Page 1: ODOT DISTRICT 11 - Ohio109365 COL ODNR Highlandtown Culvert Culvert Preservation 7/26/2021 9/1/2021 10/31/2021 $156,900 106993 COL SR 7 17.740 Geologic Maintenance / Slide Repair 8/26/2021

ODOT DISTRICT 11 2021 CONSTRUCTION PROGRAM

MIKE DEWINE, OHIO GOVERNOR | JACK MARCHBANKS, PH.D., ODOT DIRECTOR

SERVING BELMONT, CARROLL, COLUMBIANA, HARRISON, HOLMES, JEFFERSON & TUSCARAWAS COUNTIES

Page 2: ODOT DISTRICT 11 - Ohio109365 COL ODNR Highlandtown Culvert Culvert Preservation 7/26/2021 9/1/2021 10/31/2021 $156,900 106993 COL SR 7 17.740 Geologic Maintenance / Slide Repair 8/26/2021

HIGHLIGHTS | 2021 CONSTRUCTION PROGRAM

CONSTRUCTION PROGRAM HIGHLIGHTS 2

* Total includes district maintenance projects, some of which do not apply to the breakdown below

116 TOTAL PROJECTS

28

PAVEMENT PROJECTS

28 BRIDGE / CULVERT PROJECTS

24 SAFETY IMPROVEMENTS

33 SLIDE REPAIRS

$118 million investment

into eastern OHIO

Page 3: ODOT DISTRICT 11 - Ohio109365 COL ODNR Highlandtown Culvert Culvert Preservation 7/26/2021 9/1/2021 10/31/2021 $156,900 106993 COL SR 7 17.740 Geologic Maintenance / Slide Repair 8/26/2021

HIGHLIGHTS | 2021 CONSTRUCTION PROGRAM

CONSTRUCTION PROGRAM HIGHLIGHTS 3

• 19 Slide Repairs • 3 Pavement Projects • 5 Bridge/Culvert Projects • 4 Safety Projects

31 TOTAL PROJECTS

BELMONT COUNTY PROJECTS (PAGES 4-7)

CARROLL COUNTY PROJECTS (PAGES 8-9)

• 3 Pavement Projects • 3 Bridge/Culvert Projects

6 TOTAL PROJECTS

HOLMES COUNTY PROJECTS (PAGES 14-15)

• 2 Slide Repair • 1 Pavement Projects • 4 Bridge/ Culvert Projects • 1 Safety Project

8 TOTAL PROJECTS

JEFFERSON COUNTY PROJECTS ( PAGES 16-17)

• 6 Slide Repairs • 5 Pavement Projects • 7 Bridge/Culvert Projects • 3 Safety Projects

21 TOTAL PROJECTS

TUSCARAWAS COUNTY PROJECTS (PAGES 18-19)

• 2 Slide Repairs • 4 Pavement Projects • 4 Bridge/Culvert Projects • 4 Safety Projects • 1 misc.

15 TOTAL PROJECTS

DISTRICT MAINTENANCE PROJECTS (PAGE 20)

• 5 Safety (Signals/Signs/Guardrail/lighting) • 2 Vegetative Maintenance • 4 Pavement Maintenance

10 TOTAL PROJECTS

• 2 Slide Repairs • 2 Pavement Projects • 6 Bridge/Culvert Projects • 4 Safety Projects

14 TOTAL PROJECTS

COLUMBIANA COUNTY PROJECTS (PAGES 10-11)

HARRISON COUNTY PROJECTS (PAGES 12-13) • 2 Slide Repairs • 6 Pavement Projects • 3 Safety Projects 11 TOTAL PROJECTS

$8.4 MILLION

$21 MILLION

$22.8 MILLION

$8.5 MILLION

$27.2 MILLION

$3 MILLION

$21.7 MILLION

$4.9 MILLION

Page 4: ODOT DISTRICT 11 - Ohio109365 COL ODNR Highlandtown Culvert Culvert Preservation 7/26/2021 9/1/2021 10/31/2021 $156,900 106993 COL SR 7 17.740 Geologic Maintenance / Slide Repair 8/26/2021

BELMONT COUNTY | 2021 CONSTRUCTION PROGRAM

BELMONT COUNTY 4

Page 5: ODOT DISTRICT 11 - Ohio109365 COL ODNR Highlandtown Culvert Culvert Preservation 7/26/2021 9/1/2021 10/31/2021 $156,900 106993 COL SR 7 17.740 Geologic Maintenance / Slide Repair 8/26/2021

