ods blue water energy

30
‘‘We shape our buildings;thereafter they shape us’’ Sir Winston Churchill

Upload: anna-atkinson

Post on 28-Mar-2016

218 views

Category:

Documents


2 download

DESCRIPTION

 

TRANSCRIPT

Page 1: Ods blue water energy

‘‘We shape our buildings;thereafter they shape us’’Sir Winston Churchill

Page 2: Ods blue water energy

PREPARED BY OD SOLUTIONS FOR BLUE WATER ENERGYPAGE 2

The OD Group was founded in 2004 by Jon Kearney to work within the construction industry alongside many of the professional bodies in the interiors market to deliver high quality interior projects across commercial, residential, and leisure sectors.

Over the past decade, steady growth and the consistent delivery of projects through some of the UK’s most exciting and challenging times has resulted in OD gaining respect from not only the professional bodies that we work with but also our peers and the wider business community.

OD is one of the Capital’s leading integrated design, project management and construction companies. With our partners we undertake various different projects in terms of scale and complexity for a diverse client base.

We provide the very best specialist expertise in all facets of the construction process, from project initiation to completion. Our talented and experienced team has been hand picked, trained and supported so that they can achieve the very best results. The team is made up of like-minded individuals who understand the importance of attention to detail and the essential need for a high quality end product. We do not consider ourselves to be builders or contractors, but craftsmen who can be proud of what we produce from conception to completion.

We genuinely enjoy working with a diverse range of companies from large multinationals to small privately owned businesses, taking care that each solution we design and implement reflects the individual needs of the client.

OD enjoys a high level of repeat business from many of our clients; a testament indeed to the professionalism and dedication of all our staff, which is something we believe that sets us apart in the market. Our trademark is combining high quality interior design and commercial acumen with best practice delivery in the market place.

The OD Management team is extremely passionate about what we do and supports all the staff within our business who enable us to deliver beyond our client’s expectations. What each client has in common, is a desire that their project is undertaken with complete attention to detail, is within budget, and delivered on time by a professional team. They also wish for the project, which can often be the cause of great stress within an organisation, to be as pleasurable an experience as possible.

At OD, we believe we can exceed all of our client’s needs and expectations.

FOREWORD

Steve CherryConstruction Director

Jon Kearney Managing Director

Greg PinchinCommercial Director

Page 3: Ods blue water energy

PAGE 3 PREPARED BY OD SOLUTIONS FOR SAVILLS WEST END LONDON

• OD Projects client list includes Arsenal FC, Scott Brownrigg, AYH, and Price & Myers.

• Recruitment of Commercial Director (Managing Surveyor of top fit out company)

• Recruitment of Construction Director (BCO & FX Quality Award Winner)

• AIB framework contractor.

• OD Projects currently employ 25 staff.

• Achieve British Council for offices corporate member status.

• Sign 5 year lease and fit out Moorgate HQ.

• Jon Kearney finalist for G4_ New Generation Awards – Entrepreneurship Award.

• Rolls Royce Framework contractor• Green Apple Award for Digitas

Saatchi & Saatchi

• Instutute of Chartered Accountants Framework contractor

• Awarded Vogue /Condenast HQ fitout

• Education sector expansion with successful fitout projects for Partnerships For Schools and North Herts College

• Savills approved contractor

• High end residential team acknowledged as leading contractor within sector

• Awarded refurbishment for Royal Albert Hall

2004 2005 2006 2007 2008 2009 2010 2011 2012

In January Jon Kearney founds OD Projects.

• Client base expanded to include Royal & Sun Alliance, O2, AIB, Morley Fund, and GIS Interpublic.

• Consultants include Gensler, Cushman & Wakefield, Barr Gazetas, and Leslie Clark.

• Royal & Sun Alliance approved contractor status.

• OD Projects complete £4 million,107 Leadenhall, fit out.

• OD Projects achieve ISO9001 status.

• Forecast record turnover of circa £20m in with Business Plan.

• Official launch of aftercare team ‘ZEROdEFECTS’.

• Successful completion of first Irish project for Marcus Evans HQ in Dublin.

• Notable project wins for clients such as Finchatton, BMB Property, United Continental Airlines, Safestay and Royal London Asset Management.

• Commitment to sustainability – BREEAM ‘Excellent’ achieved on refurbishment of RLAM property in Crawley, LEED silver certification achieved for Harris Williams fit out in Mayfair, SKA silver certificate achieved for Paradigm Housing in High Wycombe.

