odot all roads transportation safety...

34
LOCAL AGENCY KICK-OFF MEETING REGION 5 ODOT ALL ROADS TRANSPORTATION SAFETY (ARTS)

Upload: others

Post on 13-Sep-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ODOT ALL ROADS TRANSPORTATION SAFETY (ARTS)odot2020arts.com/wp-content/uploads/sites/15/2020/08/... · 2020. 8. 5. · ODOT ARTS PROJECT SELECTION. 9. Systemic approach uses . low-cost

LOCAL AGENCY KICK-OFF MEETINGREGION 5

ODOT ALL ROADS TRANSPORTATION SAFETY (ARTS)

Page 2: ODOT ALL ROADS TRANSPORTATION SAFETY (ARTS)odot2020arts.com/wp-content/uploads/sites/15/2020/08/... · 2020. 8. 5. · ODOT ARTS PROJECT SELECTION. 9. Systemic approach uses . low-cost

TODAY’S AGENDA

1 / OVERVIEW OF THE ARTS PROGRAM

2 / PROJECT SCHEDULE AND APPLICATION DEADLINES

3 / HOW CAN DKS HELP YOU?

4 / RESOURCES

5 / EXAMPLES

• Diagnosis & Countermeasure Selection

• Benefit-Cost Calculations• Previous Project Applications

Page 3: ODOT ALL ROADS TRANSPORTATION SAFETY (ARTS)odot2020arts.com/wp-content/uploads/sites/15/2020/08/... · 2020. 8. 5. · ODOT ARTS PROJECT SELECTION. 9. Systemic approach uses . low-cost

ODOT ARTS PROJECT SELECTION 3

ARTS 2024-2027

PROGRAM BACKGROUND

‘21-’24 VS. ‘24-’27 PROGRAM DIFFERENCES

TIMELINES AND FUNDING

Page 4: ODOT ALL ROADS TRANSPORTATION SAFETY (ARTS)odot2020arts.com/wp-content/uploads/sites/15/2020/08/... · 2020. 8. 5. · ODOT ARTS PROJECT SELECTION. 9. Systemic approach uses . low-cost

50% of Oregon’s Fatal and Serious Injury crashes occur on

local agency roadways

Page 5: ODOT ALL ROADS TRANSPORTATION SAFETY (ARTS)odot2020arts.com/wp-content/uploads/sites/15/2020/08/... · 2020. 8. 5. · ODOT ARTS PROJECT SELECTION. 9. Systemic approach uses . low-cost

• Goal is to reduce fatalities and serious injuries

• Emphasizes spending on all public roads

• Requires Performance-Based Measures (States set Targets)> Fatal and serious injury crashes per VMT

> Number of fatalities and serious injuries

• Maintains emphasis on data-driven approach

HSIP PROGRAM PRINCIPLES

ODOT ARTS PROJECT SELECTION 5

Page 6: ODOT ALL ROADS TRANSPORTATION SAFETY (ARTS)odot2020arts.com/wp-content/uploads/sites/15/2020/08/... · 2020. 8. 5. · ODOT ARTS PROJECT SELECTION. 9. Systemic approach uses . low-cost

BASED ON 2014-2018 DATA

STATEWIDE

ODOT ARTS PROJECT SELECTION 6

49%

29%

22%

STATE HIGHWAYS

• 931 fatal and serious injury crashes per year;

• 8,000 miles

CITY STREETS

• 554 fatal and serious injury crashes per year;

• 10,000 miles

COUNTY ROADS

• 412 fatal and serious injury crashes per year;

• 26,000 miles

Page 7: ODOT ALL ROADS TRANSPORTATION SAFETY (ARTS)odot2020arts.com/wp-content/uploads/sites/15/2020/08/... · 2020. 8. 5. · ODOT ARTS PROJECT SELECTION. 9. Systemic approach uses . low-cost

• Reduce fatalities and serious injuries

• Address safety on all public roads

• Data-driven and blind to jurisdiction

• Overseen by ODOT Regions

• Allocated to each ODOT Region based on fatalities and serious injuries

• Engage local agencies in the project selection process

ARTS PROGRAM PRINCIPLES

ODOT ARTS PROJECT SELECTION 7

Page 8: ODOT ALL ROADS TRANSPORTATION SAFETY (ARTS)odot2020arts.com/wp-content/uploads/sites/15/2020/08/... · 2020. 8. 5. · ODOT ARTS PROJECT SELECTION. 9. Systemic approach uses . low-cost

