ASME COMMITTEE STRUCTURE Council Codes and Standards I S Pressure Technology Codes and Standards I Committee Boiler & Pressure Vessel (FC Cherny,) RES Nonnuclear Sections VII, IV, V, V1, VII, Vill, ix, X I -- I Nuclear Sections Ill X1 I I Board Nuclear Codes & Standards (ME Mayfield) RES (FC Chemy, alt) RES (RH Wessman) NRR F Committee Nuclear Quality Assurance (LL Campbell) NMSS Committee Nuclear Risk Management (MA Cunningham) RES U Committee Operation & Maintenance (EV Imbro) NRR Committee Nuclear Air & Gas Treatment (RR Bellamy) RGN I (JJ Hayes) NRR Committee Qualification of Mechanical Equipment (RH Wessman) NRR it Committee Cranes for Nuclear Operations (BE Thomas) NRR II 0 I I

Upload: others

Post on 10-Aug-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Office Input for OMB Cirular A-119 FY 2001 Annual Report on … · 2012-11-18 · (RRajan) NRR Subgroup Diesel Generators -- Subgroup Functional Systems Subgroup Piping Systems (JR

ASME COMMITTEE STRUCTURE

Council

Codes and Standards

I SBoard

Pressure Technology

Codes and Standards I

Committee Boiler & Pressure Vessel

(FC Cherny,) RES

Nonnuclear

Sections

VII, IV, V, V1, VII, Vill, ix, X

I-- I Nuclear Sections

Ill

X1

I

I Board

Nuclear Codes & Standards (ME Mayfield) RES

(FC Chemy, alt) RES (RH Wessman) NRR

F

Committee Nuclear Quality

Assurance (LL Campbell) NMSS

Committee Nuclear Risk Management

(MA Cunningham) RES

U

Committee Operation & Maintenance

(EV Imbro) NRR

Committee Nuclear Air & Gas

Treatment (RR Bellamy) RGN I

(JJ Hayes) NRR

Committee Qualification of

Mechanical Equipment (RH Wessman) NRR

it

Committee Cranes for Nuclear

Operations (BE Thomas) NRR

II0

I

I

Page 2: Office Input for OMB Cirular A-119 FY 2001 Annual Report on … · 2012-11-18 · (RRajan) NRR Subgroup Diesel Generators -- Subgroup Functional Systems Subgroup Piping Systems (JR

ASME BOARDS

Council

Codes and StandardsI

I * I -

Board

Pressure Technology

Codes and StandardsII

Board

Performance Test

Codes

IBoard

Hearings and Appeals

Board

Council Operations

1Board

Safety Codes

and Standards

___________________________________________________________________________ £

I Board

Metrication

I Board

International

Standards

I Board

Conformity

Assessment

Board

Nuclear Codes

and Standards

(ME Mayfield) RES

(FC Cherny, alt) RES

(RH Wessman) NRR

Board Standardization

II

Page 3: Office Input for OMB Cirular A-119 FY 2001 Annual Report on … · 2012-11-18 · (RRajan) NRR Subgroup Diesel Generators -- Subgroup Functional Systems Subgroup Piping Systems (JR

ASME BNCS

I Committee

Board Operations IU'

1 Main Committee Committee on

Qualifcation of

Mechanical Equipment

Used in Nuclear Power

Plants (RH Wessman) NRR

I.

I Main Committee

Committee on Nuclear Air and

Gas Treatment (RR Bellamy) RGN I

(JJ Hayes) NRR

4

I

I Main Committee Committee on

Cranes for Nuclear Facilities

(BE Thomas) NRR

Board

Nuclear Codes and Standards

(ME Mayfield) RES

(FC Cherny, alt) RES

(RH Wessman) NRRI

Committee Nuclear Risk Management

(MA Cunningham) RES

Main Committee Committee on Nuclear

Quality Assurance

(LL Campbell) NMSS

Main Committee Committee on Operation

and Maintenance of

Nuclear Power Plants

(EV Imbro) NRR

I I I

I -I- L

I

Page 4: Office Input for OMB Cirular A-119 FY 2001 Annual Report on … · 2012-11-18 · (RRajan) NRR Subgroup Diesel Generators -- Subgroup Functional Systems Subgroup Piping Systems (JR

ASME Board on Conformity Assessment

Main Committee QAI

Main Committee Qualifications for Authorized Inspection

(RP McIntyre) NRR

Subcommittee Authorized Inspection Agency Accreditation (RP McIntyre) NRR

Page 5: Office Input for OMB Cirular A-119 FY 2001 Annual Report on … · 2012-11-18 · (RRajan) NRR Subgroup Diesel Generators -- Subgroup Functional Systems Subgroup Piping Systems (JR

ASME BPTC&SBoard

Pressure Technology

Codes and Standards

I I Task Group B16

Graphite and Ceramic Standardization of Valves,

Pressure Equipment Flanges, Fittings, and Gaskets

Main Committee

HSS~~ubc mtteeB /

Threaded Fittings (Except Steel &

Cast Iron), Flanges, and Flanged I Fittings I

Subcommittee C Steel Ranges and Flanged

Fittings

Subcommittee F Steel Threaded and Welding

Fittings

H Subcommittee G Gaskets for Flanged Joints

Subcommittee J Copper and Copper Alloy

Flanges, Flanged Fittings, and Solder Joint Fittings

HýSubcommittee L Gas Shutoff s and Valves

III

II

Subcommittee N Steel Valves and Face-to-Face and End-to-End Dimensions of

Valves (JD Page) RES

USTAG ISOITO 153/C 1 & 2

I

I

B31 Code for Pressure Piping

Standards CommitteeI

B96 Welded Aluminum Alloy

Storage Tanks Main Committee

B31 Mat~erials, Fabrication, and

Examination Technical Committee

B31 Mechanical Design

Technicad Commitjtee

I I

I -. MMMEME

___I

I L-

I

I

'L

L Suboomite !

L. Subcommittee

Dimensions and Tolerances

Page 6: Office Input for OMB Cirular A-119 FY 2001 Annual Report on … · 2012-11-18 · (RRajan) NRR Subgroup Diesel Generators -- Subgroup Functional Systems Subgroup Piping Systems (JR

(Listed below are the Main Committees which report to the Board. Space does not permit listing the subcommittees and working groups.)

L Al112 131

Plumbing, Materials Screw Threads and Equipment

B5 Machine Tools Components,

Elements, Performance, and

Equipment

B40B4 P46 7~

Specifications for Classification and B47 I Designation of Gage Blanks

Vacuum Gauges and Surface Qualities

Thermometers

B18 Standardization of Bolts, Nuts, Rivets, Screws, Washers,

and Similar Fasteners

B73 Chemical Standard

Pumps

B29 Chains,

Attachments, and Sprockets for Power Transmission and

Conveying

B32 Metal and Metal

Alloy Wrought Mill Product Nominal

Sizes

B94 Cutting Tools,

Holders, Drivers, and Bushings

B1307 Hand Tools and

Accessories

MH1 Pallets, Slip Sheets, and Other Bases for

Unit Loads

B133 Gas Turbine Procurement

Slew Ring Bearings

BH Standards Committee Design of

Below-the-Hook Lifting

STS Steel Stacks

Special Committee H213

Harmonization of Dimensional and

Geometrical Product Specifications and

Verification

Y14 Engineering,

Drawing and Related Documentation

Practices

HST Hoists Overhead

MFC Measurement of Fluid Flow in Closed Conduits

ASME

Page 7: Office Input for OMB Cirular A-119 FY 2001 Annual Report on … · 2012-11-18 · (RRajan) NRR Subgroup Diesel Generators -- Subgroup Functional Systems Subgroup Piping Systems (JR

ASME SECTION III

SubcommitteeNuclear Power

(KR Wichman) NRR, (FC Cherny) RES

Subgroup

General Requirements

(RP McIntyre) NRR

Working Group Dynamic & Extreme

Load Conditions (PY Chen) NRR

(M Hartzman) NRR

Special Working Group Seismic Piping Rules

(KA Manoly) NRR

Subgroup Pressure Relief

(FC Cherny) RES

Working Group Dynamic Analysis

Methods (PY Chen) NRR

(M Hartzman) NRR Committee Joint ACI-ASME Committee on

Concrete Components for Nuclear Service

(RE Shewmaker) NMSS

Subgroup Materials, Construction, &

Examination

Subgroup Design

(RE Shewmaker) NRR

Subgroup

Containment Systems

for Spent Fuel & High

Level Waste Transport

Packagings

(HW Lee) NMSS

II

I no&

I ommomwommmmmmmommmma

Page 8: Office Input for OMB Cirular A-119 FY 2001 Annual Report on … · 2012-11-18 · (RRajan) NRR Subgroup Diesel Generators -- Subgroup Functional Systems Subgroup Piping Systems (JR