BELMONT COUNTY | 2021 CONSTRUCTION PROGRAM

BELMONT COUNTY 5

BELMONT COUNTY PROJECTS (CONTINUED ON PAGE 7)

REF. PID NUMBER ROUTE & SECTION WORK TYPE

SALE DATE

ESTIMATED START DATE

ESTIMATED END DATE

ESTIMATED INVESTMENT

109909 BEL SR 7 11.050 Geologic Maintenance / Slide Repair 3/1/2019 3/4/2019 10/31/2021 $400,000

108187 BEL SR 148 17.730 Geologic Maintenance / Slide Repair 1/23/2020 3/10/2020 5/31/2021 $628,686

106495 BEL BARKCAMP ODNR BRIDGES Bridge Preservation 4/23/2020 10/31/2020 2/28/2021 $253,484

111942 BEL SR 7 8.140 Traffic Control (Safety) 5/21/2020 7/1/2020 5/31/2021 $132,944

110791 BEL SR 147 27.440 Geologic Maintenance / Slide Repair 7/10/2020 9/10/2020 5/31/2021 $293,000

104061 BEL SR 149 12.71 Geologic Maintenance / Slide Repair 8/6/2020 10/1/2020 7/31/2021 $687,760

109905 BEL SR 149 32.690 Roadway Minor Rehab 8/20/2020 5/1/2021 9/30/2021 $985,986

99613 BEL IR 470 2.390 Bridge Preservation 9/3/2020 7/1/2021 10/31/2021 $940,357

113457 BEL CR 48 5.110 Geologic Maintenance / Slide Repair 9/9/2020 9/10/2020 5/31/2021 $744,673

110397 BEL SR 148 9.360 Geologic Maintenance / Slide Repair 9/24/2020 1/1/2021 5/31/2021 $96,708

108725 BEL CR 214 6.870 Geologic Maintenance / Slide Repair 10/8/2020 11/15/2020 5/31/2021 $169,415

100670 BEL-7-8.14 and Various Traffic Control Maintenance 11/13/2020 6/1/2021 10/31/2021 $908,679

107327 BEL SR 9 0.01 Geologic Maintenance / Slide Repair 12/10/2020 3/1/2021 8/31/2021 $964,116

112288 BEL CR 10 21.24 Geological Maintenance/ Slide Repair 12/16/2020 3/15/2021 6/30/2021 $964,702

107487 BEL-147/VAR-13.23/VAR Roadway Minor Rehab 1/25/2021 5/1/2021 10/31/2021 $2,652,289

108719 BEL CR 46 2.48/2.79 Geologic Maintenance / Slide Repair 2/1/2021 4/1/2021 10/31/2021 $643,524

87341 BEL IR 70 5.040 Roadway Minor Rehab 2/8/2021 5/1/2021 10/15/2021 $3,149,986

108723 BEL CR 214 6.580 Geologic Maintenance / Slide Repair 2/22/2021 4/1/2021 7/31/2021 $164,931

110476 BEL SR 147 4.900 Traffic Control (Safety) 2/22/2021 4/1/2021 10/31/2021 $408,026

Page 6: ODOT DISTRICT 11 - Ohio109365 COL ODNR Highlandtown Culvert Culvert Preservation 7/26/2021 9/1/2021 10/31/2021 $156,900 106993 COL SR 7 17.740 Geologic Maintenance / Slide Repair 8/26/2021

BELMONT COUNTY | 2021 CONSTRUCTION PROGRAM

BELMONT COUNTY 6

Page 7: ODOT DISTRICT 11 - Ohio109365 COL ODNR Highlandtown Culvert Culvert Preservation 7/26/2021 9/1/2021 10/31/2021 $156,900 106993 COL SR 7 17.740 Geologic Maintenance / Slide Repair 8/26/2021

