odot district 3 · 30/ sr 179, from the holmes county line to sr 60 12/12/19 04/01/20 10/15/20...

28
MIKE DEWINE, OHIO GOVERNOR | JACK MARCHBANKS, ODOT DIRECTOR |BOB WEAVER, DISTRICT DEPUTY DIRECTOR SERVING ASHLAND, CRAWFORD, ERIE, HURON, LORAIN, MEDINA, RICHLAND AND WAYNE COUNTIES Erie Huron Lorain Medina Wayne Richland Ashland Cr awfor d ODOT DISTRICT 3 2020 CONSTRUCTION PROGRAM

Upload: others

Post on 29-Jul-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ODOT DISTRICT 3 · 30/ SR 179, from the Holmes County line to SR 60 12/12/19 04/01/20 10/15/20 $2,591,520.00 Shelly & Sands Traffic maintained by flaggers 94431 ASD US 42 09.43 Bridge

MIKE DEWINE, OHIO GOVERNOR | JACK MARCHBANKS, ODOT DIRECTOR |BOB WEAVER, DISTRICT DEPUTY DIRECTOR

SERVING ASHLAND, CRAWFORD, ERIE, HURON, LORAIN, MEDINA, RICHLAND AND WAYNE COUNTIES

Erie

Huron

Lorain

Medina

WayneRichland

AshlandCrawford

ODOT DISTRICT 3 2020 CONSTRUCTION PROGRAM

Page 2: ODOT DISTRICT 3 · 30/ SR 179, from the Holmes County line to SR 60 12/12/19 04/01/20 10/15/20 $2,591,520.00 Shelly & Sands Traffic maintained by flaggers 94431 ASD US 42 09.43 Bridge

CONSTRUCTION PROGRAM 2020

Ashland County Projects

PID Number

Route & Section

Work Type Location

Sale Date

Est. Start &

Est. End

Est. Cost &

Contactor Maintenance of Traffic

90912 ASD US 224

11.12 Culvert

Rehabilitation US 224, just east of SR 58 09/26/19

11/18/19 10/31/20

$164,140.00 Marra

Services Inc

Traffic maintained at all times

108920 ASD SR 3 06.81

Smooth Seal

SR 3, from the Village of

Loudonville, in Ashland County, to the City of Wooster, in Wayne

County

09/26/19 04/01/20 09/30/20

$3,585,610.00

Kokosing

Traffic maintained by flaggers

102960 ASD SMOOTH

FY 2020 Smooth

Seal

US 250, from the City of Ashland

Corp. limit to Bailey Lakes/ US 60, from Village of Hayesville to US

30/ SR 179, from the Holmes County line to SR 60

12/12/19 04/01/20 10/15/20

$2,591,520.00 Shelly & Sands

Traffic maintained by flaggers

94431 ASD US 42

09.43 Bridge

Replacement US 42, between Cleveland Ave.

and Twp Rd 793 02/27/20

05/01/20 10/31/20

$848,453.00 Unknown

One lane of traffic maintained at all times

97045 ASD SR 3/SR 60

00.00/00.67 Minor

Rehabilitation

SR 3, from Knox County line to SR 39/ SR 60, from SR 3 to the

northern Corp. limits of the Village of Loudonville

04/09/20 05/20/20 08/20/20

$1,700,000.00 Unknown

Traffic maintained at all times

103016 ASD US 250/SR

58 12.22/00.00

Minor Rehabilitation

US 250, from US 42 to the northern Ashland Corp. limits/ SR 58 from US 250 Connector Rd to northern

Corp. limits

05/07/20 07/01/20 11/01/20

$1,030,457.00 Unknown

Traffic maintained at all times

106356 ASD SR 179

04.91 Culvert

Replacement SR 179, between Lake Twp Rd. 257

and Lake Twp Rd. 2300 05/21/20

07/01/20 09/01/20

$200,000.00 Unknown

30 day closure

Page 3: ODOT DISTRICT 3 · 30/ SR 179, from the Holmes County line to SR 60 12/12/19 04/01/20 10/15/20 $2,591,520.00 Shelly & Sands Traffic maintained by flaggers 94431 ASD US 42 09.43 Bridge