• Rebrand of Od which defines our focus and disciplined approach to achieving quality.

• Od appointed on Savills Estate Agency office fitout framework

• Repeat business levels at 70% of turnover and growing

• Notable project wins for Dow Jones, Royal London Asset Management, Fendi,National Australia Group and Berkeley Group Marketing Suites

• Od completes its first hotel refurbishment for launch of exciting new venture for Safestay in London

• Od working on over 50000sqft of Londons super prime residential projects in Knightsbridge, Kensington & Hampstead

• Od Group formed, divisions focused on Commercial Fitout, Super prime Residential and Commercial Design & Build

• OD Expand office space to take another floor at Sun St HQ

HISTORY

Page 4: Ods blue water energy

PREPARED BY OD SOLUTIONS FOR BLUE WATER ENERGYPAGE 4

OD HOLDINGS

OD INTERIORSOD PROJECTS OD SOLUTIONS

Specialising in interior fit out and construction to the professional construction industry.

Working closely with Architects, Project Managers, Quantity Surveyors and direct for end user clients.

Covering all sectors including Commercial, Retail and Leisure

Specialist high end residential refurbishment and construction company working closely with high net worth clients, developers and architects to deliver unique boutique interiors

Set up to cater for direct End User clients requiring a ‘one stop shop’ turnkey solution. Working with interior design and architecture companies Od are procurement specialist to take a client from concept to completion under one roof.

OD INTERIORS

Jon KearneyManaging Director

Steve CherryConstruction Director

Greg PinchinCommercial Director

Andy TorlotDirector

Graham CannDirector

Andrew WrightDirector

Page 5: Ods blue water energy

PAGE 5 PREPARED BY OD SOLUTIONS FOR SAVILLS WEST END LONDON

TURNOVER

182 8 10 12 14 164 60

(Turnover £m April-April)

2011/2012

20 2422 26

2012/2013

Secured2013/2014 (Projected)

OD GROUP TURNOVER

Secured2014/2015 (Projected)

Page 6: Ods blue water energy

PREPARED BY OD SOLUTIONS FOR BLUE WATER ENERGYPAGE 6

Page 7: Ods blue water energy

PAGE 7 PREPARED BY OD SOLUTIONS FOR SAVILLS WEST END LONDON

OD SOLUTIONS: INTERIOR DESIGN & ARCHITECT PARTNERS

Master planning

Due diligence and building evaluation

Design team leader

Feasibility studies

Condition surveys

Lease support

Development and base build monitoring

Brief gathering

Workplace strategy and change management

Space planning

Architectural and interior design through all RIBA work stages

Building refurbishment to the following standards:

- Shell andCore- Cat A- Cat B

Building extensions

Core reconfigurations and other major structural interventions

Planning applications and local authority liaison

Contract administration

Post occupancy evaluation

Furniture audits, selection and procurement

Assistance with artwork selection

Computer generated imagery – animation and stills

Graphic design Signage and way finding

At OD we select the very best UK and International design partners to work on all projects. The scope of professional services that we offer includes:

We also have associations with a number of other specialist consultancies and can offer the following additional services fully integrated into our overall offer:

Catering design and specification

Acoustics

Fire engineering

Measured surveys

Specialist lighting – internal and external

External landscaping – hard and soft

Audio visual design and specification

Relocation management

Page 8: Ods blue water energy

PREPARED BY OD SOLUTIONS FOR BLUE WATER ENERGYPAGE 8

DESIGN & BUILD: OD CONSTRUCTIVE DESIGN

PROJECTLIFECYCLE

STAGE 1 DESIGN• Feasibility – Test Fits• Concept Design• Detailed Design• Technical Design• Specialist Design• Construction Supervision

STAGE 4 CONSTRUCTION• Setting up of site & Logistics• Coordination of works• Construction Programme management• Reporting structure• Financial control• Close-out• ZerOdefects

STAGE 2 PRE CONSTRUCTION• Initial Scope of Project• Budget setting & development• Programme management• Technical Coordination• Services & Systems Integration• Approval Coordination• Contract negotiation