ASME SECTION III

Subcommittee

Nuclear Power

(KR Wichman) NRR, (FC Cherny) RES

Subgroup

General Requirements

(RP McIntyre) NRR

Working Group Dynamic & Extreme

Load Conditions (PY Chen) NRR

(M Hartzman) NRR

Special Working Group Seismic Piping Rules

(KA Manoly) NRR

(NC Chokshi) RES

Special Working Group

Environmental

Subgroup Pressure Relief

(FC Cherny) RES

Working Group Dynamic Analysis

Methods (PY Chen) NRR

(M Hartzman) NRR Committee Joint ACI-ASME Committee on

Concrete Corn ponents for Nuclear Service

(RE Shewmaker) NMSS

Subgroup Materials, Construction, &

Examination

Subgroup Design

(RE Shewmaker) NRR

Subgroup

Containment Systems for Spent Fuel & High Level Waste Transport

Packagings

(HW Lee) NMSS

II

I m

I

Page 9: Office Input for OMB Cirular A-119 FY 2001 Annual Report on … · 2012-11-18 · (RRajan) NRR Subgroup Diesel Generators -- Subgroup Functional Systems Subgroup Piping Systems (JR

ASME SECTION XI

Subgroup • Subgroup Water-Cooled Systems Evaluation Standards

7' (WE Norris) RES I H'(KR Wichman) NRR

Working Group Inspection, Systems,

& Components (DG Naujock) NRR

Working Group Pressure Testing

(AD Lee) NRR

Working Group Implementation of

Risk-Based Examination (SA Ali) NRR

Working Group Containment

(HL Graves) RES (MA Kotzalas) NRR

Working Group Flaw Evaluation

(KR Wichman) NRR

Working Group Pipe Flaw Evaluation j

(AD Lee) NRR

Working Group Welding & Special

eRRepair Processes (JA Davis) NRR

Working Group Design

0iReconciliation j(EV Imbro) NRR

Working Group Responsibilities &

Program Requirements

(JD Peralta) NRR

SSubgroup

Nondestructive

Examination tMC Modes) RGN I

Working Group | Procedure

L • Qualification & | Volumetric / Exam ination

/(MC Modes) RGN I

Working Group Personnel

Qualification & Surface Visual

Examination and Eddy Current Examination

HWorking Group General Requirements

(DA Jackson) RES

Special Working Group Plant Life Extension

(PT Kuo) NRR

Subcommittee

Nuclear Inservice Inspection

(WE Norris, alt) RES

i

Subgroup

Repair, Replacement &

Modification

(EV Imbro) NRRII

-- I I

I I

I

I EEO MMMEM

I

Page 10: Office Input for OMB Cirular A-119 FY 2001 Annual Report on … · 2012-11-18 · (RRajan) NRR Subgroup Diesel Generators -- Subgroup Functional Systems Subgroup Piping Systems (JR

MAIN COMMITTEE O&MMain Committee

Committee on Operation and

Maintenance of Nuclear Power Plants

(EV Imbro) NRR

-1--u-

I

Performance Appraisal

SSubcommittee

l iCodes g (EV Imbro) NRR

(FC Cherny) RES

L Subgroup ISTA (Eitora eiw) [Subgroup Relief

(JD Page) ]RES CValve

Subgroup ISTB Operated Valves (JD Page) RES (TG Scarbrough)

NRR

Subgroup ISTC (FC Chemy) RESl

Subgroup Air Operated Valves

(J Colaccino) NRR

Subgroup ISTD Check Valves

S (Risk Initiatives)

(DC.Fischer)_NRR

[-Subcommittee

Standards & Guides (RRajan) NRR

Subgroup Diesel Generators

-- Subgroup

Functional Systems

Subgroup Piping Systems (JR Rajan) NRR

Subgroup Rotating Equipment

Subgroup Reactor Internals &

Heat Exchangers

Special Committee Standards Planning

(EV Imbro) NRJR

Subgroup Loose Parts

Subgroup Heat Exchangers

II

I

Page 11: Office Input for OMB Cirular A-119 FY 2001 Annual Report on … · 2012-11-18 · (RRajan) NRR Subgroup Diesel Generators -- Subgroup Functional Systems Subgroup Piping Systems (JR

MAIN COMMITTEE NQA

Executive Committee Nuclear Quality

Assurance '

1 Subcommittee Interfaces &

Administration (OP Gormley) RES (WR Smith) NMVSSI

A Subcommittee Engineering & Procurement

Processes (TH Carter) NMSS

(LLCampbell) NMSS

Subcommittee Program

Management Processes

(LL Campbell) NMSS

_ _ I _

Subcommittee Program

Management Processes

(OP Gormley) RES

(WL Belke) NMSS

Subcommittee Assessment &

Verification (JJ Pearson)

INMSS

I Subcommittee

Waste Management (CL Pittiglio)

NMSS

Main Committee

Committee on Nuclear Quality

Assurance

(LL Campbell) NMSS

I iI

Im

Page 12: Office Input for OMB Cirular A-119 FY 2001 Annual Report on … · 2012-11-18 · (RRajan) NRR Subgroup Diesel Generators -- Subgroup Functional Systems Subgroup Piping Systems (JR

ASME MAIN COMMITTEE CONAGT

S Subcommittee

Ventilation Air

" Cleaning Equipment

(RR Bellamy) RGN I,

(JJ Haves) NRR

Subcommittee Ventilation and

Conditioning Equipment

Main Committee

Committee on Nuclear Air & Gas

Treatment Equipment

I(RR Bellamy) RGN I, (JJ Hayes) NRR

Page 13: Office Input for OMB Cirular A-119 FY 2001 Annual Report on … · 2012-11-18 · (RRajan) NRR Subgroup Diesel Generators -- Subgroup Functional Systems Subgroup Piping Systems (JR

ASME

MAIN COMMITTEE QME

I Subcommittee

Qualification of Valve Assemblies

(TG Scarbrough) NRR

Subcommittee Qualification of Active Dynamic

Restraints WJDPage) RES

Subcommittee

General Requirements LLI

Subgroup Dynamic Qualification

(KA Manoly) NRR

Main Committee Committee on Qualification of

Mechanical Equipment Used in Nuclear Power Plants (RH Wessman) NRR

Subcommittee Qualification of Pump Assemblies (JR Rajah) NJRR

Page 14: Office Input for OMB Cirular A-119 FY 2001 Annual Report on … · 2012-11-18 · (RRajan) NRR Subgroup Diesel Generators -- Subgroup Functional Systems Subgroup Piping Systems (JR

ASME Main Committee CNF

Executive Committee Cranes for Nuclear Facilities

Main Committee Committee on Cranes for Nuclear

Facilities (BE Thomas) NRR

I Subcommittee

Nuclear Overhead & Gantry Cranes

ISubcommittee

Nuclear Underhung and Monorail Cranes

Page 15: Office Input for OMB Cirular A-119 FY 2001 Annual Report on … · 2012-11-18 · (RRajan) NRR Subgroup Diesel Generators -- Subgroup Functional Systems Subgroup Piping Systems (JR

ASME B&PV Committee Subcommittee on Design

Subcommittee on Design

*

I.

Special Working Group on Bolted Flanged

Joints

Subgroup on Openings

Subgroup on Design Analysis

Subgroup on Elevated

Temperature Design

-1 Subgroup

on Fatigue Strength (J Muscara) RES

1,

I

0

II

II

Page 16: Office Input for OMB Cirular A-119 FY 2001 Annual Report on … · 2012-11-18 · (RRajan) NRR Subgroup Diesel Generators -- Subgroup Functional Systems Subgroup Piping Systems (JR

American Nuclear Society Standards Committee

C. H. Moseley Jr., Chairman N. Prasad Kadambi, Vice-Chairman 1

Standards Steering Committee

(NP Kadambi) RES.*-.** .,..--� ;f-*y.***...

r I, r

N16 Nuclear Criticality Safety

(JR Davis) NMSS

.1ANS-8

Subcommittee on Nuclear Criticality Safety in Operations with Fissionable

Materials Outside Reactors (DR Damon) NMSS

II

I�.

INFSC

Nuclear Facility Standards Committee

(NP Kadambi) RES

[See NFSC Organization Chart

for further detail]

IANS-1

Safety Guide for the Performance of

Critical Experiments

ANS-6 Radiation

Protection & Shielding

ANS-10 Mathematics and

Computation Subcommittee

ANS-14 Fast Pulse Reactors

ANS-15 Committee on Operation of

Research Reactors (LB Marsh) NRR (A Adams) NRR

ANS-19 Committee on

Physics of Reactor Design

(L Lois) NRR

S. Coyne-Nalbach Administrative Secretary

N17 Research Reactors,

Reactor Physics, Radiation Shielding &

Computational Methods (A Adams) NRR (LB Marsh) NRR

II I

RISC Risk Informed Standards Consensus Committee

(MA Cunninghmam)RES (RJ Barrett) NRR

MOVATMFIM-V-r-= I I

- OM WMZWTWIA or'Te, ýz

II

I

i

Page 17: Office Input for OMB Cirular A-119 FY 2001 Annual Report on … · 2012-11-18 · (RRajan) NRR Subgroup Diesel Generators -- Subgroup Functional Systems Subgroup Piping Systems (JR

American Nuclear Society

ANS-N17/ANS-1

Working Group Safety Guide for the

Performance of Critical Experiments

ANS-17

Research Reactors, Reactor Physics, Radiation

Shielding & Computational Methods

(A Adams) NRR

(LB Marsh) NRR

ANS-1

Safety Guide for the

Performance of Critical

Experiments

II amino"= 11

Page 18: Office Input for OMB Cirular A-119 FY 2001 Annual Report on … · 2012-11-18 · (RRajan) NRR Subgroup Diesel Generators -- Subgroup Functional Systems Subgroup Piping Systems (JR