CONSTRUCTION PROGRAM 2020

110311 ASD US 250

00.00 Minor

Rehabilitation

US 250 from the Huron County line to Bailey Lakes southern Corp

limits 05/21/20

07/01/20 10/31/20

$2,347,750.00 Unknown

Traffic maintained at all times

103925 ASD SR 60

09.95 Culvert

Replacement SR 60, between Ashland Co Rd 775

and Vermin Twp Rd 2104 06/04/20

08/01/20 10/01/20

$150,000.00 Unknown

30 day closure

87729 ASD US 30

00.16 Minor

Rehabilitation US 30, from just east of SR 603 to

just past SR 511 11/19/20

01/01/21 12/31/21

$4,710,207.00 Unknown

Traffic maintained at all times

Page 4: ODOT DISTRICT 3 · 30/ SR 179, from the Holmes County line to SR 60 12/12/19 04/01/20 10/15/20 $2,591,520.00 Shelly & Sands Traffic maintained by flaggers 94431 ASD US 42 09.43 Bridge

CONSTRUCTION PROGRAM 2020

Page 5: ODOT DISTRICT 3 · 30/ SR 179, from the Holmes County line to SR 60 12/12/19 04/01/20 10/15/20 $2,591,520.00 Shelly & Sands Traffic maintained by flaggers 94431 ASD US 42 09.43 Bridge

CONSTRUCTION PROGRAM 2020

Crawford County Projects

PID Number

Route & Section

Work Type Location

Sale Date

Est. Start &

Est. End

Est. Cost &

Contactor

Maintenance of Traffic

104117 CRA SR 4

09.31 Resurfacing SR 4, from Perry St. to SR 19 05/16/19

07/15/19 05/29/20

$1,698,000.00 Kokosing

Traffic maintained by flaggers

102970 CRA Smooth

FY 2020 Smooth Seal

SR 19, from Galion West Corp. limit to Bucyrus East Corp. limit/ SR 4, from Bucyrus North Corp. limit to Seneca County line/ SR 97, from

Millsboro Rd. to Morrow County line

06/20/19 08/01/19 07/18/20

$3,093,000.00 Shelly & Sands

Traffic maintained by flaggers

90883 CRA SR 4

19.13 Bridge Repair

SR 4, just north of south intersection of SR4/ SR103, over

Sycamore Creek 08/22/19

05/26/20 08/31/20

$504,420.00 Rietschlin

Construction 60 day detour

101409 CRA SR 19

16.08 Minor

Rehabilitation SR 19, from CR 16 to just north of

CR 27 09/26/19

06/01/20 09/30/20

$1,596,750.00 Kokosing

Traffic maintained at all times

102635 CRA SR 19

26.18 Bridge

Preservation SR 19, between New Washington Rd.

and Feichner St. 04/09/20

05/01/20 11/30/20

$500,000.00 Unknown

45 day closure

107861 CRA US 30

10.92 Slide Repair

Various locations on US 30 eastbound from just east of Bucyrus

to SR 61 07/16/20

07/27/20 11/27/20

$1,905,200.00 Unknown

Traffic maintained at all times

103703 CRA SR 19/SR

97 01.21/00.70

Minor Rehabilitation

SR 19, from the Morrow County line to Evans Ave./ SR 97, from 6th St. to

eastern Corp. limits of Galion 07/02/20

08/01/20 09/30/20

$1,383,166.00 Unknown

Traffic maintained at all times

Page 6: ODOT DISTRICT 3 · 30/ SR 179, from the Holmes County line to SR 60 12/12/19 04/01/20 10/15/20 $2,591,520.00 Shelly & Sands Traffic maintained by flaggers 94431 ASD US 42 09.43 Bridge

CONSTRUCTION PROGRAM 2020

Page 7: ODOT DISTRICT 3 · 30/ SR 179, from the Holmes County line to SR 60 12/12/19 04/01/20 10/15/20 $2,591,520.00 Shelly & Sands Traffic maintained by flaggers 94431 ASD US 42 09.43 Bridge

CONSTRUCTION PROGRAM 2020

Erie County Projects

PID Number

Route & Section

Work Type Location

Sale Date

Est. Start &

Est. End

Est. Cost &

Contactor

Maintenance of Traffic

105587 ERI SR 2 14.06

Bridge Repair

The Camp Rd. overpass, between Galloway Rd. and Rye Beach Rd./ the Hahn Rd. overpass, between

SR61 and Frailey Rd./ the Joppa Rd. overpass, between

Frailey Rd. and Barnes Rd.

10/01/19 04/01/20 10/15/20

$545,640.00 BCC Ohio Inc

One lane of traffic in each direction

maintained at all times, with 45 day

detours at Camp, Hahn and Joppa Rds.

