offer forms (attachments) yost...water treatment, wastewater reclamation, water distribution, and...

47
Request for Qualifications Solicitation No. ADSPO1800007887 Description: 2018 Professional Services List Arizona Department of Administration State Procurement Office 100 N 15th Ave., Suite 201 Phoenix, AZ 85007 PART 4 of the Solicitation Documents: Offer Forms (Attachments) Index Date: January 8, 2018 Page 1 of 36 4 A v a i l a b l e o n l i n e a t : P r o c u r e . A Z . g o v Offer Forms (Attachments) Date: January 8, 2018 ATTACHMENT 1........ OFFER AND ACCEPTANCE FORM ...................................... 2 ATTACHMENT 2-A.... EXPERIENCE AND CAPACITY ............................................. 3 1.0 ..... FIVE (5) EXAMPLE PROJECTS ...................................................................... 3 ATTACHMENT 2-A.... EXPERIENCE AND CAPACITY ............................................. 6 2.0 ..... EMPLOYEES BY DISCIPLINE......................................................................... 6 3.0 ..... FIRMS EXPERIENCE AND REVENUE ........................................................... 8 4.0 ..... FIRMS SERVICES ........................................................................................... 8 5.0 ..... EXPERIENCE REFERENCES: ........................................................................ 9 ATTACHMENT 2-B.... ORGANIZATION PROFILE .................................................. 11 ATTACHMENT 3-A.... METHOD PROPOSAL.......................................................... 13 ATTACHMENT 3-B.... KEY PERSONNEL PROPOSAL ........................................... 14 ATTACHMENT 3-C ... PROPOSED SUBCONTRACTORS ..................................... 24 ATTACHMENT 3-D ... PERFORMANCE GUARANTEE........................................... 25 ATTACHMENT 3-E.... ISRAEL BOYCOTT FORM ................................................... 26 ATTACHMENT 4........ PRICING SHEET .................................................................. 27 ATTACHMENT 5-A.... CONFIDENTIAL INFORMATION DESIGNATION ................ 28 ATTACHMENT 5-B.... CONFORMANCE STATEMENTS ........................................ 31 ATTACHMENT 5-C ... INSURANCE EVIDENCE ..................................................... 35 ATTACHMENT 5-D ... OFFER CHECKLIST............................................................. 36 - -

Upload: others

Post on 09-Apr-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Offer Forms (Attachments) Yost...water treatment, wastewater reclamation, water distribution, and office sites throughout the City. These systems are monitored and controlled by Supervisory

Request for Qualifications Solicitation No.

ADSPO18‐00007887   

Description: 2018 Professional Services List

Arizona Department of Administration

State Procurement Office

100 N 15th Ave., Suite 201 Phoenix, AZ 85007

PART 4 of the Solicitation Documents: Offer Forms (Attachments)

Index Date: January 8, 2018

Page 1 of 36 4

A v a i l a b l e o n l i n e a t : P r o c u r e . A Z . g o v

Offer Forms (Attachments)

Date: January 8, 2018

ATTACHMENT 1 ........ OFFER AND ACCEPTANCE FORM ...................................... 2

ATTACHMENT 2-A .... EXPERIENCE AND CAPACITY ............................................. 3

1.0 ..... FIVE (5) EXAMPLE PROJECTS ...................................................................... 3

ATTACHMENT 2-A .... EXPERIENCE AND CAPACITY ............................................. 6

2.0 ..... EMPLOYEES BY DISCIPLINE ......................................................................... 6

3.0 ..... FIRMS EXPERIENCE AND REVENUE ........................................................... 8

4.0 ..... FIRMS SERVICES ........................................................................................... 8

5.0 ..... EXPERIENCE REFERENCES: ........................................................................ 9

ATTACHMENT 2-B .... ORGANIZATION PROFILE .................................................. 11

ATTACHMENT 3-A .... METHOD PROPOSAL .......................................................... 13

ATTACHMENT 3-B .... KEY PERSONNEL PROPOSAL ........................................... 14

ATTACHMENT 3-C ... PROPOSED SUBCONTRACTORS ..................................... 24

ATTACHMENT 3-D ... PERFORMANCE GUARANTEE ........................................... 25

ATTACHMENT 3-E .... ISRAEL BOYCOTT FORM ................................................... 26

ATTACHMENT 4 ........ PRICING SHEET .................................................................. 27

ATTACHMENT 5-A .... CONFIDENTIAL INFORMATION DESIGNATION ................ 28

ATTACHMENT 5-B .... CONFORMANCE STATEMENTS ........................................ 31

ATTACHMENT 5-C ... INSURANCE EVIDENCE ..................................................... 35

ATTACHMENT 5-D ... OFFER CHECKLIST ............................................................. 36

- -

Page 2: Offer Forms (Attachments) Yost...water treatment, wastewater reclamation, water distribution, and office sites throughout the City. These systems are monitored and controlled by Supervisory

Request for Qualifications Solicitation No.

ADSPO18‐00007887   

Description: 2018 Professional Services List

Arizona Department of Administration

State Procurement Office

100 N 15th Ave., Suite 201 Phoenix, AZ 85007

PART 4 of the Solicitation Documents: Offer Forms (Attachments)

Date: January 8, 2018

Page 2 of 36 4

A v a i l a b l e o n l i n e a t : P r o c u r e . A Z . g o v

Attachment 1 Offer and Acceptance Form

SUBMISSION OF OFFER: Undersigned hereby offers and agrees to provide qualifications for 2018 Annual Professional Services List in compliance with the Solicitation indicated above and our Offer indicated by the latest dated version below:

Initial Offer:

1. 1/23/18

date initial

West Yost Associates

Offeror company name Signature of person authorized to sign Offer Initials

4505 East Chandler Blvd, Suite 230 Charles Duncan, PE, President

Address Printed name and title

Phoenix, AZ 85048 Daniel Groves, PE, Engineering Technical Manager II

City | State | ZIP Contact name and title

68-0370826 [email protected] 602-845-0326

Federal tax identifier (EIN or SSN) Contact Email Address Contact phone number

CERTIFICATION: By signature in the above, Offeror certifies that it:

1. will not discriminate against any employee or applicant for employment in violation of Federal Executive Order 11246, [Arizona] State Executive Order 2009-9 or A.R.S. §§ 41−1461 through 1465;

2. has not given, offered to give, nor intends to give at any time hereafter any economic opportunity, future employment, gift, loan, gratuity, special discount, trip, favor, or service to a public servant in connection with the submitted offer. Failure to provide a valid signature affirming the stipulations required by this clause will result in rejection of the Offer. Signing the Offer with a false statement will void the Offer, any resulting contract, and may be subject to legal penalties under law;

3. complies with A.R.S. § 41-3532 when offering electronics or information technology products, services, or maintenance; and

4. is not debarred from, or otherwise prohibited from participating in any contract awarded by federal, state, or local government.

ACCEPTANCE OF OFFER: State hereby accepts the initial Offer, Revised Offer, or Best and Final Offer identified by number ADSPO18-00007887 at the top of this form, and which was dated__________ (the Accepted Offer). Offeror is now bound (as Contractor) to carry out the Work under the attached Contract, of which the Accepted Offer forms a part. Contractor is cautioned not to commence any billable work or to provide any material or perform any service under the Contract until Contractor receives the applicable Order or written notice to proceed from Procurement Officer.

State’s Contract No. is: ADSPO18-00007887 The effective date of the Contract: __________ Contract awarded: __________

Procurement Officer signature Procurement Officer printed name

Contract qualification award can be viewed at https://spo.az.gov/procurement-services/professional-services

1/23/2018

01/30/2018 01/30/2019

Sean Wulfekuhle

Page 3: Offer Forms (Attachments) Yost...water treatment, wastewater reclamation, water distribution, and office sites throughout the City. These systems are monitored and controlled by Supervisory

Request for Qualifications Solicitation No.

ADSPO18‐00007887   

Description: 2018 Professional Services List

Arizona Department of Administration

State Procurement Office

100 N 15th Ave., Suite 201 Phoenix, AZ 85007

PART 4 of the Solicitation Documents: Offer Forms (Attachments)

Date: January 8, 2018

Page 3 of 36 4

A v a i l a b l e o n l i n e a t : P r o c u r e . A Z . g o v

Attachment 2-A Experience and Capacity

STATE MAY DETERMINE YOUR SUBMITTAL IS NON-RESPONSIVE IF YOU DO NOT ANSWER ALL QUESTIONS FULLY.

DEFINITIONS Branch Office: A geographically distinct place of business or subsidiary office of a firm that has a key role on the team. Discipline: Primary technical capabilities of key personnel, as evidenced by academic degree, professional registration, certification, and/or extensive experience. Key Personnel: Individuals who will have major contract responsibilities and/or provide unusual or unique expertise. Parent Company. Identify controlling company name in this field if the Firm is owned or controlled by another company.

Structure: How a business is organized to accomplish its objectives (ie, Sole Proprietor, Limited Liability Company, Cooperative, Corporation, Partnership, S Corporation). See chart below for example:

1.0 Five (5) Example Projects List no more than five (5) example projects which best illustrate firm’s qualification for this contract in the chart provided below. Select projects where multiple team members worked together, if possible, that demonstrate the team’s capability to perform work similar to that required for this qualifications list contract. (NOTE: The integrity of the chart table columns shall remain unchanged, however the rows for each project may be expanded by the Offeror to accommodate the information).

a. Title and Locations of project or contract. For an indefinite delivery contract, the location is the geographic scope of the

contract. b. Enter the year completed of the professional services (such as planning, engineering study, or design), and/or the year

completed if construction. If any of the professional services or the construction projects are not complete, leave Year Completed blank and indicate the status in Brief Description of Project and Relevance to This Contract (block f).

c. Project Owner or user, such as a government agency or installation, an institution, a corporation or private individual. d. Provide the original budget or not to exceed dollar amount for the project. e. Provide the Total Cost of the Project. If any of the professional services or construction projects is not complete, indicate the

percentage compete and whether this project will be on budget, over or under budget. f. Brief Description: Indicate scope, size, and length of project, principle elements and special features of the project. Discuss

the relevance of the example project to this contract.

Entity Type Structure

Corporation S Corporation or C Corporation, or Professional Corporation

Cooperative Cooperative

Partnership General Partnership, Limited Partnership, Limited Liability Partnership, Limited Liability Limited Partnership

Sole Proprietor Sole Proprietor

Limited Liability Company Limited Liability Company or Professional Limited Liability Company

Page 4: Offer Forms (Attachments) Yost...water treatment, wastewater reclamation, water distribution, and office sites throughout the City. These systems are monitored and controlled by Supervisory

Request for Qualifications Solicitation No.

