Page 1
Offshore Deployment
Flexible Pipe & Cable Handling
SEM REV Subsea Cable
Spooling & Deployment
February to July 2015
Page 2
Product Handling Solutions
Flowline Specialists designs, engineers and manufactures equipment handling solutions for the renewable energy and manufacturing industry and oil & gas sectors.
• Cable deployment and recovery
• Decommissioning
• Onshore spooling
• Flexible pipe and umbilical handling
Page 3
Products & Services
Under rollers 300Te hub driveTensioners
Linear cable engines Shaft drive spooler with level winds Experienced Technicians
Page 4
SEM REV Subsea Cable Spooling & Deployment
February to July 2015
Cables:
600m of 86mm cable approx. 13Te
with one connector
Connector weights approx. 1Te each
1250m of 102mm cable approx.
30Te with two connectors
Page 5
SEM REV Subsea Cable Spooling & Deployment
February to July 2015
Reel selection
Page 6
SEM REV Subsea Cable Spooling & Deployment
February to July 2015
Reel design and modification
Page 7
SEM REV Subsea Cable Spooling & Deployment
February to July 2015
Reel modification
Page 8
SEM REV Subsea Cable Spooling & Deployment
February to July 2015
Design of reel cradles
Page 9
SEM REV Subsea Cable Spooling & Deployment
February to July 2015
Manufacture of reel cradles
Page 10
SEM REV Subsea Cable Spooling & Deployment
February to July 2015
Modifications to shaft drive spooler
Page 11
SEM REV Subsea Cable Spooling & Deployment
February to July 2015
Transpooling of cables
Page 12
SEM REV Subsea Cable Spooling & Deployment
February to July 2015
Securing end connectors
Page 13
SEM REV Subsea Cable Spooling & Deployment
February to July 2015
Design of spreader beam
Page 14
SEM REV Subsea Cable Spooling & Deployment
February to July 2015
Load testing of spreader beam
Page 15
SEM REV Subsea Cable Spooling & Deployment
February to July 2015
Load out
of reels
Page 16
SEM REV Subsea Cable Spooling & Deployment
February to July 2015
Arrival of reels at client site
Page 17
SEM REV Subsea Cable Spooling & Deployment
February to July 2015
Deck layout
Page 18
SEM REV Subsea Cable Spooling & Deployment
February to July 2015
Deck layout
Page 19
SEM REV Subsea Cable Spooling & Deployment
February to July 2015
Installation
Page 20
SEM REV Subsea Cable Spooling & Deployment
February to July 2015
Page 21
Contact us
+44 (0) 1651 871872
[email protected]
www.flowlinespecialists.com
SCOTLAND | NORWAY | THE NETHERLANDS
SINGAPORE | DUBAI – UAE