92889 ERI US 6/US 250

06.41/00.00 Minor

Rehabilitation

US 6, from Venice Rd to Sandusky eastern Corp. limit/ US 250, from

Cleveland Rd. to Butler St. 04/09/20

06/01/20 08/31/20

$1,955,827.00 Unknown

Traffic maintained by flaggers

111437 ERI SMOOTH

FY 2021 Smooth Seal

SR 13, from US 250 to the Huron Corp limit/ SR 99, the Huron

County line to SR 4 12/17/20

05/01/21 08/01/21

$1,656,085.00 Unknown

Traffic maintained by flaggers

Page 8: ODOT DISTRICT 3 · 30/ SR 179, from the Holmes County line to SR 60 12/12/19 04/01/20 10/15/20 $2,591,520.00 Shelly & Sands Traffic maintained by flaggers 94431 ASD US 42 09.43 Bridge

CONSTRUCTION PROGRAM 2020

Page 9: ODOT DISTRICT 3 · 30/ SR 179, from the Holmes County line to SR 60 12/12/19 04/01/20 10/15/20 $2,591,520.00 Shelly & Sands Traffic maintained by flaggers 94431 ASD US 42 09.43 Bridge

CONSTRUCTION PROGRAM 2020

Huron County Projects

PID Number

Route & Section

Work Type Location

Sale Date

Est. Start &

Est. End

Est. Cost &

Contactor

Maintenance of Traffic

90902 HUR SR 162

04.13 Bridge

Replacement SR 162. just west of Miller Rd. 09/26/19

06/08/20 08/21/20

$572,710.00 R&I

Construction 60 day detour

77529 HUR US 20

10.76 Minor

Rehabilitation US 20, from the bridge over SR

61 to the end of the Bypass 02/27/20

05/01/20 11/01/20

$6,292,260.00 Unknown

Traffic maintained at all times. Expect single lane closures on US 20, with some short-term

closures at ramps

100074 HUR SR 601

01.02 Bridge

Replacement SR 601, just south of US 20 01/23/20

08/31/20 11/06/20

$538,176.00 Unknown

60 day detour

102239 HUR SR 601

01.85 Bridge

Replacement SR 601, between US 20 and Gibbs

Rd 05/07/20

07/01/20 09/30/20

$275,000.00 Unknown

30 day detour

106353 HUR SR 60/SR 99

10.78/08.04 Culvert

Replacement SR 60, just south of Auster Rd. SR

99, just south of Dogtown Rd 05/21/20

07/01/20 09/30/20

$375,000.00 Unknown

SR 60: 30 day detour SR 99: 30 day detour

98462 HUR US 250

05.10 Minor

Rehabilitation

US 250, from eastern Corp limit of Norwalk to the Ashland County

line 11/05/20

05/15/21 07/30/21

$4,387,671.00 Unknown

Traffic maintained by flaggers

Page 10: ODOT DISTRICT 3 · 30/ SR 179, from the Holmes County line to SR 60 12/12/19 04/01/20 10/15/20 $2,591,520.00 Shelly & Sands Traffic maintained by flaggers 94431 ASD US 42 09.43 Bridge

CONSTRUCTION PROGRAM 2020

Page 11: ODOT DISTRICT 3 · 30/ SR 179, from the Holmes County line to SR 60 12/12/19 04/01/20 10/15/20 $2,591,520.00 Shelly & Sands Traffic maintained by flaggers 94431 ASD US 42 09.43 Bridge

CONSTRUCTION PROGRAM 2020

Lorain County Projects

PID Number

Route & Section

Work Type Location

Sale Date

Est. Start &

Est. End

Est. Cost &

Contactor

Maintenance of Traffic

82632 LOR US 20

22.19 Major

Rehabilitation US 20, from Stoney Ridge Rd to

Lear Nagle Road 11/30/17

04/02/18 11/20/20

$26,874,800.65 Fechko

One lane of traffic maintained in each direction. Various

intersecting side street closures.

92013 LOR US 6

09.67 Bridge Repair

US 6, near the intersection of US 6 and SR 57

01/25/18 04/02/18 08/15/20

$26,332,328.83 The Ruhlin Co.

One lane of traffic maintained in each

direction. Up to three different closures of

US 6, that will be limited to 7 days for operating equipment

installation

102660 LOR US 20

20.47 Bridge

Replacement US 20, over Ridgeway Ditch 04/04/19

06/01/19 05/31/20

$2,061,613.00 Schirmer

Construction

One lane of traffic maintained in each

direction at all times

84829 LOR SR 301

26.67 Major

Rehabilitation SR 301, through the City of

Sheffield Lake 05/02/19

06/15/19 05/29/20

$1,580,814.00 Fechko

Traffic maintained by flaggers

101359 LOR US 20

19.40 Roadway

Improvement US 20, from SR 301 to Case Rd. 05/02/19

07/29/19 04/30/20

$1,627,320.00 Karvo

Traffic maintained at all times, with single

lane closures as needed

Page 12: ODOT DISTRICT 3 · 30/ SR 179, from the Holmes County line to SR 60 12/12/19 04/01/20 10/15/20 $2,591,520.00 Shelly & Sands Traffic maintained by flaggers 94431 ASD US 42 09.43 Bridge