ADSPO18‐00007887   

Description: 2018 Professional Services List

Arizona Department of Administration

State Procurement Office

100 N 15th Ave., Suite 201 Phoenix, AZ 85007

PART 4 of the Solicitation Documents: Offer Forms (Attachments)

Date: January 8, 2018

Page 4 of 36 4

A v a i l a b l e o n l i n e a t : P r o c u r e . A Z . g o v

Title and Location of Project

Design Completion Year

Construction Completion Year

Project Owner

Project Original Budget (or not to exceed amount)

Total Cost of the Project

Brief Description of Project

City of Buckeye SCADA Improvement Program Plan; Buckeye, AZ

2016 N/A City of Buckeye, AZ

$30,000 $2.9 million, (program cost)

The City of Buckeye (City) owns and operates over 47 water treatment, wastewater reclamation, water distribution, and office sites throughout the City. These systems are monitored and controlled by Supervisory Control and Data Acquisition (SCADA) systems. The Program intent is to integrate Water SCADA systems into a single City SCADA system, with consistency and standardization. West Yost created a program plan organized into eight projects with a planned duration of approximately 24 months, including current ongoing projects being executed by the City. An engineering budget analysis recommends a planning budget of $2.9M.

Buckeye SCADA Improvements Program, Phase 1 GWIC; Buckeye, AZ

2017 ongoing N/A City of Buckeye, AZ

$100,000 $100,000 (ongoing)

West Yost is providing technical oversight and Program Management services for the City of Buckeye SCADA Improvements Project, Phase 1 – Global Water Integration. The current project is expected to last 6 months, and will provide critical updates to the City’s SCADA system, while integrating elements of the SCADA system that were acquired by the City from Global Water. The scope of work includes system integrator selection assistance, development of cybersecurity standards, Programmable Logic Controller (PLC) and Human Machine (HMI) standards, Control Strategies development and as-needed services as required.

Page 5: Offer Forms (Attachments) Yost...water treatment, wastewater reclamation, water distribution, and office sites throughout the City. These systems are monitored and controlled by Supervisory

Request for Qualifications Solicitation No.

ADSPO18‐00007887   

Description: 2018 Professional Services List

Arizona Department of Administration

State Procurement Office

100 N 15th Ave., Suite 201 Phoenix, AZ 85007

PART 4 of the Solicitation Documents: Offer Forms (Attachments)

Date: January 8, 2018

Page 5 of 36 4

A v a i l a b l e o n l i n e a t : P r o c u r e . A Z . g o v

Playa Photovoltaic Solar Project; First Solar, Tempe, Arizona

2016 2017 First Solar $673,000 $3.5 million Planning, permitting, design and design services during construction of water infrastructure for a 200-megawatt solar photovoltaic facility with total project costs of approximately $1 billion.

Desert Stateline Photovoltaic Solar Project; First Solar, Tempe, Arizona

2014 2016 Southern Power and First Solar

$423,000 $2.0 million Planning, permitting, design and design services during construction of water infrastructure for a 300-megawatt solar photovoltaic facility with total project costs of approximately $1 billion.

Desert Sunlight Photovoltaic Solar Project; First Solar, Tempe, Arizona

2014 2014 NextEra Energy Resources, NRG Energy, Sumitomo Corp of America

$347,000 $1.5 million

Planning, permitting, design and design services during construction of water infrastructure for a 550-megawatt solar photovoltaic facility with total project costs of approximately $2.3 billion.

Page 6: Offer Forms (Attachments) Yost...water treatment, wastewater reclamation, water distribution, and office sites throughout the City. These systems are monitored and controlled by Supervisory

Request for Qualifications Solicitation No.

ADSPO18‐00007887   

Description: 2018 Professional Services List

Arizona Department of Administration

State Procurement Office

100 N 15th Ave., Suite 201 Phoenix, AZ 85007

PART 4 of the Solicitation Documents: Offer Forms (Attachments)

Date: January 8, 2018

Page 6 of 36 4

A v a i l a b l e o n l i n e a t : P r o c u r e . A Z . g o v

Attachment 2-A

Experience and Capacity

STATE MAY DETERMINE YOUR SUBMITTAL IS NON-RESPONSIVE IF YOU DO NOT ANSWER ALL QUESTIONS FULLY.

2.0 EMPLOYEES BY DISCIPLINE

Aeronautical Engineer Electrical Engineer Mechanical Engineer

Agricultural Engineer Environmental Engineer Metallurgical Engineer

Archeologist Environmental Scientist Mining Engineer

Architect Fire Protection Engineer Nuclear Engineer

Architectural Engineering

Geodetic Surveyor Petroleum Engineer

Biologist Geographic Information System Specialist

Photogrammetrist

CADD Technician Geological Engineer Project Manager

Chemical Engineer Geologist Sanitary Engineer

Civil Engineer Hydrographic Surveyor Soils Engineer

Construction Manager Hydraulic Engineer Structural Engineer

Construction Inspector Hydrologist Technician/Analyst

Control Systems Engineer

Industrial Engineer Transportation Engineer

Cost Engineer/Estimator Landscape Architect Water Resources Engineer

Enter requested information in the chart provided below:

a. Select disciplines from the List of Disciplines. For employees that do not qualify for any of the disciplines, select “Other”.

b. Each person can be counted only twice; once for his/her primary function and once for his/her secondary function. Primary and secondary functions should be indicated by including a “P” or an “S” in column b after the Description Title is given.

c-d. If the form is completed for a firm (including all branch offices), enter the number of employees by disciplines in column c. If

the form is completed for a branch office, enter the number of employees by discipline in column d and for the firm in column c. (NOTE: The Offeror may insert or delete rows in the existing Employees by Discipline chart table on page six (6) as necessary to complete the requirements for Question 2).

Page 7: Offer Forms (Attachments) Yost...water treatment, wastewater reclamation, water distribution, and office sites throughout the City. These systems are monitored and controlled by Supervisory

Request for Qualifications Solicitation No.

ADSPO18‐00007887   

Description: 2018 Professional Services List

Arizona Department of Administration

State Procurement Office

100 N 15th Ave., Suite 201 Phoenix, AZ 85007

PART 4 of the Solicitation Documents: Offer Forms (Attachments)

Date: January 8, 2018

Page 7 of 36 4 A v a i l a b l e o n l i n e a t : P r o c u r e . A Z . g o v

EXAMPLE:

a. Discipline Title b. Function: Primary (P) or Secondary (S)

c. No. of Employees Firm

d. No. of Employees Branch

Example: Architect P 138 50-Yuma Branch

50-Tempe Branch

38 – Phoenix Branch

Example: Architect S 20 5-Yuma Branch

5-Tempe Branch

5 – Phoenix Branch

5- Tucson Branch

a. Discipline Title

b. Function: Primary (P) or Secondary (S)

c. No. of Employees Firm

d. No. of Employees Branch

CADD Technician P 2 0

Civil Engineer P 71 1

Construction Manager P 12 0

Construction Inspector S 5 0

Control Systems Engineer

P 2 4

Geographic Information System Specialist

S 3 0

Geologist P 3 0

Mechanical Engineer S 1 0

Project Manager S 42 0

Technician/Analyst S 8 0

Water Resources Engineer S 23 0

Total 119 5

Page 8: Offer Forms (Attachments) Yost...water treatment, wastewater reclamation, water distribution, and office sites throughout the City. These systems are monitored and controlled by Supervisory

Request for Qualifications Solicitation No.

ADSPO18‐00007887   

Description: 2018 Professional Services List

Arizona Department of Administration

State Procurement Office

100 N 15th Ave., Suite 201 Phoenix, AZ 85007

PART 4 of the Solicitation Documents: Offer Forms (Attachments)

Date: January 8, 2018

Page 8 of 36 4 A v a i l a b l e o n l i n e a t : P r o c u r e . A Z . g o v

3.0 FIRMS EXPERIENCE AND REVENUE

a. Firm shall complete the document titled “Project Experience Number of Projects and Revenue”, using same document title and upload in .pdf format only as an “Attachment” with firm’s offer in ProcureAZ.

.

4.0 FIRMS SERVICES a. Firm shall complete the Excel spreadsheet titled “2018 Professional Services List of Firms Services”

using same document title and uploaded in Excel format only as an “Attachment” with firm’s offer in ProcureAZ.

.

Page 9: Offer Forms (Attachments) Yost...water treatment, wastewater reclamation, water distribution, and office sites throughout the City. These systems are monitored and controlled by Supervisory

Request for Qualifications Solicitation No.

ADSPO18‐00007887   

Description: 2018 Professional Services List

Arizona Department of Administration

State Procurement Office

100 N 15th Ave., Suite 201 Phoenix, AZ 85007

PART 4 of the Solicitation Documents: Offer Forms (Attachments)

Date: January 8, 2018

Page 9 of 36 4 A v a i l a b l e o n l i n e a t : P r o c u r e . A Z . g o v

5.0 EXPERIENCE REFERENCES: THE PRIME FIRM SHALL LIST A TOTAL OF THREE (3) CLIENT REFERENCES FOR ANY PROJECTS COMPLETED IN THE LAST YEAR BY THE FIRM (OR A BRANCH LOCATION). REFERENCES MAY BE CONTACTED BY ANY ELIGIBLE AGENCY.

1 Client Company/Address Contact Begin Date End Date

City of Buckeye, 423 Arizona Eastern Ave Buckeye, AZ 85326

Mark J Seamans 2003 ongoing

Phone Number Email Address

623 349-6126 [email protected]

List project name, project location, original design fee, final design fee, construction costs (if applicable), and program facilities (What were the uses, facilities, or activities that were built. For example; lift station, parking lot, bridge, playground, sewerage treatment plant, storm drainage, etc.).

Project name: SCADA Improvement Program; Location: Buckeye, AZ; Original and Final Design fee: $100,000; Construction Cost: $2.9 million; Program facilities: SCADA systems for 47 facilities

Services performed similar to those described in Solicitation

Control Systems Engineering

2 Client Company/Address Contact Begin Date End Date

Eastern Municipal Water District, 2270 Trumble Road, Perris, CA 92572

Laura Barraza, P.E. 2010 ongoing

Phone Number Email Address

951 928-3777 ext. 4228 [email protected]

List project name, project location, original design fee, final design fee, construction costs (if applicable), and program facilities (What were the uses, facilities, or activities that were built. For example; lift station, parking lot, bridge, playground, sewerage treatment plant, storm drainage, etc.).

Project name: Water Facilities Master Plan Update; Location: Perris, CA; Original and Final Design Fee: $1.75 million; Construction Cost: Not applicable; Program facilities: all client’s water facilities

Services performed similar to those described in Solicitation

Civil Engineering, Water Resources Engineering

3 Client Company/Address Contact Begin Date End Date

First Solar, Inc. 350 West Washington Street, Suite 600, Tempe, AZ 85281-1244

Eric Thornbrew, P.E. 2009 ongoing

Phone Number Email Address

Page 10: Offer Forms (Attachments) Yost...water treatment, wastewater reclamation, water distribution, and office sites throughout the City. These systems are monitored and controlled by Supervisory

Request for Qualifications Solicitation No.

