1 OFFSHORE CONSTRUCTION TO DECOMMISSIONING SpanSet have always worked with the companies involved in the generation and distribution sector. For us it is an important area whether it is Oil, Gas, Wind Power, Nuclear, Coal or Solar. We look to support those in the supply chain and are specialists in bespoke solutions. The result of this is we can support all stages of the life cycle of an offshore oil and gas rig. Construction – Use – Decommissioning. SpanSet Works in three areas Working at Height/Confined Spaces Lifting Load Restraint Providing - Advice - Products - Support Services – training, inspection, repair. The most demanding times of a project like this is either at concept the first stage or at the end of life - decommissioning. Where construction is concerned then the tasks under taken are usually clearer than at the time of decommissioning where many unforeseen consequences arise due to the design and the age of the equipment. All our products are safety based and we provide a wide range of solutions for the Oil and Gas Industry. In addition to safety our solutions also make tasks easier and are often most cost effective.

Upload: ngolien

Post on 05-Jul-2018

240 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: OFFSHORE CONSTRUCTION TO DECOMMISSIONING · OFFSHORE CONSTRUCTION TO DECOMMISSIONING ... the life cycle of an offshore oil and gas rig. Construction ... deck lashing, load

1

OFFSHORE CONSTRUCTION TO DECOMMISSIONING

SpanSet have always worked with the companies involved in the generation and distribution sector. For us it is an important area whether it is Oil, Gas, Wind Power, Nuclear, Coal or Solar.

We look to support those in the supply chain and are specialists in bespoke solutions. The result of this is we can support all stages of the life cycle of an offshore oil and gas rig.

Construction – Use – Decommissioning.

SpanSet Works in three areas

Working at Height/Confi ned Spaces

Lifting

Load Restraint

Providing

- Advice

- Products

- Support Services – training, inspection, repair.

The most demanding times of a project like this is either at concept the fi rst stage or at the end of life - decommissioning. Where construction is concerned then the tasks under taken are usually clearer than at the time of decommissioning where many unforeseen consequences arise due to the design and the age of the equipment.

All our products are safety based and we provide a wide range of solutions for the Oil and Gas Industry. In addition to safety our solutions also make tasks easier and are often most cost effective.

Page 2: OFFSHORE CONSTRUCTION TO DECOMMISSIONING · OFFSHORE CONSTRUCTION TO DECOMMISSIONING ... the life cycle of an offshore oil and gas rig. Construction ... deck lashing, load

2

Transport to site SpanSet have a range of solutions for load restraint, deck lashing, load security, securing pipe bundles and for the ever increasing complex and heavy lifts offshore.

High performance Magnum Plus & Magnum X – Up to 200 tons lift.

NoCut HMPE Protective Sleeving.

Moving items on site, build or erecting of the offshore facility.

THE CONSTRUCTION PHASE

Temporary Horizontal Anchorage Line for work restraint and fall arrest – up to 20m long.

Heavy Duty Load Security and Deck Lashings up to 12.5 tons.

WalkAbout Access Systems – an innovative platform for working at height.UK Patent Application Pending – No: 15030026

UK Patent No: GB 2 269 623 B

Steeltex SD HMPE – Up to 900 tons lift.

Page 3: OFFSHORE CONSTRUCTION TO DECOMMISSIONING · OFFSHORE CONSTRUCTION TO DECOMMISSIONING ... the life cycle of an offshore oil and gas rig. Construction ... deck lashing, load

3

Solutions SpanSet provide look after the personnel while they access and work protecting them in the case of an emergency with rescue or evacuation; devices to secure loads as well as equipment to lift and lower them in a controlled and safe manner.

All assets can be managed with RFID tracking & certifi cation online – IDXpertNet.

ONGOING AND ROUTINE MAINTENANCE

Work at Height PFPE.

Safeline Fixed Safety Systems.

Fall Arrest Blocks.

Award winning double self-retracting lanyard – reducing fall distances.

Rescue Kits & Equipment.

Rescue & Recovery Blocks. - RFID Asset Managed Tracking & Database.

Page 4: OFFSHORE CONSTRUCTION TO DECOMMISSIONING · OFFSHORE CONSTRUCTION TO DECOMMISSIONING ... the life cycle of an offshore oil and gas rig. Construction ... deck lashing, load

SpanSet Ltd. Telford Way, Middlewich Cheshire CW10 0HX, UKTel: +44 (0) 1606 737494 Fax +44 (0) 1606 737502www.spanset.co.uk

- SpanSet provide training for Height Safety, Lifting and Load Restraint for Users, Managers and Inspectors.

- Quality assured to ISO90011 in accordance with BS8454

- Expert tuition, Industry experience, and knowledge of Product Manufacturing for support.

- Delivered at our extensive facilities in Middlewich, at sites throughout the UK including offshore locations via our training partners or on customer sites.

- Selected dates available for online booking or tailored dates for groups.

© 2

015

Span

Set L

td. -

SP8

7575

- 8/

2015

- Pr

oduc

ed b

y w

ww

.thep

rintin

ghou

seltd

.co.

uk C

an b

e re

cycle

d.W

e ha

ve a

pol

icy o

f con

tinuo

us d

evel

opm

ent a

nd th

eref

ore

rese

rve

the

right

to m

odify

des

igns

and

spec

ifi ca

tions

with

out p

rior n

otic

e.

Deconstruction of offshore facilities has to be approached in a predictable and controlled manner not easy when dealing with aging equipment and where decommissioning was not designed in.

Axzion Engineered Lifting Solutions – specialised lifting devices custom designed to meet the exacting requirements of the offshore industry.

DECOMMISSIONING PHASE