CONSTRUCTION PROGRAM 2020

102027 LOR SR 254

02.03 Turn Lane Addition

SR 254, eastbound at the intersection with SR 301

06/06/19 08/05/19 05/29/20

$1,479,930.00 Karvo

Two lanes of traffic in each direction

maintained at all times with single lane

closures as needed

98273 LOR SMOOTH

FY2020 Smooth

Seal Various locations throughout

Lorain County 06/20/19

08/01/19 06/30/20

$3,134,240.00 Karvo

Traffic maintained by flaggers

101387 LOR SR 301

22.33 Resurfacing

SR 301, from SR 254 to Colorado Ave. From Colorado Ave. to

Walker Rd. SR 611, from SR 301 to Miller Rd.

07/25/19 08/01/19 06/15/20

$2,099,420.00 Karvo

Traffic maintained by flaggers

94420 LOR SR 303

11.05 Minor

Rehabilitation SR 303, from Lagrange Corp. limit

to Medina County line. 11/07/19

05/01/20 07/31/20

$2,316,962.00 Kokosing

Traffic maintained by

flaggers

80121 LOR SR 113

07.76 Bridge

Replacement SR 113, just east of SR 58 02/13/20

05/01/20 07/31/20

$291,257.00 Unknown

30 day detour

98526 LOR SIGN FY 2020

Signs Various locations in Lorain County 03/12/20 05/01/20 12/31/20

$539,718.00 Unknown

Traffic maintained at

all times

104186 LOR SR 2

07.49 Slide Repair SR 2, eastbound just east of SR 58 03/12/20

04/01/20 09/01/20

$514,990.00 Unknown

Outside shoulder

closure, two lanes of traffic maintained

110815 LOR FINDLEY STATE PARK

Minor Rehabilitation

Findley State Park Main Rd 03/14/20 04/01/20 06/20/20

$650,669.00 Unknown

Traffic maintained by

flaggers

Page 13: ODOT DISTRICT 3 · 30/ SR 179, from the Holmes County line to SR 60 12/12/19 04/01/20 10/15/20 $2,591,520.00 Shelly & Sands Traffic maintained by flaggers 94431 ASD US 42 09.43 Bridge

CONSTRUCTION PROGRAM 2020

98574 LOR SR 83

10.50 Minor

Rehabilitation

SR 83, from just south of Mills Rd. to the southern North Ridgeville

Corp. limits 04/23/20

06/01/20 07/31/20

$1,298,247.00 Unknown

Traffic maintained with flaggers

92881 LOR SR 254

02.83 Minor

Rehabilitation

SR 254, from the western Corp. limits of the City of Avon to just

west of Clifton Way, and from just east of Nagle Rd to the Lorain

County line

05/21/20 07/01/20 10/31/20

$748,335.00 Unknown

Traffic maintained

with flaggers

77537 LOR SR 2

03.86 Minor

Rehabilitation SR 2, from just east of Baumhart

Rd to just east of SR 58 08/27/20

04/15/21 10/31/21

$5,739,014.00 Unknown

Traffic maintained at

all times

79759 LOR IR 480

00.97 Minor

Rehabilitation

IR 480, from the Ohio Turnpike Booth to the CUY County line/ The SR 10 ramp to IR 480 east

10/01/20 01/01/21 12/31/21

$2,368,900.00 Unknown

Traffic maintained at

all times

90942 LOR IR 90

17.85 Bridge

Replacement IR 90, bridge over Norfolk

Southern Railroad 12/03/20

03/01/21 11/30/21

$7,763,140.00 Unknown

Traffic maintained at all times. Nightly lane

closures as needed

Page 14: ODOT DISTRICT 3 · 30/ SR 179, from the Holmes County line to SR 60 12/12/19 04/01/20 10/15/20 $2,591,520.00 Shelly & Sands Traffic maintained by flaggers 94431 ASD US 42 09.43 Bridge

CONSTRUCTION PROGRAM 2020

Page 15: ODOT DISTRICT 3 · 30/ SR 179, from the Holmes County line to SR 60 12/12/19 04/01/20 10/15/20 $2,591,520.00 Shelly & Sands Traffic maintained by flaggers 94431 ASD US 42 09.43 Bridge

