,520.00$1,565.00
Ref #14 606E26500 ANCHOR ASSEMBLY, TYPE T, (1 EACH)
Awd $770.00$770.00
2 $770.00$770.00
3 $770.00$770.00
4 $770.00$770.00
Ref #15 606E35010 BRIDGE TERMINAL ASSEMBLY REBUILT, TYPE 1, (4 EACH)
Awd $4,140.00$1,035.00
2 $4,140.00$1,035.00
3 $4,140.00$1,035.00
4 $4,140.00$1,035.00
Ref #16 623E39500 MONUMENT BOX ADJUSTED TO GRADE, (19 EACH)
Awd $9,500.00$500.00
2 $8,550.00$450.00
3 $4,180.00$220.00
4 $8,550.00$450.00
Section 1 - ROADWAY - Totals
Awd $69,269.30
2 $63,909.30
3 $66,235.30
4 $62,205.30
Ref #17 832E30000 EROSION CONTROL, (2400 EACH)
Awd $2,400.00$1.00
2 $2,400.00$1.00
3 $2,400.00$1.00
4 $2,400.00$1.00
Section 2 - EROSION CONTROL - Totals
Awd $2,400.00
2 $2,400.00
3 $2,400.00
4 $2,400.00
200261 - Page 69
Ref #18 251E01042 PARTIAL DEPTH PAVEMENT REPAIR (ASPHALT CONCRETE BA, (505 CY)
Awd $106,050.00$210.00
2 $90,900.00$180.00
3 $101,000.00$200.00
4 $90,900.00$180.00
Ref #19 253E02000 PAVEMENT REPAIR, (30 CY)
Awd $7,800.00$260.00
2 $9,600.00$320.00
3 $6,300.00$210.00
4 $6,600.00$220.00
Ref #20 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (1.5"), (90624 SY)
Awd $67,968.00$0.75
2 $54,374.40$0.60
3 $81,561.60$0.90
4 $135,936.00$1.50
Ref #21 254E01600 PATCHING PLANED SURFACE, (459 SY)
Awd $1,377.00$3.00
2 $573.75$1.25
3 $229.50$0.50
4 $1,377.00$3.00
Ref #22 407E20000 NON-TRACKING TACK COAT, (7267 GAL)
Awd $21,801.00$3.00
2 $18,167.50$2.50
3 $15,987.40$2.20
4 $24,707.80$3.40
Ref #23 408E10001 PRIME COAT, AS PER PLAN, (3322 GAL)
Awd $9,135.50$2.75
2 $9,966.00$3.00
3 $13,288.00$4.00
4 $14,949.00$4.50
Ref #24 442E10000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A (, (3792 CY)
Awd $553,632.00$146.00
2 $633,264.00$167.00
3 $599,136.00$158.00
4 $663,600.00$175.00
Ref #25 617E10100 COMPACTED AGGREGATE, (487 CY)
Awd $19,480.00$40.00
2 $17,045.00$35.00
3 $14,610.00$30.00
4 $38,960.00$80.00
Ref #26 617E20000 SHOULDER PREPARATION, (8290 SY)
Awd $1,243.50$0.15
2 $829.00$0.10
3 $2,404.10$0.29
4 $4,145.00$0.50
Section 3 - PAVEMENT - Totals
Awd $788,487.00
2 $834,719.65
3 $834,516.60
4 $981,174.80
200261 - Page 70
Ref #27 621E00100 RPM, (410 EACH)
Awd $10,619.00$25.90
2 $11,562.00$28.20
3 $11,562.00$28.20
4 $12,095.00$29.50
Ref #28 621E54000 RAISED PAVEMENT MARKER REMOVED, (400 EACH)
Awd $1,200.00$3.00
2 $2,000.00$5.00
3 $920.00$2.30
4 $2,000.00$5.00
Ref #29 626E00110 BARRIER REFLECTOR, TYPE 2 (BIDIRECTIONAL), (38 EACH)
Awd $271.70$7.15
2 $271.70$7.15
3 $271.70$7.15
4 $271.70$7.15
Ref #30 646E10010 EDGE LINE, 6", (0.16 MILE)
Awd $3,124.80$19,530.00
2 $2,400.00$15,000.00
3 $2,400.00$15,000.00
4 $100.00$625.00
Ref #31 646E10200 CENTER LINE, (0.08 MILE)
Awd $1,573.60$19,670.00
2 $1,600.00$20,000.00
3 $1,600.00$20,000.00
4 $60.00$750.00
Section 4 - TRAFFIC CONTROL - Totals
Awd $16,789.10
2 $17,833.70
3 $16,753.70
4 $14,526.70
Ref #39 AA2 644E00104 EDGE LINE, 6" (ALTERNATE 2), (4.1 MILE)
Awd $13,120.00$3,200.00
2 $13,530.00$3,300.00
3 $13,653.00$3,330.00
4 $13,120.00$3,200.00
Ref #40 AA2 644E00300 CENTER LINE (ALTERNATE 2), (1.9 MILE)
Awd $9,167.50$4,825.00
2 $9,500.00$5,000.00
3 $9,538.00$5,020.00
4 $9,167.50$4,825.00
Ref #41 AA2 644E00404 CHANNELIZING LINE, 12" (ALTERNATE 2), (886 FT)
Awd $1,772.00$2.00
2 $1,816.30$2.05
3 $1,816.30$2.05
4 $1,772.00$2.00
Ref #42 AA2 644E00500 STOP LINE (ALTERNATE 2), (154 FT)
Awd $924.00$6.00
2 $954.80$6.20
3 $962.50$6.25
4 $924.00$6.00
200261 - Page 71
Ref #43 AA2 644E00700 TRANSVERSE/DIAGONAL LINE (ALTERNATE 2), (824 FT)
Awd $4,944.00$6.00
2 $5,108.80$6.20
3 $5,150.00$6.25
4 $4,944.00$6.00
Ref #44 AA2 644E01300 LANE ARROW (ALTERNATE 2), (8 EACH)
Awd $760.00$95.00
2 $784.00$98.00
3 $800.00$100.00
4 $760.00$95.00
Ref #45 AA2 644E01510 DOTTED LINE, 6" (ALTERNATE 2), (700 FT)
Awd $910.00$1.30
2 $945.00$1.35
3 $945.00$1.35
4 $910.00$1.30
Section 5 - TRAFFIC CONTROL (ALTERNATES A) - Totals
Awd $31,597.50
2 $32,638.90
3 $32,864.80
4 $31,597.50
Ref #53 AB2 644E00104 EDGE LINE, 6" (ALTERNATE 2), (1.68 MILE)
Awd $5,880.00$3,500.00
2 $6,090.00$3,625.00
3 $6,115.20$3,640.00
4 $5,880.00$3,500.00
Ref #54 AB2 644E00300 CENTER LINE (ALTERNATE 2), (0.78 MILE)
Awd $3,763.50$4,825.00
2 $3,900.00$5,000.00
3 $3,915.60$5,020.00
4 $3,763.50$4,825.00
Ref #55 AB2 644E00404 CHANNELIZING LINE, 12" (ALTERNATE 2), (289 FT)
Awd $722.50$2.50
2 $751.40$2.60
3 $751.40$2.60
4 $722.50$2.50
Ref #56 AB2 644E00500 STOP LINE (ALTERNATE 2), (72 FT)
Awd $324.00$4.50
2 $334.80$4.65
3 $338.40$4.70
4 $324.00$4.50
Ref #57 AB2 644E00700 TRANSVERSE/DIAGONAL LINE (ALTERNATE 2), (252 FT)
Awd $1,512.00$6.00
2 $1,562.40$6.20
3 $1,575.00$6.25
4 $1,512.00$6.00
Ref #58 AB2 644E01300 LANE ARROW (ALTERNATE 2), (10 EACH)
Awd $950.00$95.00
2 $980.00$98.00
3 $1,000.00$100.00
4 $950.00$95.00
200261 - Page 72
Ref #59 AB2 644E01510 DOTTED LINE, 6" (ALTERNATE 2), (600 FT)
Awd $1,350.00$2.25
2 $1,380.00$2.30
3 $1,410.00$2.35
4 $1,350.00$2.25
Section 6 - TRAFFIC CONTROL (ALTERNATES B) - Totals
Awd $14,502.00
2 $14,998.60
3 $15,105.60
4 $14,502.00
Ref #66 AC2 644E00104 EDGE LINE, 6" (ALTERNATE 2), (1.22 MILE)
Awd $4,270.00$3,500.00
2 $4,422.50$3,625.00
3 $4,440.80$3,640.00
4 $4,270.00$3,500.00
Ref #67 AC2 644E00300 CENTER LINE (ALTERNATE 2), (0.61 MILE)
Awd $2,943.25$4,825.00
2 $3,050.00$5,000.00
3 $3,062.20$5,020.00
4 $2,943.25$4,825.00
Ref #68 AC2 644E00404 CHANNELIZING LINE, 12" (ALTERNATE 2), (230 FT)
Awd $575.00$2.50
2 $598.00$2.60
3 $598.00$2.60
4 $575.00$2.50
Ref #69 AC2 644E00500 STOP LINE (ALTERNATE 2), (82 FT)
Awd $492.00$6.00
2 $508.40$6.20
3 $512.50$6.25
4 $492.00$6.00
Ref #70 AC2 644E00700 TRANSVERSE/DIAGONAL LINE (ALTERNATE 2), (212 FT)
Awd $1,272.00$6.00
2 $1,314.40$6.20
3 $1,325.00$6.25
4 $1,272.00$6.00
Ref #71 AC2 644E01300 LANE ARROW (ALTERNATE 2), (8 EACH)
Awd $760.00$95.00
2 $784.00$98.00
3 $800.00$100.00
4 $760.00$95.00
Section 7 - TRAFFIC CONTROL (ALTERNATES C) - Totals
Awd $10,312.25
2 $10,677.30
3 $10,738.50
4 $10,312.25
200261 - Page 73
Ref #72 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST, (24 HOUR)
Awd $1,680.00$70.00
2 $1,440.00$60.00
3 $1,560.00$65.00
4 $1,800.00$75.00
Ref #73 614E12420 DETOUR SIGNING, (LUMP SUM)
Awd $5,000.00$5,000.00
2 $5,000.00$5,000.00
3 $5,000.00$5,000.00
4 $5,000.00$5,000.00
Ref #74 614E12460 WORK ZONE MARKING SIGN, (40 EACH)
Awd $2,000.00$50.00
2 $2,000.00$50.00
3 $2,000.00$50.00
4 $4,000.00$100.00
Ref #75 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC, (35 CY)
Awd $7,000.00$200.00
2 $3,500.00$100.00
3 $7,700.00$220.00
4 $5,250.00$150.00
Ref #76 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN, (4 SNMT)
Awd $3,600.00$900.00
2 $3,600.00$900.00
3 $3,600.00$900.00
4 $4,000.00$1,000.00
Ref #77 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT, (6.72 MILE)
Awd $6,048.00$900.00
2 $6,048.00$900.00
3 $6,048.00$900.00
4 $6,048.00$900.00
Ref #78 614E23690 WORK ZONE CHANNELIZING LINE, CLASS III, 12", 642 P, (1405 FT)
Awd $1,053.75$0.75
2 $1,053.75$0.75
3 $1,053.75$0.75
4 $1,053.75$0.75
Ref #79 614E25620 WORK ZONE TRANSVERSE/DIAGONAL LINE, CLASS III, 642, (1288 FT)
Awd $3,864.00$3.00
2 $3,864.00$3.00
3 $3,864.00$3.00
4 $3,864.00$3.00
Ref #80 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT, (308 FT)
Awd $924.00$3.00
2 $924.00$3.00
3 $924.00$3.00
4 $924.00$3.00
Ref #81 614E30650 WORK ZONE ARROW, CLASS III, 642 PAINT, (22 EACH)
Awd $880.00$40.00
2 $880.00$40.00
3 $880.00$40.00
4 $880.00$40.00
200261 - Page 74
Section 8 - MAINTENANCE OF TRAFFIC - Totals
Awd $32,049.75
2 $28,309.75
3 $32,629.75
4 $32,819.75
Ref #82 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (131 SY)
Awd $2,947.50$22.50
2 $3,078.50$23.50
3 $2,554.50$19.50
4 $3,078.50$23.50
Ref #83 512E10400 TREATING OF CONCRETE BRIDGE DECK WITH SRS, (1000 SY)
Awd $8,000.00$8.00
2 $6,800.00$6.80
3 $12,990.00$12.99
4 $6,800.00$6.80
Ref #84 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE, (131 SY)
Awd $3,144.00$24.00
2 $2,554.50$19.50
3 $2,217.83$16.93
4 $2,554.50$19.50
Ref #85 518E12500 SCUPPER, MISC.: CLEANOUT, (3 EACH)
Awd $450.00$150.00
2 $900.00$300.00
3 $585.00$195.00
4 $900.00$300.00
Ref #86 519E12510 SPECIAL - PATCHING CONCRETE BRIDGE DECK, (6 SY)
Awd $4,680.00$780.00
2 $2,940.00$490.00
3 $740.28$123.38
4 $2,940.00$490.00
Section 9 - STRUCTURE REPAIR (ASD-250-1391 SFN 03048 - Totals
Awd $19,221.50
2 $16,273.00
3 $19,087.61
4 $16,273.00
Ref #87 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (201 SY)
Awd $4,522.50$22.50
2 $4,723.50$23.50
3 $5,527.50$27.50
4 $4,723.50$23.50
Ref #88 512E10400 TREATING OF CONCRETE BRIDGE DECK WITH SRS, (1410 SY)
Awd $11,280.00$8.00
2 $9,588.00$6.80
3 $18,315.90$12.99
4 $9,588.00$6.80
200261 - Page 75
Ref #89 512E74000 REMOVAL OF EXISTING COATINGS FROM CONCRETE SURFACE, (201 SY)
Awd $4,824.00$24.00
2 $3,919.50$19.50
3 $3,402.93$16.93
4 $3,919.50$19.50
Ref #90 518E12500 SCUPPER, MISC.: CLEANOUT, (8 EACH)
Awd $840.24$105.03
2 $2,400.00$300.00
3 $1,560.00$195.00
4 $2,400.00$300.00
Ref #91 519E12510 SPECIAL - PATCHING CONCRETE BRIDGE DECK, (6 SY)
Awd $4,680.00$780.00
2 $2,940.00$490.00
3 $740.28$123.38
4 $2,940.00$490.00
Section 10 - STRUCTURE REPAIR (ASD-250-1408 SFN 03048 - Totals
Awd $26,146.74
2 $23,571.00
3 $29,546.61
4 $23,571.00
Ref #92 100E00300 PREMIUM ON RAILROADS' PROTECTIVE PUBLIC LIABILITY , (LUMP SUM)
Awd $3,000.00$3,000.00
2 $1,500.00$1,500.00
3 $3,000.00$3,000.00
4 $10,000.00$10,000.00
Ref #93 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $6,000.00$6,000.00
2 $4,750.00$4,750.00
3 $5,000.00$5,000.00
4 $10,000.00$10,000.00
Ref #94 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $68,825.00$68,825.00
2 $77,970.00$77,970.00
3 $70,000.00$70,000.00
4 $100,000.00$100,000.00
Ref #95 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING, (LUMP SUM)
Awd $3,000.00$3,000.00
2 $1,000.00$1,000.00
3 $2,560.00$2,560.00
4 $2,500.00$2,500.00
Ref #96 624E10000 MOBILIZATION, (LUMP SUM)
Awd $40,000.00$40,000.00
2 $40,000.00$40,000.00
3 $95,000.00$95,000.00
4 $40,000.00$40,000.00
200261 - Page 76
Section 11 - INCIDENTALS - Totals
Awd $120,825.00
2 $125,220.00
3 $175,560.00
4 $162,500.00
200261 - Page 77
Project No. 200262
PID 111215
ATH-US 33-19.30
Federal
Type: MISCELLANEOUS
Completion Date: 10/15/2020
Award Amount: $102,837.18
Contract Awarded To: BOCA CONSTRUCTION INC
Letting Date: 5/7/2020
Engineer's Estimate: $75,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jack Marchbanks, Ph.D., Director
BOCA CONSTRUCTION INC
380 EAST PARK DR
NORWALK, OH 44857
Huron
Bidder 1
Bid $102,837.18
200262 - Page 78
Ref #1 618E44000 RUMBLE STRIPES, CENTER LINE (CONCRETE), (8.91 MILE)
Awd $51,856.20$5,820.00
Section 1 - PAVEMENT - Totals
Awd $51,856.20
Ref #2 642E00300 CENTER LINE, TYPE 1, (8.91 MILE)
Awd $8,910.00$1,000.00
Section 2 - TRAFFIC CONTROL - Totals
Awd $8,910.00
Ref #3 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN, (1 SNMT)
Awd $900.00$900.00
Section 3 - MAINTENANCE OF TRAFFIC - Totals
Awd $900.00
Ref #4 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $1,012.00$1,012.00
Ref #5 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $17,744.00$17,744.00
Ref #6 623E10001 CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P, (LUMP SUM)
Awd $2,819.98$2,819.98
Ref #7 624E10000 MOBILIZATION, (LUMP SUM)
Awd $19,595.00$19,595.00
Section 4 - INCIDENTALS - Totals
Awd $41,170.98
200262 - Page 79
Project No. 200264
PID 105231
BEL-SR 147-10.40, BEL-SR 149-22.91
Federal
Type: CULVERT REPLACEMENT
Completion Date: 9/30/2020
Award Amount: $207,514.50
Contract Awarded To: STANLEY MILLER CONSTRUCTION COMPANY
Letting Date: 5/7/2020
Engineer's Estimate: $273,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jack Marchbanks, Ph.D., Director
STANLEY MILLER CONSTRUCTION COMPANY
2250 HOWENSTINE DR SE
EAST SPARTA, OH 44626
Stark
Bidder 1
Bid $207,514.50
J & J BRIDGE COMPANY INC
3049 ROUGH AND READY ROAD
NEW CONCORD, OH 43762
Muskingum
Bidder 2
Bid $217,338.00
OHIO-WEST VIRGINIA EXCAVATING CO
56461 FERRY LANDING ROAD
SHADYSIDE, OH 43947
Belmont
Bidder 3
Bid $224,366.00
AMAAZZ CONSTRUCTION OHIO LLC
545 METRO PLACE SOUTH, SUITE 201
DUBLIN, OH 43017
Franklin
Bidder 4
Bid $248,019.00
MARRA SERVICES INC
700 E 73RD ST
CLEVELAND, OH 44103
Cuyahoga
Bidder 5
Bid $279,482.00
ECLIPSE CO LLC
11554 EAST WASHINGTON ST
CHAGRIN FALLS, OH 44023
Geauga
Bidder 6
Bid $343,539.22
R C CONSTRUCTION COMPANY AND SON INC
8096 FEDERAL ROAD
CUTLER, OH 45724
Washington
Bidder 7
Bid $408,203.00
200264 - Page 80
Ref #1 201E11000 CLEARING AND GRUBBING, (LUMP SUM)
Awd $4,334.00$4,334.00
2 $1,000.00$1,000.00
3 $5,000.00$5,000.00
4 $5,203.25$5,203.25
5 $8,000.00$8,000.00
6 $4,508.50$4,508.50
7 $3,500.00$3,500.00
Ref #2 202E70120 SPECIAL - PIPE CLEANOUT, 27" TO 48", (256 FT)
Awd $11,008.00$43.00
2 $9,728.00$38.00
3 $12,800.00$50.00
4 $17,664.00$69.00
5 $7,680.00$30.00
6 $25,088.00$98.00
7 $51,200.00$200.00
Ref #3 202E70130 SPECIAL - PIPE CLEANOUT OVER 48", (164 FT)
Awd $6,642.00$40.50
2 $20,500.00$125.00
3 $2,460.00$15.00
4 $12,300.00$75.00
5 $6,560.00$40.00
6 $13,612.00$83.00
7 $32,800.00$200.00
Ref #4 202E75000 FENCE REMOVED, (120 FT)
Awd $204.00$1.70
2 $360.00$3.00
3 $480.00$4.00
4 $600.00$5.00
5 $600.00$5.00
6 $1,380.00$11.50
7 $2,400.00$20.00
Section 1 - ROADWAY - Totals
Awd $22,188.00
2 $31,588.00
3 $20,740.00
4 $35,767.25
5 $22,840.00
6 $44,588.50
7 $89,900.00
Ref #5 601E11000 RIPRAP, TYPE D, (4 SY)
Awd $2,888.00$722.00
2 $1,600.00$400.00
3 $980.00$245.00
4 $2,180.00$545.00
5 $1,000.00$250.00
6 $1,470.00$367.50
7 $1,100.00$275.00
200264 - Page 81
Ref #6 601E32010 ROCK CHANNEL PROTECTION, TYPE A WITH AGGREGATE FIL, (53 CY)
Awd $6,837.00$129.00
2 $6,943.00$131.00
3 $7,950.00$150.00
4 $6,943.00$131.00
5 $10,600.00$200.00
6 $5,300.00$100.00
7 $9,275.00$175.00
Ref #7 601E32110 ROCK CHANNEL PROTECTION, TYPE B WITH AGGREGATE FIL, (8 CY)
Awd $1,856.00$232.00
2 $1,216.00$152.00
3 $1,360.00$170.00
4 $1,304.00$163.00
5 $2,800.00$350.00
6 $892.00$111.50
7 $1,400.00$175.00
Ref #8 659E00100 SOIL ANALYSIS TEST, (4 EACH)
Awd $400.00$100.00
2 $100.00$25.00
3 $1,000.00$250.00
4 $308.00$77.00
5 $1,200.00$300.00
6 $316.00$79.00
7 $40.00$10.00
Ref #9 659E00300 TOPSOIL, (288 CY)
Awd $7,200.00$25.00
2 $864.00$3.00
3 $10,080.00$35.00
4 $6,624.00$23.00
5 $8,640.00$30.00
6 $13,248.00$46.00
7 $5,760.00$20.00
Ref #10 659E10000 SEEDING AND MULCHING, (2600 SY)
Awd $8,268.00$3.18
2 $1,300.00$0.50
3 $5,200.00$2.00
4 $5,590.00$2.15
5 $7,800.00$3.00
6 $5,200.00$2.00
7 $26,000.00$10.00
Ref #11 659E14000 REPAIR SEEDING AND MULCHING, (130 SY)
Awd $130.00$1.00
2 $65.00$0.50
3 $390.00$3.00
4 $279.50$2.15
5 $260.00$2.00
6 $260.00$2.00
7 $26.00$0.20
200264 - Page 82
Ref #12 659E20000 COMMERCIAL FERTILIZER, (0.38 TON)
Awd $304.00$800.00
2 $266.00$700.00
3 $380.00$1,000.00
4 $245.10$645.00
5 $380.00$1,000.00
6 $241.49$635.50
7 $456.00$1,200.00
Ref #13 659E31000 LIME, (0.54 ACRE)
Awd $40.50$75.00
2 $270.00$500.00
3 $216.00$400.00
4 $39.15$72.50
5 $162.00$300.00
6 $39.69$73.50
7 $432.00$800.00
Ref #14 659E35000 WATER, (14 MGAL)
Awd $14.00$1.00
2 $14.00$1.00
3 $140.00$10.00
4 $14.00$1.00
5 $70.00$5.00
6 $14.00$1.00
7 $14.00$1.00
Ref #15 832E30000 EROSION CONTROL, (10000 EACH)
Awd $10,000.00$1.00
2 $10,000.00$1.00
3 $10,000.00$1.00
4 $10,000.00$1.00
5 $10,000.00$1.00
6 $10,000.00$1.00
7 $10,000.00$1.00
Section 2 - EROSION CONTROL - Totals
Awd $37,937.50
2 $22,638.00
3 $37,696.00
4 $33,526.75
5 $42,912.00
6 $36,981.18
7 $54,503.00
Ref #16 503E11100 COFFERDAMS AND EXCAVATION BRACING, (LUMP SUM)
Awd $11,467.00$11,467.00
2 $13,000.00$13,000.00
3 $9,000.00$9,000.00
4 $14,000.00$14,000.00
5 $2,500.00$2,500.00
6 $38,517.50$38,517.50
7 $35,000.00$35,000.00
200264 - Page 83
Ref #17 611E96550 FIELD PAVING OF EXISTING PIPE, 108" CMP, (164 FT)
Awd $16,728.00$102.00
2 $41,000.00$250.00
3 $27,060.00$165.00
4 $26,240.00$160.00
5 $34,440.00$210.00
6 $15,908.00$97.00
7 $48,380.00$295.00
Section 3 - DRAINAGE - Totals
Awd $28,195.00
2 $54,000.00
3 $36,060.00
4 $40,240.00
5 $36,940.00
6 $54,425.50
7 $83,380.00
Ref #18 611E97400 CONDUIT, MISC.:CURED-IN-PLACE PIPE LINER, (256 FT)
Awd $86,016.00$336.00
2 $77,312.00$302.00
3 $81,920.00$320.00
4 $94,720.00$370.00
6 $125,696.00$491.00
7 $101,120.00$395.00
Section 4 - DRAINAGE OPTION 1: CURED-IN-PLACE LINER - Totals
Awd $86,016.00
2 $77,312.00
3 $81,920.00
4 $94,720.00
6 $125,696.00
7 $101,120.00
Ref #19 833E10000 CONDUIT RENEWAL USING SPRAY APPLIED STRUCTURAL LIN, (256 FT)
5 $151,040.00$590.00
Section 5 - DRAINAGE OPTION 2: STRUCTURAL SPRAY LINE - Totals
5 $151,040.00
Ref #20 614E12200 SPECIAL - WORK ZONE GUARDRAIL, (100 FT)
Awd $1,700.00$17.00
2 $1,000.00$10.00
3 $3,500.00$35.00
4 $3,600.00$36.00
5 $5,000.00$50.00
6 $6,450.00$64.50
7 $7,500.00$75.00
200264 - Page 84
Section 6 - MAINTENANCE OF TRAFFIC - Totals
Awd $1,700.00
2 $1,000.00
3 $3,500.00
4 $3,600.00
5 $5,000.00
6 $6,450.00
7 $7,500.00
Ref #21 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $2,700.00$2,700.00
2 $8,000.00$8,000.00
3 $10,000.00$10,000.00
4 $2,865.00$2,865.00
5 $5,000.00$5,000.00
6 $14,000.00$14,000.00
7 $16,500.00$16,500.00
Ref #22 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $5,223.00$5,223.00
2 $15,000.00$15,000.00
3 $16,500.00$16,500.00
4 $13,700.00$13,700.00
5 $7,000.00$7,000.00
6 $17,000.00$17,000.00
7 $30,000.00$30,000.00
Ref #23 619E16000 FIELD OFFICE, TYPE A, (3 MNTH)
Awd $3,333.00$1,111.00
2 $1,500.00$500.00
3 $1,950.00$650.00
4 $7,800.00$2,600.00
5 $750.00$250.00
6 $1,200.00$400.00
7 $300.00$100.00
Ref #24 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING, (LUMP SUM)
Awd $5,222.00$5,222.00
2 $100.00$100.00
3 $6,000.00$6,000.00
4 $2,800.00$2,800.00
5 $500.00$500.00
6 $8,500.00$8,500.00
7 $10,000.00$10,000.00
Ref #25 624E10000 MOBILIZATION, (LUMP SUM)
Awd $15,000.00$15,000.00
2 $6,200.00$6,200.00
3 $10,000.00$10,000.00
4 $13,000.00$13,000.00
5 $7,500.00$7,500.00
6 $34,698.04$34,698.04
7 $15,000.00$15,000.00
200264 - Page 85
Section 7 - INCIDENTALS - Totals
Awd $31,478.00
2 $30,800.00
3 $44,450.00
4 $40,165.00
5 $20,750.00
6 $75,398.04
7 $71,800.00
200264 - Page 86
Project No. 200265
PID 102059
BUT-SR 73-13.05
Federal
Type: INTERSECTION
Completion Date: 8/31/2021
Award Amount: $2,936,977.10
Contract Awarded To: BARRETT PAVING MATERIALS INC
Letting Date: 5/7/2020
Engineer's Estimate: $2,841,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jack Marchbanks, Ph.D., Director
BARRETT PAVING MATERIALS INC
3751 COMMERCE DR
MIDDLETOWN, OH 45055
Butler
Bidder 1
Bid $2,936,977.10
R B JERGENS CONTRACTORS INC
11418 N DIXIE DR
VANDALIA, OH 45377
Montgomery
Bidder 2
Bid $2,994,256.71
RACK & BALLAUER EXCAVATING CO INC
11321 PADDY'S RUN RD
HAMILTON, OH 45013
Butler
Bidder 3
Bid $3,007,465.98
SUNESIS CONSTRUCTION CO
2610 CRESCENTVILLE RD
WEST CHESTER, OH 45069
Butler
Bidder 4
Bid $3,265,250.00
MILCON CONCRETE INC
1360 S COUNTY RD 25 A
TROY, OH 45373
Miami
Bidder 5
Bid $3,285,886.26
ECLIPSE CO LLC
11554 EAST WASHINGTON ST
CHAGRIN FALLS, OH 44023
Geauga
Bidder 6
Bid $3,322,829.55
FORD DEVELOPMENT CORP
11148 WOODWARD LANE
SHARONVILLE, OH 45241
Hamilton
Bidder 7
Bid $3,733,049.83
JOHN R JURGENSEN COMPANY
11641 MOSTELLER RD
CINCINNATI, OH 45241
Hamilton
Bidder 8
Bid $3,824,492.35
200265 - Page 87
Ref #1 201E11000 CLEARING AND GRUBBING, (LUMP SUM)
Awd $12,000.00$12,000.00
2 $24,865.05$24,865.05
3 $30,000.00$30,000.00
4 $23,300.00$23,300.00
5 $8,300.00$8,300.00
6 $11,521.00$11,521.00
7 $30,000.00$30,000.00
8 $29,969.08$29,969.08
Ref #2 202E23000 PAVEMENT REMOVED, (553 SY)
Awd $3,871.00$7.00
2 $8,007.44$14.48
3 $7,189.00$13.00
4 $13,736.52$24.84
5 $3,705.10$6.70
6 $7,465.50$13.50
7 $2,765.00$5.00
8 $5,292.21$9.57
Ref #3 202E23010 PAVEMENT REMOVED, ASPHALT, (8475 SY)
Awd $38,137.50$4.50
2 $35,934.00$4.24
3 $36,018.75$4.25
4 $95,004.75$11.21
5 $45,765.00$5.40
6 $63,562.50$7.50
7 $33,900.00$4.00
8 $86,699.25$10.23
Ref #4 202E35100 PIPE REMOVED, 24" AND UNDER, (735 FT)
Awd $11,760.00$16.00
2 $16,588.95$22.57
3 $8,085.00$11.00
4 $8,717.10$11.86
5 $9,922.50$13.50
6 $15,067.50$20.50
7 $3,675.00$5.00
8 $20,205.15$27.49
Ref #5 202E35200 PIPE REMOVED, OVER 24", (263 FT)
Awd $5,917.50$22.50
2 $8,792.09$33.43
3 $6,838.00$26.00
4 $12,929.08$49.16
5 $9,915.10$37.70
6 $7,758.50$29.50
7 $2,630.00$10.00
8 $13,023.76$49.52
Ref #6 202E38000 GUARDRAIL REMOVED, (457 FT)
Awd $1,828.00$4.00
2 $2,842.54$6.22
3 $2,742.00$6.00
4 $2,216.45$4.85
5 $3,107.60$6.80
6 $2,285.00$5.00
7 $457.00$1.00
8 $2,513.50$5.50
200265 - Page 88
Ref #7 202E47000 BRIDGE TERMINAL ASSEMBLY REMOVED, (4 EACH)
Awd $800.00$200.00
2 $1,037.08$259.27
3 $1,200.00$300.00
4 $1,109.20$277.30
5 $1,132.00$283.00
6 $2,148.00$537.00
7 $200.00$50.00
8 $1,112.00$278.00
Ref #8 202E53100 MAILBOX REMOVED, (1 EACH)
Awd $50.00$50.00
2 $312.23$312.23
3 $65.00$65.00
4 $60.28$60.28
5 $37.00$37.00
6 $162.00$162.00
7 $10.00$10.00
8 $208.71$208.71
Ref #9 202E58100 CATCH BASIN REMOVED, (3 EACH)
Awd $900.00$300.00
2 $793.65$264.55
3 $1,200.00$400.00
4 $1,245.78$415.26
5 $990.00$330.00
6 $1,411.50$470.50
7 $300.00$100.00
8 $5,418.33$1,806.11
Ref #10 202E75000 FENCE REMOVED, (926 FT)
Awd $1,852.00$2.00
2 $5,759.72$6.22
3 $3,935.50$4.25
4 $2,778.00$3.00
5 $3,704.00$4.00
6 $3,704.00$4.00
7 $926.00$1.00
8 $6,389.40$6.90
Ref #11 202E98100 REMOVAL MISC.: INSPECTION WELL, (2 EACH)
Awd $210.00$105.00
2 $164.42$82.21
3 $300.00$150.00
4 $2,531.80$1,265.90
5 $320.00$160.00
6 $941.00$470.50
7 $100.00$50.00
8 $1,315.04$657.52
Ref #12 202E98200 REMOVAL MISC.: CONDUIT, (300 FT)
Awd $3,000.00$10.00
2 $2,412.00$8.04
3 $3,000.00$10.00
4 $2,094.00$6.98
5 $2,700.00$9.00
6 $5,700.00$19.00
7 $600.00$2.00
8 $14,115.00$47.05
200265 - Page 89
Ref #13 202E98200 REMOVAL MISC.: DECORATIVE WALL, (43 FT)
Awd $860.00$20.00
2 $345.72$8.04
3 $537.50$12.50
4 $3,751.75$87.25
5 $1,935.00$45.00
6 $3,332.50$77.50
7 $430.00$10.00
8 $9,423.45$219.15
Ref #14 203E10000 EXCAVATION, (2547 CY)
Awd $32,474.25$12.75
2 $44,623.44$17.52
3 $25,470.00$10.00
4 $26,692.56$10.48
5 $28,017.00$11.00
6 $30,564.00$12.00
7 $50,940.00$20.00
8 $26,055.81$10.23
Ref #15 203E20000 EMBANKMENT, (16115 CY)
Awd $241,725.00$15.00
2 $172,269.35$10.69
3 $257,840.00$16.00
4 $203,049.00$12.60
5 $241,725.00$15.00
6 $193,380.00$12.00
7 $483,450.00$30.00
8 $256,389.65$15.91
Ref #16 203E20001 EMBANKMENT, AS PER PLAN, (50 CY)
Awd $750.00$15.00
2 $534.50$10.69
3 $800.00$16.00
4 $1,661.00$33.22
5 $1,512.50$30.25
6 $925.00$18.50
7 $1,750.00$35.00
8 $4,464.50$89.29
Ref #17 204E10000 SUBGRADE COMPACTION, (1315 SY)
Awd $4,602.50$3.50
2 $5,167.95$3.93
3 $4,602.50$3.50
4 $5,457.25$4.15
5 $1,841.00$1.40
6 $3,287.50$2.50
7 $2,630.00$2.00
8 $2,998.20$2.28
Ref #18 204E45000 PROOF ROLLING, (6 HOUR)
Awd $600.00$100.00
2 $1,314.30$219.05
3 $1,080.00$180.00
4 $1,620.00$270.00
5 $1,410.00$235.00
6 $5,763.00$960.50
7 $600.00$100.00
8 $1,134.00$189.00
200265 - Page 90
Ref #19 206E10500 CEMENT, (285 TON)
Awd $41,895.00$147.00
2 $50,051.70$175.62
3 $46,509.15$163.19
4 $46,509.15$163.19
5 $47,452.50$166.50
6 $47,880.00$168.00
7 $51,300.00$180.00
8 $59,191.65$207.69
Ref #20 206E11000 CURING COAT, (11021 SY)
Awd $13,776.25$1.25
2 $13,114.99$1.19
3 $12,453.73$1.13
4 $12,453.73$1.13
5 $15,429.40$1.40
6 $11,021.00$1.00
7 $13,776.25$1.25
8 $16,311.08$1.48
Ref #21 206E15010 CEMENT STABILIZED SUBGRADE, 12 INCHES DEEP, (11021 SY)
Awd $59,513.40$5.40
2 $45,626.94$4.14
3 $46,839.25$4.25
4 $74,061.12$6.72
5 $71,636.50$6.50
6 $38,573.50$3.50
7 $39,675.60$3.60
8 $46,288.20$4.20
Ref #22 206E30000 MIXTURE DESIGN FOR CHEMICALLY STABILIZED SOILS, (LUMP SUM)
Awd $12,500.00$12,500.00
2 $5,600.29$5,600.29
3 $12,514.95$12,514.95
4 $12,514.95$12,514.95
5 $14,160.00$14,160.00
6 $12,890.50$12,890.50
7 $14,000.00$14,000.00
8 $12,600.00$12,600.00
Ref #23 623E38500 MONUMENT ASSEMBLY, (9 EACH)
Awd $5,220.00$580.00
2 $8,407.80$934.20
3 $7,875.00$875.00
4 $7,745.94$860.66
5 $7,650.00$850.00
6 $10,102.50$1,122.50
7 $6,300.00$700.00
8 $6,452.37$716.93
Ref #24 623E40500 REFERENCE MONUMENT, (1 EACH)
Awd $415.00$415.00
2 $509.49$509.49
3 $375.00$375.00
4 $327.62$327.62
5 $90.00$90.00
6 $614.00$614.00
7 $300.00$300.00
8 $365.00$365.00
200265 - Page 91
Ref #25 690E50350 SPECIAL - MAILBOX REMOVED AND RESET, (12 EACH)
Awd $2,400.00$200.00
2 $6,222.60$518.55
3 $3,360.00$280.00
4 $4,374.96$364.58
5 $2,340.00$195.00
6 $1,404.00$117.00
7 $1,200.00$100.00
8 $4,020.84$335.07
Ref #26 878E25000 INSPECTION AND COMPACTION TESTING OF UNBOUND MATER, (LUMP SUM)
Awd $24,600.00$24,600.00
2 $28,701.48$28,701.48
3 $25,060.00$25,060.00
4 $18,200.00$18,200.00
5 $84,990.00$84,990.00
6 $15,141.50$15,141.50
7 $25,000.00$25,000.00
8 $51,350.00$51,350.00
Section 1 - ROADWAY - Totals
Awd $521,657.40
2 $489,999.72
3 $545,890.33
4 $584,141.99
5 $609,787.20
6 $496,605.50
7 $766,914.85
8 $683,306.18
Ref #27 601E21050 TIED CONCRETE BLOCK MAT, TYPE 1, (8 SY)
Awd $480.00$60.00
2 $372.72$46.59
3 $720.00$90.00
4 $1,564.40$195.55
5 $480.00$60.00
6 $820.00$102.50
7 $400.00$50.00
8 $735.04$91.88
Ref #28 601E21060 TIED CONCRETE BLOCK MAT, TYPE 2, (21 SY)
Awd $1,260.00$60.00
2 $1,586.76$75.56
3 $1,890.00$90.00
4 $4,137.84$197.04
5 $1,260.00$60.00
6 $2,163.00$103.00
7 $1,050.00$50.00
8 $9,096.57$433.17
200265 - Page 92
Ref #29 601E32100 ROCK CHANNEL PROTECTION, TYPE B WITH FILTER, (24 CY)
Awd $2,520.00$105.00
2 $3,077.52$128.23
3 $3,120.00$130.00
4 $2,654.16$110.59
5 $3,000.00$125.00
6 $2,004.00$83.50
7 $2,400.00$100.00
8 $4,389.60$182.90
Ref #30 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER, (2 CY)
Awd $240.00$120.00
2 $263.84$131.92
3 $340.00$170.00
4 $201.36$100.68
