of ivinistry of railways board)

10
THE GENERAL MANAGERS EAST CENTRAL RAILWAY/HAJ I PU R SOUTH EAST CENTRAL RAILWAY/ BILASPUR CHITTARANJAN LOCOMOTIVE WORKS/CH ITTARANJAN OST PY lssuED oN 24.04.2020 CAO RAIL WHEEL PLANT/BELA RAILWAYS (.) sct**-1"-e (s.c. KRtSHNA) DEPUTY SECRETARY/ ESTT.(SPL) RAILWAY BOARD Copy to:- GOVERNTVENT OF tNDIA (BHARAT SARKAR) IVINISTRY OF RAILWAYS (RAIL MANTRALAYA) (RAtLWAY BOARD) 1) EDPG/MR, EDPG/MOS(R),Addt.ps/MR(BS) 2) PSOs/Sr. PPSs/PPSs/PSs !o CRq fC, MRS, MTR, ME,MT, MS, MST, t\,4t\IM, SECY., A DGs, A AMs/PEDS, JS(G), JS(c), {slE.}.J!(?)_ls, EDCC, EDE(cc), ED(E&R), EDtp, Dir.(D), Dir.(c)/cRB, - gs(9/SpL, us(c), uS(D), US(E), US(D&A), US/DAR|, ERB-|, Vtd(C l iiairway eoaro.' 3) The Principal Directors of Audit, E, EC & SEC Rtys. 4) The PFAS, E, EC & SEC Rtys 5) The FA&CAO, RWP/Bela 6) CAO, IROAF, New Delhi. 7) The Secretary General, FROA, R No. 256-A, Rail Bhawan, New Delhi 8) The General Secretary, lRpOF, R No. 268, Rail Bhawan, New Delhi. 9) The General Secretary, AIRF, R No. 2S3, Rait Bhawan, New Delhi. The General Secretary, NFIR, R No. 256-C, Rail Bhawan, New Delhi RBCC, Room No. 476, Rail Bhawan, New Delhi for updating on the website 10 t:) '11 12 IJ 14 The General secretary, Arr rndia sc/sr Emproyees Assn. Room No.7-G, Rair Bhawan, New Derhi The Secretary General, AIRPFA, Room No. 2S6-D, Rait Bhawan, New Dethi. The Secretary, RBSS Group 'A' Officers Association, R.No.37O, Rail Bhawan, New Delhi. The DAI (Railways), Room No.224, Rail Bhawan. New Dethi O.No. tJ 104 NO. E(O)III.2O2OITN147 (.) MINISTRY OF RAILWAYS HAVE, WITH THE APPROVAL OF THE PRESIDENT, DECIDED THAT :- (1) SHRI D. NAIK; SAG/IRSME/CLW, SHOULD BE TRANSFERRED TO RAIL WHEEL PLANT/BELA AND POSTED IN THE CADRE ; (2) SHRI J MAJHI, NF.HAG/IRSME/SOUTH EAST CENTRAL RAILWAY, SHOULD BE TRANSFERRED TO CLW AND POSTED AS PCME (CHOD) BY UTILISING THE SAG/IRSME POST (PC: 05CL4P00 j ); AND (3) SHRI AMIATAVA CHAUDHARI, SAG/IRSME/SOUTH EAST CENTRAL RAILWAY, PRESENTLY WORKING AS ADRM/RAIPUR, SHOULD BE POSTED IN THE CADRE ON THE RA|LWAY |TSELF, V|CE SHR| J. MAJHT (.) DATES ON WHICH THE ABOVE OFFICERS RELINQUISH/ASSUME CHARGE MAY BE ADVTSED (.)