BELMONT COUNTY | 2021 CONSTRUCTION PROGRAM

BELMONT COUNTY 7

BELMONT COUNTY PROJECTS

REF. PID NUMBER ROUTE & SECTION WORK TYPE

SALE DATE

ESTIMATED START DATE

ESTIMATED END DATE

ESTIMATED INVESTMENT

109912 BEL SR 800 0.700 Geologic Maintenance / Slide Repair 3/1/2021 5/1/2021 7/31/2021 $245,469

108722 BEL CR 4 4.34/5.15 Geologic Maintenance / Slide Repair 3/8/2021 4/8/2021 8/31/2021 $964,702

110324 BEL SR 7 11.480 Bridge Preservation 3/8/2021 4/15/2021 10/31/2021 $7,381,000

107455 BEL SR 147 4.45 Intersection Improvement (Safety) 3/8/2021 5/1/2021 8/1/2021 $207,001

106990 BEL US 250 7.650 Geologic Maintenance / Slide Repair 3/22/2021 5/1/2021 8/31/2021 $303,000

110724 BEL CR 46 1.84 Geologic Maintenance / Slide Repair 5/1/2021 7/1/2021 9/30/2021 $259,931

107380 BEL US 40 11.62/11.81 Culvert Preservation 5/24/2021 7/1/2021 11/30/2021 $369,446

108720 BEL CR 24 0.710 Geologic Maintenance / Slide Repair 6/1/2021 7/1/2021 9/30/2021 $168,900

108714 BEL CR 16 2.18/2.46 Geologic Maintenance / Slide Repair 7/1/2021 8/1/2021 10/31/2021 $465,410

113926 BEL SR 148 11.35 Bridge Preservation 7/12/2021 9/1/2021 6/30/2022 $780,000

108716 BEL CR 4 23.62/25.79 Geologic Maintenance / Slide Repair 8/1/2021 9/1/2021 11/30/2021 $548,130

108718 BEL CR 56 33.21/34.26 Geologic Maintenance / Slide Repair 10/1/2021 11/1/2021 5/31/2022 $359,260

Page 8: ODOT DISTRICT 11 - Ohio109365 COL ODNR Highlandtown Culvert Culvert Preservation 7/26/2021 9/1/2021 10/31/2021 $156,900 106993 COL SR 7 17.740 Geologic Maintenance / Slide Repair 8/26/2021

CARROLL COUNTY | 2021 CONSTRUCTION PROGRAM

CARROLL COUNTY 8

Page 9: ODOT DISTRICT 11 - Ohio109365 COL ODNR Highlandtown Culvert Culvert Preservation 7/26/2021 9/1/2021 10/31/2021 $156,900 106993 COL SR 7 17.740 Geologic Maintenance / Slide Repair 8/26/2021

CARROLL COUNTY | 2021 CONSTRUCTION PROGRAM

CARROLL COUNTY 9

CARROLL COUNTY PROJECTS REF. PID NUMBER ROUTE & SECTION WORK TYPE

SALE DATE

ESTIMATED START DATE

ESTIMATED END DATE

ESTIMATED INVESTMENT

103878 CAR 212 5.84 Culvert Preservation 3/26/2020 8/17/2020 5/31/2021 $216,764

102474 CAR SR 164 0.000 Roadway Minor Rehab 11/25/2020 5/1/2021 9/30/2021 $349,164

106926 CAR SR 542 12.62 Bridge Preservation 11/25/2020 7/1/2021 10/31/2021 $588,485

110393 CAR SR 43 24.050 Roadway Minor Rehab 1/25/2021 5/1/2021 9/30/2021 $708,631

106764 CAR SR 43 23.09 Bridge Preservation 5/10/2021 5/11/2021 10/31/2021 $975,000

114421 CAR CR 19 Autumn Road Roadway Minor Rehab 8/2/2021 8/16/2021 10/31/2021 $339,589

Page 10: ODOT DISTRICT 11 - Ohio109365 COL ODNR Highlandtown Culvert Culvert Preservation 7/26/2021 9/1/2021 10/31/2021 $156,900 106993 COL SR 7 17.740 Geologic Maintenance / Slide Repair 8/26/2021

COLUMBIANA COUNTY | 2021 CONSTRUCTION PROGRAM

COLUMBIANA COUNTY 10

Page 11: ODOT DISTRICT 11 - Ohio109365 COL ODNR Highlandtown Culvert Culvert Preservation 7/26/2021 9/1/2021 10/31/2021 $156,900 106993 COL SR 7 17.740 Geologic Maintenance / Slide Repair 8/26/2021

