official exhibit - pef021-00-bd01 - aquatic …united states nuclear regulatory commission official...
TRANSCRIPT
���������� �������
United States Nuclear Regulatory Commission Official Hearing Exhibit
In the Matter of: Progress Energy Florida, Inc. (Levy County Nuclear Power Plant, Units 1 and 2)
ASLBP #: 09-879-04-COL-BD01 Docket #: 05200029 | 05200030 Exhibit #: Identified: Admitted: Withdrawn: Rejected: Stricken:
Other:
PEF021-00-BD01 10/31/201210/31/2012
File Path: \\boomer\J\projects4\Progress_EnergLFL\MXD\Figure1-1_ID2323.mxd, Date: 01/14/09, User: KBerry
338884-TMEM-087, REV 2 CH2M HILL NUCLEAR BUSINESS GROUP CONTROLLED DOCUMENT
W+E S
LEGEND
Station Location
Sampling Location
D LNP Property Boundary
D CREC Property Boundary
Sources LNP Site: Sargent & Lundy, 2007 Imagery: Labins, 2004
o 0.5 1 1.5 2
Kilometers
o 0.5 1 1.5 2 - -- -Miles
Progress Energy Florida
Levy Nuclear Plant Overview Map
Aquatic Ecology Sampling Report
FIGURE 1-1
PAGE F1 OF F31
Rev
MLG: CFBC 5, 6, and 7 extend outinto the Gulf at about 1 mileintervals from CFBC 4
VVaterSurtace Ir-------------,--------------,--------------,--------------r--------------r-------------,--------------,
0.15
1
I .r:: ~
0.. Q) 2 0 ~
Q) ~
~ 3
4
0 5 10 15 20 25 _ CFBC1 Salinity (pss) - CFBC2 - CFBC3 - CFBC4 Note: CFBC Station 5 total water depth is less than 3 meters.
- CFBC5 - CFBC6 - CFBC7
\\Odin\Groups\Publications\-JMS-2008\Progress_Energy\M R- 2339\3.1 .2-2.pdf Date: 1 122/2009; Tech: H Robertson
338884-TMEM-087. REV 2 CH2M HILL NUCLEAR BUSINESS GROUP CONTROLLED DOCUMENT
30 35
Progress Energy Florida
Levy Nuclear Plant Units 1 and 2
Aquatic Ecology Sampling Report
Average Salinity (pss) at CFBC Stations
FIGURE 3.1.2-2 Rev 0
PAGE F6 OF F31
VVaterSurface rl----------;----------r---------;----------~--------_r--------_;----------;_--------_;--------_;
0.15 -
1 -
~
E ~
..c: -Co
2l ~ Qj
c ~ Qj -~
3--lii
4 -
o 1 2 3 4 5 6
- CFBC10 Salinity (pss) - CFBC9 - CFBC8
Note: CFBC Stations 8.9. and 10 total water depths are less than 4 meters.
\\Odin\Groups\Publications\-JMS-2008\Progress_Energy\MR-2339\3.3.2-1.pdf Date: 112212009; Tech: HRobertson
338884-TMEM-087. REV 2 CH2M HILL NUCLEAR BUSINESS GROUP CONTROLLED DOCUMENT
7 8 9
Progress Energy Florida
Levy Nuclear Plant Units 1 and 2
Aquatic Ecology Sampling Report
Average Salinity (pss) at OWR Stations
FIGURE 3.3.2-1 Rev 0