Upload: others

Post on 19-Jan-2022

1 views

Category:

Documents


0 download

TRANSCRIPT

THE GENERAL MANAGERSEAST CENTRAL RAILWAY/HAJ I PU RSOUTH EAST CENTRAL RAILWAY/ BILASPURCHITTARANJAN LOCOMOTIVE WORKS/CH ITTARANJAN

OST PYlssuED oN 24.04.2020

CAORAIL WHEEL PLANT/BELA

RAILWAYS (.)

sct**-1"-e(s.c. KRtSHNA)

DEPUTY SECRETARY/ ESTT.(SPL)RAILWAY BOARD

Copy to:-

GOVERNTVENT OF tNDIA (BHARAT SARKAR)IVINISTRY OF RAILWAYS (RAIL MANTRALAYA)

(RAtLWAY BOARD)

1) EDPG/MR, EDPG/MOS(R),Addt.ps/MR(BS)2) PSOs/Sr. PPSs/PPSs/PSs !o CRq fC, MRS, MTR, ME,MT, MS, MST, t\,4t\IM, SECY., A DGs, A

AMs/PEDS, JS(G), JS(c), {slE.}.J!(?)_ls, EDCC, EDE(cc), ED(E&R), EDtp, Dir.(D), Dir.(c)/cRB,- gs(9/SpL, us(c), uS(D), US(E), US(D&A), US/DAR|, ERB-|, Vtd(C l iiairway eoaro.'3) The Principal Directors of Audit, E, EC & SEC Rtys.4) The PFAS, E, EC & SEC Rtys5) The FA&CAO, RWP/Bela6) CAO, IROAF, New Delhi.7) The Secretary General, FROA, R No. 256-A, Rail Bhawan, New Delhi8) The General Secretary, lRpOF, R No. 268, Rail Bhawan, New Delhi.9) The General Secretary, AIRF, R No. 2S3, Rait Bhawan, New Delhi.

The General Secretary, NFIR, R No. 256-C, Rail Bhawan, New Delhi

RBCC, Room No. 476, Rail Bhawan, New Delhi for updating on the website

10

t:)

'11

12IJ

14

The General secretary, Arr rndia sc/sr Emproyees Assn. Room No.7-G, Rair Bhawan, New DerhiThe Secretary General, AIRPFA, Room No. 2S6-D, Rait Bhawan, New Dethi.The Secretary, RBSS Group 'A' Officers Association, R.No.37O, Rail Bhawan, New Delhi.The DAI (Railways), Room No.224, Rail Bhawan. New Dethi

O.No. tJ 104

NO. E(O)III.2O2OITN147 (.) MINISTRY OF RAILWAYS HAVE, WITH THE APPROVAL OF THEPRESIDENT, DECIDED THAT :-

(1) SHRI D. NAIK; SAG/IRSME/CLW, SHOULD BE TRANSFERRED TO RAIL WHEELPLANT/BELA AND POSTED IN THE CADRE ;

(2) SHRI J MAJHI, NF.HAG/IRSME/SOUTH EAST CENTRAL RAILWAY, SHOULD BETRANSFERRED TO CLW AND POSTED AS PCME (CHOD) BY UTILISING THESAG/IRSME POST (PC: 05CL4P00 j ); AND

(3) SHRI AMIATAVA CHAUDHARI, SAG/IRSME/SOUTH EAST CENTRAL RAILWAY,PRESENTLY WORKING AS ADRM/RAIPUR, SHOULD BE POSTED IN THE CADRE ONTHE RA|LWAY |TSELF, V|CE SHR| J. MAJHT (.)

DATES ON WHICH THE ABOVE OFFICERS RELINQUISH/ASSUME CHARGE MAY BEADVTSED (.)

GOVERNMENT OF INDIA (BHARAT SARKARIMrNtsTRy oF RAtLWAYS (RAtL MANTRALAyi)

(RAILWAY BOARD)

THE GENERAL MANAGERSCH ITTARANJAN LOCOMOTIVE WORKS /CHITTARANJANDI ESEL LOCOMOTIVE WORKSA/ARANASI

FAXPOST COPYISSUED ON:24.04.2020

NO. E(O)III-2O2O||N145 (.) MINISTRY OF RAILWAYS HAVE WITH THE APPROVAL OF THEPRESIDENT DECIDED THAT SHRI PRAI\,4OD KUMAR CHAUDHARY, SAG/IRSS/CLW, SHOULDBE TRANSFERRED TO DLW AND POSTED AS CVO, BY UTILISING THE SAG/IRSS POST(PC:O9DL4POO5) OF DLW AND THE SURPLUS SAG/IRSS OFFICER IN DLW SHOULD BEPOSTED IN THE CADRE BY MAKING SUITABLE ADJUSTMENTS (.) ORDERS FOR SHRI Y BSHAHARE, SAG/IRSME, PRESENTLY WORKING AS CVO/DLW WILL FOLLOW (.)