5 $249.00$124.50
6 $167.00$83.50
7 $200.00$100.00
8 $1,195.52$597.76
Ref #31 659E00100 SOIL ANALYSIS TEST, (2 EACH)
Awd $250.00$125.00
2 $259.28$129.64
3 $250.00$125.00
4 $250.00$125.00
5 $130.00$65.00
6 $291.00$145.50
7 $274.00$137.00
8 $250.00$125.00
Ref #32 659E00300 TOPSOIL, (2182 CY)
Awd $94,917.00$43.50
2 $98,430.02$45.11
3 $94,917.00$43.50
4 $31,966.30$14.65
5 $40,367.00$18.50
6 $66,551.00$30.50
7 $106,918.00$49.00
8 $86,734.50$39.75
Ref #33 659E00510 SEEDING AND MULCHING, CLASS 2, (14138 SY)
Awd $12,724.20$0.90
2 $12,865.58$0.91
3 $12,441.44$0.88
4 $15,834.56$1.12
5 $10,603.50$0.75
6 $7,069.00$0.50
7 $14,138.00$1.00
8 $12,441.44$0.88
Ref #34 659E14000 REPAIR SEEDING AND MULCHING, (967 SY)
Awd $821.95$0.85
2 $879.97$0.91
3 $850.96$0.88
4 $290.10$0.30
5 $290.10$0.30
6 $483.50$0.50
7 $967.00$1.00
8 $850.96$0.88
200265 - Page 93
Ref #35 659E15000 INTER-SEEDING, (967 SY)
Awd $290.10$0.30
2 $879.97$0.91
3 $290.10$0.30
4 $290.10$0.30
5 $290.10$0.30
6 $483.50$0.50
7 $386.80$0.40
8 $290.10$0.30
Ref #36 659E20000 COMMERCIAL FERTILIZER, (2.61 TON)
Awd $2,022.75$775.00
2 $2,097.76$803.74
3 $2,022.75$775.00
4 $2,349.00$900.00
5 $2,349.00$900.00
6 $2,419.47$927.00
7 $2,218.50$850.00
8 $2,022.75$775.00
Ref #37 659E31000 LIME, (4 ACRE)
Awd $140.00$35.00
2 $145.20$36.30
3 $140.00$35.00
4 $1,000.00$250.00
5 $1,000.00$250.00
6 $1,030.00$257.50
7 $156.00$39.00
8 $140.00$35.00
Ref #38 659E35000 WATER, (105 MGAL)
Awd $105.00$1.00
2 $109.20$1.04
3 $105.00$1.00
4 $1,050.00$10.00
5 $1,050.00$10.00
6 $1,102.50$10.50
7 $210.00$2.00
8 $105.00$1.00
Ref #39 659E40000 MOWING, (44 MSF)
Awd $349.80$7.95
2 $362.56$8.24
3 $349.80$7.95
4 $440.00$10.00
5 $440.00$10.00
6 $462.00$10.50
7 $396.00$9.00
8 $349.80$7.95
Ref #40 670E00700 DITCH EROSION PROTECTION, (283 SY)
Awd $650.90$2.30
2 $676.37$2.39
3 $650.90$2.30
4 $566.00$2.00
5 $650.90$2.30
6 $566.00$2.00
7 $849.00$3.00
8 $650.90$2.30
200265 - Page 94
Ref #41 832E15000 STORM WATER POLLUTION PREVENTION PLAN, (LUMP SUM)
Awd $1,275.00$1,275.00
2 $1,659.34$1,659.34
3 $1,300.00$1,300.00
4 $1,600.00$1,600.00
5 $1,444.00$1,444.00
6 $3,605.00$3,605.00
7 $2,000.00$2,000.00
8 $1,275.00$1,275.00
Ref #42 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS, (LUMP SUM)
Awd $8,000.00$8,000.00
2 $24,890.17$24,890.17
3 $10,600.00$10,600.00
4 $12,180.00$12,180.00
5 $11,720.00$11,720.00
6 $10,815.00$10,815.00
7 $3,000.00$3,000.00
8 $6,840.00$6,840.00
Ref #43 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA, (LUMP SUM)
Awd $12,500.00$12,500.00
2 $15,556.36$15,556.36
3 $12,500.00$12,500.00
4 $12,450.81$12,450.81
5 $14,100.00$14,100.00
6 $7,725.00$7,725.00
7 $14,000.00$14,000.00
8 $12,450.81$12,450.81
Ref #44 832E30000 EROSION CONTROL, (82000 EACH)
Awd $82,000.00$1.00
2 $82,000.00$1.00
3 $82,000.00$1.00
4 $82,000.00$1.00
5 $82,000.00$1.00
6 $82,000.00$1.00
7 $82,000.00$1.00
8 $82,000.00$1.00
Ref #45 836E10000 SEEDING AND EROSION CONTROL WITH TURF REINFORCING , (112 SY)
Awd $1,069.60$9.55
2 $1,108.80$9.90
3 $1,069.60$9.55
4 $560.00$5.00
5 $638.40$5.70
6 $560.00$5.00
7 $1,232.00$11.00
8 $1,069.60$9.55
Ref #46 836E10020 SEEDING AND EROSION CONTROL WITH TURF REINFORCING , (110 SY)
Awd $1,199.00$10.90
2 $1,243.00$11.30
3 $1,199.00$10.90
4 $550.00$5.00
5 $627.00$5.70
6 $550.00$5.00
7 $1,320.00$12.00
8 $1,199.00$10.90
200265 - Page 95
Section 2 - EROSION CONTROL - Totals
Awd $222,815.30
2 $248,464.42
3 $226,756.55
4 $171,934.63
5 $172,689.00
6 $190,866.97
7 $234,115.30
8 $224,086.59
Ref #47 602E20000 CONCRETE MASONRY, (3 CY)
Awd $4,050.00$1,350.00
2 $6,171.42$2,057.14
3 $4,110.00$1,370.00
4 $8,183.91$2,727.97
5 $5,835.00$1,945.00
6 $3,828.00$1,276.00
7 $3,900.00$1,300.00
8 $7,218.09$2,406.03
Ref #48 605E06000 4" BASE PIPE UNDERDRAINS, (3996 FT)
Awd $43,956.00$11.00
2 $21,698.28$5.43
3 $30,969.00$7.75
4 $26,573.40$6.65
5 $26,373.60$6.60
6 $31,968.00$8.00
7 $39,960.00$10.00
8 $38,521.44$9.64
Ref #49 605E13300 6" UNCLASSIFIED PIPE UNDERDRAINS, (80 FT)
Awd $1,120.00$14.00
2 $2,170.40$27.13
3 $960.00$12.00
4 $829.60$10.37
5 $1,536.00$19.20
6 $800.00$10.00
7 $960.00$12.00
8 $2,608.00$32.60
Ref #50 611E00410 4" CONDUIT, TYPE F FOR UNDERDRAIN OUTLET, (284 FT)
Awd $3,124.00$11.00
2 $4,208.88$14.82
3 $4,828.00$17.00
4 $13,444.56$47.34
5 $4,941.60$17.40
6 $4,828.00$17.00
7 $5,680.00$20.00
8 $9,147.64$32.21
200265 - Page 96
Ref #51 611E01100 6" CONDUIT, TYPE C, (12 FT)
Awd $360.00$30.00
2 $283.68$23.64
3 $324.00$27.00
4 $471.96$39.33
5 $354.00$29.50
6 $150.00$12.50
7 $180.00$15.00
8 $996.48$83.04
Ref #52 611E01500 6" CONDUIT, TYPE F, (100 FT)
Awd $1,200.00$12.00
2 $5,738.00$57.38
3 $1,000.00$10.00
4 $1,873.00$18.73
5 $2,800.00$28.00
6 $1,300.00$13.00
7 $2,000.00$20.00
8 $2,935.00$29.35
Ref #53 611E04400 12" CONDUIT, TYPE B, (363 FT)
Awd $16,335.00$45.00
2 $18,578.34$51.18
3 $17,424.00$48.00
4 $24,299.22$66.94
5 $15,137.10$41.70
6 $22,687.50$62.50
7 $25,410.00$70.00
8 $31,969.41$88.07
Ref #54 611E04600 12" CONDUIT, TYPE C, (133 FT)
Awd $5,985.00$45.00
2 $9,663.78$72.66
3 $5,586.00$42.00
4 $9,177.00$69.00
5 $8,911.00$67.00
6 $7,514.50$56.50
7 $6,650.00$50.00
8 $11,630.85$87.45
Ref #55 611E04900 12" CONDUIT, TYPE D, (81 FT)
Awd $2,430.00$30.00
2 $3,521.88$43.48
3 $3,442.50$42.50
4 $4,936.14$60.94
5 $3,888.00$48.00
6 $4,617.00$57.00
7 $4,050.00$50.00
8 $5,920.29$73.09
Ref #56 611E05900 15" CONDUIT, TYPE B, (40 FT)
Awd $2,280.00$57.00
2 $2,811.60$70.29
3 $2,360.00$59.00
4 $3,440.40$86.01
5 $1,792.00$44.80
6 $2,480.00$62.00
7 $3,200.00$80.00
8 $5,951.20$148.78
200265 - Page 97
Ref #57 611E06100 15" CONDUIT, TYPE C, (574 FT)
Awd $23,534.00$41.00
2 $25,784.08$44.92
3 $26,404.00$46.00
4 $30,915.64$53.86
5 $22,156.40$38.60
6 $33,579.00$58.50
7 $34,440.00$60.00
8 $47,337.78$82.47
Ref #58 611E07400 18" CONDUIT, TYPE B, (95 FT)
Awd $5,225.00$55.00
2 $5,623.05$59.19
3 $5,985.00$63.00
4 $12,367.10$130.18
5 $5,472.00$57.60
6 $6,840.00$72.00
7 $8,550.00$90.00
8 $11,271.75$118.65
Ref #59 611E07600 18" CONDUIT, TYPE C, (448 FT)
Awd $21,056.00$47.00
2 $24,304.00$54.25
3 $23,744.00$53.00
4 $31,476.48$70.26
5 $23,408.00$52.25
6 $27,776.00$62.00
7 $31,360.00$70.00
8 $42,649.60$95.20
Ref #60 611E08900 21" CONDUIT, TYPE B, (62 FT)
Awd $4,774.00$77.00
2 $5,330.76$85.98
3 $4,836.00$78.00
4 $8,272.04$133.42
5 $5,456.00$88.00
6 $5,797.00$93.50
7 $6,820.00$110.00
8 $8,896.38$143.49
Ref #61 611E16400 36" CONDUIT, TYPE B, (278 FT)
Awd $29,468.00$106.00
2 $37,682.90$135.55
3 $26,410.00$95.00
4 $55,341.46$199.07
5 $25,381.40$91.30
6 $33,916.00$122.00
7 $41,700.00$150.00
8 $49,795.36$179.12
Ref #62 611E16600 36" CONDUIT, TYPE C, (44 FT)
Awd $3,696.00$84.00
2 $6,538.40$148.60
3 $3,608.00$82.00
4 $8,273.76$188.04
5 $12,980.00$295.00
6 $4,158.00$94.50
7 $5,720.00$130.00
8 $8,378.48$190.42
200265 - Page 98
Ref #63 611E97400 CONDUIT, MISC.: TYPE B FOR DRAINAGE DISCHARGE CONT, (100 FT)
Awd $1,800.00$18.00
2 $3,075.00$30.75
3 $900.00$9.00
4 $6,556.00$65.56
5 $3,000.00$30.00
6 $3,450.00$34.50
7 $1,000.00$10.00
8 $4,528.00$45.28
Ref #64 611E97400 CONDUIT, MISC.: TYPE C FOR DRAINAGE DISCHARGE CONT, (100 FT)
Awd $1,800.00$18.00
2 $3,075.00$30.75
3 $900.00$9.00
4 $6,556.00$65.56
5 $3,000.00$30.00
6 $3,000.00$30.00
7 $800.00$8.00
8 $4,028.00$40.28
Ref #65 611E97400 CONDUIT, MISC.: TYPE F FOR DRAINAGE DISCHARGE CONT, (100 FT)
Awd $1,800.00$18.00
2 $3,075.00$30.75
3 $900.00$9.00
4 $5,925.00$59.25
5 $3,000.00$30.00
6 $2,700.00$27.00
7 $1,200.00$12.00
8 $4,803.00$48.03
Ref #66 611E98180 CATCH BASIN, NO. 3A, (11 EACH)
Awd $31,900.00$2,900.00
2 $22,058.85$2,005.35
3 $26,400.00$2,400.00
4 $24,957.13$2,268.83
5 $30,140.00$2,740.00
6 $24,029.50$2,184.50
7 $27,500.00$2,500.00
8 $21,710.81$1,973.71
Ref #67 611E98370 CATCH BASIN, NO. 6, (1 EACH)
Awd $3,200.00$3,200.00
2 $1,951.60$1,951.60
3 $2,150.00$2,150.00
4 $2,698.01$2,698.01
5 $2,005.00$2,005.00
6 $2,298.00$2,298.00
7 $3,000.00$3,000.00
8 $2,370.38$2,370.38
Ref #68 611E98470 CATCH BASIN, NO. 2-2B, (8 EACH)
Awd $14,000.00$1,750.00
2 $11,506.00$1,438.25
3 $8,800.00$1,100.00
4 $10,481.28$1,310.16
5 $11,880.00$1,485.00
6 $13,416.00$1,677.00
7 $14,400.00$1,800.00
8 $8,986.08$1,123.26
200265 - Page 99
Ref #69 611E98634 CATCH BASIN RECONSTRUCTED TO GRADE, (1 EACH)
Awd $950.00$950.00
2 $969.68$969.68
3 $850.00$850.00
4 $442.42$442.42
5 $447.00$447.00
6 $1,060.00$1,060.00
7 $1,000.00$1,000.00
8 $1,144.66$1,144.66
Ref #70 611E99574 MANHOLE, NO. 3, (8 EACH)
Awd $30,400.00$3,800.00
2 $23,649.44$2,956.18
3 $24,000.00$3,000.00
4 $33,539.36$4,192.42
5 $36,624.00$4,578.00
6 $26,296.00$3,287.00
7 $28,000.00$3,500.00
8 $19,555.68$2,444.46
Ref #71 611E99586 MANHOLE, NO. 3 WITH 108" BASE I.D. AND 12" WEIR, (1 EACH)
Awd $14,500.00$14,500.00
2 $13,868.07$13,868.07
3 $21,000.00$21,000.00
4 $19,736.17$19,736.17
5 $19,750.00$19,750.00
6 $20,899.00$20,899.00
7 $20,000.00$20,000.00
8 $20,043.82$20,043.82
Ref #72 611E99660 MANHOLE RECONSTRUCTED TO GRADE, (2 EACH)
Awd $2,300.00$1,150.00
2 $1,819.28$909.64
3 $2,000.00$1,000.00
4 $1,761.12$880.56
5 $712.00$356.00
6 $2,651.00$1,325.50
7 $2,000.00$1,000.00
8 $2,988.96$1,494.48
Ref #73 611E99710 PRECAST REINFORCED CONCRETE OUTLET, (6 EACH)
Awd $900.00$150.00
2 $2,200.20$366.70
3 $1,800.00$300.00
4 $1,422.96$237.16
5 $1,860.00$310.00
6 $1,508.46$251.41
7 $1,800.00$300.00
8 $1,974.06$329.01
Ref #74 611E99720 INSPECTION WELL, (5 EACH)
Awd $2,400.00$480.00
2 $3,587.35$717.47
3 $2,500.00$500.00
4 $32,500.00$6,500.00
5 $4,290.00$858.00
6 $1,965.00$393.00
7 $2,000.00$400.00
8 $7,082.70$1,416.54
200265 - Page 100
Ref #75 895E10040 MANUFACTURED WATER QUALITY STRUCTURE, TYPE 4, (1 EACH)
Awd $41,500.00$41,500.00
2 $31,955.32$31,955.32
3 $35,000.00$35,000.00
4 $55,252.67$55,252.67
5 $49,284.00$49,284.00
6 $54,128.00$54,128.00
7 $40,000.00$40,000.00
8 $49,366.82$49,366.82
Section 3 - DRAINAGE - Totals
Awd $316,043.00
2 $302,900.24
3 $289,190.50
4 $441,703.79
5 $332,414.10
6 $349,639.96
7 $363,280.00
8 $433,810.72
Ref #76 302E46000 ASPHALT CONCRETE BASE, PG64-22, (1271 CY)
Awd $129,642.00$102.00
2 $151,846.37$119.47
3 $142,352.00$112.00
4 $144,080.56$113.36
5 $161,162.80$126.80
6 $142,352.00$112.00
7 $156,333.00$123.00
8 $179,922.76$141.56
Ref #77 304E20000 AGGREGATE BASE, (1897 CY)
Awd $91,056.00$48.00
2 $97,467.86$51.38
3 $79,674.00$42.00
4 $128,351.02$67.66
5 $74,931.50$39.50
6 $93,901.50$49.50
7 $104,335.00$55.00
8 $106,782.13$56.29
Ref #78 407E20000 NON-TRACKING TACK COAT, (762 GAL)
Awd $2,286.00$3.00
2 $2,438.40$3.20
3 $2,286.00$3.00
4 $2,286.00$3.00
5 $2,286.00$3.00
6 $2,400.30$3.15
7 $2,514.60$3.30
8 $2,286.00$3.00
200265 - Page 101
Ref #79 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG, (22 CY)
Awd $8,360.00$380.00
2 $13,494.14$613.37
3 $12,650.00$575.00
4 $12,650.00$575.00
5 $14,322.00$651.00
6 $12,738.00$579.00
7 $13,860.00$630.00
8 $8,620.92$391.86
Ref #80 442E20000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A (, (317 CY)
Awd $57,060.00$180.00
2 $70,335.96$221.88
3 $65,936.00$208.00
4 $65,936.00$208.00
5 $74,685.20$235.60
6 $66,253.00$209.00
7 $72,910.00$230.00
8 $69,359.60$218.80
Ref #81 442E20200 ASPHALT CONCRETE INTERMEDIATE COURSE, 19 MM, TYPE , (423 CY)
Awd $59,220.00$140.00
2 $71,292.42$168.54
3 $66,834.00$158.00
4 $66,834.00$158.00
5 $75,717.00$179.00
6 $66,834.00$158.00
7 $73,602.00$174.00
8 $82,912.23$196.01
Ref #82 452E10010 6" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P, (615 SY)
Awd $35,055.00$57.00
2 $52,275.00$85.00
3 $40,590.00$66.00
4 $37,287.45$60.63
5 $43,757.25$71.15
6 $36,285.00$59.00
7 $40,590.00$66.00
8 $36,254.25$58.95
Ref #83 452E11010 7" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P, (493 SY)
Awd $31,552.00$64.00
2 $36,398.19$73.83
3 $33,031.00$67.00
4 $32,883.10$66.70
5 $38,947.00$79.00
6 $32,538.00$66.00
7 $35,003.00$71.00
8 $32,020.35$64.95
Ref #84 609E12000 COMBINATION CURB AND GUTTER, TYPE 2, (3161 FT)
Awd $63,220.00$20.00
2 $61,829.16$19.56
3 $72,703.00$23.00
4 $88,571.22$28.02
5 $78,392.80$24.80
6 $83,766.50$26.50
7 $82,186.00$26.00
8 $82,280.83$26.03
200265 - Page 102
Ref #85 609E26000 CURB, TYPE 6, (513 FT)
Awd $11,799.00$23.00
2 $14,148.54$27.58
3 $15,903.00$31.00
4 $14,707.71$28.67
5 $15,133.50$29.50
6 $16,929.00$33.00
7 $13,851.00$27.00
8 $13,030.20$25.40
Ref #86 609E31000 COMBINATION CURB AND GUTTER, TYPE 9, (352 FT)
Awd $8,096.00$23.00
2 $11,802.56$33.53
3 $10,560.00$30.00
4 $10,281.92$29.21
5 $11,264.00$32.00
6 $13,552.00$38.50
7 $9,504.00$27.00
8 $9,556.80$27.15
Ref #87 609E31001 COMBINATION CURB AND GUTTER, TYPE 9, AS PER PLAN, (243 FT)
Awd $7,047.00$29.00
2 $8,147.79$33.53
3 $8,748.00$36.00
4 $10,303.20$42.40
5 $9,452.70$38.90
6 $10,692.00$44.00
7 $8,019.00$33.00
8 $9,911.97$40.79
Ref #88 609E72001 CONCRETE MEDIAN, AS PER PLAN, (1255 SY)
Awd $92,870.00$74.00
2 $114,995.65$91.63
3 $92,870.00$74.00
4 $82,403.30$65.66
5 $113,452.00$90.40
6 $99,772.50$79.50
7 $112,950.00$90.00
8 $83,357.10$66.42
Ref #89 690E98400 SPECIAL - CONSULTANT FOR CONCRETE QUALITY CONTROL , (LUMP SUM)
Awd $18,450.00$18,450.00
2 $16,614.19$16,614.19
3 $7,500.00$7,500.00
4 $6,300.00$6,300.00
5 $21,444.00$21,444.00
6 $17,000.00$17,000.00
7 $10,000.00$10,000.00
8 $4,740.00$4,740.00
200265 - Page 103
Section 4 - PAVEMENT - Totals
Awd $615,713.00
2 $723,086.23
3 $651,637.00
4 $702,875.48
5 $734,947.75
6 $695,013.80
7 $735,657.60
8 $721,035.14
Ref #90 638E01140 6" WATER MAIN POLYVINYL CHLORIDE PIPE AND FITTINGS, (1002 FT)
Awd $59,118.00$59.00
2 $40,280.40$40.20
3 $60,120.00$60.00
4 $42,284.40$42.20
5 $36,172.20$36.10
6 $44,589.00$44.50
7 $50,100.00$50.00
8 $61,162.08$61.04
Ref #91 638E04900 1" COPPER SERVICE BRANCH, (203 FT)
Awd $7,105.00$35.00
2 $12,143.46$59.82
3 $12,180.00$60.00
4 $14,581.49$71.83
5 $7,896.70$38.90
6 $9,744.00$48.00
7 $8,120.00$40.00
8 $9,983.54$49.18
Ref #92 638E07800 6" GATE VALVE AND VALVE BOX, (4 EACH)
Awd $7,400.00$1,850.00
2 $4,906.60$1,226.65
3 $2,600.00$650.00
4 $11,017.08$2,754.27
5 $4,000.00$1,000.00
6 $3,760.00$940.00
7 $4,000.00$1,000.00
8 $18,087.84$4,521.96
Ref #93 638E10201 6" FIRE HYDRANT, AS PER PLAN, TWO-WAY, (1 EACH)
Awd $5,000.00$5,000.00
2 $4,287.96$4,287.96
3 $4,200.00$4,200.00
4 $4,948.79$4,948.79
5 $2,980.00$2,980.00
6 $5,283.00$5,283.00
7 $5,000.00$5,000.00
8 $3,571.80$3,571.80
200265 - Page 104
Ref #94 638E11200 METER, SETTING, STOP AND CHAMBER, (5 EACH)
Awd $5,875.00$1,175.00
2 $5,495.90$1,099.18
3 $7,750.00$1,550.00
4 $6,388.15$1,277.63
5 $5,100.00$1,020.00
6 $4,717.50$943.50
7 $5,000.00$1,000.00
8 $17,480.10$3,496.02
Ref #95 638E98000 WATER WORK, MISC.:CONNECT TO EX. WATER MAIN, (3 EACH)
Awd $6,375.00$2,125.00
2 $8,799.90$2,933.30
3 $11,400.00$3,800.00
4 $15,436.20$5,145.40
5 $2,535.00$845.00
6 $10,642.50$3,547.50
7 $18,000.00$6,000.00
8 $21.96$7.32
Ref #96 638E98600 WATER WORK, MISC.:12" STEEL CASING, (50 FT)
Awd $4,050.00$81.00
2 $2,621.00$52.42
3 $3,250.00$65.00
4 $5,940.00$118.80
5 $2,800.00$56.00
6 $7,025.00$140.50
7 $5,000.00$100.00
8 $6,506.50$130.13
Ref #97 638E98600 WATER WORK, MISC.:2" PVC CASING, (90 FT)
Awd $1,260.00$14.00
2 $52.20$0.58
3 $2,700.00$30.00
4 $1,493.10$16.59
5 $846.00$9.40
6 $5,805.00$64.50
7 $900.00$10.00
8 $2,154.60$23.94
Section 5 - WATER WORK - Totals
Awd $96,183.00
2 $78,587.42
3 $104,200.00
4 $102,089.21
5 $62,329.90
6 $91,566.00
7 $96,120.00
8 $118,968.42
200265 - Page 105
Ref #98 625E00450 CONNECTION, FUSED PULL APART, (26 EACH)
Awd $2,314.00$89.00
2 $2,561.52$98.52
3 $2,314.00$89.00
4 $2,314.00$89.00
5 $2,797.60$107.60
6 $2,548.00$98.00
7 $2,548.00$98.00
8 $1,586.00$61.00
Ref #99 625E00460 CONNECTION, UNFUSED PULL APART, (13 EACH)
Awd $1,014.00$78.00
2 $1,280.76$98.52
3 $1,014.00$78.00
4 $1,014.00$78.00
5 $1,398.80$107.60
6 $1,274.00$98.00
7 $1,118.00$86.00
8 $832.00$64.00
Ref #100 625E00480 CONNECTION, UNFUSED PERMANENT, (45 EACH)
Awd $900.00$20.00
2 $4,923.45$109.41
3 $900.00$20.00
4 $900.00$20.00
5 $5,400.00$120.00
6 $4,410.00$98.00
7 $990.00$22.00
8 $2,475.00$55.00
Ref #101 625E10490 LIGHT POLE, CONVENTIONAL, AT6B32.5, (13 EACH)
Awd $27,560.00$2,120.00
2 $28,083.38$2,160.26
3 $27,560.00$2,120.00
4 $27,560.00$2,120.00
5 $30,680.00$2,360.00
6 $28,119.00$2,163.00
7 $30,420.00$2,340.00
8 $20,384.00$1,568.00
Ref #102 625E14000 LIGHT POLE FOUNDATION, 24" X 6' DEEP, (13 EACH)
Awd $14,430.00$1,110.00
2 $22,056.84$1,696.68
3 $14,430.00$1,110.00
4 $14,430.00$1,110.00
5 $24,089.00$1,853.00
6 $24,908.00$1,916.00
7 $15,860.00$1,220.00
8 $22,035.00$1,695.00
Ref #103 625E23200 NO. 4 AWG 2400 VOLT DISTRIBUTION CABLE, (573 FT)
Awd $1,719.00$3.00
2 $1,959.66$3.42
3 $1,719.00$3.00
4 $1,719.00$3.00
5 $2,120.10$3.70
6 $1,719.00$3.00
7 $1,890.90$3.30
8 $1,231.95$2.15
200265 - Page 106
Ref #104 625E23400 NO. 10 AWG POLE AND BRACKET CABLE, (1482 FT)
Awd $1,482.00$1.00
2 $2,771.34$1.87
3 $1,482.00$1.00
4 $1,482.00$1.00
5 $2,964.00$2.00
6 $1,482.00$1.00
7 $1,630.20$1.10
8 $1,482.00$1.00
Ref #105 625E24320 1-1/2" DUCT CABLE WITH THREE NO. 4 AWG 2400 VOLT C, (1691 FT)
Awd $15,219.00$9.00
2 $15,438.83$9.13
3 $15,219.00$9.00
4 $15,219.00$9.00
5 $16,910.00$10.00
6 $15,219.00$9.00
7 $16,910.00$10.00
8 $8,370.45$4.95
Ref #106 625E25900 CONDUIT, JACKED OR DRILLED, 3", (191 FT)
Awd $6,303.00$33.00
2 $9,131.71$47.81
3 $6,303.00$33.00
4 $6,303.00$33.00
5 $9,970.20$52.20
6 $4,297.50$22.50
7 $7,067.00$37.00
8 $7,258.00$38.00
Ref #107 625E26251 LUMINAIRE, CONVENTIONAL, AS PER PLAN, SOLID STATE , (13 EACH)
Awd $5,070.00$390.00
2 $5,379.40$413.80
3 $5,070.00$390.00
4 $5,070.00$390.00
5 $5,876.00$452.00
6 $4,017.00$309.00
7 $5,590.00$430.00
8 $6,435.00$495.00
Ref #108 625E29002 TRENCH, 24" DEEP, (1653 FT)
Awd $14,050.50$8.50
2 $21,257.58$12.86
3 $14,050.50$8.50
4 $14,050.50$8.50
5 $23,142.00$14.00
6 $15,703.50$9.50
7 $15,538.20$9.40
8 $14,463.75$8.75
Ref #109 625E30700 PULL BOX, 725.08, 18", (8 EACH)
Awd $7,520.00$940.00
2 $6,591.76$823.97
3 $7,520.00$940.00
4 $7,520.00$940.00
5 $7,200.00$900.00
6 $7,004.00$875.50
7 $8,240.00$1,030.00
8 $5,960.00$745.00
200265 - Page 107
Ref #110 625E32000 GROUND ROD, (14 EACH)
Awd $3,514.00$251.00
2 $3,343.06$238.79
3 $3,514.00$251.00
4 $3,514.00$251.00
5 $3,640.00$260.00
6 $3,822.00$273.00
7 $3,864.00$276.00
8 $3,486.00$249.00
Ref #111 625E34001 POWER SERVICE, AS PER PLAN, (1 EACH)
Awd $1,925.00$1,925.00
2 $5,637.62$5,637.62
3 $1,925.00$1,925.00
4 $1,925.00$1,925.00
5 $6,156.00$6,156.00
6 $824.00$824.00
7 $2,100.00$2,100.00
8 $2,280.00$2,280.00
Ref #112 625E34450 CONTROL CENTER CABINET, COMPLETE, (1 EACH)
Awd $3,100.00$3,100.00
2 $3,436.92$3,436.92
3 $3,100.00$3,100.00
4 $3,100.00$3,100.00
5 $3,750.00$3,750.00
6 $6,180.00$6,180.00
7 $3,400.00$3,400.00
8 $3,580.00$3,580.00
Ref #113 625E36000 PLASTIC CAUTION TAPE, (1653 FT)
Awd $82.65$0.05
2 $264.48$0.16
3 $82.65$0.05
4 $82.65$0.05
5 $330.60$0.20
6 $347.13$0.21
7 $99.18$0.06
8 $165.30$0.10
Ref #114 632E70200 CONDUIT RISER, 1" DIAMETER, (1 EACH)
Awd $50.00$50.00
2 $441.80$441.80
3 $50.00$50.00
4 $50.00$50.00
5 $482.50$482.50
6 $154.50$154.50
7 $55.00$55.00
8 $450.00$450.00
200265 - Page 108
Section 6 - LIGHTING - Totals
Awd $106,253.15
2 $134,560.11
3 $106,253.15
4 $106,253.15
5 $146,906.80
6 $122,028.63
7 $117,320.48
8 $102,474.45
Ref #115 621E00100 RPM, (63 EACH)
Awd $3,981.60$63.20
2 $4,129.02$65.54
3 $3,981.60$63.20
4 $3,981.60$63.20
5 $4,510.80$71.60
6 $4,095.00$65.00
7 $4,410.00$70.00
8 $3,981.60$63.20
Ref #116 621E54000 RAISED PAVEMENT MARKER REMOVED, (28 EACH)
Awd $238.00$8.50
2 $312.20$11.15
3 $294.00$10.50
4 $510.44$18.23
5 $1,929.20$68.90
6 $322.00$11.50
7 $280.00$10.00
8 $498.68$17.81
Ref #117 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST, (337 FT)
Awd $3,707.00$11.00
2 $3,845.17$11.41
3 $3,707.00$11.00
4 $3,707.00$11.00
5 $4,212.50$12.50
6 $3,875.50$11.50
7 $4,044.00$12.00
8 $3,707.00$11.00
Ref #118 630E03101 GROUND MOUNTED SUPPORT, NO. 3 POST, AS PER PLAN, (91 FT)
Awd $1,001.00$11.00
2 $1,557.01$17.11
3 $1,501.50$16.50
4 $1,001.00$11.00
5 $1,701.70$18.70
6 $1,046.50$11.50
7 $1,638.00$18.00
8 $1,001.00$11.00
200265 - Page 109
Ref #119 630E08600 SIGN POST REFLECTOR, (6 EACH)
Awd $300.00$50.00
2 $304.92$50.82
3 $294.00$49.00
4 $300.00$50.00
5 $333.00$55.50
6 $309.00$51.50
7 $330.00$55.00
8 $300.00$50.00
Ref #120 630E79500 SIGN SUPPORT ASSEMBLY, POLE MOUNTED, (1 EACH)
Awd $125.00$125.00
2 $181.49$181.49
3 $175.00$175.00
4 $125.00$125.00
5 $200.60$200.60
6 $129.00$129.00
7 $195.00$195.00
8 $125.00$125.00
Ref #121 630E80100 SIGN, FLAT SHEET, (233 SF)
Awd $5,825.00$25.00
2 $3,117.54$13.38
3 $3,005.70$12.90
4 $5,825.00$25.00
5 $3,401.80$14.60
6 $6,058.00$26.00
7 $3,495.00$15.00
8 $5,825.00$25.00
Ref #122 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL, (22 EACH)
Awd $440.00$20.00
2 $456.28$20.74
3 $440.00$20.00
4 $440.00$20.00
5 $503.80$22.90
6 $451.00$20.50
7 $484.00$22.00
8 $440.00$20.00
Ref #123 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION, (4 EACH)
Awd $260.00$65.00
2 $165.92$41.48
3 $180.00$45.00
4 $260.00$65.00
5 $181.20$45.30
6 $268.00$67.00
7 $200.00$50.00
8 $260.00$65.00
Ref #124 630E85201 REMOVAL OF GROUND MOUNTED SIGN AND DELIVERY, AS PE, (4 EACH)
Awd $140.00$35.00
2 $145.20$36.30
3 $160.00$40.00
4 $140.00$35.00
5 $158.40$39.60
6 $144.00$36.00
7 $156.00$39.00
8 $140.00$35.00
200265 - Page 110
Ref #125 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA, (15 EACH)
Awd $300.00$20.00
2 $544.50$36.30
3 $525.00$35.00
4 $300.00$20.00
5 $594.00$39.60
6 $307.50$20.50
7 $585.00$39.00
8 $300.00$20.00
Ref #126 632E90010 PEDESTAL, MISC.: REMOVAL & RE-ERECT PEDESTAL W/ SO, (4 EACH)
Awd $6,620.00$1,655.00
2 $9,707.16$2,426.79
3 $6,620.00$1,655.00
4 $6,620.00$1,655.00
5 $10,600.00$2,650.00
6 $11,330.00$2,832.50
7 $7,280.00$1,820.00
8 $7,920.00$1,980.00
Ref #127 632E90101 REMOVAL OF TRAFFIC SIGNAL INSTALLATION, AS PER PLA, (1 EACH)
Awd $1,285.00$1,285.00
2 $1,685.27$1,685.27
3 $1,285.00$1,285.00
4 $1,285.00$1,285.00
5 $1,840.00$1,840.00
6 $623.00$623.00
7 $1,410.00$1,410.00
8 $2,800.00$2,800.00
Ref #128 644E00104 EDGE LINE, 6", (0.71 MILE)
Awd $4,725.05$6,655.00
2 $4,900.31$6,901.85
3 $4,725.05$6,655.00
4 $4,725.05$6,655.00
5 $5,350.56$7,536.00
6 $4,866.70$6,854.51
7 $5,183.00$7,300.00
8 $4,650.50$6,550.00
Ref #129 644E00300 CENTER LINE, DOUBLE SOLID, (0.28 MILE)
Awd $2,063.60$7,370.00
2 $2,140.14$7,643.36
3 $2,063.60$7,370.00
4 $2,063.60$7,370.00
5 $1,217.05$4,346.61
6 $2,125.48$7,591.00
7 $2,268.00$8,100.00
8 $2,063.60$7,370.00
Ref #130 644E00700 TRANSVERSE/DIAGONAL LINE, (110 FT)
Awd $561.00$5.10
2 $581.90$5.29
3 $561.00$5.10
4 $561.00$5.10
5 $638.00$5.80
6 $605.00$5.50
7 $660.00$6.00
8 $561.00$5.10
200265 - Page 111
Ref #131 644E01510 DOTTED LINE, 6", (319 FT)
Awd $988.90$3.10
2 $1,023.99$3.21
3 $988.90$3.10
4 $988.90$3.10
5 $1,116.50$3.50
6 $957.00$3.00
7 $1,116.50$3.50
8 $988.90$3.10
Ref #132 644E01520 DOTTED LINE, 12", (139 FT)
Awd $500.40$3.60
2 $518.47$3.73
3 $500.40$3.60
4 $500.40$3.60
5 $569.90$4.10
6 $486.50$3.50
7 $556.00$4.00
8 $500.40$3.60
Ref #133 644E20800 YIELD LINE, (61 FT)
Awd $649.65$10.65
2 $673.44$11.04
3 $649.65$10.65
4 $649.65$10.65
5 $732.00$12.00
6 $671.00$11.00
7 $793.00$13.00
8 $649.65$10.65
Section 7 - TRAFFIC CONTROL - Totals
Awd $33,711.20
2 $35,989.93
3 $31,657.40
4 $33,983.64
5 $39,791.01
6 $38,670.18
7 $35,083.50
8 $36,712.33
Ref #134 661E00501 MULCH, AS PER PLAN SHREDDED BARK, 4" THICKNESS, (76 CY)
Awd $6,042.00$79.50
2 $6,266.20$82.45
3 $6,042.00$79.50
4 $4,940.00$65.00
5 $7,037.60$92.60
6 $5,092.00$67.00
7 $6,688.00$88.00
8 $6,042.00$79.50
200265 - Page 112
Ref #135 661E12100 GROUND COVER AND VINES, 1 YEAR, FLAT VINVA MINOR -, (2988 EACH)
Awd $11,503.80$3.85
2 $11,922.12$3.99
3 $11,503.80$3.85
4 $10,458.00$3.50
5 $13,446.00$4.50
6 $10,458.00$3.50
7 $13,446.00$4.50
8 $11,503.80$3.85
Ref #136 661E20070 DECIDUOUS SHRUB, 30" HEIGHT CORNUS ALBA 'CHBLZAM' , (30 EACH)
Awd $2,520.00$84.00
2 $2,613.60$87.12
3 $2,520.00$84.00
4 $2,250.00$75.00
5 $2,901.00$96.70
6 $2,325.00$77.50
7 $2,850.00$95.00
8 $2,520.00$84.00
Ref #137 661E30040 EVERGREEN SHRUB, 18" HEIGHT THUJA OCCIDENTALIS 'AU, (76 EACH)
Awd $6,156.00$81.00
2 $6,384.00$84.00
3 $6,156.00$81.00
4 $6,080.00$80.00
5 $7,782.40$102.40
6 $6,270.00$82.50
7 $6,764.00$89.00
8 $6,156.00$81.00
Ref #138 662E31000 LANDSCAPE WATERING, (424 GAL)
Awd $424.00$1.00
2 $440.96$1.04
3 $424.00$1.00
4 $424.00$1.00
5 $424.00$1.00
6 $424.00$1.00
7 $848.00$2.00
8 $424.00$1.00
Section 8 - LANDSCAPING - Totals
Awd $26,645.80
2 $27,626.88
3 $26,645.80
4 $24,152.00
5 $31,591.00
6 $24,569.00
7 $30,596.00
8 $26,645.80
200265 - Page 113
Ref #139 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST, (100 HOUR)
Awd $6,500.00$65.00
2 $7,260.00$72.60
3 $6,500.00$65.00
4 $6,500.00$65.00
5 $7,500.00$75.00
6 $6,700.00$67.00
7 $6,500.00$65.00
8 $7,500.00$75.00
Ref #140 614E11630 INCREASED BARRIER DELINEATION, (610 FT)
Awd $1,525.00$2.50
2 $1,579.90$2.59
3 $1,525.00$2.50
4 $1,067.50$1.75
5 $1,708.00$2.80
6 $1,525.00$2.50
7 $1,677.50$2.75
8 $1,525.00$2.50
Ref #141 614E12336 WORK ZONE IMPACT ATTENUATOR (UNIDIRECTIONAL), (18 EACH)
Awd $34,200.00$1,900.00
2 $35,468.46$1,970.47
3 $34,200.00$1,900.00
4 $34,200.00$1,900.00
5 $41,400.00$2,300.00
6 $35,226.00$1,957.00
7 $37,800.00$2,100.00
8 $42,247.26$2,347.07
Ref #142 614E12420 DETOUR SIGNING, (LUMP SUM)
Awd $11,770.00$11,770.00
2 $12,206.55$12,206.55
3 $11,770.00$11,770.00
4 $11,770.00$11,770.00
5 $15,100.00$15,100.00
6 $12,123.00$12,123.00
7 $10,000.00$10,000.00
8 $8,460.00$8,460.00
Ref #143 614E13310 BARRIER REFLECTOR, TYPE 1 (BIDIRECTIONAL), (72 EACH)
Awd $792.00$11.00
2 $821.52$11.41
3 $792.00$11.00
4 $792.00$11.00
