office of portfolio management may 16, 2013 district 30 middle school rezoning
TRANSCRIPT
Office of Portfolio Management
May 16, 2013
District 30 Middle School Rezoning
Table of Contents
2
Slide #
I. Rationale for Rezoning . . . . . . . . . . . . . . 3
II. Overview of the Rezoning Process . . . . . . . . . . . . . . 4
III. Guiding Policies and Principles . . . . . . . . . . . . . . 5IV. Methodology . . . . . . . . . . . . . .
6-7a. Determining the Target 6th Grade Zone Sizeb. Determining the Zone Lines
V. Schools Affected by Rezoning . . . . . . . . . . . . . . 8VI. Impact of Rezoning . . . . . . . . . . . . . . 9-10VII. Scenario Zone Lines . . . . . . . . . . . . . . 11-17VIII. Contact Information for Comments . . . . . . . . . . . . . .
18IX. Appendix . . . . . . . . . . . . . . 19
a. Admissions Process
OPM conducts analysis and
works with DPC and CEC to
assess the need to rezone
OPM derives the ideal
Kindergarten zone size of any
impacted schools
OPM develops and discusses scenario map
with key stakeholders
OPM and Superintendent
presents proposal before
CEC at public meeting
Superintendent collects
feedback and submits
proposal for approval
CEC collects feedback and
votes on proposal within
45 days of submission
1 2 3
4 5 6
Overview of Rezoning Process
Guiding Policies and Principles
4
• Pending approval by the CEC, the proposed changes would take effect for the 2014-2015 academic year.
• Pending approval by the CEC, the proposed changes would only impact incoming sixth grade students or new students to the system. All currently enrolled students may remain in their school until graduation.
• See Appendix A for the admissions process as outlined in the Chancellor’s regulation A-101.
• The Office of Pupil Transportation (OPT) will follow standard procedure to determine bus service eligibility of general education students, as outlined by Chancellor’s regulation A-801.
Methodology – Determining the Target 6th Grade Zone Size
5
Seat Supply: What is the capacity of each school?Specifically, how many instructional sections can each building accommodate?We assess capacity based on:
• The number of full-size classrooms available in the building; • The number of specialty rooms to which a school is entitled; and• Historical enrollment increases and decreases at each grade level.
Seat Demand: How many students do we anticipate?We assess demand – both from inside and outside the zone – based on:
• The historical number of sixth grade students living in the zone;• Historical average class sizes;• Historical zone retention rates (the percent of students who live in the zone
and attend their zoned school);• Historical zone enrollment rates (the percent of enrolled students who are
also zoned to that school); and• Anticipated sixth grade growth, based on current/future housing
developments.
Methodology – Determining the Zone Lines
6
To the extent possible, we draw zone lines in a way that:
• Achieves the targeted sixth grade zone size for all affected schools;
• Addresses overcrowding and other concerns of the community;
• Aligns zoning at the elementary and middle school grade levels;
• Accounts for grade reconfigurations as well as other programmatic offerings at impacted schools (e.g. expansions, magnet, etc.);
• Avoids forcing students to cross geographic barriers (e.g. highways, railroads, etc.);
• Accounts for residential construction and population growth within the affected areas;
• Centrally locates the school within the zone, wherever possible;
• Minimizes the distance students must travel to attend their zoned school; and
• Maintains the diversity of schools.
Rationale for Rezoning
7
• To alleviate overcrowding at I.S. 145.
• To create a zone for Hunters Point Community Middle School (30Q291), the new school in building Q404, located at 1-50 51st Avenue, that will open in September 2013.
• To account for the new capacity of new building Q297, located at 74-03 34th Avenue, that is slated to open in September 2014.
• To utilize excess middle school capacity in D30 to serve D30 residents.
• To align zoning at the elementary and middle school levels.
Schools Affected by Rezoning
8
DBN School Name Current Grade Span
Grade Span at Scale
Total Enrollment1
Total Org Capacity2 Utilization %
30Q145 I.S. 145 Joseph Pulitzer 6-8 6-8 2,073 1,740 119%
30Q230 I.S. 230 6-8 6-8 968 908 107%
30Q010 I.S. 010 Horace Greeley 6-8 6-8 919 1,043 88%
30Q126 Albert Shanker School for Visual and Performing Arts 6-8 6-8 489 980 50%
30Q204 I.S. 204 Oliver W. Holmes 6-8 6-8 701 1,047 67%
30Q291 Hunters Point Community Middle School New School 6-8 New School New School New School
(1) Based on the 2012-2013 Audited Register as of October 26, 2013.(2) Based on the 2011-2012 Blue Book Capacity.