DATBON WHICH THE ABOVE CHANGES TAKE PLACE MAY BE ADVISED (.)

RATLWAYS (.)

ser-* l--(s c KR|SHNA)

DEPUry SECRETARY (ESTT.YSPLRAILWAY BOARD

Copy to

1. EDPG/I\,4R, EDPG/MoS(R) & Addj. PS/I\,4R/BS ]2. psos/sr. ppSs/ppss to cIBlIgl MMM, ME: MSr, MTR, MRS, [/s, rMr, sECy, Ail DGs,Ail AMs/pEDs, JS(c), JS(C),_JS(D), JS, EDCt. i-DerCct, _eo(ean), EDtp, Dir.(c), Dir.(D),Dir (cycRB, DS(E)spr, us(c), us(D), usrilspills_riuonn, vii.lcJ a' enri-i],nlir*rv

3. The Principal Directors of Audit, E & NE Rlys.4. The PFAs, CLW & DLW.5. The Secretary General, FROA, R No. 256_4, Rail Bhawan, New Delhi.6 The Generat Secrerary, tRpoF, R No. 268, i";iil;;; New Delhi./. tne uenerat Secretary, AIRF, R No. 253, Rail Bhawan, New Delhi.o. tne u^eneratsecretary, NFIR, R No. 256-C, Rail Bhawan, New Delhi.t

#:_"Tii:1S"",;1:"r, Al rndia sc/sr E;pt;y;u" n""o.i"tion, Room No.7-G, Rait

10. The Secretary General, AlRpFA, R-oom No.2S6-D, Rail Bhawan, New Delhi.'1 1 The Secretary, RBSS Group,'A' omgers nssociafi"-",'n.rui.:zo, Rair Bhawan, New Derhi,12. The^DAt (Railways), Room No.224, Rait Ahr*;n, N;* D"rni.13. RBCC, Room No. 476, Rail Bhawan, ruew Oef niioiupOlting on the website

O. No. /8 i04

THE GENERAL IVANAGERSEAST COAST RAILWAY/BHUBAN ESWARMETRO RAILWAY/KOLKATASOUTH WESTERN RAILWAY/HUBBALI

GOVERNMENT OF rNDrA (BHARAT SARKAR)MtNtsTRy oF RAtLWAYS (R,AtL MANTRALAYA)

(RAtLWAY BOARD)

NO. E(O)ilt-2020/TR/95 (.) MtNtSTRy OF RAILWAYS HAVE W|TH THE APPROVAL OF THE

PRESTDENT DECTDED THAT THE ORDERS CONTATNED AT |TEM NO. (1)OF BOARD'S FAX

IVESSAGE OF EVEN NUMBER DATED 27.02,2020, TRANSFERRING SHRI BIKASH K

MOHANTY, SAG/ IRSS/ EAST COAST RAILWAY TO METRO RAILWAY, SHOULD BE TREATED

AS CANCELLED; AND SHRI B,KASH K MOHANTY, SHOULD NOW BE TRANSFERRED ToSOUTH WESTERN RAILWAY AND POSTED IN THE CADRE BY MAKING SUITABLE

ADJUSTMENTS(.)

DATES ON WHICH SHRI BIKASH K MOHANTY RELINQUISHES/ASSUI/ES CHARGE MAY

BEADVTSED (.)