HOT SPOT

ODOT ARTS PROJECT SELECTION 8

Targets locations with histories of fatal and serious injury crashes

Page 9: ODOT ALL ROADS TRANSPORTATION SAFETY (ARTS)odot2020arts.com/wp-content/uploads/sites/15/2020/08/... · 2020. 8. 5. · ODOT ARTS PROJECT SELECTION. 9. Systemic approach uses . low-cost

SYSTEMIC

ODOT ARTS PROJECT SELECTION 9

Systemic approach uses low-cost countermeasures that can be widely implemented to reduce fatalities

and serious injuries

Page 10: ODOT ALL ROADS TRANSPORTATION SAFETY (ARTS)odot2020arts.com/wp-content/uploads/sites/15/2020/08/... · 2020. 8. 5. · ODOT ARTS PROJECT SELECTION. 9. Systemic approach uses . low-cost

• Each application (except systemic bicycle or pedestrian) must treat at least one fatal or severe injury crash

• 2014-2018 data

• Project ranking and selection based on cost effectiveness (benefit-cost ratio)

• All applications require a 7.78% local match

ARTS APPLICATION CRITERIA

ODOT ARTS PROJECT SELECTION 10

Page 11: ODOT ALL ROADS TRANSPORTATION SAFETY (ARTS)odot2020arts.com/wp-content/uploads/sites/15/2020/08/... · 2020. 8. 5. · ODOT ARTS PROJECT SELECTION. 9. Systemic approach uses . low-cost

NUMBERS IN () REPRESENT APPROXIMATE SPLIT (STATEWIDE)

FUNDING GOALS

ODOT ARTS PROJECT SELECTION 11

ARTS

Hot Spot(50%)

Systemic(50%)

Roadway Departure

(50%)

Intersection(35%)

Bike/Ped(15%)

Page 12: ODOT ALL ROADS TRANSPORTATION SAFETY (ARTS)odot2020arts.com/wp-content/uploads/sites/15/2020/08/... · 2020. 8. 5. · ODOT ARTS PROJECT SELECTION. 9. Systemic approach uses . low-cost

ODOT ARTS PROJECT SELECTION 12

ANTICIPATED ARTS FEDERAL FUNDING

REGION 5: 6% OF TOTAL FUNDING

APPROX.

$7.1M OVER 3 YEARS

2024-2027 STIP – REGION 5

• 51% to local jurisdictions• 49% to state highways

Page 13: ODOT ALL ROADS TRANSPORTATION SAFETY (ARTS)odot2020arts.com/wp-content/uploads/sites/15/2020/08/... · 2020. 8. 5. · ODOT ARTS PROJECT SELECTION. 9. Systemic approach uses . low-cost

• Recommended minimum project size to optimize federal delivery – $500,000.

• Within each Region, funding will be split (51%/49%) for local and state projects.

• New application form that combines all information into one file.

• Updated and additional countermeasure crash reduction factors.

• New resources for crash data investigation and countermeasure selection.

WHAT’S DIFFERENT?

ODOT ARTS PROJECT SELECTION 13

‘21-’24 ARTS VS. ‘24-’27 ARTS

Page 14: ODOT ALL ROADS TRANSPORTATION SAFETY (ARTS)odot2020arts.com/wp-content/uploads/sites/15/2020/08/... · 2020. 8. 5. · ODOT ARTS PROJECT SELECTION. 9. Systemic approach uses . low-cost

• More thorough application QA/QC procedures to make sure the right projects move forward.

• One-on-one workshops available for local agencies and tribes to get additional training and support.

• Consultants are still available to assist with data analysis, diagnosis, countermeasure selection, and preparing applications.

WHAT’S DIFFERENT?