American Nuclear Society ANS N17/ANS-6

/WG 6.1.1

Neutron and Gamma-Ray Fluence-to-Dose Factors

WG 6.4 Guideines on the Nuclear

Analysis and Design of Concrete Radiation

Shielding for Nuclear Power Plants

WG 6.1.2 Neutron and Gamma-Ray Cross Sections for Nuclear

Radiation Protections Calculations for Nuclear

Power Plants

WG 6.2.1 Shielding Benchmark

Problems (project withdrawn)

WG 6.2.2 Benchmark Problems for Radiation Energy

Spectra Unfolding (project withdrawn)

WG 6.4.3 WG 6.5 WG 6.4.2 Gamma-Ray Attenuation Glossary of Terms in

Specifications for Radiation Coefficients and Buildup Shielding and Dosimetry Shielding Materials Factors for Engineering (project withdrawn)

Materials

WG 6.3.1 Program for Testing

Radiation Shields in LWRs (RL Pedersen) NRR

WG 6.6.1 Calculation and

Measurement of Direct and Scattered Gamma

Radiation from LWR Nuclear Power Plants

WG 6.7.1 WG 6.7.2 Radiation Zoning for Radiation Zoning of LWR

Design of Nuclear Power Plants for Plants Accident Conditions

(project withdrawn) (project withdrawn)

N17

Research Reactors, Reactor Physics, Radiation

Shielding & Computational Methods

(A Adams) NRR

(LB Marsh) NRR

ANS-6

Radiation Protection

and Shielding

WG 6.6.2 Standard on Neutron

Air Scattering

Page 19: Office Input for OMB Cirular A-119 FY 2001 Annual Report on … · 2012-11-18 · (RRajan) NRR Subgroup Diesel Generators -- Subgroup Functional Systems Subgroup Piping Systems (JR

American Nuclear Society

ANS N17/ANS-10

ANS-10

Mathematics and Computation Subcommittee

WG 10.2 Programming Practices for Portability of Science

and Engineering Programs

I WG 10.4

Verification and Validation of Science and

Engineering Computer Programs

N17

Research Reactors, Reactor Physics, Radiation

Shielding & Computational Methods

(A Adams) NRR

(LB Marsh) NRR

WG 10.3 Documentation of

Computer Software

I WG 10.5

Accommodating User Needs

I i

Page 20: Office Input for OMB Cirular A-119 FY 2001 Annual Report on … · 2012-11-18 · (RRajan) NRR Subgroup Diesel Generators -- Subgroup Functional Systems Subgroup Piping Systems (JR

American Nuclear Society N16/ANS-8

N16

Nuclear Criticality Safety

Committee I

WG 8.1 Nuclear Criticality Safety

in Operations with Fissionable Materials

Outside Reactors (DC Morey) NMSS

WG 8.3 Alarm System

WG 8.6 Subcritical

Neutron-Multiplication

WG 8.17 Handling, Storage, and Transportation of Ash

WG 8.7 Criticality Safety in the

Storage of Fissile Materials

(HD Felscher) NMSS

WG 8.19 Administrative Practices

for Nuclear Criticality Safety

(HD Felsher) NMSS

����1�����

/

ANS-8 Subcommittee

Nuclear Criticality Safety in

Operations with Fissionable

Materials Outside Reactors

(DR Damon) NMSS

WG 8.5 Borosil icate-Glass

Raschig Ri

WG 8.10 Nuclear Criticality

Practices for Nuclear Criticality Safety

(HD Felsher) NMSS

WG 8.12 Nuclear Criticality Control

and Safety of Plutonium-Uranium Fuel

Mixtures Outside Reactors

(HD Felsher) NMSS

WG 8.15 Special Actinide

Elements

WG 8.20 Safety Training

WG 8.21 Use of Fixed Neutron

Absorbers for Criticality Control

(DE Carlson) NMSS

WG 8.22 Limiting and Controlling

Moderators

WG 8.23 Accident Emergency Planning Response

f I--%

I I

I I I 1 1 1 1 11 . ,

i

Page 21: Office Input for OMB Cirular A-119 FY 2001 Annual Report on … · 2012-11-18 · (RRajan) NRR Subgroup Diesel Generators -- Subgroup Functional Systems Subgroup Piping Systems (JR

American Nuclear Society

ANS-N17/ANS-14

N17

Research Reactors, Reactor

Physics, Radiation Sheielding &

Computational Methods

(A Adams) NRR

(LB Marsh) NRR

--F------ANS-14

Fast Pulse Reactors

S WG 14.1

Operation of Fast Pulse Reactors

Page 22: Office Input for OMB Cirular A-119 FY 2001 Annual Report on … · 2012-11-18 · (RRajan) NRR Subgroup Diesel Generators -- Subgroup Functional Systems Subgroup Piping Systems (JR

American Nuclear Society

ANS N17/ANS-15

N17 Research Reactors, Reactor Physics, Radiation

Shielding & Computational Methods (A Adams) NRR (LB Marsh) NRR

ANS-1 5 Committee on Operation

of Research Reactors (LB Marsh) NRR

/5 / ........ ANS-15.02 b Ar ~ ........

IANS-1 5.16

WG Emergency Planning for Research Reactors

(A Adams) NRR

ANS-15.21 WG Format and Content

for Safety Analysis Reports for Research Reactors

(A Adams) NRR

IN-5 I O.U I

WG Development of Technical Specifications for Research Reactors (N378)

(A Adams) NRR

WG Quality Control for Plate-Type

Uranium-Aluminum Fuel Elements

(MM Mendonca) NRR

A1S- I 5.04

WG Selection and Training of Personnel for Research

Reactors (WJ Eresian) NRR

ANS-1 5.08 WG Quality Assurance Program Guidance and

Requirements for Research Reactors

(A Adams) NRR

ANS-15.07 WG Research Reactor Site

Evaluation (MM Mendonca) NRR

ANS-15.10 WG Decommissioning of

Research Reactors (N550) (MM Mendonca) NRR

ANS-15.11 WG Radiation Protection at

Research Reactor Facilities

(TF Dragoun) Reg I

ANS-15.17 WG Fire Protection for

Research Reactors (A Adams) NRR

ANS-15.19 WG Shipment and Receipt of Special Nuclear Material

by Research Reactor Facilities

(CH Bassett) NRR

ANS-15.20 WG Control and Safety Systems for Research

Reactors (TS Michaels) NRR

Page 23: Office Input for OMB Cirular A-119 FY 2001 Annual Report on … · 2012-11-18 · (RRajan) NRR Subgroup Diesel Generators -- Subgroup Functional Systems Subgroup Piping Systems (JR

American Nuclear Society ANS N17/ANS-19

ANS-19 Committee on Physics of Reactor

Design (L Lois) NRR

WG 19.1 Nuclear Data Sets for

Reactor Design Calculations

WG 19.4 Guide for Acquisition and

Documentation of Reference Power Reactor Physics Measurements for

Nuclear Analysis Verification

WG 19.2 Definitions of Reactor Physics Terms and

Parameters (project withdrawn)

WG 19.5 Requirements for

Reference Reactor Physics Measurements

WG 19.10 Fast Neutron Fluence to Power Reactor Cavities

(L Lois) NRR

WG 19.2.1 Terms and Definitions for Breeder Reactor Systems

(project withdrawn)

WG 19.6.1 Reload Startup Physics

I ests Tor Pressurized Water Reactors

(MS Chatterton) NRR

WG 19.11 Calculation and Measurement of

Moderator Temperature Coefficients of Reactivity

WG 19.3 The Determination of Steady State Neutron

Reactor Rate Distributions and Reactivity of Nuclear

Reactors

WG 19.7 Reactor Physics Input to

Safety Analysis (Calculation of Sample

Reactivity for Use in Thermal LWR Safety

Analysis) (CL Hoxie) OCO

WG 5.01 Decay Heat Power in Light

Water Reactors (DE Carlson) NMSS

WG 19.3.4 The Determination of

Thermal Energy Deposition Rates in

Nuclear ReactorsWG 19.1 Nuclear Data Sets for

Reactor Design Calculations

WG 19.8 Fission Product Yields for

235U, 238U, and 239P

N17 Research Reactors, Reactor Physics, Radiation

Shielding & Computational Methods (A Adams) NRR (LB Marsh) NRR

Z7

IA

I ...- -- - I

Page 24: Office Input for OMB Cirular A-119 FY 2001 Annual Report on … · 2012-11-18 · (RRajan) NRR Subgroup Diesel Generators -- Subgroup Functional Systems Subgroup Piping Systems (JR

American Nuclear Society NFSC/NPSLD

Nuclear Power System Level

Design Standards

Subcommittee

II

WG 52.X Boiling Water]l

ReorSystems

WG 50.1

Light-Water Reactor Safety Criteria

WG 54.X ILiquid Metal IFastil Breeder Reactor

Systems

WG 55.1 Solid Radioactive Waste Processing

Systems for Light-Water Cooled

Reactor Plants

WG 55.4 Gas Waste Systems

- LWR

WG 55.6 Liquid Waste

Systems - LWR

WG 56.2 Containment

Isolation

WG 56.3 Operating Plant

Protection

WG 56.6 PWR Containment

Venting

WG 56.7 BWR Containment

Venting

WG 58.14

Safety Classification (CG Hammer) NRR

WG 59.XX Water/Air Systems

WG 59.2 Safety Criteria for

HVAC Systems Located Outside of

Containments (JJ Haves) NRR

WG 59.5 Emergency Diesels

(EB Tomlinson)NRR

/

WG 56.5 Spray

Page 25: Office Input for OMB Cirular A-119 FY 2001 Annual Report on … · 2012-11-18 · (RRajan) NRR Subgroup Diesel Generators -- Subgroup Functional Systems Subgroup Piping Systems (JR