RATLWAYS (.)

sck*J*J(S C KRISHNA)

DY.SECRETARY (E) SPLRAILWAY BOARD

Copy to :.1. EDPG/MR, EDPG/MOS(R) & Addt PS/MR (BS).2. PSOs/Sr. PPSs/PPSs to CRB, FC, MMM, ME, MST, MTR, MRS, MS, MT, DG/RHS,

DG/RPF, SECY, AM(RS), PED/RS(P), All AMs/PEDs, JS(G), JS(D), JS(C), JS, EDCC,ED(E&R), EDIP, Dir.(D), Dir(c)/cRB, DS(E), DS(E)Spl., us(c), US(Eys, us/DAR, Vis.(c) &ERB-|, Railway Board.

3. The Principal Directors of Audit, ECoR, E & SW Railways.4. The PFAs, ECoR, SW & Metro Railways.5. The Secretary General, FROA, R No. 256-4, Rail Bhawan, New Delhi.6. The General Secretary, IRPOF, R No.268, Rail Bhawan, New Delhi.7. The General Secretary, AIRF, R No. 253, Rail Bhawan, New Delhi.8. The General Secretary, NFIR, R No. 256-C, Rail Bhawan, New Delhi.9. The General Secretary, All lndia SC/ST Employees Association, Room No.7-G, Rail

Bhawan, New Delhi.10. The Secretary General, AIRPFA, Room No. 256-D, Rail Bhawan, New Delhi.1'1 . The Secretary, RBSS Group 'A' Officers Association, R.No.370, Rail Bhawan, New Delhi.12. The DAI (Railways), Room No.224, Rail Bhawan, New Dethi.13. RBCC, Room No. 476, Rail Bhawan, New Delhi for updating on the website

O. No. lct 104

FAX / POST COPYISSUED ON:.24.04.2020

GOVERNMENT OF tNDtA (BHARAT SARKAR)M|N|STRY OF RA|LWAYS (RA|L MANTRALAYA)

(RAtLWAY BOARD)

THE GENERAL IVANAGERSEASTERN RAILWAY/KOLKATAMETRO RAILWAY/KOLKATA

FAVPOST COPYISSUED ON:24.04.2020

NO. E(O)ilt-2020/TR/146 (.) MtNtSTRy OF RA|LWAYS HAVE W|TH THE APPROVAL OF THE

PRESIDENT DECIDED THAT SHRI AJAI KUMAR DUBEY, HAG/IRSS/METRO RAILWAY,

SHOULD BE TRANSFERRED TO EASTERN RAILWAY AND POSTED AS PCMM AGAINST AN

EXTSTTNG VACANCY (.)

DATES ON WHICH SHRI AJAI KUMAR DUBEY RELINQUISHES/ASSUMES CHARGE ,\/AY BE

ADVISED (.)

RAILWAYS (.)

Sck---J^-.-c(s c KR|SHNA)

DEPUTY SECRETARY (ESTT.YSPLRAILWAY BOARD

Copy to

1. EDPG/MR, EDPG/MOS(R) & Addt. pS/tVR(BS)2. PSOs/Sr. PPSs/PPSs to CRB, FC, MMM, ME, MST, MTR, MRS, MS, MT, Secretary, Ail

DGs, All AMs/PEDs, JS(c), JS(D), JS, EDCC, EDE(GC), ED(E&R), EDtP, Dir.(C), Dir.(D),Dir.(C)/CRB, DS(E)Spl, US(C), US(D), US/E(Spl.), US-tl|/DAR, Vis.(C) & ERB-|, RaitwayBoard.

3. The Principal Director of Audit, E Rly.4. The PFAs, E & Metro Rlys.5. The Secretary General, FROA, R No. 256-4, Rail Bhawan, New Delhi.6. The General Secretary, IRPOF, R No. 268, Rail Bhawan, New Delhi.7. The General Secretary, AIRF, R No. 253, Rail Bhawan, New Delhi.8. The General Secretary, NFIR, R No. 256-C, Rail Bhawan, New Delhi.9. The General Secretary, All lndia SC/ST Employees Association, Room No.7-G, Rail

Bhawan, New Delhi.10. The Secretary General, AIRPFA, Room No.256-D, Rail Bhawan, New Delhi.1'1. The Secretary, RBSS Group 'A' Officers Association, R.No.37O, Rail Bhawan, New Delhi.12. The DAI (Railways), Room No.224, Rail Bhawan, New Dethi.13. RBCC, Room No.476, Rail Bhawan, New Delhi for updating on the website

