offering of 8 working areas
TRANSCRIPT
4 Direct Proposal
4 Regular Tender
OFFERING OF 8 WORKING AREAS2nd Round 2021
West Palmerah (566.3 Km2) Onshore Sumatera Selatan & Jambi
Bertak Pijar Puyuh (266.99 Km2) Onshore Sumatera Selatan
North Ketapang (3,121.4 Km2) Onshore & Offshore Jawa Timur
Agung I (6,656.73 Km2) Offshore Bali & Jawa Timur
Agung II (7,969.84 Km2) Offshore Sulawesi Selatan, Nusa Tenggara Barat & Jawa Timur
Paus (8,214 Km2) Offshore Natuna Maratua II (5,333.33 Km2)
Onshore & Offshore Kalimantan Utara
Karaeng (6,845.36 Km2) Onshore & Offshore Sulawesi Selatan
TERMS AND CONDITIONSfavorable T&C to your investment
▪ Source rock: Lemat and Talang Akar Fm▪ Reservoir: from the basement through Gumai
Formation & Baturaja Carbonate▪ Traps: structure (anticline & fault)▪ Plays: Pre-Tertiary Basement, Lower Talang Akar Fm
(and Lemat/Lahat Fm), Baturaja Fm, Gumai Fm, Air Benakat Fm
▪ Estimated recoverable reserves: 1.37 MMSTB
▪ Oil & gas fields within: Bertak, Pijar, Puyuh
TERMS & CONDITIONS
Area 266.99 Km2
Minimum Firm Commitment
Workover 5 wells
Signature Bonus open bid
Contract Type Cost Recovery PSC
Sharing Split (%) 75:25 (Oil), 70:30 (Gas)
BERTAK PIJAR PUYUH – Exploitation Block
▪ Source Rock: Ngimbang Sequences & KujungSequences
▪ Reservoir: sandstones & limestone of the NgimbangFm, Kujung III & II, carbonate Build-ups of Kujung I and basement fractured
▪ Traps: Structure and stratigraphic▪ Plays: Carbonate Play Kujung Fm and Ngimbang Fm▪ Estimated recoverable resources: 270.08 MMBO and
1,580.81 BCF▪ Surrounding oil & gas fields: Ketapang, Bukit Tua,
Jenggolo, Poleng, Sidayu, WMO, dan Camar
TERMS & CONDITIONS
Area 3,121.4 Km2
Minimum Firm Commitment
G&G, 3D Seismic 300 Km2
Signature Bonus open bid
Contract Type Cost Recovery PSC
Sharing Split (%) 70:30 (Oil), 60:40 (Gas)
N
NORTH KETAPANG
AGUNG I ▪ Source Rock: Eocene non-marine Ngimbang-shale Fm▪ Reservoir: Palaeocene sequence shale intercalated with
sandstone, coal, and siltstone▪ Traps: structural (Masalima Through, Central High Sepanjang
Ridge, Southern basin graben system, and Southern thrustcomplex of Bali-Lombok Through)
▪ Plays: Eocene synrift, Eocene Postrift, Oligocene Carbonate,Oligocene Debris Carbonate, Miocene Carbonate, dan PlioceneSandstone
▪ Estimated recoverable resources: 985 BCF
▪ Surrounding oil & gas fields : Pagerungan, Terang, Sirasun, Batur
TERMS & CONDITIONS
Area 6,656.73 Km2
Minimum Firm Commitment
G&G, 2D Seismic 2,000 Km
Signature Bonus open bid
Contract Type Cost Recovery PSC
Sharing Split (%) 55:45 (Oil), 50:50 (Gas)
AGUNG II
TERMS & CONDITIONS
Area 7,969.84 Km2
Minimum Firm Commitment
G&G, 2D Seismic 2,000 Km
Signature Bonus open bid
Contract Type Cost Recovery PSC
Sharing Split (%) 55:45 (Oil), 50:50 (Gas)
▪ Source rock: Eocene non-marine Ngimbang-shale Fm▪ Reservoir: Palaeocene sequence shale intercalated with
sandstone, coal, and siltstone▪ Traps: structural (Masalima Through, Central High Sepanjang
Ridge, Southern basin graben system, and Southern thrustcomplex of Bali-Lombok Through)
▪ Plays: Eocene synrift, Eocene Postrift, Oligocene Carbonate,Oligocene Debris Carbonate, Miocene Carbonate, dan PlioceneSandstone
▪ Estimated recoverable resources: 16.5 TCF