5 $900.00$12.50
6 $828.00$11.50
7 $864.00$12.00
8 $720.00$10.00
Ref #144 614E13350 OBJECT MARKER, ONE WAY, (72 EACH)
Awd $936.00$13.00
2 $970.56$13.48
3 $936.00$13.00
4 $792.00$11.00
5 $1,058.40$14.70
6 $972.00$13.50
7 $1,008.00$14.00
8 $1,206.00$16.75
200265 - Page 114
Ref #145 614E21000 WORK ZONE CENTER LINE, CLASS I, (0.91 MILE)
Awd $1,337.70$1,470.00
2 $1,387.31$1,524.52
3 $1,337.70$1,470.00
4 $1,337.70$1,470.00
5 $1,515.15$1,665.00
6 $1,377.74$1,514.00
7 $1,474.20$1,620.00
8 $1,337.70$1,470.00
Ref #146 614E22010 WORK ZONE EDGE LINE, CLASS I, 6", (2.68 MILE)
Awd $3,443.80$1,285.00
2 $3,571.53$1,332.66
3 $3,443.80$1,285.00
4 $3,443.80$1,285.00
5 $3,899.40$1,455.00
6 $3,546.98$1,323.50
7 $3,778.80$1,410.00
8 $3,443.80$1,285.00
Ref #147 614E24000 WORK ZONE DOTTED LINE, CLASS I, 6", (46 FT)
Awd $46.00$1.00
2 $47.84$1.04
3 $46.00$1.00
4 $46.00$1.00
5 $52.90$1.15
6 $46.00$1.00
7 $50.60$1.10
8 $46.00$1.00
Ref #148 614E26000 WORK ZONE STOP LINE, CLASS I, 24", (54 FT)
Awd $270.00$5.00
2 $280.26$5.19
3 $270.00$5.00
4 $270.00$5.00
5 $307.80$5.70
6 $270.00$5.00
7 $297.00$5.50
8 $270.00$5.00
Ref #149 615E25000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS B, (7459 SY)
Awd $249,876.50$33.50
2 $305,595.23$40.97
3 $425,163.00$57.00
4 $340,354.17$45.63
5 $299,851.80$40.20
6 $350,573.00$47.00
7 $372,950.00$50.00
8 $278,369.88$37.32
Ref #150 616E10000 WATER, (59 MGAL)
Awd $1,475.00$25.00
2 $5,960.77$101.03
3 $4,720.00$80.00
4 $742.22$12.58
5 $4,410.25$74.75
6 $1,180.00$20.00
7 $118.00$2.00
8 $241.31$4.09
200265 - Page 115
Ref #151 622E41100 PORTABLE BARRIER, UNANCHORED, (3590 FT)
Awd $48,465.00$13.50
2 $50,260.00$14.00
3 $48,465.00$13.50
4 $48,465.00$13.50
5 $66,415.00$18.50
6 $50,260.00$14.00
7 $53,850.00$15.00
8 $61,281.30$17.07
Ref #200 614E21001 WORK ZONE CENTER LINE, CLASS I, AS PER PLAN, SPRAY, (0.44 MILE)
Awd $1,502.60$3,415.00
2 $1,558.33$3,541.66
3 $1,502.60$3,415.00
4 $1,502.60$3,415.00
5 $1,628.00$3,700.00
6 $1,547.70$3,517.50
7 $1,628.00$3,700.00
8 $1,502.60$3,415.00
Ref #201 614E22011 WORK ZONE EDGE LINE, CLASS I, 6", AS PER PLAN, SPR, (1.48 MILE)
Awd $4,632.40$3,130.00
2 $4,804.21$3,246.09
3 $4,632.40$3,130.00
4 $4,632.40$3,130.00
5 $5,180.00$3,500.00
6 $4,771.52$3,224.00
7 $5,032.00$3,400.00
8 $4,632.40$3,130.00
Ref #202 614E24001 WORK ZONE DOTTED LINE, CLASS I, AS PER PLAN, 6", , (80 FT)
Awd $800.00$10.00
2 $829.60$10.37
3 $800.00$10.00
4 $800.00$10.00
5 $904.00$11.30
6 $840.00$10.50
7 $880.00$11.00
8 $800.00$10.00
Ref #203 614E26001 WORK ZONE STOP LINE, CLASS I, AS PER PLAN, 24", SR, (27 FT)
Awd $675.00$25.00
2 $700.11$25.93
3 $675.00$25.00
4 $675.00$25.00
5 $764.10$28.30
6 $702.00$26.00
7 $756.00$28.00
8 $675.00$25.00
200265 - Page 116
Section 9 - MAINTENANCE OF TRAFFIC - Totals
Awd $368,247.00
2 $433,302.18
3 $546,778.50
4 $457,390.39
5 $452,594.80
6 $472,488.94
7 $498,664.10
8 $414,258.25
Ref #152 202E11201 PORTIONS OF STRUCTURE REMOVED, AS PER PLAN, (LUMP SUM)
Awd $8,000.00$8,000.00
2 $11,631.91$11,631.91
3 $15,000.00$15,000.00
4 $11,147.77$11,147.77
5 $12,890.00$12,890.00
6 $21,445.00$21,445.00
7 $12,000.00$12,000.00
8 $15,022.46$15,022.46
Ref #153 503E11101 COFFERDAMS AND EXCAVATION BRACING, AS PER PLAN, (LUMP SUM)
Awd $91,000.00$91,000.00
2 $65,287.72$65,287.72
3 $68,000.00$68,000.00
4 $53,759.35$53,759.35
5 $94,100.00$94,100.00
6 $33,123.50$33,123.50
7 $50,000.00$50,000.00
8 $25,147.09$25,147.09
Ref #154 503E21300 UNCLASSIFIED EXCAVATION, (LUMP SUM)
Awd $12,000.00$12,000.00
2 $17,830.65$17,830.65
3 $11,500.00$11,500.00
4 $10,011.73$10,011.73
5 $10,925.00$10,925.00
6 $6,625.50$6,625.50
7 $5,000.00$5,000.00
8 $9,852.38$9,852.38
Ref #155 509E10000 EPOXY COATED REINFORCING STEEL, (6929 LB)
Awd $5,196.75$0.75
2 $12,957.23$1.87
3 $5,196.75$0.75
4 $10,254.92$1.48
5 $5,543.20$0.80
6 $17,322.50$2.50
7 $13,858.00$2.00
8 $16,283.15$2.35
200265 - Page 117
Ref #156 510E10001 DOWEL HOLES WITH NONSHRINK, NONMETALLIC GROUT, AS , (18 EACH)
Awd $1,170.00$65.00
2 $420.48$23.36
3 $450.00$25.00
4 $247.14$13.73
5 $2,543.40$141.30
6 $270.00$15.00
7 $540.00$30.00
8 $222.84$12.38
Ref #157 511E46011 CLASS QC1 CONCRETE, RETAINING/WINGWALL NOT INCLUDI, (68 CY)
Awd $30,124.00$443.00
2 $76,678.84$1,127.63
3 $29,240.00$430.00
4 $47,259.32$694.99
5 $37,984.80$558.60
6 $71,604.00$1,053.00
7 $68,000.00$1,000.00
8 $59,538.08$875.56
Ref #158 511E46513 CLASS QC1 CONCRETE WITH QC/QA, FOOTING, AS PER PLA, (77 CY)
Awd $38,885.00$505.00
2 $54,732.37$710.81
3 $50,050.00$650.00
4 $47,320.35$614.55
5 $68,091.10$884.30
6 $50,974.00$662.00
7 $38,500.00$500.00
8 $74,294.99$964.87
Ref #159 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (75 SY)
Awd $2,400.00$32.00
2 $2,240.25$29.87
3 $1,500.00$20.00
4 $3,894.75$51.93
5 $4,815.00$64.20
6 $1,350.00$18.00
7 $1,875.00$25.00
8 $2,400.00$32.00
Ref #160 512E33000 TYPE 2 WATERPROOFING, (195 SY)
Awd $4,582.50$23.50
2 $3,744.00$19.20
3 $4,680.00$24.00
4 $4,713.15$24.17
5 $8,521.50$43.70
6 $5,460.00$28.00
7 $3,900.00$20.00
8 $4,582.50$23.50
Ref #161 516E13600 1" PREFORMED EXPANSION JOINT FILLER, (60 SF)
Awd $285.00$4.75
2 $294.00$4.90
3 $180.00$3.00
4 $260.40$4.34
5 $264.00$4.40
6 $450.00$7.50
7 $300.00$5.00
8 $270.00$4.50
200265 - Page 118
Ref #162 518E21230 POROUS BACKFILL WITH GEOTEXTILE FABRIC, (LUMP SUM)
Awd $1,700.00$1,700.00
2 $2,205.66$2,205.66
3 $6,200.00$6,200.00
4 $7,384.39$7,384.39
5 $4,123.70$4,123.70
6 $5,195.00$5,195.00
7 $6,000.00$6,000.00
8 $23,549.61$23,549.61
Ref #163 601E11000 RIPRAP, TYPE D, (19 SY)
Awd $2,945.00$155.00
2 $2,782.17$146.43
3 $4,465.00$235.00
4 $7,072.75$372.25
5 $7,096.50$373.50
6 $3,230.00$170.00
7 $1,900.00$100.00
8 $5,652.12$297.48
Ref #164 601E32004 ROCK CHANNEL PROTECTION, TYPE A WITH GEOTEXTILE FA, (66 CY)
Awd $7,260.00$110.00
2 $9,276.96$140.56
3 $7,920.00$120.00
4 $8,742.36$132.46
5 $8,223.60$124.60
6 $5,544.00$84.00
7 $9,900.00$150.00
8 $10,686.06$161.91
Ref #165 601E34200 ROCK CHANNEL PROTECTION, TYPE C WITHOUT FILTER, (17 CY)
Awd $1,870.00$110.00
2 $2,004.64$117.92
3 $2,890.00$170.00
4 $4,090.88$240.64
5 $2,002.60$117.80
6 $1,394.00$82.00
7 $1,700.00$100.00
8 $5,224.27$307.31
Ref #166 611E95521 10' X 9' CONDUIT, TYPE A, 706.05, AS PER PLAN, (DE, (40 FT)
Awd $52,000.00$1,300.00
2 $66,936.00$1,673.40
3 $74,400.00$1,860.00
4 $82,555.60$2,063.89
5 $53,708.00$1,342.70
6 $81,260.00$2,031.50
7 $64,000.00$1,600.00
8 $100,001.60$2,500.04
Ref #167 613E41200 LOW STRENGTH MORTAR BACKFILL, (21 CY)
Awd $1,890.00$90.00
2 $4,418.61$210.41
3 $1,785.00$85.00
4 $6,583.50$313.50
5 $3,612.00$172.00
6 $4,504.50$214.50
7 $2,625.00$125.00
8 $2,513.49$119.69
200265 - Page 119
Section 10 - STRUCTURE 20 FOOT SPAN AND UNDER (BUT-07 - Totals
Awd $261,308.25
2 $333,441.49
3 $283,456.75
4 $305,298.36
5 $324,444.40
6 $309,752.00
7 $280,098.00
8 $355,240.64
Ref #168 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $8,900.00$8,900.00
2 $8,414.01$8,414.01
3 $25,000.00$25,000.00
4 $16,986.16$16,986.16
5 $26,387.30$26,387.30
6 $64,000.00$64,000.00
7 $30,000.00$30,000.00
8 $29,177.72$29,177.72
Ref #169 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $230,000.00$230,000.00
2 $70,879.07$70,879.07
3 $65,000.00$65,000.00
4 $191,541.93$191,541.93
5 $288,780.00$288,780.00
6 $291,971.27$291,971.27
7 $415,200.00$415,200.00
8 $557,828.77$557,828.77
Ref #170 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING, (LUMP SUM)
Awd $29,500.00$29,500.00
2 $15,193.37$15,193.37
3 $30,000.00$30,000.00
4 $18,312.50$18,312.50
5 $22,300.00$22,300.00
6 $55,000.00$55,000.00
7 $30,000.00$30,000.00
8 $20,947.34$20,947.34
Ref #171 624E10000 MOBILIZATION, (LUMP SUM)
Awd $100,000.00$100,000.00
2 $91,811.64$91,811.64
3 $75,000.00$75,000.00
4 $108,586.77$108,586.77
5 $40,923.00$40,923.00
6 $120,657.30$120,657.30
7 $100,000.00$100,000.00
8 $100,000.00$100,000.00
200265 - Page 120
Section 11 - INCIDENTALS - Totals
Awd $368,400.00
2 $186,298.09
3 $195,000.00
4 $335,427.36
5 $378,390.30
6 $531,628.57
7 $575,200.00
8 $707,953.83
200265 - Page 121
Project No. 200266
PID 107117
CAR-SR 542-09.34
Federal
Type: BRIDGE REPLACEMENT (1 BRIDGE)
Completion Date: 10/31/2020
Award Amount: $783,889.40
Contract Awarded To: MC CONNELL CONTRACTING INC
Letting Date: 5/7/2020
Engineer's Estimate: $810,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jack Marchbanks, Ph.D., Director
MC CONNELL CONTRACTING INC
56194 CR 5
WEST LAFAYETTE, OH 43845
Coshocton
Bidder 1
Bid $783,889.40
STANLEY MILLER CONSTRUCTION COMPANY
2250 HOWENSTINE DR SE
EAST SPARTA, OH 44626
Stark
Bidder 2
Bid $802,709.66
LOCKHART CONCRETE CO
800 W WATERLOO RD
AKRON, OH 44314
Summit
Bidder 3
Bid $814,957.50
BOG CONSTRUCTION INC
8235 HUXLEY RD
BERLIN CENTER, OH 44401
Mahoning
Bidder 4
Bid $883,158.20
ALAN STONE CO INC
1324 ELLIS RUN RD
CUTLER, OH 45724
Washington
Bidder 5
Bid $898,490.78
SHELLY & SANDS INC
1515 HARMON AVE
COLUMBUS, OH 43223
Franklin
Bidder 6
Bid $945,000.40
200266 - Page 122
Ref #1 201E11000 CLEARING AND GRUBBING, (LUMP SUM)
Awd $1,500.00$1,500.00
2 $1,611.00$1,611.00
3 $1,000.00$1,000.00
4 $3,500.00$3,500.00
5 $5,000.00$5,000.00
6 $1,000.00$1,000.00
Ref #2 202E35100 PIPE REMOVED, 24" AND UNDER, (42 FT)
Awd $252.00$6.00
2 $462.00$11.00
3 $420.00$10.00
4 $840.00$20.00
5 $882.00$21.00
6 $567.00$13.50
Ref #3 202E38000 GUARDRAIL REMOVED, (348 FT)
Awd $870.00$2.50
2 $696.00$2.00
3 $1,044.00$3.00
4 $696.00$2.00
5 $1,044.00$3.00
6 $713.40$2.05
Ref #4 202E42000 ANCHOR ASSEMBLY REMOVED, TYPE A, (4 EACH)
Awd $2,000.00$500.00
2 $700.00$175.00
3 $1,000.00$250.00
4 $400.00$100.00
5 $1,120.00$280.00
6 $1,088.00$272.00
Ref #5 202E47000 BRIDGE TERMINAL ASSEMBLY REMOVED, (4 EACH)
Awd $800.00$200.00
2 $400.00$100.00
3 $1,000.00$250.00
4 $400.00$100.00
5 $400.00$100.00
6 $389.60$97.40
Ref #6 202E53100 MAILBOX REMOVED, (2 EACH)
Awd $100.00$50.00
2 $50.00$25.00
3 $40.00$20.00
4 $200.00$100.00
5 $32.00$16.00
6 $31.00$15.50
Ref #7 203E10000 EXCAVATION, (218 CY)
Awd $5,450.00$25.00
2 $6,322.00$29.00
3 $4,360.00$20.00
4 $5,450.00$25.00
5 $5,014.00$23.00
6 $4,578.00$21.00
200266 - Page 123
Ref #8 203E20000 EMBANKMENT, (496 CY)
Awd $9,920.00$20.00
2 $19,443.20$39.20
3 $14,880.00$30.00
4 $12,400.00$25.00
5 $10,416.00$21.00
6 $9,424.00$19.00
Ref #9 204E10000 SUBGRADE COMPACTION, (1051 SY)
Awd $1,839.25$1.75
2 $1,051.00$1.00
3 $2,102.00$2.00
4 $3,153.00$3.00
5 $3,153.00$3.00
6 $3,047.90$2.90
Ref #10 606E15050 GUARDRAIL, TYPE MGS, (262.5 FT)
Awd $4,305.00$16.40
2 $5,134.50$19.56
3 $4,725.00$18.00
4 $5,250.00$20.00
5 $4,987.50$19.00
6 $4,725.00$18.00
Ref #11 606E25550 ANCHOR ASSEMBLY, MGS TYPE A, (4 EACH)
Awd $3,940.00$985.00
2 $5,488.00$1,372.00
3 $4,000.00$1,000.00
4 $5,600.00$1,400.00
5 $5,200.00$1,300.00
6 $5,064.00$1,266.00
Ref #12 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1, (4 EACH)
Awd $8,100.00$2,025.00
2 $9,000.00$2,250.00
3 $8,000.00$2,000.00
4 $8,400.00$2,100.00
5 $8,800.00$2,200.00
6 $8,300.00$2,075.00
Ref #13 690E50100 SPECIAL - MAILBOX SUPPORT SYSTEM, SINGLE, (2 EACH)
Awd $400.00$200.00
2 $324.00$162.00
3 $300.00$150.00
4 $400.00$200.00
5 $320.00$160.00
6 $297.14$148.57
Ref #14 690E98400 SPECIAL - MISC.: WORK INVOLVING ASBESTOS CONTAININ, (LUMP SUM)
Awd $3,500.00$3,500.00
2 $4,000.00$4,000.00
3 $4,000.00$4,000.00
4 $5,000.00$5,000.00
5 $2,000.00$2,000.00
6 $3,800.00$3,800.00
200266 - Page 124
Section 1 - ROADWAY - Totals
Awd $42,976.25
2 $54,681.70
3 $46,871.00
4 $51,689.00
5 $48,368.50
6 $43,025.04
Ref #15 659E00100 SOIL ANALYSIS TEST, (2 EACH)
Awd $200.00$100.00
2 $200.00$100.00
3 $1,000.00$500.00
4 $100.00$50.00
5 $200.00$100.00
6 $200.00$100.00
Ref #16 659E00300 TOPSOIL, (120 CY)
Awd $7,800.00$65.00
2 $2,670.00$22.25
3 $3,600.00$30.00
4 $3,600.00$30.00
5 $7,080.00$59.00
6 $7,200.00$60.00
Ref #17 659E10000 SEEDING AND MULCHING, (1082 SY)
Awd $3,246.00$3.00
2 $2,434.50$2.25
3 $2,164.00$2.00
4 $5,410.00$5.00
5 $4,328.00$4.00
6 $2,564.34$2.37
Ref #18 659E14000 REPAIR SEEDING AND MULCHING, (54 SY)
Awd $81.00$1.50
2 $54.00$1.00
3 $54.00$1.00
4 $54.00$1.00
5 $54.00$1.00
6 $127.98$2.37
Ref #19 659E20000 COMMERCIAL FERTILIZER, (0.15 TON)
Awd $750.00$5,000.00
2 $120.00$800.00
3 $105.00$700.00
4 $150.00$1,000.00
5 $82.50$550.00
6 $90.75$605.00
Ref #20 659E31000 LIME, (0.22 ACRE)
Awd $550.00$2,500.00
2 $88.00$400.00
3 $132.00$600.00
4 $44.00$200.00
5 $18.48$84.00
6 $15.40$70.00
200266 - Page 125
Ref #21 659E35000 WATER, (6 MGAL)
Awd $6.00$1.00
2 $6.00$1.00
3 $300.00$50.00
4 $6.00$1.00
5 $12.00$2.00
6 $6.00$1.00
Ref #22 832E30000 EROSION CONTROL, (6000 EACH)
Awd $6,000.00$1.00
2 $6,000.00$1.00
3 $6,000.00$1.00
4 $6,000.00$1.00
5 $6,000.00$1.00
6 $6,000.00$1.00
Section 2 - EROSION CONTROL - Totals
Awd $18,633.00
2 $11,572.50
3 $13,355.00
4 $15,364.00
5 $17,774.98
6 $16,204.47
Ref #23 602E20000 CONCRETE MASONRY, (0.2 CY)
Awd $1,000.00$5,000.00
2 $406.80$2,034.00
3 $400.00$2,000.00
4 $500.00$2,500.00
5 $520.00$2,600.00
6 $800.00$4,000.00
Ref #24 605E31100 AGGREGATE DRAINS, (50 FT)
Awd $750.00$15.00
2 $1,117.50$22.35
3 $750.00$15.00
4 $1,000.00$20.00
5 $2,000.00$40.00
6 $1,000.00$20.00
Ref #25 611E04600 12" CONDUIT, TYPE C, (174 FT)
Awd $6,960.00$40.00
2 $7,925.70$45.55
3 $16,530.00$95.00
4 $7,830.00$45.00
5 $10,266.00$59.00
6 $8,178.00$47.00
Ref #26 611E98470 CATCH BASIN, NO. 2-2B, (2 EACH)
Awd $4,400.00$2,200.00
2 $2,484.00$1,242.00
3 $2,500.00$1,250.00
4 $3,400.00$1,700.00
5 $3,800.00$1,900.00
6 $5,000.00$2,500.00
200266 - Page 126
Section 3 - DRAINAGE - Totals
Awd $13,110.00
2 $11,934.00
3 $20,180.00
4 $12,730.00
5 $16,586.00
6 $14,978.00
Ref #27 252E01500 FULL DEPTH PAVEMENT SAWING, (247 FT)
Awd $1,605.50$6.50
2 $1,062.10$4.30
3 $1,235.00$5.00
4 $2,964.00$12.00
5 $3,458.00$14.00
6 $642.20$2.60
Ref #28 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (VARIABLE DEPTH, (562 SY)
Awd $3,934.00$7.00
2 $4,372.36$7.78
3 $4,496.00$8.00
4 $8,430.00$15.00
5 $4,496.00$8.00
6 $7,868.00$14.00
Ref #29 301E46000 ASPHALT CONCRETE BASE, PG64-22, (157 CY)
Awd $27,004.00$172.00
2 $29,987.00$191.00
3 $47,100.00$300.00
4 $39,250.00$250.00
5 $29,830.00$190.00
6 $31,400.00$200.00
Ref #30 304E20000 AGGREGATE BASE, (167 CY)
Awd $15,865.00$95.00
2 $13,026.00$78.00
3 $8,350.00$50.00
4 $15,865.00$95.00
5 $14,529.00$87.00
6 $15,030.00$90.00
Ref #31 407E10000 TACK COAT, (314 GAL)
Awd $785.00$2.50
2 $879.20$2.80
3 $1,570.00$5.00
4 $1,256.00$4.00
5 $942.00$3.00
6 $785.00$2.50
Ref #32 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS, (47 CY)
Awd $14,993.00$319.00
2 $16,685.00$355.00
3 $16,215.00$345.00
4 $15,510.00$330.00
5 $15,980.00$340.00
6 $19,975.00$425.00
200266 - Page 127
Ref #33 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2, (448, (53 CY)
Awd $9,222.00$174.00
2 $10,282.00$194.00
3 $18,020.00$340.00
4 $21,730.00$410.00
5 $10,070.00$190.00
6 $21,200.00$400.00
Section 4 - PAVEMENT - Totals
Awd $73,408.50
2 $76,293.66
3 $96,986.00
4 $105,005.00
5 $79,305.00
6 $96,900.20
Ref #34 621E00100 RPM, (13 EACH)
Awd $2,925.00$225.00
2 $3,250.00$250.00
3 $4,225.00$325.00
4 $3,900.00$300.00
5 $3,120.00$240.00
6 $2,925.00$225.00
Ref #35 621E54000 RAISED PAVEMENT MARKER REMOVED, (13 EACH)
Awd $650.00$50.00
2 $325.00$25.00
3 $845.00$65.00
4 $650.00$50.00
5 $351.00$27.00
6 $78.00$6.00
Ref #36 626E00110 BARRIER REFLECTOR, TYPE 2 (BI-DIRECTIONAL), (10 EACH)
Awd $220.00$22.00
2 $82.50$8.25
3 $200.00$20.00
4 $100.00$10.00
5 $80.00$8.00
6 $76.00$7.60
Ref #37 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST, (67 FT)
Awd $737.00$11.00
2 $720.25$10.75
3 $670.00$10.00
4 $1,340.00$20.00
5 $1,340.00$20.00
6 $1,296.45$19.35
Ref #38 630E80100 SIGN, FLAT SHEET, (18.3 SF)
Awd $457.50$25.00
2 $501.42$27.40
3 $457.50$25.00
4 $915.00$50.00
5 $750.30$41.00
6 $732.00$40.00
200266 - Page 128
Ref #39 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL, (5 EACH)
Awd $250.00$50.00
2 $250.00$50.00
3 $250.00$50.00
4 $500.00$100.00
5 $55.00$11.00
6 $51.25$10.25
Ref #40 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA, (5 EACH)
Awd $250.00$50.00
2 $375.00$75.00
3 $375.00$75.00
4 $250.00$50.00
5 $205.00$41.00
6 $200.00$40.00
Ref #41 646E10010 EDGE LINE, 6", (0.28 MILE)
Awd $3,360.00$12,000.00
2 $2,177.84$7,778.00
3 $2,240.00$8,000.00
4 $4,200.00$15,000.00
5 $3,528.00$12,600.00
6 $3,360.00$12,000.00
Ref #42 646E10200 CENTER LINE, (0.14 MILE)
Awd $1,680.00$12,000.00
2 $1,088.92$7,778.00
3 $1,540.00$11,000.00
4 $2,100.00$15,000.00
5 $1,764.00$12,600.00
6 $1,680.00$12,000.00
Section 5 - TRAFFIC CONTROL - Totals
Awd $10,529.50
2 $8,770.93
3 $10,802.50
4 $13,955.00
5 $11,193.30
6 $10,398.70
Ref #43 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST, (24 HOUR)
Awd $1,200.00$50.00
2 $1,800.00$75.00
3 $1,320.00$55.00
4 $1,440.00$60.00
5 $1,656.00$69.00
6 $1,728.00$72.00
Ref #44 614E12336 WORK ZONE IMPACT ATTENUATOR (UNIDIRECTIONAL), (4 EACH)
Awd $10,000.00$2,500.00
2 $7,800.00$1,950.00
3 $4,000.00$1,000.00
4 $10,000.00$2,500.00
5 $8,800.00$2,200.00
6 $8,400.00$2,100.00
200266 - Page 129
Ref #45 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC, (10 CY)
Awd $1,500.00$150.00
2 $1,670.00$167.00
3 $2,000.00$200.00
4 $1,000.00$100.00
5 $3,800.00$380.00
6 $2,300.00$230.00
Ref #46 614E13310 BARRIER REFLECTOR, TYPE 1 (BI-DIRECTIONAL), (15 EACH)
Awd $330.00$22.00
2 $183.75$12.25
3 $300.00$20.00
4 $150.00$10.00
5 $360.00$24.00
6 $135.00$9.00
Ref #47 614E13312 BARRIER REFLECTOR, TYPE 2 (BI-DIRECTIONAL), (14 EACH)
Awd $399.00$28.50
2 $186.90$13.35
3 $280.00$20.00
4 $140.00$10.00
5 $420.00$30.00
6 $126.00$9.00
Ref #48 614E13360 OBJECT MARKER, TWO WAY, (24 EACH)
Awd $528.00$22.00
2 $400.80$16.70
3 $600.00$25.00
4 $480.00$20.00
5 $576.00$24.00
6 $384.00$16.00
Ref #49 614E21200 WORK ZONE CENTER LINE, CLASS I, 740.06, TYPE I, (0.19 MILE)
Awd $2,555.50$13,450.00
2 $1,895.06$9,974.00
3 $2,280.00$12,000.00
4 $2,850.00$15,000.00
5 $2,698.00$14,200.00
6 $2,556.45$13,455.00
Ref #50 614E22210 WORK ZONE EDGE LINE, CLASS I, 6", 740.06, TYPE I, (0.5 MILE)
Awd $4,497.50$8,995.00
2 $3,373.50$6,747.00
3 $5,000.00$10,000.00
4 $7,500.00$15,000.00
5 $4,750.00$9,500.00
6 $4,500.00$9,000.00
Ref #51 614E26400 WORK ZONE STOP LINE, CLASS I, 740.06, TYPE I, (20 FT)
Awd $259.00$12.95
2 $90.00$4.50
3 $120.00$6.00
4 $400.00$20.00
5 $280.00$14.00
6 $260.00$13.00
200266 - Page 130
Ref #52 615E20000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS A, (36 SY)
Awd $6,300.00$175.00
2 $4,680.00$130.00
3 $2,160.00$60.00
4 $3,420.00$95.00
5 $5,040.00$140.00
6 $5,400.00$150.00
Ref #53 616E10000 WATER, (5 MGAL)
Awd $5.00$1.00
2 $5.00$1.00
3 $250.00$50.00
4 $5.00$1.00
5 $105.00$21.00
6 $345.00$69.00
Ref #54 622E41100 PORTABLE BARRIER, UNANCHORED, (631 FT)
Awd $17,668.00$28.00
2 $13,408.75$21.25
3 $20,192.00$32.00
4 $10,727.00$17.00
5 $8,203.00$13.00
6 $9,465.00$15.00
Ref #55 622E41110 PORTABLE BARRIER, ANCHORED, (63 FT)
Awd $3,150.00$50.00
2 $1,471.05$23.35
3 $2,268.00$36.00
4 $1,260.00$20.00
5 $3,024.00$48.00
6 $3,465.00$55.00
Section 6 - MAINTENANCE OF TRAFFIC - Totals
Awd $48,392.00
2 $36,964.81
3 $40,770.00
4 $39,372.00
5 $39,712.00
6 $39,064.45
Ref #56 202E11002 STRUCTURE REMOVED, OVER 20 FOOT SPAN, (LUMP SUM)
Awd $40,000.00$40,000.00
2 $22,556.00$22,556.00
3 $69,900.00$69,900.00
4 $65,000.00$65,000.00
5 $55,000.00$55,000.00
6 $30,000.00$30,000.00
Ref #57 202E22900 APPROACH SLAB REMOVED, (88 SY)
Awd $6,600.00$75.00
2 $7,084.00$80.50
3 $1,672.00$19.00
4 $2,640.00$30.00
5 $880.00$10.00
6 $2,288.00$26.00
200266 - Page 131
Ref #58 202E23500 WEARING COURSE REMOVED, (225 SY)
Awd $1,350.00$6.00
2 $3,217.50$14.30
3 $2,250.00$10.00
4 $5,625.00$25.00
5 $1,575.00$7.00
6 $3,825.00$17.00
Ref #59 503E11101 COFFERDAMS AND EXCAVATION BRACING, AS PER PLAN, (LUMP SUM)
Awd $5,000.00$5,000.00
2 $10,889.00$10,889.00
3 $5,000.00$5,000.00
4 $5,500.00$5,500.00
5 $13,000.00$13,000.00
6 $30,700.00$30,700.00
Ref #60 503E21100 UNCLASSIFIED EXCAVATION, (183 CY)
Awd $2,745.00$15.00
2 $5,673.00$31.00
3 $5,490.00$30.00
4 $5,490.00$30.00
5 $6,954.00$38.00
6 $17,385.00$95.00
Ref #61 505E11100 PILE DRIVING EQUIPMENT MOBILIZATION, (LUMP SUM)
Awd $18,000.00$18,000.00
2 $12,223.00$12,223.00
3 $29,000.00$29,000.00
4 $65,000.00$65,000.00
5 $35,000.00$35,000.00
6 $29,803.00$29,803.00
Ref #62 507E00100 STEEL PILES HP10X42, FURNISHED, (1050 FT)
Awd $30,450.00$29.00
2 $19,351.50$18.43
3 $31,500.00$30.00
4 $53,550.00$51.00
5 $19,950.00$19.00
6 $18,900.00$18.00
Ref #63 507E00150 STEEL PILES HP10X42, DRIVEN, (980 FT)
Awd $5,880.00$6.00
2 $25,823.00$26.35
3 $49,000.00$50.00
4 $6,860.00$7.00
5 $19,600.00$20.00
6 $15,680.00$16.00
Ref #64 507E93300 STEEL POINTS OR SHOES, (14 EACH)
Awd $1,400.00$100.00
2 $1,322.30$94.45
3 $7,000.00$500.00
4 $2,100.00$150.00
5 $1,260.00$90.00
6 $1,461.04$104.36
200266 - Page 132
Ref #65 509E10000 EPOXY COATED REINFORCING STEEL, (17021 LB)
Awd $19,574.15$1.15
2 $27,233.60$1.60
3 $17,021.00$1.00
4 $37,446.20$2.20
5 $34,042.00$2.00
6 $25,531.50$1.50
Ref #66 511E31610 CLASS QC2 CONCRETE, SUPERSTRUCTURE, (50 CY)
Awd $55,000.00$1,100.00
2 $49,900.00$998.00
3 $35,000.00$700.00
4 $52,000.00$1,040.00
5 $60,000.00$1,200.00
6 $97,750.00$1,955.00
Ref #67 511E43510 CLASS QC1 CONCRETE, ABUTMENT INCLUDING FOOTING, (84 CY)
Awd $46,200.00$550.00
2 $32,088.00$382.00
3 $58,800.00$700.00
4 $42,000.00$500.00
5 $41,160.00$490.00
6 $74,340.00$885.00
Ref #68 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (72 SY)
Awd $1,296.00$18.00
2 $1,972.80$27.40
3 $1,080.00$15.00
4 $2,016.00$28.00
5 $3,096.00$43.00
6 $2,304.00$32.00
Ref #69 512E33000 TYPE 2 WATERPROOFING, (10 SY)
Awd $450.00$45.00
2 $360.00$36.00
3 $200.00$20.00
4 $650.00$65.00
5 $2,200.00$220.00
6 $400.00$40.00
Ref #70 515E12051 PRESTRESSED CONCRETE COMPOSITE BOX BEAM BRIDGE MEM, (9 EACH)
Awd $126,000.00$14,000.00
2 $126,252.00$14,028.00
3 $40,500.00$4,500.00
4 $119,160.00$13,240.00
5 $141,300.00$15,700.00
6 $144,000.00$16,000.00
Ref #71 516E13900 2" PREFORMED EXPANSION JOINT FILLER, (30 SF)
Awd $750.00$25.00
2 $124.50$4.15
3 $150.00$5.00
4 $300.00$10.00
5 $120.00$4.00
6 $300.00$10.00
200266 - Page 133
Ref #72 516E14014 INTEGRAL ABUTMENT EXPANSION JOINT SEAL, (90 FT)
Awd $2,880.00$32.00
2 $2,227.50$24.75
3 $900.00$10.00
4 $2,700.00$30.00
5 $1,890.00$21.00
6 $2,160.00$24.00
Ref #73 516E41100 1/8" PREFORMED BEARING PAD, (18 EACH)
Awd $180.00$10.00
2 $144.00$8.00
3 $900.00$50.00
4 $126.00$7.00
5 $630.00$35.00
6 $306.00$17.00
Ref #74 516E43101 ELASTOMERIC BEARING WITH INTERNAL LAMINATES ONLY (, (18 EACH)
Awd $1,800.00$100.00
2 $1,260.00$70.00
3 $1,800.00$100.00
4 $1,260.00$70.00
5 $1,260.00$70.00
6 $1,008.00$56.00
Ref #75 516E44001 ELASTOMERIC BEARING WITH INTERNAL LAMINATES AND LO, (18 EACH)
Awd $13,500.00$750.00
2 $12,942.00$719.00
3 $18,000.00$1,000.00
4 $6,300.00$350.00
5 $4,680.00$260.00
6 $3,870.00$215.00
Ref #76 517E70000 RAILING (TWIN STEEL TUBE), (130 FT)
Awd $20,150.00$155.00
2 $17,940.00$138.00
3 $21,450.00$165.00
4 $17,550.00$135.00
5 $18,200.00$140.00
6 $18,720.00$144.00
Ref #77 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC, (59 CY)
Awd $5,015.00$85.00
2 $6,962.00$118.00
3 $2,950.00$50.00
4 $5,015.00$85.00
5 $11,210.00$190.00
6 $6,490.00$110.00
Ref #78 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE, (109 FT)
Awd $1,090.00$10.00
2 $272.50$2.50
3 $1,090.00$10.00
4 $1,090.00$10.00
5 $1,090.00$10.00
6 $545.00$5.00
200266 - Page 134
Ref #79 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI, (48 FT)
Awd $480.00$10.00
2 $255.36$5.32
3 $480.00$10.00
4 $480.00$10.00
5 $1,104.00$23.00
6 $288.00$6.00
Ref #80 526E15001 REINFORCED CONCRETE APPROACH SLABS (T=13"), AS PER, (160 SY)
Awd $47,200.00$295.00
2 $37,760.00$236.00
3 $76,000.00$475.00
4 $32,800.00$205.00
5 $43,200.00$270.00
6 $43,200.00$270.00
Ref #81 526E90010 TYPE A INSTALLATION, (72 FT)
Awd $14,040.00$195.00
2 $7,272.00$101.00
3 $5,400.00$75.00
4 $9,720.00$135.00
5 $21,600.00$300.00
6 $13,104.00$182.00
Ref #82 601E32204 ROCK CHANNEL PROTECTION, TYPE C WITH GEOTEXTILE FA, (101 CY)
Awd $8,585.00$85.00
2 $10,302.00$102.00
3 $12,120.00$120.00
4 $6,060.00$60.00
5 $9,090.00$90.00
6 $14,241.00$141.00
Ref #83 846E00110 POLYMER MODIFIED ASPHALT EXPANSION JOINT SYSTEM, (31 CF)
Awd $14,725.00$475.00
2 $15,422.50$497.50
3 $10,540.00$340.00
4 $14,105.00$455.00
5 $14,260.00$460.00
6 $13,330.00$430.00
Section 7 - STRUCTURE OVER 20 FOOT SPAN (CAR-542-093 - Totals
Awd $490,340.15
2 $458,830.06
3 $505,193.00
4 $562,543.20
5 $563,351.00
6 $611,929.54
Ref #84 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $9,500.00$9,500.00
2 $9,360.00$9,360.00
3 $24,900.00$24,900.00
4 $15,000.00$15,000.00
5 $5,500.00$5,500.00
6 $5,400.00$5,400.00
200266 - Page 135
Ref #85 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $50,000.00$50,000.00
2 $74,511.00$74,511.00
3 $20,000.00$20,000.00
4 $40,000.00$40,000.00
5 $52,800.00$52,800.00
6 $42,000.00$42,000.00
Ref #86 619E16010 FIELD OFFICE, TYPE B, (4 MNTH)
Awd $4,000.00$1,000.00
2 $6,668.00$1,667.00
3 $2,000.00$500.00
4 $2,000.00$500.00
5 $2,800.00$700.00
6 $12,100.00$3,025.00
Ref #87 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING, (LUMP SUM)
Awd $1,000.00$1,000.00
2 $18,567.00$18,567.00
3 $14,900.00$14,900.00
4 $5,500.00$5,500.00
5 $11,100.00$11,100.00
6 $13,000.00$13,000.00
Ref #88 624E10000 MOBILIZATION, (LUMP SUM)
Awd $22,000.00$22,000.00
2 $34,556.00$34,556.00
3 $19,000.00$19,000.00
4 $20,000.00$20,000.00
5 $50,000.00$50,000.00
6 $40,000.00$40,000.00
Section 8 - INCIDENTALS - Totals
Awd $86,500.00
2 $143,662.00
3 $80,800.00
4 $82,500.00
5 $122,200.00
6 $112,500.00
200266 - Page 136
Project No. 200268