O. No. z-6 /04

GOVERNT\4ENT OF rNDtA (BHARAT SARKAR)IVINISTRY OF RAILWAYS (RAIL MANTRALAYA)

(RATLWAY BOARD)

THE GENERAL MANAGERSNORTHERN RAILWAY/ NEW DELHISOUTH CENTRAL RAILWAY/SECUNDERABAD

FA)(/ POST COPYjSSUED ON: 24.04.2020

NO. E(O)il1-2020lTR/03 (.) MTNISTRY OF RATLWAYS HAVE W|TH THE APPROVAL OF THE

PRESIDENT DECIDED THAT :.

(1) ON ATTAINING THE AGE OF 62 YEARS ON 24.04.2020 AND EXERCTSTNG OPTTON FOR A

CLINICAL POST, DR. SRIKANTH MAHAPATRA, SAG/IRHS/SOUTH CENTRAL RAILWAY,

SHOULD BE POSTED lN A CLINICAL POST ON THE RAILWAY ITSELF; AND

(2) ON ATTA|N|NG THE AGE OF 62 YEARS ON 23.04.2020 AND EXERCTSTNG OPTION FOR A

CLINICAL POST, DR A. C. AGRAWAL, SAG/IRHS/NORTHERN RAILWAY, SHOULD BE

POSTED IN A CLINICAL POST ON THE RAILWAY ITSELF (.)

DATE ON WHTCH THE ABOVE OFFTCERS RELTNQUTSH/ASSUME CHARGE MAY BE ADVTSED (.)

RAILWAYS (.)

scK_--J-^e(s. c. KRTSHNA)

DEPUTY SECRETARY(ESTT.)SPLRAILWAY BOARD

Copy to :-

1. EDPG/MR, EDPG/MOS(R), Addr. PS/MR(BS)2. PSOS/ST. PPSS/PPSS/PSS tO CRB, FC, MS, MRS, ME, MTR, MT, MST, MMM, SECY, DG/RHS,

DG/RPF, All AMS/PEDS, PED/Health, JS(G), JS(C), JS(E), JS(D), JS, EDCC, EDE(GC), ED(E&R),EDIP, Dir.(D). Di(C)/CRB, DS(E)Spl., US(C), US(D), US(E), US(E)/S, US/DAR, ERB-|, Rairway Board

3. The Principal Director of Audit, N & SC Rlys.4. The PFAs, N & SC Rlys5. The Secretary General, FROA, R No. 256-4, Rail Bhawan, New Delhi.6. The General Secretary, IRPOF, R No. 268, Rail Bhawan, New Delhi.7. The General Secretary, AIRF, R No. 253, Rail Bhawan, New Delhi.8. The General Secretary, NFIR, R No.256-C, Rail Bhawan, New Delhi.9. The General Secretary, All lndia SC/ST Employees Association, Room No.7-G, Rail Bhawan, New Delhi.'10. The Secretary General, AIRPFA, Room No.256-D, Rail thawan, New Delhi.11. The Secretary, RBSS Group 'A' Officers Association, R.No.370, Rail Bhawan, New Delhi.12. The DAI (Railways), Room No.224, Rail Bhawan, New Delhi.13. RBCC, Room No. 476, Rail Bhawan, New Delhi, for updating on the website.

O. No. zl /04

GOVERNMENT OF INDIA (BHARAT SARKAR)MINISTRY OF RAILWAYS (RAIL MANTRALAYA)

(RAILWAY BOARD)

THE GENERAL MANAGERSEAST CENTRAL RAI LWAY/HAJ IPURNORTHERN RAILWAY/NEW DELHINORTH CENTRAL RAILWAY/PRAYAGRAJSOUTHERN RAILWAY/CHENNAISOUTH EAST CENTRAL RAILWAY/BILASPURSOUTH WESTERN RAILWY/HUBBALIWEST CENTRAL RAILWAY/JABALPUR