▪ Nearest oil & gas fields: Pagerungan
TERMS & CONDITIONS
Area 566.3 Km2
Minimum Firm Commitment
G&G and 2D Seismic 200 Km
Signature Bonus open bid
Contract Type flexible
Sharing Split (%) for Cost Recovery PSC
70:30 (Oil), 60:40 (Gas)
Base Split (%) for Gross Split PSC
57:43 (Oil), 52:48 (Gas)(will be adjusted at POD)
▪ Source rock: Talang Akar & Gumai Fm▪ Reservoir: Talang Akar Sandstone, Baturaja Carbonate, Air
Benakat Sandstone Formations & Basement Fractured ▪ Traps: Structure (anticline), stratigraphic (Basement drape
and fractured)▪ Plays: Fracture Basement, Lower Talangakar, Baturaja
Carbonate, and Air Benakat▪ Estimated recoverable resources: 71.7 MMBO and 270.9
BCF▪ Surrounding oil & gas fields: Petapahan, Kotabatak, Baru,
Bentu, Segat and Binio
WEST PALMERAH
PAUS
TERMS & CONDITIONS
Area 8,214 Km2
Minimum Firm Commitment
G&G, 3D Seismic 200 Km2 and 1 well
Signature Bonus open bid
Contract Type flexible
Sharing Split (%) for Cost Recovery PSC
70:30 (Oil), 60:40 (Gas)
Base Split (%) for Gross Split PSC
57:43 (Oil), 52:48 (Gas)(will be adjusted at POD)
▪ Source Rock: lower Arang and upper Gabus Fm▪ Reservoir: Terumbu carbonates, sandstones
within the Muda Fm▪ Traps: structural and stratigraphic▪ Plays: structural and stratigraphic play Pliocene
Shallow Marine
▪ Estimated recoverable resources: 2,555.78 BCF
MARATUA II
TERMS & CONDITIONS
Area 5,333.33 Km2
Minimum Firm Commitment
G&G, 2D Seismic 1,000 Km
Signature Bonus open bid
Contract Type flexible
Sharing Split (%) for Cost Recovery PSC
60:40 (Oil), 55:45 (Gas)
Base Split (%) for Gross Split PSC
57:43 (Oil), 52:48 (Gas)(will be adjusted at POD)
▪ Source Rock: Naintupo, Tabul, Santul and Tarakan Fm▪ Reservoir: Birang, Tabul, Santul and Tarakan Fm▪ Traps: Structural (four-way dip closure) and stratigraphic▪ Plays: structural Tarakan sandstone and stratigraphic Santul,
Tabul and Meliat sandstone
▪ Estimated recoverable resources: 107.06 MMBO or 556.77 BCF
▪ Surrounding oil & gas production area: Simenggaris, Tarakan (Bunyu Area), and Nunukan
KARAENG
TERMS & CONDITIONS
Area 6,845.36 Km2
Minimum Firm Commitment
G&G, 2D Seismic 200 Km
Signature Bonus open bid
Contract Type flexible
Sharing Split (%) for Cost Recovery PSC
55:45 (Oil), 50:50 (Gas)
Base Split (%) for Gross Split PSC
57:43 (Oil), 52:48 (Gas)(will be adjusted at POD)
▪ Source Rock: Carbonaceous Shales of the EoceneMalawa/Toraja Fm
▪ Reservoir: Eocene classics (Malawa Fm), Eocene – LowerMiocene carbonates (Tonasa Eq)
▪ Traps: Structural (anticlinal traps with four-way and three-waydip closures) and stratigraphic
▪ Plays: Eocene Malawa sandstones and L. Miocene Tonasacarbonates
▪ Estimated recoverable resources: 64.2 MMBO or 182.08 BCF
TENDER SCHEDULE• Accessing Bid Document and bid submission through https://esdm.go.id/wkmigas• Accessing data through MDR (Migas Data Repository) membership or free of charge of bidding Data
Package
DIRECT PROPOSAL
TENDER
REGULARTENDER
Bid Document access : 29 November 2021 - 11 January 2022Bid Submission : 11 - 12 January 2022
Bid Document access : 29 November 2021 - 24 Mach 2022Bid Submission : 24 - 25 March 2022
Working areas: BERTAK PIJAR PUYUH, NORTH KETAPANG, AGUNG I, AGUNG II
Working areas: WEST PALMERAH, PAUS, MARATUA II, KARAENG