ADSPO18‐00007887   

Description: 2018 Professional Services List

Arizona Department of Administration

State Procurement Office

100 N 15th Ave., Suite 201 Phoenix, AZ 85007

PART 4 of the Solicitation Documents: Offer Forms (Attachments)

Date: January 8, 2018

Page 10 of 36 4 A v a i l a b l e o n l i n e a t : P r o c u r e . A Z . g o v

602 427-1275 [email protected]

List project name, project location, original design fee, final design fee, construction costs (if applicable), and program facilities (What were the uses, facilities, or activities that were built. For example; lift station, parking lot, bridge, playground, sewerage treatment plant, storm drainage, etc.).

Project name: Playa Photovoltaic Solar Project; Location: Tempe, AZ; Original and Final Design fee: $673,000; Construction Cost: $3.5 million; Program facilities: All water infrastructure for 200 megawatt solar facility

Services performed similar to those described in Solicitation

Civil Engineering, Water Resources Engineering

End of Attachment 2-A

Page 11: Offer Forms (Attachments) Yost...water treatment, wastewater reclamation, water distribution, and office sites throughout the City. These systems are monitored and controlled by Supervisory

Request for Qualifications Solicitation No.

ADSPO18‐00007887   

Description: 2018 Professional Services List

Arizona Department of Administration

State Procurement Office

100 N 15th Ave., Suite 201 Phoenix, AZ 85007

PART 4 of the Solicitation Documents: Offer Forms (Attachments)

Date: January 8, 2018

Page 11 of 36 4 A v a i l a b l e o n l i n e a t : P r o c u r e . A Z . g o v

Attachment 2-B Organization Profile

STATE MAY DETERMINE YOUR PROPOSAL IS NON-RESPONSIVE IF YOU DO NOT ANSWER ALL QUESTIONS FULLY.

ORGANIZATION PROFILE

The firm shall complete a separate Organizational Profile document for each branch office.

Firm Name West Yost Associates Year established 2017

Principal address (street, city, state)

4505 East Chandler Blvd, Suite 230, Phoenix, AZ 85048

Entity type: Private Structure: S-Corp

Branch or Division:

Branch Parent Company: N/A

Years the organization has conducted business in Arizona. 1

Contract Representatives to Contact

Name Title Telephone Number E-Mail Address

1. Daniel Groves, PE Engineering Manager II (602) 845-0326 [email protected]

2. Charles Duncan, PE President (530) 792-3220 [email protected]

3. x x x x

Firm Professional Registration and Certifications (INCLUDE COPY OF DOCUMENT IN OFFER)

Description Issuer Number Expiration

1. Arizona Board of Technical Registration

State of Arizona 20157 1/14/2019

2.

Arizona transaction privilege tax license or (if applicable) Arizona Corporate Commission Certificate of Good Standing

State of Arizona 68-0370826 N/A

Page 12: Offer Forms (Attachments) Yost...water treatment, wastewater reclamation, water distribution, and office sites throughout the City. These systems are monitored and controlled by Supervisory

Request for Qualifications Solicitation No.

ADSPO18‐00007887   

Description: 2018 Professional Services List

Arizona Department of Administration

State Procurement Office

100 N 15th Ave., Suite 201 Phoenix, AZ 85007

PART 4 of the Solicitation Documents: Offer Forms (Attachments)

Date: January 8, 2018

Page 12 of 36 4 A v a i l a b l e o n l i n e a t : P r o c u r e . A Z . g o v

ATTACHMENT 2-B SUPPLEMENTS: (For submission of additional Organizational Profile qualifications beyond the number of forms provided in the Offer Documents: Offeror shall copy the Organizational Profile form in its entirety and complete in a separate Document for submission with the offer or type “None” on first line if not applicable. Offeror shall title Supplement(s) with the same beginning title as named herein, number sequentially in accordance with the number of Organizational Profile forms submitting and upload with offer.).

Title Document

Date No. of pages Purpose in Offer

3. Organizational Profile – AZ Board of Technical Registration 2018 – Firm

1/18/2018 1 Proof of Registration

4. Organizational Profile – State of AZ Dept of Economics

1/18/2018 2 Proof of Certification

5. Organizational Profile – State of AZ Dept of Revenue

1/18/2018 2 Proof of Certification

(NOTE: The Offeror may insert additional rows as required).

End of Attachment 2-B

Page 13: Offer Forms (Attachments) Yost...water treatment, wastewater reclamation, water distribution, and office sites throughout the City. These systems are monitored and controlled by Supervisory

Request for Qualifications Solicitation No.

ADSPO18‐00007887   

Description: 2018 Professional Services List

Arizona Department of Administration

State Procurement Office

100 N 15th Ave., Suite 201 Phoenix, AZ 85007

PART 4 of the Solicitation Documents: Offer Forms (Attachments)

Date: January 8, 2018

Page 13 of 36 4 A v a i l a b l e o n l i n e a t : P r o c u r e . A Z . g o v

Attachment 3-A Method Proposal (Method of Approach)

RESERVED FOR AWARDED DESIGN PROFESSIONAL UPON SERVICE REQUEST

End of Attachment 3-A

Page 14: Offer Forms (Attachments) Yost...water treatment, wastewater reclamation, water distribution, and office sites throughout the City. These systems are monitored and controlled by Supervisory

Request for Qualifications Solicitation No.

ADSPO18‐00007887   

Description: 2018 Professional Services List

Arizona Department of Administration

State Procurement Office

100 N 15th Ave., Suite 201 Phoenix, AZ 85007

PART 4 of the Solicitation Documents: Offer Forms (Attachments)

Date: January 8, 2018

Page 14 of 36 4 A v a i l a b l e o n l i n e a t : P r o c u r e . A Z . g o v

Attachment 3-B Key Personnel Proposal

Answer all questions thoroughly in the spaces provided. Complete this form in full for each one of the key personnel who will participate in this contract. Insert or attach a separate resume if desired, but any attached resumes are supplemental to this form and do not substitute resumes for this form. Offeror shall list any resume filename within the Key Personnel Form resume section and Attach as titled and submit with firm’s offer in ProcureAZ. Resumes shall not be listed in Attachment 3-B as Supplements.

1 Name: Daniel Groves, PE, CISSP How long with company? 2 years

Current position in company:

Engineering Tech Manager II How long in position? 2 years

Position for the Services: Control Systems Engineer How much of time will be dedicated to the Services?

As needed

What primary functions will be assigned?

Planning, design and implementation of Operational Technology (OT) systems in the water and wastewater infrastructure; Cybersecurity for OT systems, including system assessments, design and implementation of system improvements to improve system performance and resilience against cyber threats; OT Cybersecurity Subject Matter Expert for assessments, design and implementation of OT systems in the water sector.

Describe person’s experience in performing

services like those that are to be assigned:

Daniel Groves has 26 years of experience providing planning, design and implementation of OT systems in water and wastewater infrastructure. For the past 11 years, Daniel has focused on Cybersecurity for OT systems, including system assessments, design and implementation of system improvements to improve system performance and resilience against cyber threats. He has served as Program Manager, Project Manager and OT Cybersecurity Subject Matter Expert for assessments, design and implementation of OT systems in the water sector. In previous engagements, Daniel served as an instrumentation and controls engineer, OT master planning, design, and implementation, system programming for water and wastewater treatment plant start-up projects. Early in his career, Daniel worked as an electrical technician completing design/build, installation, and repair of OT systems for water industry clients in the Southwest.

SCADA Improvement Program, City of Buckeye, AZ: Daniel serves as Project Manager for the SCADA Improvement Project for the City of Buckeye (City). The City owns and operates 47 water treatment, wastewater reclamation, water distribution, and office sites. These sites are monitored and controlled by Supervisory Control and Data Acquisition (SCADA) systems. The City is implementing a $2.9 million SCADA Improvement Program to fully integrate and improve these systems, and has retained West Yost as its Program Manager

Page 15: Offer Forms (Attachments) Yost...water treatment, wastewater reclamation, water distribution, and office sites throughout the City. These systems are monitored and controlled by Supervisory

Request for Qualifications Solicitation No.

ADSPO18‐00007887   

Description: 2018 Professional Services List

Arizona Department of Administration

State Procurement Office

100 N 15th Ave., Suite 201 Phoenix, AZ 85007

PART 4 of the Solicitation Documents: Offer Forms (Attachments)

Date: January 8, 2018

Page 15 of 36 4 A v a i l a b l e o n l i n e a t : P r o c u r e . A Z . g o v

List person’s job-related training and education:

Professional Registrations: Professional Electrical Engineer, Arizona No. 40255, Hawaii No. 15787; Professional Controls Systems Engineer, California No. 7454, Arizona No. 45679, Colorado No. 0044651 Education: BS, Information Technology/Information Systems Security from University of Phoenix Certifications/Training: Project Management Professional (PMP); Certified Information System Security Professional (CISSP); ENV Sustainability Professional (ENV SP); CompTIA Network + Completed Cisco Certified Network Associate training; BICSI DD102: Designing Telecommunications Distribution Systems

Resume: Not included

Page 16: Offer Forms (Attachments) Yost...water treatment, wastewater reclamation, water distribution, and office sites throughout the City. These systems are monitored and controlled by Supervisory

Request for Qualifications Solicitation No.

ADSPO18‐00007887   

Description: 2018 Professional Services List

Arizona Department of Administration

State Procurement Office

100 N 15th Ave., Suite 201 Phoenix, AZ 85007

PART 4 of the Solicitation Documents: Offer Forms (Attachments)

Date: January 8, 2018

Page 16 of 36 4 A v a i l a b l e o n l i n e a t : P r o c u r e . A Z . g o v

2 Name: Joel Cox, CCNA, GPEN How long with company? 2 years

Current position in company:

Principal Tech Specialist II How long in positon? 2 years

Position for the Services: Control Systems Engineer How much of time will be dedicated to the Services?

As needed

What primary functions will be assigned?

Design and delivery of communications systems and data center infrastructure with a focus on network communications and cybersecurity; design and implementation of Information Technology (IT) enterprise systems and Operational Technology (OT) to support manufacturing, services and municipal water and wastewater treatment systems; project management, disaster recovery planning and information system security; communications network design and implementation; database design and implementation; storage design and implementation; and virtualization design and implementation.

Describe person’s experience in performing

services like those that are to be assigned:

Joel Cox has 26 years of experience providing a broad range of design and delivery of communications systems and data center infrastructure with a focus on network communications and cybersecurity. He has served as Project Manager, Subject Matter Expert for the design and implementation of IT enterprise systems and OT to support manufacturing, services and municipal water and wastewater treatment systems. His experience includes project management, disaster recovery planning and information system security; communications network design and implementation; database design and implementation; and storage design and implementation. In previous engagements, Joel led the IT team from startup to initial public offering (IPO) for a leading identity theft protection organization, which involved rigorous information security design and testing to protect personally identifiable information (PII). He worked closely with the audit and security teams to maintain International Organization for Standardization (ISO) 27001 and payment card industry (PCI) certifications. SCADA Improvement Program, City of Buckeye, AZ: Joel served as Cyber Security and Network Engineer for the SCADA Improvement Project for the City of Buckeye (City). The City owns and operates 47 water treatment, wastewater reclamation, water distribution, and office sites. These sites are monitored and controlled by Supervisory Control and Data Acquisition (SCADA) systems. The City is implementing a $2.9 million SCADA Improvement Program to fully integrate and improve these systems, and has retained West Yost as its Program Manager.