PID 95739
HEN-SR 108-00.00 Resurf
Federal
Type: TWO LANE RESURFACING
Completion Date: 11/15/2020
Award Amount: $4,744,947.75
Contract Awarded To: GERKEN PAVING INC
Letting Date: 5/7/2020
Engineer's Estimate: $4,630,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jack Marchbanks, Ph.D., Director
GERKEN PAVING INC
9072 CO RD 424
NAPOLEON, OH 43545
Henry
Bidder 1
Bid $4,744,947.75
200268 - Page 137
Ref #1 202E23000 PAVEMENT REMOVED, (30970 SY)
Awd $247,760.00$8.00
Ref #2 202E38000 GUARDRAIL REMOVED, (100 FT)
Awd $220.00$2.20
Ref #3 202E42001 ANCHOR ASSEMBLY REMOVED, TYPE A, AS PER PLAN, (3 EACH)
Awd $795.00$265.00
Ref #4 202E42040 ANCHOR ASSEMBLY REMOVED, TYPE T, (1 EACH)
Awd $115.00$115.00
Ref #5 202E47000 BRIDGE TERMINAL ASSEMBLY REMOVED, (4 EACH)
Awd $240.00$60.00
Ref #6 203E20000 EMBANKMENT, (2439 CY)
Awd $15,853.50$6.50
Ref #7 204E10000 SUBGRADE COMPACTION, (35565 SY)
Awd $35,565.00$1.00
Ref #8 204E13000 EXCAVATION OF SUBGRADE, (11855 CY)
Awd $71,130.00$6.00
Ref #9 204E30020 GRANULAR MATERIAL, TYPE C, (11855 CY)
Awd $414,925.00$35.00
Ref #10 204E50100 GEOTEXTILE FABRIC, 712.09, TYPE A, (30484 SY)
Awd $30,484.00$1.00
Ref #11 209E60500 LINEAR GRADING, (11 MILE)
Awd $13,750.00$1,250.00
Ref #12 209E72051 PREPARING SUBGRADE FOR SHOULDER PAVING, AS PER PLA, (9.95 MILE)
Awd $17,910.00$1,800.00
Ref #13 606E15050 GUARDRAIL, TYPE MGS, (213 FT)
Awd $4,089.60$19.20
Ref #14 606E20050 ROUNDED END SECTION, (1 EACH)
Awd $65.00$65.00
Ref #15 606E26150 ANCHOR ASSEMBLY, MGS TYPE E, MASH2016, (3 EACH)
Awd $7,125.00$2,375.00
Ref #16 606E35140 BRIDGE TERMINAL ASSEMBLY, TYPE 4, (3 EACH)
Awd $2,250.00$750.00
Ref #17 606E35141 BRIDGE TERMINAL ASSEMBLY, TYPE 4, AS PER PLAN, (1 EACH)
Awd $875.00$875.00
Ref #18 690E50100 SPECIAL - MAILBOX SUPPORT SYSTEM, SINGLE, (1 EACH)
Awd $195.00$195.00
Ref #100 203E10000 EXCAVATION, (11855 CY)
Awd $142,260.00$12.00
Section 1 - ROADWAY - Totals
Awd $1,005,607.10
Ref #19 659E15000 INTER-SEEDING, (200 SY)
Awd $1,390.00$6.95
Ref #20 832E15000 STORM WATER POLLUTION PREVENTION PLAN, (LUMP SUM)
Awd $2,500.00$2,500.00
200268 - Page 138
Ref #21 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS, (LUMP SUM)
Awd $3,200.00$3,200.00
Ref #22 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA, (LUMP SUM)
Awd $8,400.00$8,400.00
Ref #23 832E30000 EROSION CONTROL, (20000 EACH)
Awd $20,000.00$1.00
Section 2 - EROSION CONTROL - Totals
Awd $35,490.00
Ref #24 605E14020 6" BASE PIPE UNDERDRAINS WITH GEOTEXTILE FABRIC, (55170 FT)
Awd $275,850.00$5.00
Ref #25 611E00510 6" CONDUIT, TYPE F FOR UNDERDRAIN OUTLETS, (1960 FT)
Awd $39,200.00$20.00
Ref #26 611E99711 PRECAST REINFORCED CONCRETE OUTLET, AS PER PLAN, (35 EACH)
Awd $8,575.00$245.00
Section 3 - DRAINAGE - Totals
Awd $323,625.00
Ref #27 253E02000 PAVEMENT REPAIR, (387 CY)
Awd $96,750.00$250.00
Ref #28 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (T=2.5"), (82311 SY)
Awd $226,355.25$2.75
Ref #29 301E46000 ASPHALT CONCRETE BASE, PG64-22, (5622 CY)
Awd $815,190.00$145.00
Ref #30 304E20000 AGGREGATE BASE, (7904 CY)
Awd $331,968.00$42.00
Ref #31 407E20000 NON-TRACKING TACK COAT, (17938 GAL)
Awd $35,876.00$2.00
Ref #32 441E10000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (446), PG, (3542 CY)
Awd $563,178.00$159.00
Ref #33 441E10200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2, (446, (4086 CY)
Awd $588,384.00$144.00
Ref #34 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG, (20 CY)
Awd $7,000.00$350.00
Ref #35 617E10100 COMPACTED AGGREGATE, (1694 CY)
Awd $99,946.00$59.00
Ref #37 875E10000 LONGITUDINAL JOINT ADHESIVE, (6966 LB)
Awd $8,707.50$1.25
Section 4 - PAVEMENT - Totals
Awd $2,773,354.75
Ref #38 621E00100 RPM, (350 EACH)
Awd $10,062.50$28.75
200268 - Page 139
Ref #39 621E54000 RAISED PAVEMENT MARKER REMOVED, (60 EACH)
Awd $450.00$7.50
Ref #40 626E00116 BARRIER REFLECTOR, TYPE 5, BIDIRECTIONAL, (7 EACH)
Awd $50.40$7.20
Ref #41 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION, (1 EACH)
Awd $245.00$245.00
Ref #42 642E00104 EDGE LINE, 6", TYPE 1, (10.56 MILE)
Awd $7,392.00$700.00
Ref #43 642E00300 CENTER LINE, TYPE 1, (5.28 MILE)
Awd $4,224.00$800.00
Section 5 - TRAFFIC CONTROL - Totals
Awd $22,423.90
Ref #44 410E12000 TRAFFIC COMPACTED SURFACE, TYPE A OR B, (100 CY)
Awd $5,180.00$51.80
Ref #45 614E12460 WORK ZONE MARKING SIGN, (33 EACH)
Awd $3,630.00$110.00
Ref #46 614E21000 WORK ZONE CENTER LINE, CLASS I, (15.84 MILE)
Awd $12,672.00$800.00
Ref #47 614E22010 WORK ZONE EDGE LINE, CLASS I, 6", (42.24 MILE)
Awd $29,568.00$700.00
Section 6 - MAINTENANCE OF TRAFFIC - Totals
Awd $51,050.00
Ref #48 202E23501 WEARING COURSE REMOVED, AS PER PLAN, (325 SY)
Awd $4,875.00$15.00
Ref #49 202E38602 BRIDGE RAILING REMOVED FOR REUSE, (100 FT)
Awd $360.00$3.60
Ref #50 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, (VARIES), (532 SY)
Awd $7,980.00$15.00
Ref #51 512E33010 TYPE 3 WATERPROOFING, (161 SY)
Awd $5,152.00$32.00
Ref #52 516E31200 SPECIAL - SAWING AND SEALING BITUMINOUS CONCRETE J, (140 FT)
Awd $2,800.00$20.00
Ref #53 517E75501 BRIDGE RAILING REBUILT, AS PER PLAN, (100 FT)
Awd $4,360.00$43.60
Ref #54 517E75601 DEEP BEAM BRIDGE RETROFIT RAILING, AS PER PLAN, (100 FT)
Awd $8,540.00$85.40
Ref #55 518E22300 SPECIAL - STEEL DRIP STRIP, (103 FT)
Awd $1,030.00$10.00
Ref #56 519E11100 PATCHING CONCRETE STRUCTURE, (6 SF)
Awd $4,800.00$800.00
200268 - Page 140
Section 7 - STRUCTURE REPAIR (HEN-108-0412) - Totals
Awd $39,897.00
Ref #57 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $23,000.00$23,000.00
Ref #58 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $335,000.00$335,000.00
Ref #59 619E16010 FIELD OFFICE, TYPE B, (6 MNTH)
Awd $27,000.00$4,500.00
Ref #60 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING, (LUMP SUM)
Awd $8,500.00$8,500.00
Ref #61 624E10000 MOBILIZATION, (LUMP SUM)
Awd $100,000.00$100,000.00
Section 8 - INCIDENTALS - Totals
Awd $493,500.00
200268 - Page 141
Project No. 200269
PID 110795
HOC-SR 56-00.00
Federal
Type: TWO LANE RESURFACING
Completion Date: 9/15/2020
Award Amount: $1,330,012.33
Contract Awarded To: SHELLY & SANDS INC
Letting Date: 5/7/2020
Engineer's Estimate: $1,451,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jack Marchbanks, Ph.D., Director
SHELLY & SANDS INC
1515 HARMON AVE
COLUMBUS, OH 43223
Franklin
Bidder 1
Bid $1,330,012.33
SHELLY COMPANY
80 PARK DR BOX 266
THORNVILLE, OH 43076
Perry
Bidder 2
Bid $1,457,772.86
200269 - Page 142
Ref #1 202E30000 WALK REMOVED, (1879 SF)
Awd $3,758.00$2.00
2 $10,992.15$5.85
Ref #2 202E32000 CURB REMOVED, (118 FT)
Awd $885.00$7.50
2 $1,858.50$15.75
Ref #3 209E72050 PREPARING SUBGRADE FOR SHOULDER PAVING, (8 MILE)
Awd $5,200.00$650.00
2 $7,200.00$900.00
Ref #4 608E10000 4" CONCRETE WALK, (391 SF)
Awd $3,128.00$8.00
2 $6,451.50$16.50
Ref #5 608E52000 CURB RAMP, (1528 SF)
Awd $35,908.00$23.50
2 $29,414.00$19.25
Ref #6 608E53020 DETECTABLE WARNING, (82 SF)
Awd $2,952.00$36.00
2 $3,526.00$43.00
Section 1 - ROADWAY - Totals
Awd $51,831.00
2 $59,442.15
Ref #7 253E02000 PAVEMENT REPAIR, (850 CY)
Awd $191,250.00$225.00
2 $192,525.00$226.50
Ref #8 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (T=1.0"), (19495 SY)
Awd $38,990.00$2.00
2 $33,141.50$1.70
Ref #9 407E20000 NON-TRACKING TACK COAT, (13955 GAL)
Awd $41,865.00$3.00
2 $45,353.75$3.25
Ref #10 408E10000 PRIME COAT, (3755 GAL)
Awd $14,081.25$3.75
2 $14,832.25$3.95
Ref #11 424E12000 FINE GRADED POLYMER ASPHALT CONCRETE, TYPE B, (2185 CY)
Awd $349,600.00$160.00
2 $378,551.25$173.25
Ref #12 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG, (1925 CY)
Awd $240,625.00$125.00
2 $256,987.50$133.50
Ref #13 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG, (58 CY)
Awd $9,570.00$165.00
2 $12,934.00$223.00
Ref #14 441E50200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1, (448, (1446 CY)
Awd $173,520.00$120.00
2 $182,919.00$126.50
200269 - Page 143
Ref #15 617E10100 COMPACTED AGGREGATE, (587 CY)
Awd $38,155.00$65.00
2 $38,301.75$65.25
Section 2 - PAVEMENT - Totals
Awd $1,097,656.25
2 $1,155,546.00
Ref #16 621E00100 RPM (WHITE), (32 EACH)
Awd $880.00$27.50
2 $732.80$22.90
Ref #17 621E00100 RPM (YELLOW/YELLOW), (840 EACH)
Awd $23,100.00$27.50
2 $19,236.00$22.90
Ref #18 621E54000 RAISED PAVEMENT MARKER REMOVED, (959 EACH)
Awd $6,713.00$7.00
2 $11,508.00$12.00
Ref #19 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST, (56 FT)
Awd $1,456.00$26.00
2 $672.00$12.00
Ref #20 630E80100 SIGN, FLAT SHEET, (24 SF)
Awd $864.00$36.00
2 $480.00$20.00
Ref #21 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL, (2 EACH)
Awd $20.00$10.00
2 $50.00$25.00
Ref #22 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION, (1 EACH)
Awd $76.00$76.00
2 $25.00$25.00
Ref #23 642E00104 EDGE LINE, 6", TYPE 1, (16.37 MILE)
Awd $10,967.90$670.00
2 $6,548.00$400.00
Ref #24 642E00300 CENTER LINE, TYPE 1, (8.8 MILE)
Awd $7,568.00$860.00
2 $4,400.00$500.00
Ref #25 644E00500 STOP LINE, (435 FT)
Awd $2,827.50$6.50
2 $1,305.00$3.00
Ref #26 644E00600 CROSSWALK LINE, (980 FT)
Awd $2,940.00$3.00
2 $1,960.00$2.00
Ref #27 644E01110 SCHOOL SYMBOL MARKING, 96", (2 EACH)
Awd $1,300.00$650.00
2 $400.00$200.00
Ref #28 644E01200 PARKING LOT STALL MARKING, (320 FT)
Awd $640.00$2.00
2 $320.00$1.00
200269 - Page 144
Section 3 - TRAFFIC CONTROL - Totals
Awd $59,352.40
2 $47,636.80
Ref #29 614E12460 WORK ZONE MARKING SIGN, (53 EACH)
Awd $5,035.00$95.00
2 $4,505.00$85.00
Ref #30 614E21100 WORK ZONE CENTER LINE, CLASS I, 642 PAINT, (13.8 MILE)
Awd $18,975.00$1,375.00
2 $6,348.00$460.00
Ref #31 614E21500 WORK ZONE CENTER LINE, CLASS II, 642 PAINT, (13.8 MILE)
Awd $1,380.00$100.00
2 $4,140.00$300.00
Section 4 - MAINTENANCE OF TRAFFIC - Totals
Awd $25,390.00
2 $14,993.00
Ref #32 846E00110 POLYMER MODIFIED ASPHALT EXPANSION JOINT SYSTEM, (32.8 CF)
Awd $15,908.00$485.00
2 $15,154.91$462.04
Section 5 - STRUCTURE OVER 20 FOOT SPAN (3700976) - Totals
Awd $15,908.00
2 $15,154.91
Ref #33 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $5,300.00$5,300.00
2 $8,000.00$8,000.00
Ref #34 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $49,800.00$49,800.00
2 $112,000.00$112,000.00
Ref #35 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING, (LUMP SUM)
Awd $4,849.68$4,849.68
2 $5,000.00$5,000.00
Ref #36 624E10000 MOBILIZATION, (LUMP SUM)
Awd $19,925.00$19,925.00
2 $40,000.00$40,000.00
Section 6 - INCIDENTALS - Totals
Awd $79,874.68
2 $165,000.00
200269 - Page 145
Project No. 200270
PID 102239
HUR-SR 601-01.85
Federal
Type: CULVERT REPLACEMENT
Completion Date: 10/31/2020
Award Amount: $208,411.15
Contract Awarded To: ADENA CORPORATION
Letting Date: 5/7/2020
Engineer's Estimate: $278,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jack Marchbanks, Ph.D., Director
ADENA CORPORATION
1310 WEST FOURTH ST
MANSFIELD, OH 44906
Richland
Bidder 1
Bid $208,411.15
MOSSER CONSTRUCTION INC
122 S WILSON AVE
FREMONT, OH 43420
Sandusky
Bidder 2
Bid $212,650.60
GREAT LAKES DEMOLITION COMPANY
1787 North State Route 510
VICKERY, OH 43464
Sandusky
Bidder 3
Bid $236,782.33
ECLIPSE CO LLC
11554 EAST WASHINGTON ST
CHAGRIN FALLS, OH 44023
Geauga
Bidder 4
Bid $238,428.52
KELSTIN INC
183 SOUTH GAMBLE ST
SHELBY, OH 44875
Richland
Bidder 5
Bid $240,361.00
LOCKHART CONCRETE CO
800 W WATERLOO RD
AKRON, OH 44314
Summit
Bidder 6
Bid $249,765.00
RIETSCHLIN CONSTRUCTION INC
4240 BAKER RD
CRESTLINE, OH 44827
Crawford
Bidder 7
Bid $264,569.25
A J RILEY INC
151 AKRON RD
NORWALK, OH 44857-1665
Bidder 8
Bid $289,295.00
200270 - Page 146
Ref #1 201E11000 CLEARING AND GRUBBING, (LUMP SUM)
Awd $3,271.92$3,271.92
2 $2,500.00$2,500.00
3 $5,000.00$5,000.00
4 $5,238.50$5,238.50
5 $3,000.00$3,000.00
6 $1,000.00$1,000.00
7 $10,000.00$10,000.00
8 $5,000.00$5,000.00
Ref #2 202E23000 PAVEMENT REMOVED, (321 SY)
Awd $4,038.18$12.58
2 $3,210.00$10.00
3 $4,815.00$15.00
4 $4,654.50$14.50
5 $2,889.00$9.00
6 $3,852.00$12.00
7 $2,728.50$8.50
8 $2,568.00$8.00
Ref #3 202E35100 PIPE REMOVED, 24" AND UNDER, (34 FT)
Awd $155.72$4.58
2 $34.00$1.00
3 $340.00$10.00
4 $850.00$25.00
5 $68.00$2.00
6 $340.00$10.00
7 $646.00$19.00
8 $306.00$9.00
Ref #4 202E38000 GUARDRAIL REMOVED, (91 FT)
Awd $934.57$10.27
2 $182.00$2.00
3 $182.00$2.00
4 $182.00$2.00
5 $182.00$2.00
6 $273.00$3.00
7 $819.00$9.00
8 $637.00$7.00
Ref #5 202E42040 ANCHOR ASSEMBLY REMOVED, TYPE T, (2 EACH)
Awd $311.74$155.87
2 $220.00$110.00
3 $250.00$125.00
4 $231.00$115.50
5 $300.00$150.00
6 $500.00$250.00
7 $800.00$400.00
8 $300.00$150.00
Ref #6 203E10000 EXCAVATION, (119 CY)
Awd $1,357.79$11.41
2 $1,190.00$10.00
3 $2,381.19$20.01
4 $4,700.50$39.50
5 $4,760.00$40.00
6 $2,380.00$20.00
7 $3,570.00$30.00
8 $17,850.00$150.00
200270 - Page 147
Ref #7 203E20000 EMBANKMENT, (536 CY)
Awd $14,032.48$26.18
2 $4,288.00$8.00
3 $11,792.00$22.00
4 $10,452.00$19.50
5 $26,800.00$50.00
6 $16,080.00$30.00
7 $8,040.00$15.00
8 $8,040.00$15.00
Ref #8 204E10000 SUBGRADE COMPACTION, (354 SY)
Awd $492.06$1.39
2 $354.00$1.00
3 $708.00$2.00
4 $708.00$2.00
5 $1,770.00$5.00
6 $7,080.00$20.00
7 $1,062.00$3.00
8 $1,770.00$5.00
Ref #9 606E13000 GUARDRAIL, TYPE 5, (206.25 FT)
Awd $4,211.63$20.42
2 $3,877.50$18.80
3 $4,125.00$20.00
4 $4,640.63$22.50
5 $4,537.50$22.00
6 $4,537.50$22.00
7 $7,631.25$37.00
8 $4,950.00$24.00
Ref #10 606E17290 GUARDRAIL, TYPE 5, LONG-SPAN, (75 FT)
Awd $2,403.75$32.05
2 $1,545.00$20.60
3 $1,968.75$26.25
4 $1,725.00$23.00
5 $1,650.00$22.00
6 $1,500.00$20.00
7 $3,900.00$52.00
8 $1,875.00$25.00
Ref #11 606E26100 ANCHOR ASSEMBLY, TYPE E, (1 EACH)
Awd $3,992.90$3,992.90
2 $2,440.00$2,440.00
3 $3,200.00$3,200.00
4 $2,572.50$2,572.50
5 $2,600.00$2,600.00
6 $2,050.00$2,050.00
7 $4,840.00$4,840.00
8 $3,000.00$3,000.00
Ref #12 606E26500 ANCHOR ASSEMBLY, TYPE T, (3 EACH)
Awd $4,652.37$1,550.79
2 $2,910.00$970.00
3 $3,750.00$1,250.00
4 $3,072.00$1,024.00
5 $3,000.00$1,000.00
6 $2,850.00$950.00
7 $4,950.00$1,650.00
8 $4,500.00$1,500.00
200270 - Page 148
Section 1 - ROADWAY - Totals
Awd $39,855.11
2 $22,750.50
3 $38,511.94
4 $39,026.63
5 $51,556.50
6 $42,442.50
7 $48,986.75
8 $50,796.00
Ref #13 601E32100 ROCK CHANNEL PROTECTION, TYPE B WITH FILTER, (76 CY)
Awd $8,757.48$115.23
2 $6,840.00$90.00
3 $7,600.00$100.00
4 $6,992.00$92.00
5 $12,160.00$160.00
6 $9,500.00$125.00
7 $7,600.00$100.00
8 $5,320.00$70.00
Ref #14 659E00100 SOIL ANALYSIS TEST, (2 EACH)
Awd $200.00$100.00
2 $50.00$25.00
3 $400.00$200.00
4 $263.00$131.50
5 $200.00$100.00
6 $1,000.00$500.00
7 $110.00$55.00
8 $200.00$100.00
Ref #15 659E00300 TOPSOIL, (113 CY)
Awd $2,732.34$24.18
2 $8,475.00$75.00
3 $5,650.00$50.00
4 $6,328.00$56.00
5 $5,650.00$50.00
6 $3,390.00$30.00
7 $3,898.50$34.50
8 $7,910.00$70.00
Ref #16 659E10000 SEEDING AND MULCHING, (1015 SY)
Awd $2,222.85$2.19
2 $2,233.00$2.20
3 $1,015.00$1.00
4 $3,552.50$3.50
5 $10,150.00$10.00
6 $1,522.50$1.50
7 $3,552.50$3.50
8 $6,090.00$6.00
200270 - Page 149
Ref #17 659E14000 REPAIR SEEDING AND MULCHING, (51 SY)
Awd $51.00$1.00
2 $51.00$1.00
3 $204.00$4.00
4 $51.00$1.00
5 $510.00$10.00
6 $51.00$1.00
7 $153.00$3.00
8 $255.00$5.00
Ref #18 659E15000 INTER-SEEDING, (51 SY)
Awd $51.00$1.00
2 $25.50$0.50
3 $204.00$4.00
4 $9.18$0.18
5 $255.00$5.00
6 $51.00$1.00
7 $153.00$3.00
8 $153.00$3.00
Ref #19 659E20000 COMMERCIAL FERTILIZER, (0.14 TON)
Awd $179.86$1,284.71
2 $63.00$450.00
3 $140.00$1,000.00
4 $79.87$570.50
5 $140.00$1,000.00
6 $84.00$600.00
7 $112.00$800.00
8 $126.00$900.00
Ref #20 659E31000 LIME, (0.21 ACRE)
Awd $149.88$713.71
2 $2.10$10.00
3 $115.08$548.00
4 $21.42$102.00
5 $105.00$500.00
6 $105.00$500.00
7 $21.00$100.00
8 $168.00$800.00
Ref #21 659E35000 WATER, (5.6 MGAL)
Awd $5.60$1.00
2 $56.00$10.00
3 $56.00$10.00
4 $5.60$1.00
5 $28.00$5.00
6 $280.00$50.00
7 $112.00$20.00
8 $28.00$5.00
Ref #22 832E30000 EROSION CONTROL, (2000 EACH)
Awd $2,000.00$1.00
2 $2,000.00$1.00
3 $2,000.00$1.00
4 $2,000.00$1.00
5 $2,000.00$1.00
6 $2,000.00$1.00
7 $2,000.00$1.00
8 $2,000.00$1.00
200270 - Page 150
Section 2 - EROSION CONTROL - Totals
Awd $16,350.01
2 $19,795.60
3 $17,384.08
4 $19,302.57
5 $31,198.00
6 $17,983.50
7 $17,712.00
8 $22,250.00
Ref #23 605E31100 AGGREGATE DRAINS, (48 FT)
Awd $674.88$14.06
2 $1,200.00$25.00
3 $2,064.00$43.00
4 $768.00$16.00
5 $240.00$5.00
6 $1,440.00$30.00
7 $840.00$17.50
8 $720.00$15.00
Ref #24 611E01500 6" CONDUIT, TYPE F, (10 FT)
Awd $275.70$27.57
2 $650.00$65.00
3 $410.00$41.00
4 $120.00$12.00
5 $100.00$10.00
6 $300.00$30.00
7 $560.00$56.00
8 $500.00$50.00
Ref #25 611E04600 12" CONDUIT, TYPE C, (24 FT)
Awd $1,094.88$45.62
2 $1,200.00$50.00
3 $1,320.00$55.00
4 $1,536.00$64.00
5 $1,200.00$50.00
6 $2,280.00$95.00
7 $1,680.00$70.00
8 $1,680.00$70.00
Section 3 - DRAINAGE - Totals
Awd $2,045.46
2 $3,050.00
3 $3,794.00
4 $2,424.00
5 $1,540.00
6 $4,020.00
7 $3,080.00
8 $2,900.00
200270 - Page 151
Ref #26 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (3.00"), (297 SY)
Awd $5,497.47$18.51
2 $5,049.00$17.00
3 $7,425.00$25.00
4 $7,425.00$25.00
5 $2,376.00$8.00
6 $2,970.00$10.00
7 $8,167.50$27.50
8 $3,564.00$12.00
Ref #27 301E46000 ASPHALT CONCRETE BASE, PG64-22, (18 CY)
Awd $5,335.74$296.43
2 $5,400.00$300.00
3 $5,202.00$289.00
4 $5,436.00$302.00
5 $7,200.00$400.00
6 $4,680.00$260.00
7 $5,940.00$330.00
8 $4,320.00$240.00
Ref #28 304E20000 AGGREGATE BASE, (75 CY)
Awd $6,569.25$87.59
2 $4,800.00$64.00
3 $4,800.00$64.00
4 $4,462.50$59.50
5 $4,687.50$62.50
6 $3,750.00$50.00
7 $6,300.00$84.00
8 $4,125.00$55.00
Ref #29 407E10000 TACK COAT, (85 GAL)
Awd $1,174.70$13.82
2 $255.00$3.00
3 $298.35$3.51
4 $340.00$4.00
5 $255.00$3.00
6 $425.00$5.00
7 $340.00$4.00
8 $425.00$5.00
Ref #30 442E10501 ASPHALT CONCRETE SURFACE COURSE, 9.5 MM, TYPE A (4, (51 CY)
Awd $15,932.91$312.41
2 $11,730.00$230.00
3 $11,169.00$219.00
4 $11,985.00$235.00
5 $1,377.00$27.00
6 $16,320.00$320.00
7 $12,903.00$253.00
8 $13,260.00$260.00
200270 - Page 152
Section 4 - PAVEMENT - Totals
Awd $34,510.07
2 $27,234.00
3 $28,894.35
4 $29,648.50
5 $15,895.50
6 $28,145.00
7 $33,650.50
8 $25,694.00
Ref #31 626E00110 BARRIER REFLECTOR, TYPE 2 (BI-DIRECTIONAL), (7 EACH)
Awd $218.82$31.26
2 $45.50$6.50
3 $70.00$10.00
4 $49.00$7.00
5 $63.00$9.00
6 $84.00$12.00
7 $154.00$22.00
8 $455.00$65.00
Ref #32 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST, (10 FT)
Awd $570.70$57.07
2 $300.00$30.00
3 $350.00$35.00
4 $75.00$7.50
5 $350.00$35.00
6 $160.00$16.00
7 $220.00$22.00
8 $350.00$35.00
Ref #33 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION, (1 EACH)
Awd $522.01$522.01
2 $95.00$95.00
3 $306.00$306.00
4 $21.00$21.00
5 $105.00$105.00
6 $65.00$65.00
7 $99.00$99.00
8 $100.00$100.00
Ref #34 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA, (1 EACH)
Awd $77.93$77.93
2 $15.00$15.00
3 $306.00$306.00
4 $21.00$21.00
5 $25.00$25.00
6 $25.00$25.00
7 $50.00$50.00
8 $50.00$50.00
200270 - Page 153
Ref #35 642E00104 EDGE LINE, 6", TYPE 1, (0.08 MILE)
Awd $1,586.13$19,826.63
2 $1,192.80$14,910.00
3 $1,192.96$14,912.00
4 $2,016.00$25,200.00
5 $3,040.00$38,000.00
6 $1,000.00$12,500.00
7 $1,320.00$16,500.00
8 $1,600.00$20,000.00
Ref #36 642E00300 CENTER LINE, TYPE 1, (0.04 MILE)
Awd $692.10$17,302.50
2 $447.20$11,180.00
3 $448.00$11,200.00
4 $1,008.00$25,200.00
5 $920.00$23,000.00
6 $240.00$6,000.00
7 $492.00$12,300.00
8 $1,000.00$25,000.00
Section 5 - TRAFFIC CONTROL - Totals
Awd $3,667.69
2 $2,095.50
3 $2,672.96
4 $3,190.00
5 $4,503.00
6 $1,574.00
7 $2,335.00
8 $3,555.00
Ref #37 614E12420 DETOUR SIGNING, (LUMP SUM)
Awd $6,570.90$6,570.90
2 $5,220.00$5,220.00
3 $5,220.00$5,220.00
4 $8,305.82$8,305.82
5 $6,000.00$6,000.00
6 $4,600.00$4,600.00
7 $5,800.00$5,800.00
8 $7,000.00$7,000.00
Section 6 - MAINTENANCE OF TRAFFIC - Totals
Awd $6,570.90
2 $5,220.00
3 $5,220.00
4 $8,305.82
5 $6,000.00
6 $4,600.00
7 $5,800.00
8 $7,000.00
200270 - Page 154
Ref #38 202E11001 STRUCTURE REMOVED, AS PER PLAN, (LUMP SUM)
Awd $8,834.07$8,834.07
2 $14,000.00$14,000.00
3 $15,000.00$15,000.00
4 $13,195.50$13,195.50
5 $3,000.00$3,000.00
6 $19,000.00$19,000.00
7 $13,500.00$13,500.00
8 $11,000.00$11,000.00
Ref #39 503E11100 COFFERDAMS AND EXCAVATION BRACING, (LUMP SUM)
Awd $5,944.31$5,944.31
2 $11,000.00$11,000.00
3 $10,000.00$10,000.00
4 $7,921.00$7,921.00
5 $3,000.00$3,000.00
6 $1,900.00$1,900.00
7 $7,200.00$7,200.00
8 $25,000.00$25,000.00
Ref #40 602E20000 CONCRETE MASONRY, (11 CY)
Awd $11,573.21$1,052.11
2 $11,000.00$1,000.00
3 $17,600.00$1,600.00
4 $12,864.50$1,169.50
5 $17,600.00$1,600.00
6 $9,900.00$900.00
7 $18,425.00$1,675.00
8 $22,000.00$2,000.00
Ref #41 611E59501 137" X 87" CONDUIT, TYPE A, AS PER PLAN, 707.04 (0, (84 FT)
Awd $63,322.56$753.84
2 $73,500.00$875.00
3 $75,600.00$900.00
4 $58,800.00$700.00
5 $82,068.00$977.00
6 $88,200.00$1,050.00
7 $83,580.00$995.00
8 $75,600.00$900.00
Section 7 - STRUCTURE 20 FOOT SPAN AND UNDER (HUR-60 - Totals
Awd $89,674.15
2 $109,500.00
3 $118,200.00
4 $92,781.00
5 $105,668.00
6 $119,000.00
7 $122,705.00
8 $133,600.00
200270 - Page 155
Ref #42 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $2,757.86$2,757.86
2 $2,000.00$2,000.00
3 $3,500.00$3,500.00
4 $7,200.00$7,200.00
5 $6,000.00$6,000.00
6 $7,000.00$7,000.00
7 $3,500.00$3,500.00
8 $5,000.00$5,000.00
Ref #43 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $2,404.13$2,404.13
2 $2,005.00$2,005.00
3 $2,005.00$2,005.00
4 $7,500.00$7,500.00
5 $2,000.00$2,000.00
6 $9,000.00$9,000.00
7 $2,300.00$2,300.00
8 $15,000.00$15,000.00
Ref #44 619E16000 FIELD OFFICE, TYPE A, (2 MNTH)
Awd $959.24$479.62
2 $6,000.00$3,000.00
3 $1,000.00$500.00
4 $1,050.00$525.00
5 $1,000.00$500.00
6 $1,000.00$500.00
7 $4,400.00$2,200.00
8 $1,000.00$500.00
Ref #45 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING, (LUMP SUM)
Awd $3,717.11$3,717.11
2 $3,000.00$3,000.00
3 $1,600.00$1,600.00
4 $13,000.00$13,000.00
5 $5,000.00$5,000.00
6 $7,500.00$7,500.00
7 $2,100.00$2,100.00
8 $4,500.00$4,500.00
Ref #46 624E10000 MOBILIZATION, (LUMP SUM)
Awd $5,899.42$5,899.42
2 $10,000.00$10,000.00
3 $14,000.00$14,000.00
4 $15,000.00$15,000.00
5 $10,000.00$10,000.00
6 $7,500.00$7,500.00
7 $18,000.00$18,000.00
8 $18,000.00$18,000.00
200270 - Page 156
Section 8 - INCIDENTALS - Totals
Awd $15,737.76
2 $23,005.00
3 $22,105.00
4 $43,750.00
5 $24,000.00
6 $32,000.00
7 $30,300.00
8 $43,500.00
200270 - Page 157
Project No. 200271
PID 109618
JEF-SR 43-04.48
Federal
Type: TWO LANE RESURFACING
Completion Date: 9/30/2020
Award Amount: $884,662.50
Contract Awarded To: NLS PAVING, INC
Letting Date: 5/7/2020
Engineer's Estimate: $798,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jack Marchbanks, Ph.D., Director
NLS PAVING, INC
67925 Bayberry Drive Suite B
St Clairsville, OH 43950
Belmont
Bidder 1
Bid $884,662.50
SHELLY & SANDS INC
1515 HARMON AVE
COLUMBUS, OH 43223
Franklin
Bidder 2
Bid $892,298.00
CAST & BAKER CORPORATION
2214 WASHINGTON RD
CANONSBURG, PA 15317
Bidder 3
Bid $1,117,153.80
200271 - Page 158
Ref #1 202E23500 WEARING COURSE REMOVED, (1772 SY)
Awd $8,860.00$5.00
2 $7,974.00$4.50
3 $3,189.60$1.80
Ref #2 202E30000 WALK REMOVED, (1326 SF)
Awd $7,956.00$6.00
2 $9,282.00$7.00
3 $11,934.00$9.00
Ref #3 202E32000 CURB REMOVED, (317 FT)
Awd $4,755.00$15.00
2 $4,121.00$13.00
3 $5,072.00$16.00
Ref #4 209E60500 LINEAR GRADING, (1.64 MILE)
Awd $2,214.00$1,350.00
2 $2,952.00$1,800.00
3 $18,860.00$11,500.00
Ref #5 607E98000 FENCE, MISC.: TEMPORARY ORANGE PLASTIC CONSTRUCTIO, (515 FT)
Awd $2,575.00$5.00
2 $1,030.00$2.00
3 $2,369.00$4.60
Ref #6 608E52000 CURB RAMP, (1266 SF)
Awd $32,916.00$26.00
2 $36,714.00$29.00
3 $27,852.00$22.00
Ref #7 608E53021 DETECTABLE WARNING, AS PER PLAN, (248 SF)
Awd $19,840.00$80.00
2 $17,236.00$69.50
3 $10,912.00$44.00
Section 1 - ROADWAY - Totals
Awd $79,116.00
2 $79,309.00
3 $80,188.60
Ref #8 659E98000 SEEDING, MISC.: CURB RAMP GRADING RESTORATION, (36 SY)
Awd $1,800.00$50.00
2 $1,620.00$45.00
3 $1,620.00$45.00
Ref #9 832E30000 EROSION CONTROL, (1000 EACH)
Awd $1,000.00$1.00
2 $1,000.00$1.00
3 $1,000.00$1.00
Section 2 - EROSION CONTROL - Totals
Awd $2,800.00
2 $2,620.00
3 $2,620.00
200271 - Page 159
Ref #10 251E01010 PARTIAL DEPTH PAVEMENT REPAIR (441), (25 CY)
Awd $6,500.00$260.00
2 $9,700.00$388.00
3 $13,750.00$550.00
Ref #11 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1 1/2", (11229 SY)
Awd $14,036.25$1.25
2 $21,335.10$1.90
3 $30,879.75$2.75
Ref #12 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 2 1/4", (38704 SY)
Awd $63,861.60$1.65
2 $87,084.00$2.25
3 $108,371.20$2.80
Ref #13 407E20000 NON-TRACKING TACK COAT, (7060 GAL)
Awd $21,180.00$3.00
2 $18,638.40$2.64
3 $26,475.00$3.75
Ref #14 408E10001 PRIME COAT, AS PER PLAN, (770 GAL)
Awd $3,080.00$4.00
2 $2,310.00$3.00
3 $3,850.00$5.00
Ref #15 441E10101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (446), AS, (1835 CY)
Awd $313,785.00$171.00
2 $297,270.00$162.00
3 $403,700.00$220.00
Ref #16 441E50200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1, (448, (1074 CY)
Awd $171,840.00$160.00
2 $152,508.00$142.00
3 $225,540.00$210.00
Ref #17 441E50401 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), (D, (100 CY)
Awd $27,500.00$275.00
2 $29,800.00$298.00
3 $35,000.00$350.00
Ref #18 617E10101 COMPACTED AGGREGATE, AS PER PLAN, (80 CY)
Awd $4,000.00$50.00
2 $7,040.00$88.00
3 $6,880.00$86.00
Section 3 - PAVEMENT - Totals
Awd $625,782.85
2 $625,685.50
3 $854,445.95
Ref #19 646E10110 LANE LINE, 6", (2.2 MILE)
Awd $3,916.00$1,780.00
2 $4,840.00$2,200.00
3 $4,180.00$1,900.00
Ref #20 646E10200 CENTER LINE, (2.77 MILE)
Awd $11,772.50$4,250.00
2 $12,465.00$4,500.00