FAXPOST COPYISSI.JED ON: 24.04 -2020

E(O)I[-2020/PM/55 (.) MINISTRY OF RAILWAYS HAVE WITH THE APPROVAL OF THE PRESIDENT

DECIDED THAT THE FOLLOWING OFFICERS OF IRTS SHOULD BE GRANTED S A GRADE ON

NON-FUNCTIONAL BASIS WITH EFFECT FROM 25.10.2019:-

S NO. NAME OF OFFICERS/SHRI

RAILWAY/ORGN. WHEREWORKING

1 RAHUL HIMALIAN DEP (IRCTC)

2 RAJIV GUPTA DEP (CRrS)

3 AMIT KU I\,4AR JAIN DEP (CRrS)

PRITHUL KUMAR RB

5 MANOJ KUI\,4AR I\,4 ISHRA DEP(DEPTT. OF COMMERCE &TRANSPORT, GOW. OFoDrsHA)

6 AVINASH KUMAR MISHRA NCR

7 MS. SHIKHA (TRIPATHI) SRIVASTAVADEP

(GOVT OF BIHAR)

I SWADESH KUI\,4AR SINGH DEP (LMRC)

I IVIANOJ KU I\,4AR GANGEYDEP

(M/O ENVIRONMENT, FORESTS& CLIMATE CHANGE)

fuIS, VEENA KUMARI VERMA NR

11 SHRIKANT VISHWAPAL JANBANDHU DEP (RITES)

12 RAJNEESH KUI\,4AR

13 VIKRAM SINGH RANA DEP (CSrR)

14 S ANWAR HUSSAIN DEP (CRrS)

15 S THIRUVARANGA RAMALINGAM SR

to SWAPNIL ANAND WALINJKAR DEP (UIDAI)

17 YASHWANT KUMAR CHAUDHARY SECR

18 DILIP KUMAR ECR

19 VI NAYAK RAI!,IACHANDRA NAYAK SWR

2A D NARASINGA RAO

sek -:-i-^sDsLE)ltP!

..2t-

10

WCR

DEP (TRCTC)

-2-

?. .|-HE UP-GRADATION GRANTED WILL BE A PURELY NON.FUNCTIONAL UP.GRADATION,

PERSONAL TO THE OFFICER AND IT WOULD NOT BESTOW ANY RIGHT TO THE OFFICER TO

CLAIM PROMOTION OR DEPUTATION BENEFITS BASED ON THE NON-FUNCTIONAL UP-

GRADATTON (.)

RAILWAYS (.)

scr..--1"^s(s c KRTSHNA)

DEPUTY SECRETARY (ESTT.ySPL.RAILWAY BOARD

Copy to :-

1. EDPG/MR, EDPG/MOS(R) & Addl. PS/MR(BS).2. PSOs/Sr. PPSS/PPSS to CRB, MT, SECY., AM(Tratfic), JS(G), JS(E), JS, JS(C), EDCC, ED/E&R,

EDE/GC, PED/Rectt., PED/T&MPP, Dir.(C)/CRB, Dir(D), DIP, DS(E)Spl, DS(E), US(C), US(E/S,US/DAR, US(Prot), E(GC), Vig(C), ERB-|, Cash-|, 'G'. G(Pass), G(Accom), Tele, Tl, Protocol,Reception & Library Railway Board Railway Board.

3. The Principal Directors of Audit, EC, N, NC, S, SEC, SW, & WC Rlys.4. The PFAs, EC, N, NC, S, SEC, SW, & WC Rlys.5. The Pay & Accounts Oiflcer, Railway Board, New Delhi6. The Secretary General, FROA, R No. 256-4, Rail Bhawan, New Delhi.7. The General Secretary, IRPOF, R No.268, Rail Bhawan, New Delhi.8. The General Secretary, AIRF, R No. 253, Rail Bhawan, New Delhi.9. The General Secretary, NFIR, R No.256-C, Rail Bhawan, New Oelhi.'10. The Secretary General, AIRPFA, Room No. 256-D, Rail Bhawan, New Delhi.11. The General Secretary, All lndia SC/ST Employees Association, R.No. 7GlF, Rail Bhawan, New