STAGE 3 PROCUREMENT• Identification of packages• Long lead Items• Specialist Packages• Placing of all orders• Coordination of

project deliverables

Page 9: Ods blue water energy

PAGE 9 PREPARED BY OD SOLUTIONS FOR SAVILLS WEST END LONDON

OD SOLUTIONS & BLUEBOTTLE

PRE CONSTRUCTION CONSTRUCTION

COORDINATION COLLABORATION QUANTIFICATION EXECUTION COMPLETION

PROFESSIONAL ACCOUNTABLE RESPONSIBLE

SOLUTIONSOd SOLUTIONSOd

SPECIALIST PARTNERS• IT & AV• FURNITURE

DESIGN

BLUeBOTTLe

Page 10: Ods blue water energy

PREPARED BY OD SOLUTIONS FOR BLUE WATER ENERGYPAGE 10

Page 11: Ods blue water energy

PAGE 11 PREPARED BY OD SOLUTIONS FOR SAVILLS WEST END LONDON

› Procurement: Design & Build

› Architect Gensler

› Project Manager Gensler

› Quantity Surveyor Montie

› Duration 11 Weeks

› Value £600,000

› Size 3000 sq ft

Strip out and new fit out of existing occupied offices in two separate phases. The works undertaken comprised:

• New Cellularized Offices,

• New Meeting and Board rooms,

• High spec stone reception,

• Stone flooring,

• Specialist joinery,

• New Lighting inclusive of feature lighting installed throughout

SAPINDALEVEL 5, 25 PARK LANE, W1

Page 12: Ods blue water energy

PREPARED BY OD SOLUTIONS FOR BLUE WATER ENERGYPAGE 12

Page 13: Ods blue water energy

PAGE 13 PREPARED BY OD SOLUTIONS FOR SAVILLS WEST END LONDON

› Project Manager: Gensler

› Architect: Gensler

› Duration: 14 weeks

› Size: 10,000 sq ft

› Value: £535,000

CAT B fit out of the first floor newly refurbished occupied building to provide a high quality office.

The works comprised:

• High quality bespoke joinery,

• Mechanical & electrical modifications,

• Double glazed BENE partitions & doors,

• Handmade carpet flooring,

• Audio visual installations.

HARRIS WILLIAMSLEVEL 2, 63 BROOK STREET, MAYFAIR, W1

Page 14: Ods blue water energy

PREPARED BY OD SOLUTIONS FOR BLUE WATER ENERGYPAGE 14

Page 15: Ods blue water energy

PAGE 15 PREPARED BY OD SOLUTIONS FOR SAVILLS WEST END LONDON

› Procurement: Design & Build

› Architect: Barrett Lloyd Davis Associates

› Duration: 12 Weeks

› Value: £700,000

› Size 9000 sq ft

Cat B commercial office fit out at Simmonscourt House in Dublin, Works included:

• New Offices,

• New Meeting and Board rooms,

• High spec reception,

• Staff break out areas,

• New comms Room,

MARCUS EVANSSIMMONSCOURT HOUSE

Page 16: Ods blue water energy

PREPARED BY OD SOLUTIONS FOR BLUE WATER ENERGYPAGE 16

Page 17: Ods blue water energy

PAGE 17 PREPARED BY OD SOLUTIONS FOR SAVILLS WEST END LONDON

› Procurement: Design & Build

› Architect Edge

› Quantity Surveyor Arcadis

› Duration 12 Weeks

› Value £1,000,000

› Size 30,000 sq ft

Refurbishment of office floor whilst the building remained in full occupation, works included:

• Strip out

• Installation of new electrical & mechanical services

• Glass partitions

• Fit Out of new toilets

• Tea Points

• High specification restaurant

• Floor coverings

DOW JONESGRAYS INN ROAD, WC1

Page 18: Ods blue water energy

PREPARED BY OD SOLUTIONS FOR BLUE WATER ENERGYPAGE 18

Page 19: Ods blue water energy

PREPARED BY OD SOLUTIONS FOR BLUE WATER ENERGYPAGE 19

› Quantity Surveyor: Gleeds

› Architect: DEGW

› Services Consultant: ARUP

› Project Value £2,000,000

› Duration 21 weeks

› Size: 60,000 sq ft

Under the design and build contract the fit out and refurbishment of two floors of G-Wing evolved to a negotiated second phase involving a further three floors of similar works comprising, new suspended ceilings, new partition layouts with glazed walls, air conditioning modifications, new electrical installations, toilet fit out and specialist joinery.