American Nuclear Society NFSC/NPPDC&O

WG 2.12 Hazards

WG 3.5 Nuclear Power Plant Simulators for Use in Operator Training and Examinations

(L Vick) NRR

WG 56.8 Containment

Leakage (D Lurie) CFO

(JC Pulsipher) NRR

WG 58.9 Single Failure

WG 2.23 Guidelines for

Post-Earthquake Inspection and

Restart (RM Kenneally) RES

WG 4.XX Criteria for

Instrumentation

WG 56.9 Environmental Env

WG 58.11 Cold S/D

WG 3.1 Qualification &

Training of Nuclear Plant Personnel

(JJ Persensky) RES

WG 5.6.2 Post Accident

Access/ Health Physics

WG 56.11 Component

Flooding

WG 56.12 Loss of AC

IWG 3.3 Security

WG 3.2 Administrative

Controls for Nuclear Power Plants

(RP Correia) NRR

WG 5.7.2 Post Accident

Monitoring

WG 58.3 Protection Criteria

WG 56.13 Post Accident

Access - Outside Containment

WG 3.4 Medical

Requirements for Licensed Nuclear

Power Plant Operators

(EE Bamhill) NRR

WG 5.9 Design of Critical

Radiation Monitoring Systems

WG 58.6 Remote

S/D

WG 7.4.3 Digital Component

Systems

WG 58.4 Radiation Technical

Specifications

Nuclear Power Plant Design

Criteria and Operations

Subcommittee

I,A

Page 26: Office Input for OMB Cirular A-119 FY 2001 Annual Report on … · 2012-11-18 · (RRajan) NRR Subgroup Diesel Generators -- Subgroup Functional Systems Subgroup Piping Systems (JR

American Nuclear Society

NFSC/EP

1WG 3.7.1

Facilities for Medical Care On and Off Plant

Site (N682) (DM Barss) NRR

WG 3.7.3 Emegency Preparedness at Nuclear Power Plants

(DM Barss) NRR

WG 3.8.5 Emergency Procedures

Field Monitoring (DM Barss) NRR

Subcommittee

Emergency Planning

/WG 3.7.2

Emergency Control

WG 3.8.2 Emergency Facilities

(DM Barss) NRR

WG 3.8.1 Emergency Functions

(DM Barss) NRR

WG 3.8.3 Emegency Procedures

(DM Barss) NRR

WG 3.8.4 Emergency Capabilities

(DM Barss) NRR

WG 3.8.6 Off Site Radiation

Assessment (DM Barss) NRR

WG 3.8.7 Drills

(DM Barss) NRR

WG 3.8.8 PAGs

(DM Barss) NRR

I

I.N,. mm NMIN ýmf

A

Page 27: Office Input for OMB Cirular A-119 FY 2001 Annual Report on … · 2012-11-18 · (RRajan) NRR Subgroup Diesel Generators -- Subgroup Functional Systems Subgroup Piping Systems (JR

American Nuclear Society

NFSC/FFC&S

WG 2.19 Site Independent Spent

Fuel Storage Installations

I~I I

WG 2.24 Geological Repositories

WG 57.3 Design Requirements for New Storage Facilities at

Nuclear Power Plants (C Gratton) NRA

WG 57.4 Failed Fuel Detection

Systems

WG 57.5 Assembly Design

I I"I'lo . ýI'm III

WG 57.6 QA for

Design/Manufacture of Nuclear Power Plant Fuel

WG 57.7 Design of Independent

Spent Fuel Storage Installations

(JR Hall) NMSS

WG 57.9 Design of Independent

Spent Fuel Storage Installations (Dry)

(RJ Randall)NMSS

WG 57.10 Fuel Rods Consolidation

Subcommittee

Fuel, Fuel Containment, and

Storage

/WG 57.1

Fuel Handling Eq

WG 57.2 Design Requirements for LWR Spent Fuel Facilities at Nuclear Power Plants

(C Gratton) NRR

II I

I I I I

Page 28: Office Input for OMB Cirular A-119 FY 2001 Annual Report on … · 2012-11-18 · (RRajan) NRR Subgroup Diesel Generators -- Subgroup Functional Systems Subgroup Piping Systems (JR

American Nuclear Society

NFSC/NPFRWC&S

I WG2.26

Classification Criteria for Nuclear

Materia Facilities

I WG 2.28

Nuclear Material Facilities - Natural

Hazards

I.

WG 40.35 Volume Reduction of Low-Level Waste

(DA Orlando) NMSS

WG 40.36 Measurement of

Radnuclides - Solid Waste

I WG 40.21 Siting and

Operation of Commercial Burial

Grounds

WG 40.37 Mobile Processing

WG 40.23 Criteria for

Acceptance for Radwaste at Federal Sites

Non-Power Facilities,

Radioactive Waste Containment

& Storage Subcommittee

'I

Page 29: Office Input for OMB Cirular A-119 FY 2001 Annual Report on … · 2012-11-18 · (RRajan) NRR Subgroup Diesel Generators -- Subgroup Functional Systems Subgroup Piping Systems (JR

American Nuclear Society NFSC/SE

Subcommittee 2

Site Evaluation

(AJ Murphy) RES

WG 2.22W WG 2.1 Earthquake WG 2.3 W . WG 2.5 WG 2.6

Earthquake Instrumentation Estimating Wsu2.4iMeterology at Nuclear Population Criteria Tornado/Winds Power Plants

(RM Kenneally) RESIIIII

WG 2.10 WG 2.8 Review of Data from WG2.13 WG 2.7 Guidelines for Surface Faulting Determining Design Basis WG 2.9 Seismic WG 2.11 Evaluation of Surface

Nuclear Power Plants Flooding at Nuclear Water Transport Instrumentation Geotech Water Supplies for Power Reactor Sites (N643) Nuclear Power Plants

(RM Kenneally) RES

WG 2.14 WG 2.15 WG 2.16 WG 2.17 WG WG 2.20 1 Surface WaterGelg Water Supply Transport Transport Radiation Transport Transport Geology

WG 2.22 WG 2.25 Criteria for Natural Assess Capability for Met 3.11M t at1i L Environmental Surveys of Terrestrial Phenomenological Surface Faulting at Met. Monitoring at Leachability LoweLevel

MEcology Hazards for Nuclear Nuclear Facilities Nuclear Power Plants Waste Materials Facilities

WG 18.5 Terrestrial Ecology

Page 30: Office Input for OMB Cirular A-119 FY 2001 Annual Report on … · 2012-11-18 · (RRajan) NRR Subgroup Diesel Generators -- Subgroup Functional Systems Subgroup Piping Systems (JR

IEEE STRUCTURE

Board of Directors Executive Committee

Standards Board Review

Committee

(SK Aggarwal) RES HON

Standards Association

IEEE Standards Board

(SK Aggarwal) RES

I39 Other Societies and

Technical Councils

0 1I

Electric IPower System] Insulated_ _ Machinery Dynamic Conductors

Committee Perfornamce Committee Committee

Power Systems •ITransformers Power System

Communications Transtfers Relaying

Committee Committee

Pnwer .v.tem Energy Power SystemI v-vvq - 3- ....

Instrumentation & Measurements

Committee

Development &

Power

Generation

Committee

Analysis,

Computing, &

Economics Committee

Transmission & Power System Power System Distribution Planning & Operations Committee Implementation Committee]

Committee I i statiOnary

Substations Switchgear Battery

Committee Committee Committeer

Nuclear Power

Engineering

Committee

(SK Aggarwal) RES

Surge Protection

Devices

Committee

(S Mazumdar)

NRR

I

1 111 .m omm II

MP I I m i

I "I , I I -I, I lommilm l ------T----"II I

I 4

I

/

Page 31: Office Input for OMB Cirular A-119 FY 2001 Annual Report on … · 2012-11-18 · (RRajan) NRR Subgroup Diesel Generators -- Subgroup Functional Systems Subgroup Piping Systems (JR

Institute of Electrical and Electronic Engineers

NPEC

Nuclear Power Engineering

Committee

(SK Aggarwal) RES

Subcommittee 2

Qualifications

(SK Aggarwal) RES

Subcommittee 3

Operations, Surveillance, &

Maintenance

(JP Vora) RES

I wal 'I'm Mil

4

4

Subcommittee 5 Human Factors, Control

Facilities, and Reliability

(JP Bongarra) NRR

Subcommittee 6

Safety Related Systems

(EC Marinos) NRR

Subcommittee 4

Auxiliary Power

(AS Gill) NRR

Subcommittee 8 Quality Maintenance and

Improvement

Page 32: Office Input for OMB Cirular A-119 FY 2001 Annual Report on … · 2012-11-18 · (RRajan) NRR Subgroup Diesel Generators -- Subgroup Functional Systems Subgroup Piping Systems (JR