Delhi.12. The Secrstary, RBSS Group 'A' Olficers Association, R.No.402, Rail Bhawan, New Delhi.13. The DAI (Railways), Room No.224, Rail Bhawan, New Delhi.14. The CMD, IRCTC, B 148, '11th Floor, Statesman House, Barakhamba Road, New Delhi-1'10001.15. S/Shri Rahul Himalian, IRTS, & D. Narasinga Rao, IRTS. C/o The CMD, IRCTC, B 148, 1'lth Floor,

Statesman House, Barakhamba Road, New Delhi-110001.16. The Managing Director, CRIS, Chanakyapuri, New Delhi.17. S/Shri Rajiv Gupta, IRTS, Amit Kumar Jain, IRTS, S. Anwar Hussain, IRTS, C /o The Managing

Director, CRIS, Chanakyapuri, New Delhi.'18. The Chief Secretary, Government of Odisha, Secretariat, Bhubaneswar19. Shri Manoj Kumar Mishra, IRTS, C/o Chief Secretary, Govt. of Odisha, Secretariat, Bhubaneswar.20. The Chief Secretary, Govemment of Bihar, Sachivalaya, Patna.21. Ms. Shikha (Tripathi) Srivastava, IRTS, Cio Chief Secretary, Government of Bihar, Sachivalaya,

Patna.22. The Managing Director, Lucknow Metro Rail Corporation Ltd., Mpin Khand, Gomti Nagar, Lucknow,23. Shri Swadesh Kumar Singh, IRTS, C/o MD, Lucknow Metro Rail Corpn., MpinKhand, Gomti Nagar,

Lucknow.24. The Secretary, Ministry of Environment, Forests & Climate Change, Govt. of lndia, lndira Paryavaran

Bhawan, Jor Bagh Road,New DeIhi,110003.25. Shri Manoj Kumar Gangey, IRTS, C/o Secretary, Ministry of Environment, Forests & Climate Change,

Govt. of lndia, lndira Paryavaran Bhawan, Jor Bagh Road,New De|hi,110003.26. The CMD/ RITES, RITES Bhawan, 1, Sector-2g, Gurgaon27. Shri Shrikant Mshwapal Janbandhu, IRTS, C/o- The CMD/ RITES, RITES Bhawan, 1, Sector-29,

Gurgaon.28. The Director General, Council of Scientific and lndustrial Research, Anusandhan Bhawan,2 Rafi Ahmed

Kidwai Marg, New Delhi - 1'10001

-3-

29- Shri Vikram Singh Rana, IRTS, C/o, The Director ceneral, Councit of Scientific and lndustrial Research,Anusandhan Bhawan, 2 Rafi Ahmed Kidwai Marg, New Delhi - 1 I OOO1

30. The cEo, Unique ldentification Authority Of lndia(UlDAl), Government of lndia, Bangla Sahib Rd,Behind Kali Mandir, Gole Market, New Delhi - 110001.

31. Shri Swapnil Anand Walinjkar, IRTS, C/o CEO, UtDAt, Government of lndia, Bangla Sahib Rd,Behind Kali Mandir, cole Market, New Delhi - 110001.

32. Shri Prithul Kumar, IRTS, Railway Board.33. RBCC, Room No.476, for updating on the website.

O.No. z-z)04

THE GENERAL MANAGERSCENTRAL RAILWAY/MUMBAIEAST CENTRAL RAI LWAY/HAJ IPUREAST COAST RAILWAY/BHUBANESWARNORTHERN RAILWAY/NEW DELHINORTH CENTRAL RAILWAY/PRAYAGRAJNORTHEAST FRONTIER RAILWAY/GUWAHATISOUTHERN RAILWAY/CHENNAISOUTH CENTRAL RAILWAY/SECUNDERABADSOUTH EASTERN RAILWAY/KOLKATASOUTH EAST CENTRAL RAILWAY/BILASPURSOUTH WESTERN RAILWAY/HUBBALI