In the current 2012-2013 school year:
Impact of Rezoning – 6th Grade Zone Size
9
School Name Current6th Grade Zone Size1
Planned 6th Grade Zone Size2
Change in 6th Grade Zone Size
I.S. 145 Joseph Pulitzer 973 810-820 ↓
I.S. 230 304 470-480 ↑
I.S. 010 Horace Greeley 400 450-460 ↑
Albert Shanker School for Visual and Performing Arts 312 330-340 ↑
I.S. 204 Oliver W. Holmes 380 355-365 ↓
Hunters Point Community Middle School New School 285-2953 New School
(1) The current zone size is based on the 2012-2013 Audited Register data as of October 26, 2012.(2) The planned zone size accounts for residential growth based on new construction data provided by the SCA.(3) The planned zone size accounts for approximately 145 additional 6th grade students in new residential construction. Based
on the 2012-2013 Audited Register data as of October 26, 2012, there are only approximately 145 6th grade students residing within the planned zone.
Impact of Rezoning – 6th Grade Sections
10
Current1 Planned2 `
School Name# of GE/ICT6th Grade Sections
GE/ICT 6th Grade
Enrollment
# of GE/ICT6th Grade Sections
GE/ICT 6th Grade
Enrollment
Change in 6th Grade
Enrollment
I.S. 145 Joseph Pulitzer 23 627 20 540-600 ↓
I.S. 230 11 298 15-16 425-465 ↑
I.S. 010 Horace Greeley 11 280 12 330-360 ↑
Albert Shanker School for Visual and Performing Arts
5 130 8 230-240 ↑
I.S. 204 Oliver W. Holmes 9 230 9 230-240 -
Hunters Point Community Middle School
New School New School 5 140-150 New School
(1) The 6th grade enrollment is based on the 2012-2013 Audited Register as of October 26, 2012.(2) The planned 6th grade section counts and enrollment take into account all programmatic offerings, such as G&T, magnet
programs, etc. These figures are subject to change based on revisions to the proposed zones.
District 30 Zone Line Scenario
11
Zone Line Scenario – IS 145
12
Zone Line Scenario – IS 230
13
Zone Line Scenario – IS 10
14
Zone Line Scenario – IS 126
15
Zone Line Scenario – IS 204
16
Zone Line Scenario – IS 291
17
Contact Information for Comments
18
OPMOffice of Portfolio
Management
Community Superintendent
CECCommunity
Education Council
Phone: (718) 391 – 8323Email: [email protected]: District 30 Zoning
Email: [email protected]: District 30 Zoning
Email: [email protected]: District 30 Zoning
Appendix A – Admissions Process¹
19
Students will be enrolled in New York City middle schools by the following priority:
a. Students with a zoned middle school have a priority to attend that school if they rank it on their middle school application. During the middle school admissions process, available seats (determined by OSE) at zoned schools will be available for non-zoned students who apply once all of the zoned students have been accommodated in the application process. Zoned students who do not apply to their zoned school no longer have a priority to attend that school. Zoned students who have applied will be accommodated before non-zoned students on appeal as space is available.
b. Fifth-grade students attending a K-8 school maintain a priority for the 6th grade middle school admissions process if they rank the continuing K-8 school on their middle school choice application. During the middle school admissions process, available seats (determined by OSE) at K-8 schools will be available for non-continuing students who apply once all of the continuing students have been accommodated in the application process. Continuing students who do not apply to their current school no longer have a priority to attend that school for 6th grade. Continuing students will be accommodated before non-continuing students on appeal as space is available.
c. When students receive a non-zoned or non-continuing school placement as a part of the middle school choice process, the students no longer have any entitlement to return to their zoned or K-8 school for the duration of middle school. Any requests for the zoned or K-8 school must be expressed through the PER or transfer process.
(1) Please refer to Chancellor’s Regulation A-101 for further information.