3 $12,465.00$4,500.00
200271 - Page 160
Ref #21 646E10310 CHANNELIZING LINE, 12", (1433 FT)
Awd $2,866.00$2.00
2 $4,299.00$3.00
3 $3,080.95$2.15
Ref #22 646E10400 STOP LINE, (390 FT)
Awd $4,758.00$12.20
2 $5,460.00$14.00
3 $5,070.00$13.00
Ref #23 646E10500 CROSSWALK LINE, (1060 FT)
Awd $6,201.00$5.85
2 $7,950.00$7.50
3 $6,625.00$6.25
Ref #24 646E10600 TRANSVERSE/DIAGONAL LINE, (385 FT)
Awd $3,907.75$10.15
2 $4,620.00$12.00
3 $4,235.00$11.00
Ref #25 646E10800 ISLAND MARKING, (143 SF)
Awd $858.00$6.00
2 $1,144.00$8.00
3 $929.50$6.50
Ref #26 646E20300 LANE ARROW, (50 EACH)
Awd $7,600.00$152.00
2 $8,250.00$165.00
3 $8,250.00$165.00
Ref #27 646E20504 DOTTED LINE, 6", (85 FT)
Awd $119.00$1.40
2 $170.00$2.00
3 $127.50$1.50
Ref #28 646E20650 SHARED LANE MARKING, (9 EACH)
Awd $2,286.00$254.00
2 $2,700.00$300.00
3 $2,430.00$270.00
Section 4 - TRAFFIC CONTROL - Totals
Awd $44,284.25
2 $51,898.00
3 $47,392.95
Ref #29 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST, (100 HOUR)
Awd $7,000.00$70.00
2 $7,000.00$70.00
3 $6,400.00$64.00
Ref #30 614E12460 WORK ZONE MARKING SIGN, (4 EACH)
Awd $500.00$125.00
2 $540.00$135.00
3 $540.00$135.00
Ref #31 614E20510 WORK ZONE LANE LINE, CLASS II, 6", 642 PAINT, (6.6 MILE)
Awd $6,435.00$975.00
2 $3,960.00$600.00
3 $2,640.00$400.00
200271 - Page 161
Ref #32 614E20560 WORK ZONE LANE LINE, CLASS III, 6", 642 PAINT, (6.6 MILE)
Awd $6,435.00$975.00
2 $5,214.00$790.00
3 $6,600.00$1,000.00
Ref #33 614E21500 WORK ZONE CENTER LINE, CLASS II, 642 PAINT, (7.46 MILE)
Awd $4,662.50$625.00
2 $2,238.00$300.00
3 $4,177.60$560.00
Ref #34 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT, (7.46 MILE)
Awd $10,742.40$1,440.00
2 $9,698.00$1,300.00
3 $11,190.00$1,500.00
Ref #35 614E23690 WORK ZONE CHANNELIZING LINE, CLASS III, 12", 642 P, (4299 FT)
Awd $2,149.50$0.50
2 $2,149.50$0.50
3 $2,579.40$0.60
Ref #36 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT, (1081 FT)
Awd $5,405.00$5.00
2 $6,486.00$6.00
3 $5,729.30$5.30
Section 5 - MAINTENANCE OF TRAFFIC - Totals
Awd $43,329.40
2 $37,285.50
3 $39,856.30
Ref #37 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $4,350.00$4,350.00
2 $3,500.00$3,500.00
3 $7,650.00$7,650.00
Ref #38 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $55,000.00$55,000.00
2 $51,000.00$51,000.00
3 $60,000.00$60,000.00
Ref #39 624E10000 MOBILIZATION, (LUMP SUM)
Awd $30,000.00$30,000.00
2 $41,000.00$41,000.00
3 $25,000.00$25,000.00
Section 6 - INCIDENTALS - Totals
Awd $89,350.00
2 $95,500.00
3 $92,650.00
200271 - Page 162
Project No. 200272
PID 106643
MEG-Middleport Trail Phase 2
Federal
Type: BIKEWAYS
Completion Date: 10/31/2020
Award Amount: $172,174.02
Contract Awarded To: SHELLY COMPANY
Letting Date: 5/7/2020
Engineer's Estimate: $222,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jack Marchbanks, Ph.D., Director
SHELLY COMPANY
80 PARK DR BOX 266
THORNVILLE, OH 43076
Perry
Bidder 1
Bid $172,174.02
AMAAZZ CONSTRUCTION OHIO LLC
545 METRO PLACE SOUTH, SUITE 201
DUBLIN, OH 43017
Franklin
Bidder 2
Bid $177,000.00
PARKER CORPORATION
ST RT 7
TUPPERS PLAINS, OH 45783
Meigs
Bidder 3
Bid $177,351.92
AXIS CIVIL CONSTRUCTION LLC
5715 WESTBOURNE AVENUE
COLUMBUS, OH 43213
Franklin
Bidder 4
Bid $223,092.17
D V WEBER CONSTRUCTION
P O BOX 116
REEDSVILLE, OH 45772
Meigs
Bidder 5
Bid $245,615.37
200272 - Page 163
Ref #1 201E11000 CLEARING AND GRUBBING, (LUMP SUM)
Awd $3,500.00$3,500.00
2 $2,900.60$2,900.60
3 $5,000.00$5,000.00
4 $15,000.00$15,000.00
5 $21,925.00$21,925.00
Ref #2 202E75000 FENCE REMOVED, (88 FT)
Awd $440.00$5.00
2 $352.00$4.00
3 $440.00$5.00
4 $440.00$5.00
5 $2,816.00$32.00
Ref #3 202E75250 GATE REMOVED, (1 EACH)
Awd $450.00$450.00
2 $175.00$175.00
3 $100.00$100.00
4 $200.00$200.00
5 $500.00$500.00
Ref #4 203E10000 EXCAVATION, (402 CY)
Awd $11,658.00$29.00
2 $10,854.00$27.00
3 $10,050.00$25.00
4 $14,070.00$35.00
5 $21,306.00$53.00
Ref #5 203E20000 EMBANKMENT, (101 CY)
Awd $1,818.00$18.00
2 $1,843.25$18.25
3 $2,525.00$25.00
4 $3,535.00$35.00
5 $4,848.00$48.00
Ref #6 204E10000 SUBGRADE COMPACTION, (2624 SY)
Awd $3,280.00$1.25
2 $8,921.60$3.40
3 $1,312.00$0.50
4 $5,248.00$2.00
5 $5,248.00$2.00
Ref #7 204E45000 PROOF ROLLING, (1 HOUR)
Awd $175.00$175.00
2 $220.00$220.00
3 $100.00$100.00
4 $225.00$225.00
5 $250.00$250.00
Ref #8 607E23000 FENCE, TYPE CLT, (200 FT)
Awd $6,300.00$31.50
2 $6,500.00$32.50
3 $6,300.00$31.50
4 $6,300.00$31.50
5 $6,300.00$31.50
200272 - Page 164
Ref #9 607E61201 GATE, TYPE CLT, AS PER PLAN, (1 EACH)
Awd $3,850.00$3,850.00
2 $4,200.00$4,200.00
3 $3,850.00$3,850.00
4 $3,850.00$3,850.00
5 $3,850.00$3,850.00
Ref #10 608E53020 DETECTABLE WARNING, (101 SF)
Awd $5,151.00$51.00
2 $2,525.00$25.00
3 $3,030.00$30.00
4 $2,525.00$25.00
5 $5,656.00$56.00
Ref #11 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL, (1 EACH)
Awd $20.30$20.30
2 $55.00$55.00
3 $20.00$20.00
4 $20.00$20.00
5 $50.00$50.00
Ref #12 638E10800 VALVE BOX ADJUSTED TO GRADE, (1 EACH)
Awd $250.00$250.00
2 $330.00$330.00
3 $500.00$500.00
4 $750.00$750.00
5 $100.00$100.00
Ref #13 690E50600 SPECIAL - BOLLARD, (9 EACH)
Awd $4,050.00$450.00
2 $4,500.00$500.00
3 $4,500.00$500.00
4 $4,050.00$450.00
5 $4,050.00$450.00
Section 1 - ROADWAY - Totals
Awd $40,942.30
2 $43,376.45
3 $37,727.00
4 $56,213.00
5 $76,899.00
Ref #14 659E00100 SOIL ANALYSIS TEST, (2 EACH)
Awd $676.00$338.00
2 $220.00$110.00
3 $100.00$50.00
4 $200.00$100.00
5 $400.00$200.00
Ref #15 659E00300 TOPSOIL, (168 CY)
Awd $8,568.00$51.00
2 $3,696.00$22.00
3 $5,880.00$35.00
4 $4,704.00$28.00
5 $14,784.00$88.00
200272 - Page 165
Ref #16 659E10000 SEEDING AND MULCHING, (3020 SY)
Awd $5,436.00$1.80
2 $4,530.00$1.50
3 $3,020.00$1.00
4 $4,258.20$1.41
5 $4,258.20$1.41
Ref #17 659E14000 REPAIR SEEDING AND MULCHING, (151 SY)
Awd $102.68$0.68
2 $226.50$1.50
3 $15.10$0.10
4 $212.91$1.41
5 $212.91$1.41
Ref #18 659E15000 INTER-SEEDING, (151 SY)
Awd $102.68$0.68
2 $226.50$1.50
3 $15.10$0.10
4 $212.91$1.41
5 $212.91$1.41
Ref #19 659E20000 COMMERCIAL FERTILIZER, (0.41 TON)
Awd $272.51$664.66
2 $274.70$670.00
3 $1,000.40$2,440.00
4 $248.05$605.00
5 $248.05$605.00
Ref #20 659E31000 LIME, (0.64 ACRE)
Awd $95.89$149.83
2 $48.00$75.00
3 $1,000.32$1,563.00
4 $44.80$70.00
5 $44.80$70.00
Ref #21 659E35000 WATER, (17 MGAL)
Awd $17.00$1.00
2 $17.85$1.05
3 $1.70$0.10
4 $17.00$1.00
5 $17.00$1.00
Ref #22 670E00500 SLOPE EROSION PROTECTION, (960 SY)
Awd $1,488.00$1.55
2 $2,640.00$2.75
3 $2,400.00$2.50
4 $2,400.00$2.50
5 $2,400.00$2.50
Ref #23 832E15000 STORM WATER POLLUTION PREVENTION PLAN, (LUMP SUM)
Awd $1,500.00$1,500.00
2 $2,770.00$2,770.00
3 $5,000.00$5,000.00
4 $1,750.00$1,750.00
5 $1,375.00$1,375.00
200272 - Page 166
Ref #24 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS, (LUMP SUM)
Awd $1,000.00$1,000.00
2 $3,900.00$3,900.00
3 $5,000.00$5,000.00
4 $7,400.00$7,400.00
5 $2,350.00$2,350.00
Ref #25 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA, (LUMP SUM)
Awd $4,834.46$4,834.46
2 $2,800.00$2,800.00
3 $5,000.00$5,000.00
4 $4,500.00$4,500.00
5 $5,500.00$5,500.00
Ref #26 832E30000 EROSION CONTROL, (10000 EACH)
Awd $10,000.00$1.00
2 $10,000.00$1.00
3 $10,000.00$1.00
4 $10,000.00$1.00
5 $10,000.00$1.00
Section 2 - EROSION CONTROL - Totals
Awd $34,093.22
2 $31,349.55
3 $38,432.62
4 $35,947.87
5 $41,802.87
Ref #27 304E20000 AGGREGATE BASE, (380 CY)
Awd $27,550.00$72.50
2 $25,080.00$66.00
3 $32,300.00$85.00
4 $41,800.00$110.00
5 $49,400.00$130.00
Ref #28 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG, (134 CY)
Awd $24,790.00$185.00
2 $27,470.00$205.00
3 $26,130.00$195.00
4 $26,800.00$200.00
5 $30,150.00$225.00
Ref #29 452E12010 8" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P, (159 SY)
Awd $17,490.00$110.00
2 $19,875.00$125.00
3 $12,084.00$76.00
4 $13,674.00$86.00
5 $15,105.00$95.00
Section 3 - PAVEMENT - Totals
Awd $69,830.00
2 $72,425.00
3 $70,514.00
4 $82,274.00
5 $94,655.00
200272 - Page 167
Ref #30 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST, (183 FT)
Awd $2,745.00$15.00
2 $3,019.50$16.50
3 $2,745.00$15.00
4 $2,745.00$15.00
5 $2,745.00$15.00
Ref #31 630E80100 SIGN, FLAT SHEET, (34.5 SF)
Awd $1,035.00$30.00
2 $1,104.00$32.00
3 $1,035.00$30.00
4 $1,035.00$30.00
5 $1,035.00$30.00
Ref #32 642E00201 LANE LINE, 4", TYPE 1, AS PER PLAN (BROKEN YELLOW), (0.38 MILE)
Awd $750.50$1,975.00
2 $779.00$2,050.00
3 $1,307.20$3,440.00
4 $1,307.20$3,440.00
5 $750.50$1,975.00
Ref #33 642E00201 LANE LINE, 4", TYPE 1, AS PER PLAN (SOLID YELLOW), (0.03 MILE)
Awd $555.00$18,500.00
2 $600.00$20,000.00
3 $144.60$4,820.00
4 $144.60$4,820.00
5 $555.00$18,500.00
Ref #34 642E00500 STOP LINE, TYPE 1, (25 FT)
Awd $225.00$9.00
2 $243.75$9.75
3 $100.00$4.00
4 $100.00$4.00
5 $225.00$9.00
Ref #35 642E00600 CROSSWALK LINE, TYPE 1, (33 FT)
Awd $297.00$9.00
2 $321.75$9.75
3 $115.50$3.50
4 $115.50$3.50
5 $297.00$9.00
Ref #36 642E19000 SHARED LANE MARKING, TYPE 1, (6 EACH)
Awd $1,200.00$200.00
2 $1,260.00$210.00
3 $1,080.00$180.00
4 $1,080.00$180.00
5 $1,200.00$200.00
Section 4 - TRAFFIC CONTROL - Totals
Awd $6,807.50
2 $7,328.00
3 $6,527.30
4 $6,527.30
5 $6,807.50
200272 - Page 168
Ref #37 616E10000 WATER, (1 MGAL)
Awd $1.00$1.00
2 $41.00$41.00
3 $1.00$1.00
4 $30.00$30.00
5 $1.00$1.00
Section 5 - MAINTENANCE OF TRAFFIC - Totals
Awd $1.00
2 $41.00
3 $1.00
4 $30.00
5 $1.00
Ref #38 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $1,000.00$1,000.00
2 $1,280.00$1,280.00
3 $2,650.00$2,650.00
4 $5,000.00$5,000.00
5 $5,000.00$5,000.00
Ref #39 614E11001 MAINTAINING TRAFFIC, AS PER PLAN, (LUMP SUM)
Awd $5,500.00$5,500.00
2 $3,000.00$3,000.00
3 $5,000.00$5,000.00
4 $3,500.00$3,500.00
5 $2,600.00$2,600.00
Ref #40 619E16000 FIELD OFFICE, TYPE A, (3 MNTH)
Awd $4,500.00$1,500.00
2 $4,500.00$1,500.00
3 $300.00$100.00
4 $3,600.00$1,200.00
5 $4,500.00$1,500.00
Ref #41 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING, (LUMP SUM)
Awd $4,500.00$4,500.00
2 $1,200.00$1,200.00
3 $5,000.00$5,000.00
4 $10,000.00$10,000.00
5 $5,850.00$5,850.00
Ref #42 624E10000 MOBILIZATION, (LUMP SUM)
Awd $5,000.00$5,000.00
2 $12,500.00$12,500.00
3 $11,200.00$11,200.00
4 $20,000.00$20,000.00
5 $7,500.00$7,500.00
Section 6 - INCIDENTALS - Totals
Awd $20,500.00
2 $22,480.00
3 $24,150.00
4 $42,100.00
5 $25,450.00
200272 - Page 169
Project No. 200273
PID 91907
MRW-IR 71 Crackseal FY20
Federal
Type: CRACK SEALING
Completion Date: 8/30/2020
Award Amount: $176,000.00
Contract Awarded To: THE AERO-MARK COMPANY LLC
Letting Date: 5/7/2020
Engineer's Estimate: $276,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jack Marchbanks, Ph.D., Director
THE AERO-MARK COMPANY LLC
10423 DANNER DR
STREETSBORO, OH 44241
Portage
Bidder 1
Bid $176,000.00
STRAWSER CONSTRUCTION INC
1392 DUBLIN RD
COLUMBUS, OH 43215
Franklin
Bidder 2
Bid $186,110.20
SCODELLER CONSTRUCTION INC
51722 GRAND RIVER AVE
WIXOM, MI 48393-2303
Bidder 3
Bid $234,601.60
BITUMINOUS PAVEMENT SYSTEMS
1595 FRANK RD
COLUMBUS, OH 43223
Franklin
Bidder 4
Bid $238,492.54
DOT CONSTRUCTION CORP
4030 BOARDMAN-CANFIELD RD, SUITE 200B
CANFIELD, OH 44406
Mahoning
Bidder 5
Bid $406,610.80
200273 - Page 170
Ref #1 832E30000 EROSION CONTROL, (1000 EACH)
Awd $1,000.00$1.00
2 $1,000.00$1.00
3 $1,000.00$1.00
4 $1,000.00$1.00
5 $1,000.00$1.00
Section 1 - EROSION CONTROL - Totals
Awd $1,000.00
2 $1,000.00
3 $1,000.00
4 $1,000.00
5 $1,000.00
Ref #2 423E00250 CRACK SEALING, TYPE IV, (354728 SY)
Awd $124,154.80$0.35
2 $106,418.40$0.30
3 $124,154.80$0.35
4 $99,323.84$0.28
5 $177,364.00$0.50
Section 2 - PAVEMENT - Totals
Awd $124,154.80
2 $106,418.40
3 $124,154.80
4 $99,323.84
5 $177,364.00
Ref #3 642E00104 EDGE LINE, 6", TYPE 1, (32.32 MILE)
Awd $17,872.96$553.00
2 $21,654.40$670.00
3 $21,654.40$670.00
4 $23,011.84$712.00
5 $21,654.40$670.00
Ref #4 642E00204 LANE LINE, 6", TYPE 1, (30.88 MILE)
Awd $7,781.76$252.00
2 $10,036.00$325.00
3 $10,036.00$325.00
4 $16,891.36$547.00
5 $10,036.00$325.00
Section 3 - TRAFFIC CONTROL - Totals
Awd $25,654.72
2 $31,690.40
3 $31,690.40
4 $39,903.20
5 $31,690.40
200273 - Page 171
Ref #5 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST, (480 HOUR)
Awd $19,200.00$40.00
2 $5,280.00$11.00
3 $36,000.00$75.00
4 $36,000.00$75.00
5 $38,400.00$80.00
Ref #6 614E12421 DETOUR SIGNING, AS PER PLAN, (LUMP SUM)
Awd $500.00$500.00
2 $3,200.00$3,200.00
3 $3,200.00$3,200.00
4 $3,300.00$3,300.00
5 $2,700.00$2,700.00
Ref #7 614E12460 WORK ZONE MARKING SIGN, (10 EACH)
Awd $100.00$10.00
2 $2,500.00$250.00
3 $2,500.00$250.00
4 $1,380.00$138.00
5 $1,500.00$150.00
Ref #8 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN, (2 SNMT)
Awd $700.00$350.00
2 $2,100.00$1,050.00
3 $2,200.00$1,100.00
4 $1,760.00$880.00
5 $2,100.00$1,050.00
Ref #9 614E20550 WORK ZONE LANE LINE, CLASS III, 4", 642 PAINT, (0.78 MILE)
Awd $195.00$250.00
2 $1,856.40$2,380.00
3 $1,856.40$2,380.00
4 $565.50$725.00
5 $1,856.40$2,380.00
Section 4 - MAINTENANCE OF TRAFFIC - Totals
Awd $20,695.00
2 $14,936.40
3 $45,756.40
4 $43,005.50
5 $46,556.40
Ref #10 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $945.48$945.48
2 $750.00$750.00
3 $4,000.00$4,000.00
4 $1,800.00$1,800.00
5 $5,000.00$5,000.00
Ref #11 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $1,500.00$1,500.00
2 $20,500.00$20,500.00
3 $12,000.00$12,000.00
4 $34,700.00$34,700.00
5 $100,000.00$100,000.00
200273 - Page 172
Ref #12 623E10001 CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P, (LUMP SUM)
Awd $50.00$50.00
2 $200.00$200.00
3 $500.00$500.00
4 $18,000.00$18,000.00
5 $5,000.00$5,000.00
Ref #13 624E10000 MOBILIZATION, (LUMP SUM)
Awd $2,000.00$2,000.00
2 $10,615.00$10,615.00
3 $15,500.00$15,500.00
4 $760.00$760.00
5 $40,000.00$40,000.00
Section 5 - INCIDENTALS - Totals
Awd $4,495.48
2 $32,065.00
3 $32,000.00
4 $55,260.00
5 $150,000.00
200273 - Page 173
Project No. 200274
PID 91780
NOB-IR 77-02.50
Federal
Type: FOUR LANE RESURFACING
Completion Date: 10/1/2020
Award Amount: $336,999.69
Contract Awarded To: SHELLY & SANDS INC
Letting Date: 5/7/2020
Engineer's Estimate: $301,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jack Marchbanks, Ph.D., Director
SHELLY & SANDS INC
1515 HARMON AVE
COLUMBUS, OH 43223
Franklin
Bidder 1
Bid $336,999.69
NLS PAVING, INC
67925 Bayberry Drive Suite B
St Clairsville, OH 43950
Belmont
Bidder 2
Bid $378,125.15
200274 - Page 174
Ref #1 201E11000 CLEARING AND GRUBBING, (LUMP SUM)
Awd $5,350.00$5,350.00
2 $750.00$750.00
Ref #2 202E20010 HEADWALL REMOVED, (1 EACH)
Awd $200.00$200.00
2 $475.00$475.00
Ref #3 202E23000 PAVEMENT REMOVED, (1492 SY)
Awd $10,071.00$6.75
2 $29,840.00$20.00
Ref #4 202E35100 PIPE REMOVED, 24" AND UNDER, (103 FT)
Awd $951.72$9.24
2 $1,030.00$10.00
Ref #5 202E75000 FENCE REMOVED, (175 FT)
Awd $1,137.50$6.50
2 $455.00$2.60
Ref #6 203E10000 EXCAVATION, (362 CY)
Awd $8,507.00$23.50
2 $18,100.00$50.00
Ref #7 203E20000 EMBANKMENT, (5 CY)
Awd $390.00$78.00
2 $75.00$15.00
Ref #8 204E10000 SUBGRADE COMPACTION, (1492 SY)
Awd $3,804.60$2.55
2 $2,238.00$1.50
Ref #9 209E60500 LINEAR GRADING, (0.12 MILE)
Awd $732.00$6,100.00
2 $600.00$5,000.00
Ref #10 209E70000 BORROW, (45 CY)
Awd $1,125.00$25.00
2 $270.00$6.00
Ref #11 607E15000 FENCE, TYPE 47, (175 FT)
Awd $4,637.50$26.50
2 $4,340.00$24.80
Section 1 - ROADWAY - Totals
Awd $36,906.32
2 $58,173.00
Ref #12 659E10000 SEEDING AND MULCHING, (3300 SY)
Awd $7,425.00$2.25
2 $3,036.00$0.92
Ref #13 659E20000 COMMERCIAL FERTILIZER, (0.45 TON)
Awd $315.00$700.00
2 $272.25$605.00
Ref #14 659E31000 LIME, (0.69 ACRE)
Awd $55.20$80.00
2 $48.30$70.00
200274 - Page 175
Ref #15 659E35000 WATER, (9 MGAL)
Awd $9.00$1.00
2 $9.00$1.00
Ref #16 832E30000 EROSION CONTROL, (20000 EACH)
Awd $20,000.00$1.00
2 $20,000.00$1.00
Section 2 - EROSION CONTROL - Totals
Awd $27,804.20
2 $23,365.55
Ref #17 602E20000 CONCRETE MASONRY, (0.46 CY)
Awd $1,794.00$3,900.00
2 $1,840.00$4,000.00
Ref #18 611E10600 24" CONDUIT, TYPE C, (103 FT)
Awd $12,875.00$125.00
2 $12,360.00$120.00
Section 3 - DRAINAGE - Totals
Awd $14,669.00
2 $14,200.00
Ref #19 252E01500 FULL DEPTH PAVEMENT SAWING, (654 FT)
Awd $3,270.00$5.00
2 $1,962.00$3.00
Ref #20 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1.5", (1628 SY)
Awd $8,547.00$5.25
2 $6,919.00$4.25
Ref #21 302E46000 ASPHALT CONCRETE BASE, PG64-22, (466 CY)
Awd $65,240.00$140.00
2 $81,550.00$175.00
Ref #22 304E20000 AGGREGATE BASE, (260 CY)
Awd $20,800.00$80.00
2 $23,400.00$90.00
Ref #23 407E20000 NON-TRACKING TACK COAT, (359 GAL)
Awd $1,077.00$3.00
2 $1,077.00$3.00
Ref #24 442E20000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A (, (130 CY)
Awd $29,250.00$225.00
2 $37,700.00$290.00
Ref #25 442E20200 ASPHALT CONCRETE INTERMEDIATE COURSE, 19 MM, TYPE , (75 CY)
Awd $15,000.00$200.00
2 $18,000.00$240.00
Ref #26 618E40100 RUMBLE STRIPS, SHOULDER (ASPHALT CONCRETE), (1220 FT)
Awd $5,185.00$4.25
2 $4,575.00$3.75
200274 - Page 176
Section 4 - PAVEMENT - Totals
Awd $148,369.00
2 $175,183.00
Ref #27 621E00100 RPM, (41 EACH)
Awd $3,895.00$95.00
2 $3,690.00$90.00
Ref #28 621E54000 RAISED PAVEMENT MARKER REMOVED, (41 EACH)
Awd $184.50$4.50
2 $164.00$4.00
Ref #29 644E00104 EDGE LINE, 6", (1.08 MILE)
Awd $5,275.80$4,885.00
2 $5,000.40$4,630.00
Ref #30 644E00204 LANE LINE, 6", (0.62 MILE)
Awd $1,565.50$2,525.00
2 $1,475.60$2,380.00
Ref #31 644E30030 REMOVAL OF PAVEMENT MARKING, (1.7 MILE)
Awd $4,250.00$2,500.00
2 $3,155.20$1,856.00
Section 5 - TRAFFIC CONTROL - Totals
Awd $15,170.80
2 $13,485.20
Ref #32 614E12350 WORK ZONE IMPACT ATTENUATOR, (1 EACH)
Awd $2,375.00$2,375.00
2 $3,725.00$3,725.00
Ref #33 614E20560 WORK ZONE LANE LINE, CLASS III, 6", 642 PAINT, (0.62 MILE)
Awd $753.30$1,215.00
2 $713.00$1,150.00
Ref #34 614E22210 WORK ZONE EDGE LINE, CLASS I, 6", 740.06, TYPE I, (1.08 MILE)
Awd $9,180.00$8,500.00
2 $8,672.40$8,030.00
Ref #35 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT, (1.08 MILE)
Awd $1,431.00$1,325.00
2 $1,350.00$1,250.00
Ref #36 614E24402 WORK ZONE DOTTED LINE, CLASS I, 6", 740.06, TYPE I, (840 FT)
Awd $1,050.00$1.25
2 $1,008.00$1.20
Ref #37 622E41100 PORTABLE BARRIER, UNANCHORED, (1270 FT)
Awd $27,940.00$22.00
2 $31,750.00$25.00
Section 6 - MAINTENANCE OF TRAFFIC - Totals
Awd $42,729.30
2 $47,218.40
200274 - Page 177
Ref #38 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $4,500.00$4,500.00
2 $1,500.00$1,500.00
Ref #39 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $20,000.00$20,000.00
2 $15,000.00$15,000.00
Ref #40 623E10001 CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P, (LUMP SUM)
Awd $7,500.00$7,500.00
2 $5,000.00$5,000.00
Ref #41 624E10000 MOBILIZATION, (LUMP SUM)
Awd $19,351.07$19,351.07
2 $25,000.00$25,000.00
Section 7 - INCIDENTALS - Totals
Awd $51,351.07
2 $46,500.00
200274 - Page 178
Project No. 200275
PID 110731
PIK-SR 32-12.54 Landslide
Federal
Type: SLIDE REPAIR
Completion Date: 8/7/2020
Award Amount: $301,119.50
Contract Awarded To: ALAN STONE CO INC
Letting Date: 5/7/2020
Engineer's Estimate: $440,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jack Marchbanks, Ph.D., Director
ALAN STONE CO INC
1324 ELLIS RUN RD
CUTLER, OH 45724
Washington
Bidder 1
Bid $301,119.50
GEORGE J IGEL & CO INC
2040 ALUM CREEK DR
COLUMBUS, OH 43207
Franklin
Bidder 2
Bid $347,114.30
COMPLETE GENERAL CONSTRUCTION COMPANY
1221 EAST FIFTH AVE
COLUMBUS, OH 43219
Franklin
Bidder 3
Bid $380,294.55
SHELLY & SANDS INC
1515 HARMON AVE
COLUMBUS, OH 43223
Franklin
Bidder 4
Bid $402,398.09
D G M INC
1881 ADAMS RD
BEAVER, OH 45613
Pike
Bidder 5
Bid $454,074.15
R C CONSTRUCTION COMPANY AND SON INC
8096 FEDERAL ROAD
CUTLER, OH 45724
Washington
Bidder 6
Bid $644,687.10
200275 - Page 179
Ref #1 201E11000 CLEARING AND GRUBBING, (LUMP SUM)
Awd $3,000.00$3,000.00
2 $2,900.00$2,900.00
3 $5,000.00$5,000.00
4 $2,500.00$2,500.00
5 $11,000.00$11,000.00
6 $3,000.00$3,000.00
Ref #2 202E38000 GUARDRAIL REMOVED, (213 FT)
Awd $639.00$3.00
2 $1,650.75$7.75
3 $426.00$2.00
4 $1,065.00$5.00
5 $213.00$1.00
6 $1,065.00$5.00
Ref #3 203E20000 EMBANKMENT, (6 CY)
Awd $264.00$44.00
2 $480.00$80.00
3 $120.00$20.00
4 $330.00$55.00
5 $300.00$50.00
6 $120.00$20.00
Ref #4 209E70000 BORROW, (33 CY)
Awd $264.00$8.00
2 $1,485.00$45.00
3 $1,485.00$45.00
4 $561.00$17.00
5 $2,310.00$70.00
6 $660.00$20.00
Ref #5 209E72001 PREPARING SUBGRADE FOR SHOULDER PAVING, AS PER PLA, (2 STA)
Awd $1,360.00$680.00
2 $1,820.00$910.00
3 $4,000.00$2,000.00
4 $3,000.00$1,500.00
5 $3,000.00$1,500.00
6 $3,000.00$1,500.00
Ref #6 606E15050 GUARDRAIL, TYPE MGS, (212.5 FT)
Awd $7,437.50$35.00
2 $5,610.00$26.40
3 $5,610.00$26.40
4 $6,906.25$32.50
5 $6,375.00$30.00
6 $7,437.50$35.00
Section 1 - ROADWAY - Totals
Awd $12,964.50
2 $13,945.75
3 $16,641.00
4 $14,362.25
5 $23,198.00
6 $15,282.50
200275 - Page 180
Ref #7 659E00300 TOPSOIL, (28 CY)
Awd $1,456.00$52.00
2 $1,596.00$57.00
3 $560.00$20.00
4 $1,960.00$70.00
5 $420.00$15.00
6 $1,400.00$50.00
Ref #8 659E10000 SEEDING AND MULCHING, (252 SY)
Awd $1,008.00$4.00
2 $2,394.00$9.50
3 $2,394.00$9.50
4 $2,016.00$8.00
5 $1,764.00$7.00
6 $5,040.00$20.00
Ref #9 659E14000 REPAIR SEEDING AND MULCHING, (13 SY)
Awd $208.00$16.00
2 $123.50$9.50
3 $123.50$9.50
4 $9.10$0.70
5 $0.65$0.05
6 $2.60$0.20
Ref #10 659E20000 COMMERCIAL FERTILIZER, (0.03 TON)
Awd $105.00$3,500.00
2 $18.15$605.00
3 $18.15$605.00
4 $22.74$758.00
5 $19.50$650.00
6 $36.00$1,200.00
Ref #11 659E31000 LIME, (0.05 ACRE)
Awd $42.00$840.00
2 $3.50$70.00
3 $3.50$70.00
4 $8.00$160.00
5 $4.00$80.00
6 $40.00$800.00
Ref #12 659E35000 WATER, (1 MGAL)
Awd $21.00$21.00
2 $1.00$1.00
3 $1.00$1.00
4 $1.00$1.00
5 $1.00$1.00
6 $1.00$1.00
Ref #13 832E30000 EROSION CONTROL, (1000 EACH)
Awd $1,000.00$1.00
2 $1,000.00$1.00
3 $1,000.00$1.00
4 $1,000.00$1.00
5 $1,000.00$1.00
6 $1,000.00$1.00
200275 - Page 181
Section 2 - EROSION CONTROL - Totals
Awd $3,840.00
2 $5,136.15
3 $4,100.15
4 $5,016.84
5 $3,209.15
6 $7,519.60
Ref #14 441E50701 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1, (448, (16 CY)
Awd $13,280.00$830.00
2 $9,728.00$608.00
3 $12,576.00$786.00
4 $10,800.00$675.00
5 $13,600.00$850.00
6 $9,200.00$575.00
Section 3 - PAVEMENT - Totals
Awd $13,280.00
2 $9,728.00
3 $12,576.00
4 $10,800.00
5 $13,600.00
6 $9,200.00
Ref #15 626E00112 BARRIER REFLECTOR, TYPE 3 (ONE-WAY), (3 EACH)
Awd $27.00$9.00
2 $24.00$8.00
3 $24.00$8.00
4 $30.00$10.00
5 $45.00$15.00
6 $60.00$20.00
Ref #16 642E00104 EDGE LINE, 6", TYPE 1, (0.32 MILE)
Awd $1,120.00$3,500.00
2 $1,040.00$3,250.00
3 $1,040.00$3,250.00
4 $1,040.00$3,250.00
5 $1,120.00$3,500.00
6 $4,000.00$12,500.00
Ref #17 642E00204 LANE LINE, 6", TYPE 1, (0.32 MILE)
Awd $1,024.00$3,200.00
2 $960.00$3,000.00
3 $960.00$3,000.00
4 $960.00$3,000.00
5 $1,120.00$3,500.00
6 $4,000.00$12,500.00
200275 - Page 182
Section 4 - TRAFFIC CONTROL - Totals
Awd $2,171.00
2 $2,024.00
3 $2,024.00
4 $2,030.00
5 $2,285.00
6 $8,060.00
Ref #18 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST, (80 HOUR)
Awd $5,520.00$69.00
2 $6,400.00$80.00
3 $6,400.00$80.00
4 $5,200.00$65.00
5 $2,400.00$30.00
6 $2,800.00$35.00
Ref #19 614E12336 WORK ZONE IMPACT ATTENUATOR (UNIDIRECTIONAL), (1 EACH)
Awd $2,500.00$2,500.00
2 $2,500.00$2,500.00
3 $3,575.00$3,575.00
4 $2,350.00$2,350.00
5 $2,000.00$2,000.00
6 $2,500.00$2,500.00
Ref #20 614E13310 BARRIER REFLECTOR, TYPE 1 (ONE-WAY), (9 EACH)
Awd $342.00$38.00
2 $180.00$20.00
3 $324.00$36.00
4 $63.00$7.00
5 $135.00$15.00
6 $180.00$20.00
Ref #21 614E13350 OBJECT MARKER, ONE WAY, (9 EACH)
Awd $378.00$42.00
2 $225.00$25.00
3 $360.00$40.00
4 $117.00$13.00
5 $135.00$15.00
6 $180.00$20.00
Ref #22 614E22210 WORK ZONE EDGE LINE, CLASS I, 6", 740.06, TYPE I, (0.32 MILE)
Awd $3,200.00$10,000.00
2 $3,040.00$9,500.00
3 $3,040.00$9,500.00
4 $3,040.00$9,500.00
5 $3,200.00$10,000.00
6 $4,000.00$12,500.00
Ref #23 614E24402 WORK ZONE DOTTED LINE, CLASS I, 6", 740.06, TYPE I, (720 FT)
Awd $1,440.00$2.00
2 $950.40$1.32
3 $950.40$1.32
4 $1,080.00$1.50
5 $972.00$1.35
6 $3,600.00$5.00
200275 - Page 183
Ref #24 622E41100 PORTABLE BARRIER, UNANCHORED, (390 FT)
Awd $8,190.00$21.00
2 $12,480.00$32.00
3 $7,800.00$20.00
4 $11,700.00$30.00
5 $7,800.00$20.00
6 $9,750.00$25.00
Section 5 - MAINTENANCE OF TRAFFIC - Totals
Awd $21,570.00
2 $25,775.40
3 $22,449.40
4 $23,550.00
5 $16,642.00
6 $23,010.00
Ref #25 507E00400 STEEL PILES, MISC.: STEEL PILES W14X82, AS PER PLA, (1514 FT)
Awd $51,476.00$34.00
2 $66,616.00$44.00
3 $81,756.00$54.00
4 $59,046.00$39.00
5 $75,700.00$50.00
6 $68,130.00$45.00
Ref #26 507E00400 STEEL PILES, MISC.: STEEL PILES W16X57, AS PER PLA, (671 FT)
Awd $16,104.00$24.00
2 $23,485.00$35.00
3 $33,550.00$50.00
4 $23,485.00$35.00
5 $26,840.00$40.00
6 $23,485.00$35.00
Ref #27 524E94503 DRILLED SHAFTS, 24" DIAMETER, ABOVE BEDROCK, AS PE, (1672 FT)
Awd $61,864.00$37.00
2 $78,584.00$47.00
3 $81,928.00$49.00
4 $112,024.00$67.00
5 $83,600.00$50.00
6 $209,000.00$125.00
Ref #28 524E94505 DRILLED SHAFTS, 24" DIAMETER, INTO BEDROCK, AS PER, (540 FT)
Awd $38,880.00$72.00
2 $32,400.00$60.00
3 $24,300.00$45.00
4 $46,170.00$85.50
5 $94,500.00$175.00
6 $67,500.00$125.00
Ref #29 524E95000 DRILLED SHAFTS, MISC.: PLUG SHAFT, 24" DIAMETER, U, (1330 FT)
Awd $38,570.00$29.00
2 $58,520.00$44.00
3 $78,470.00$59.00
4 $75,810.00$57.00
5 $66,500.00$50.00
6 $133,000.00$100.00
200275 - Page 184
Section 6 - RETAINING WALLS - Totals
Awd $206,894.00
2 $259,605.00
3 $300,004.00
4 $316,535.00
5 $347,140.00
6 $501,115.00
Ref #30 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $4,500.00$4,500.00
2 $3,000.00$3,000.00
3 $3,500.00$3,500.00
4 $3,404.00$3,404.00