COLUMBIANA COUNTY | 2021 CONSTRUCTION PROGRAM

COLUMBIANA COUNTY 11

COLUMBIANA COUNTY PROJECTS

REF. PID NUMBER ROUTE & SECTION WORK TYPE

SALE DATE

ESTIMATED START DATE

ESTIMATED END DATE

ESTIMATED INVESTMENT

106328 COL SR 170 14.79 Roadway Improvement (Safety) 5/23/2019 7/8/2019 5/31/2020 $189,349

81722 JEF/COL SR 7 31.13/0.00 Roadway Minor Rehab 2/13/2020 5/1/2020 6/7/2021 $6,733,993

99646 COL SR 7 26.340 Bridge Preservation 2/27/2020 4/1/2020 6/30/2021 $2,417,000

106671 COL East 4th Street Phase 2 Pedestrian Facilities 7/13/2020 8/12/2020 5/28/2021 $1,664,675

110251 COL CR 427A 0.09 Geologic Maintenance / Slide Repair 10/22/2020 2/1/2021 5/31/2021 $412,499

105289 COL SR 164 4.530 Roadway Minor Rehab 2/22/2021 5/1/2021 9/30/2021 $899,215

105042 COL Elizabeth Street Bridge Bridge Preservation 3/8/2021 4/5/2021 5/31/2022 $2,296,980

97492 COL-30-34.13, COL-7-5.94 Bridge Preservation 4/26/2021 5/31/2021 10/31/2021 $2,000,000

111097 COL SR 45 1.510 Culvert Preservation 4/26/2021 6/7/2021 8/31/2021 $246,240

104684 COL Washington Street Bridge Bridge Preservation 5/6/2021 5/10/2021 11/1/2021 $359,590

22329 COL CR 430 0.30 Roadway Improvement (Safety) 6/18/2021 7/19/2021 10/1/2022 $3,822,000

109365 COL ODNR Highlandtown Culvert Culvert Preservation 7/26/2021 9/1/2021 10/31/2021 $156,900

106993 COL SR 7 17.740 Geologic Maintenance / Slide Repair 8/26/2021 10/1/2021 7/31/2022 $195,223

109006 COL Salem Sidewalks Phase 1 Pedestrian Facilities 10/14/2021 6/13/2022 11/18/2022 $306,220

Page 12: ODOT DISTRICT 11 - Ohio109365 COL ODNR Highlandtown Culvert Culvert Preservation 7/26/2021 9/1/2021 10/31/2021 $156,900 106993 COL SR 7 17.740 Geologic Maintenance / Slide Repair 8/26/2021

HARRISON COUNTY | 2021 CONSTRUCTION PROGRAM

HARRISON COUNTY 12

Page 13: ODOT DISTRICT 11 - Ohio109365 COL ODNR Highlandtown Culvert Culvert Preservation 7/26/2021 9/1/2021 10/31/2021 $156,900 106993 COL SR 7 17.740 Geologic Maintenance / Slide Repair 8/26/2021

HARRISON COUNTY | 2021 CONSTRUCTION PROGRAM

HARRISON COUNTY 13

HARRISON COUNTY PROJECTS

REF. PID NUMBER ROUTE & SECTION WORK TYPE

SALE DATE

ESTIMATED START DATE

ESTIMATED END DATE

ESTIMATED INVESTMENT

110455 HAS US 22 15.250 Roadway Minor Rehab 6/28/2021 8/1/2021 10/31/2021 $670,000

109905 HAS/BEL SR 149 32.690 Roadway Minor Rehab 8/20/2020 5/1/2021 9/30/2021 $985,986

114415 HAS CR 17/CR 43 Roadway Minor Rehab 8/2/2021 8/16/2021 11/15/2021 $636,249

109913 HAS SR 646 1.21 Geologic Maintenance / Slide Repair 11/13/2020 2/1/2021 6/30/2021 $148,354

110744 HAS SR 342 1.790 Geologic Maintenance / Slide Repair 12/10/2020 3/1/2021 5/31/2021 $82,878

105298 HAS US 250 19.170 Roadway Minor Rehab 2/8/2021 5/1/2021 9/30/2021 $978,757

109304 HAS VAR GR Phase 1 Roadside / Median Improvement (Safety) 3/17/2021 4/19/2021 11/19/2021 $408,718

112690 HAS CR 5 4.78 Roadway Minor Rehab 4/26/2021 6/1/2021 9/30/2021 $160,616

106674 HAS Conotton Creek Trail Bike Facility 5/7/2021 6/7/2021 9/30/2021 $909,091

112295 HAS SR 646 6.37 Intersection Improvement (Safety) 5/24/2021 6/28/2021 10/1/2021 $455,164

110499 HAS SR 9 22.440 Roadway Minor Rehab 6/28/2021 8/1/2021 10/15/2021 $524,000

Page 14: ODOT DISTRICT 11 - Ohio109365 COL ODNR Highlandtown Culvert Culvert Preservation 7/26/2021 9/1/2021 10/31/2021 $156,900 106993 COL SR 7 17.740 Geologic Maintenance / Slide Repair 8/26/2021