Institute of Electrical and Electronics Engineers

Nuclear Power Engineering Committee

SC2

Working Group 2.1

Revision to IEEE Std 323

SEquipment Qualification

(PC Shemanski) NRR

Working Group 2.5

Revision to IEEE Std 344

Seismic Qualification

(PY Chen) NRR

II I m

Subcommittee 2

Qualifications (SK Aggarwal) RES

IWorking Group 2.2

Revision to IEEE Std 334

Qualifications of Motors, in

Cooperation with Rotating

Machinery Committee

Working Group 2.3

Revision to IEEE Std 382

Valve Operators

Working Group 2.4

Revision to IEEE Std 383

Cables - in Cooperation with

Insulated Conductors

Committee

IWorking Group 2.10

Revision to IEEE Std 627

Design Qualification of

Safety Equipment

1r 1, 1w

Working Group 2.11

Revision to IEEE Std 572

Connectors and

Connections

IWorking Group 2.14

Revision to IEEE Std 649

Motor Control Centers

mllmmlgýýl

L llwý

m

Page 33: Office Input for OMB Cirular A-119 FY 2001 Annual Report on … · 2012-11-18 · (RRajan) NRR Subgroup Diesel Generators -- Subgroup Functional Systems Subgroup Piping Systems (JR

Institute of Electrical and Electronic Engineers

Nuclear Power Engineering Committee

SC3

Subcommittee 3

Operations, Surveillance, and Testing

(JP Vora) RES

Working Group 3.0 Working Group 3.3 Revision to IEEE Std 338 Revision to IEEE Std P-1359

Periodic Testing Maintenance & Good Practices

of Safety Systems

_____________________ _______________ _______________iWorking Group 3.4

Revision to IEEE Std P-1205

Assessing, Monitoring, & Mitigating

Aging Effects on Nuclear Power

Generating Station Equipment

(PC Shemanski) NRR

Working Group 3.6

Revision to IEEE Std 415

Periodic Testing of Power

Systems

I

Working Group 3.7

Revision to IEEE Std 692

Security Systems

Page 34: Office Input for OMB Cirular A-119 FY 2001 Annual Report on … · 2012-11-18 · (RRajan) NRR Subgroup Diesel Generators -- Subgroup Functional Systems Subgroup Piping Systems (JR

Institute of Electrical and Electronic Engineers

Nuclear Power Engineering Committee

SC4

Working Group 4.2

Revision to IEEE Std 387

Diesel Generator Units

(OP Chopra) NRR

V I I

Working Group 4.3

Revision to IEEE Std 317

Electrical Penetrations of

Containment Structures

Working Group 4.4 Valve Motor Selection,

Application, and Testing

&

Working Group 4.7

Revision to IEEE Std 741

Protection of Class 1 E

Power Systems

(NK Trehan) NRR

Subcommittee 4

Auxiliary Power

(AS Gill) NRR

U

Working Group 4.1

Revision to IEEE Std 308

Auxiliary Power Systems

(AS Gill) NRR

Working Group 4.6

Revision to IEEE Std 765

Interfacing of Class 1 E

Power Systems with

Offsite Power

II I

Working Group 4.8

Revision to IEEE Std 833

Protection of Safety

Systems from Hazards

of Water

Working Group 4.9

Revision to IEEE Std 628

Raceway Systems for

Class 1E Circuits

(OP Chopra) NRR

I I -- l"I

. 11

I1I

II

I

Page 35: Office Input for OMB Cirular A-119 FY 2001 Annual Report on … · 2012-11-18 · (RRajan) NRR Subgroup Diesel Generators -- Subgroup Functional Systems Subgroup Piping Systems (JR

Institute of Electrical and Electronic Engineers Nuclear Power Engineering Committee

SC5

Working Group 5.1

Revision to IEEE Std P-933

Reliability Engineering

Program Plans

! 1 Working Group 5.4

Revision to IEEE Std P-1574

Human Reliability Analysis

(JP Bongarra) NRR

Subcommittee 5

Human Factors, Control Facilities, and

Reliability Subcommittee

(JJ Persensky) RES

(JP Bongarra) NRR

- I

Working Group 5.2

Revision to IEEE Std 352

Principles of Reliability

Analysis

I

Working Group 5.3

Revision to IEEE Std 500

Reliability Data

IWorking Group 5.4

Revision to IEEE Std 336

Human Factors;

Revision to IEEE Std 567,

1023, and 1289

Applications

Working Group 5.5

Human Factors International

Conference

Working Group 5.6

Revision to IEEE Std 567

Control Room Complex

Page 36: Office Input for OMB Cirular A-119 FY 2001 Annual Report on … · 2012-11-18 · (RRajan) NRR Subgroup Diesel Generators -- Subgroup Functional Systems Subgroup Piping Systems (JR

Institute of Electrical and Electronic Engineers Nuclear Power Engineering Committee

SC6

S

I.

Subcommittee 6

Safety Related Systems

(EC Marinos) NRR

Working Group 6.1 Revision to IEEE Std 497, ANS 4.5

Accident Monitoring Instrumentation

(JP Joyce) NRR

Working Group 6.3

Revision to IEEE Std 279, 379, and 603

Safety Systems, and Single Failure

Criteria

(PJ Loeser) NRR

Working Group 6.4

Revision of IEEE-ANS-7-4.3.2

Computers in Safety Systems

(Standard Criteria for Digital Computers in Safety Systems of Nuclear Power

Generating Stations)

(ME Waterman) RES

Working Group 6.5

Independence Revision to IEEE Std 384

Independence Criteria

(DF Thatcher) NRR

, I Jim min-al, =,NMI

Page 37: Office Input for OMB Cirular A-119 FY 2001 Annual Report on … · 2012-11-18 · (RRajan) NRR Subgroup Diesel Generators -- Subgroup Functional Systems Subgroup Piping Systems (JR

Institute of Electrical and Electronics Engineers

Nuclear Power Engineering Committee

SC8

Subcommittee 8

Quality Maintenance and Improvement j 1_

Working Group 8.1

Revision to IEEE Std 336

Installation, Inspection and

Testing Requirements for Class

1 E Power, Instrumentation, and

Control Equipment

Working Group 8.3

Revision to IEEE Std 498

Calibration and Control of

Measuring and Test

Equipment

Working Group 8.5

Revision to IEEE Std 934

Replacement Parts for Class 1E

Equipment

Page 38: Office Input for OMB Cirular A-119 FY 2001 Annual Report on … · 2012-11-18 · (RRajan) NRR Subgroup Diesel Generators -- Subgroup Functional Systems Subgroup Piping Systems (JR

IEEE PSRC

Power System Relaying Committee

(S Mazumdar) NRR

Working Group Software Models for

Relays

Working Group New Technology Related to

, Transmission and Distribution Protection (S Mazumdar) NRR

Working Group Application of Intelligent

Systems to Power System Protection

Working Group Mathematical Models for Current Transformers and

Voltage Transformers

Working Group EMTP Applications to

Power System Protection

Working Group High Impedance Fault Detection Technology

Relaying Communications Subcommmittee I

Working Group Revision of IEEE-643 Guide for Power Une Carrier Applications

Working Group Revision of Comtrade (C37 111 Standard)

Working Group Comtrade Users

Working Group Standard Test Methods for

Evaluation of Message Communication Between

| ED's in an Integrated Substation Automation

System

I

Working Group Application of Peer to Peer Communications in

S Working Group

Standard for Optical Fiber DSO Interfaces Between

Teleprotections and M ultiplex Eq ui=,,pment

SWorking Group [

Digital Communications

SWorking Group

Revision of Audio Tone Guide--C37.93

Relaying Practicesc Consumer Interf'ace

.WG Differential and Polarizing

__R e_.l a..yCircuit Te stin~g _

SWG C37.100 Technology

SUsage Review

.}WG Relay Performance

Measuring Criteria

,WG IEC Standards Advisory

t WG Trial-Use Standard for=''•='

,• Low Energy Inputs to | Protective Relays

,,NG C37•.90Rel/ays and•

SElectrical Powe r.,.Ap.parat u.,.=s

,.•WG Standard Electrostatic

| Discharge Tests

wI--G-C37.90.1 Standard: Surge

t Withstand Capability Tests

IN G Survey of Relay Test

Practices

WG Revision of G57.13.1

" IEEE Guide for Field Testing of SRelayin,.g Current Transformers,,••. ,.,

WG Revision of C57.13.3

IEEE Guide for Grounding of

Secondary Circuits and Cases

WG Telecommunications Terms/Now Terms Used by Power

System Protection Engineers

WG Revision of C37.1 10 IEEE Guide for the/Applications of

Current Transformers Used for

Protective Relaying Purposes

Working Group Performance of

Generator Protection During Major System

Disturbances

Working Group Appflication of Multt-Function

Protction Systems ]on Generating Units

Working Group Guide to Protective

Relay Applications to

Power System Buses

Working Group Guide for Protection of Network TransformersI

Page 39: Office Input for OMB Cirular A-119 FY 2001 Annual Report on … · 2012-11-18 · (RRajan) NRR Subgroup Diesel Generators -- Subgroup Functional Systems Subgroup Piping Systems (JR