CONSTRUCTION PROGRAM 2020

Medina County Projects

PID Number

Route & Section

Work Type Location

Sale Date

Est. Start &

Est. End

Est. Cost &

Contactor Maintenance of Traffic

14821 MED

N. Carpenter Road

Major Reconstruction

SR 303 to Boston Rd. 05/03/18 03/12/18 09/15/20

$11,419,901.00 Shelly & Sands

One-way traffic for 120 days

100928 MED US 224

13.47 Intersection

Improvement US 224 at Westfield Center Rd. 05/23/19

07/15/19 05/31/20

$1,281,200.00 Shelly & Sands

One lane of traffic will be maintained in each direction at all times

106876 MED SMOOTH FY2019 (A)

Smooth Seal

SR 3, from Medina Corp. limit to just north of Fenn Rd. and from just south of Odessa Rd. to the Cuyahoga County line/ SR 252,

from just north of SR 57 to Lorain County line/ SR 57, from SR 18 to

just south of SR 252

06/06/19 08/20/19 06/30/20

$3,175,531.00 Ronyak Paving

Traffic maintained with flaggers

108636 MED IR 76

08.31 Culvert

Rehabilitation I-76 eastbound between SR 57 and

SR 94 10/24/19

11/11/19 06/01/20

$539,930.00 Marra Services

No impact to traffic expected

98928 MED US 224

15.61 Culvert

Rehabilitation US 224, eastbound, just past Lake

Rd. before the I -71 on ramps 11/21/19

05/01/20 08/31/20

$194,460.00 Inland Water

Pollution Single lane closures

94436 MED SR 3

17.05 Bridge Repair SR 3 over Plum Creek TBD TBD

$671,141.00 Lockhart

Concrete Co

No impact to traffic expected

94440 MED SR 303 13.90/14.96

Bridge Replacement

Culvert just west of State Rd./ Bridge just east of State Rd., west

of Summit County line 01/23/20

02/04/20 08/31/20

$1,765,500.00 Unknown

90 day detour

Page 16: ODOT DISTRICT 3 · 30/ SR 179, from the Holmes County line to SR 60 12/12/19 04/01/20 10/15/20 $2,591,520.00 Shelly & Sands Traffic maintained by flaggers 94431 ASD US 42 09.43 Bridge

CONSTRUCTION PROGRAM 2020

87716 MED IR 71

06.06 Minor

Rehabilitation

IR 71, from just south of the IR 76 interchange to just north of the

interchange 04/20/20

05/15/21 08/15/21

$3,040,020.00 Unknown

Traffic maintained at all times

103924 MED SR 162

11.70 Culvert

Replacement SR 162, west of US 42 before

Lance Rd. 04/23/20

06/01/20 08/01/20

$165,000.00 Unknown

30 day detour

102738 MED SR 3

12.00 Bridge

Replacement SR 3, just north of Friendship St.

over Broadway Creek 04/23/20

05/05/20 11/30/20

$497,700.00 Unknown

60 day detour

106354 MED SR 3/SR 94

24.34/20.11 Culvert

Replacements SR 3, just north of Mattingly Rd./ SR 94, just south of Mattingly Rd.

06/04/20 07/15/20 11/13/20

$442,000.00 Unknown

SR 3: 30 day closure SR 94: 30 day closure

109232 MED SR 3

15.05 Major

Rehabilitation SR 3, from just north of Fenn Rd.

to just south of Odessa Rd. 07/30/20

05/01/21 06/01/22

$8,009,280.00 Unknown

One-way traffic will be maintained from

Hamilton Rd to Fenn Rd

100063 MED SR 162

25.43 Bridge

Replacement SR 162, between State Rd. and

Burdett Rd. 08/27/20

06/01/21 08/31/21

$1,006,500.00 Unknown

90 day detour

94437 MED US 42

02.47 Bridge

Replacement US 42, just north of Crawford Rd. 11/19/20

04/05/21 08/20/21

$1,177,000.00 Unknown

90 day detour

98395 MED SR 3

03.80 Minor

Rehabilitation SR 3, from just south of the IR 76 ramps to the Medina Corp limits

11/19/20 06/01/21 08/31/21

$2,479,064.00 Unknown

Traffic maintained by flaggers

98570 MED SR 18

00.00 Minor

Rehabilitation SR 18, from the Lorain Countyline

to the Medina Corp limit 12/17/20

05/01/21 10/31/21

$3,461,700.00 Unknown

Traffic maintained by flaggers

Page 17: ODOT DISTRICT 3 · 30/ SR 179, from the Holmes County line to SR 60 12/12/19 04/01/20 10/15/20 $2,591,520.00 Shelly & Sands Traffic maintained by flaggers 94431 ASD US 42 09.43 Bridge