HOLMES COUNTY | 2021 CONSTRUCTION PROGRAM

HOLMES COUNTY 14

Page 15: ODOT DISTRICT 11 - Ohio109365 COL ODNR Highlandtown Culvert Culvert Preservation 7/26/2021 9/1/2021 10/31/2021 $156,900 106993 COL SR 7 17.740 Geologic Maintenance / Slide Repair 8/26/2021

HOLMES COUNTY | 2021 CONSTRUCTION PROGRAM

HOLMES COUNTY 15

HOLMES COUNTY PROJECTS REF. PID NUMBER ROUTE & SECTION WORK TYPE

SALE DATE

ESTIMATED START DATE

ESTIMATED END DATE

ESTIMATED INVESTMENT

108406 HOL SR 241 2.650 Geologic Maintenance / Slide Repair 8/20/2020 3/22/2021 7/31/2021 $243,089

99648 HOL SR 83 9.980 Culvert Preservation 10/8/2020 3/15/2021 9/30/2021 $234,867

106994 HOL SR 557 6.900 Geologic Maintenance / Slide Repair 10/8/2020 3/1/2021 9/30/2021 $248,093

105123 HOL SR 39 2.37/2.58 Culvert Preservation 12/23/2020 3/1/2021 8/31/2021 $419,871

105124 HOL US 62 5.06/VAR Culvert Preservation 2/8/2021 3/1/2021 8/31/2021 $453,403

107511 HOL SR 514 0.000 Roadway Minor Rehab 2/8/2021 5/1/2021 9/30/2021 $2,625,072

110481 HOL US 62 19.650 Intersection Improvement (Safety) 5/10/2021 6/1/2021 9/30/2021 $93,562

100093 HOL CR 23 2.28 Bridge Preservation 6/14/2021 7/19/2021 7/18/2022 $4,133,600

Page 16: ODOT DISTRICT 11 - Ohio109365 COL ODNR Highlandtown Culvert Culvert Preservation 7/26/2021 9/1/2021 10/31/2021 $156,900 106993 COL SR 7 17.740 Geologic Maintenance / Slide Repair 8/26/2021

JEFFERSON COUNTY | 2021 CONSTRUCTION PROGRAM

JEFFERSON COUNTY 16

Page 17: ODOT DISTRICT 11 - Ohio109365 COL ODNR Highlandtown Culvert Culvert Preservation 7/26/2021 9/1/2021 10/31/2021 $156,900 106993 COL SR 7 17.740 Geologic Maintenance / Slide Repair 8/26/2021