ODOT ARTS PROJECT SELECTION 14

‘21-’24 ARTS VS. ‘24-’27 ARTS

Page 15: ODOT ALL ROADS TRANSPORTATION SAFETY (ARTS)odot2020arts.com/wp-content/uploads/sites/15/2020/08/... · 2020. 8. 5. · ODOT ARTS PROJECT SELECTION. 9. Systemic approach uses . low-cost

• ODOT has three delivery options for federally funded, Local Public Agency (LPA) projects:

> (1) Fund exchange through State Funded Local Projects program (SFLP) per program guidelines (this option will likely be very limited this cycle due to limited budget);

> (2) Utilize the Certification Program by becoming certified to deliver federal-aid projects or working with a Certified LPA to deliver the project on their behalf; or

> (3) When options 1 and 2 are unavailable, ODOT will directly deliver the project for the LPA using consultants hired and managed by ODOT

• All project applications should assume Federalized delivery

PROJECT DELIVERY OPTIONS

Page 16: ODOT ALL ROADS TRANSPORTATION SAFETY (ARTS)odot2020arts.com/wp-content/uploads/sites/15/2020/08/... · 2020. 8. 5. · ODOT ARTS PROJECT SELECTION. 9. Systemic approach uses . low-cost

ODOT ARTS PROJECT SELECTION 16

ANTICIPATED ARTS TIMELINE

SUMMER 2020

OUTREACH TO LOCAL AGENCIES

WINTER-SPRING 2020

PROJECT SELECTION

2024-2027 STIP

SEPTEMBER 14 –NOVEMBER 20

APPLICATION SUBMISSION

Page 17: ODOT ALL ROADS TRANSPORTATION SAFETY (ARTS)odot2020arts.com/wp-content/uploads/sites/15/2020/08/... · 2020. 8. 5. · ODOT ARTS PROJECT SELECTION. 9. Systemic approach uses . low-cost

• Submission Window: September 14 – November 20, 2020> www.ODOT2020ARTS.com

• Application Materials> Application Form*

> Benefit-Cost or Cost Effectiveness Index Worksheet*

> Aerial Vicinity/Location Map*

> Crash Data Report(s)*

> Traffic Analysis*

> Conceptual Layout or Drawing

> Field Scope Verification

> Collision Diagrams

PROJECT APPLICATIONS

*REQUIRED

ODOT ARTS PROJECT SELECTION 17

Page 18: ODOT ALL ROADS TRANSPORTATION SAFETY (ARTS)odot2020arts.com/wp-content/uploads/sites/15/2020/08/... · 2020. 8. 5. · ODOT ARTS PROJECT SELECTION. 9. Systemic approach uses . low-cost

• Preliminary & Supplemental Data Analysis> Identify crash patterns, hot-spot locations, or systemic trends

• Project Application Assistance> Diagnosis and Countermeasure Selection

> Benefit-Cost Analysis

> Project Cost Estimation

HOW CAN DKS HELP YOU?

ODOT ARTS PROJECT SELECTION 18

Page 19: ODOT ALL ROADS TRANSPORTATION SAFETY (ARTS)odot2020arts.com/wp-content/uploads/sites/15/2020/08/... · 2020. 8. 5. · ODOT ARTS PROJECT SELECTION. 9. Systemic approach uses . low-cost

• ODOT Crash Database> Download raw crash data

• TransGIS> Visualize crash data

> SPIS sites

• Countermeasure CRF List

• NEW Tableau Crash Data Dashboard

• NEW Countermeasure Search Tool

SAFETY ANALYSIS RESOURCES

ODOT ARTS PROJECT SELECTION 19

ODOT ARTS Website

http://www.oregon.gov/ODOT/Engineering/Pages/ARTS.aspx

Page 20: ODOT ALL ROADS TRANSPORTATION SAFETY (ARTS)odot2020arts.com/wp-content/uploads/sites/15/2020/08/... · 2020. 8. 5. · ODOT ARTS PROJECT SELECTION. 9. Systemic approach uses . low-cost

• Crash Database> https://zigzag.odot.state.or.us

SAFETY ANALYSIS RESOURCES

ODOT ARTS PROJECT SELECTION 20

Page 21: ODOT ALL ROADS TRANSPORTATION SAFETY (ARTS)odot2020arts.com/wp-content/uploads/sites/15/2020/08/... · 2020. 8. 5. · ODOT ARTS PROJECT SELECTION. 9. Systemic approach uses . low-cost