CONSTRUCTION PROGRAM 2020

106232 MED SR 57

17.65

Drainage System

Maintenance

SR 57, around all approaches to the SR 57/Spieth Rd. roundabout

12/17/20 06/01/21 11/30/21

$1,669,200.00 Unknown

SR 57/Spieth Rd. (west of roundabout) 60 day

closure/Spieth Rd. (east of roundabout)

eastbound will have a 7 day closure with

westbound traffic maintained

Page 18: ODOT DISTRICT 3 · 30/ SR 179, from the Holmes County line to SR 60 12/12/19 04/01/20 10/15/20 $2,591,520.00 Shelly & Sands Traffic maintained by flaggers 94431 ASD US 42 09.43 Bridge

CONSTRUCTION PROGRAM 2020

Page 19: ODOT DISTRICT 3 · 30/ SR 179, from the Holmes County line to SR 60 12/12/19 04/01/20 10/15/20 $2,591,520.00 Shelly & Sands Traffic maintained by flaggers 94431 ASD US 42 09.43 Bridge

CONSTRUCTION PROGRAM 2020

Richland County Projects

PID Number

Route & Section

Work Type Location

Sale Date

Est. Start &

Est. End

Est. Cost &

Contactor

Maintenance of Traffic

87728 RIC US 30

04.07 Minor

Rehabilitation From 4th St. to SR 309 06/20/19

08/01/19 08/28/20

$3,427,940.00 Kokosing

Single lane closures

102058 RIC SR 603

00.05 Slide Repair Just north of SR 95 09/26/19

04/01/20 06/05/20

$395,350.00 Alan Stone Co

Inc 45 day detour

94405 RIC US 42

03.48 Minor

Rehabilitation From just south of Fox Rd., to

the Mansfield Corp. limit 10/10/19

04/06/20 07/31/20

$1,802,390.00 Shelly & Sand

Traffic maintained by flaggers

87722 RIC IR 71

00.00 Minor

Rehabilitation From the Richland County line to

SR 13 11/21/19

05/01/20 10/03/20

$9,410,670.00 Kokosing

Single and two-lane closures

100057 RIC SR 13

05.30 Bridge Repair SR 13, just south of SR 97 02/13/20

04/01/20 08/14/20

$984,331.00 Unknown

One lane traffic maintained with

signals

93455 RIC US 30

09.26 Major

Rehabilitation US 30, from SR 309 to just east

of the 5th Ave ramps 04/02/20

04/15/20 05/26/23

$79,299,900.00 Unknown

Traffic maintained at all times

101442 RIC SR 309

03.91 Minor

Rehabilitation

SR 309, from SR 314 to just east of the SR 430 ramps and SR 430

from SR 309 to the Mansfield Corp. limit

04/09/20 06/01/20 09/30/20

$1,387,171.00 Unknown

Traffic maintained at all times

Page 20: ODOT DISTRICT 3 · 30/ SR 179, from the Holmes County line to SR 60 12/12/19 04/01/20 10/15/20 $2,591,520.00 Shelly & Sands Traffic maintained by flaggers 94431 ASD US 42 09.43 Bridge

CONSTRUCTION PROGRAM 2020

101431 RIC SMOOTH

FY 2021 Smooth Seal

SR 61, from just north of Shelby Corp limit to the Plymouth Corp

limit/ SR 96, from the Shelby Corp limit to SR 13

05/18/20 01/01/21 12/31/21

$2,284,921.00 Unknown

Traffic maintained by flaggers

94442 RIC SR 430

03.66 Bridge Repair SR 430, just east of Pinecrest St. 06/04/20

07/01/20 09/15/20

$550,000.00 Unknown

One lane traffic maintained with

signals

87690 RIC SR 13

11.01 Minor

Rehabilitation SR 13, from Hanley Rd to just

south of East Raleigh Ave 10/01/20

01/01/21 12/31/21

$4,123,000.00 Unknown

Traffic maintained by flaggers

Page 21: ODOT DISTRICT 3 · 30/ SR 179, from the Holmes County line to SR 60 12/12/19 04/01/20 10/15/20 $2,591,520.00 Shelly & Sands Traffic maintained by flaggers 94431 ASD US 42 09.43 Bridge

CONSTRUCTION PROGRAM 2020

Page 22: ODOT DISTRICT 3 · 30/ SR 179, from the Holmes County line to SR 60 12/12/19 04/01/20 10/15/20 $2,591,520.00 Shelly & Sands Traffic maintained by flaggers 94431 ASD US 42 09.43 Bridge