IEEE SPDC

Surge Protective Devices Comm~ittee (S Mazumndar) NRIR

I Overvoltage

Protective Devices Subcommmittee, 3.3

Working Group C62.11 Standard for Metal Oxide Surge Arrestors for

AC Power Systems

Working Group No. 3.3.8

Review of Intermediate and Station Surge Arrestor

Durability and Protective Characteristics

Working Group No. 3.3.10

Review of Distribution Surge Arrrestor Durability

and Protective Characteristics

Working Group No. 3.3.11

Continuous Revisions of ANSI C62.11

Application of Surge Protective Devices Subcommittee, 3.4

Working Group C62.2.01

Application Guide for Surge Protection of Electric Generation Plants

Working Group No. 3.4.6

Overvoltage Protection of High Voltage Direct Current Installations

Working Group 3.4.8

Arrestor Protection and Coordination Transformer Insulation

I Low Voltage Surge Protective Devices

Subcommmittee, 3.6

Working Group 1 3.4.11 Surge Arrestor Modeling Techniques

Working Group 3.4.13

Surge Protection of Power Generating Plants

(S Mazumdar) NRR

III

IWorking Group

3.4.16 Separation Effects

SWorking Group 3.4.17

Surge Arrester Protection of Capacitor

Banks, Cable Connected Equipment and Gas Insulated Substations

Neutral Grounding Devices

Subcommittee, 3.5 (S Mazumdar)

NRR

Working Group 062.92 Guide for

Application of Neutral Grounding in Electric

Utility SYstems (Transmission and

Subtransmission Systems) (S Mazumdar) NR R

Working Group 3.5.6

Revision of IEEE Std 32, Requirements,

Terminology, and Test Procedure for Neutral

Grounding Devices

I

Working Group 3.4.9

C62.21 Application Guide for Surge Voltage Protective Equipment on AC

Rotating Machinery (S Mazumdar)

Working Group 3.4.14

Continuous Revision of ANSI C62.3 and Compilation of a Metal Oxide

Arrestor Application Guide

mmil

Working Group 3.4.10

High Voltage System Arrestor Application Guide

I|11

i

Surge Protective Devices

Committee (S Mazumdar) NRR •/

i

I

I

I 1 11 . " iI

I I motm, now-smogm I

I

Page 40: Office Input for OMB Cirular A-119 FY 2001 Annual Report on … · 2012-11-18 · (RRajan) NRR Subgroup Diesel Generators -- Subgroup Functional Systems Subgroup Piping Systems (JR

Institute of Electrical and Electronics Engineers

SBC

Stationary Battery Committee (Standards Coordinating Committee 29)

(S Saba) NRR

Selection and Sizing Battery Protection Nuclear Task Force Coordination Subcommittee

Subcommittee Subcommittee

Working Group Batteries

Revision to IEEE Std 450

(S Saba) NRR

Working Group

DC Auxiliary Power

Revision to IEEE Std 946

(JL Knox) NRR

I NJ

Page 41: Office Input for OMB Cirular A-119 FY 2001 Annual Report on … · 2012-11-18 · (RRajan) NRR Subgroup Diesel Generators -- Subgroup Functional Systems Subgroup Piping Systems (JR

Health Physics Society STRUCTURE

N43Equipment for

Non-Medical Radiation Applications

(FC Sturz) NMSS

Laboratory Accreditation Assessment Committee

Legis

N13 Radiation Protection

(DA Cool) NMSS

Standards Committee

Section Chairs

Page 42: Office Input for OMB Cirular A-119 FY 2001 Annual Report on … · 2012-11-18 · (RRajan) NRR Subgroup Diesel Generators -- Subgroup Functional Systems Subgroup Piping Systems (JR

HPS N13 STRUCTUREHealth Physics Society Committee N13

Radiation Protection (DA Cool) NMSS

WG N13.1 WG N13.2 WG N13.5 WG N13.6 Guide to Sampling Airborne Guide for Administrative Practices WG N13.3 Performance Specifications for Practice for Occupational

Radioactive Materials in Stacks in Radiation Monitoring Dosimetry for Criticality Accidents Direct Reading and Indirect Radiation Exposure Records and Ducts (J DeCicco) NMSS.Reading Pocket Dosimeters for X- Systems

(S McGuire) NMSS_ ,,__ __ _ _ _,_,_ and Gamma-Radiation

WG N13.11 WG N13.14 WG N13.7 Criteria for Testing Personnel Internal Dosimetry Programs for WG N13.272 Performane Specifications for

Criteria for Film Dosimeter Dosimetry Performance (revision) Tritium Exposure-Minimum Bioacssay ProgramsetizeodsAla r Performance Requirements Pocket-Sized Alarming

I, ,-.D os im eters/R atem eters

WG N13.42 Interred Dosimetry for Mixed

Fission and Activation Products

WG N 13.30 Performance Criteria for

Radiobioassay I WG N13.32 WG N13.37 Performance Testing of Extremity Performance Testing and WG N13.41

Dosimeters Procedural Specifications for Criteria for Performing Multiple Thermoluminescent Dosimeters I IDosimetry

W G N 1 3 .2 8a W G N 1 3 .5 2 W G P/N 1 3 .9 . . . . . . Guide for Hospital Emergency Performance Specifications for A Guide to Environmental WG P/N 13.12

Departments on Handling Personnel Neutron Dosimeters Surveillance Around Nuclear Surface and Volume Radioactivity WG P/N 13.25

Patien Ra tets Facilities Standards for Unconditional Internal Dosimetry Techniques "____________________ Clearance for Plutonium WG P/N 13.31 WG P/N 13.33C........

WG PIN 13.29 Guide for Assessing Radiation Guide to Preparation of

Criteria for Testing Environmental Doses from Plutonium and Environmental Radiation WG P/N 13.34 WG P/N 13.35 Dosimeter Performance Americium in Soils Surveillance and Monitoring Performance Specification for the Standard for the Bottle Manikin

(SS Sherbini) NMSS R tsMeasurement of Radon in Indoor Absorption (BOMAB) Phantom E7 •. .~ . ' - _ReportsAirwG P/N 13.36 WG P/N 13.38

Core Training in Radiation How to Select and Use Neutron WG P/N 13.39 Protection for Workers Radiation Instrumentation for Standard for Internal Dosimetry (PE Knapp) HR/TTC lndividual Dose Determinations Programs

WG P/N 13.46 Guide for Radon/Radon Decay Product Testing in Real Estate Transactions for Residential

Dwellings I-T

WG P/N 13.53 Guide for Control and Release of Technically Enhanced Naturally Occurring Radioactive Materials

c . WG P/N 13.59 Characterization of Land Areas

and Structures in Support of Decommissioning

(DW Schmidt) NMSS

WG P/N 13.44 Thyroid Phantom Used in

Occupational Monitoring

Measurements ot Internally I WG P/N 13.47 Deposited Radionuclides Q WG P/N 13.50

Environmental Pathway Modeling Radiation Protction Terminology QualitativeandQuantitative WG P/N 13.49 CharacterizationiofwLow Level

WG P/N-13.55 Performance and Documentation Radioactive Waste WG P/N 13.55 W. wPN 1-356 of Ionizing Radiation Surveys |

How to Estimate the Overall JPProcedures and Instrumentation (RReed) HRvTTC WG P/N 13.58 Accuracy in Occupational Dose P foedureshandIntraer n tatirorne"RRMethodsfor Evaluating Radiation

Determinations foRadioactivityzin the Workplace__ Protection Requirements for Radioactivityre) WG P/N 13.57 Handling Radioactive Material

WG P/N 13.60 MW - Performance Specifications for Standards for Late-Phase WG PIN 13.61 Clinical Xenon-13 Traps WG PIN 13.62

Protection Actions in Sampling and Monitoring Airborne Training and Qualification of Post-Nuclear Incident Radioactive Substances from the Health and Safety Technicians

Ambient AtmosphereI

WG P/N 13.40 Standard for Thorax Phantoms Used in Performing Radiological

L-

I a

I

7-

Page 43: Office Input for OMB Cirular A-119 FY 2001 Annual Report on … · 2012-11-18 · (RRajan) NRR Subgroup Diesel Generators -- Subgroup Functional Systems Subgroup Piping Systems (JR

HPS N43 STRUCTURE

WG N43.5 Radiological Safety for

the Design of Radiographic and

Fluoroscopic Industrial X-Ray Equipment

(ML Burgess)NMSS

WG N43.9 Radiological Safety for

the Design and Construction of

Apparatus for Gamma Radiography

(ML Burgess) NMSS

WG N43.1 Radiological Safety in

the Design and Operation of Particle

Accelerators

WG N43.3 General Radiation Safety Standard for Installations Using Non-Medical X-Ray and Sealed Gamma-Ray

Sources (JB Carrico) NMSS

I.