• TransGIS (layered mapping tool)> Crash Data

> SPIS

• https://gis.odot.state.or.us/transgis/

SAFETY ANALYSIS RESOURCES

ODOT ARTS PROJECT SELECTION 21

Page 22: ODOT ALL ROADS TRANSPORTATION SAFETY (ARTS)odot2020arts.com/wp-content/uploads/sites/15/2020/08/... · 2020. 8. 5. · ODOT ARTS PROJECT SELECTION. 9. Systemic approach uses . low-cost

• Countermeasure CRF List> On main ARTS website

SAFETY ANALYSIS RESOURCES

ODOT ARTS PROJECT SELECTION 23

Page 23: ODOT ALL ROADS TRANSPORTATION SAFETY (ARTS)odot2020arts.com/wp-content/uploads/sites/15/2020/08/... · 2020. 8. 5. · ODOT ARTS PROJECT SELECTION. 9. Systemic approach uses . low-cost

• Tableau Crash Data Dashboard> http://odot2020arts.com/crash-data-dashboard/

SAFETY ANALYSIS RESOURCES

ODOT ARTS PROJECT SELECTION 24

Share your feedback!

Page 24: ODOT ALL ROADS TRANSPORTATION SAFETY (ARTS)odot2020arts.com/wp-content/uploads/sites/15/2020/08/... · 2020. 8. 5. · ODOT ARTS PROJECT SELECTION. 9. Systemic approach uses . low-cost

• Countermeasure Search Tool> On main ARTS website

SAFETY ANALYSIS RESOURCES

ODOT ARTS PROJECT SELECTION 25

Share your feedback!

Page 25: ODOT ALL ROADS TRANSPORTATION SAFETY (ARTS)odot2020arts.com/wp-content/uploads/sites/15/2020/08/... · 2020. 8. 5. · ODOT ARTS PROJECT SELECTION. 9. Systemic approach uses . low-cost

• Selecting the right countermeasure> Identify Crash Patterns

• Type (i.e.: rear-end, pedestrian, fixed object, etc.)

• Location (i.e.: intersection, curve, segment, etc.)

• Time of Day/Weather (i.e.: dark, icy, etc.)

• Contributing Factors (i.e.: DUI, speed, failure to yield, etc.)

> Make sure the countermeasure treats the fatal or severe crashes, too!

• Maximum of four countermeasures per application

• Countermeasures must be on the CRF List!

EXAMPLES

ODOT ARTS PROJECT SELECTION 26

Page 26: ODOT ALL ROADS TRANSPORTATION SAFETY (ARTS)odot2020arts.com/wp-content/uploads/sites/15/2020/08/... · 2020. 8. 5. · ODOT ARTS PROJECT SELECTION. 9. Systemic approach uses . low-cost

• Benefit-Cost Calculations

EXAMPLES

ODOT ARTS PROJECT SELECTION 27

• Represents the expected reduction in crashes due to treatment

• Expressed as monetary equivalent of crashes based on societal costs

Benefit

Cost HIGHWAY TYPE URBAN RURAL

PDO

All Facilities $20,400 $20,400

MODERATE (INJURY B) AND MINOR (INJURY C) INJURY

Interstate $72,400 $83,800

Other State Highway $74,600 $85,800

Off System $76,300 $87,700

FATAL AND SEVERE (INJURY A) INJURY

Interstate $1,140,000 $2,010,000

Other State Highway $1,210,000 $1,850,000

Off System $940,000 $1,870,000

COMPREHENSIVE ECONOMIC VALUE PER CRASH2,3

Page 27: ODOT ALL ROADS TRANSPORTATION SAFETY (ARTS)odot2020arts.com/wp-content/uploads/sites/15/2020/08/... · 2020. 8. 5. · ODOT ARTS PROJECT SELECTION. 9. Systemic approach uses . low-cost

• Benefit-Cost Calculations

EXAMPLES

ODOT ARTS PROJECT SELECTION 28

Annual Benefit = (# crashes per year) x (associated economic values) x (CRF)

Important Notes:

• Some CRFs have specific target crash types or severity levels (i.e. pedestrian improvements will only reduce pedestrian crashes)