GOVERNMENT OF INDIA (BHARAT SARKAR)MINISTRY OF RATLWAYS (RAIL MANTRALAYA)

(RAILWAY BOARD)

F POST COPYISSUED ON: 24.04.2020

THE PRINCIPAL CAODMW/PATIALA

NO. E(O) t-2020lAEl2s (.) lvllNlsTRY OF RAILWAYS HAVE WITH THE APPROVAL OF THE

PRESIDENT DECIDED THAT THE FOLLOWING IRHS OFFICERS, SHOULD BE TRANSFERRED, ON

THEIR OWN REQUEST, TO THE RAILWAYS AS INDICATED AGAINST EACH, AND POSTED IN THE

CADRE IN THE SAME CAPACITY :.

S. NO. CMSEBATCH

RAILWAY/UN ITWHERE WORKING

AT PRESENT

RAILWAY/UNITWHERE

TRANSFERRED

1 RAJESH KUMAR GODUGULA 2015 SR ECOR

2 (MS) SONAM NR

3 BALAGARI RATNAMAIAH 2014 SECR SCR

4 SUDHAKAR PANNARSA CR SCR

5 (I\,IS) ANU RADHA, JAG/I RI,'IS 2A02 NCR NR

HARISH BHUKYA 2014 CR SCR

7 RAJESH KUMAR, SS/IRMS NFR ECR

8 KORALAPATY VINAY BABU 2015 CR SCR

I ([,,1S) PrSlNt SUNEETA 2016 CR ECOR

'10 (N,4S) NAM RATA SINGH 2012 SER CR

11 (MS) SHREEKAVYA MANDAPATI 2013 CR

12 (MS) YAMINI VISHNU PRIYA G 2014 co SCR

IJ BHASWANTH MAHARSHYVEERAPALLI

2014 SR

14 (I!1S) G. VEDARANYA 2014 SWR SCR

(MS) JYOTHSNA CHALLA 2017 CR SCR

DATES ON WHICH THE ABOVE OFFICERS RELINQUISH/ASSUME CHARGE MAY BE ADVISED (.)

RAILWAYS (.)

sck^:.-[-.-.-s(s c KRISHNA)

DEPUTY SECRETARY(E) SPL.RAILWAY BOARD

....2t-

NAME(oR.)

2013 DI\4W

2014

6

20'10

SCR

SCR

15

-2-

Copy to :-

1. EDPG/MR, EDPG/MOS(R), Addl. PS/MR(BS).2- PSOS/Sr.PPSs/PPSs to CRB, FC, MS, SECY, DG/RHS, PED/Health, JS(c), JS(C), JS(E), JS,

JS(D), EDCC, EDE(GC), PED(T&MPP), ED(E&R), PED/Rectt, DlP, Di(D), Dir.(C)/CRB,DS(E)Spl, US(C), US/E(S), US/DAR, US(E)Spl., Vig.(C), ERB-I Raitway Board.

3. The Principal Directors of Audit, C, EC, ECO, N, NC, NF, S, SC, SE, SEC & SW Raitways4. The PFAs, C, EC, ECO, N, NC, NF, S, SC, SE, SEC & SW Railways5. FA&CAO, DMw/Patiala6. The Secretary General, FROA, R No. 256-A, Rail Bhawan, New Delhi.7. The General Secretary, IRPOF, R No.268, Rail Bhawan, New Delhi.8. The General Secretary, AIRF, R No. 253, Rail Bhawan, New Delhi.9. The General Secretary, NFIR, R No,256-C, Rail Bhawan, New Delhi.10. The General Secretary, All lndia SC/ST Employees Association, Room No.7-G, Rail Bhawan,

New Delhi.1'1- The Secretary General, AIRPFA, Room No. 256-D, Rail Bhawan, New Delhi.12. The Secretary, RBSS Group 'A' Officers Association, R.No.370, Rail Bhawan, New Delhi.13. The DAI (Railways), Room No.224, Rail Bhawan, New Delhi.14. RBCC, Room No.476, Rail Bhawan, New Delhi for updating on the website

O. No. z'l i04