5 $18,000.00$18,000.00
6 $18,000.00$18,000.00
Ref #31 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $15,400.00$15,400.00
2 $11,000.00$11,000.00
3 $7,000.00$7,000.00
4 $9,700.00$9,700.00
5 $20,000.00$20,000.00
6 $35,000.00$35,000.00
Ref #32 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING, (LUMP SUM)
Awd $3,500.00$3,500.00
2 $6,900.00$6,900.00
3 $2,000.00$2,000.00
4 $7,000.00$7,000.00
5 $4,000.00$4,000.00
6 $12,500.00$12,500.00
Ref #33 624E10000 MOBILIZATION, (LUMP SUM)
Awd $17,000.00$17,000.00
2 $10,000.00$10,000.00
3 $10,000.00$10,000.00
4 $10,000.00$10,000.00
5 $6,000.00$6,000.00
6 $15,000.00$15,000.00
Section 7 - INCIDENTALS - Totals
Awd $40,400.00
2 $30,900.00
3 $22,500.00
4 $30,104.00
5 $48,000.00
6 $80,500.00
200275 - Page 185
Project No. 200278
PID 107844
D01-CR FY20
Non-Federal
Type: MISCELLANEOUS
Completion Date: 9/30/2020
Award Amount: $298,188.54
Contract Awarded To: STANLEY MILLER CONSTRUCTION COMPANY
Letting Date: 5/7/2020
Engineer's Estimate: $499,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jack Marchbanks, Ph.D., Director
STANLEY MILLER CONSTRUCTION COMPANY
2250 HOWENSTINE DR SE
EAST SPARTA, OH 44626
Stark
Bidder 1
Bid $298,188.54
HYDRATECH ENGINEERED PRODUCTS LLC
10448 CHESTER RD
CINCINNATI, OH 45215
Hamilton
Bidder 2
Bid $378,675.58
PROSHOT CONCRETE INC
4158 MUSGROVE DR
FLORENCE, AL 35630
Bidder 3
Bid $429,305.00
200278 - Page 186
Ref #1 201E11000 CLEARING AND GRUBBING, (LUMP SUM)
Awd $10,555.00$10,555.00
2 $1,435.00$1,435.00
3 $5,000.00$5,000.00
Ref #2 202E70130 SPECIAL - PIPE CLEANOUT OVER 48", (2588 FT)
Awd $21,739.20$8.40
2 $25,569.44$9.88
3 $77,640.00$30.00
Section 1 - ROADWAY - Totals
Awd $32,294.20
2 $27,004.44
3 $82,640.00
Ref #3 832E30000 EROSION CONTROL, (2850 EACH)
Awd $2,850.00$1.00
2 $2,850.00$1.00
3 $2,850.00$1.00
Section 2 - EROSION CONTROL - Totals
Awd $2,850.00
2 $2,850.00
3 $2,850.00
Ref #4 503E11100 COFFERDAMS AND EXCAVATION BRACING, (LUMP SUM)
Awd $19,222.00$19,222.00
2 $7,891.65$7,891.65
3 $10,000.00$10,000.00
Ref #5 611E96550 FIELD PAVING OF EXISTING PIPE, 66" CMP, (234 FT)
Awd $17,238.78$73.67
2 $25,983.36$111.04
3 $24,570.00$105.00
Ref #6 611E96550 FIELD PAVING OF EXISTING PIPE, 72" CMP, (1406 FT)
Awd $103,580.02$73.67
2 $162,547.66$115.61
3 $139,194.00$99.00
Ref #7 611E96550 FIELD PAVING OF EXISTING PIPE, 78" CMP, (562 FT)
Awd $41,402.54$73.67
2 $67,698.52$120.46
3 $64,630.00$115.00
Section 3 - DRAINAGE - Totals
Awd $181,443.34
2 $264,121.19
3 $238,394.00
Ref #8 503E11100 COFFERDAMS AND EXCAVATION BRACING, (LUMP SUM)
Awd $7,389.00$7,389.00
2 $1,578.33$1,578.33
3 $5,000.00$5,000.00
200278 - Page 187
Ref #9 611E96550 FIELD PAVING OF EXISTING PIPE, 84" CMP, (386 FT)
Awd $23,546.00$61.00
2 $47,435.54$122.89
3 $64,076.00$166.00
Section 4 - STRUCTURE REPAIR (SFN 3201009) - Totals
Awd $30,935.00
2 $49,013.87
3 $69,076.00
Ref #10 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $4,000.00$4,000.00
2 $8,750.00$8,750.00
3 $6,345.00$6,345.00
Ref #11 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $6,111.00$6,111.00
2 $8,890.00$8,890.00
3 $10,000.00$10,000.00
Ref #12 624E10000 MOBILIZATION, (LUMP SUM)
Awd $40,555.00$40,555.00
2 $18,046.08$18,046.08
3 $20,000.00$20,000.00
Section 5 - INCIDENTALS - Totals
Awd $50,666.00
2 $35,686.08
3 $36,345.00
200278 - Page 188
Project No. 200279
PID 106371
D07-BS FY20 (B)
Non-Federal
Type: BRIDGE REPAIR
Completion Date: 9/30/2020
Award Amount: $835,750.00
Contract Awarded To: ATHOS CONTRACTING
Letting Date: 5/7/2020
Engineer's Estimate: $832,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jack Marchbanks, Ph.D., Director
ATHOS CONTRACTING
7207 RUSTIC OVAL
SEVEN HILLS, OH 44131
Cuyahoga
Bidder 1
Bid $835,750.00
LITHKO RESTORATION TECHNOLOGIES
990 N MAIN ST
MONROE, OH 45050
Butler
Bidder 2
Bid $884,999.99
BECDIR CONSTRUCTION COMPANY
15764 W AKRON-CANFIELD RD
BERLIN CENTER, OH 44401
Mahoning
Bidder 3
Bid $897,537.10
200279 - Page 189
Ref #1 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST, (320 HOUR)
Awd $19,200.00$60.00
2 $24,000.00$75.00
3 $22,400.00$70.00
Ref #2 614E12420 DETOUR SIGNING, (LUMP SUM)
Awd $28,665.00$28,665.00
2 $125,467.53$125,467.53
3 $42,000.00$42,000.00
Ref #3 614E12500 REPLACEMENT SIGN, (6 EACH)
Awd $900.00$150.00
2 $1,500.00$250.00
3 $690.00$115.00
Ref #4 614E12600 REPLACEMENT DRUM, (10 EACH)
Awd $1,250.00$125.00
2 $750.00$75.00
3 $550.00$55.00
Ref #5 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN, (4 SNMT)
Awd $3,600.00$900.00
2 $6,000.00$1,500.00
3 $7,600.00$1,900.00
Section 1 - MAINTENANCE OF TRAFFIC - Totals
Awd $53,615.00
2 $157,717.53
3 $73,240.00
Ref #6 512E10401 TREATING OF CONCRETE BRIDGE DECK WITH SRS, AS PER , (27737 SY)
Awd $166,422.00$6.00
2 $117,882.25$4.25
3 $155,327.20$5.60
Section 2 - STRUCTURE REPAIR (MOT-075-1282) - Totals
Awd $166,422.00
2 $117,882.25
3 $155,327.20
Ref #7 512E10401 TREATING OF CONCRETE BRIDGE DECK WITH SRS, AS PER , (2099 SY)
Awd $14,693.00$7.00
2 $9,781.34$4.66
3 $14,693.00$7.00
Section 3 - STRUCTURE REPAIR (MOT-075-1347) - Totals
Awd $14,693.00
2 $9,781.34
3 $14,693.00
Ref #8 512E10401 TREATING OF CONCRETE BRIDGE DECK WITH SRS, AS PER , (16699 SY)
Awd $100,194.00$6.00
2 $70,970.75$4.25
3 $93,514.40$5.60
200279 - Page 190
Section 4 - STRUCTURE REPAIR (MOT-075-1367) - Totals
Awd $100,194.00
2 $70,970.75
3 $93,514.40
Ref #9 512E10401 TREATING OF CONCRETE BRIDGE DECK WITH SRS, AS PER , (7274 SY)
Awd $50,918.00$7.00
2 $30,914.50$4.25
3 $43,644.00$6.00
Section 5 - STRUCTURE REPAIR (MOT-075-1367W) - Totals
Awd $50,918.00
2 $30,914.50
3 $43,644.00
Ref #10 512E10401 TREATING OF CONCRETE BRIDGE DECK WITH SRS, AS PER , (2081 SY)
Awd $14,567.00$7.00
2 $9,697.46$4.66
3 $15,607.50$7.50
Section 6 - STRUCTURE REPAIR (MOT-075-1396) - Totals
Awd $14,567.00
2 $9,697.46
3 $15,607.50
Ref #11 512E10401 TREATING OF CONCRETE BRIDGE DECK WITH SRS, AS PER , (4176 SY)
Awd $29,232.00$7.00
2 $17,748.00$4.25
3 $25,891.20$6.20
Section 7 - STRUCTURE REPAIR (MOT-075-1433) - Totals
Awd $29,232.00
2 $17,748.00
3 $25,891.20
Ref #12 512E10401 TREATING OF CONCRETE BRIDGE DECK WITH SRS, AS PER , (1754 SY)
Awd $12,278.00$7.00
2 $8,173.64$4.66
3 $14,032.00$8.00
Section 8 - STRUCTURE REPAIR (MOT-075-1466) - Totals
Awd $12,278.00
2 $8,173.64
3 $14,032.00
Ref #13 512E10401 TREATING OF CONCRETE BRIDGE DECK WITH SRS, AS PER , (2723 SY)
Awd $19,061.00$7.00
2 $12,689.18$4.66
3 $17,699.50$6.50
200279 - Page 191
Section 9 - STRUCTURE REPAIR (MOT-075-1503) - Totals
Awd $19,061.00
2 $12,689.18
3 $17,699.50
Ref #14 512E10401 TREATING OF CONCRETE BRIDGE DECK WITH SRS, AS PER , (9008 SY)
Awd $63,056.00$7.00
2 $38,284.00$4.25
3 $50,444.80$5.60
Section 10 - STRUCTURE REPAIR (MOT-075-1523) - Totals
Awd $63,056.00
2 $38,284.00
3 $50,444.80
Ref #15 512E10401 TREATING OF CONCRETE BRIDGE DECK WITH SRS, AS PER , (1452 SY)
Awd $10,164.00$7.00
2 $7,506.84$5.17
3 $10,164.00$7.00
Section 11 - STRUCTURE REPAIR (MOT-075-1554) - Totals
Awd $10,164.00
2 $7,506.84
3 $10,164.00
Ref #16 512E10401 TREATING OF CONCRETE BRIDGE DECK WITH SRS, AS PER , (2197 SY)
Awd $15,379.00$7.00
2 $10,238.02$4.66
3 $15,379.00$7.00
Section 12 - STRUCTURE REPAIR (MOT-075-1582) - Totals
Awd $15,379.00
2 $10,238.02
3 $15,379.00
Ref #17 512E10401 TREATING OF CONCRETE BRIDGE DECK WITH SRS, AS PER , (1319 SY)
Awd $9,233.00$7.00
2 $5,869.55$4.45
3 $9,892.50$7.50
Section 13 - STRUCTURE REPAIR (MOT-075-1636) - Totals
Awd $9,233.00
2 $5,869.55
3 $9,892.50
Ref #18 512E10401 TREATING OF CONCRETE BRIDGE DECK WITH SRS, AS PER , (965 SY)
Awd $9,650.00$10.00
2 $6,330.40$6.56
3 $7,720.00$8.00
200279 - Page 192
Section 14 - STRUCTURE REPAIR (MOT-075-20.31) - Totals
Awd $9,650.00
2 $6,330.40
3 $7,720.00
Ref #19 512E10401 TREATING OF CONCRETE BRIDGE DECK WITH SRS, AS PER , (12048 SY)
Awd $72,288.00$6.00
2 $51,204.00$4.25
3 $72,288.00$6.00
Section 15 - STRUCTURE REPAIR (MOT-075-2033) - Totals
Awd $72,288.00
2 $51,204.00
3 $72,288.00
Ref #20 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $25,000.00$25,000.00
2 $14,225.00$14,225.00
3 $18,000.00$18,000.00
Ref #21 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $85,000.00$85,000.00
2 $262,967.53$262,967.53
3 $240,000.00$240,000.00
Ref #22 624E10000 MOBILIZATION, (LUMP SUM)
Awd $85,000.00$85,000.00
2 $52,800.00$52,800.00
3 $20,000.00$20,000.00
Section 16 - INCIDENTALS - Totals
Awd $195,000.00
2 $329,992.53
3 $278,000.00
200279 - Page 193
Project No. 200280
PID 103268
D07-RPM FY20
Non-Federal
Type: RAISED PAVEMENT MARKERS
Completion Date: 8/31/2020
Award Amount: $239,632.40
Contract Awarded To: W L MARKERS INC
Letting Date: 5/7/2020
Engineer's Estimate: $201,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jack Marchbanks, Ph.D., Director
W L MARKERS INC
2834 FISHER RD
COLUMBUS, OH 43204
Franklin
Bidder 1
Bid $239,632.40
A & A SAFETY INC
1126 FERRIS RD
AMELIA, OH 45102
Clermont
Bidder 2
Bid $281,339.65
200280 - Page 194
Ref #1 621E00300 RPM REFLECTOR, (48009 EACH)
Awd $172,832.40$3.60
2 $184,834.65$3.85
Section 1 - TRAFFIC CONTROL - Totals
Awd $172,832.40
2 $184,834.65
Ref #2 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST, (32 HOUR)
Awd $3,200.00$100.00
2 $1,920.00$60.00
Section 2 - MAINTENANCE OF TRAFFIC - Totals
Awd $3,200.00
2 $1,920.00
Ref #3 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $2,600.00$2,600.00
2 $2,100.00$2,100.00
Ref #4 614E11001 MAINTAINING TRAFFIC, AS PER PLAN, (LUMP SUM)
Awd $45,000.00$45,000.00
2 $82,485.00$82,485.00
Ref #5 624E10000 MOBILIZATION, (LUMP SUM)
Awd $16,000.00$16,000.00
2 $10,000.00$10,000.00
Section 3 - INCIDENTALS - Totals
Awd $63,600.00
2 $94,585.00
200280 - Page 195
Project No. 200281
PID 108759
GUE-Salt Fork Resurfacing FY20
Non-Federal
Type: TWO LANE RESURFACING
Completion Date: 11/15/2020
Award Amount: $2,196,969.00
Contract Awarded To: AMAAZZ CONSTRUCTION OHIO LLC
Letting Date: 5/7/2020
Engineer's Estimate: $2,338,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jack Marchbanks, Ph.D., Director
AMAAZZ CONSTRUCTION OHIO LLC
545 METRO PLACE SOUTH, SUITE 201
DUBLIN, OH 43017
Franklin
Bidder 1
Bid $2,196,969.00
NLS PAVING, INC
67925 Bayberry Drive Suite B
St Clairsville, OH 43950
Belmont
Bidder 2
Bid $2,264,059.50
SHELLY & SANDS INC
1515 HARMON AVE
COLUMBUS, OH 43223
Franklin
Bidder 3
Bid $2,314,334.34
BARBICAS CONSTRUCTION COMPANY INC
124 DARROW RD
AKRON, OH 44305
Summit
Bidder 4
Bid $2,610,599.05
200281 - Page 196
Ref #1 202E23500 WEARING COURSE REMOVED, (4503 SY)
Awd $9,456.30$2.10
2 $22,515.00$5.00
3 $38,275.50$8.50
4 $18,012.00$4.00
Ref #2 202E32000 CURB REMOVED, (130 FT)
Awd $403.00$3.10
2 $910.00$7.00
3 $715.00$5.50
4 $1,300.00$10.00
Ref #3 202E53010 SPECIAL - PARKING BLOCK REMOVED AND RESET, (798 EACH)
Awd $19,351.50$24.25
2 $23,940.00$30.00
3 $39,900.00$50.00
4 $19,950.00$25.00
Ref #4 202E53020 SPECIAL - PARKING BLOCK REMOVED FOR STORAGE, (51 EACH)
Awd $688.50$13.50
2 $1,275.00$25.00
3 $1,963.50$38.50
4 $510.00$10.00
Ref #5 203E10000 EXCAVATION, (260 CY)
Awd $2,925.00$11.25
2 $3,900.00$15.00
3 $7,800.00$30.00
4 $13,000.00$50.00
Ref #6 203E20000 EMBANKMENT, (130 CY)
Awd $1,982.50$15.25
2 $1,950.00$15.00
3 $2,990.00$23.00
4 $3,250.00$25.00
Ref #7 609E24510 CURB, TYPE 4-C, (130 FT)
Awd $6,760.00$52.00
2 $5,200.00$40.00
3 $2,925.00$22.50
4 $5,200.00$40.00
Ref #8 613E41300 LOW STRENGTH MORTAR BACKFILL (TYPE 2), (5 CY)
Awd $1,270.00$254.00
2 $600.00$120.00
3 $825.00$165.00
4 $750.00$150.00
Ref #100 209E10001 DITCH CLEANOUT, AS PER PLAN, (7600 FT)
Awd $28,500.00$3.75
2 $22,800.00$3.00
3 $6,080.00$0.80
4 $22,800.00$3.00
Section 1 - ROADWAY - Totals
Awd $71,336.80
2 $83,090.00
3 $101,474.00
4 $84,772.00
200281 - Page 197
Ref #9 653E10001 TOPSOIL FURNISHED AND PLACED, AS PER PLAN, (1103 CY)
Awd $35,296.00$32.00
2 $11,030.00$10.00
3 $49,635.00$45.00
4 $55,150.00$50.00
Ref #10 659E00100 SOIL ANALYSIS TEST, (2 EACH)
Awd $202.00$101.00
2 $200.00$100.00
3 $180.00$90.00
4 $400.00$200.00
Ref #11 659E00500 SEEDING AND MULCHING, CLASS 1, (17055 SY)
Awd $17,055.00$1.00
2 $13,644.00$0.80
3 $12,791.25$0.75
4 $17,055.00$1.00
Ref #12 659E14000 REPAIR SEEDING AND MULCHING, (842 SY)
Awd $842.00$1.00
2 $673.60$0.80
3 $589.40$0.70
4 $842.00$1.00
Ref #13 659E15000 INTER-SEEDING, (842 SY)
Awd $842.00$1.00
2 $673.60$0.80
3 $589.40$0.70
4 $84.20$0.10
Ref #14 659E20000 COMMERCIAL FERTILIZER, (2.35 TON)
Awd $1,445.25$615.00
2 $1,468.75$625.00
3 $1,527.50$650.00
4 $658.00$280.00
Ref #15 659E31000 LIME, (3.48 ACRE)
Awd $267.96$77.00
2 $261.00$75.00
3 $539.40$155.00
4 $522.00$150.00
Ref #16 659E35000 WATER, (93 MGAL)
Awd $93.00$1.00
2 $93.00$1.00
3 $93.00$1.00
4 $93.00$1.00
Ref #17 832E30000 EROSION CONTROL, (5000 EACH)
Awd $5,000.00$1.00
2 $5,000.00$1.00
3 $5,000.00$1.00
4 $5,000.00$1.00
Ref #101 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER, (20 CY)
Awd $2,400.00$120.00
2 $2,300.00$115.00
3 $2,000.00$100.00
4 $4,000.00$200.00
200281 - Page 198
Ref #102 601E34300 ROCK CHANNEL PROTECTION, TYPE D WITHOUT FILTER, (365 CY)
Awd $26,280.00$72.00
2 $27,375.00$75.00
3 $23,725.00$65.00
4 $45,625.00$125.00
Section 2 - EROSION CONTROL - Totals
Awd $89,723.21
2 $62,718.95
3 $96,669.95
4 $129,429.20
Ref #18 611E98630 CATCH BASIN ADJUSTED TO GRADE, (6 EACH)
Awd $1,890.00$315.00
2 $4,710.00$785.00
3 $7,500.00$1,250.00
4 $39,000.00$6,500.00
Section 3 - DRAINAGE - Totals
Awd $1,890.00
2 $4,710.00
3 $7,500.00
4 $39,000.00
Ref #19 253E02000 PAVEMENT REPAIR, (250 CY)
Awd $84,500.00$338.00
2 $52,500.00$210.00
3 $61,250.00$245.00
4 $45,000.00$180.00
Ref #20 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1.25", (16565 SY)
Awd $25,675.75$1.55
2 $24,847.50$1.50
3 $37,271.25$2.25
4 $33,130.00$2.00
Ref #21 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 2.25", (2423 SY)
Awd $7,390.15$3.05
2 $7,269.00$3.00
3 $10,903.50$4.50
4 $6,057.50$2.50
Ref #22 407E20000 NON-TRACKING TACK COAT, (18762 GAL)
Awd $72,233.70$3.85
2 $56,286.00$3.00
3 $56,286.00$3.00
4 $63,790.80$3.40
Ref #23 411E10001 STABILIZED CRUSHED AGGREGATE, AS PER PLAN, (6103 CY)
Awd $374,724.20$61.40
2 $390,592.00$64.00
3 $457,725.00$75.00
4 $366,180.00$60.00
200281 - Page 199
Ref #24 422E11000 AGGREGATE, SINGLE CHIP SEAL, TYPE A, (10017 SY)
Awd $11,018.70$1.10
2 $25,843.86$2.58
3 $23,039.10$2.30
4 $22,037.40$2.20
Ref #25 422E25000 EMULSION, CHIP SEAL, (3707 GAL)
Awd $9,638.20$2.60
2 $12,937.43$3.49
3 $12,047.75$3.25
4 $8,526.10$2.30
Ref #26 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG, (2593 CY)
Awd $396,729.00$153.00
2 $414,880.00$160.00
3 $375,985.00$145.00
4 $453,775.00$175.00
Ref #27 441E50100 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG, (3425 CY)
Awd $476,109.25$139.01
2 $496,625.00$145.00
3 $445,250.00$130.00
4 $633,625.00$185.00
Ref #28 441E50200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1, (448, (2736 CY)
Awd $352,260.00$128.75
2 $355,680.00$130.00
3 $328,320.00$120.00
4 $478,800.00$175.00
Ref #29 516E31011 2" DEEP JOINT SEALER, AS PER PLAN, (48 FT)
Awd $2,448.00$51.00
2 $1,200.00$25.00
3 $2,400.00$50.00
4 $1,200.00$25.00
Section 4 - PAVEMENT - Totals
Awd $1,812,726.95
2 $1,838,660.79
3 $1,810,477.60
4 $2,112,121.80
Ref #30 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST, (108 FT)
Awd $1,107.00$10.25
2 $1,080.00$10.00
3 $1,134.00$10.50
4 $1,080.00$10.00
Ref #31 630E80100 SIGN, FLAT SHEET, (14 SF)
Awd $546.00$39.00
2 $532.00$38.00
3 $560.00$40.00
4 $532.00$38.00
Ref #32 644E00104 EDGE LINE, 6", (13.54 MILE)
Awd $40,620.00$3,000.00
2 $40,525.22$2,993.00
3 $40,620.00$3,000.00
4 $44,343.50$3,275.00
200281 - Page 200
Ref #33 644E00300 CENTER LINE, (7.08 MILE)
Awd $33,630.00$4,750.00
2 $33,134.40$4,680.00
3 $33,276.00$4,700.00
4 $30,408.60$4,295.00
Ref #34 644E00400 CHANNELIZING LINE, 8", (861 FT)
Awd $1,506.75$1.75
2 $1,463.70$1.70
3 $1,506.75$1.75
4 $1,420.65$1.65
Ref #35 644E00500 STOP LINE, (378 FT)
Awd $2,249.10$5.95
2 $2,192.40$5.80
3 $2,230.20$5.90
4 $2,268.00$6.00
Ref #36 644E00700 TRANSVERSE/DIAGONAL LINE, (2108 FT)
Awd $10,750.80$5.10
2 $10,540.00$5.00
3 $11,067.00$5.25
4 $12,648.00$6.00
Ref #37 644E01200 PARKING LOT STALL MARKING, (19518 FT)
Awd $34,156.50$1.75
2 $33,180.60$1.70
3 $34,156.50$1.75
4 $30,252.90$1.55
Ref #38 644E01300 LANE ARROW, (18 EACH)
Awd $1,647.00$91.50
2 $1,620.00$90.00
3 $1,710.00$95.00
4 $1,620.00$90.00
Ref #39 644E01410 WORD ON PAVEMENT, 96", (2 EACH)
Awd $223.00$111.50
2 $220.00$110.00
3 $220.00$110.00
4 $630.00$315.00
Ref #40 644E50100 PAVEMENT MARKING, MISC.: HELIPAD MARKING, (1 EACH)
Awd $2,800.00$2,800.00
2 $2,742.00$2,742.00
3 $2,800.00$2,800.00
4 $1,000.00$1,000.00
Ref #41 644E50100 PAVEMENT MARKING, MISC.:PARKING STALL DESIGNATION , (108 EACH)
Awd $27,540.00$255.00
2 $27,000.00$250.00
3 $28,080.00$260.00
4 $24,300.00$225.00
Ref #42 647E20202 HANDICAP SYMBOL MARKING, TYPE A125, (17 EACH)
Awd $2,720.00$160.00
2 $2,635.00$155.00
3 $2,720.00$160.00
4 $4,250.00$250.00
200281 - Page 201
Section 5 - TRAFFIC CONTROL - Totals
Awd $159,496.15
2 $156,865.32
3 $160,080.45
4 $154,753.65
Ref #43 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC, (4 CY)
Awd $740.00$185.00
2 $1,288.16$322.04
3 $800.00$200.00
4 $800.00$200.00
Ref #44 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT, (14.16 MILE)
Awd $13,027.20$920.00
2 $12,814.80$905.00
3 $13,382.19$945.07
4 $13,310.40$940.00
Ref #45 614E23680 WORK ZONE CHANNELIZING LINE, CLASS III, 8", 642 PA, (1662 FT)
Awd $1,246.50$0.75
2 $1,662.00$1.00
3 $1,329.60$0.80
4 $1,662.00$1.00
Ref #46 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT, (75 FT)
Awd $761.25$10.15
2 $750.00$10.00
3 $750.00$10.00
4 $750.00$10.00
Section 6 - MAINTENANCE OF TRAFFIC - Totals
Awd $15,774.95
2 $16,514.96
3 $16,261.79
4 $16,522.40
Ref #47 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $13,780.94$13,780.94
2 $10,499.48$10,499.48
3 $8,200.00$8,200.00
4 $24,000.00$24,000.00
Ref #48 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $15,710.00$15,710.00
2 $45,000.00$45,000.00
3 $78,000.00$78,000.00
4 $24,000.00$24,000.00
Ref #49 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING, (LUMP SUM)
Awd $3,000.00$3,000.00
2 $6,000.00$6,000.00
3 $4,850.00$4,850.00
4 $2,000.00$2,000.00
200281 - Page 202
Ref #50 624E10000 MOBILIZATION, (LUMP SUM)
Awd $13,530.00$13,530.00
2 $40,000.00$40,000.00
3 $30,820.55$30,820.55
4 $24,000.00$24,000.00
Section 7 - INCIDENTALS - Totals
Awd $46,020.94
2 $101,499.48
3 $121,870.55
4 $74,000.00
200281 - Page 203
Project No. 200282
PID 109903
HAN-ODNR/ODOT-Paving
Non-Federal
Type: PARKING AREAS
Completion Date: 9/30/2020
Award Amount: $162,559.35
Contract Awarded To: SHELLY COMPANY
Letting Date: 5/7/2020
Engineer's Estimate: $185,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jack Marchbanks, Ph.D., Director
SHELLY COMPANY
80 PARK DR BOX 266
THORNVILLE, OH 43076
Perry
Bidder 1
Bid $162,559.35
BLUFFTON PAVING INC
P O BOX 26
BLUFFTON, OH 45817
Allen
Bidder 2
Bid $185,642.50
SCHOEN INC
200 SOUTH WESTWOOD AVE
TOLEDO, OH 43607
Lucas
Bidder 3
Bid $185,812.80
GEDDIS PAVING & EXCAVATING INC
1019 WAMBA AVE
TOLEDO, OH 43607
Lucas
Bidder 4
Bid $188,418.00
M & B ASPHALT CO INC
1525 WEST COUNTY RD #42
TIFFIN, OH 44883
Seneca
Bidder 5
Bid $192,292.10
HENRY W BERGMAN INC
218 E NINTH ST
GENOA, OH 43430
Ottawa
Bidder 6
Bid $195,418.00
EXPERCON LLC
ONE MARITIME PLAZA, 4TH FLOOR
TOLEDO, OH 43604
Lucas
Bidder 7
Bid $210,302.20
WARD CONSTRUCTION CO
385 OAK ST
LEIPSIC, OH 45856
Putnam
Bidder 8
Bid $212,724.00
200282 - Page 204
Ref #1 202E30000 WALK REMOVED, (320 SF)
Awd $1,920.00$6.00
2 $1,280.00$4.00
3 $3,200.00$10.00
4 $1,600.00$5.00
5 $2,240.00$7.00
6 $960.00$3.00
7 $960.00$3.00
8 $1,280.00$4.00
Ref #2 608E52000 CURB RAMP, (104 SF)
Awd $1,456.00$14.00
2 $2,080.00$20.00
3 $1,040.00$10.00
4 $1,768.00$17.00
5 $1,560.00$15.00
6 $2,080.00$20.00
7 $1,300.00$12.50
8 $1,352.00$13.00
Ref #3 608E52001 CURB RAMP, AS PER PLAN, (216 SF)
Awd $3,024.00$14.00
2 $4,320.00$20.00
3 $4,320.00$20.00
4 $3,672.00$17.00
5 $3,240.00$15.00
6 $4,320.00$20.00
7 $4,104.00$19.00
8 $3,024.00$14.00
Section 1 - ROADWAY - Totals
Awd $6,400.00
2 $7,680.00
3 $8,560.00
4 $7,040.00
5 $7,040.00
6 $7,360.00
7 $6,364.00
8 $5,656.00
Ref #4 832E30000 EROSION CONTROL, (1000 EACH)
Awd $1,000.00$1.00
2 $1,000.00$1.00
3 $1,000.00$1.00
4 $1,000.00$1.00
5 $1,000.00$1.00
6 $1,000.00$1.00
7 $1,000.00$1.00
8 $1,000.00$1.00
200282 - Page 205
Section 2 - EROSION CONTROL - Totals
Awd $1,000.00
2 $1,000.00
3 $1,000.00
4 $1,000.00
5 $1,000.00
6 $1,000.00
7 $1,000.00
8 $1,000.00
Ref #5 253E02000 PAVEMENT REPAIR, (31 CY)
Awd $15,035.00$485.00
2 $7,564.00$244.00
3 $10,075.00$325.00
4 $7,440.00$240.00
5 $11,470.00$370.00
6 $9,300.00$300.00
7 $9,610.00$310.00
8 $11,160.00$360.00
Ref #6 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1.5" THICKNESS, (12868 SY)
Awd $16,728.40$1.30
2 $32,170.00$2.50
3 $28,953.00$2.25
4 $38,604.00$3.00
5 $29,596.40$2.30
6 $35,387.00$2.75
7 $37,317.20$2.90
8 $32,170.00$2.50
Ref #7 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, VARIABLE THICK, (1183 SY)
Awd $2,543.45$2.15
2 $2,957.50$2.50
3 $4,732.00$4.00
4 $3,549.00$3.00
5 $3,549.00$3.00
6 $3,549.00$3.00
7 $11,830.00$10.00
8 $3,844.75$3.25
Ref #8 254E01600 PATCHING PLANED SURFACE, (281 SY)
Awd $2,950.50$10.50
2 $562.00$2.00
3 $4,215.00$15.00
4 $562.00$2.00
5 $1,967.00$7.00
6 $3,934.00$14.00
7 $5,058.00$18.00
8 $3,372.00$12.00
200282 - Page 206
Ref #9 407E10000 TACK COAT, (1194 GAL)
Awd $2,388.00$2.00
2 $2,985.00$2.50
3 $3,582.00$3.00
4 $2,388.00$2.00
5 $2,388.00$2.00
6 $3,582.00$3.00
7 $2,985.00$2.50
8 $2,985.00$2.50
Ref #10 441E50400 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), (D, (586 CY)
Awd $105,773.00$180.50
2 $120,130.00$205.00
3 $102,550.00$175.00
4 $107,824.00$184.00
5 $121,888.00$208.00
6 $112,512.00$192.00
7 $119,544.00$204.00
8 $140,640.00$240.00
Ref #100 617E10100 COMPACTED AGGREGATE, (2 CY)
Awd $380.00$190.00
2 $1,000.00$500.00
3 $100.00$50.00
4 $500.00$250.00
5 $400.00$200.00
6 $400.00$200.00
7 $100.00$50.00
8 $600.00$300.00
Section 3 - PAVEMENT - Totals
Awd $145,798.35
2 $167,368.50
3 $154,207.00
4 $160,867.00
5 $171,258.40
6 $168,664.00
7 $186,444.20
8 $194,771.75
Ref #11 642E00700 TRANSVERSE/DIAGONAL LINE, TYPE 1, (689 FT)
Awd $1,378.00$2.00
2 $1,378.00$2.00
3 $1,515.80$2.20
4 $1,378.00$2.00
5 $1,446.90$2.10
6 $1,378.00$2.00
7 $1,378.00$2.00
8 $861.25$1.25
200282 - Page 207
Ref #12 642E01200 PARKING LOT STALL MARKING, TYPE 1, (1708 FT)
Awd $1,708.00$1.00
2 $3,416.00$2.00
3 $17,080.00$10.00
4 $1,708.00$1.00
5 $3,586.80$2.10
6 $3,416.00$2.00
7 $3,416.00$2.00
8 $2,135.00$1.25
Ref #13 642E01300 LANE ARROW, TYPE 1, (8 EACH)
Awd $600.00$75.00
2 $800.00$100.00
3 $600.00$75.00
4 $600.00$75.00
5 $880.00$110.00
6 $800.00$100.00
7 $800.00$100.00
8 $1,200.00$150.00
Ref #14 642E01702 HANDICAP SYMBOL MARKING, TYPE 1, (3 EACH)
Awd $150.00$50.00
2 $300.00$100.00
3 $150.00$50.00
4 $150.00$50.00
5 $330.00$110.00
6 $300.00$100.00
7 $300.00$100.00
8 $600.00$200.00
Section 4 - TRAFFIC CONTROL - Totals
Awd $3,836.00
2 $5,894.00
3 $19,345.80
4 $3,836.00
5 $6,243.70
6 $5,894.00
7 $5,894.00
8 $4,796.25
Ref #15 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $925.00$925.00
2 $1,000.00$1,000.00
3 $750.00$750.00
4 $750.00$750.00
5 $1,000.00$1,000.00
6 $3,000.00$3,000.00
7 $2,600.00$2,600.00
8 $2,000.00$2,000.00
200282 - Page 208
Ref #16 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING, (LUMP SUM)
Awd $600.00$600.00
2 $200.00$200.00
3 $200.00$200.00
4 $1,200.00$1,200.00
5 $500.00$500.00
6 $2,000.00$2,000.00
7 $500.00$500.00
8 $500.00$500.00
Ref #17 624E10000 MOBILIZATION, (LUMP SUM)
Awd $4,000.00$4,000.00
2 $2,500.00$2,500.00
3 $1,750.00$1,750.00
4 $13,725.00$13,725.00
5 $5,250.00$5,250.00
6 $7,500.00$7,500.00
7 $7,500.00$7,500.00
8 $4,000.00$4,000.00
Section 5 - INCIDENTALS - Totals
Awd $5,525.00
2 $3,700.00
3 $2,700.00
4 $15,675.00
5 $6,750.00
6 $12,500.00
7 $10,600.00
8 $6,500.00
200282 - Page 209
Project No. 200283
PID 104063
HAS-SR 258-01.18
Non-Federal
Type: SLIDE REPAIR
Completion Date: 8/31/2020
Award Amount: $240,533.95
Contract Awarded To: ALAN STONE CO INC
Letting Date: 5/7/2020
Engineer's Estimate: $304,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jack Marchbanks, Ph.D., Director
ALAN STONE CO INC
1324 ELLIS RUN RD
CUTLER, OH 45724
Washington
Bidder 1
Bid $240,533.95
DENNISON BRIDGE INC
500 STILLWATER AVE
DENNISON, OH 44621
Tuscarawas
Bidder 2
Bid $257,198.75
CRAIG EDWARD SUSANY INC
13535 MARKET STREET
NORTH LIMA, OH 44452
Mahoning
Bidder 3
Bid $265,147.25
SHELLY & SANDS INC
1515 HARMON AVE
COLUMBUS, OH 43223
Franklin
Bidder 4
Bid $300,482.68
OHIO-WEST VIRGINIA EXCAVATING CO
56461 FERRY LANDING ROAD
SHADYSIDE, OH 43947
Belmont
Bidder 5
Bid $302,319.00
LOCKHART CONCRETE CO
800 W WATERLOO RD
AKRON, OH 44314
Summit
Bidder 6
Bid $389,994.75
R C CONSTRUCTION COMPANY AND SON INC
8096 FEDERAL ROAD
CUTLER, OH 45724
Washington
Bidder 7
Bid $424,328.75
200283 - Page 210
Ref #1 201E11000 CLEARING AND GRUBBING, (LUMP SUM)
Awd $7,000.00$7,000.00
2 $1,000.00$1,000.00
3 $100.00$100.00
4 $7,500.00$7,500.00
5 $5,350.00$5,350.00
6 $1,000.00$1,000.00
7 $3,500.00$3,500.00
Ref #2 202E23010 PAVEMENT REMOVED, ASPHALT, (241 SY)
Awd $2,169.00$9.00
2 $3,856.00$16.00
3 $2,892.00$12.00
4 $4,820.00$20.00
5 $5,543.00$23.00
6 $2,892.00$12.00
7 $9,640.00$40.00
Ref #3 202E38000 GUARDRAIL REMOVED, (200 FT)
Awd $600.00$3.00
2 $400.00$2.00
3 $400.00$2.00
4 $400.00$2.00
5 $1,154.00$5.77
6 $600.00$3.00
7 $1,000.00$5.00
Ref #4 202E75000 FENCE REMOVED, (140 FT)
Awd $280.00$2.00