CONSTRUCTION PROGRAM 2020

Wayne County Projects

PID Number

Route & Section

Work Type Location

Sale Date

Est. Start &

Est. End

Est. Cost &

Contactor Maintenance of Traffic

102109 WAY US 30

23.33 Intersection Improvement

US 30, at Wenger Rd., in the Village of Dalton

05/02/19 09/18/19 05/31/20

$644,560.00 Central-Allied

Enterprises

One lane of traffic in each direction will be maintained at all

times

88886 WAY SR 83

00.62/00.74 Bridge

Replacement

Between CR 2 (Harrison Rd.) and CR 289 (Force

Rd.) 12/12/19

05/28/20 08/31/20

$828,250.00 V O Menuez &

Sons Inc 75 day detour

105455 WAY SR 83

16.31 Resurfacing

SR 83, from the Medina County line to the northern

Corp. limits of Wooster 02/27/20

06/01/20 10/31/20

$6,445,652.00 Unknown

84 day closure

102770 WAY US 250

19.26 Bridge

Replacement

US 250, between Villard St. and Apple Ridge Dr. over

Little Apple Creek 03/12/20

06/01/20 10/31/20

$1,177,000.00 Unknown

150 day signalized lane closure

Page 23: ODOT DISTRICT 3 · 30/ SR 179, from the Holmes County line to SR 60 12/12/19 04/01/20 10/15/20 $2,591,520.00 Shelly & Sands Traffic maintained by flaggers 94431 ASD US 42 09.43 Bridge

CONSTRUCTION PROGRAM 2020

Page 24: ODOT DISTRICT 3 · 30/ SR 179, from the Holmes County line to SR 60 12/12/19 04/01/20 10/15/20 $2,591,520.00 Shelly & Sands Traffic maintained by flaggers 94431 ASD US 42 09.43 Bridge

CONSTRUCTION PROGRAM 2020

District Wide Projects

PID Number

Route & Section

Work Type Location

Sale Date Est. Start

& Est. Ed

Est. Cost &

Contactor Maintenance of Traffic

101833 D03 PM FY2019

Loop Detector Repair

Various locations throughout the District

04/04/19 05/29/19 05/31/21

$213,390.00 Perram Electric

Traffic maintained at all times

98933 D03 PM FY2019

Pavement Marking

Various locations throughout the District

05/02/19 07/01/19 07/31/20

$2,542,640.00 Oglesby

Traffic maintained at all times

104286 D03 PR FY2020

Pruning, Tree/Bush Removal

Various locations throughout the District

07/25/19 10/03/19 09/30/20

$153,110.00 Ecotree Services

Traffic maintained at all times

98275 D03 CRSEAL

FY2020 Crack Seal

Various locations throughout the District

08/22/19 10/08/19 06/30/20

$242,892.00 Bituminous

Pavement Sys Traffic maintained by flaggers

109054 D03 GR

FY2020(A) Guardrail

Maintenance Various locations throughout

the District 10/10/19

03/16/20 01/31/21

$536,270.00 Lake Erie

Construction Traffic maintained at all times

103475 D03 PR

FY2020 (B)

Pruning, Tree/Bush Removal

Various locations throughout the District

10/24/19 12/04/19 03/31/21

$240,500.00 Van Curen

Services Inc Traffic maintained at all times

105359 D03 TSG FY2020

Signals Various locations throughout

the District 11/21/19

02/01/20 08/31/20

$205,950.00 Perram Electric

Traffic maintained at all times

104148 D03 GR FY2020

Guardrail Maintenance

Various locations throughout the District

11/21/19 02/01/20 01/31/21

$739,150.00 Lake Erie

Construction Traffic maintained at all times

Page 25: ODOT DISTRICT 3 · 30/ SR 179, from the Holmes County line to SR 60 12/12/19 04/01/20 10/15/20 $2,591,520.00 Shelly & Sands Traffic maintained by flaggers 94431 ASD US 42 09.43 Bridge