List person’s job-related training and education:

Education/Training/Certifications: Cisco Certified Network Associate (CCNA), Routing and Switching; Security, Cisco ID No. CSCO12375337; GIAC GPEN (Penetration Testing); SANS SEC560; Network Penetration Testing and Ethical Hacking; Red Tiger Security; Securing ICS/SCADA Systems, Department of Homeland Security, 210W – Cybersecurity for Industrial Control Systems

Resume: Not included

Page 17: Offer Forms (Attachments) Yost...water treatment, wastewater reclamation, water distribution, and office sites throughout the City. These systems are monitored and controlled by Supervisory

Request for Qualifications Solicitation No.

ADSPO18‐00007887   

Description: 2018 Professional Services List

Arizona Department of Administration

State Procurement Office

100 N 15th Ave., Suite 201 Phoenix, AZ 85007

PART 4 of the Solicitation Documents: Offer Forms (Attachments)

Date: January 8, 2018

Page 17 of 36 4 A v a i l a b l e o n l i n e a t : P r o c u r e . A Z . g o v

3 Name: Kristen Whatley, PE How long with company? 3 years

Current position in company:

Senior Engineer II How long in positon? 3 years

Position for the Services: Civil Engineer How much of time will be dedicated to the Services?

As needed

What primary functions will be assigned?

Planning and computer modeling of water systems, designing and bidding of water resources projects including wells and wastewater, water treatment, booster pump stations, reservoirs, and pipelines; water storage, treatment, and distribution projects; master planning, and water system permitting.

Describe person’s experience in performing

services like those that are to be assigned:

Kristen Whatley has over 15 years of experience working on and managing water resources and wastewater projects. Her capabilities range from the planning and computer modeling of water systems, designing and bidding of water resources projects including wells and wastewater, water treatment, booster pump stations, reservoirs, and pipelines. Project experience includes serving as the project manager on major water resources and wastewater design and permitting projects and residential land development projects; water storage, treatment, and distribution projects; and master planning efforts on several land development projects including coordination with regulatory agencies. Water system permitting experience includes obtaining a Certificate of Convenience and Necessity (CC&N) extensions and coordination on rate cases, obtaining Certificates and Designations of Assured Water Supply, service area water right establishment, and Arizona Department of Environmental Quality (ADEQ) new water system establishment.

Well No. 23 & Arsenic Water Treatment Plant Design and Bidding, Sahuarita Water Company/Sahuarita, AZ: Project Manager for the design, project bidding services and construction administration to construct a new 1,600 gpm well (Well 23) with a 5,000-gallon surge tank and air compressor, and a centralized arsenic treatment facility for Sahuarita Water Company.

City of Phoenix Water Resource Options Evaluation, City of Phoenix / Phoenix, AZ: Project Engineer for a reclaimed water asset evaluation study for the City of Phoenix. The study evaluated project opportunities to beneficially utilize uncommitted existing reclaimed water supplies to meet future water supply needs.

Willow Springs Reclaimed Water Reservoir and Booster Pump Station Design, Willow Springs Utilities/Pinal County, AZ: Project Manager for the design of a 250,000 gallon reclaimed water reservoir and 1,000 gpm booster pump station, surge tank, and air compressor to serve the Phase I Willow Springs master planned development reclaimed water system.

List person’s job-related training and education:

Professional Registrations: Professional Civil Engineer, California No. 84665, Professional Civil Engineer, Arizona No. 45171; California Grade 2 Water Distribution and Treatment Operator; Arizona Grade 2 Water Distribution and Treatment Operator

Education: BS, Environmental Engineering, Northern Arizona University, Flagstaff

Page 18: Offer Forms (Attachments) Yost...water treatment, wastewater reclamation, water distribution, and office sites throughout the City. These systems are monitored and controlled by Supervisory

Request for Qualifications Solicitation No.

ADSPO18‐00007887   

Description: 2018 Professional Services List

Arizona Department of Administration

State Procurement Office

100 N 15th Ave., Suite 201 Phoenix, AZ 85007

PART 4 of the Solicitation Documents: Offer Forms (Attachments)

Date: January 8, 2018

Page 18 of 36 4 A v a i l a b l e o n l i n e a t : P r o c u r e . A Z . g o v

Resume: Not included

Page 19: Offer Forms (Attachments) Yost...water treatment, wastewater reclamation, water distribution, and office sites throughout the City. These systems are monitored and controlled by Supervisory

Request for Qualifications Solicitation No.

ADSPO18‐00007887   

Description: 2018 Professional Services List

Arizona Department of Administration

State Procurement Office

100 N 15th Ave., Suite 201 Phoenix, AZ 85007

PART 4 of the Solicitation Documents: Offer Forms (Attachments)

Date: January 8, 2018

Page 19 of 36 4 A v a i l a b l e o n l i n e a t : P r o c u r e . A Z . g o v

4 Name: Jon Wells, PE How long with company? 6 years

Current position in company:

Principal Engineer II How long in position? 6 years

Position for the Services: Civil Engineer How much of time will be dedicated to the Services?

As needed

What primary functions will be assigned?

Water and wastewater system hydraulic modeling and master planning; flow monitoring plans, interpreting and analyzing flow monitoring data, and using flow monitoring data to develop dry weather and wet weather flow components for collection systems, wastewater master plans, hydraulic model updates, and capacity assessments.

Describe person’s experience in performing

services like those that are to be assigned:

Jon Wells has nearly 16 years of experience in consulting engineering with a focus on water and wastewater system hydraulic modeling and master planning. He brings extensive experience in wastewater hydraulic modeling using a wide variety of software applications. Additionally, Jon has experience in developing flow monitoring plans, interpreting and analyzing flow monitoring data, and using flow monitoring data to develop dry weather and wet weather flow components for collection systems. Jon’s collection system work, particularly in the Bay Area, is in accordance with the State Water Resources Control Board’s Statewide General Waste Discharge Requirements for Sanitary Sewer Systems. His experience includes serving as project manager or project engineer on numerous wastewater master plans, hydraulic model updates, and capacity assessments.

French Valley and Winchester Sub-Regional Master Plan, Eastern Municipal Water District, Perris, CA: Wastewater Project Manager for a regional sewer master plan for the District in the French Valley and Winchester Region.

Southern Division Sewer Study, Eastern Municipal Water District, Temecula, CA: Project Manager for this ongoing planning study for Eastern Municipal Water District, Elsinore Valley Municipal Water District, and Western Municipal Water District.

Old Town Temecula Sanitary Sewer Study, Eastern Municipal Water District, Temecula, CA: Project Engineer for planning study that evaluated the capacity solutions for an undersized gravity main running through Old Town Temecula.

List person’s job-related training and education:

Professional Registrations: Professional Civil Engineer, California No. C67782 Education: MS, Environmental Engineering and Science, Stanford University; BS, Civil Engineering, Stanford University

Resume: Not included

Page 20: Offer Forms (Attachments) Yost...water treatment, wastewater reclamation, water distribution, and office sites throughout the City. These systems are monitored and controlled by Supervisory

Request for Qualifications Solicitation No.

ADSPO18‐00007887   

Description: 2018 Professional Services List

Arizona Department of Administration

State Procurement Office

100 N 15th Ave., Suite 201 Phoenix, AZ 85007

PART 4 of the Solicitation Documents: Offer Forms (Attachments)

Date: January 8, 2018

Page 20 of 36 4 A v a i l a b l e o n l i n e a t : P r o c u r e . A Z . g o v

5 Name: Lani Good, PE How long with company? 4 years

Current position in company:

Principal Engineer I How long in position? 4 years

Position for the Services: Civil Engineer How much of time will be dedicated to the Services?

As needed

What primary functions will be assigned?

Wastewater collection system risk assessments, condition assessment, improvement project prioritization, and regulatory compliance, long-term asset management and capital improvement planning, urgent regulatory compliance projects.

Describe person’s experience in performing

services like those that are to be assigned:

Lani Good has 17 years of experience in a wide range of wastewater infrastructure planning and design projects. She specializes in wastewater collection system risk assessments, condition assessment, improvement project prioritization, and regulatory compliance. Lani is an expert in guiding wastewater agencies of all sizes through the decision-making process, from long-term asset management and capital improvement planning to urgent regulatory compliance projects. She has successfully led multidisciplinary workshops for large agencies with diverse stakeholder groups and is known for maintaining excellent client relationships that lead to repeat work. Lani has a strong involvement in professional associations and currently serves as a Board member for the San Francisco Bay Section of the California Water Environment Association.

Douglas Ranch, Water Reclamation Facility, Town of Buckeye, AZ: As Project Manager, oversaw the preliminary design of the 29-mgd water reclamation facility and the permitting for the 1.0-mgd first phase. Included treatment processes selection for the tertiary treatment plant, preliminary site layouts, and a facility phasing plan.

Sycamore Farms 12-inch Water Line, Arizona American Water Company, AZ: As Project Manager, responsible for the design and construction document preparation for 3,000 feet of 12-inch waterline within the City of Surprise for the Arizona American Water Company.

Effluent Disposal Line, Arizona City Sanitary District, AZ: As Project Engineer, designed a three-mile, 12-inch effluent disposal line in an arterial street from the newly expanded wastewater treatment plant to the Santa Cruz Wash.

Wastewater Collection System Assessment, City of Davis, CA: Project Manager for a comprehensive third-party evaluation of the City’s collection system management and Sewer System Management Plan (SSMP).

Sanitary Sewer Master Plan Update, City of West Sacramento, CA: Asset Management and CIP Task Lead for the City’s comprehensive Sewer Master Plan.

List person’s job-related training and education:

Professional Registrations: Professional Civil Engineer, California No. 73677 Education: BS, Civil Engineering, Arizona State University, Tempe, Arizona

Resume: Not included

Page 21: Offer Forms (Attachments) Yost...water treatment, wastewater reclamation, water distribution, and office sites throughout the City. These systems are monitored and controlled by Supervisory

Request for Qualifications Solicitation No.

ADSPO18‐00007887   

Description: 2018 Professional Services List

Arizona Department of Administration

State Procurement Office

100 N 15th Ave., Suite 201 Phoenix, AZ 85007

PART 4 of the Solicitation Documents: Offer Forms (Attachments)

Date: January 8, 2018

Page 21 of 36 4 A v a i l a b l e o n l i n e a t : P r o c u r e . A Z . g o v

6 Name: Kathryn Gies, PE, ENV SP, LEED AP How long with company? 18 years

Current position in company:

Engineering Manager II How long in position? 3 years

Position for the Services: Civil Engineer How much of time will be dedicated to the Services?