• If applying multiple countermeasures, must run B/C calcs for each target crash type

Benefit

Cost

Page 28: ODOT ALL ROADS TRANSPORTATION SAFETY (ARTS)odot2020arts.com/wp-content/uploads/sites/15/2020/08/... · 2020. 8. 5. · ODOT ARTS PROJECT SELECTION. 9. Systemic approach uses . low-cost

• Benefit-Cost Calculations

EXAMPLES

ODOT ARTS PROJECT SELECTION 29

Benefit

Cost

• Annualized cost of treatment, including:

• Construction Costs• Maintenance/Operating costs

• Net present worth of all costs over the service life of the treatment

Page 29: ODOT ALL ROADS TRANSPORTATION SAFETY (ARTS)odot2020arts.com/wp-content/uploads/sites/15/2020/08/... · 2020. 8. 5. · ODOT ARTS PROJECT SELECTION. 9. Systemic approach uses . low-cost

• Benefit-Cost Calculations

EXAMPLES

ODOT ARTS PROJECT SELECTION 30

ODOT BC Form does the hard work!

• Available on the ARTS Website

Important Notes:

• Bicycle/Pedestrian projects use Cost Effectiveness Index instead of Benefit-Cost Ratio

Benefit

Cost

Page 30: ODOT ALL ROADS TRANSPORTATION SAFETY (ARTS)odot2020arts.com/wp-content/uploads/sites/15/2020/08/... · 2020. 8. 5. · ODOT ARTS PROJECT SELECTION. 9. Systemic approach uses . low-cost

• Systemic Project Application> Curve Warning Signage on Willow Creek Road in Morrow County

> Safety Issues:

• A significant number of fatality or serious injury run-off-road crashes

> Project Scope:

• Ball bank curves and install appropriate curve warning signs

> Benefit-Cost Ratio: 10.69

EXAMPLES

ODOT ARTS PROJECT SELECTION 31

Page 31: ODOT ALL ROADS TRANSPORTATION SAFETY (ARTS)odot2020arts.com/wp-content/uploads/sites/15/2020/08/... · 2020. 8. 5. · ODOT ARTS PROJECT SELECTION. 9. Systemic approach uses . low-cost

• Hot Spot Project Application> Guard Rail Installation and Roadway Widening on Morgan Lake

Road in Union County

> Safety Issues:

• Documented run-off-road crashes (including one fatal); local knowledge of non-documented run-off-road crashes in winter

> Project Scope:

• Install new guard rail; widen rural paved lane width by 1-foot

> Benefit-Cost Ratio: 3.26

EXAMPLES

ODOT ARTS PROJECT SELECTION 32

Page 32: ODOT ALL ROADS TRANSPORTATION SAFETY (ARTS)odot2020arts.com/wp-content/uploads/sites/15/2020/08/... · 2020. 8. 5. · ODOT ARTS PROJECT SELECTION. 9. Systemic approach uses . low-cost

• Review your crash data online> http://odot2020arts.com/crash-data-dashboard/

• Contact DKS directly for any of the following:> Request a one-on-one meeting w/consultant for additional

training and support on the program and tools

> Request consultant support with project identification/selection, preparing applications, and benefit-cost analysis

> [email protected]

NEXT STEPS

ODOT ARTS PROJECT SELECTION 33

Page 33: ODOT ALL ROADS TRANSPORTATION SAFETY (ARTS)odot2020arts.com/wp-content/uploads/sites/15/2020/08/... · 2020. 8. 5. · ODOT ARTS PROJECT SELECTION. 9. Systemic approach uses . low-cost

• Project Team > Jeff Wise, ODOT Region 5

[email protected]

> Lacy Brown, DKS Associates

[email protected]

> Christina McDaniel-Wilson, ODOT HQ

[email protected]

QUESTIONS & COMMENTS

ODOT ARTS PROJECT SELECTION 34

Page 34: ODOT ALL ROADS TRANSPORTATION SAFETY (ARTS)odot2020arts.com/wp-content/uploads/sites/15/2020/08/... · 2020. 8. 5. · ODOT ARTS PROJECT SELECTION. 9. Systemic approach uses . low-cost

THANK YOU