CONSTRUCTION PROGRAM 2020

95585 D03 BH

FY2020 (A) Bridge Repair

Various locations on I-71 in Ashland and Richland Counties,

and US 30 in Ashland County 12/12/19

01/01/20 10/31/20

$386,650.00 Ohio Concrete

Paving LLC Traffic maintained at all times

105357 D03 LG FY 2020

Lighting Various locations throughout

the District 11/21/19

04/01/20 09/30/20

$105,990.00 Perram Electric

Traffic maintained at all times

95586 D03 BH FY 2020

Bridge Repair Various locations in Crawford, Huron, and Richland Counties

02/13/20 04/01/20 02/01/21

$807,460.00

Unknown

Traffic maintained at all times with one 14 day closure on HUR SR 99

101467 D03 RPM FY 2020

Raised Pavement Markings

Various locations throughout the District

03/26/20 05/01/20 12/31/20

$213,200.00 Unknown

Traffic maintained at all times

110809 D03 GR FY 2020

Guardrail Replacement

Various locations throughout the District

04/01/20 07/01/20 07/01/21

$200,000.00 Unknown

Traffic maintained at all times

101466 D03 PM FY 2020

Pavement Marking

Various locations throughout the District

04/09/20 05/01/20 12/31/20

$2,060,000.00 Unknown

Traffic maintained by flaggers

104158 D03 LG FY 2020

Highway Lighting

Various interchanges along US 20 in Lorain County

05/21/20 06/02/20 12/30/20

$1,535,000.00 Unknown

Traffic maintained at all times

98276 D03 RM FY 2020

Mill and Fill

ASD US 30, just east of SR 60 eastbound and WAY US 30, just

west of the E Lincoln Way overpass

06/04/20 08/01/20 10/31/20

$363,000.00 Unknown

Traffic maintained at all times

104288 D03 PR FY 2020

Pruning, Tree/Brush

Removal

Various locations throughout the District

07/16/20 10/03/20 09/30/21

$215,000.00 Unknown

Traffic maintained by flaggers

Page 26: ODOT DISTRICT 3 · 30/ SR 179, from the Holmes County line to SR 60 12/12/19 04/01/20 10/15/20 $2,591,520.00 Shelly & Sands Traffic maintained by flaggers 94431 ASD US 42 09.43 Bridge

CONSTRUCTION PROGRAM 2020

101438 D03 MICRO

FY2021 Micro

Surfacing

ASD SR 39, from the Richland County line to the Loudonville Corp. limit/ ASD SR 60, from the Loudonville Corp. limit to

SR 95/ ASD SR 89, from the Polk Corp. limit to SR 58

06/18/20 08/01/20 09/30/21

$1,989,907.00 Unknown

Traffic maintained by flaggers

101465 D03 CRSEAL

FY 2021 Crack Seal

Various locations throughout the District

06/18/20 09/01/20 10/31/20

$416,000.00 Unknown

Traffic maintained by flaggers

101429 D03 CHIP FY 2021

Preventative Maintenance

HUR SR 60, from SR 18 to the Wakeman Corp. limit and LOR SR 303, from the Huron County

line to Rowell Rd.

06/18/20 08/01/20 09/15/20

$457,343.00 Unknown

Traffic maintained by flaggers

110796 D03 TSG FY 2021

Signals Various locations throughout

the District 10/15/20

07/01/21 09/02/22

$177,620.00 Unknown

Traffic maintained at all times

101469 D03 RPM FY 2021

Raised Pavement Markings

Various locations throughout the District

11/05/20 05/01/21 11/01/21

$242,000.00 Unknown

Traffic maintained at all times

104149 D03 GR FY 2021

Guardrail Various locations throughout

the District 12/03/20

02/01/21 01/31/22

$770,000.00 Unknown

Traffic maintained at all times

101449 D03 Culvert Culvert

ERI US 250, just south of E Mason Rd/ RIC IR 71, just north of the SR 546 overpass/ WAY SR 95, between Springville Rd. and

S Jefferson Rd.

12/03/20 12/14/20 04/01/21

$137,500.00 Unknown

Traffic maintained at all times

*Highlighted projects are carry over projects from 2019.

Page 27: ODOT DISTRICT 3 · 30/ SR 179, from the Holmes County line to SR 60 12/12/19 04/01/20 10/15/20 $2,591,520.00 Shelly & Sands Traffic maintained by flaggers 94431 ASD US 42 09.43 Bridge

CONSTRUCTION PROGRAM 2020

Page 28: ODOT DISTRICT 3 · 30/ SR 179, from the Holmes County line to SR 60 12/12/19 04/01/20 10/15/20 $2,591,520.00 Shelly & Sands Traffic maintained by flaggers 94431 ASD US 42 09.43 Bridge

CONSTRUCTION PROGRAM 2020

We will serve, innovate, and communicate with purpose. ..

We will be productive, lean, efficient and effective. ..

We will utilize the public resources entrusted to us by..

satisfying the State's transportation needs. ..

We will be the standard of excellence for winter maintenance. ..

We will create a working environment based on trust and mutual respect. ..

We will value the diversity of all ODOT people. ..

We will work together — one team: ..

the Ohio Department of Transportation. ..

For more information, please contact the Public Information Office at (419) 207-7181.

Like us on Facebook: www.facebook.com/OhioDepartmentofTransportationDistrict3

Follow us on Twitter: www.twitter.com/ODOT_NorthCenOH

Statewide Traffic Information: www.Ohgo.com

For general information, call (800) 276-4188 or visit District 3’s Web site at: www.transportation.ohio.gov/dist3

O U R M I S S I O N

To provide safe and easy movement of people and goods from..

place to place, we will:..

• Improve safety; ..

• Take care of what we have; ..

• Make our system better; ..

• Enhance capacity. .. O U R V I S I O N