As needed

What primary functions will be assigned?

Planning and permitting wastewater treatment and recycled water projects; wastewater treatment facilities planning, treatment process design, biological nutrient removal systems, natural wastewater treatment systems; sustainable infrastructure planning; NPDES regulatory permitting; recycled water and land disposal systems master planning; biosolids land application planning and permitting; and groundwater quality studies for regulatory compliance purposes.

Describe person’s experience in performing

services like those that are to be assigned:

Kathryn Gies has over 18 years of experience in planning and permitting wastewater treatment and recycled water projects. Kathryn’s areas of expertise include wastewater treatment facilities planning; treatment process design; biological nutrient removal (BNR) systems; natural wastewater treatment systems; sustainable infrastructure planning; NPDES regulatory permitting; recycled water and land disposal systems master planning; biosolids land application planning and permitting; and groundwater quality studies for regulatory compliance purposes. She has completed facilities planning studies for a number of wastewater treatment plants, including BioWIN process modeling of biological nutrient removal activated sludge treatment systems. She has performed analyses for a number of projects using agricultural lands for effluent reuse including the development of: comprehensive water balances for complex reuse sites to assess water use efficiency; specialty spreadsheet tools for biosolids and water reuse management; nutrient management plans for land application of recycled water, biosolids, and food processing wastewater; Title 22 Engineer’s Reports for water reuse; and pilot-scale percolation studies.

Tertiary Treatment Project Facilities Master Plan, Easterly Wastewater Treatment Plant, City of Vacaville, CA: Project Engineer for the evaluation and development of a Facilities Master Plan.

Wastewater Treatment and Biosolids Facilities Master Plan, Dublin San Ramon Services District, Dublin, CA: Assistant Project Manager for the development of a comprehensive Wastewater Treatment and Biosolids Facilities Master Plan to identify the major improvements needed through the 2035 planning horizon.

List person’s job-related training and education:

Professional Registrations: Professional Civil Engineer; California No. 65022; LEED® Accredited Professional BD+C; EnvisionTM Sustainability Professional Education: PhD Candidate, Bioresource Engineering, Oregon State University; BS, Agricultural and Biological Engineering, Clemson University; Wetland Treatment and Design Course, Humboldt State University; BioWin® Process Modeling

Resume: Not included

Page 22: Offer Forms (Attachments) Yost...water treatment, wastewater reclamation, water distribution, and office sites throughout the City. These systems are monitored and controlled by Supervisory

Request for Qualifications Solicitation No.

ADSPO18‐00007887   

Description: 2018 Professional Services List

Arizona Department of Administration

State Procurement Office

100 N 15th Ave., Suite 201 Phoenix, AZ 85007

PART 4 of the Solicitation Documents: Offer Forms (Attachments)

Date: January 8, 2018

Page 22 of 36 4 A v a i l a b l e o n l i n e a t : P r o c u r e . A Z . g o v

7 Name: Craig Thompson, PE, BCEE How long with company? 3 years

Current position in company:

Principal Engineer II How long in position? 3 years

Position for the Services: Civil Engineer How much of time will be dedicated to the Services?

As needed

What primary functions will be assigned?

Wastewater treatment plant design, regulatory compliance, training, condition assessments for wastewater treatment plants, construction inspection, start-up training and assistance, and process optimization studies.

Describe person’s experience in performing

services like those that are to be assigned:

Craig Thompson’s 31 years civil engineering experience is primarily focused on water supply, including major involvement in 26 water treatment facilities with a total capacity of over 1,000 mgd and for plant capacities that range between 1 and 220 mgd. His experience includes regulatory compliance evaluations and training; condition assessments for water treatment plant facilities; award-winning process designs; construction inspection; start-up training and assistance; process optimization studies; and the design, construction, and operation of pilot plants.

Craig has been an invited speaker at workshops organized by the US Environmental Protection Agency (USEPA), California Division of Drinking Water (DDW), and California/Nevada Section AWWA. He currently serves as the California-Nevada Section AWWA Safe Drinking Water Act Committee chair, served on the Section’s Governing Board as Trustee for both Water Quality and Operations and Maintenance Divisions, and is past chair of the International Ozone Association-Pan American Group and Cal/Nevada Section Water Quality Division.

Rio Vista Water Treatment Plant Expansion, Preliminary Design Report, Castaic Lake Water Agency, Santa Clarita, CA: Project Engineer for the design of improvements to increase capacity from 30- to 66-mgd. Lead Process Engineer for original ozone system, contact clarifiers, and clarifier-filter building for the first 30-mgd phase of planned 140-mgd capacity water treatment plant.

Hennessey Water Treatment Plant, City of Napa, CA: Project Engineer for the design of a new surface wash and filter-to-waste system for existing self-backwashing filters to improve filter performance and regulatory compliance.

Ophir Water Treatment Plant, Placer County Water Agency, Auburn, CA: Project Engineer for Feasibility Study evaluation of alternative water treatment processes and to develop conceptual design of new 30-mgd water treatment plant.

List person’s job-related training and education:

Professional Registrations and Certifications: Professional Civil Engineer, California No. 44224; Board Certified Environmental Engineer, American Academy of Environmental Engineers

Education: BA, History, University of California, San Diego; BS, Civil Engineering, University of California, Berkeley; ME, Civil Engineering, University

of California, Berkeley

Resume: Not included

Page 23: Offer Forms (Attachments) Yost...water treatment, wastewater reclamation, water distribution, and office sites throughout the City. These systems are monitored and controlled by Supervisory

Request for Qualifications Solicitation No.

ADSPO18‐00007887   

Description: 2018 Professional Services List

Arizona Department of Administration

State Procurement Office

100 N 15th Ave., Suite 201 Phoenix, AZ 85007

PART 4 of the Solicitation Documents: Offer Forms (Attachments)

Date: January 8, 2018

Page 23 of 36 4 A v a i l a b l e o n l i n e a t : P r o c u r e . A Z . g o v

ATTACHMENT 3-B SUPPLEMENTS: (For submission of additional Key Personnel qualifications beyond the number of forms provided in the Offer Documents: Offeror shall copy the Key Personnel Form in its entirety and complete in a separate Word Document for submission with the offer, and list file name below or type “None” on first line if not applicable. Offeror shall title Supplement(s) with the same title as named herein and upload with offer.).

Title Document

Date No. of pages Purpose in Offer

1. Key Personnel Proposal - AZ Board of Technical Registration 2018 - Daniel Groves

1/22/2018 1 Proof of Registration

2. Key Personnel Proposal - AZ Board of Technical Registration 2018 - Kristen Whatley

1/17/2018 1 Proof of Registration

(NOTE: The Offeror may insert additional rows as required).

End of Attachment 3-B

Page 24: Offer Forms (Attachments) Yost...water treatment, wastewater reclamation, water distribution, and office sites throughout the City. These systems are monitored and controlled by Supervisory

Request for Qualifications Solicitation No.

ADSPO18‐00007887   

Description: 2018 Professional Services List

Arizona Department of Administration

State Procurement Office

100 N 15th Ave., Suite 201 Phoenix, AZ 85007

PART 4 of the Solicitation Documents: Offer Forms (Attachments)

Date: January 8, 2018

Page 24 of 36 4 A v a i l a b l e o n l i n e a t : P r o c u r e . A Z . g o v

Attachment 3-C Proposed Subcontractors

RESERVED FOR AWARDED DESIGN PROFESSIONAL UPON SERVICE REQUEST

Check “NO” if you WILL NOT subcontract any portion of the Work and will therefore be carrying out all of the Work with your own personnel.

NO, the Offeror will not subcontract any portion of the Work.

If you WILL subcontract any portion of the Work, check “YES” below and list name of persons or companies you propose to use as subconsultants.

1. Fill in the information in the chart below for every proposed subcontractor – indicate the role and services work the subconsultant may provide in performing any of the services as outlined in the Requirements Document in the solicitation.

2. Offeror shall complete an Attachment 3-B Key Personnel Form in its entirety for each proposed subcontractor and submit with offer. The term “Subconsultant” shall be annotated in parenthesis after each subcontractor key personnel name typed in the “Name” section of the 3-B form.

3. State may demand additional information about proposed subcontractors as a precondition of award.

�YES, the Offeror will use the Subcontractors listed below:

Subcontractor Key Personnel Name; Subcontractor Firm Name and Contact

Information List Proposed Subcontractor

Role(s) and Services

Capacity % Dedicated to Perform the

Proposed Role/Service For Any

Project Under This Contract

1. None

ATTACHMENT 3-C SUPPLEMENTS: (Offeror to insert as required and list here or type “None” on first line. Offeror shall title any Supplement(s) with the same title as named herein and upload with offer.)

Title Document

Date No. of pages Purpose in Offer

1. None x x x

End of Attachment 3-C

Page 25: Offer Forms (Attachments) Yost...water treatment, wastewater reclamation, water distribution, and office sites throughout the City. These systems are monitored and controlled by Supervisory

Request for Qualifications Solicitation No.

ADSPO18‐00007887   

Description: 2018 Professional Services List

Arizona Department of Administration

State Procurement Office

100 N 15th Ave., Suite 201 Phoenix, AZ 85007

PART 4 of the Solicitation Documents: Offer Forms (Attachments)

Date: January 8, 2018

Page 25 of 36 4 A v a i l a b l e o n l i n e a t : P r o c u r e . A Z . g o v

Attachment 3-D Performance Guarantee

RESERVED FOR AWARDED DESIGN PROFESSIONAL UPON SERVICE REQUEST

End of Attachment 3-D

Page 26: Offer Forms (Attachments) Yost...water treatment, wastewater reclamation, water distribution, and office sites throughout the City. These systems are monitored and controlled by Supervisory

Request for Qualifications Solicitation No.

ADSPO18‐00007887   

Description: 2018 Professional Services List

Arizona Department of Administration

State Procurement Office

100 N 15th Ave., Suite 201 Phoenix, AZ 85007

PART 4 of the Solicitation Documents: Offer Forms (Attachments)

Date: January 8, 2018

Page 26 of 36 4 A v a i l a b l e o n l i n e a t : P r o c u r e . A Z . g o v

Attachment 3-E Israel Boycott Form

All materials submitted as part of a response to a solicitation are subject to Arizona public records law and will be disclosed if there is an appropriate public records request at the time of or after the award of the contract. Recently legislation has been enacted to prohibit the state from contracting with companies currently engaged in a boycott of Israel. To ensure compliance with A.R.S. §35-393.01. This form must be completed and returned with the response to the solicitation and any supporting information to assist the State in making its determination of compliance.

As defined by A.R.S. §35-393.01:

1."Boycott" means engaging in a refusal to deal, terminating business activities or performing other actions that are intended to limit commercial relations with Israel or with persons or entities doing business in Israel or in territories controlled by Israel, if those actions are taken either:

(a) In compliance with or adherence to calls for a boycott of Israel other than those boycotts to which 50 United States Code section 4607(c) applies.