JEFFERSON COUNTY | 2021 CONSTRUCTION PROGRAM

JEFFERSON COUNTY 17

JEFFERSON COUNTY PROJECTS REF. PID NUMBER ROUTE & SECTION WORK TYPE

SALE DATE

ESTIMATED START DATE

ESTIMATED END DATE

ESTIMATED INVESTMENT

79353 JEF Wellsburg Bridge Bridge Expansion (New Ohio River Bridge) 7/26/2016 3/1/2017 6/1/2021 $34,363,591

96440 JEF SR 164 5.630 Bridge Preservation 1/23/2020 4/1/2020 9/30/2021 $2,959,000

81722 JEF/COL SR 7 31.13/0.00 Roadway Minor Rehab 2/13/2020 5/1/2020 6/7/2021 $6,733,993

113188 JEF SR 7 14.450 Geologic Maintenance / Slide Repair 3/25/2020 3/25/2020 10/31/2021 $500,000

96599 JEF SR 213 18.43 Bridge Preservation 6/25/2020 8/1/2020 5/31/2021 $634,000

106996 JEF SR 164 9.400 Geologic Maintenance / Slide Repair 8/6/2020 6/15/2021 7/31/2021 $209,000

108158 JEF CR 6 5.390 Geologic Maintenance / Slide Repair 9/1/2020 12/1/2020 5/31/2021 $204,348

113621 JEF CR 26 6.950 Geologic Maintenance / Slide Repair 9/3/2020 9/4/2020 5/31/2021 $1,457,050

112625 JEF CR 22A 2.75 Geologic Maintenance / Slide Repair 10/8/2020 11/2/2020 5/31/2021 $189,029

107563 JEF SR 7 6.400 Roadway Minor Rehab 10/8/2020 5/1/2021 8/31/2021 $1,909,251

108798 JEF CR 2 2.54 Traffic Control (Safety) 10/22/2020 5/1/2021 8/31/2021 $504,245

105885 JEF Steubenville Shared Use Path Shared Use Path 10/28/2020 4/12/2021 9/17/2021 $618,263

105302 JEF US 22 0.000 Roadway Minor Rehab 11/13/2020 5/1/2021 9/30/2021 $2,669,551

87350 JEF US 22 10.130 Roadway Minor Rehab 11/13/2020 5/1/2021 10/31/2021 $2,982,230

102055 JEF 150A/7 Park & Ride Miscellaneous 1/25/2021 6/1/2021 9/30/2021 $397,000

113791 JEF US 22 5.900 Bridge / Culvert Maintenance 2/22/2021 5/1/2021 7/31/2021 $200,000

103330 JEF US 22 15.11 Bridge / Culvert Maintenance 3/8/2021 4/1/2021 10/31/2021 $530,211

108257 JEF CR 53 7.450 Geologic Maintenance / Slide Repair 4/12/2021 6/1/2021 10/31/2021 $783,985

112774 JEF TR 167 3.13 Roadway Minor Rehab 5/10/2021 6/14/2021 10/31/2021 $320,000

107648 JEF SR 7 20.59/20.84 Bridge Preservation 5/10/2021 6/28/2021 6/30/2022 $4,023,000

111601 JEF 7 12.93 Bridge Preservation 8/26/2021 9/7/2021 3/30/2022 $93,000

Page 18: ODOT DISTRICT 11 - Ohio109365 COL ODNR Highlandtown Culvert Culvert Preservation 7/26/2021 9/1/2021 10/31/2021 $156,900 106993 COL SR 7 17.740 Geologic Maintenance / Slide Repair 8/26/2021

TUSCARAWAS COUNTY | 2021 CONSTRUCTION PROGRAM

TUSCARAWAS COUNTY 18

Page 19: ODOT DISTRICT 11 - Ohio109365 COL ODNR Highlandtown Culvert Culvert Preservation 7/26/2021 9/1/2021 10/31/2021 $156,900 106993 COL SR 7 17.740 Geologic Maintenance / Slide Repair 8/26/2021

