McKenney’s completely replaced 16 floors of mechanical systems within an occupied commercial office building in Atlanta.TRANSCRIPT
Project NameOffice Consolidation Project
Project LocationAtlanta, Georgia
Project TeamOwner: Investment and Property Management FirmGeneral Contractor: Skanska USAArchitect: Carson GuestEngineer: Heery International, Inc./Newcomb & Boyd
Commercial OfficesMarkets
Specializations
LEED Certification
Pipe Shop Prefab
Sheet Metal Shop Prefab
Plumbing Shop Prefab
Building Information Modeling
Energy Management
McKenney’s completely replaced 16 floors of mechanical systems within an occupied commercial office building in Atlanta.
The ChallengeThe McKenney’s team needed to upgrade the mechanical systems they had originally installed 25 years ago. The work had to be performed in phases—vacating occupied floors and relocating employees to newly renovated floors. Design challenges and a complex schedule resulted in as many as 10 floors being under construction simultaneously with varying completion dates.
The SolutionTo minimize installation time, the team created detailed shop and fabrication drawings to get preassembled pieces to the field. A comprehensive schedule and delivery log reduced on-site clutter and allowed just-in-time arrival of materials and equipment. In addition, several key foremen managed large teams to ensure timely completion while certifying installation quality and integrity.
The content of this document is not intended as an endorsement.
The ResultsThe building owner’s goals to minimize disruptions during construction, occupy newly renovated floors as soon as installations were complete, and adhere to an aggressive schedule were all successfully met.