WG N43.4 Classification of

Radioactive Self-Luminous Light

Sources (N540) (AS Kirkwood) NMSS

WG N43.8 Classification of Industrial

Ionizing Raidation Guaging Devices (SJ Lee) NMSS

/

Health Physics Society Committee N43

Equipment for Non-medical Radiation

Applications

(FC Sturz) NMSS

WG N43.2 X-Ray Diffraction and Fluorescence Analysis

Equipment

WG N43.6 Sealed Radioactive

Sources Classification (US Bhachu) NMSS

WG N43.10 Safe Design and Use of Panoramic Wet Source

Storage Gamma Irradiators (Category IV)

WG P/N43.15 Safe Design and Use of

Self Contained, Wet Source Storage Gamma Irradiators (Category I11)

WG N43.7 Safe Design and Use of

Self-Contained, Dry Storage Gamma

Irradiators (Category I) (JP Jankovich) NMSS

WG P/N43.11 Safe Operation Design

for Industrial X-Ray Radiographic Equipment

WG P/N43.14 Manual of Good Safety Practice for Industrial Gamma Radiography

WG P/N43.12 Safe Design and Use of Panasonic Dry Source

Storage Gamma Irradiators (Category II)

WG P/N43.16 Radiation Safety in the

Use of Radionuclide Sources to Test Scrap

Metal Radioactive Material Monitoring

Systems

I

Page 44: Office Input for OMB Cirular A-119 FY 2001 Annual Report on … · 2012-11-18 · (RRajan) NRR Subgroup Diesel Generators -- Subgroup Functional Systems Subgroup Piping Systems (JR

ACI STRUCTURE

100 200 300 400Sp00 Research & Materials & Design & I SStructural Special Administration Properties of Construction AnalysisProcs

Concrete PracticesAProcesses

Page 45: Office Input for OMB Cirular A-119 FY 2001 Annual Report on … · 2012-11-18 · (RRajan) NRR Subgroup Diesel Generators -- Subgroup Functional Systems Subgroup Piping Systems (JR

American Concrete Institute

300

Practices

- .400

Structural Analysis

Page 46: Office Input for OMB Cirular A-119 FY 2001 Annual Report on … · 2012-11-18 · (RRajan) NRR Subgroup Diesel Generators -- Subgroup Functional Systems Subgroup Piping Systems (JR

American Concrete Institute TECHNICAL COMMITTEES - 200

20oo Materials and Properties of Concrete

Commitee 201 Committee 207 Committee 209] Committee 210 Committee 211 Committee]212 Committee 213 Committeed214 io e Lig t aEvaluation of Durability of Mass Concrete Creepand Deterioration of Proportioning Chemical Lightweight REsultsoof

Concetein HdralicResults of Tests

Concr.eterShrinkage incSte_ rte inHydraulic Concrete Admixtures Agregate and Used to Determine Mixturesthe Strength of

Concrete

C m ] Committee 216 Committee 222 Committee 223 Committee 226 Committee 215 LFire Res' stance Committee 221 orsino)Mtl i h Inkg Committee 224 Concrete 225 Comte26 S Fr sitce Corrosion of Metas in Shrinkage- Fly Ash, Otheri Fatigue of and Fire Protection Aggregates Concrete Compensating Cracking Hydraulic F of Structures - Joint • i CompShenaating Pozzolans, and CneeR NMSShConcCements [ J [ J MS onreeSlag

Committee 309 Consolidation]

[ f onrete

Committee 227 Radioactve and Hazardous Waste

Management (RE Shewmaker)

NMSSI

Committee 228 Committee 229 Committee 231 Committee 232

Nondestructive Controlled Low- Committee 230 Properties of Fly Ash and Committee 233 Committee 234

Tetig fI m tNtrl GonSagi Silica Fume in Testing of Strength Soil Cement Concrete at Early Natural Ground Slag in Concrete Materials Ages Pozzolans in Concrete Concrete

i Concrete

Committee 235 Knowledge

Based Systems and Mathematical Modeling for

Materials

Committee 236

Material

Science of Concrete

Page 47: Office Input for OMB Cirular A-119 FY 2001 Annual Report on … · 2012-11-18 · (RRajan) NRR Subgroup Diesel Generators -- Subgroup Functional Systems Subgroup Piping Systems (JR

ACI TECHNICAL COMMITTEES - 300 30oo

Design and Construction Practices

Committee 301 Committee 302 Committee 303 Committee 304 Committee 305 Committee 306 Committee 307 Committee 308 Committee 309 Specifications Construction of Architectural Measuring, Mixing, Hot Weather Cold Weather Concrete Curing Concrete Consolidation for Concrete Concrete Floors Cast-in-Place Transporting, and Concreting Concreting Chimneys of Concrete

Committee 311 Committee 313 Committee315Concrete 332 Committee 334 Committee 335

Committee 31 Details of Committee 318 Committee 325 Committee 330 Concrete Shell Composite and Inspection of Concrete Bins Standard Building Concrete Concrete Parking Residential Design and Joint SLots and Site Concrete Construction-Joint Hybrid

ConcreteReinforcement CodePavementsaving Work ACI-ASCE Structures

Committee 336 Committee 340 Committee 341 Committee 342 Committee 343 Committee 344 Committee 345 Footings, Mats, Design Aids for Earthquake- Evaluation of Concrete Circular Concrete Bridge Committee 346 Committee 347

and Drilled ACl Building Resistant Concrete Bridges Bridge Design - Prestressed Construction, Cast-in-Place Formwork for an rle C uligMaintenance, andPieC n rt ieoConcrete and Bridge Joint Concrete ai Pipe Concrete Bridges Elements ACI-ASCE Structures Repair

Committee 348

Structural

Safety

Committee 361 Composite

Concrete and Steel Pressure

Vessels

Committee 370

Short Duration Dynamic and

Vibratory Load Effects

Committee 350 Committee 351 Environmental Foundations for Engineering Equipment and

Concrete StrctureseMachinery Structures

Committee 362 Parking

Structures

Committee 371

Concrete

Pedestal Water

Towers

Committee 363 High-Strength

Concrete

Committee 372 Circular Concrete

Structures Prestressed by

Wrapping with Wire or Strand

Committee 364

Rehabilitation

(RE Shewmaker)

NMSS

Committee 373

Circular Concrete

Structures

Prestressed with

Circumferential

Tendons

Committee 352 Joints and

Connections in Monolithic Concrete

Structures - Joint ACI-ASCE

Committee 365

Service Life

Prediction

Committee 374 Performance

Based Seismic Design of Concrete

Buildings (RE Shewmaker)

NMSS

Committee 355 Committee 357

Anchorage to Offshore and

Concrete Marine

(HL Graves) Concrete

RES Structures

Committee 366 Precast

Concrete Pipelines

Committee 367 Precast

Concrete Chimneys

Committee 359 Concrete

Components for Nuclear Reactors

Joint ACI-ASME (DC Jeng) NRR

(RE Shewmaker) NMSS

Committee 368 Earthquake

Resisting Concrete Structural Elements

and Systems

Committee 360

Design of Slabs

on Ground

Committee 369

Seismic Repair

and

Rehabilitation

r . -- k6wým

11

I

Page 48: Office Input for OMB Cirular A-119 FY 2001 Annual Report on … · 2012-11-18 · (RRajan) NRR Subgroup Diesel Generators -- Subgroup Functional Systems Subgroup Piping Systems (JR

American Concrete Institute

COMMITTEE 349

I_ Subcommittee SC-1

General, Materials, andConstruction

(HG Ashar) NRR

wmm" ý -- ~I IIISubcommittee SC-2

Design (HL Ashar) NRR

Subcommittee SC-3 Reinforcements and Steel

Embedments (HL Graves) RES

Committee 349

Concrete Nuclear Structures

(HG Ashar) NRR

(HL Graves) RES

Page 49: Office Input for OMB Cirular A-119 FY 2001 Annual Report on … · 2012-11-18 · (RRajan) NRR Subgroup Diesel Generators -- Subgroup Functional Systems Subgroup Piping Systems (JR

American Concrete Institute COMMITTEE 359

Committee 359

Concrete Components for Nuclear

Reactors [Joint ACI-ASME]

(DC Jeng) NRR

(RE Shewmaker) NMSS

Subgroup Materials, Construction, and

Examination

Subgroup Design

(RE Shewmaker) NMSS

11 .11 1 111 -11.11 , I I III MMM

Page 50: Office Input for OMB Cirular A-119 FY 2001 Annual Report on … · 2012-11-18 · (RRajan) NRR Subgroup Diesel Generators -- Subgroup Functional Systems Subgroup Piping Systems (JR

ASTM

Ceramics and Advanced Materials

End Use Products

Chemical

i Energy

Metal Products

Constructionn 1 Materials andj

Engineering

Environment

Metals Test Methods and

Analytical Procedures

Corrosion and Degradation

General LMethods

Paint adCoatings

Terminology Textiles and TInProtective Clothing

American Society for Testing and Materials Committees by Category

Cementitious and Concrete Materials

Electronics and Electrical Insulation

Paper and Packaging

I

Page 51: Office Input for OMB Cirular A-119 FY 2001 Annual Report on … · 2012-11-18 · (RRajan) NRR Subgroup Diesel Generators -- Subgroup Functional Systems Subgroup Piping Systems (JR

American Society for Testing and Materials CM&E

ASTM Committee on Construction Materials

and Engineering

/

Subcommittee C24 Building Seals and

Sealants I Subcommittee D04 Road & Paving

Materials I Subcommittee D08 Roofing, Waterproofing,

Bituminous Materials

I -

Subcommittee D18 Soil & Rock

Subcommittee El 7 Vehicle-Pavement

Systems

ISubcommittee E33

Environmental Acoustics I

I.- �

Subcommittee E05 Fire Standards

Subcommittee F06 Resilient Floor

CoveringsI

Subcommittee E06 Performance of

Buildings

Subcommittee F17 Plastic Piping Systems

Subcommittee C04 Vitrified Clay Pipe

ISubcommittee C11 Gypsum & Related

Building Materials and Systems

Subcommittee C16 Thermal Insulation

mmTW

Subcommittee C18 Dimension Stone

Subcommittee D35 Geosynthetics

Subcommittee F33 Detention & Correctional

Facilities

I~I I 1 1I

A

I

Page 52: Office Input for OMB Cirular A-119 FY 2001 Annual Report on … · 2012-11-18 · (RRajan) NRR Subgroup Diesel Generators -- Subgroup Functional Systems Subgroup Piping Systems (JR