TUSCARAWAS COUNTY | 2021 CONSTRUCTION PROGRAM

TUSCARAWAS COUNTY 19

TUSCARAWAS COUNTY PROJECTS REF. PID NUMBER ROUTE & SECTION WORK TYPE SALE

DATE ESTIMATED START DATE

ESTIMATED END DATE

ESTIMATED INVESTMENT

101817 TUS IR 77 33.430 Bridge Preservation 9/12/2019 4/1/2020 7/31/2021 $3,098,829

106688 TUS 416 4.57 Bikeways 1/23/2020 5/4/2020 5/31/2021 $1,351,555

107417 TUS Dennison Depot Phase 9 Diesel Emissions 2/26/2020 5/1/2020 5/31/2021 $498,890

99603 TUS SR 416 14.81 Bridge Preservation 9/3/2020 3/1/2021 9/30/2021 $1,324,403

107536 TUS-36-17.49, TUS-250-21.35 Roadway Minor Rehab 9/24/2020 4/1/2021 9/30/2021 $2,488,884

102478 TUS US 250 0.000 Roadway Minor Rehab 10/22/2020 5/1/2021 10/15/2021 $2,108,917

106997 TUS-800-26.67 Geologic Maintenance / Slide Repair 10/22/2020 3/22/2021 6/15/2021 $402,786

100603 TUS-212-9.09, TUS-800-22.74 Roadway Minor Rehab 11/13/2020 5/1/2021 10/15/2022 $6,803,439

107514 TUS SR 516 0.000 Roadway Minor Rehab 12/10/2020 5/1/2021 9/30/2021 $725,000

110875 TUS SR 800 27.110 Geologic Maintenance / Slide Repair 2/22/2021 4/1/2021 10/31/2021 $267,000

106667 TUS Lakeview Road Sidewalks Pedestrian Facilities 3/3/2021 4/15/2021 7/31/2021 $456,635

106686 TUS Dover Canal Park Path Bike Facility 3/31/2021 4/15/2021 9/15/2021 $640,000

96608 TUS US 250 20.330 Bridge Preservation 4/12/2021 5/1/2021 10/31/2021 $1,437,538

111231 TUS IR 77 11.52/12.84 Culvert Preservation 6/7/2021 8/1/2021 10/31/2021 $1,004,917

109243 TUS VAR PM Phase 4 Traffic Control (Safety) 8/2/2021 8/2/2021 10/15/2021 $150,000

Page 20: ODOT DISTRICT 11 - Ohio109365 COL ODNR Highlandtown Culvert Culvert Preservation 7/26/2021 9/1/2021 10/31/2021 $156,900 106993 COL SR 7 17.740 Geologic Maintenance / Slide Repair 8/26/2021

DISTRICT WIDE | 2021 CONSTRUCTION PROGRAM

DISTRICT MAINTENANCE PROJECTS 20

DISTRICT MAINTENANCE PROJECTS (NOT MAPPED) REF. PID NUMBER PROJECT NAME WORK TYPE

SALE DATE

ESTIMATED START DATE

ESTIMATED END DATE

ESTIMATED INVESTMENT

100332 D11-PM-FY2021(B) Traffic Control (Safety) 6/25/2020 8/1/2020 6/30/2022 $1,841,926

100335 D11-LG-FY2021 Traffic Control Maintenance 8/20/2020 11/1/2020 10/31/2021 $374,292

100331 D11-PM-FY2021(A) Traffic Control (Safety) 10/22/2020 4/1/2021 11/15/2021 $460,000

100653 D11 CS FY2021 Pavement Maintenance 12/10/2020 5/1/2021 10/31/2021 $248,375

113231 D11-PM-RWR2021 Traffic Control (Safety) 2/8/2021 4/1/2021 10/31/2021 $1,446,637

100334 D11-RPM-FY2021 Traffic Control (Safety) 2/22/2021 4/1/2021 5/15/2022 $276,241

102439 D11-GR-FY2021 Guardrail / Roadside

Maintenance 4/12/2021 5/3/2021 3/31/2022 $1,651,860

100654 D11 SP FY2021 Pavement Maintenance 4/26/2021 5/1/2021 9/30/2021 $1,537,558

101354 D11-DS-FY2021 Bridge / Culvert Maintenance 4/26/2021 6/15/2021 8/31/2021 $245,000

102363 D11-LIGHTING-FY2022 Highway Lighting Maintenance 7/1/2021 11/01/2021 10/31/2022 $439,231.00

Page 21: ODOT DISTRICT 11 - Ohio109365 COL ODNR Highlandtown Culvert Culvert Preservation 7/26/2021 9/1/2021 10/31/2021 $156,900 106993 COL SR 7 17.740 Geologic Maintenance / Slide Repair 8/26/2021

We will serve, innovate, and communicate with purpose. ..

We will be productive, lean, efficient and effective. ..

We will utilize the public resources entrusted to us by.. satisfying the State's transportation needs. ..

We will be the standard of excellence for winter maintenance. ..

We will create a working environment based on trust and mutual respect. ..

We will value the diversity of all ODOT people. ..

We will work together — one team: .. the Ohio Department of Transportation. ..

For more information, contact the ODOT District 11 Public Information Office at (330) 308-7817.

Like us on Facebook: www.facebook.com/ODOTEasternOhio

Follow us on Twitter: www.twitter.com/ODOT_EasternOH

Statewide Traffic Information: www.Ohgo.com

For general information, call (330) 339-6633 or visit District 11’s Web site at: www.transportation.ohio.gov/dist11

To provide safe and easy movement of people and goods from.. place to place, we will:..

• Improve safety; ..

• Take care of what we have; ..

• Make our system better; ..

• Enhance capacity. ..

O U R G U I D I N G P R I N C I P L E S

O U R V I S I O N A long-term, reliable, professional and highly productive organization. ..

O U R M I S S I O N