(b) In a manner that discriminates on the basis of nationality, national origin or religion and that is not based on a valid business reason.

2. "Company" means a sole proprietorship, organization, association, corporation, partnership, joint venture, limited partnership, limited liability partnership, limited liability company or other entity or business association, and includes a wholly owned subsidiary, majority-owned subsidiary, parent company or affiliate.

3. "Direct holdings" means all publicly traded securities of a company that are held directly by the state treasurer or a retirement system in an actively managed account or fund in which the retirement system owns all shares or interests.

4."Indirect holdings" means all securities of a company that are held in an account or fund, including a mutual fund, that is managed by one or more persons who are not employed by the state treasurer or a retirement system, if the state treasurer or retirement system owns shares or interests either:

(a) together with other investors that are not subject to this section. (b) that are held in an index fund.

5.”Public entity" means this State, a political subdivision of this STATE or an agency, board, commission or department of this state or a political subdivision of this state.

6. ”Public fund" means the state treasurer or a retirement system. 7. "Restricted companies" means companies that boycott Israel. 8. "Retirement system" means a retirement plan or system that is established by or pursuant to title 38.

All offerors must select one of the following:

X My company does not participate in, and agrees not to participate in during the term of the contract a boycott of Israel in accordance with A.R.S. §35-393.01. I understand that my entire response will become public record in accordance with A.A.C. R2-7-C317.

My company does participate in a boycott of Israel as defined by A.R.S. §35-393.01. :

By submitting this response, proposer agrees to indemnify and hold the State, its agents and employees, harmless from any claims or causes of action relating to the State’s action based upon reliance on the above representations, including the payment of all costs and attorney fees incurred by the State in defending such an action.

Company Name Signature of Person Authorized to Sign

Address Printed Name

City State Zip Title

End of Attachment 3-E

West Yost Associates

2020 Research Park Drive, Suite 100 Charles Duncan, PE

Davis CA 95618 President

Page 27: Offer Forms (Attachments) Yost...water treatment, wastewater reclamation, water distribution, and office sites throughout the City. These systems are monitored and controlled by Supervisory

Request for Qualifications Solicitation No.

ADSPO18‐00007887   

Description: 2018 Professional Services List

Arizona Department of Administration

State Procurement Office

100 N 15th Ave., Suite 201 Phoenix, AZ 85007

PART 4 of the Solicitation Documents: Offer Forms (Attachments)

Date: January 8, 2018

Page 27 of 36 4 A v a i l a b l e o n l i n e a t : P r o c u r e . A Z . g o v

Attachment 4 Pricing Sheet

RESERVED FOR AWARDED DESIGN PROFESSIONAL SERVICE ORDER CONTRACT

End of Attachment 4

Page 28: Offer Forms (Attachments) Yost...water treatment, wastewater reclamation, water distribution, and office sites throughout the City. These systems are monitored and controlled by Supervisory

Request for Qualifications Solicitation No.

ADSPO18‐00007887   

Description: 2018 Professional Services List

Arizona Department of Administration

State Procurement Office

100 N 15th Ave., Suite 201 Phoenix, AZ 85007

PART 4 of the Solicitation Documents: Offer Forms (Attachments)

Date: January 8, 2018

Page 28 of 36 4 A v a i l a b l e o n l i n e a t : P r o c u r e . A Z . g o v

Attachment 5-A Confidential Information Designation

All materials submitted as part of a response to a solicitation are subject to Arizona public records law and will be disclosed if there is an appropriate public records request at the time of or after the award of the contract. Recognizing there may be materials included in a solicitation response that are proprietary or a trade secret, a process is set out in A.A.C. R2-7-103 (copy attached) that will allow qualifying materials to be designated as confidential and excluded from disclosure. For purposes of this process the definition of “trade secret” will be the same as that set out in A.A.C. R2-7-101(52).

Complete this form return it with your Offer along with the appropriate supporting information to assist State in making its determination as to whether any of the materials submitted as part of your Offer should be designated confidential because the material is proprietary or a trade secret and therefore not subject to disclosure.

STATE WILL NOT CONSIDER ANY MATERIAL IN YOUR OFFER “CONFIDENTIAL” UNLESS DESIGNATED ON THIS FORM.

Check one of the following – if neither is checked, State will assume that as equivalent to “DOES NOT”:

This response DOES NOT contain proprietary or trade secret information. I understand that my entire response will become public record in accordance with A.A.C. R2-7-C317.

�This response DOES contain trade secret information because it contains information that:

1. Is a formula, pattern, compilation, program, device, method, technique or process, AND

2. Derives independent economic value, actual or potential, from not being generally known to, and not being readily ascertainable by proper means by, other persons who can obtain economic value from its disclosure or use; AND

3. Is the subject of efforts by myself or my organization that are reasonable under the circumstances to maintain its secrecy.

NOTE: Failure to attach an explanation may result in a determination that the information does not meet the statutory trade secret definition. All information that does not meet the definition of trade secret as defined by A.A.C. R2-7-101(52) will become public in accordance with A.A.C. R2-7-C317. State may make its own determination on materials in accordance with A.A.C. R2-7-103.

If State agrees with Offeror’s designation of trade secret or confidentiality and the determination is challenged, the undersigned hereby agrees to cooperate and support the defense of the determination with all interested parties, including legal counsel or other necessary assistance.

By submitting this response, Offeror agrees that the entire Offer, including confidential, trade secret and proprietary information may be shared with an evaluation committee and technical advisors during the evaluation process. Offeror agrees to indemnify and hold State, its agents and employees, harmless from any claims or causes of action relating to State’s withholding of information based upon reliance on the above representations, including the payment of all costs and attorney fees incurred by State in defending such an action.

West Yost Associates

Offeror Company Name Signature of Authorized Person

2020 Research Park Drive, Suite 100, Davis, CA 95618 Charles Duncan, PE

Address Printed Name

Page 29: Offer Forms (Attachments) Yost...water treatment, wastewater reclamation, water distribution, and office sites throughout the City. These systems are monitored and controlled by Supervisory

Request for Qualifications Solicitation No.

ADSPO18‐00007887   

Description: 2018 Professional Services List

Arizona Department of Administration

State Procurement Office

100 N 15th Ave., Suite 201 Phoenix, AZ 85007

PART 4 of the Solicitation Documents: Offer Forms (Attachments)

Date: January 8, 2018

Page 29 of 36 4 A v a i l a b l e o n l i n e a t : P r o c u r e . A Z . g o v

x x

City State Zip Title

ATTACHMENT 5-A SUPPLEMENTS: (Offeror to insert as required and list here or type “None” on first line. Offeror shall title any Supplement(s) with the same title as named herein and upload with offer.).

Title Document

Date No. of pages Purpose in Offer

1. None x x x

End of Attachment 5-A

Page 30: Offer Forms (Attachments) Yost...water treatment, wastewater reclamation, water distribution, and office sites throughout the City. These systems are monitored and controlled by Supervisory

Request for Qualifications Solicitation No.

ADSPO18‐00007887   

Description: 2018 Professional Services List

Arizona Department of Administration

State Procurement Office

100 N 15th Ave., Suite 201 Phoenix, AZ 85007

PART 4 of the Solicitation Documents: Offer Forms (Attachments)

Date: January 8, 2018

Page 30 of 36 4 A v a i l a b l e o n l i n e a t : P r o c u r e . A Z . g o v

Copy of A.A.C. R2-7-103 [Confidential Information] as was current at time of Solicitation issuance

PROVIDED FOR REFERENCE ONLY

A. If a person wants to assert that a person's offer, specification, or protest contains a trade secret or other proprietary information, a person shall include with the submission a statement supporting this assertion. A person shall clearly designate any trade secret and other proprietary information, using the term "confidential". Contract terms and conditions, pricing, and information generally available to the public are not considered confidential information under this Section.

B. Until a final determination is made under subsection (C), an agency chief procurement officer shall not disclose information designated as confidential under subsection (A) except to those individuals deemed by an agency chief procurement officer to have a legitimate state interest.

C. Upon receipt of a submission, an agency chief procurement officer shall make one of the following written determinations:

1. The designated information is confidential and the agency chief procurement officer shall not disclose the information except to those individuals deemed by the agency chief procurement officer to have a legitimate state interest;

2. The designated information is not confidential; or

3. Additional information is required before a final confidentiality determination can be made.

D. If an agency chief procurement officer determines that information submitted is not confidential, a person who made the submission shall be notified in writing. The notice shall include a time period for requesting a review of the determination by the state procurement administrator.

E. An agency chief procurement officer may release information designated as confidential under subsection (A) if:

1. A request for review is not received by the state procurement administrator within the time period specified in the notice; or

2. The state procurement administrator, after review, makes a written determination that the designated information is not confidential.

- - -

Page 31: Offer Forms (Attachments) Yost...water treatment, wastewater reclamation, water distribution, and office sites throughout the City. These systems are monitored and controlled by Supervisory

Request for Qualifications Solicitation No.

ADSPO18‐00007887   

Description: 2018 Professional Services List

Arizona Department of Administration

State Procurement Office

100 N 15th Ave., Suite 201 Phoenix, AZ 85007

PART 4 of the Solicitation Documents: Offer Forms (Attachments)

Date: January 8, 2018

Page 31 of 36 4 A v a i l a b l e o n l i n e a t : P r o c u r e . A Z . g o v

Attachment 5-B Conformance Statements

STATE WILL NOT CONSIDER ANY EXCEPTIONS UNLESS DESIGNATED ON THIS FORM.

READ THE INSTRUCTIONS TO OFFERORS BEFORE TAKING ANY EXCEPTIONS – TAKING EXCEPTIONS CAN BE GROUNDS FOR STATE REJECTING YOUR OFFER IN EVALUATION.

CONFORMANCE TO THE INSTRUCTIONS: (PART 1 OF THE SOLICITATION)

Check one of the following – if neither is checked, State will assume that as equivalent to “YES”:

YES – Offeror acknowledges that it has read and understands the Solicitation Summary in Section 1-A of the Solicitation Documents and the Instructions to Offerors in Section 1-B of the Solicitation Documents and the and attests that its Offer complies with both.

�NO – Offeror acknowledges that it has read and understands the Solicitation Summary in Section 1-A of the Solicitation Documents and the Instructions to Offerors in Section 1-B of the Solicitation Documents, and attests that its Offer complies with both EXCEPT FOR the exceptions listed in Attachment 5-B Supplement 1.

CONFORMANCE TO THE CONTRACT TERMS AND CONDITIONS: (PART 2 OF THE SOLICITATION)

Check one of the following – if neither is checked, State will assume that as equivalent to “YES”:

YES – Offeror acknowledges that it has read and understands the Special Terms and Conditions and the Uniform Terms and Conditions, along with their respective Exhibits and Appendices, in Part 2 of the Solicitation Documents and attests that its Offer complies with both.