ROLLS ROYCEPRIDE PARK, DERBY

Page 20: Ods blue water energy

PREPARED BY OD SOLUTIONS FOR BLUE WATER ENERGYPAGE 20

Page 21: Ods blue water energy

PAGE 21 PREPARED BY OD SOLUTIONS FOR SAVILLS WEST END LONDON

› Procurement: Design & Build

› Quantity Surveyor: DTZ

› Architect: Bluebottle

› Project Manager: DTZ

› Project Value £1,400,000

› Duration 14 weeks

› Size: 6000 sq ft

• Total strip out of existing offices including M&E.

• New ceilings, largely MF ceilings with integrated recessed lighting features

• New meeting rooms, walnut hardwood fold back glazed doors

• Horizontally laid walnut veneered sliding folding walls

• Privalight glazing to boardroom

• Wide planked white oiled oak floor

• Specialist macassar ebony joinery

• Specialist lighting

ARTEMISST JAMES ST, SW1

Page 22: Ods blue water energy

PREPARED BY OD SOLUTIONS FOR BLUE WATER ENERGYPAGE 22

Page 23: Ods blue water energy

PAGE 23 PREPARED BY OD SOLUTIONS FOR SAVILLS WEST END LONDON

› Procurement: Design & Build

› Architect: Bluebottle

› Quantity Surveyor: Savills

› Project Manager: Savills

› Project Value £1,800,000

› Duration 12 weeks

› Size: 18,000 sq ft

Fit out of a Grade II listed building in St James’s Square.

• The design and co-ordination of a bespoke polished stainless steel staircase linking the two occupied floors

• Bespoke leather and high gloss polished joinery

• Bespoke translucent feature glazing screen between reception and breakout space

• Large breakout space

PERMALST JAMES ST, SW1

Page 24: Ods blue water energy

PREPARED BY OD SOLUTIONS FOR BLUE WATER ENERGYPAGE 24

Page 25: Ods blue water energy

PAGE 25 PREPARED BY OD SOLUTIONS FOR SAVILLS WEST END LONDON

› Procurement: Traditional

› Architect: Bluebottle

› Quantity Surveyor: Bigham Anderson Partnership

› Project Manager: King Sturge

› Project Value £1,500,000

› Duration 12 weeks

› Size: 16,000 sq ft

Fit out of a recently completed Cat A development

• Project divided into two halves.

• The front of house, client facing reception and meeting suits.

• The private work area, incorporating 170 open plan desks, quiet and internal meeting rooms as well as a large break out space.

• Large pivoting glass screen doors to the boardroom

• Bespoke ebony stained feature ceiling

• Integrated bespoke joinery

• MF ceiling with inset circular lighting features

ORIEL SECURITIESCHEAPSIDE, EC2

Page 26: Ods blue water energy

PREPARED BY OD SOLUTIONS FOR BLUE WATER ENERGYPAGE 26

CERTIFICATION

Page 27: Ods blue water energy

PAGE 27 PREPARED BY OD SOLUTIONS FOR SAVILLS WEST END LONDON

SUSTAINABLE CREDENTIALS

Page 28: Ods blue water energy

PREPARED BY OD SOLUTIONS FOR BLUE WATER ENERGYPAGE 28

Page 29: Ods blue water energy

Od OD SOLUTIONS 1 SUN STREET LONDON EC2A 2EP

WHY OD?

In appointing OD Solutions potential clients will be taking full advantage of the following key areas that we believe differentiate us from our competitors:

• NO LEARNING CURVE - A proven understanding of London’s fit-out market, standards and quality expectations.

• LOCAL & INTERNATIONAL – A dedicated team of professionals based in both London and Singapore

• DESIGN – A partnership with “BEST IN CLASS” leading interior design & architect practice Bluebottle with extensive experience of financial clients and up to date knowledge of trends and regulations. A design with Integrity

• COST CERTAINTY – commercial competitiveness and understanding of clients’ value aspirations

• COMMUNICATION – Open and honest communication; we won’t make promises we know we can’t keep

• COORDINATION – A thorough understanding of all the approvals process and associated requirements

• DEDICATED – Project Manager & Site Manager assigned to project for the duration of the project

• QUALITY – A team who care about the end product, service and delivery

• DETAIL - A design with Integrity and high finished product – Not Design & Dump

• EXPERIENCE - An extensive proven sub-contractor and supplier base

• ENGINEERED - A cohesive application of the building environment and “In house” MEP coordination

• TRANSPARENCY - A clearly thought out process within an open and honest culture

Page 30: Ods blue water energy

DES

IGN