2 $280.00$2.00
3 $280.00$2.00
4 $630.00$4.50
5 $532.00$3.80
6 $420.00$3.00
7 $2,800.00$20.00
Ref #5 203E10000 EXCAVATION, (24 CY)
Awd $336.00$14.00
2 $600.00$25.00
3 $408.00$17.00
4 $480.00$20.00
5 $840.00$35.00
6 $720.00$30.00
7 $480.00$20.00
Ref #6 203E20000 EMBANKMENT, (88 CY)
Awd $1,320.00$15.00
2 $2,640.00$30.00
3 $1,496.00$17.00
4 $1,936.00$22.00
5 $8,624.00$98.00
6 $2,640.00$30.00
7 $1,760.00$20.00
200283 - Page 211
Ref #7 204E10000 SUBGRADE COMPACTION, (341 SY)
Awd $1,023.00$3.00
2 $1,023.00$3.00
3 $1,023.00$3.00
4 $2,046.00$6.00
5 $682.00$2.00
6 $682.00$2.00
7 $682.00$2.00
Ref #8 606E15151 GUARDRAIL, TYPE MGS HALF POST SPACING, AS PER PLAN, (131.25 FT)
Awd $4,593.75$35.00
2 $4,200.00$32.00
3 $4,068.75$31.00
4 $4,331.25$33.00
5 $6,090.00$46.40
6 $3,675.00$28.00
7 $5,906.25$45.00
Ref #9 606E15201 GUARDRAIL, TYPE MGS HALF POST SPACING WITH LONG PO, (68.75 FT)
Awd $3,025.00$44.00
2 $2,543.75$37.00
3 $2,475.00$36.00
4 $2,853.13$41.50
5 $3,932.50$57.20
6 $2,131.25$31.00
7 $3,437.50$50.00
Section 1 - ROADWAY - Totals
Awd $20,346.75
2 $16,542.75
3 $13,142.75
4 $24,996.38
5 $32,747.50
6 $14,760.25
7 $29,205.75
Ref #10 659E00100 SOIL ANALYSIS TEST, (2 EACH)
Awd $200.00$100.00
2 $100.00$50.00
3 $60.00$30.00
4 $176.00$88.00
5 $120.00$60.00
6 $1,000.00$500.00
7 $40.00$20.00
Ref #11 659E00300 TOPSOIL, (96 CY)
Awd $4,896.00$51.00
2 $1,920.00$20.00
3 $2,880.00$30.00
4 $4,320.00$45.00
5 $11,808.00$123.00
6 $2,880.00$30.00
7 $4,800.00$50.00
200283 - Page 212
Ref #12 659E10000 SEEDING AND MULCHING, (866 SY)
Awd $1,732.00$2.00
2 $2,598.00$3.00
3 $3,464.00$4.00
4 $2,424.80$2.80
5 $1,299.00$1.50
6 $1,732.00$2.00
7 $8,660.00$10.00
Ref #13 659E20000 COMMERCIAL FERTILIZER, (0.12 TON)
Awd $420.00$3,500.00
2 $60.00$500.00
3 $60.00$500.00
4 $78.24$652.00
5 $210.00$1,750.00
6 $84.00$700.00
7 $144.00$1,200.00
Ref #14 659E31000 LIME, (0.18 ACRE)
Awd $151.20$840.00
2 $18.00$100.00
3 $13.50$75.00
4 $27.36$152.00
5 $351.00$1,950.00
6 $108.00$600.00
7 $144.00$800.00
Ref #15 659E35000 WATER, (5 MGAL)
Awd $105.00$21.00
2 $50.00$10.00
3 $5.00$1.00
4 $5.00$1.00
5 $2,500.00$500.00
6 $250.00$50.00
7 $5.00$1.00
Ref #16 832E30000 EROSION CONTROL, (1000 EACH)
Awd $1,000.00$1.00
2 $1,000.00$1.00
3 $1,000.00$1.00
4 $1,000.00$1.00
5 $1,000.00$1.00
6 $1,000.00$1.00
7 $1,000.00$1.00
Section 2 - EROSION CONTROL - Totals
Awd $8,504.20
2 $5,746.00
3 $7,482.50
4 $8,031.40
5 $17,288.00
6 $7,054.00
7 $14,793.00
200283 - Page 213
Ref #17 611E99711 PRECAST REINFORCED CONCRETE OUTLET, AS PER PLAN, (1 EACH)
Awd $330.00$330.00
2 $300.00$300.00
3 $150.00$150.00
4 $300.00$300.00
5 $185.00$185.00
6 $750.00$750.00
7 $275.00$275.00
Section 3 - DRAINAGE - Totals
Awd $330.00
2 $300.00
3 $150.00
4 $300.00
5 $185.00
6 $750.00
7 $275.00
Ref #18 252E01500 FULL DEPTH PAVEMENT SAWING, (720 FT)
Awd $2,880.00$4.00
2 $2,160.00$3.00
3 $1,440.00$2.00
4 $1,440.00$2.00
5 $3,168.00$4.40
6 $2,160.00$3.00
7 $7,200.00$10.00
Ref #19 301E46000 ASPHALT CONCRETE BASE, PG64-22, (36 CY)
Awd $9,720.00$270.00
2 $10,800.00$300.00
3 $14,400.00$400.00
4 $11,700.00$325.00
5 $8,910.00$247.50
6 $8,712.00$242.00
7 $16,200.00$450.00
Ref #20 304E20000 AGGREGATE BASE, (56 CY)
Awd $4,144.00$74.00
2 $7,000.00$125.00
3 $4,480.00$80.00
4 $5,040.00$90.00
5 $5,544.00$99.00
6 $2,800.00$50.00
7 $7,000.00$125.00
Ref #21 304E20001 AGGREGATE BASE, AS PER PLAN, (46 CY)
Awd $3,680.00$80.00
2 $5,750.00$125.00
3 $3,680.00$80.00
4 $4,140.00$90.00
5 $4,968.00$108.00
6 $2,300.00$50.00
7 $6,900.00$150.00
200283 - Page 214
Ref #22 407E10000 TACK COAT, (17 GAL)
Awd $68.00$4.00
2 $170.00$10.00
3 $51.00$3.00
4 $42.50$2.50
5 $688.50$40.50
6 $42.50$2.50
7 $170.00$10.00
Ref #23 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2, (448, (26 CY)
Awd $8,060.00$310.00
2 $9,100.00$350.00
3 $10,400.00$400.00
4 $8,450.00$325.00
5 $8,450.00$325.00
6 $12,012.00$462.00
7 $12,350.00$475.00
Section 4 - PAVEMENT - Totals
Awd $28,552.00
2 $34,980.00
3 $34,451.00
4 $30,812.50
5 $31,728.50
6 $28,026.50
7 $49,820.00
Ref #24 621E54000 RAISED PAVEMENT MARKER REMOVED, (6 EACH)
Awd $150.00$25.00
2 $60.00$10.00
3 $30.00$5.00
4 $84.00$14.00
5 $387.00$64.50
6 $750.00$125.00
7 $300.00$50.00
Ref #25 626E00110 BARRIER REFLECTOR, TYPE 2, BIDIRECTIONAL, (3 EACH)
Awd $24.00$8.00
2 $30.00$10.00
3 $21.00$7.00
4 $22.50$7.50
5 $36.00$12.00
6 $30.00$10.00
7 $60.00$20.00
Ref #26 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST, (16 FT)
Awd $464.00$29.00
2 $320.00$20.00
3 $112.00$7.00
4 $440.00$27.50
5 $280.00$17.50
6 $192.00$12.00
7 $640.00$40.00
200283 - Page 215
Ref #27 630E08600 SIGN POST REFLECTOR, (1 EACH)
Awd $48.00$48.00
2 $75.00$75.00
3 $42.00$42.00
4 $45.00$45.00
5 $57.00$57.00
6 $50.00$50.00
7 $175.00$175.00
Ref #28 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION, (1 EACH)
Awd $100.00$100.00
2 $50.00$50.00
3 $25.00$25.00
4 $95.00$95.00
5 $92.00$92.00
6 $75.00$75.00
7 $175.00$175.00
Ref #29 642E00104 EDGE LINE, 6", TYPE 1, (0.21 MILE)
Awd $861.00$4,100.00
2 $840.00$4,000.00
3 $1,050.00$5,000.00
4 $808.50$3,850.00
5 $945.00$4,500.00
6 $798.00$3,800.00
7 $2,625.00$12,500.00
Ref #30 642E00300 CENTER LINE, TYPE 1, (0.11 MILE)
Awd $814.00$7,400.00
2 $770.00$7,000.00
3 $825.00$7,500.00
4 $768.90$6,990.00
5 $880.00$8,000.00
6 $572.00$5,200.00
7 $1,375.00$12,500.00
Section 5 - TRAFFIC CONTROL - Totals
Awd $2,461.00
2 $2,145.00
3 $2,105.00
4 $2,263.90
5 $2,677.00
6 $2,467.00
7 $5,350.00
Ref #31 614E12348 WORK ZONE IMPACT ATTENUATOR (BIDIRECTIONAL), 24", (2 EACH)
Awd $5,400.00$2,700.00
2 $4,000.00$2,000.00
3 $4,000.00$2,000.00
4 $4,970.00$2,485.00
5 $5,400.00$2,700.00
6 $1,900.00$950.00
7 $5,000.00$2,500.00
200283 - Page 216
Ref #32 614E13310 BARRIER REFLECTOR, TYPE 1, BIDIRECTIONAL, (5 EACH)
Awd $255.00$51.00
2 $50.00$10.00
3 $110.00$22.00
4 $50.00$10.00
5 $275.00$55.00
6 $60.00$12.00
7 $100.00$20.00
Ref #33 614E13360 OBJECT MARKER, TWO WAY, (5 EACH)
Awd $265.00$53.00
2 $100.00$20.00
3 $170.00$34.00
4 $75.00$15.00
5 $285.00$57.00
6 $70.00$14.00
7 $100.00$20.00
Ref #34 614E22210 WORK ZONE EDGE LINE, CLASS I, 6", 740.06, TYPE I, (0.19 MILE)
Awd $1,786.00$9,400.00
2 $1,710.00$9,000.00
3 $1,710.00$9,000.00
4 $1,691.00$8,900.00
5 $1,938.00$10,200.00
6 $1,615.00$8,500.00
7 $2,375.00$12,500.00
Ref #35 614E26400 WORK ZONE STOP LINE, CLASS I, 740.06, TYPE I, (20 FT)
Awd $280.00$14.00
2 $200.00$10.00
3 $260.00$13.00
4 $250.00$12.50
5 $290.00$14.50
6 $100.00$5.00
7 $1,000.00$50.00
Ref #36 615E10000 ROADS FOR MAINTAINING TRAFFIC, (LUMP SUM)
Awd $7,800.00$7,800.00
2 $5,000.00$5,000.00
3 $10,000.00$10,000.00
4 $17,500.00$17,500.00
5 $12,865.00$12,865.00
6 $19,000.00$19,000.00
7 $15,000.00$15,000.00
Ref #37 615E25001 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS B, AS PER , (202 SY)
Awd $11,716.00$58.00
2 $20,200.00$100.00
3 $14,140.00$70.00
4 $14,140.00$70.00
5 $27,472.00$136.00
6 $40,400.00$200.00
7 $35,350.00$175.00
200283 - Page 217
Ref #38 616E10000 WATER, (10 MGAL)
Awd $210.00$21.00
2 $100.00$10.00
3 $10.00$1.00
4 $150.00$15.00
5 $5,000.00$500.00
6 $50.00$5.00
7 $10.00$1.00
Ref #39 622E41100 PORTABLE BARRIER, UNANCHORED, (220 FT)
Awd $4,180.00$19.00
2 $3,080.00$14.00
3 $4,840.00$22.00
4 $7,700.00$35.00
5 $12,760.00$58.00
6 $7,040.00$32.00
7 $6,600.00$30.00
Section 6 - MAINTENANCE OF TRAFFIC - Totals
Awd $31,892.00
2 $34,440.00
3 $35,240.00
4 $46,526.00
5 $66,285.00
6 $70,235.00
7 $65,535.00
Ref #40 503E21101 UNCLASSIFIED EXCAVATION, AS PER PLAN, (241 CY)
Awd $5,061.00$21.00
2 $15,665.00$65.00
3 $10,845.00$45.00
4 $8,435.00$35.00
5 $10,604.00$44.00
6 $7,230.00$30.00
7 $12,050.00$50.00
Ref #41 507E00201 STEEL PILES HP12X53, FURNISHED, AS PER PLAN, (985 FT)
Awd $22,655.00$23.00
2 $29,550.00$30.00
3 $25,610.00$26.00
4 $29,550.00$30.00
5 $28,565.00$29.00
6 $21,670.00$22.00
7 $34,475.00$35.00
Ref #42 511E46511 CLASS QC1 CONCRETE, FOOTING, AS PER PLAN, (21 CY)
Awd $7,980.00$380.00
2 $9,450.00$450.00
3 $8,400.00$400.00
4 $9,450.00$450.00
5 $10,374.00$494.00
6 $10,500.00$500.00
7 $9,450.00$450.00
200283 - Page 218
Ref #43 511E81300 CONCRETE, MISC.: 8"x24"x57" PRECAST CONCRETE LAGGI, (84 EACH)
Awd $14,280.00$170.00
2 $16,800.00$200.00
3 $14,532.00$173.00
4 $18,900.00$225.00
5 $11,172.00$133.00
6 $25,200.00$300.00
7 $16,800.00$200.00
Ref #44 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC, (47 CY)
Awd $4,230.00$90.00
2 $6,110.00$130.00
3 $4,700.00$100.00
4 $8,225.00$175.00
5 $7,426.00$158.00
6 $2,350.00$50.00
7 $9,400.00$200.00
Ref #45 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE, (143 FT)
Awd $858.00$6.00
2 $1,430.00$10.00
3 $858.00$6.00
4 $1,001.00$7.00
5 $1,859.00$13.00
6 $2,145.00$15.00
7 $1,430.00$10.00
Ref #46 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI, (7 FT)
Awd $217.00$31.00
2 $140.00$20.00
3 $105.00$15.00
4 $210.00$30.00
5 $448.00$64.00
6 $175.00$25.00
7 $70.00$10.00
Ref #47 524E94503 DRILLED SHAFTS, 24" DIAMETER, ABOVE BEDROCK, AS PE, (541 FT)
Awd $20,017.00$37.00
2 $27,050.00$50.00
3 $30,296.00$56.00
4 $35,165.00$65.00
5 $24,345.00$45.00
6 $66,002.00$122.00
7 $67,625.00$125.00
Ref #48 524E94505 DRILLED SHAFTS, 24" DIAMETER, INTO BEDROCK, AS PER, (290 FT)
Awd $16,240.00$56.00
2 $21,750.00$75.00
3 $25,230.00$87.00
4 $25,810.00$89.00
5 $23,490.00$81.00
6 $35,380.00$122.00
7 $36,250.00$125.00
200283 - Page 219
Section 7 - RETAINING WALLS - Totals
Awd $91,538.00
2 $127,945.00
3 $120,576.00
4 $136,746.00
5 $118,283.00
6 $170,652.00
7 $187,550.00
Ref #49 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $3,000.00$3,000.00
2 $3,100.00$3,100.00
3 $7,500.00$7,500.00
4 $2,606.50$2,606.50
5 $4,350.00$4,350.00
6 $14,900.00$14,900.00
7 $16,500.00$16,500.00
Ref #50 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $25,000.00$25,000.00
2 $18,000.00$18,000.00
3 $30,000.00$30,000.00
4 $23,500.00$23,500.00
5 $8,550.00$8,550.00
6 $35,000.00$35,000.00
7 $30,000.00$30,000.00
Ref #51 619E16000 FIELD OFFICE, TYPE A, (3 MNTH)
Awd $2,910.00$970.00
2 $1,500.00$500.00
3 $1,500.00$500.00
4 $9,900.00$3,300.00
5 $4,125.00$1,375.00
6 $1,950.00$650.00
7 $300.00$100.00
Ref #52 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING, (LUMP SUM)
Awd $4,000.00$4,000.00
2 $2,500.00$2,500.00
3 $3,000.00$3,000.00
4 $4,800.00$4,800.00
5 $900.00$900.00
6 $12,500.00$12,500.00
7 $12,500.00$12,500.00
Ref #53 624E10000 MOBILIZATION, (LUMP SUM)
Awd $22,000.00$22,000.00
2 $10,000.00$10,000.00
3 $10,000.00$10,000.00
4 $10,000.00$10,000.00
5 $15,200.00$15,200.00
6 $31,700.00$31,700.00
7 $12,500.00$12,500.00
200283 - Page 220
Section 8 - INCIDENTALS - Totals
Awd $56,910.00
2 $35,100.00
3 $52,000.00
4 $50,806.50
5 $33,125.00
6 $96,050.00
7 $71,800.00
200283 - Page 221
Project No. 200284
PID 100849
LAW-SR 217-13.59
Non-Federal
Type: CHIP SEAL
Completion Date: 9/30/2020
Award Amount: $239,864.49
Contract Awarded To: SHELLY COMPANY
Letting Date: 5/7/2020
Engineer's Estimate: $240,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jack Marchbanks, Ph.D., Director
SHELLY COMPANY
80 PARK DR BOX 266
THORNVILLE, OH 43076
Perry
Bidder 1
Bid $239,864.49
AMAAZZ CONSTRUCTION OHIO LLC
545 METRO PLACE SOUTH, SUITE 201
DUBLIN, OH 43017
Franklin
Bidder 2
Bid $272,127.00
200284 - Page 222
Ref #1 251E01001 PARTIAL DEPTH PAVEMENT REPAIR (441), AS PER PLAN, (500 SY)
Awd $17,000.00$34.00
2 $23,750.00$47.50
Ref #2 422E11000 AGGREGATE, SINGLE CHIP SEAL, TYPE A, (47771 SY)
Awd $42,038.48$0.88
2 $57,325.20$1.20
Ref #3 422E25000 EMULSION, CHIP SEAL, (19108 GAL)
Awd $44,903.80$2.35
2 $49,680.80$2.60
Ref #4 886E11000 FOG SEAL, (7166 GAL)
Awd $25,797.60$3.60
2 $22,572.90$3.15
Section 1 - PAVEMENT - Totals
Awd $129,739.88
2 $153,328.90
Ref #5 621E00100 RPM, (525 EACH)
Awd $14,175.00$27.00
2 $14,700.00$28.00
Ref #6 621E54000 RAISED PAVEMENT MARKER REMOVED, (525 EACH)
Awd $5,906.25$11.25
2 $6,956.25$13.25
Ref #7 642E00104 EDGE LINE, 6", TYPE 1, (7.61 MILE)
Awd $5,935.80$780.00
2 $6,772.90$890.00
Ref #8 642E00300 CENTER LINE, TYPE 1, (3.79 MILE)
Awd $4,923.21$1,299.00
2 $4,548.00$1,200.00
Ref #9 642E00500 STOP LINE, TYPE 1, (25 FT)
Awd $137.50$5.50
2 $312.50$12.50
Ref #10 644E30030 REMOVAL OF PAVEMENT MARKING, (11.4 MILE)
Awd $18,091.80$1,587.00
2 $13,965.00$1,225.00
Section 2 - TRAFFIC CONTROL - Totals
Awd $49,169.56
2 $47,254.65
Ref #11 614E12460 WORK ZONE MARKING SIGN, (10 EACH)
Awd $1,200.00$120.00
2 $1,250.00$125.00
Ref #12 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT, (11.37 MILE)
Awd $9,380.25$825.00
2 $12,620.70$1,110.00
Ref #13 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT, (22.83 MILE)
Awd $12,784.80$560.00
2 $19,405.50$850.00
200284 - Page 223
Ref #14 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT, (36 FT)
Awd $90.00$2.50
2 $450.00$12.50
Section 3 - MAINTENANCE OF TRAFFIC - Totals
Awd $23,455.05
2 $33,726.20
Ref #15 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $1,000.00$1,000.00
2 $1,870.00$1,870.00
Ref #16 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $24,000.00$24,000.00
2 $23,000.00$23,000.00
Ref #17 624E10000 MOBILIZATION, (LUMP SUM)
Awd $12,500.00$12,500.00
2 $12,947.25$12,947.25
Section 4 - INCIDENTALS - Totals
Awd $37,500.00
2 $37,817.25
200284 - Page 224
Project No. 200285
PID 94671
LOG-SR 273-02.96
Non-Federal
Type: CULVERT REPLACEMENT
Completion Date: 9/30/2020
Award Amount: $227,639.08
Contract Awarded To: J & J SCHLAEGEL INC
Letting Date: 5/7/2020
Engineer's Estimate: $264,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jack Marchbanks, Ph.D., Director
J & J SCHLAEGEL INC
1250 E US Highway 36
URBANA, OH 43078
Champaign
Bidder 1
Bid $227,639.08
VTF EXCAVATION LLC
8398 CELINA-MENDON RD
CELINA, OH 45822
Mercer
Bidder 2
Bid $255,299.19
AXIS CIVIL CONSTRUCTION LLC
5715 WESTBOURNE AVENUE
COLUMBUS, OH 43213
Franklin
Bidder 3
Bid $267,443.20
SHELLY COMPANY
80 PARK DR BOX 266
THORNVILLE, OH 43076
Perry
Bidder 4
Bid $309,878.00
ECLIPSE CO LLC
11554 EAST WASHINGTON ST
CHAGRIN FALLS, OH 44023
Geauga
Bidder 5
Bid $324,447.72
200285 - Page 225
Ref #1 201E11000 CLEARING AND GRUBBING, (LUMP SUM)
Awd $500.00$500.00
2 $397.50$397.50
3 $2,500.00$2,500.00
4 $15,000.00$15,000.00
5 $1,500.00$1,500.00
Ref #2 202E23010 PAVEMENT REMOVED, ASPHALT, (202 SY)
Awd $1,616.00$8.00
2 $898.90$4.45
3 $2,020.00$10.00
4 $5,050.00$25.00
5 $2,323.00$11.50
Ref #3 202E35100 PIPE REMOVED, 24" AND UNDER, (20 FT)
Awd $400.00$20.00
2 $162.60$8.13
3 $440.00$22.00
4 $200.00$10.00
5 $640.00$32.00
Ref #4 203E10000 EXCAVATION, (94 CY)
Awd $2,068.00$22.00
2 $1,087.58$11.57
3 $1,880.00$20.00
4 $3,290.00$35.00
5 $3,290.00$35.00
Ref #5 203E20000 EMBANKMENT, (58 CY)
Awd $870.00$15.00
2 $274.92$4.74
3 $1,160.00$20.00
4 $2,030.00$35.00
5 $1,914.00$33.00
Ref #6 204E10000 SUBGRADE COMPACTION, (229 SY)
Awd $343.50$1.50
2 $295.41$1.29
3 $458.00$2.00
4 $687.00$3.00
5 $1,145.00$5.00
Ref #7 623E38500 MONUMENT ASSEMBLY, (1 EACH)
Awd $1,500.00$1,500.00
2 $924.38$924.38
3 $2,800.00$2,800.00
4 $3,000.00$3,000.00
5 $1,307.00$1,307.00
Ref #8 623E40500 REFERENCE MONUMENT, (8 EACH)
Awd $4,000.00$500.00
2 $3,387.52$423.44
3 $4,000.00$500.00
4 $3,200.00$400.00
5 $2,548.00$318.50
200285 - Page 226
Section 1 - ROADWAY - Totals
Awd $11,297.50
2 $7,428.81
3 $15,258.00
4 $32,457.00
5 $14,667.00
Ref #9 601E11000 RIPRAP, TYPE D, (25 SY)
Awd $3,750.00$150.00
2 $2,612.50$104.50
3 $3,125.00$125.00
4 $8,750.00$350.00
5 $3,450.00$138.00
Ref #10 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER, (24 CY)
Awd $2,280.00$95.00
2 $1,919.04$79.96
3 $3,000.00$125.00
4 $3,600.00$150.00
5 $2,292.00$95.50
Ref #11 659E00100 SOIL ANALYSIS TEST, (2 EACH)
Awd $100.00$50.00
2 $500.00$250.00
3 $150.00$75.00
4 $400.00$200.00
5 $421.00$210.50
Ref #12 659E00300 TOPSOIL, (51 CY)
Awd $1,530.00$30.00
2 $2,318.97$45.47
3 $1,020.00$20.00
4 $5,100.00$100.00
5 $3,060.00$60.00
Ref #13 659E10000 SEEDING AND MULCHING, (462 SY)
Awd $1,155.00$2.50
2 $1,732.50$3.75
3 $924.00$2.00
4 $2,310.00$5.00
5 $2,541.00$5.50
Ref #14 659E14000 REPAIR SEEDING AND MULCHING, (23 SY)
Awd $115.00$5.00
2 $28.75$1.25
3 $46.00$2.00
4 $23.00$1.00
5 $23.00$1.00
Ref #15 659E20000 COMMERCIAL FERTILIZER, (0.06 TON)
Awd $45.00$750.00
2 $37.50$625.00
3 $36.00$600.00
4 $30.00$500.00
5 $31.56$526.00
200285 - Page 227
Ref #16 659E31000 LIME, (0.1 ACRE)
Awd $20.00$200.00
2 $25.00$250.00
3 $25.00$250.00
4 $20.00$200.00
5 $21.05$210.50
Ref #17 659E35000 WATER, (3 MGAL)
Awd $15.00$5.00
2 $3.75$1.25
3 $3.00$1.00
4 $3.00$1.00
5 $3.00$1.00
Ref #18 832E30000 EROSION CONTROL, (3000 EACH)
Awd $3,000.00$1.00
2 $3,000.00$1.00
3 $3,000.00$1.00
4 $3,000.00$1.00
5 $3,000.00$1.00
Section 2 - EROSION CONTROL - Totals
Awd $12,010.00
2 $12,178.01
3 $11,329.00
4 $23,236.00
5 $14,842.61
Ref #19 602E20000 CONCRETE MASONRY, (0.2 CY)
Awd $500.00$2,500.00
2 $764.50$3,822.50
3 $900.00$4,500.00
4 $500.00$2,500.00
5 $908.80$4,544.00
Ref #20 605E31100 AGGREGATE DRAINS, (83 FT)
Awd $996.00$12.00
2 $912.17$10.99
3 $830.00$10.00
4 $1,245.00$15.00
5 $1,743.00$21.00
Ref #21 611E00900 6" CONDUIT, TYPE B, (75 FT)
Awd $1,125.00$15.00
2 $842.25$11.23
3 $300.00$4.00
4 $1,500.00$20.00
5 $1,650.00$22.00
Ref #22 611E01400 6" CONDUIT, TYPE E, (75 FT)
Awd $750.00$10.00
2 $549.75$7.33
3 $300.00$4.00
4 $750.00$10.00
5 $1,012.50$13.50
200285 - Page 228
Ref #23 611E01500 6" CONDUIT, TYPE F, (75 FT)
Awd $825.00$11.00
2 $549.75$7.33
3 $300.00$4.00
4 $750.00$10.00
5 $1,275.00$17.00
Ref #24 611E04600 12" CONDUIT, TYPE C, (30 FT)
Awd $1,950.00$65.00
2 $1,706.10$56.87
3 $1,950.00$65.00
4 $2,250.00$75.00
5 $2,040.00$68.00
Section 3 - DRAINAGE - Totals
Awd $6,146.00
2 $5,324.52
3 $4,580.00
4 $6,995.00
5 $8,629.30
Ref #25 301E46000 ASPHALT CONCRETE BASE, PG64-22, (36 CY)
Awd $10,800.00$300.00
2 $13,050.00$362.50
3 $9,000.00$250.00
4 $12,600.00$350.00
5 $10,620.00$295.00
Ref #26 304E20000 AGGREGATE BASE, (36 CY)
Awd $1,980.00$55.00
2 $2,481.12$68.92
3 $2,880.00$80.00
4 $3,060.00$85.00
5 $2,160.00$60.00
Ref #27 407E10000 TACK COAT, (22 GAL)
Awd $550.00$25.00
2 $165.00$7.50
3 $110.00$5.00
4 $44.00$2.00
5 $132.00$6.00
Ref #28 411E10000 STABILIZED CRUSHED AGGREGATE, (9 CY)
Awd $720.00$80.00
2 $620.28$68.92
3 $1,080.00$120.00
4 $540.00$60.00
5 $972.00$108.00
Ref #29 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG, (17 CY)
Awd $5,100.00$300.00
2 $9,350.00$550.00
3 $5,950.00$350.00
4 $7,650.00$450.00
5 $7,480.00$440.00
200285 - Page 229
Section 4 - PAVEMENT - Totals
Awd $19,150.00
2 $25,666.40
3 $19,020.00
4 $23,894.00
5 $21,364.00
Ref #30 621E54000 RAISED PAVEMENT MARKER REMOVED, (1 EACH)
Awd $10.00$10.00
2 $46.88$46.88
3 $50.00$50.00
4 $15.00$15.00
5 $77.50$77.50
Ref #31 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST, (26 FT)
Awd $520.00$20.00
2 $650.00$25.00
3 $520.00$20.00
4 $520.00$20.00
5 $299.00$11.50
Ref #32 630E80100 SIGN, FLAT SHEET, (13.4 SF)
Awd $536.00$40.00
2 $670.00$50.00
3 $536.00$40.00
4 $536.00$40.00
5 $355.10$26.50
Ref #33 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL, (3 EACH)
Awd $60.00$20.00
2 $56.25$18.75
3 $45.00$15.00
4 $45.00$15.00
5 $63.00$21.00
Ref #34 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA, (3 EACH)
Awd $60.00$20.00
2 $56.25$18.75
3 $45.00$15.00
4 $45.00$15.00
5 $79.50$26.50
Ref #35 642E00104 EDGE LINE, 6", TYPE 1, (0.04 MILE)
Awd $38.60$965.00
2 $48.25$1,206.25
3 $38.60$965.00
4 $1,400.00$35,000.00
5 $40.62$1,015.50
Ref #36 642E00300 CENTER LINE, TYPE 1, (0.02 MILE)
Awd $29.80$1,490.00
2 $37.25$1,862.50
3 $29.80$1,490.00
4 $700.00$35,000.00
5 $31.36$1,568.00
200285 - Page 230
Section 5 - TRAFFIC CONTROL - Totals
Awd $1,254.40
2 $1,564.88
3 $1,264.40
4 $3,261.00
5 $946.08
Ref #37 410E12000 TRAFFIC COMPACTED SURFACE, TYPE A OR B, (10 CY)
Awd $450.00$45.00
2 $689.80$68.98
3 $550.00$55.00
4 $300.00$30.00
5 $690.00$69.00
Ref #38 410E13000 TRAFFIC COMPACTED SURFACE, TYPE C, (10 CY)
Awd $450.00$45.00
2 $714.80$71.48
3 $600.00$60.00
4 $300.00$30.00
5 $675.00$67.50
Ref #39 614E12420 DETOUR SIGNING, (LUMP SUM)
Awd $5,975.00$5,975.00
2 $7,468.75$7,468.75
3 $5,975.00$5,975.00
4 $5,975.00$5,975.00
5 $10,500.00$10,500.00
Ref #40 616E10000 WATER, (10 MGAL)
Awd $100.00$10.00
2 $125.00$12.50
3 $200.00$20.00
4 $40.00$4.00
5 $250.00$25.00
Section 6 - MAINTENANCE OF TRAFFIC - Totals
Awd $6,975.00
2 $8,998.35
3 $7,325.00
4 $6,615.00
5 $12,115.00
Ref #41 202E11000 STRUCTURE REMOVED, (LUMP SUM)
Awd $5,000.00$5,000.00
2 $5,263.00$5,263.00
3 $8,500.00$8,500.00
4 $12,500.00$12,500.00
5 $14,500.00$14,500.00
Ref #42 204E30021 GRANULAR MATERIAL, TYPE C, AS PER PLAN, (170 CY)
Awd $7,650.00$45.00
2 $10,582.50$62.25
3 $16,150.00$95.00
4 $15,300.00$90.00
5 $11,730.00$69.00
200285 - Page 231
Ref #43 204E50001 GEOTEXTILE FABRIC, AS PER PLAN, (254 SY)
Awd $762.00$3.00
2 $393.70$1.55
3 $762.00$3.00
4 $508.00$2.00
5 $381.00$1.50
Ref #44 503E11100 COFFERDAMS AND EXCAVATION BRACING, (LUMP SUM)
Awd $1,500.00$1,500.00
2 $585.00$585.00
3 $5,500.00$5,500.00
4 $1,200.00$1,200.00
5 $12,500.00$12,500.00
Ref #45 503E21300 UNCLASSIFIED EXCAVATION, (LUMP SUM)
Awd $4,500.00$4,500.00
2 $2,740.00$2,740.00
3 $8,500.00$8,500.00
4 $3,500.00$3,500.00
5 $16,500.00$16,500.00
Ref #46 509E10000 EPOXY COATED REINFORCING STEEL, (3936 LB)
Awd $5,431.68$1.38
2 $5,589.12$1.42
3 $7,084.80$1.80
4 $7,872.00$2.00
5 $5,510.40$1.40
Ref #47 511E46010 CLASS QC1 CONCRETE, RETAINING/WINGWALL NOT INCLUDI, (11 CY)
Awd $18,898.00$1,718.00
2 $14,214.42$1,292.22
3 $18,150.00$1,650.00
4 $27,500.00$2,500.00
5 $20,691.00$1,881.00
Ref #48 511E46510 CLASS QC1 CONCRETE, FOOTING, (32 CY)
Awd $17,600.00$550.00
2 $29,285.12$915.16
3 $13,600.00$425.00
4 $12,800.00$400.00
5 $18,528.00$579.00
Ref #49 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE), (47 SY)
Awd $1,504.00$32.00
2 $1,130.82$24.06
3 $1,316.00$28.00
4 $940.00$20.00
5 $587.50$12.50
Ref #50 512E33000 TYPE 2 WATERPROOFING, (234 SY)
Awd $4,212.00$18.00
2 $18,146.70$77.55
3 $3,744.00$16.00
4 $4,680.00$20.00
5 $3,744.00$16.00
200285 - Page 232
Ref #51 516E13600 1" PREFORMED EXPANSION JOINT FILLER, (30 SF)
Awd $300.00$10.00
2 $150.00$5.00
3 $150.00$5.00
4 $120.00$4.00
5 $210.00$7.00
Ref #52 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC, (7 CY)
Awd $595.00$85.00
2 $578.55$82.65
3 $1,785.00$255.00
4 $4,900.00$700.00
5 $1,120.00$160.00
Ref #53 611E95600 12' X 4' CONDUIT, TYPE A, 706.05 (2 FT. COVER), (77 FT)
Awd $84,353.50$1,095.50
2 $74,453.61$966.93
3 $90,475.00$1,175.00
4 $80,850.00$1,050.00
5 $88,550.00$1,150.00
Section 7 - STRUCTURE 20 FOOT SPAN AND UNDER (LOG-27 - Totals
Awd $152,306.18
2 $163,112.54
3 $175,716.80
4 $172,670.00
5 $194,551.90
Ref #54 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $2,500.00$2,500.00
2 $1,838.18$1,838.18
3 $3,000.00$3,000.00
4 $1,500.00$1,500.00
5 $9,600.00$9,600.00
Ref #55 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $1,500.00$1,500.00
2 $6,750.00$6,750.00
3 $5,000.00$5,000.00
4 $10,000.00$10,000.00
5 $9,893.60$9,893.60
Ref #56 619E16000 FIELD OFFICE, TYPE A, (3 MNTH)
Awd $2,250.00$750.00
2 $1,875.00$625.00
3 $4,950.00$1,650.00
4 $3,750.00$1,250.00
5 $1,500.00$500.00
Ref #57 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING, (LUMP SUM)
Awd $5,000.00$5,000.00
2 $5,937.50$5,937.50
3 $5,000.00$5,000.00
4 $8,000.00$8,000.00
5 $14,794.50$14,794.50
200285 - Page 233
Ref #58 624E10000 MOBILIZATION, (LUMP SUM)
Awd $7,250.00$7,250.00
2 $14,625.00$14,625.00
3 $15,000.00$15,000.00
4 $17,500.00$17,500.00
5 $21,543.73$21,543.73
Section 8 - INCIDENTALS - Totals
Awd $18,500.00
2 $31,025.68
3 $32,950.00
4 $40,750.00
5 $57,331.83
200285 - Page 234
Project No. 200287
PID 94220
WYA-US 23-06.65
Non-Federal
Type: FOUR LANE RESURFACING
Completion Date: 10/31/2020
Award Amount: $1,883,515.06
Contract Awarded To: KOKOSING CONSTRUCTION COMPANY INC
Letting Date: 5/7/2020
Engineer's Estimate: $1,995,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jack Marchbanks, Ph.D., Director
KOKOSING CONSTRUCTION COMPANY INC
6235 WESTERVILLE RD
WESTERVILLE, OH 43081
Franklin
Bidder 1
Bid $1,883,515.06
SHELLY COMPANY
80 PARK DR BOX 266
THORNVILLE, OH 43076
Perry
Bidder 2
Bid $2,026,824.69
SHELLY & SANDS INC
1515 HARMON AVE
COLUMBUS, OH 43223
Franklin
Bidder 3
Bid $2,123,434.44
200287 - Page 235
Ref #1 832E30000 EROSION CONTROL, (1000 EACH)
Awd $1,000.00$1.00
2 $1,000.00$1.00
3 $1,000.00$1.00
Section 1 - EROSION CONTROL - Totals
Awd $1,000.00
2 $1,000.00
3 $1,000.00
Ref #2 253E02001 PAVEMENT REPAIR, AS PER PLAN, (475 CY)
Awd $166,250.00$350.00
2 $178,125.00$375.00
3 $154,375.00$325.00
Ref #3 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1-1/2", (179089 SY)
Awd $89,544.50$0.50
2 $125,362.30$0.70
3 $179,089.00$1.00
Ref #4 407E20000 NON-TRACKING TACK COAT, (15222 GAL)
Awd $36,532.80$2.40
2 $32,727.30$2.15
3 $45,666.00$3.00
Ref #5 442E00100 ANTI-SEGREGATION EQUIPMENT, (5183 CY)
Awd $5,183.00$1.00
2 $44,314.65$8.55
3 $25,915.00$5.00
Ref #6 442E10300 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A (, (7462 CY)
Awd $1,164,072.00$156.00
2 $1,145,417.00$153.50
3 $1,305,850.00$175.00
Ref #7 617E10101 COMPACTED AGGREGATE, AS PER PLAN, (753 CY)
Awd $31,626.00$42.00
2 $42,921.00$57.00
3 $37,650.00$50.00
Ref #8 618E40600 RUMBLE STRIPS, SHOULDER (ASPHALT CONCRETE), (14 MILE)
Awd $8,050.00$575.00
2 $11,900.00$850.00
3 $14,000.00$1,000.00
Section 2 - PAVEMENT - Totals
Awd $1,501,258.30
2 $1,580,767.25
3 $1,762,545.00
Ref #9 621E00100 RPM, (659 EACH)
Awd $16,639.75$25.25
2 $16,639.75$25.25
3 $16,639.75$25.25
200287 - Page 236
Ref #10 621E54000 RAISED PAVEMENT MARKER REMOVED, (659 EACH)
Awd $3,295.00$5.00
2 $3,954.00$6.00
3 $2,636.00$4.00