�NO – Offeror acknowledges that it has read and understands the Special Terms and Conditions and the Uniform Terms and Conditions, along with their respective Exhibits and Appendices in Part 2 of the Solicitation Documents and attests that its Offer complies with both EXCEPT FOR the exceptions listed in Attachment 5-B Supplement 2.

CONFORMANCE TO THE TECHNICAL DOCUMENTS: (PART 3 OF THE SOLICITATION)

Check one of the following – if neither is checked, State will assume that as equivalent to “YES”:

YES – Offeror acknowledges that it has read and understands the Requirements Document and the Compensation Document in Part 3 of the Solicitation Documents and attests that its Offer complies with both.

Page 32: Offer Forms (Attachments) Yost...water treatment, wastewater reclamation, water distribution, and office sites throughout the City. These systems are monitored and controlled by Supervisory

Request for Qualifications Solicitation No.

ADSPO18‐00007887   

Description: 2018 Professional Services List

Arizona Department of Administration

State Procurement Office

100 N 15th Ave., Suite 201 Phoenix, AZ 85007

PART 4 of the Solicitation Documents: Offer Forms (Attachments)

Date: January 8, 2018

Page 32 of 36 4 A v a i l a b l e o n l i n e a t : P r o c u r e . A Z . g o v

�NO – Offeror acknowledges that it has read and understands the Requirements Document and the Compensation Document, in Part 3 of the Solicitation Documents and attests that its Offer complies with both EXCEPT FOR the exceptions listed in Attachment 5-B Supplement 3.

Page 33: Offer Forms (Attachments) Yost...water treatment, wastewater reclamation, water distribution, and office sites throughout the City. These systems are monitored and controlled by Supervisory

Request for Qualifications Solicitation No.

ADSPO18‐00007887   

Description: 2018 Professional Services List

Arizona Department of Administration

State Procurement Office

100 N 15th Ave., Suite 201 Phoenix, AZ 85007

PART 4 of the Solicitation Documents: Offer Forms (Attachments)

Date: January 8, 2018

Page 33 of 36 4 A v a i l a b l e o n l i n e a t : P r o c u r e . A Z . g o v

ATTACHMENT 5-B Supplement No. 1: Exceptions to Instructions

Article / Paragraph or Exhibit Reference Proposed Changes / Alternate Language Rationale for Proposed Change

Section 1-A: Solicitation Summary

x None x

Section 1-B: Instructions to Offerors

x None x

ATTACHMENT 5-B Supplement No. 2: Exceptions to Contract Terms & Conditions

Article/ Paragraph or Exhibit Reference Proposed Changes / Alternate Language Rationale for Proposed Change

Section 2-A: Special Terms & Conditions

x None x

Article/ Paragraph

or Appendix Reference Proposed Changes / Alternate Language Rationale for Proposed Change

Section 2-B: Uniform Terms & Conditions

X None x

Page 34: Offer Forms (Attachments) Yost...water treatment, wastewater reclamation, water distribution, and office sites throughout the City. These systems are monitored and controlled by Supervisory

Request for Qualifications Solicitation No.

ADSPO18‐00007887   

Description: 2018 Professional Services List

Arizona Department of Administration

State Procurement Office

100 N 15th Ave., Suite 201 Phoenix, AZ 85007

PART 4 of the Solicitation Documents: Offer Forms (Attachments)

Date: January 8, 2018

Page 34 of 36 4 A v a i l a b l e o n l i n e a t : P r o c u r e . A Z . g o v

ATTACHMENT 5-B Supplement No. 3: Exceptions to Technical and Commercial

Article / Paragraph or Exhibit Reference Proposed Changes / Alternate Language Rationale for Proposed Change

Section 2-A Scope of Work (Requirements Document)

x None x

Section 2-B: Compensation Document

x None x

West Yost Associates

Company Name Signature of Person Authorized to Sign

End of Attachment 5-B

Page 35: Offer Forms (Attachments) Yost...water treatment, wastewater reclamation, water distribution, and office sites throughout the City. These systems are monitored and controlled by Supervisory

Request for Qualifications Solicitation No.

ADSPO18‐00007887   

Description: 2018 Professional Services List

Arizona Department of Administration

State Procurement Office

100 N 15th Ave., Suite 201 Phoenix, AZ 85007

PART 4 of the Solicitation Documents: Offer Forms (Attachments)

Date: January 8, 2018

Page 35 of 36 4 A v a i l a b l e o n l i n e a t : P r o c u r e . A Z . g o v

Attachment 5-C Insurance Evidence

RESERVED FOR AWARDED DESIGN PROFESSIONAL UPON SERVICE REQUEST

End of Attachment 5-C

Page 36: Offer Forms (Attachments) Yost...water treatment, wastewater reclamation, water distribution, and office sites throughout the City. These systems are monitored and controlled by Supervisory

Request for Qualifications Solicitation No.

ADSPO18‐00007887   

Description: 2018 Professional Services List

Arizona Department of Administration

State Procurement Office

100 N 15th Ave., Suite 201 Phoenix, AZ 85007

PART 4 of the Solicitation Documents: Offer Forms (Attachments)

Date: January 8, 2018

Page 36 of 36 4 A v a i l a b l e o n l i n e a t : P r o c u r e . A Z . g o v

Attachment 5-D Offer Checklist

STATE MAY DETERMINE YOUR PROPOSAL IS NON-RESPONSIVE IF YOU DO NOT SUBMIT ALL ATTACHMENTS.

DOCUMENT SUBMITTED

1. Attachment 1: Offer and Acceptance Form - SIGNED YES no

2. Attachment 2-A: Experience and Capacity YES no

3. Attachment 2-A: References YES no

4. Attachment 2-B: Organization Profile YES no

5. Attachment 3-A: Method Proposal – RESERVED FOR AWARD YES no

6. Attachment 3-B: Key Personnel Proposal YES no

7. Attachment 3-C: Proposed Subcontractors – RESERVED FOR AWARD YES no

8. Attachment 3-D: Performance Guarantee – RESERVED FOR AWARD YES no

9. Attachment 3-E: Israel Boycott Form -SIGNED YES no

10. Attachment 4: Pricing Sheet – RESERVED FOR AWARD YES, no

11. Attachment 5-A: Confidential Information Designation - SIGNED YES no

12. Attachment 5-B: Conformance Statements - SIGNED YES no

13. Attachment 5-C: Insurance Evidence – RESERVED FOR AWARD YES no

14. Attachment 5-D: Offer Checklist YES no

15. .pdf File: Number of Projects and Revenue YES no

16. Excel File: 2018 Professional Services List of Firms Services YES no

End of Attachment 5-D

End of Part 4

Page 37: Offer Forms (Attachments) Yost...water treatment, wastewater reclamation, water distribution, and office sites throughout the City. These systems are monitored and controlled by Supervisory

Name First Name DANIELMiddle NameLast Name GROVESPhone NumberEmail [email protected]

Mailing Address Street 2702 E. Bighorn AvenueCity PhoenixState AZZip 85048

Business Address Street 2020 Research Park Drive, Suite 100City DavisState CAZip 95618

License Number License Type License Issue Date License Expiration Date License Status40255 Professional Engineer Registration 5/14/2003 12/31/2018 Active45679 Professional Engineer Registration 5/14/2003 3/31/2019 Active

Disciplinary Actions

Arizona State Board of Technical Registration

Details

Individual Picture

Back to Results

Arizona State Board of Technical Registration

STATEWIDE POLICIES AGENCY POLICIES SITEMAP FACEBOOK

Page 1 of 1

1/22/2018https://azbtrprod.glsuite.us/GLSuiteWeb/Clients/AZBTR/Public/RegistrantRosterSearch/R...

Page 38: Offer Forms (Attachments) Yost...water treatment, wastewater reclamation, water distribution, and office sites throughout the City. These systems are monitored and controlled by Supervisory

Name First Name KRISTENMiddle NameLast Name WHATLEYPhone NumberEmail [email protected]

Mailing Address Street 4505 E. Chandler Blvd, Suite 230City PhoenixState AZZip 85048

Business Address Street 4505 E. Chandler Blvd, Suite 230City PhoenixState AZZip 85048

License Number License Type License Issue Date License Expiration Date License Status08910 Engineer In-Training Designation 2/4/2002 Active45171 Professional Engineer Registration 2/4/2002 12/31/2018 Active

Disciplinary Actions

Arizona State Board of Technical Registration

Details

Individual Picture

Back to Results

Arizona State Board of Technical Registration

STATEWIDE POLICIES AGENCY POLICIES SITEMAP FACEBOOK

Page 1 of 1

1/17/2018https://azbtrprod.glsuite.us/GLSuiteWeb/Clients/AZBTR/Public/RegistrantRosterSearch/R...

Page 39: Offer Forms (Attachments) Yost...water treatment, wastewater reclamation, water distribution, and office sites throughout the City. These systems are monitored and controlled by Supervisory
Page 40: Offer Forms (Attachments) Yost...water treatment, wastewater reclamation, water distribution, and office sites throughout the City. These systems are monitored and controlled by Supervisory
Page 41: Offer Forms (Attachments) Yost...water treatment, wastewater reclamation, water distribution, and office sites throughout the City. These systems are monitored and controlled by Supervisory
Page 42: Offer Forms (Attachments) Yost...water treatment, wastewater reclamation, water distribution, and office sites throughout the City. These systems are monitored and controlled by Supervisory
Page 43: Offer Forms (Attachments) Yost...water treatment, wastewater reclamation, water distribution, and office sites throughout the City. These systems are monitored and controlled by Supervisory

TYPE OF PROJECT  TOTAL 

NUMBER OF 

FIRM 

PROJECTS 

(ALL FIRM 

LOCATIONS) 

COMPLETED 

IN LAST 

THREE YEARS 

Using the 

Revenue Index 

(Enter 1‐10) 

indicate the 

approximate 

revenue the firm 

has earned over 

the last three 

years from 

ARIZONA ONLY  

state, municipal, 

federal etc. 

government 

projects only

Using the 

Revenue Index 

(Enter 1‐10) 

indicate the 

approximate 

revenue the firm 

has earned over 

the last three 

years from 

ARIZONA ONLY 

non‐ government 

projects only

TYPE OF PROJECT  TOTAL 

NUMBER OF 

FIRM 

PROJECTS 

(ALL FIRM 

LOCATIONS) 

COMPLETED 

IN LAST 

THREE YEARS 

Using the 

Revenue Index 

(Enter 1‐10) 

indicate the 

approximate 

revenue the firm 

has earned over 

the last three 

years from 

ARIZONA ONLY  

state, municipal, 

federal etc. 

government 

projects only

Using the 

Revenue Index 

(Enter 1‐10) 

indicate the 

approximate 

revenue the 

firm has earned 

over the last 

three years 

from ARIZONA 

ONLY  non‐ 

government 

projects only

Professional Services               Revenue 

Index Number                                                 

1. Less than $100,000                                    2. $100,000 to less than $250,000               3. $250,000 to less than $500,00                 4. $500,000 to less than $1 Million             5. $1 Million to less than $2 Million            6. $2 Million to less than $5 Million            7. $5 Million to less than $10 Million          8. $10 Million to less than $25 Million        9. $25 Million to less than $50 Million        10. $50 Million or greater

Acoustics, Noise Abatement Land Surveying

Activity Centers Landscape Architecture

Aerial Photography; Airborne Data and Imagery Collection and Analysis

LEED Accredited A/E

Agricultural Development; Grain Storage; Farm Mechanization

LEED Independent 3rd Party Building Commissioning

Air Pollution Control Libraries; Museums; Galleries

Airports; Navaids; Airport Lighting; Aircraft FuelingLighting (Exteriors; Streets; Memorials; Athletic Fields, Etc.)

