office of coast survey nrb 2013 debrief for boh lt michael c. davidson chief, navigation response...
TRANSCRIPT
Office of Coast Survey
Office of Coast SurveyOffice of Coast Survey
NRB 2013 Debrief for BOHLT Michael C. Davidson
Chief, Navigation Response Branch
Rapid Maritime Response
NRT6
NRT1
NRT2
NRT5
Galveston TX
Panama City FL
Jacksonville FL
USCG RDCNew London CT
NOS Navigation Response Teams
MIST 1 and AUVSilver Spring MD
Bay Hydro IISolomons MD
MIST 2DRC – Mobile AL
NRT4
San Francisco CA
NRT3 – Temporarily offlineNewport OR
Office of Coast Survey
Office of Coast Survey
Basic Stats
• Metrics MTS Ports surveyed – 11/13• Survey Project Instructions Issued – 17• Survey Projects Submitted – 12• Response Surveys Conducted – 12• DTONs submitted – 23?• Days of Operations - 268
Office of Coast Survey
NRT1 – Northern/Eastern GOM Region• J910-NRT1-13 Panama City, FL
– H12357 13 SNM - Completed– H12358 9 SNM – 82%– H12376 3 SNM – 15%
• Decommissioned TSWIG – Recommissioned old NRT4 boat.
• CARIS/HSTP on Edgetech 4125 integration• Received new office trailer• PS Froelich and ERT Mueller visits
Office of Coast Survey
NRT2 – SE Atlantic Region• S-G902-NRT2-13 St Augustine, FL
– F00629 3 SNM - Submitted
• S-G901-NRT2-13 St Johns River, FL– H12407 3 SNM – Submitted
– H12408 3 SNM – Submitted
• S-H918-NRT2-13 Ft Pierce, FL response– F00634 1 SNM – Submitted
• S-G929-NRT2-13 Mathews Bridge (Jax, FL)– D00188 1 SNM – Submitted
• S-H902-NRT2-14 Miami– F00640 – 1 SNM – Submitted *
• PS Herzog and PS Argento visits
Office of Coast Survey
NRT3 – Pacific NW Region• Warm lay-up status for 2013 season due to
staffing and budget challenges• Vessel located on MOC-P facility• Office trailer to be relocated to DRC, Mobile, AL.• Vehicles to be dispersed to other NRTs to
replace ageing vehicles (F350 will stay w/ boat)• May staff up as early as Q4 2014, but FY15
more likely
Office of Coast Survey
NRT4 – Great Lakes/Western Gulf• K414-NRT4-13 – Galveston Bay, TX
– H12388 10 SNM – Complete– H12391 2 SNM – Complete
• Responded to Sunken Barge, MS River over 4th of July Weekend
• Integrated POS/MV Ver5
• 2 Personnel new to the team in 2013
Office of Coast Survey
NRT5 – NE Region (USCG RDC- New London CT)• S-B903-NRT5-13 – New London CT
– D00177 1 SNM - Completed
• S-B906-NRT5-13 – Liberty/Ellis Islands– F00630 1 SNM - Submitted
• S-B917-NRT5-13 – Sandy Hook/USCG ANT NY– D00178 1 SNM – Complete– D00179 1 SNM – Complete– D00180 1 SNM – Complete– D00181 1 SNM - Complete
• B370-NRT5-13 – E Long Island Sound– H12508 8 SNM – Complete
• F00598, F00619, F00620, F00623 prior backlog nearing completion
Office of Coast Survey
NRT6• L430-NRT6-13 San Francisco
– H12227 12 SNM – 15%
• S-L919-NRT6-13 Fernstream– D00182 1SNM - Submitted
• S-L922-NRT6-13 San Francisco Anchorage 9– D00183 1 SNM - Submitted
• S-L926-NRT6-13 Mare Island, San Fran – D00186 1SNM - Submitted
• S-L927-NRT6-13 San Fran Pier 1– F00635 1 SNM – Submitted
• S-L925_NRT6-14 Carquinez Strait– Recon led to a LNM broadcast and subsequent full survey request
• MBES TPU failed – using NRT3’s
Office of Coast Survey
R/V Bay Hydro II• E349-BH2-13 Central Chesapeake Bay
– H12305 19 SNM – squared off at about 40%
• E924-BH2-13 Southern Chesapeake Bay– D00187 11 SNM – Complete
– BathyRadar ground truth survey and CBBT tunnel inspection
• Kongsberg EM2040 Integration and Testing
• Novatel GPS testing
• MAST
• Other HSTP related testing
• PS Powdrell visit
Office of Coast Survey
ERT Contractor
Current vacancies awaiting OCS realignment
ZT-4 will convert to ZP-3 when ZT-4 retires
Hiring Cert received - positions not affected by OCS realignment
NRB Staffing Plan
Office of Coast Survey
NRB Vessel Recapitalization Plan
• USCG 25’ RB-S #25426 from GSAXcess
• Contract with CDI Marine for engineering support and modification design
• $500K for new vessel construction – April 4 procurement deadline– Market research and SOW ongoing– Committed to 1 new vessel in FY 14 (Goal = 2)
Office of Coast Survey
NRT Mobile Asset Status Tracker• Utilizing 4G LTE wireless broadband
• Desired sensor data tx ashore in real-time
• ESRI GeoEvent Processor– Automate metrics tracking (geofencing)
– Dynamic floatplan with automated alerts
– Common Operating Picture through ESRI Dashboard
• Capability for Raw survey data transmit ashore for Near-time processing