American Society for Testing and Materials Construction, Materials, and Engineering/E05

Committee E05 Fire Standards

E05.21 Smoke & Combustion

Products

S E05.32

E05.36 Membership

E05.13 Large Scale Fire Tests

I I

E05.22 Surface Burning

ii

I

E05.17 Transportation

Subcommittee E06 Performance of

Buildings

/E05.1 1

Fire Endurance

-I

E05.11.08 Fire Tests of Fire

Resistive Barrier Systems

E05.13.09 Standard Practice for Thermal

Qualification of Radioactive Materials Packages (CS Bajwa) NMSS

E05.23 Combustibility

E05.31 Terminology & Editorial

E05.37

Honors, Awards, & Nominations I

II ý = 11 1

E05.90 Executive

E05.91 Planning & Review

I

I

- WAMME

I

Page 53: Office Input for OMB Cirular A-119 FY 2001 Annual Report on … · 2012-11-18 · (RRajan) NRR Subgroup Diesel Generators -- Subgroup Functional Systems Subgroup Piping Systems (JR

American Society for Testing and Materials ENERGY

ASTM

Committee on Energy

-- 7--Subcommittee C26 Nuclear Fuel Cycle

Subcommittee E10 Nuclear Technology &

Applications

Subcommittee E44 Solar, Geothermal, &

Other Alternative Energy Sources

m

Page 54: Office Input for OMB Cirular A-119 FY 2001 Annual Report on … · 2012-11-18 · (RRajan) NRR Subgroup Diesel Generators -- Subgroup Functional Systems Subgroup Piping Systems (JR

American Society for Testing of Materials ENERGY/C26

C26.08 Quality Assurance & Reference Materials

C26.05 Methods of Test

IC26.13

Respository Waste (CG Interrante) NMSS

/

Committee C26 Nuclear Fuel Cycle

C26.01 Editorial & TerminologyI1 C26.02

Fuel & Fertile Material Specifications

C26.03 Neutron Absorber

Materials Specifications

C26.07 Waste Materials

(CG Interrante) NMSS

C26.09 Nuclear Processing

(TC Johnson) NMSS

I!

IC26.90

Executive

I-

I ; I I - -- I I I I

I

Page 55: Office Input for OMB Cirular A-119 FY 2001 Annual Report on … · 2012-11-18 · (RRajan) NRR Subgroup Diesel Generators -- Subgroup Functional Systems Subgroup Piping Systems (JR

American Society for Testing and Materials ENERGY/El0

/

E10.05 Nuclear Radiation

Metrology

El10.06 Food Irradiation Processings &

PackagingsIr

E10.07 Radiation Dosimetry for

Radiation Effects on Materials & Devices

E10.08 Procedures for Neutron

Radiation Damage Simulation

E10.92 Honors and Awards

E10.96 Standards Promotion

Committee El0 Nuclear Technology and Applications

E10.01 Dosimetry for Radiation

Processing

E10.02 Behavior & Use of Nuclear Structural

Materials (MT Kirk) RES

E10.03 Radiological Protection for

Decontamination & Decommissioning of

Nuclear Facilities and Components

E10.04 Radiation Protection

Methodology

E10.90 Executive

II

E10.93 Editorial

I

E10.95 Long Range Planning & International Activities I

E10.94 Membership

HI

I

I

Page 56: Office Input for OMB Cirular A-119 FY 2001 Annual Report on … · 2012-11-18 · (RRajan) NRR Subgroup Diesel Generators -- Subgroup Functional Systems Subgroup Piping Systems (JR

American Society for Testing and Materials ENVIRONMENT

I

I

/

ASTM

Committee on Environment ISubcommittee D18

Soil and RockSubcommittee D19

Water

Im

Subcommittee D22 Sampling & Analysis of

Atmospheres

Subcommittee E35 Pesticides

Subcommittee D34 Waste Management

Subcommittee E47 Biological Effects & Environmental Fate

Subcommittee E48 Biotechnology

Subcommittee F20 Hazardous Substances &

Oil Spill Response

Subcommittee E50 Environmental

US TAG to ISO TC-207 Environmental Management

Environmental, Health, & Safety Software

Development Group (EHSSDG)

Committee

on

Environment

ASTM

I I

11 1 11 IN

A

Page 57: Office Input for OMB Cirular A-119 FY 2001 Annual Report on … · 2012-11-18 · (RRajan) NRR Subgroup Diesel Generators -- Subgroup Functional Systems Subgroup Piping Systems (JR

American Society for Testing and Materials Environment/D 19

D19.04 Methods of

Radiochemical Analysis (JJ Kottan) RGN I

DD19.06 Methods for Analysis for Organic Substances in

Water II I I1111 1 -11 111811 IfD1 9.15

Commercial Field Devices for Treatment

of Ambient Water

Dl19.90 j Executive

D19.90.01 Technical Operations

US TAG to ISO/TC 147 Water Quality

D19.02 General Specifications, Technical Resources, &

Statistical Methods-II

I D19.03 Sampling of Water &

Water-Formed Deposits, Surveillance of Water, &

Flow Measurement

Dl19.05 Inorganic Constituents

in Water

D 19.07 Sediments,

Geomorphology, & Open-Channel Flow

D19.08 Membranes & Ion

Exchange Materials

II '

Dl19.90.03 Standards

Dl19.90.04 ASTM/EPS Coordination

I I

D1 9.24

I

Page 58: Office Input for OMB Cirular A-119 FY 2001 Annual Report on … · 2012-11-18 · (RRajan) NRR Subgroup Diesel Generators -- Subgroup Functional Systems Subgroup Piping Systems (JR

American Society for Testing and Materials General Products

I Subcommittee D14

Adhesives

ISubcommittee D28 Activated Carbon

I

I Subcommittee F05 Business Imaging

Products

a

Subcommittee F25 Ships & Marine

Technology

ASTM Committee on General Products

I Subcommittee E21 Space Simulation &

Applications of Space Technology

Subcommittee F07 Aerospace & Aircraft I

I

F

r

Page 59: Office Input for OMB Cirular A-119 FY 2001 Annual Report on … · 2012-11-18 · (RRajan) NRR Subgroup Diesel Generators -- Subgroup Functional Systems Subgroup Piping Systems (JR

American Society for Testing and Materials General Products/D28

D28.02 Liquid Phase Evaluations

D28.03 Nonmenclature &

Editorial

I . ai ff

D28.04 Gas Phase Evaluation

Tests (RR Bellamy) RGN I

D28.90 Executive

D28.92 Long Range

Planning

Committee D28 Activated Carbon

Page 60: Office Input for OMB Cirular A-119 FY 2001 Annual Report on … · 2012-11-18 · (RRajan) NRR Subgroup Diesel Generators -- Subgroup Functional Systems Subgroup Piping Systems (JR

American Society for Testing and Materials MTM&AP

E42I Surface Analysis

/

ASTM Committee on Metals Test Methods &

Analytical Procedures

E01 Analytical Chemistry for Metals, Ores, & Related

Materials

E04 Metallography I E07

Nondestructive Testing

E28 Mechanical Testing

I

j

Page 61: Office Input for OMB Cirular A-119 FY 2001 Annual Report on … · 2012-11-18 · (RRajan) NRR Subgroup Diesel Generators -- Subgroup Functional Systems Subgroup Piping Systems (JR

American Society for Testing and Materials Metals Test Methods and Analytical Procedures/E08

Committee E08

Fatigue and Fracture al"WMMUMOM "'Imr~mT I

E08.05 Cyclic Deformation &

Fatigue Crack Formation I

E08.08 Elastic-Plastic Fracture Mechanics Technology

(SN Malik) RES

/E08.02

Standards & Terminology

E08.03 Advanced Apparatus &

Techniques

E08.06 Crack Growth Behavior

E08.07 Linear-Elastic Fracture

����11

E08.91 Long Range Planning

I Mý ~~~I IIIl1 111,18

J

I

Page 62: Office Input for OMB Cirular A-119 FY 2001 Annual Report on … · 2012-11-18 · (RRajan) NRR Subgroup Diesel Generators -- Subgroup Functional Systems Subgroup Piping Systems (JR

American Society for Testing and Materials Paints and Coatings

I Subcommittee D01

Paint & Related Coatings, Materials and

ApplicationsI

ISubcommittee E12

Appearance

ASTM Committee on Paints and Coatings

Subcommittee B08 Metallic & Inorganic

liCoatings I I"� ii

Subcommittee D33 Protective Coating and Lining Work for Power Generation Facilities

(JA Davis) NRR I mU

I

I

Page 63: Office Input for OMB Cirular A-119 FY 2001 Annual Report on … · 2012-11-18 · (RRajan) NRR Subgroup Diesel Generators -- Subgroup Functional Systems Subgroup Piping Systems (JR

American Society for Testing and Materials Paints and Coatings/D33

Committee D33 Protective Coating and Lining Work for

Power Generation Facilities (JA Davis) NRR

D33.04 Inspection

/D33.02

Service & Material Parameters

.'m1111-r n -I1.11101

D33.03 Quality Systems

u-U-'-.

D33.07 Application

D33.09 Protective Lining for

FGD Systems

D33.10 Protective Coatings and Lining Work for Power Generation Facilities

(M Marshall)RES

D33.90 Executive

D33.12 Tank Coatings and

Linings

D33.92 Definitions

D33.93 Plannings & Utility

Advisory

D33.94 Awards

I