Page 1: OECD Annex I Expert Group International Technology Collaboration Case Study 5 Wind Power Integration into Electricity Systems Debra Justus (OECD) Paris,

OECD Annex I Expert Group

International Technology Collaboration Case Study 5

Wind Power Integration into Electricity Systems

Debra Justus (OECD)

Paris, 22 March 2005

Page 2: OECD Annex I Expert Group International Technology Collaboration Case Study 5 Wind Power Integration into Electricity Systems Debra Justus (OECD) Paris,

OECD Annex I Expert Group

Wind Power – from farm to grid

Page 3: OECD Annex I Expert Group International Technology Collaboration Case Study 5 Wind Power Integration into Electricity Systems Debra Justus (OECD) Paris,

OECD Annex I Expert Group

Installed Wind Power Capacity "Top Ten" in 2004

0

2000

4000

6000

8000

10000

12000

14000

16000

18000

MW

Germany

Spain

US

Denmark

India

Italy

Netherlands

UK

Japan

China

Page 4: OECD Annex I Expert Group International Technology Collaboration Case Study 5 Wind Power Integration into Electricity Systems Debra Justus (OECD) Paris,

OECD Annex I Expert Group

Electricity Generation from Wind1990- 2002

0

10000

20000

30000

40000

50000

60000

1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002

GW

h

World

OECD Total

EuropeanUnion (EU 15)

United States

India

Page 5: OECD Annex I Expert Group International Technology Collaboration Case Study 5 Wind Power Integration into Electricity Systems Debra Justus (OECD) Paris,

OECD Annex I Expert Group

Current Focus of Grid Integration Research

• Wind power prediction tools

• Tools for grid system optimisation

• New designs for reinforcing and extending grids

• Analysis & Development of technical codes and international standards

Page 6: OECD Annex I Expert Group International Technology Collaboration Case Study 5 Wind Power Integration into Electricity Systems Debra Justus (OECD) Paris,

OECD Annex I Expert Group

Some Collaborations In Grid Integration Research

• IEA Wind: (1977) 19 countries & EC grid work – 2002

• CIGRE: (1921) 80 countries grid work – 2002

• Dispower: (2001) Europe grid work 2001

• Riso Wind: (1977) DK & int’l grid work 1999

Page 7: OECD Annex I Expert Group International Technology Collaboration Case Study 5 Wind Power Integration into Electricity Systems Debra Justus (OECD) Paris,

OECD Annex I Expert Group

Some Lessons Learned

• Market changing polices need to engage stakeholders all along the commercialisation chain.

• Technology development is a continuum that spans from RD&D through market deployment with a need for collaboration also in deployment phase.