Ref #11 642E00104 EDGE LINE, 6", TYPE 1, (15.68 MILE)
Awd $12,904.64$823.00
2 $12,904.64$823.00
3 $12,904.64$823.00
Ref #12 642E00204 LANE LINE, 6", TYPE 1, (7.04 MILE)
Awd $3,379.20$480.00
2 $3,379.20$480.00
3 $3,379.20$480.00
Ref #13 643E00404 CHANNELIZING LINE, 12", (6928 FT)
Awd $8,660.00$1.25
2 $8,660.00$1.25
3 $8,660.00$1.25
Ref #14 643E00500 STOP LINE, (147 FT)
Awd $668.85$4.55
2 $668.85$4.55
3 $668.85$4.55
Ref #15 643E01510 DOTTED LINE, 6", (6365 FT)
Awd $5,092.00$0.80
2 $5,092.00$0.80
3 $5,092.00$0.80
Section 3 - TRAFFIC CONTROL - Totals
Awd $50,639.44
2 $51,298.44
3 $49,980.44
Ref #16 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST, (80 HOUR)
Awd $4,800.00$60.00
2 $5,200.00$65.00
3 $5,600.00$70.00
Ref #17 614E12460 WORK ZONE MARKING SIGN, (12 EACH)
Awd $1,812.00$151.00
2 $1,800.00$150.00
3 $1,800.00$150.00
Ref #18 614E12484 WORK ZONE INCREASED PENALTIES SIGN, (16 EACH)
Awd $3,520.00$220.00
2 $3,520.00$220.00
3 $3,520.00$220.00
Ref #19 614E12500 REPLACEMENT SIGN, (5 EACH)
Awd $960.00$192.00
2 $960.00$192.00
3 $960.00$192.00
Ref #20 614E12600 REPLACEMENT DRUM, (50 EACH)
Awd $2,800.00$56.00
2 $2,800.00$56.00
3 $2,800.00$56.00
200287 - Page 237
Ref #21 614E13310 BARRIER REFLECTOR, TYPE 1 (ONE-WAY), (84 EACH)
Awd $672.00$8.00
2 $672.00$8.00
3 $672.00$8.00
Ref #22 614E13312 BARRIER REFLECTOR, TYPE 2 (ONE-WAY), (153 EACH)
Awd $1,224.00$8.00
2 $1,224.00$8.00
3 $1,224.00$8.00
Ref #23 614E13350 OBJECT MARKER, ONE WAY, (237 EACH)
Awd $2,844.00$12.00
2 $2,844.00$12.00
3 $2,844.00$12.00
Ref #24 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN, (8 SNMT)
Awd $3,600.00$450.00
2 $8,000.00$1,000.00
3 $8,000.00$1,000.00
Ref #25 614E22110 WORK ZONE EDGE LINE, CLASS I, 6", 642 PAINT, (14.14 MILE)
Awd $12,019.00$850.00
2 $12,019.00$850.00
3 $12,019.00$850.00
Ref #26 614E22210 WORK ZONE EDGE LINE, CLASS I, 6", 740.06, TYPE I, (2.59 MILE)
Awd $12,950.00$5,000.00
2 $19,425.00$7,500.00
3 $19,425.00$7,500.00
Ref #27 614E24202 WORK ZONE DOTTED LINE, CLASS I, 6", 642 PAINT, (6365 FT)
Awd $6,365.00$1.00
2 $6,365.00$1.00
3 $6,365.00$1.00
Ref #28 614E24402 WORK ZONE DOTTED LINE, CLASS I, 6", 740.06, TYPE I, (7840 FT)
Awd $9,800.00$1.25
2 $15,680.00$2.00
3 $15,680.00$2.00
Ref #29 808E18700 DIGITAL SPEED LIMIT (DSL) SIGN ASSEMBLY, (40 SNMT)
Awd $30,000.00$750.00
2 $38,000.00$950.00
3 $38,000.00$950.00
Section 4 - MAINTENANCE OF TRAFFIC - Totals
Awd $93,366.00
2 $118,509.00
3 $118,909.00
Ref #30 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $6,000.00$6,000.00
2 $10,750.00$10,750.00
3 $12,000.00$12,000.00
Ref #31 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $185,251.32$185,251.32
2 $200,000.00$200,000.00
3 $131,500.00$131,500.00
200287 - Page 238
Ref #32 619E16010 FIELD OFFICE, TYPE B, (3 MNTH)
Awd $6,000.00$2,000.00
2 $4,500.00$1,500.00
3 $7,500.00$2,500.00
Ref #33 624E10000 MOBILIZATION, (LUMP SUM)
Awd $40,000.00$40,000.00
2 $60,000.00$60,000.00
3 $40,000.00$40,000.00
Section 5 - INCIDENTALS - Totals
Awd $237,251.32
2 $275,250.00
3 $191,000.00
200287 - Page 239
Project No. 201015
PID 111497
D06-ITS Maintenance FY 20
Non-Federal
Type: SIGNALIZATION
Completion Date: 6/30/2021
Award Amount: $807,137.87
Contract Awarded To: ASPLUNDH CONSTRUCTION LLC
Letting Date: 5/7/2020
Engineer's Estimate: $926,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jack Marchbanks, Ph.D., Director
ASPLUNDH CONSTRUCTION LLC
481 SCHROCK RD
COLUMBUS, OH 43229
Franklin
Bidder 1
Bid $807,137.87
COMPLETE GENERAL CONSTRUCTION COMPANY
1221 EAST FIFTH AVE
COLUMBUS, OH 43219
Franklin
Bidder 2
Bid $853,555.75
MILLER CABLE COMPANY
210 S BROADWAY ST P O BOX 68
GREEN SPRINGS, OH 44836
Seneca
Bidder 3
Bid $945,500.00
PERRAM ELECTRIC INC
6882 RIDGE RD
WADSWORTH, OH 44281
Medina
Bidder 4
Bid $1,026,576.00
201015 - Page 240
Ref #1 201E11000 CLEARING AND GRUBBING, (LUMP SUM)
Awd $10,048.80$10,048.80
2 $10,000.00$10,000.00
3 $14,000.00$14,000.00
4 $10,020.00$10,020.00
Ref #2 606E15050 GUARDRAIL, TYPE MGS, (190 FT)
Awd $4,535.30$23.87
2 $4,123.00$21.70
3 $380.00$2.00
4 $4,123.00$21.70
Ref #3 606E26150 ANCHOR ASSEMBLY, MGS TYPE E, MASH 2016, (2 EACH)
Awd $6,237.00$3,118.50
2 $5,670.00$2,835.00
3 $6,600.00$3,300.00
4 $5,670.00$2,835.00
Ref #4 607E50901 GATE, TYPE CL, AS PER PLAN, (2 EACH)
Awd $7,700.00$3,850.00
2 $7,000.00$3,500.00
3 $6,400.00$3,200.00
4 $7,000.00$3,500.00
Section 1 - ROADWAY - Totals
Awd $28,521.10
2 $26,793.00
3 $27,380.00
4 $26,813.00
Ref #5 659E00510 SEEDING AND MULCHING, CLASS 2, (2475 SY)
Awd $7,128.00$2.88
2 $4,331.25$1.75
3 $6,682.50$2.70
4 $495.00$0.20
Ref #6 659E20000 COMMERCIAL FERTILIZER, (0.35 TON)
Awd $543.77$1,553.63
2 $175.00$500.00
3 $143.50$410.00
4 $70.00$200.00
Ref #7 659E35000 WATER, (14 MGAL)
Awd $14.98$1.07
2 $14.00$1.00
3 $3.50$0.25
4 $140.00$10.00
Ref #8 832E30000 EROSION CONTROL, (10000 EACH)
Awd $10,000.00$1.00
2 $10,000.00$1.00
3 $10,000.00$1.00
4 $10,000.00$1.00
201015 - Page 241
Section 2 - EROSION CONTROL - Totals
Awd $17,686.75
2 $14,520.25
3 $16,829.50
4 $10,705.00
Ref #9 625E00470 CONNECTION, UNFUSED BOLTED, (2 EACH)
Awd $177.20$88.60
2 $200.00$100.00
3 $240.00$120.00
4 $620.00$310.00
Ref #10 625E22900 NO. 1/0 AWG 2400 VOLT DISTRIBUTION CABLE, (4620 FT)
Awd $21,205.80$4.59
2 $18,480.00$4.00
3 $16,170.00$3.50
4 $20,189.40$4.37
Ref #11 625E22990 NO. 6 AWG 600 VOLT DISTRIBUTION CABLE, (3405 FT)
Awd $8,750.85$2.57
2 $6,810.00$2.00
3 $5,448.00$1.60
4 $6,537.60$1.92
Ref #12 625E25408 CONDUIT, 2", 725.051, (1655 FT)
Awd $2,714.20$1.64
2 $11,585.00$7.00
3 $11,585.00$7.00
4 $7,695.75$4.65
Ref #13 625E25740 CONDUIT, MULTICELL, 4", 725.20, SCHEDULE 80, JACKE, (875 FT)
Awd $64,960.00$74.24
2 $50,750.00$58.00
3 $35,000.00$40.00
4 $62,081.25$70.95
Ref #14 625E25750 CONDUIT, 4", MULTICELL, 725.20 , EPC-40, (3545 FT)
Awd $32,436.75$9.15
2 $67,355.00$19.00
3 $56,720.00$16.00
4 $117,162.25$33.05
Ref #15 625E25908 CONDUIT, JACKED OR DRILLED, 725.052, 2", SCHEDULE , (150 FT)
Awd $3,915.00$26.10
2 $3,900.00$26.00
3 $2,400.00$16.00
4 $4,515.00$30.10
Ref #16 625E29010 TRENCH, 30" DEEP, (4950 FT)
Awd $31,086.00$6.28
2 $39,600.00$8.00
3 $79,200.00$16.00
4 $59,400.00$12.00
Ref #17 625E30700 PULL BOX, 725.08, 18", (20 EACH)
Awd $11,444.40$572.22
2 $22,000.00$1,100.00
3 $14,500.00$725.00
4 $24,600.00$1,230.00
201015 - Page 242
Ref #18 625E30711 PULL BOX, 725.08, 32", AS PER PLAN, (31 EACH)
Awd $45,428.64$1,465.44
2 $86,800.00$2,800.00
3 $68,200.00$2,200.00
4 $94,705.00$3,055.00
Ref #19 625E32001 GROUND ROD, AS PER PLAN, (31 EACH)
Awd $5,299.14$170.94
2 $6,820.00$220.00
3 $8,215.00$265.00
4 $8,277.00$267.00
Ref #20 625E36000 PLASTIC CAUTION TAPE, (4950 FT)
Awd $99.00$0.02
2 $990.00$0.20
3 $7,425.00$1.50
4 $247.50$0.05
Ref #21 632E64020 PEDESTAL FOUNDATION, (2 EACH)
Awd $1,733.28$866.64
2 $2,700.00$1,350.00
3 $2,000.00$1,000.00
4 $1,970.00$985.00
Ref #22 632E70001 POWER SERVICE, AS PER PLAN, A, (6 EACH)
Awd $25,507.20$4,251.20
2 $24,000.00$4,000.00
3 $75,000.00$12,500.00
4 $21,030.00$3,505.00
Ref #23 632E70001 POWER SERVICE, AS PER PLAN, B, (2 EACH)
Awd $8,004.20$4,002.10
2 $6,000.00$3,000.00
3 $7,200.00$3,600.00
4 $4,700.00$2,350.00
Ref #24 632E70001 POWER SERVICE, AS PER PLAN, C, (1 EACH)
Awd $4,055.60$4,055.60
2 $3,000.00$3,000.00
3 $6,250.00$6,250.00
4 $2,350.00$2,350.00
Ref #25 632E70400 CONDUIT RISER, 2" DIAMETER, (1 EACH)
Awd $403.97$403.97
2 $675.00$675.00
3 $550.00$550.00
4 $750.00$750.00
Ref #26 632E89701 PEDESTAL, 11', AS PER PLAN, (2 EACH)
Awd $2,521.10$1,260.55
2 $2,800.00$1,400.00
3 $700.00$350.00
4 $1,960.00$980.00
Ref #27 632E90000 PEDESTAL, 11', TRANSFORMER BASE, (2 EACH)
Awd $1,180.30$590.15
2 $1,400.00$700.00
3 $1,000.00$500.00
4 $1,960.00$980.00
201015 - Page 243
Ref #28 633E67101 CABINET FOUNDATION, AS PER PLAN, (11 EACH)
Awd $29,716.72$2,701.52
2 $24,200.00$2,200.00
3 $33,000.00$3,000.00
4 $35,805.00$3,255.00
Ref #29 633E67201 CONTROLLER WORK PAD, AS PER PLAN, (10 EACH)
Awd $14,701.00$1,470.10
2 $22,000.00$2,200.00
3 $14,000.00$1,400.00
4 $9,400.00$940.00
Ref #30 804E15010 FIBER OPTIC CABLE, 24 FIBER, (32320 FT)
Awd $112,473.60$3.48
2 $105,040.00$3.25
3 $129,280.00$4.00
4 $159,014.40$4.92
Ref #31 809E60030 CCTV IP-CAMERA SYSTEM, ENHANCED, (8 EACH)
Awd $60,938.64$7,617.33
2 $56,000.00$7,000.00
3 $49,600.00$6,200.00
4 $44,920.00$5,615.00
Ref #32 809E61000 CCTV CONCRETE POLE WITH LOWERING UNIT, 70 FEET, (2 EACH)
Awd $85,721.50$42,860.75
2 $74,000.00$37,000.00
3 $74,000.00$37,000.00
4 $100,730.00$50,365.00
Ref #33 809E64550 ETHERNET CABLE, OUTDOOR-RATED, (750 FT)
Awd $2,032.50$2.71
2 $2,212.50$2.95
3 $2,250.00$3.00
4 $1,125.00$1.50
Ref #34 809E65000 ITS CABINET - GROUND MOUNTED, (9 EACH)
Awd $65,917.08$7,324.12
2 $99,000.00$11,000.00
3 $72,000.00$8,000.00
4 $80,685.00$8,965.00
Ref #35 809E65990 ITS DEVICE, MISC.:, CCTV FIXED, INSTALL ONLY, (4 EACH)
Awd $2,236.60$559.15
2 $9,800.00$2,450.00
3 $4,000.00$1,000.00
4 $3,080.00$770.00
Ref #36 809E65990 ITS DEVICE, MISC.:, REMOVAL OF POLE OR DEVICE, (15 EACH)
Awd $6,558.75$437.25
2 $12,375.00$825.00
3 $11,250.00$750.00
4 $11,025.00$735.00
Ref #37 809E70000 MAINTAINING ITS DURING CONSTRUCTION, (LUMP SUM)
Awd $6,634.00$6,634.00
2 $8,000.00$8,000.00
3 $100.00$100.00
4 $1,000.00$1,000.00
201015 - Page 244
Section 3 - TRAFFIC SURVEILLANCE - Totals
Awd $657,853.02
2 $768,492.50
3 $787,283.00
4 $887,535.15
Ref #38 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST, (50 HOUR)
Awd $3,210.00$64.20
2 $3,750.00$75.00
3 $4,750.00$95.00
4 $3,250.00$65.00
Section 4 - MAINTENANCE OF TRAFFIC - Totals
Awd $3,210.00
2 $3,750.00
3 $4,750.00
4 $3,250.00
Ref #39 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $50,451.00$50,451.00
2 $7,000.00$7,000.00
3 $6,057.50$6,057.50
4 $14,472.85$14,472.85
Ref #40 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $33,066.00$33,066.00
2 $10,000.00$10,000.00
3 $69,500.00$69,500.00
4 $33,800.00$33,800.00
Ref #41 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING, (LUMP SUM)
Awd $11,000.00$11,000.00
2 $3,000.00$3,000.00
3 $13,700.00$13,700.00
4 $10,000.00$10,000.00
Ref #42 624E10000 MOBILIZATION, (LUMP SUM)
Awd $5,350.00$5,350.00
2 $20,000.00$20,000.00
3 $20,000.00$20,000.00
4 $40,000.00$40,000.00
Section 5 - INCIDENTALS - Totals
Awd $99,867.00
2 $40,000.00
3 $109,257.50
4 $98,272.85
201015 - Page 245
Project No. 203002
PID 112284
HAM-/CLE-IR 275-10.57/32.21/10.36
Non-Federal
Type: MISCELLANEOUS
Completion Date: 6/30/2021
Award Amount: $3,584,243.56
Contract Awarded To: BANSAL CONSTRUCTION INC
Letting Date: 5/7/2020
Engineer's Estimate: $4,445,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jack Marchbanks, Ph.D., Director
BANSAL CONSTRUCTION INC
3263 HOMEWARD WAY
FAIRFIELD, OH 45014
Butler
Bidder 1
Bid $3,584,243.56
THE FISHEL COMPANY
1366 DUBLIN RD
COLUMBUS, OH 43215
Franklin
Bidder 2
Bid $4,014,628.71
GUDENKAUF CORPORATION
2679 MC KINLEY AVE
COLUMBUS, OH 43204
Franklin
Bidder 3
Bid $4,229,621.59
J RANCK ELECTRIC INC
1993 GOVER PARKWAY
MT PLEASANT, MI 48858
Bidder 4
Bid $5,225,500.00
203002 - Page 246
Ref #1 659E99000 SPECIAL - PERMANENT EROSION CONTROL, (LUMP SUM)
Awd $73,750.00$73,750.00
2 $52,887.00$52,887.00
3 $65,000.00$65,000.00
4 $67,000.00$67,000.00
Section 1 - EROSION CONTROL - Totals
Awd $73,750.00
2 $52,887.00
3 $65,000.00
4 $67,000.00
Ref #2 690E20260 SPECIAL - TRAFFIC SURVEILLANCE, (LUMP SUM)
Awd $2,398,000.00$2,398,000.00
2 $596,947.77$596,947.77
3 $690,340.27$690,340.27
4 $580,000.00$580,000.00
Ref #3 804E99000 SPECIAL - FIBER OPTIC CABLE AND COMPONENTS, (LUMP SUM)
Awd $394,975.00$394,975.00
2 $2,625,730.71$2,625,730.71
3 $2,764,495.32$2,764,495.32
4 $3,406,000.00$3,406,000.00
Section 2 - TRAFFIC SURVEILLANCE - Totals
Awd $2,792,975.00
2 $3,222,678.48
3 $3,454,835.59
4 $3,986,000.00
Ref #4 614E99000 SPECIAL - MAINTAINING TRAFFIC, (LUMP SUM)
Awd $150,000.00$150,000.00
2 $200,000.00$200,000.00
3 $50,000.00$50,000.00
4 $225,000.00$225,000.00
Section 3 - MAINTENANCE OF TRAFFIC - Totals
Awd $150,000.00
2 $200,000.00
3 $50,000.00
4 $225,000.00
Ref #5 690E20010 SPECIAL - AS-BUILT CONSTRUCTION PLANS, (LUMP SUM)
Awd $25,000.00$25,000.00
2 $31,546.00$31,546.00
3 $8,280.00$8,280.00
4 $80,000.00$80,000.00
Ref #6 690E20040 SPECIAL - PRELIMINARY DESIGN, (LUMP SUM)
Awd $108,500.00$108,500.00
2 $120,591.00$120,591.00
3 $295,560.00$295,560.00
4 $290,000.00$290,000.00
203002 - Page 247
Ref #7 690E20050 SPECIAL - FINAL DESIGN, (LUMP SUM)
Awd $232,500.00$232,500.00
2 $241,182.00$241,182.00
3 $84,480.00$84,480.00
4 $140,000.00$140,000.00
Ref #8 690E20220 SPECIAL - CONSTRUCTION PLANS, (LUMP SUM)
Awd $46,000.00$46,000.00
2 $14,205.00$14,205.00
3 $42,240.00$42,240.00
4 $71,500.00$71,500.00
Section 4 - ENGINEERING AND SURVEYING SERVICES - Totals
Awd $412,000.00
2 $407,524.00
3 $430,560.00
4 $581,500.00
Ref #9 100E99010 SPECIAL - PROFESSIONAL LIABILITY INSURANCE, (LUMP SUM)
Awd $1,500.00$1,500.00
2 $20,000.00$20,000.00
3 $1.00$1.00
4 $1,000.00$1,000.00
Ref #10 103E99010 SPECIAL - PREMIUM FOR CONTRACT PERFORMANCE BOND AN, (LUMP SUM)
Awd $26,518.56$26,518.56
2 $29,481.29$29,481.29
3 $33,300.00$33,300.00
4 $100,000.00$100,000.00
Ref #11 623E99000 SPECIAL - CONSTRUCTION LAYOUT STAKES AND SURVEYING, (LUMP SUM)
Awd $25,000.00$25,000.00
2 $34,091.00$34,091.00
3 $10,000.00$10,000.00
4 $50,000.00$50,000.00
Ref #12 624E99000 SPECIAL - MOBILIZATION, (LUMP SUM)
Awd $100,000.00$100,000.00
2 $41,936.68$41,936.68
3 $175,000.00$175,000.00
4 $200,000.00$200,000.00
Ref #100 100E99000 SPECIAL - PREMIUM ON RAILROAD'S PROTECTIVE PUBLIC , (LUMP SUM)
Awd $2,500.00$2,500.00
2 $6,030.26$6,030.26
3 $10,925.00$10,925.00
4 $15,000.00$15,000.00
Section 5 - INCIDENTALS - Totals
Awd $155,518.56
2 $131,539.23
3 $229,226.00
4 $366,000.00
203002 - Page 248
Project No. 204010
PID 104058
BEL-SR 7-20.23
Federal
Type: SLIDE REPAIR
Completion Date: 10/31/2020
Award Amount: $243,724.00
Contract Awarded To: BOG CONSTRUCTION INC
Letting Date: 5/7/2020
Engineer's Estimate: $267,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jack Marchbanks, Ph.D., Director
BOG CONSTRUCTION INC
8235 HUXLEY RD
BERLIN CENTER, OH 44401
Mahoning
Bidder 1
Bid $243,724.00
ALAN STONE CO INC
1324 ELLIS RUN RD
CUTLER, OH 45724
Washington
Bidder 2
Bid $327,522.90
BUDS INC
6260 NEWARK RD
NASHPORT, OH 43830
Muskingum
Bidder 3
Bid $337,984.53
ECLIPSE CO LLC
11554 EAST WASHINGTON ST
CHAGRIN FALLS, OH 44023
Geauga
Bidder 4
Bid $416,888.20
RIETSCHLIN CONSTRUCTION INC
4240 BAKER RD
CRESTLINE, OH 44827
Crawford
Bidder 5
Bid $508,099.00
204010 - Page 249
Ref #1 201E11000 CLEARING AND GRUBBING, (LUMP SUM)
Awd $3,500.00$3,500.00
2 $2,000.00$2,000.00
3 $10,000.00$10,000.00
4 $9,146.00$9,146.00
5 $50,000.00$50,000.00
Ref #2 202E30000 WALK REMOVED, (2258 SF)
Awd $6,774.00$3.00
2 $6,774.00$3.00
3 $9,032.00$4.00
4 $6,774.00$3.00
5 $3,387.00$1.50
Ref #3 202E35100 PIPE REMOVED, 24" AND UNDER, (25 FT)
Awd $1,250.00$50.00
2 $775.00$31.00
3 $1,125.00$45.00
4 $400.00$16.00
5 $1,000.00$40.00
Ref #4 202E58100 CATCH BASIN REMOVED, (2 EACH)
Awd $1,000.00$500.00
2 $1,800.00$900.00
3 $700.00$350.00
4 $1,199.00$599.50
5 $1,200.00$600.00
Ref #5 202E98000 REMOVAL MISC.: ROCK DEBRIS, (LUMP SUM)
Awd $5,000.00$5,000.00
2 $3,900.00$3,900.00
3 $1,000.00$1,000.00
4 $3,499.00$3,499.00
5 $10,000.00$10,000.00
Ref #6 203E10000 EXCAVATION, (153 CY)
Awd $3,060.00$20.00
2 $6,885.00$45.00
3 $6,120.00$40.00
4 $5,202.00$34.00
5 $6,120.00$40.00
Ref #7 203E20000 EMBANKMENT, (125 CY)
Awd $2,500.00$20.00
2 $3,125.00$25.00
3 $5,000.00$40.00
4 $5,875.00$47.00
5 $5,000.00$40.00
Ref #8 607E98000 FENCE, MISC.: TEMPORARY ORANGE PLASTIC CONSTRUCTIO, (1815 FT)
Awd $3,630.00$2.00
2 $7,260.00$4.00
3 $12,705.00$7.00
4 $9,075.00$5.00
5 $14,520.00$8.00
204010 - Page 250
Ref #9 608E10000 4" CONCRETE WALK, (2258 SF)
Awd $15,806.00$7.00
2 $29,354.00$13.00
3 $22,580.00$10.00
4 $20,322.00$9.00
5 $24,838.00$11.00
Ref #10 622E10161 CONCRETE BARRIER, SINGLE SLOPE, TYPE D, AS PER PLA, (428 FT)
Awd $57,780.00$135.00
2 $68,480.00$160.00
3 $93,304.00$218.00
4 $112,050.40$261.80
5 $131,824.00$308.00
Ref #11 622E10161 CONCRETE BARRIER, SINGLE SLOPE, TYPE D, AS PER PLA, (508 FT)
Awd $60,960.00$120.00
2 $79,756.00$157.00
3 $93,980.00$185.00
4 $102,616.00$202.00
5 $105,664.00$208.00
Section 1 - ROADWAY - Totals
Awd $161,260.00
2 $210,109.00
3 $255,546.00
4 $276,158.40
5 $353,553.00
Ref #12 659E00100 SOIL ANALYSIS TEST, (2 EACH)
Awd $100.00$50.00
2 $186.00$93.00
3 $50.00$25.00
4 $315.00$157.50
5 $100.00$50.00
Ref #13 659E00300 TOPSOIL, (308 CY)
Awd $9,240.00$30.00
2 $12,936.00$42.00
3 $5,544.00$18.00
4 $21,560.00$70.00
5 $12,320.00$40.00
Ref #14 659E10000 SEEDING AND MULCHING, (2771 SY)
Awd $11,084.00$4.00
2 $5,542.00$2.00
3 $7,620.25$2.75
4 $6,927.50$2.50
5 $11,084.00$4.00
Ref #15 659E14000 REPAIR SEEDING AND MULCHING, (139 SY)
Awd $139.00$1.00
2 $139.00$1.00
3 $1.39$0.01
4 $139.00$1.00
5 $417.00$3.00
204010 - Page 251
Ref #16 659E15000 INTER-SEEDING, (139 SY)
Awd $139.00$1.00
2 $139.00$1.00
3 $1.39$0.01
4 $22.24$0.16
5 $417.00$3.00
Ref #17 659E20000 COMMERCIAL FERTILIZER, (0.38 TON)
Awd $380.00$1,000.00
2 $266.00$700.00
3 $171.00$450.00
4 $187.53$493.50
5 $304.00$800.00
Ref #18 659E31000 LIME, (0.57 ACRE)
Awd $57.00$100.00
2 $96.90$170.00
3 $114.00$200.00
4 $51.02$89.51
5 $114.00$200.00
Ref #19 659E35000 WATER, (20 MGAL)
Awd $20.00$1.00
2 $40.00$2.00
3 $20.00$1.00
4 $20.00$1.00
5 $480.00$24.00
Ref #20 832E30000 EROSION CONTROL, (5000 EACH)
Awd $5,000.00$1.00
2 $5,000.00$1.00
3 $5,000.00$1.00
4 $5,000.00$1.00
5 $5,000.00$1.00
Section 2 - EROSION CONTROL - Totals
Awd $26,159.00
2 $24,344.90
3 $18,522.03
4 $34,222.29
5 $30,236.00
Ref #21 605E14020 6" BASE PIPE UNDERDRAINS WITH GEOTEXTILE FABRIC, (458 FT)
Awd $9,160.00$20.00
2 $12,824.00$28.00
3 $8,244.00$18.00
4 $7,099.00$15.50
5 $9,160.00$20.00
Ref #22 611E00510 6" CONDUIT, TYPE F FOR UNDERDRAIN OUTLETS, (41 FT)
Awd $820.00$20.00
2 $615.00$15.00
3 $1,332.50$32.50
4 $1,209.50$29.50
5 $1,230.00$30.00
204010 - Page 252
Ref #23 611E99710 PRECAST REINFORCED CONCRETE OUTLET, (3 EACH)
Awd $825.00$275.00
2 $930.00$310.00
3 $1,950.00$650.00
4 $1,051.50$350.50
5 $1,350.00$450.00
Section 3 - DRAINAGE - Totals
Awd $10,805.00
2 $14,369.00
3 $11,526.50
4 $9,360.00
5 $11,740.00
Ref #24 304E20000 AGGREGATE BASE, (70 CY)
Awd $9,100.00$130.00
2 $9,800.00$140.00
3 $6,790.00$97.00
4 $5,705.00$81.50
5 $18,900.00$270.00
Section 4 - PAVEMENT - Totals
Awd $9,100.00
2 $9,800.00
3 $6,790.00
4 $5,705.00
5 $18,900.00
Ref #25 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST, (40 HOUR)
Awd $2,400.00$60.00
2 $2,800.00$70.00
3 $3,000.00$75.00
4 $3,160.00$79.00
5 $3,000.00$75.00
Section 5 - MAINTENANCE OF TRAFFIC - Totals
Awd $2,400.00
2 $2,800.00
3 $3,000.00
4 $3,160.00
5 $3,000.00
Ref #26 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $6,500.00$6,500.00
2 $2,000.00$2,000.00
3 $5,000.00$5,000.00
4 $11,500.00$11,500.00
5 $15,000.00$15,000.00
204010 - Page 253
Ref #27 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $4,500.00$4,500.00
2 $25,300.00$25,300.00
3 $20,000.00$20,000.00
4 $30,000.00$30,000.00
5 $24,000.00$24,000.00
Ref #28 619E16000 FIELD OFFICE, TYPE A, (3 MNTH)
Awd $1,500.00$500.00
2 $4,500.00$1,500.00
3 $600.00$200.00
4 $1,500.00$500.00
5 $5,670.00$1,890.00
Ref #29 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING, (LUMP SUM)
Awd $6,500.00$6,500.00
2 $6,300.00$6,300.00
3 $7,000.00$7,000.00
4 $14,500.00$14,500.00
5 $6,000.00$6,000.00
Ref #30 624E10000 MOBILIZATION, (LUMP SUM)
Awd $15,000.00$15,000.00
2 $28,000.00$28,000.00
3 $10,000.00$10,000.00
4 $30,782.51$30,782.51
5 $40,000.00$40,000.00
Section 6 - INCIDENTALS - Totals
Awd $34,000.00
2 $66,100.00
3 $42,600.00
4 $88,282.51
5 $90,670.00
204010 - Page 254
Project No. 204011
PID 103707
CUY-SRTS FY2020 Euclid
Federal
Type: BIKEWAYS
Completion Date: 9/30/2020
Award Amount: $109,368.50
Contract Awarded To: TRAFFTECH INC
Letting Date: 5/7/2020
Engineer's Estimate: $122,000.00
Ohio Department of Transportation
Official Bid Tabulation
Jack Marchbanks, Ph.D., Director
TRAFFTECH INC
7000 HUBBARD AVE
CLEVELAND, OH 44127
Cuyahoga
Bidder 1
Bid $109,368.50
ECLIPSE CO LLC
11554 EAST WASHINGTON ST
CHAGRIN FALLS, OH 44023
Geauga
Bidder 2
Bid $135,208.74
BARBICAS CONSTRUCTION COMPANY INC
124 DARROW RD
AKRON, OH 44305
Summit
Bidder 3
Bid $136,774.00
204011 - Page 255
Ref #1 201E21800 TREE REMOVED, 18", (2 EACH)
Awd $1,700.00$850.00
2 $4,725.00$2,362.50
3 $1,500.00$750.00
Ref #2 202E30000 WALK REMOVED, (905 SF)
Awd $5,430.00$6.00
2 $3,167.50$3.50
3 $5,430.00$6.00
Ref #3 202E32001 CURB REMOVED, AS PER PLAN, (17 FT)
Awd $935.00$55.00
2 $569.50$33.50
3 $170.00$10.00
Ref #4 608E10000 4" CONCRETE WALK, (550 SF)
Awd $7,700.00$14.00
2 $7,425.00$13.50
3 $3,850.00$7.00
Ref #5 608E52001 CURB RAMP, AS PER PLAN, (400 SF)
Awd $12,800.00$32.00
2 $9,800.00$24.50
3 $9,600.00$24.00
Section 1 - ROADWAY - Totals
Awd $28,565.00
2 $25,687.00
3 $20,550.00
Ref #6 659E00300 TOPSOIL, (2.5 CY)
Awd $462.50$185.00
2 $1,121.25$448.50
3 $1,250.00$500.00
Ref #7 659E00500 SEEDING AND MULCHING, CLASS 1, (19 SY)
Awd $532.00$28.00
2 $247.00$13.00
3 $190.00$10.00
Ref #8 832E30000 EROSION CONTROL, (500 EACH)
Awd $500.00$1.00
2 $500.00$1.00
3 $500.00$1.00
Section 2 - EROSION CONTROL - Totals
Awd $1,494.50
2 $1,868.25
3 $1,940.00
Ref #9 605E13300 6" UNCLASSIFIED PIPE UNDERDRAINS, (56 FT)
Awd $2,184.00$39.00
2 $1,512.00$27.00
3 $1,008.00$18.00
204011 - Page 256
Section 3 - DRAINAGE - Totals
Awd $2,184.00
2 $1,512.00
3 $1,008.00
Ref #10 512E10001 SEALING OF CONCRETE SURFACES, AS PER PLAN, (113 SY)
Awd $3,164.00$28.00
2 $2,373.00$21.00
3 $3,955.00$35.00
Ref #11 609E26001 CURB, TYPE 6, AS PER PLAN, (28 FT)
Awd $2,240.00$80.00
2 $2,170.00$77.50
3 $2,100.00$75.00
Section 4 - PAVEMENT - Totals
Awd $5,404.00
2 $4,543.00
3 $6,055.00
Ref #12 625E25400 CONDUIT, 2", 725.04, (44 FT)
Awd $616.00$14.00
2 $1,100.00$25.00
3 $1,047.20$23.80
Ref #13 625E25902 CONDUIT, JACKED OR DRILLED, 725.044", (85 FT)
Awd $6,375.00$75.00
2 $7,905.00$93.00
3 $7,535.25$88.65
Ref #14 625E29000 TRENCH, (44 FT)
Awd $528.00$12.00
2 $814.00$18.50
3 $774.40$17.60
Ref #15 625E30510 PULL BOX, 725.06, SIZE 4, (4 EACH)
Awd $2,600.00$650.00
2 $2,084.00$521.00
3 $1,984.00$496.00
Ref #16 625E32000 GROUND ROD, (4 EACH)
Awd $1,200.00$300.00
2 $946.00$236.50
3 $900.00$225.00
Ref #17 625E36000 PLASTIC CAUTION TAPE, (44 FT)
Awd $44.00$1.00
2 $66.00$1.50
3 $67.76$1.54
Ref #18 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST, (67 FT)
Awd $737.00$11.00
2 $1,407.00$21.00
3 $1,340.00$20.00
204011 - Page 257
Ref #19 630E80100 SIGN, FLAT SHEET, (51.5 SF)
Awd $927.00$18.00
2 $1,622.25$31.50
3 $1,545.00$30.00
Ref #20 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL, (4 EACH)
Awd $100.00$25.00
2 $42.00$10.50
3 $40.00$10.00
Ref #21 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA, (2 EACH)
Awd $60.00$30.00
2 $32.00$16.00
3 $30.00$15.00
Ref #22 630E87500 REMOVAL OF POLE MOUNTED SIGN AND DISPOSAL, (4 EACH)
Awd $80.00$20.00
2 $84.00$21.00
3 $80.00$20.00
Ref #23 630E97700 SIGNING, MISC.:RECTANGULAR RAPID FLASHING BEACON (, (4 EACH)
Awd $23,600.00$5,900.00
2 $18,082.00$4,520.50
3 $17,220.00$4,305.00
Ref #24 632E64020 PEDESTAL FOUNDATION, (4 EACH)
Awd $3,600.00$900.00
2 $3,340.00$835.00
3 $3,180.00$795.00
Ref #25 632E68300 POWER CABLE, 3 CONDUCTOR, NO. 6 AWG, (579 FT)
Awd $1,737.00$3.00
2 $1,737.00$3.00
3 $1,708.05$2.95
Ref #26 632E70001 POWER SERVICE, AS PER PLAN, (2 EACH)
Awd $3,600.00$1,800.00
2 $3,833.00$1,916.50
3 $3,650.34$1,825.17
Ref #27 632E70400 CONDUIT RISER, 2" DIAMETER, (2 EACH)
Awd $700.00$350.00
2 $1,008.00$504.00
3 $960.00$480.00
Ref #28 644E00300 CENTER LINE, (0.07 MILE)
Awd $665.00$9,500.00
2 $528.12$7,544.57
3 $346.50$4,950.00
Ref #29 644E00400 CHANNELIZING LINE, 8", (142 FT)
Awd $177.50$1.25
2 $284.00$2.00
3 $284.00$2.00
Ref #30 644E00500 STOP LINE, (52 FT)
Awd $312.00$6.00
2 $286.00$5.50
3 $312.00$6.00
204011 - Page 258
Ref #31 644E00700 TRANSVERSE/DIAGONAL LINE, (63 FT)
Awd $346.50$5.50
2 $346.50$5.50
3 $378.00$6.00
Ref #32 644E00900 ISLAND MARKING, (66 SF)
Awd $264.00$4.00
2 $330.00$5.00
3 $396.00$6.00
Ref #33 644E01300 LANE ARROW, (2 EACH)
Awd $250.00$125.00
2 $252.00$126.00
3 $250.00$125.00
Ref #34 644E30000 REMOVAL OF PAVEMENT MARKING, (1143 FT)
Awd $5,715.00$5.00
2 $3,429.00$3.00
3 $3,143.25$2.75
Ref #35 644E50300 PAVEMENT MARKING, MISC.:CROSSWALK, 12", (567 FT)
Awd $1,701.00$3.00
2 $1,984.50$3.50
3 $2,126.25$3.75
Ref #36 644E50300 PAVEMENT MARKING, MISC.:CROSSWALK, 24", (456 FT)
Awd $2,736.00$6.00
2 $2,964.00$6.50
3 $2,736.00$6.00
Ref #37 690E98000 SPECIAL - UTILITY TEST HOLE (LESS THAN 4 FT DEEP), (4 EACH)
Awd $1,600.00$400.00
2 $4,248.00$1,062.00
3 $472.00$118.00
Section 5 - TRAFFIC CONTROL - Totals
Awd $60,271.00
2 $58,754.37
3 $52,506.00
Ref #38 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM, (LUMP SUM)
Awd $1,200.00$1,200.00
2 $4,014.00$4,014.00
3 $3,000.00$3,000.00
Ref #39 614E11000 MAINTAINING TRAFFIC, (LUMP SUM)
Awd $5,000.00$5,000.00
2 $24,462.62$24,462.62
3 $25,000.00$25,000.00
Ref #40 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING, (LUMP SUM)
Awd $3,500.00$3,500.00
2 $6,500.00$6,500.00
3 $1,200.00$1,200.00
Ref #41 624E10000 MOBILIZATION, (LUMP SUM)
Awd $1,000.00$1,000.00
2 $7,500.00$7,500.00
3 $25,000.00$25,000.00
204011 - Page 259
Ref #42 690E98400 SPECIAL - PRE-CONSTRUCTION VIDEO, (LUMP SUM)
Awd $750.00$750.00
2 $367.50$367.50
3 $515.00$515.00
Section 6 - INCIDENTALS - Totals
Awd $11,450.00
2 $42,844.12
3 $54,715.00
204011 - Page 260