Airports; Terminals and Hangars; Freight Handling Lighting (Interior; Display; Theater, Etc.)

Animal Facilities Lighting (Cave; Cavern)

Anti-Terrorism/Force Protection Mapping Location/Addressing Systems

Area Master Planning Materials Handling Systems; Conveyors; Sorters

Auditoriums and Theaters Materials Testing

Automation; Controls; Instrumentation 7 3Measurement / Verification / Conservation Water Consumption

Barracks; Dormitories Medical Related

Bridge Design: Bridges Metallurgy

Cartography Mining and Mineralogy

Cemeteries (Planning and Relocation)Modular Systems Design; Pre-Fabricated Structures or Components

Chemical Processing and Storage Mold Investigation

Child Care/Development Facilities Museums

Codes; Standards; Ordinances Nuclear Facilities; Nuclear Shielding

Cold Storage; Refrigeration and Fast Freeze Office Buildings; Industrial Parks

Commercial Building (Low Rise) ; Shopping Centers Outdoor Recreation

Communications Systems; TV; Microwave Petroleum and Fuel (Storage and Distribution)

Community Facilities Phase I Environmental

Computer Facilities Photogrammetry

Conservation and Resource Management Pipelines (Cross-Country - Liquid and Gas)

Construction Management 45 Plumbing and Piping Design

Construction Materials Testing Pneumatic Structures, Air-Support Buildings

Construction Surveying Power Generation, Transmission, Distribution

Controls and Electronics Engineer Prisons and Correctional Facilities

Corrosion Control; Cathodic Protection Electrolysis Product, Machine Equipment Design

Cost Estimating; Cost Engineering and Analysis; Parametric Costing; Forecasting

Public Safety Facilities

Cryogenic Facilities Radar; Sonar; Radio and Radar Telescopes

Dams (Concrete; Arch) Radio Frequency Systems and Shieldings

Dams (Earth; Rock) ; Dikes; Levees Railroad; Rapid Transit

ADSPO18-00007887 2018 Professional Services Qualifications List (save document as a .pdf and submit as an attachment with offer submission).

FIRMS NAME: West Yost Associates 

ADSPO18-00007887 Project Experience Number of Projects and Revenue

Page 44: Offer Forms (Attachments) Yost...water treatment, wastewater reclamation, water distribution, and office sites throughout the City. These systems are monitored and controlled by Supervisory

TYPE OF PROJECT  TOTAL 

NUMBER OF 

FIRM 

PROJECTS 

(ALL FIRM 

LOCATIONS) 

COMPLETED 

IN LAST 

THREE YEARS 

Using the 

Revenue Index 

(Enter 1‐10) 

indicate the 

approximate 

revenue the firm 

has earned over 

the last three 

years from 

ARIZONA ONLY  

state, municipal, 

federal etc. 

government 

projects only

Using the 

Revenue Index 

(Enter 1‐10) 

indicate the 

approximate 

revenue the firm 

has earned over 

the last three 

years from 

ARIZONA ONLY 

non‐ government 

projects only

TYPE OF PROJECT  TOTAL 

NUMBER OF 

FIRM 

PROJECTS 

(ALL FIRM 

LOCATIONS) 

COMPLETED 

IN LAST 

THREE YEARS 

Using the 

Revenue Index 

(Enter 1‐10) 

indicate the 

approximate 

revenue the firm 

has earned over 

the last three 

years from 

ARIZONA ONLY  

state, municipal, 

federal etc. 

government 

projects only

Using the 

Revenue Index 

(Enter 1‐10) 

indicate the 

approximate 

revenue the 

firm has earned 

over the last 

three years 

from ARIZONA 

ONLY  non‐ 

government 

projects only

Professional Services               Revenue 

Index Number                                                 

1. Less than $100,000                                    2. $100,000 to less than $250,000               3. $250,000 to less than $500,00                 4. $500,000 to less than $1 Million             5. $1 Million to less than $2 Million            6. $2 Million to less than $5 Million            7. $5 Million to less than $10 Million          8. $10 Million to less than $25 Million        9. $25 Million to less than $50 Million        10. $50 Million or greater

Desalinization (Process and Facilities) Recreation Facilities (Parks, Marinas, Etc.)

Design & Planning Structured Parking Facilities Refrigeration Plants/Systems

Design-Build - Preparation of Requests for Proposals 10 Rehabilitation (Buildings; Structures; Facilities)

Detention Security Systems Research Facilities

Digital Elevation and Terrain Model Development Resources Recovery; Recycling

Digital Orthophotography Rivers; Canals; Waterways; Flood Control

Dining Halls; Clubs; Restaurants Roof Infrared Imaging to Identify Water Leaks

Disability / Special Needs Roofing

Dredging Studies and DesignSafety Engineering; Accident Studies; OSHA 

Studies

Ecological and Archeological InvestigationsSecurity Systems; Intruder and Smoke 

Detection

Educational Facilities; Classrooms Seismic Designs and Studies

Electrical Studies and DesignSewage Collection, Treatment and Disposal  262

Electronics Soils and Geologic Studies; Foundations 

Elevators; Escalators; People-Movers Solar Energy Utilization

Energy / Water Auditing Savings Solid Wastes; Incineration; Landfill

Energy Conservation; New Energy Sources Special Environments; Clean Rooms, Etc. Environmental Impact Studies, Assessments or Statements Specifications Writing

Fallout Shelters; Blast-Resistant Design Storm Water Handling and Facilities 121Fire Protection Structural Design; Special Structures

Fisheries; Fish LaddersSurveying; Platting; Mapping; Flood Plain 

Studies

Forensic Engineering Sustainable Design

Garages; Vehicles Maintenance Facilities; Parking Swimming Pools

Gas Systems (Propane; Natural, Etc.) Testing and Inspection Services

Geodetic Surveying: Ground and Airborne Topographic Surveying and Mapping

Heating; Ventilating; Air ConditioningTowers (Self‐Supporting and Guyed Systems)

Highways; Streets; Airfield Paving; Parking Lots Toxicology

Historical Preservation Traffic and Transportation Engineering

Hospital and Medical Facilities Traffic Studies

Hotels; Motels TransportationHousing (Residential, Multi-Family; Apartments; Condominiums) Tunnels and Subways

Hydraulics and PneumaticsUrban Renewals; Community Development

Hydrographic Surveying Utilities (Gas and Steam)

Industrial Buildings; Manufacturing Plants Value Analysis; Life‐Cycle Costing 22Industrial Processes; Quality Control Warehouse and Depots

Industrial Waste Treatment Waste Water Treatment Facility 89

Intelligent Transportation SystemsWater Resources; Hydrology; Ground Water 528 5

Page 45: Offer Forms (Attachments) Yost...water treatment, wastewater reclamation, water distribution, and office sites throughout the City. These systems are monitored and controlled by Supervisory

TYPE OF PROJECT  TOTAL 

NUMBER OF 

FIRM 

PROJECTS 

(ALL FIRM 

LOCATIONS) 

COMPLETED 

IN LAST 

THREE YEARS 

Using the 

Revenue Index 

(Enter 1‐10) 

indicate the 

approximate 

revenue the firm 

has earned over 

the last three 

years from 

ARIZONA ONLY  

state, municipal, 

federal etc. 

government 

projects only

Using the 

Revenue Index 

(Enter 1‐10) 

indicate the 

approximate 

revenue the firm 

has earned over 

the last three 

years from 

ARIZONA ONLY 

non‐ government 

projects only

TYPE OF PROJECT  TOTAL 

NUMBER OF 

FIRM 

PROJECTS 

(ALL FIRM 

LOCATIONS) 

COMPLETED 

IN LAST 

THREE YEARS 

Using the 

Revenue Index 

(Enter 1‐10) 

indicate the 

approximate 

revenue the firm 

has earned over 

the last three 

years from 

ARIZONA ONLY  

state, municipal, 

federal etc. 

government 

projects only

Using the 

Revenue Index 

(Enter 1‐10) 

indicate the 

approximate 

revenue the 

firm has earned 

over the last 

three years 

from ARIZONA 

ONLY  non‐ 

government 

projects only

Professional Services               Revenue 

Index Number                                                 

1. Less than $100,000                                    2. $100,000 to less than $250,000               3. $250,000 to less than $500,00                 4. $500,000 to less than $1 Million             5. $1 Million to less than $2 Million            6. $2 Million to less than $5 Million            7. $5 Million to less than $10 Million          8. $10 Million to less than $25 Million        9. $25 Million to less than $50 Million        10. $50 Million or greater

InfrastructureWater Supply; Treatment and Distribution 218

Irrigation; DrainageWater Well Rehabilitation; Water Well Work

Judicial and Courtroom FacilitiesWind Tunnels; Research/Testing Facilities 

Design

Laboratories; Medical Research Facilities Zoning; Land Use Studies

Labs - General

Labs – Research – Dry

Labs – Research – Wet

Page 46: Offer Forms (Attachments) Yost...water treatment, wastewater reclamation, water distribution, and office sites throughout the City. These systems are monitored and controlled by Supervisory

SAM Search ResultsList of records matching your search for :

Search Term : west* yost* associates*Record Status: Active, Inactive

ENTITY WEST YOST ASSOCIATES INC Status:Inactive

DUNS: 622968386 +4: CAGE Code: 5AQL8 DoDAAC:

Expiration Date: Apr 12, 2013 Has Active Exclusion?: No Debt Subject to Offset?: No

Address: 1260 LAKE BLVD STE 240City: DAVIS State/Province: CALIFORNIAZIP Code: 95616-6147 Country: UNITED STATES

February 13, 2018 2:08 PM https://www.sam.gov/ Page 1 of 1

Page 47: Offer Forms (Attachments) Yost...water treatment, wastewater reclamation, water distribution, and office sites throughout the City. These systems are monitored and controlled by Supervisory

Firm Registration NO.:20157

EXPIRES: 1/14/2019

STATE OF ARIZONABOARD OF TECHNICAL

REGISTRATION

■ Firm Registration ■

Firm NameWest Yost & Associates, Inc.

Firm Address2020 Research Park Drive Suite 100Davis, CA 95618

____________________________________

MELISSA CORNELIUS EXECUTIVE DIRECTOR FOR THE BOARD

Engineer DisciplinesControl Systems Civil