official exhibit - pef021-00-bd01 - aquatic …united states nuclear regulatory commission official...

3
United States Nuclear Regulatory Commission Official Hearing Exhibit In the Matter of: Progress Energy Florida, Inc. (Levy County Nuclear Power Plant, Units 1 and 2) ASLBP #: 09-879-04-COL-BD01 Docket #: 05200029 | 05200030 Exhibit #: Identified: Admitted: Withdrawn: Rejected: Stricken: Other: PEF021-00-BD01 10/31/2012 10/31/2012 File Path: \\boomer\J\projects4\Progress_EnergLFL\MXD\Figure1-1_ID2323.mxd, Date: 01/14/09, User: KBerry 338884-TMEM-087, REV 2 CH2M HILL NUCLEAR BUSINESS GROUP CONTROLLED DOCUMENT W+E S LEGEND Station Location Sampling Location D LNP Property Boundary D CREC Property Boundary Sources LNP Site: Sargent & Lundy, 2007 Imagery: Labins, 2004 o 0.5 1 1.5 2 Kilometers o 0.5 1 1.5 2 - - - - Miles Progress Energy Florida Levy Nuclear Plant Overview Map Aquatic Ecology Sampling Report FIGURE 1-1 PAGE F1 OF F31 Rev

Upload: others

Post on 14-Apr-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: OFFICIAL EXHIBIT - PEF021-00-BD01 - Aquatic …United States Nuclear Regulatory Commission Official Hearing Exhibit In the Matter of: Progress Energy Florida, Inc. (Levy County Nuclear

���������� �������

United States Nuclear Regulatory Commission Official Hearing Exhibit

In the Matter of: Progress Energy Florida, Inc. (Levy County Nuclear Power Plant, Units 1 and 2)

ASLBP #: 09-879-04-COL-BD01 Docket #: 05200029 | 05200030 Exhibit #: Identified: Admitted: Withdrawn: Rejected: Stricken:

Other:

PEF021-00-BD01 10/31/201210/31/2012

File Path: \\boomer\J\projects4\Progress_EnergLFL\MXD\Figure1-1_ID2323.mxd, Date: 01/14/09, User: KBerry

338884-TMEM-087, REV 2 CH2M HILL NUCLEAR BUSINESS GROUP CONTROLLED DOCUMENT

W+E S

LEGEND

Station Location

Sampling Location

D LNP Property Boundary

D CREC Property Boundary

Sources LNP Site: Sargent & Lundy, 2007 Imagery: Labins, 2004

o 0.5 1 1.5 2

Kilometers

o 0.5 1 1.5 2 - -- -Miles

Progress Energy Florida

Levy Nuclear Plant Overview Map

Aquatic Ecology Sampling Report

FIGURE 1-1

PAGE F1 OF F31

Rev

Page 2: OFFICIAL EXHIBIT - PEF021-00-BD01 - Aquatic …United States Nuclear Regulatory Commission Official Hearing Exhibit In the Matter of: Progress Energy Florida, Inc. (Levy County Nuclear

MLG: CFBC 5, 6, and 7 extend outinto the Gulf at about 1 mileintervals from CFBC 4

VVaterSurtace Ir-------------,--------------,--------------,--------------r--------------r-------------,--------------,

0.15

1

I .r:: ~

0.. Q) 2 0 ~

Q) ~

~ 3

4

0 5 10 15 20 25 _ CFBC1 Salinity (pss) - CFBC2 - CFBC3 - CFBC4 Note: CFBC Station 5 total water depth is less than 3 meters.

- CFBC5 - CFBC6 - CFBC7

\\Odin\Groups\Publications\-JMS-2008\Progress_Energy\M R- 2339\3.1 .2-2.pdf Date: 1 122/2009; Tech: H Robertson

338884-TMEM-087. REV 2 CH2M HILL NUCLEAR BUSINESS GROUP CONTROLLED DOCUMENT

30 35

Progress Energy Florida

Levy Nuclear Plant Units 1 and 2

Aquatic Ecology Sampling Report

Average Salinity (pss) at CFBC Stations

FIGURE 3.1.2-2 Rev 0

PAGE F6 OF F31

Page 3: OFFICIAL EXHIBIT - PEF021-00-BD01 - Aquatic …United States Nuclear Regulatory Commission Official Hearing Exhibit In the Matter of: Progress Energy Florida, Inc. (Levy County Nuclear

VVaterSurface rl----------;----------r---------;----------~--------_r--------_;----------;_--------_;--------_;

0.15 -

1 -

~

E ~

..c: -Co

2l ~ Qj

c ~ Qj -~

3--lii

4 -

o 1 2 3 4 5 6

- CFBC10 Salinity (pss) - CFBC9 - CFBC8

Note: CFBC Stations 8.9. and 10 total water depths are less than 4 meters.

\\Odin\Groups\Publications\-JMS-2008\Progress_Energy\MR-2339\3.3.2-1.pdf Date: 112212009; Tech: HRobertson

338884-TMEM-087. REV 2 CH2M HILL NUCLEAR BUSINESS GROUP CONTROLLED DOCUMENT

7 8 9

Progress Energy Florida

Levy Nuclear Plant Units 1 and 2

Aquatic Ecology Sampling Report

Average Salinity (pss) at OWR Stations

FIGURE 3.3.2-1 Rev 0

PAGE F1 OF F11