SLIDE SHOW 3 of 3:Pictorial chronology documenting the permeable paver parking lot at Odell Brewing Company. Part 3 of 3 covers the finished parking lot, first snow, special thanks, and credits.TRANSCRIPT
FINISHED PARKING LOT
multi-colored Autumn Blend creates a beautiful hardscape
FINISHED PARKING LOT
pavers add interest, aesthetic, and mitigate stormwater
FINISHED PARKING LOT
heat island effect is reduced, while creating an attractive parking lot
FINISHED PARKING LOT
pavers help compliment and complete the finished landscape
FINISHED PARKING LOT
storm drain basin lid, flush with pavers
FINISHED PARKING LOT
parking island with curb cuts and dry wells
FINISHED PARKING LOT
parking island serves as emergency ‘PLD’
FINISHED PARKING LOT
‘water bucket test’ shows infiltration of finished product
FINISHED PARKING LOT
parking stalls with pavement markings
FIRST SNOW
October snow storm
FIRST SNOW
traditional asphalt lot side-by-side permeable pavers
FIRST SNOW
snowmelt on asphalt must runoff; whereas it can infiltrate on paver lot
FIRST SNOW
snowmelt drains through paver joints and open aggregate
SPECIAL THANKS
Contributing Photographers:
Herman Feissner – Feissner Consulting
Basil Hamdan – City of Fort Collins
Clair Knapp – Delta Construction
Dave Richer – Earth Engineering Consultants
Andy Reese – Northern Engineering
Nick Haws – Northern Engineering
SPECIAL THANKS
Project Team:
General Contractor
Architect
Landscape Architect & Planner
Civil Engineer
Geotechnical Engineer
Paver Installer
Aqua-Bric® Supplier
SPECIAL THANKS
Permeable Paver Partners:
Basil Hamdan– Stormwater Quality Engineer –
Michelle Finchum– Education Specialist –
Bob Smith– Water Planning & Development Manager –
Brendan McGivney– Head of Production –
Doug Odell– Founder / Owner –
Wynne Odell– CEO / President / Owner–
Corkie Odell– Owner –